National Petroleum Services Company (K.S.

C)

RELIABLE, VALUE ADDED SOLUTIONS

Well: MG-396

Rig: SP-271
Cementing Program for 9 5/8" Casing

JOB NO: CM019-104-001-00005

May 2, 2019

Prepared for: Prepared By:


Sneh Husain Nasir
(Drilling Engineer - KOC) (Field l Engineer-Cementing)
NAPESCO
 
Index

Objective & Well Data 1.0

Procedure & Recommendations 2.0

KOC Program 3.0

Cement Lab Test Report & Charts 4.0

Preflush & Spacer Report 5.0

CEMPRO Report 6.0

CENTRA Report 7.0


 

1.0

Objective & Well Data


 

1. Objective:

The objective of this job is to cement the 9-5/8” casing with 211 bbls of Lead (12.5 ppg) and 122 bbls of
Tail (15.8 ppg). The Lead slurry will be till surface and the Tail slurry will be 500 ft above previous
casing shoe.

2. Well Data:
9-5/8’’Csg Casing: 5,050 ft MD / 4,755 ft TVD.

BHST: 141°F

BHCT: 110°F

Hole Size: 12.25’’ (50 % Xs for Open Hole)

Previous Casing Depth: 4,031 ft @ 13-3/8’’Csg

TOP of the Cement (LEAD): 0 ft

TOP of the Cement (TAIL): 6,690 ft

Mud Weight: 11.2 ppg (WBM)

Spacer Weight: 0 ppg

Pre-Flush Volume: 40 bbl / 6 bpm

Spacer-Volume: 50 bbl / 6 bpm

Lead Slurry Volume/Rate: 211 bbl / 5 bpm (12.5 ppg)

Tail Slurry Volume/Rate: 122 bbl / 4 bpm (15.8 ppg)

Displacement Volume/Rate: +/- 376.80 bbl

3. Technical Data:

ECD @ 9-5/8”casing: 13.88 ppg

ECD @ Prev. Casing Shoe: 13.30 ppg

 
 

2.0

Procedure & Recommendations


TENTATIVE PROCEDURE FOR 9-5/8”CASING CEMENT JOB
SP-271
MG-396

1. Hold a Pre-Job Toolbox and safety meeting.

2. Pressure test surface lines to 3,000psi.

3. Circulate for 2 cycles of Mud. Make sure YP < 10 pphf..

4. Pump 40 bbl of Pre-flush 2 (8.6 ppg) @6 bpm

5. Pump 50 bbl of Spacer (12.0 ppg) @ 6bpm.

6. Drop Bottom Plug.

7. Fly-Mix & Pump 211 bbl of Lead Cement Slurry 12.5 ppg @ 5 bpm.

8. Pump 122 bbl of Tail Cement Slurry 15.8 ppg @ 4 bpm.

9. Drop Top Plug and flush Cement lines by 10 bbl of water as displacement into the casing.

10. Displace the Cement using Rig Pump & Lines with +/-366.8 bbl of Displacement fluid.

 300 bbl @ 10 bpm


 54 bbl @ 8 bpm
 12.8 bbl @ 4 bpm
Recalculate the volume on the Rig (Monitor the losses, the rates can be reduced if the losses
are there).

11. If the Plug Bumps then Pressure up to 500 psi above differential.
(As Per KOC Policy)

12. If the Plug doesn’t bump, pump the calculated displacement volume plus 3 bbl.

13. If floats hold and no back flow observed, remove cement head and WOC.

14. If the float doesn’t hold (or) Back flow observed, then close the valves on the cement head and hold
pressure until cement set.

15. Conduct Top Job with 15.8 Class G Neat Cement. Each Top Job volumes not to exceed 25 BBLS. If
Well not Static Repeat Top Jobs in consultation with the base.
16. WOC for 24Hrs.

17. Keep cement sample in water bath at Downhole temperature and check when it sets

RECOMMENDATION
 While Pumping or during displacement keep the pipe reciprocate or in rotation. It might help to clean the
mud properly.

 100 bbl of 15.8ppg equivalent cement will be carried to the location for Top Job

 Mud conditioning is recommend before doing the cement job (mud YP =10 or less).

 Do not displace more than 1/2 shoe track.

 Actual displacement volume must be calc ulated and agreed upon by the company man and the
NAPESCO supervisor prior to the job and based on actual well data and casing tally.

 This program is tentative and subject to change as per actual well scenarios on location.

 If there is a top Job, we recommend using class G cement.

 70% standoff is recommended and follows the centralizer program attached.

 Follow the Mixing order in the Lab Report.

 Collect mix fluid samples, cement samples one set of sample to company man and one set of sample
for NAPESCO Lab.

 Do not mix the cement Slurry till company man confirms.

 Check the salinity of the water using chloride strips.

