Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

- Al Madar must comply the comments in CDF No. 00040 Rev.

0 and MIR for Geocellular Tank which


includes the submittals of Structural Calculation, Method Statement, Shop Drawing and Material Testing
from 3rd Part Lab.
- Method Statement for GRP waterproofing of Water Tanks not yet submitted for approval.
- MIR for Structural steel of Canopy Works to be submitted for approval.

You might also like