Professional Documents
Culture Documents
Repport D'accéder Au Calcul Statique de L'escalier
Repport D'accéder Au Calcul Statique de L'escalier
Rapport N0:002/2022
11 BP 565 Ouagadougou 11
SCOPE OF WORK
ERECTION OF THE ACCESS TOWER USING CUPLOCK SYSTEM SCAFFOLDING FOR BC-3 SLIPFORM WORK
SGS Burkina SA Zone Industrielle de Kossodo 11 B.P. 565 Ouagadougou 11t +226 25 41 21 18f +226 25 41 21 19 www.sgs.com
Member of the SGS Group (SGS SA)
Job Title : BC-3 Access Staircase Tower
Name Of Client : Cimasso
Name Of Project : Cimasso Line 02
Contractor : Ayoki Fabricon Private Limited Date : 02.04.2022
Length – 2.50 m
3.0 m Cup lock Vertical pipe
Width – 1.25m
Width – 2.50 m 3.5m length 40 NB MS
tie with Clamp
BC-3 Leg -1
Insert Plate
150x150x10 mm thk
Total staircase Grid size is 2.5 mx 2.5 m in position as mentioned above sketch. For ground stability purpose, 400
mm thk PCC concrete will be carryout all around the vertical cup lock.
150mmx150mmx10 mm thk Insert Plate will be fixed in BC3 Leg 3 m interval for Bracing support purpose.
3.6 m Length MS tube pipe tie-up with Swivel clamp. (See Pic- 01) For more clarification.
Every 3.0 m interval one bracing support will be carryout.
SGS Burkina SA Zone Industrielle de Kossodo 11 B.P. 565 Ouagadougou 11t +226 25 41 21 18f +226 25 41 21 19 www.sgs.com
Member of the SGS Group (SGS SA)
Job Title : BC-3 Access Staircase Tower
Name Of Client : Cimasso
Name Of Project : Cimasso Line 02
Contractor : Ayoki Fabricon Private Limited Date : 02.04.2022
SGS Burkina SA Zone Industrielle de Kossodo 11 B.P. 565 Ouagadougou 11t +226 25 41 21 18f +226 25 41 21 19 www.sgs.com
Member of the SGS Group (SGS SA)
Job Title : BC-3 Access Staircase Tower
Name Of Client : Cimasso
Name Of Project : Cimasso Line 02
Contractor : Ayoki Fabricon Private Limited Date : 02.04.2022
1. Design Parameter
Radius of Gyration = 16 mm
2. LOAD COMBINATIONS.
Gravity Loads
DL + 4 (LL) < Failure (as per SSH) Used to check flexural members.
(Scaffold plank, bearers, transom, runners, posts (standards) etc.).
P (DL + LL) < Pf/4; Pf = Ag x Fa
(For vertical standards or posts).
DL+ LL (gravity loads) to check capacity of couplers & fittings obtain a safety factor of four and to check the deflection in
scaffold boards, Transom/Bearer a Runners)
3. Wind Loads
DL + LL + WL for vertical posts, braces (compression members).
VC = 51.15 KN
SGS Burkina SA Zone Industrielle de Kossodo 11 B.P. 565 Ouagadougou 11t +226 25 41 21 18f +226 25 41 21 19 www.sgs.com
Member of the SGS Group (SGS SA)