 Frac Density of 16 ppg & 10 ppg of Pore Density are considered in simulator at TD.

 Check mud pump efficiency for discharge.

 Quality of cement bond, being critical & crucial, should be taken after 60 -72 Hrs . This will remove any
ambiguity or doubt on isolation of water Zone below and between the zones.

 Casing to be reciprocated while cementation and circulation if possible.


Top Job (In case Level Drops):

 15.8# Class G: The first batch should be 40 bbls wi thout CaCl2. The Second batch, if
required, should be 25 bbls having 1-2% CaCl2. In case of losses, wait for 2 hrs. Before the
2nd Top Job. Subsequent Top Jobs may be of 25 - 40 bbls batch size depending on the
losses. In case of minor losse s, check static level with water before carrying out next Top
Job.
 After 2nd Top Job and in case of repetition, Loosen the BOP studs keeping 4 diagonal studs
intact.
 Observe the well for 1/2 hour after the 2nd t op job and set casing slips if found well to be
static.
 Continue top job @ 2 hr . duration with 40 Bbls batch size through one side of well head
valve keeping the other side open till cement to surface & level static.
 If there is gas inflow contact D.E. Prepar e 100 Bbls of 100 PPB heavy doze LCM pill. The
same may be pumped followed by 50 Bbls of 15.8 PPG Class-G cement treated with 1 -
2% CaCl2.
 If gas influx continues contact D.E. again for next course of action.
 

3.0

KOC Program
CEMENT PROGRAM Option-I Date: 30-Apr-19

Well: MG-0396 Objective: 9-5/8" Casing CMT


Rig: SP-271

Data: Cmt Co: Napesco Avg Hole Size from Caliper Log
Plan TOC Density L Btm of Top of Caliper Vol Caliper Arms
@ (feet) (ppg) Yield (ft3/sx) E Interval Interval (ft3) 6/4
Lead: 0 12.5 A Bore hole Vol. 0 0 0 6
Tail: 3531 15.8 D Cement.Vol. 0 0 0 6
Casing Size: 9 5/8 47 & 43.5 PPF
Set @: 5050 feet MD OPEN HOLE VOLUMES IN BBLS
Set @: + / - 4755 feet TVD GAUGE CALIPER %Washout HOLE SIZE
Casing ID 40 p 8.835 inches 0.00 0.00 0.00 12.25
Casinf ID 43.5 8.755
9.625 "Casing

Length Shoe- Collar 2 jts


Hole Size: 12 1/4 inches
BHST: degrees F Last Csg = 13.375 in. @ 4031 ft
Last Csg 68ppf OD: 13 3/8 inches
ID: 12.415 inches T
Set @: 4031 feet A
I
Last Csg 54 ppf OD: 0 inches L
Lead Top @ 0 ft
ID: 0 feet Tail Top @ 3531 ft
Set @: 0 inches
DP Stab-in Job 0 1 = Yes Estimated Final
0 = No Displace. Pressure:
fluid type Weight 523 psi
Displace With: MUD 11.5 ppg Csg Run = 9.625 in.
@ 5050 ft

CASING DETAILS
Tensile
with SF
MD OD WEIGHT ID GRADE Collapse Burst 1.5 CONN Makeup
(feet) (inches) (lb / ft) (inches) (psi) (psi) (Klbs) Torque-ft-lb
5050 9.625 40 8.835 L-80 3090 5750 670 BTC Base of

CEMENTING VOLUMES Capacity Capacity Capacity % X-S Stage Tail Cmt


Length Gage Gage over Volume Round to
ft (ft3/ft) (ft3) (bbls) Caliper (bbls) 122 bbls
Tail Cmt x Cased Hole 500 0.3354 167.69 29.87 0% 29.87
Tail Cmt x Open Hole 1019 0.3132 319.14 56.8 50% 85.26
Tail Cmt in Shoe Track 80 0.4257 34.06 6.1 0% 6.07 Lead Cmt
Lead Cmt x Open Hole 0 0.3132 0 0.0 0% 0.00 Round to
Lead Cmt - Between Csgs 3531 0.3354 1184 210.9 0% 210.91 211 bbls
Displace. Vol to FC 4970 0.4181 2078 370.0 0% 370.04 Displ Vol
370.04

Fluid in Order pumped


Fluid Pump Fluid
Pumped Rate Volume Stage Time Elapsed Time Comments
(bbl / min) (bbls) (minutes) (minutes) (hrs:min)
Pre-Flush-I 6 40 7 7 0:06
Pre Flush-II 6 50 8 15 0:15 3% Kcl Water
Spacer 6 50 8 23 0:23 11.5 PPG SPACER WITH SURFACTANT
Lead Cmt 7 211 30 53 0:53 12.5 PPG LEAD SLURRY UP TO SURFACE
Tail Cmt 5 122 24 78 1:17 15.8 PPG TAIL SLURRY 500' ABOVE 13 3/8" SHOE
Displace 10 370.0 37 115 1:54 Displ. Vol. To be re-calculated at RIG.

