Tp3 Higiene Industrial. Sanchez Abril

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 19

Tecnicatura universitaria en higiene y seguridad industrial

Materia: Higiene Industrial

Profesor: Alfieri Victor Hugo

Alumna: Sanchez Abril Estefania

DNI: 42.132.965

Sede: UAM 4 Metan

Trabajo Practico n°3


1. Determinar Lwa.

M1=103,100,99 r=2.5 mts


M2=105,100,102 αpa=0.25
M3=102 αte=0.3
Rf=90 αpi=0.15
L —— 10 /o (10% + 10 + 10%)
pt ' 106 dBA

L preal —— 10Iop 10 lo — 10 10
106 90
Lpreal —— l0iop 1010 — 10

Lpreal —— 105,88 dB

At —— Supparedes s = 2rr2,5 2 + Sup techo

Sup p, lat. —— 3x6x2 = 36m z S —— 39,27m


2

-F Sup piso
Sup p, front. —— 3xl0x2 = 60m'
Sup p. t. —— 36 -F 60 = 96m2
Sup p. t. —— 96m 2
z 0,25

Sup p. t. —— 24

Sup piso. —— 10x6 = 60m


2
Sup piso —— 60m2z0,3
Sup piso —— 18

Sup techo = 10x6 = 60m2


Sup techo. = 60m'x0,15
Sup techo —— 9

A —— 24 -I- 18 + 9 = 51 Sabines

LwA —— L preal + 10IopS — 10 log log 1 -1— 4s A—)


39,27
LwA —— 105,88 —F 10fop39,27 — 10 log top 1 -i— 4x
51
2.
M1=M2=100 r=2 mts
α=0.25 Rf=93
LWA=?
3.
LWA=? r=2 mts
M1=M2=98 αpafyf=0.2
M3=95,95,98,101 αte=0.1
Rf=80 αpa lat=0.15
αpi=0.25
Lpmt
L preal —— l0fop 10 lo — 10 10

1D3 BD
Lpreal = l0iop 10 io — 10

Lpreal —— 102,98 dB

S —— 2ur'

S —- 25,13m 2

t = Sup paredes -1- Sup piso -1- Sup techa A


lat —— 7 5 2 = 70 2
Sup p. x x m
2 Sup p, front. = 9z5 = 45 2 S P p- <t = 70x 0 1 = 1 0 5

Sup p, front. —— irxr’

,61m p, frOllt. —— ux4 ,5 2


= 63 Sup 2

= 217frottt. = (45 + 63,61)z2 totnf Slt p ,22 m°


Sup total front. —— 217,22x0,2 = 43,44 m°

Sup p. t. = 10,5 + 43,44 = 53,94m°

Sup piso. —— 9z7 = 63m'


Sup piso. —— 63x0,25 = 15,75m'

Techo —— vxrzh
Techo —— nx4,5z7 = 98,96m 2
Techo —— 98,96z0,1 = 9,89m°
Sup total —— 53,94 + 15,75 —F 9,89 = 79,58 m'
A —— 79,58
4.
LWA=?
M1=M2=98,99,100,101
r=2 mts αte=0.3
Rf=85 αpa=0.2
αpi=0.2
i = Sup paredes -I- Sup piSO + SVQ A techo
Sup p. lat —— 8x4x2 = 64m2

Sup p, faf = 64x0,2 = 12,8m2

Sup p, /ront1. = 6x4 = 24m 2


b
Sup p front2 = "

2
Sup p, front2. —— 6 3 g
2 "

Sup total front. —— + 9)x2 = 66m 2


Sup total front. —— 66x0,2 = 13,2 m2

Sup p. t. —— 12,8 -I- 13,2 = 26m2

Sup piso, —— 6x8 = 48m°


Sup piso. —— 48x0,2 = 9,6m2

2
Techo hipot —— -I- b 2

Techo hipot —- 3 + 32
Techo hi pot —— 4,24m Z

Sup. techo —— bxñ + {UL


)xl
Sup techo —— 6z3 -F (4,24 + 4,24 + 6)z8
Sup techo = 133,84a*
Techo —— 133,84z0,3 = 40,15m‘

Sup total —— 26 + 9,6 + 40,15 = 75,75 m2


A —— 75,75

LwA —— L preal + l0fopS — 10 lo g log 1 + 4x A)


25,13
LwA —— 102,93 -F l0lop2 5,13 — 10 log log 1 -F 4z
75,75

LwA —— 113,26 dBA


5.
LWA=?
M1=M2=101 M3=M4=100
M5=95,98,99,100,103
r=1.5 mts αte=0.1
Rf=95 αpa=0.2
αpi=0.1
x2
6.
LWA=?
M1=M2+2 M3=M4-4 r=2
mts αte=0.15 Rf=80
αpa=0.25
M2= 105 dB αpi=0.2

