GROUND FLOOR
Sl.No. Description Unit Quantity Rate Amount
1 Excavation of foundation in all kinds of soil NOxLxBxH
within 1.50m. depth, dressing, levelling the bed
and sides and depositing the excavated earth
clear from working area within 50 m.
lead as directed.
Ground Floor Cum 7x1.584= 370.91 4100.59
11.08
2 Filling foundation and plinth with coarse river
sand, well watered and rammed with cost of
conveyance royality taxes labour T&P required.
i) RCC Lintel
Ground Floor Cum 1.5 4400.00 6600