Start Job:
TEST RIG PUMP EFFICIENCY PRIOR TO CMT. JOB
Pressure test lines to 3000 psi
Drop Bottom Plug; Pump Preflush, Pump Spacer
Lead Slurry
Tail Slurry
Drop Top plug, displace w/ Mud.
IF NO CEMENT TO SURFACE AND THE WELL NOT STATIC
CONDUCT TOP JOB WITH CLASS 'G' CEMENT
REMARKS: LEAD SLURRY VOL IS DESIGNED UP TO SURFACE
TAIL SLURRY VOL IS DESIGNED UP TO 500-FT ABOVE 13 3/8" SHOE.
 

4.0

Cement Lab Test Report & Charts


NATIONAL PETROLEUM SERVICES CO. (K.S.C.)
P.O. Box 9801 . Ahmadi . Kuwait . Tel.: 2251000 . Fax: 22251010

LABORATORY TEST REPORT


Lab Test No.: NPSC-19- 550 & 551A Date: 1-May-19
0
Job Type : 9-5/8" CSG Well No. : MG-396 BHST : 141 F
0
Hole Size (in) : 12.25" Rig : SP-271 BHCT : 110 F
Depth (ft) : MD 5050 TVD 5050 Field : MAGWA Temp.Grdnt: 1.1 oF/100ft Lab - 02
Type of Slurry LEAD SLURRY TAIL SLURRY
Type of Cement UNION (ClassG) UNION (ClassG)
Additives Concentration Mixing order Batch No Concentration Mixing order Batch No
NC20 (Defoamer) 0.01 gps (PH) 1 20181208 0.01 gps (PH) 1 20181208

NC213 (Anti Gas Migration) - - - - - 0.80 gps (PH) 2 10T5181018RW


NC30 (Dispersent) - - - - - 1.10 % (DB) 6642
NC50 (Retarder) 0.85 % (DB) CISCO-380400 0.17 % (DB) CISCO-380400
NC42 (Fluid Loss Control) - - - - 0.55 % (DB) 3 CH-1805862
NC44 (Fluid Loss Control) 0.70 % (DB) FL20181110 - - - -
NC81 (Strength Enhancer) 2.50 % (DB) 2 1219CS 6.00 % (DB) 1219CS
NC40 (Fluid Loss Control) 0.05 % (DB) 1809H064 - - - - -
NC63 (Cenospheres) 5.00 % (DB) NPE/EXP/18-19/58 - - - - -
NC64 (Extender) 1.40 % (DB) 81020032 - - - - -
Slurry Density (ppg) 12.5 15.8
Slurry Yield (cu.ft/sk) 2.097 1.283
Water Req'd. (gals/sk) 11.05 4.90
Mix Fluid Req'd. (gals/sk) 11.06 5.71
Type of Water (Salinity) Location (3595 mg/lit) Location (3595 mg/lit)
Thickening Time @ BHCT
Batch Mixing (Hrs:Mins) NR 0:30
40 Bc (Hrs:Mins) 6:50 5:21
70 BC (Hrs:Mins) 7:30 5:35
100 BC (Hrs:Mins) 7:45 5:40
0 mins 6 10 mins 20 mins 0 mins 5 mins 10 mins 20 mins
Atmos.Cons.at BHCT
(Bc) 9 8 8 8 7 8 9 9
RPM/Readings PV YP RPM/Readings PV YP
Rheology
300 200 100 6 3 (cp) (pphfs) 300 200 100 6 3 (cp) (pphfs)
at Surface 50 34 23 5 4 41 10 58 37 24 4 3 51 7
at BHCT 46 32 20 5 4 39 7 98 66 41 6 4 86 13
10 secs 10 mins 10 secs 10 mins
Gel Strength 2
(lb/100ft ) 5 14 6 24
Fluid Loss @ BHCT/1000 psi (mls) 122 46
API Free Water (%) 0.0 0.0
24-hr Comp. Strength (psi) 982 3062
Remarks : 1. All tests carried out according to API Recommended Practice for Testing Well Cements 10B-2 (2nd Edition - April 2013).
2. % = %BWOC (percent by weight of cement ; 94lbs/sk)
3. DB = dry-blend %BWOC
4. PH = pre-hydrated %BWOC
5. gps = gallons per sack of cement

Submitted to :
Drilling Engineer - KOC Signed:

Analyzed by : JOBI Jothi Ramalingam


Lab Technician - NAPESCO Laboratory Supervisor - NAPESCO
Company Man:

This report is the property of NAPESCO and is intended for private information of the above named party. This report nor any part thereof maybe published or disclosed to a third party without approval of NAPESCO.
 