M1=M2+2
M1=105+2
M1=107 dB

M3=M4-4=M2
M3=M4-4=105
M3 y M4 =105+4=109 dB
7.
LWA=110
M1=M2=M3=M4
r=2 mts αte=0.2
Rf=83 αpa=0.3
αpi=0.2
Sup p, front. a ——
2

Sup p, fron, a. —— ( x5) z2 = 50m2

Sup p, front. bI = 8z5 = 40m 2

Sup p, front. b2 bxh


2
5 2
Sup p, front. b2.—— = 5m 2
2

Sup p, front. total —— Front a + Front b1 + Front b2


Sup p, front. —— (50 + 40 -F 5)x2 = 190m°
Sup p, front. total —— 190x0,3 = 57tn2

Sup pared totnf. = 42 + 57 = 99m2

Sup piso. —— 10x10 = l00ri'


Sup piso total —— 100x0,2 = 20m'

Techo hipot1 = + b2

T'erho hipotl = 62 + 42

Techo hipot1 = 7,2m2


Sup. techo l = bxli
Sup fiecho1 = 7,2x10 = 72tn°

Techo hipot2 —— -F b2

Techo fiipot2 = 2 2 + 22
Techo hipot2 = 3,2m2

5up. techo2 -— bxh


Sup tecfio2 = (3,2z10)x2 = 64m2
Sup techo —— 72 + 64 = 136m2
Sup Techo totnf = 136x0,2 = 27,2tn 2

Sup totni = 99 -I- 20 -I- 27,2 = 146,2 m2


A —— 146,2 Sabines
8.
LWA=108
M1=103 M2=M3
r=2.5 mts α=0.23
Rf=87
9.
LWA=115
M1=103,102,101 M2=105
M3=100,99,98 r=2 mts
Rf=80 A=?
Sup p. centro lateral —— 72 + 96 = 168m2

Sup p, front. 1 = (4z6)z2 = 48m2

Sup p, /ro nt. 2n = (4z6)z2 - 48m2

Sup p, front. 2b —— ( Bert) z2


2

4z2
Sup p, front. 2b —— 2 = 88m Z
Sup p, front. totnl 2‹i, b = 48 -F 88 = 136m°

Sup p, front. centro —— axr 2

Sup p, front. 1 = (nx4°)x2 = 100,5m2


Sup p, front. 2 = (8z8)z2 = 128tn2

Sup totnf front. 1,2 = (100,5 + 128) = 228,5 m2

Sup paredes. t. = (168 -F 48 -F 136 -I- 228,5) = 580,5m°

Sup piso. laterales —— 6x4 = 24a'


Sup piso. rentro = 8x6 = 48m2

Sup piso. total —- (24 + 48) = 72m2

Techo —— zxrxh
7'echo1 = xx4x6 = 75,4m2

2
7 eCho hipOt2 = +b

Techo hipot2 = a 2 2 —F 42
Techo hipot2 = 4,5m2
Techo 2 = 4,5x6 = 27m°
Techo 3 = 6z4 = 24in2

Techo total —— (75,4 —F 27 + 24) = 126,4ttt 2


10.
LWA=?
M1=102 M2=105
M3=100 αte=0.15
Rf=90 αpa=0.2
r=2 mts αpi=0.25
Sup p, front. 2n = (4z6)z2 = 48m2
Bxh
Sup p, front. 2b )z2
——
2

4x2
Sup p, front. 2b x2 —- 88m°
—— 2
Sup p, front. total 2a, b —— 48 + 88 = 136m Z

Sup p, front. centro —— uzr 2


Sup p, front. 1 = (xx4*)x2 = 100,5m*
Sup p,front. 2 = (8x8)x2 - 128m2

Sup total front. 1,2 = (100,5 + 128) = 228,5 m2

Sup paredes. t. —— (168 + 48 + 136 —F 228,5)x0,2 = 116,1m2

Sup piso. laterales —— 6z4 = 24m2

Slip piso. centro —— 8x6 = 48m 2

Sup piso. total —- (24 + 48)x0,25 = 18m2

Techo -— nxrxh
techo1 = az4z6 = 75,4m2

Techo hi pot2 = 2 + b2

Techo hipot2 = a 2 2 —F 4 2

techo /iipot2 = 4,5m 2

TeCho 2 - 4,5x6 = 27m 2

Techo 3 = 6x4 = 24m2

Techo total —— (75,4 + 27 + 24)x0,15 = 18,96m 2

Sup total —— 116,1 -F 18 -F 18,96 = 153


A —— 153 Sabines
LwA —— L preal + l0fopS — 10 log log (1 + 4s A)

25,13
LwA —— 107,S + 10fop25,13 — 10 top log (1 -1- 4s 153
LwA —— 118,95 dBA

You might also like