Professional Documents
Culture Documents
A-518-External Ramp Detail
A-518-External Ramp Detail
A-518-External Ramp Detail
EXHAUST
SHAFT
LADIES
ENTRANCE
+ 0.75 m
SWL
UP
SWL
+ 0.80 m
07
1200
4- DRAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS
08 SHOULD BE FOLLOWED AND VERIFIED WITH THE DETAILS.
2 5- ANY DISCREPANCIES FOUND IN DRAWINGS ARE TO BE
REPORTED TO THE ENGINEER.
900
A-518 DN
6- CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS TO THE
CONSULTANT BEFORE COMMENCING ANY WORK ON SITE.
1200
3145
N
8.33%
0.75 m
PL
09
W
O N 3150 M
E
QIBLA
"
+ 1.35 m
06
FFL
4 8'
S
8°
3950
25
10
+ 1.000 m POLYTHENE SHEET COMPACTED SOIL 100 mm THICK PCC 150 mm THICK RCC SLAB
SSL 1000 GAUGE
3 RAMP SECTION
1 MOSQUE GROUND FLOOR RAMP PLAN (LADIES) A-518 SCALE 1 : 25
A-518 SCALE 1 : 100
LEGEND OF FINISHES
5
A-518
200
40 STAINLESS
HANDRAIL RETURNED TO WALL STAINLESS STEEL HANDRAIL STEEL
AT EACH END. 20 mm GRANITE FINISH 0 07/07/2022 MARS Issued for Construction
No. Date Issued by Revisions
60
01
PURPOSE OF ISSUE
80
FILLET WELD
DESIGN CONSULTANTS:
01 01
archcorp
architectural engineering
RAMP SLOPE 8.33% dubai : p.o. box : 95285. dubai, uae. t : +971 4 2955877 f : +971 4 2955811
1200
sharjah : p.o. box : 65100. sharjah, uae. t : +971 6 5289142, f : +971 6 5289156
1200
1600
6 mm THICK PLATE abu dhabi : p.o. box : 114840. abu dhabi, uae. t : +971 2 6775254, f : +971 2 6775276
3 e : Info@archcorp.biz www.archcorp.biz
01
ENGINEERING OFFICE
PROJECT TITLE:
SH MARS SH SH
Project No. Date Scale @ A1 Status
ISSUED FOR
2739 09/02/2022 As indicated
CONSTRUCTION
Drawing No. Rev
2739 - A-518 0