5.0

Preflush & Spacer Report


Preflush and Spacer for 9 5/8'' Casing Cement Job:

Well : MG-396
Rig : SP-271
Mud : 11.2 ppg WBM

Preflush :

Volume : 40 bbls
Density : 8.6 ppg

1. Water 36 bbls @ 38 gals/bbl


2. KCl 634 lbs @ 5 %
3. Chemical Wash(SAPP) 200 lbs @ 5 lbs/bbl
4. Surfactant (CW-20) 120 gals @ 3 gal/bbl

Spacer

Volume : 50 bbls
Density : 12.0 ppg

1. Starting Water 40 bbls @ 33.4 gals/bbl


2. KCl 418 lbs @ 3%
3. Spacer Mix 750 lbs @ 15 lbs/bbl
4. Ultra Seal (E-17) 150 lbs @ 3 lbs/bbl
5. Barite 9,100 lbs @ 182 lbs/bbl
6. Surfactant ( CW-20) 100 gals @ 2 gals/bbl
Preparation of Spacer:
1. Make sure the Mixing Tank is clean and follow mixing sequence from 1 to 5.
2. Mix slowly the Spacer Mix and let it hydrate for 10 - 15 minutes.
3. Add Barite to weight up the spacer.
4. Add required amount of Surfactant before pumping the spacer.
5. Add defoamer if needed.
 

6.0

CEMPRO Report
CEMPRO

CEMPRO+ - Mud Displacement Model

Computational Results

Report generated on 5/2/2019

Date: 5/2/2019, 2:47:34 PM Rig: SP-271

Operator: KOC Job #:

Well: MG-396 Contractor: NAPESCO

Location: MAGWA Job: CASING

Country: KUWAIT By: HUSAIN

Casing: 9 5/8"

1
Well location: On land - Forward

Pore and fracture pressures (from top down)


# Description TVD (ft) Pore (ppg) Frac. (ppg)
1 13 3/8 CASING 0.0 10 16.00
2 13 3/8 CASING 1000.0 10 16.00
3 13 3/8 CASING 2000.0 10 16.00
4 13 3/8 CASING 3000.0 10 16.00
5 13 3/8 CASING 4031 10 16.00
6 OH 5000.0 10 16.00
7 OH 5050 10 16

Weak zone (ft) 4031.0 (Not selected) (Not selected)

Geothermal
Surface T. = 85 (F)
Conductivity Heat Capacity T. gradient
# Lithology TVD (ft) Density (lbm/ft3) T. (F)
(Btu/h-ft-F) (Btu/lb-F) (F/100ft)
1 Sandstone 5050 139.3 1.080 0.17 1.1 141

Temperature calculation: Geothermal


Cased hole
WT MW Length
# Description Bit (in) OD (in) ID (in) Top (ft) Shoe (ft) TOC (ft) FF
(lbm/ft) (ppg) (ft)
1 13 3/8" 16.000 13.375 68.000 12.415 0.0 4031 0.0 11.20 0.00 4031.0
CASING
Open hole
# Description ID (in) Bottom MD (ft) Excess (%) FF Top MD (ft) Length (ft)
1 OH 12.250 5050 50 0.00 4031.0 1019.0

Pipe:
Tool joint effect on hydraulics: No
Joint TJ
Length Wt TJ OD TJ ID Collapse Burst str.
# Description OD (in) ID (in) Grade length length Yield (psi)
(ft) (lbm/ft) (in) (in) str. (psi) (psi)
(ft) (in)
1 Casing, 40.000 5050.0 9.625 40.000 8.835 10.626 8.835 L80 0.0 0.000 80000 3088 5745
(lbm/ft)
Fluid properties
Conduc Heat
YP Gel
Density tivity capacity Inlet T.
# Fluid Model PV (cP) (lbf/100f n K (*) (lbf/100f
(ppg) (Btu/h- (Btu/lb- (F)
t2) t2)
ft-F) F)
1 MUD 11.20 BP 1.0 0.0 - - 0.0 0.000 0.00 -
2 PREFLUSH 8.60 BP 1.0 0.0 - - 0.0 0.000 0.00 60
3 SPACER 12.00 BP 1.0 0.0 - - 0.0 0.000 0.00 60
4 LEAD 12.50 BP 38.0 8.0 - - 0.0 0.000 0.00 60
5 TAIL 15.80 BP 108.0 16.0 - - 0.0 0.000 0.00 60
6 DISPLACEMENT 11.20 BP 30.0 25.0 - - 0.0 0.000 0.00 60

*: (lbf-s^n/100ft2)