Job Title : BC-3 Access Staircase Tower
Name Of Client : Cimasso
Name Of Project : Cimasso Line 02
Contractor : Ayoki Fabricon Private Limited Date : 02.04.2022
4.2 Load carry capacity of MAO ‘Cup lock standard per vertical leg.
SGS Burkina SA Zone Industrielle de Kossodo 11 B.P. 565 Ouagadougou 11t +226 25 41 21 18f +226 25 41 21 19 www.sgs.com
Member of the SGS Group (SGS SA)
Job Title : BC-3 Access Staircase Tower
Name Of Client : Cimasso
Name Of Project : Cimasso Line 02
Contractor : Ayoki Fabricon Private Limited Date : 02.04.2022
SGS Burkina SA Zone Industrielle de Kossodo 11 B.P. 565 Ouagadougou 11t +226 25 41 21 18f +226 25 41 21 19 www.sgs.com
Member of the SGS Group (SGS SA)
Job Title : BC-3 Access Staircase Tower
Name Of Client : Cimasso
Name Of Project : Cimasso Line 02
Contractor : Ayoki Fabricon Private Limited Date : 02.04.2022
SGS Burkina SA Zone Industrielle de Kossodo 11 B.P. 565 Ouagadougou 11t +226 25 41 21 18f +226 25 41 21 19 www.sgs.com
Member of the SGS Group (SGS SA)
Job Title : BC-3 Access Staircase Tower
Name Of Client : Cimasso
Name Of Project : Cimasso Line 02
Contractor : Ayoki Fabricon Private Limited Date : 02.04.2022
8. Load Carry Capacity of MAO ‘Cup lock’ Standard per vertical Leg.
Total Dead Load (Vertical pipe+ Ledger +Platform + Stair riser) = 33.60 KN
Total Live load = 20.58 KN
Total Load = DL + LL = 33.60+20.58 = 54.18 KN
.
Pf = 53.4 KNs / Per Pipe (See Table no: 2)
Total 9 leg designed = 9 x 53.4 KN = 480.6 KN
SGS Burkina SA Zone Industrielle de Kossodo 11 B.P. 565 Ouagadougou 11t +226 25 41 21 18f +226 25 41 21 19 www.sgs.com
Member of the SGS Group (SGS SA)
Job Title : BC-3 Access Staircase Tower
Name Of Client : Cimasso
Name Of Project : Cimasso Line 02
Contractor : Ayoki Fabricon Private Limited Date : 02.04.2022
Pf = F a x A = 480.6 KN.
SGS Burkina SA Zone Industrielle de Kossodo 11 B.P. 565 Ouagadougou 11t +226 25 41 21 18f +226 25 41 21 19 www.sgs.com
Member of the SGS Group (SGS SA)
Job Title : BC-3 Access Staircase Tower
Name Of Client : Cimasso
Name Of Project : Cimasso Line 02
Contractor : Ayoki Fabricon Private Limited Date : 02.04.2022
Therefore DL+LL+WL = 50.1 + 41.0 + 125.0 = 216.1 KN for 2 side anchoring = 216.1/2= 106.55 KN
Total Height 24 m and Support will be carryout every 3.0 m interval so total supporting = 8 no’s
Total wind load acting in each support= 106.55/8= 13.318 KN (Allowable shear force VC= 51.1 KN, (Ref no 04)
The Horizontal Bracing is connected to the Vertical Standard using Swivel Coupler As per the recommendation of SSH,
for wind load in bracing tube, the SWL of couplers (Ref point 5).
SWL in Slip available at the connection – 6.5 KN
The horizontal bracing connected to the Existing concrete structure (BC3) every 3.0 m interval (Shown in Layout)
**Max Load in brace due to wind load = 2.040KN < 6.5 KN SWL at Connection Safe.
Table 01
SGS Burkina SA Zone Industrielle de Kossodo 11 B.P. 565 Ouagadougou 11t +226 25 41 21 18f +226 25 41 21 19 www.sgs.com
Member of the SGS Group (SGS SA)
Job Title : BC-3 Access Staircase Tower
Name Of Client : Cimasso
Name Of Project : Cimasso Line 02
Contractor : Ayoki Fabricon Private Limited Date : 02.04.2022
Table 02
SGS Burkina SA Zone Industrielle de Kossodo 11 B.P. 565 Ouagadougou 11t +226 25 41 21 18f +226 25 41 21 19 www.sgs.com
Member of the SGS Group (SGS SA)
Job Title : BC-3 Access Staircase Tower
Name Of Client : Cimasso
Name Of Project : Cimasso Line 02
Contractor : Ayoki Fabricon Private Limited Date : 02.04.2022
SGS Burkina SA Zone Industrielle de Kossodo 11 B.P. 565 Ouagadougou 11t +226 25 41 21 18f +226 25 41 21 19 www.sgs.com
Member of the SGS Group (SGS SA)