The attached documents have completed the "01-0000100567-IN-Construction - IFR" workflow with the following results :
01-140000-0000100567-
NEOM/AECOM_Review A Felimban Work May Proceed
AAC-CIV-MAT-000064
https://ksa1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1349416183&USERID=1342236753 1/1
2/21/2021 Aconex
01 NEOM Bay
NEOM Bay
NEOM
Saudi Arabia
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
The attached documents have completed the "01-0000100567-PM" workflow with the following results :
https://ksa1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1349134235&USERID=1342236753 1/1
3/5/22, 12:16 PM Aconex
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
To
(2) Mr 1100001334 DCC - Al Ayuni Investment & Contracting
Cc
(2) NEOM ETSD Document Control - NEOM - Engineering & Technical Services Dept
MESSAGE
The attached documents have completed the "10-662155-1100001334-AAC-CPM-PQD-000020 WO 007- Prequalification Documents ‘’
Khaleej Dubai Trading and Contracting Est.’’ as Guard Rail Installation subcontractor-RD-15E (C) (41-45KM)" workflow with the following
results :
10-662155-1100001334-
EPM DCC B Document Management A - Work May Proceed
AAC-CPM-CRS-000020
10-662155-1100001334-
EPM DCC B Document Management A - Work May Proceed
AAC-CPM-PQD-000020
https://ksa1.aconex.com/Logon 1/1
1/26/22, 10:44 AM https://ksa1.aconex.com/rsrc/20220107.0403/en_AU_DOC/mail/view/index.html#1342178863/1352007063
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
To
(2) Mr 1100001334 DCC - Al Ayuni Investment & Contracting
Cc
(2) NEOM ETSD Document Control - NEOM - Engineering & Technical Services Dept
MESSAGE
The attached documents have completed the "AlAyuni DCC to EPM DCC-1100001334_WO 05 Pre Qualification Documents for Khaleej
Dubai Trading and Cont. Est., as Guard Rail Installation Subcontractors RD 15W (0-10KM)- Road 15W_R02" workflow with the following
results :
10-662151-1100001334-
EPM DCC B Document Management A - Work May Proceed
AAC-CPM-CRS-000037
10-662151-1100001334-
EPM DCC B Document Management A - Work May Proceed
AAC-CPM-PQD-000008
https://ksa1.aconex.com/rsrc/20220107.0403/en_AU_DOC/mail/view/index.html#/1342178863/1352007063 1/1
2/28/22, 9:38 AM https://ksa1.aconex.com/rsrc/20220221.1004/en_AU_DOC/mail/view/index.html#1342178356/1352454162
To
(11) SAJ.DC TRSDC - Shibh Al Jazira Contracting Company (+10 more...)
Cc
(8) Mr Raymond Rice - The Red Sea Development Company (+7 more...)
Status N/A
DOCUMENT ATTACHMENTS
(1)
(0 selected)
R12-T06B05- Accepted
R12 T06B05 SAJCO Prequalification for Khaleej Dubai Trading &
SHA-PRQ-CI- 00 with
Contracting Est For Guard Rail & Cable/Steel Barriers.
0039 Comments
ATTRIBUTES
MESSAGE
The attached documents have completed the "R12 T06B05 SAJCO Prequalification for Khaleej Dubai Trading & Contracting Est For
Guard Rail & Cable/Steel Barriers." workflow with the following results :
https://ksa1.aconex.com/rsrc/20220221.1004/en_AU_DOC/mail/view/index.html#/1342178356/1352454162 1/2
KINGDOM OF SAUDI ARABIA ~mU ~j-A.J1 .a..:..1ocJ1
Royal Commission for Jubail & Yanbu ~ 4 ' ..'.' "!' 11 ;, } ,.;;..1 o-11 ;~._ •• 11
Royal Commission in Jubail ~ ;; .! ,.;... I • J1 .d....4-+J1
( 246/7) {Vj yt '\)
Gentlemen:
In response to your request for the approval of Khaleej Dubai Trading & Contracting
Est. as your subcontractor for fencing works , guard rail, cable barrier and chain link
fence (reference 1), be advised that your request has been approved by the Royal
Commission.
This approval is given with the specific understanding that the subcontractor will
adhere to the terms and conditions of the Royal Commission Contract with China
Harbour Engineering Arabia Co. Ltd.
OUSSAMAA. AYACHE
Resident Engineer
Gentlemen:
In response to your above request for the approval of Khaleej Dubai Trading & Contracting
Est. as your Sub-contractor for Fence works , please be advised that your request has been
approved by the Royal Commission.
This approval is given with the specific understanding that the Subcontractor will adhere to
all terms and conditions of the prime contractor and, in particular, that the Subcontractor will
house its personnel in Royal Commission accommodations as specified in the contract.
This approval is dependent upon the Contractor providing verification signed by both the
Contractor and the Subcontractor that all Royal Comm ission Safety requirements have
been conveyed to the Subcontractor and that the Subcontractor will comply with them , prior
to any work performed at site. Please provide this verification letter with two cop ies of the
signed Subcontract Agreement as required by Special Condition Article SC-13 prior to the
start of any work.
This is approval for your record and reference.
Very truly you rs,
HIROFUMI FUKUI
Resident Engineer
Perimitrax Cable
Perimitrax Cable