Pumping schedule (Total volume = 799.800 (bbl), Total time = 140.200 (min))
Time with
Liquid vol. Additional Liquid Q N2 ratio Stage Time Cumul. Time
Fluid Cement
(bbl) vol. (%) (bpm) (scf/bbl) (min) (min:sec)
(min)
PREFLUSH 40.000 0.0 6.00 - 6.667 6:40 0.000
SPACER 50.000 0.0 6.00 - 8.333 15:00 0.000
LEAD 211.000 0.0 4.00 - 52.750 67:45 52.750
TAIL 122.000 0.0 4.00 - 30.500 98:15 83.250
DISPLACEMENT 10.000 0.0 5.00 - 2.000 100:15 85.250

2
Time with
Liquid vol. Additional Liquid Q N2 ratio Stage Time Cumul. Time
Fluid Cement
(bbl) vol. (%) (bpm) (scf/bbl) (min) (min:sec)
(min)
300.000 0.0 10.00 - 30.000 130:15 115.250
54.000 0.0 8.00 - 6.750 137:00 122.000
12.800 0.0 4.00 - 3.200 140:12 125.200

Pump
Surface line length = Surface line ID = 5.000 Maxi. P. rating = 10000 Maxi. pump horsepower = Pump stroke = 0.2000
100.0 (ft) (in) (psi) 400. (HP) (bbl/stk)

No choke P.
Output Summary
P. @ ECD @ ECD @
Flow rate Pump P. Pump Free fall
Variables 5050.0 (ft) 5050.0 (ft) 4031.0 (ft) Weak zone Weak zone
(bpm) (psi) HHP (HP) (ft)
(psi) (ppg) (ppg)
Maxi. value 38.94 711 129. 3444 13.88 13.30 n/a n/a 855.5
Mini. value 0.00 15 2. 2737 11.02 11.02 n/a n/a 0.0
Maxi. @ time (min) 102.680 140.201 137.000 140.201 140.201 140.201 n/a n/a 92.999
Mini. @ time (min) 94.108 29.861 29.861 85.883 85.883 106.606 n/a n/a 0.093

Final fluid positions: ('-' means position in annulus for forward circ., and in pipe for reverse circ.)
Ann. fill - len.
Fluid Front (ft) Trail (ft) Pipe fill - len. (ft) Ann. fill - vol. (bbl) Pipe fill - vol. (bbl)
(ft)
PREFLUSH -0 -0 0.0 0.0 0.000 0.000
SPACER -0 -0 0.0 0.0 0.000 0.000
LEAD -0 -3518.6 3518.6 0.0 210.185 0.000
TAIL -3518.6 4969.2 1531.4 80.8 115.871 6.130
DISPLACEMENT 4969.2 4837.3 0.0 131.9 0.000 10.000
4837.3 881.0 0.0 3956.3 0.000 299.997
881.0 168.9 0.0 712.1 0.000 54.000
168.9 0.0 0.0 168.9 0.000 12.804

Pressure at the end of the job


Depth -> @ 5050.0 (ft) @ 4031.0 (ft) Weak zone Weak zone
Hydrostatic pressure (psi) 3324 2571 n/a n/a
Total pressure (psi) 3444 2667 n/a n/a
Pore/frac pressure (psi) 2485 / 3967 2008 / 3204 n/a n/a
Hydrostatic Pout - Pin (psi) 540 338 n/a n/a

Geometry table
Description Start (ft) End (ft) Vol. (bbl) Vol. (bbl/ft)
Pipe: ID = 8.835 (in), 5050.0 (ft) 0.0 5050.0 382.931 0.076
Ann.: 12.415 x 9.625 (in), 4031.0 (ft) 0.0 4031.0 240.793 0.060
Ann.: 13.371 x 9.625 (in), 1019.0 (ft) 4031.0 5050.0 85.263 0.084
Volume inside entire pipe 0.0 5050.0 382.931 0.076
Volume in entire annulus 0.0 5050.0 326.056 0.065
Volume inside pipe and annulus 0.0 5050.0 708.987 0.140
Pipe displacement (open ended) 0.0 5050.0 71.543 0.014
Pipe displacement (closed ended) 0.0 5050.0 454.474 0.090
Hole volume w/o pipe 0.0 5050.0 780.530 0.155
Pipe surface area 24405.7 (ft2)
Wellbore surface area 16668.6 (ft2)

Turbulence table: Ann.: 13.371 x 9.625 (in), 1019.0 (ft)


Fluid Crit. rate (bpm) Crit. Vel. (ft/min) Crit. Nre
MUD 0.33 4.0 2100
PREFLUSH 0.43 5.2 2100
SPACER 0.31 3.7 2100
LEAD 22.93 274.0 4262

3
Fluid Crit. rate (bpm) Crit. Vel. (ft/min) Crit. Nre
TAIL 37.56 448.8 3104
DISPLACEMENT 33.16 396.4 6995

Annular velocity table: (ft/min)


Annulus \ Rate (bpm) 4.00 5.00 6.00 8.00 10.00

12.415 x 9.625 (in) 67.0 83.7 100.4 133.9 167.4


13.371 x 9.625 (in) 47.8 59.8 71.7 95.6 119.5

Critical gel str.


Slurry Critical static gel str. (lbf/100ft2)
TAIL 614.2

Event table
ECD @ 5050.0 ECD @ 4031.0
Job time (min) Rate in (bpm) Rate out (bpm) Vol. in (bbl) Fluid in/btm/out
(ft) (ppg) (ft) (ppg)
0.093 6.00 6.00 0.561 11.25 11.26 PREFLUSH /MUD/MUD
6.760 6.00 6.00 40.561 11.25 11.26 SPACER/MUD/MUD
15.093 4.00 4.00 90.374 11.23 11.23 LEAD/MUD/MUD
67.843 4.00 4.38 301.374 11.23 11.23 TAIL/MUD/MUD
79.807 4.00 5.53 349.229 11.25 11.25 TAIL/PREFLUSH /MUD
84.574 4.00 9.07 368.296 11.08 11.32 TAIL/SPACER/MUD
98.343 5.00 0.00 423.467 11.04 11.20 DISPLACEMENT/SPACER/MUD
102.774 10.00 37.95 458.236 12.47 12.79 DISPLACEMENT/LEAD/MUD
124.084 10.00 7.66 671.340 12.02 11.84 DISPLACEMENT/TAIL/MUD
127.916 10.00 10.00 709.661 12.43 12.08 DISPLACEMENT/TAIL/PREFLUSH
132.306 8.00 8.00 749.450 13.31 12.77 DISPLACEMENT/TAIL/SPACER
140.084 4.00 4.00 799.338 13.87 13.29 DISPLACEMENT/TAIL/LEAD

4
5
6
7
8
Job detail
Time Fluid Vol. in No. of Rate in Rate Pump Choke Free Pin - ECD @ ECD @ Pressure Fric. P. pipe Fric. P. Ann.
(min) in/btm/out (bbl) strokes (bpm) out P. (psi) P. (psi) fall (ft) Pout @ 5050.0 4031.0 @ 5050.0 (psi) (psi)
(stk) (bpm) 5050.0 (ft) (ppg) (ft) (ppg) (ft) (psi)
(ft) (psi)
1 0.093 2/1/1 0.561 3 6.00 6.00 30 15 0.0 0 11.25 11.26 2794 2 13
2 10.000 3/1/1 60.000 300 6.00 6.00 91 15 0.0 0 11.25 11.26 2794 2 13
3 20.000 4/1/1 110.000 550 4.00 4.00 50 15 0.0 0 11.23 11.23 2788 3 6
4 30.000 4/1/1 150.000 750 4.00 4.15 16 15 0.3 0 11.23 11.23 2788 4 7
5 40.000 4/1/1 190.000 951 4.00 4.50 15 15 64.5 0 11.23 11.24 2789 6 8
6 50.000 4/1/1 230.000 1151 4.00 4.40 15 15 122.7 0 11.23 11.23 2789 8 8
7 60.000 4/1/1 270.000 1351 4.00 4.40 15 15 174.7 0 11.23 11.23 2789 9 8
8 70.000 5/1/1 310.000 1550 4.00 5.51 17 15 252.5 0 11.25 11.25 2792 13 11
9 80.000 5/2/1 350.000 1750 4.00 6.37 17 15 457.4 0 11.25 11.27 2794 17 14
10 90.000 5/3/1 390.000 1950 4.00 4.90 17 15 820.6 0 11.05 11.24 2745 20 9
11 100.000 6/3/1 431.750 2160 5.00 0.00 17 15 463.2 319 11.04 11.20 2742 2 0
12 110.000 6/4/1 530.500 2653 10.00 7.62 18 15 584.4 0 11.46 11.14 2845 35 36
13 120.000 6/4/1 630.500 3153 10.00 7.71 18 15 291.7 0 11.85 11.62 2941 44 59
14 130.000 6/5/2 730.419 3653 9.57 9.57 270 15 0.0 0 12.90 12.46 3202 52 104
15 140.000 6/5/3 799.000 3995 4.00 4.00 705 15 0.0 0 13.87 13.29 3441 51 105
16 140.201 6/5/4 799.804 4000 4.00 4.00 711 15 0.0 0 13.88 13.30 3444 51 106

9
MD | TVD (ft) Annulus Casing
0 0 0.0
MUD,11.20 (ppg)
PREF...,8.60 (ppg)
SPACER,12.00 (ppg)
LEAD,12.50 (ppg)
TAIL,15.80 (ppg)
DISP...,11.20 (ppg)
1000 1000

2000 1994

3000 2906

3518.6

4000 3805

5000 4705 4969.2


5050 4750

10
0.0
MUD, 11.20 (ppg) PREFLUSH , 8.60 (ppg) SPACER, 12.00 (ppg)
LEAD, 12.50 (ppg) TAIL, 15.80 (ppg) DISPLACEMENT, 11.20 (ppg)

450.0

900.0

1350.0

1800.0

2250.0
TVD (ft)

2700.0

3150.0

3600.0

4050.0

4500.0

4950.0

0.0 900.0 1800.0 2700.0 3600.0 4500.0 5400.0 6300.0

Horizontal displacement (ft)

11
12
 

7.0

CENTRA Report

 
centra 70standoff

CentraDesign - Centralizer Placement Model


Computational Results

Date: 5/2/2019 Legal:

KOC Contractor: NAPESCO

MG-396 Type of job: 9-5/8 CSG

MAGWA Prepared by: HUSAIN

KUWAIT

9 5/8'' Centra Design with 70%standoff

1 of 14
Wellbore intervals (from top down) Well name:

DescriptionLocation: ID (in) MD (ft) Friction factor


CASED HOLE 12.415 4031 0.30
OPEN HOLE 12.250 5050 0.30
Pipes (from top down) Include the effects of bow spring centralizers on drag: YesComments:
TAW (lbf) = 0 Min. centralizer spacing = 40 (ft) Max. centralizer spacing = 400(ft)

Connection for SO calculation: Yes. Casing coupling: At centralizer


Description CSG OH SHOE
Length (ft) 4031 939 80
Adjusted Wt (lb/ft) 43.500 43.500 43.500
OD (in) 9.625 9.625 9.625
ID (in) 8.755 8.755 8.755
TJ OD (in) 9.626 9.626 9.626
TJ ID (in) 8.669 8.669 8.669
TJ length (in) 14.000 14.000 14.000
Joint length (ft) 40 40 40
Tensile limit (lbf) 690164 690164 690164
Torsional limit (ft-lb) 9699 9699 9699
Density (lb/ft3) 490.0 490.0 490.0
E (psi) 30000000 30000000 30000000
Cent. setting Specify standoff Specify standoff Specify standoff
Cent. type Bow spring Rigid Rigid
Specified spacing (ft) N/A N/A N/A
Specified standoff (%) 70.0 70.0 70.0
Incremental spacing (ft) N/A N/A N/A
Part No. NW-ST-9 SpiraGlider SC-9 SpiraGlider HD-9
Blade OD (in) N/A 12.000 12.000
Bow spring OD (uncompressed) 14.583 N/A N/A
Min. compressed OD (in) 10.882 N/A N/A
Start F. (CH) (lbf) 985 N/A N/A
Start F. (OH) (lbf) 985 N/A N/A
Restore F. (CH) (lbf) 1830 N/A N/A
Restore F. (OH) (lbf) 1830 N/A N/A
FF reduction 0 0 0
Free to rotate N/A N/A N/A
Rotational FF N/A N/A N/A
#1: CSG
Hole ID (in) Running F. (lbf)
12.250 567
Consider casing flotation: No
Operation data and fluids
Tripping speed = 0.0 (ft/min) Rotation speed = 0.0 (rpm) Pipe end drag or WOB = 0 (lbf) Pipe end torque or TOB = 0 (ft-lb)
MW in annulus during tripping = 11.20 (ppg) MW inside pipe during tripping = 11.20 (ppg)
Fluid in well after cement job
# Pipe fluids Density (ppg) Top MD (ft)
1 Mud 11.20 0
2 Cement 15.80 4970

# Annular fluids Density (ppg) Top MD (ft)


1 Lead 12.50 0
2 Tail 15.80 3531
Survey data

2 of 14
MD (ft) Inc (deg) Azi (deg) TVD (ft) Vsec (ft) N+/S- (ft) E+/W- (ft) Dogleg

(deg/100ft)

0 0.00 0.00 0 0 0 0 0.00


421 0.16 166.23 421 0 0 0 0.04
603 0.14 249.80 603 1 -1 0 0.11
812 0.10 73.18 812 1 -1 0 0.11
999 0.28 14.27 999 1 0 1 0.13
1189 0.28 8.65 1189 1 1 1 0.01
1368 0.47 53.65 1368 2 1 1 0.19
1462 0.92 107.83 1462 3 1 2 0.80
1555 2.04 129.20 1555 4 0 4 1.32
1651 4.48 138.04 1651 9 -4 8 2.59
1745 6.59 136.63 1744 18 -10 14 2.25
1840 9.79 136.95 1838 31 -20 24 3.37
1935 13.32 134.59 1931 50 -34 37 3.75
2028 16.48 133.56 2021 74 -50 54 3.41
2120 18.64 134.33 2109 102 -70 74 2.36
2214 21.20 133.22 2197 134 -92 97 2.75
2308 23.18 131.65 2284 169 -116 124 2.20
2403 25.55 131.07 2371 208 -142 153 2.51
2498 26.49 130.06 2456 250 -169 185 1.09
2592 26.36 129.72 2540 292 -196 217 0.21
2687 26.21 130.10 2626 334 -223 249 0.24
2780 26.12 129.83 2709 375 -249 280 0.16
2873 25.86 129.94 2793 416 -275 312 0.28
2968 26.91 129.80 2878 458 -302 344 1.11
3061 26.68 129.48 2961 500 -329 376 0.29
3155 25.49 129.53 3045 541 -355 408 1.27
3249 25.81 129.03 3130 582 -381 440 0.41
3345 26.39 130.52 3216 624 -408 472 0.91
3437 25.77 130.75 3299 664 -434 503 0.68
3532 25.44 130.06 3385 706 -461 534 0.47
3623 25.95 130.17 3467 745 -486 564 0.56
3719 26.84 130.19 3553 788 -514 597 0.93
3815 26.46 129.57 3638 831 -541 630 0.49
3908 25.26 129.24 3722 871 -567 661 1.30
3958 25.30 129.10 3767 893 -581 678 0.14
4083 25.14 128.74 3880 946 -614 719 0.18
4178 25.19 128.08 3966 986 -639 751 0.30
4271 25.20 130.63 4050 1026 -664 782 1.17
4366 25.55 131.25 4136 1066 -691 812 0.46
4460 26.04 130.99 4221 1107 -718 843 0.53
4554 26.22 130.83 4305 1149 -745 874 0.21
4648 26.03 130.67 4390 1190 -772 906 0.22
4743 26.22 129.85 4475 1232 -799 938 0.43
4838 26.38 129.53 4560 1274 -826 970 0.23
4931 26.15 129.62 4644 1315 -852 1002 0.25
4981 26.36 129.46 4688 1337 -866 1019 0.44
5050 26.30 129.40 4750 -886 1043 1368 0.10

3 of 14
4 of 14
5 of 14
6 of 14
Section view
0

500

1000

1500

2000
TVD (ft)

2500

3000

3500

4000

4500

5000
0 1000 2000 3000 4000 5000 6000 7000

Horizontal displacement (ft)

7 of 14
Plan view
100

-100

-200

-300
N+/S- (ft)

-400

-500

-600

-700

-800

-900
0 200 400 600 800 1000 1200 1400

E+/W- (ft)

3D View

8 of 14
9 of 14
Summary
Total number of centralizers required 68

CSG - 9.625 x 8.755 (in) Specify standoff Bow


Depth interval 0 - 4031 (ft)
Inclination angle range 0 - 25 (deg)
Azimuth angle range 0 - 129 (deg)
Centralizer part No. NW-ST-9 5/8-6-ST-IIIB
Specified centralizer spacing N/A (ft)
Specified standoff at mid span 70.0 (%)
Incremental spacing N/A (ft)
Number of centralizers required 54
Average centralizer spacing 75 (ft)
Min. / Max. annular clearance at mid span 0.868 / 1.395 (in)
Min. / Max. standoff at mid span 62.2 / 100.0 (%)
Min. / Max. side force on centralizer 0 / 1672 (lbf)

OH - 9.625 x 8.755 (in) Specify standoff Rigid


Depth interval 4031 - 4970 (ft)
Inclination angle range 25 - 26 (deg)
Azimuth angle range 129 - 129 (deg)
Centralizer part No. SpiraGlider SC-9 5/8-7-Straight1225
Specified centralizer spacing N/A (ft)
Specified standoff at mid span 70.0 (%)
Incremental spacing N/A (ft)
Number of centralizers required 12
Average centralizer spacing 74 (ft)
Min. / Max. annular clearance at mid span 0.000 / 1.020 (in)
Min. / Max. standoff at mid span 70.0 / 79.6 (%)
Min. / Max. side force on centralizer 0 / 685 (lbf)

SHOE - 9.625 x 8.755 (in) Specify standoff Rigid


Depth interval 4970 - 5050 (ft)
Inclination angle range 26 - 26 (deg)
Azimuth angle range 129 - 129 (deg)
Centralizer part No. SpiraGlider HD-9 5/8-7-Straight1250
Specified centralizer spacing N/A (ft)
Specified standoff at mid span 70.0 (%)
Incremental spacing N/A (ft)
Number of centralizers required 2
Average centralizer spacing 63 (ft)
Min. / Max. annular clearance at mid span 0.000 / 0.926 (in)
Min. / Max. standoff at mid span 70.5 / 79.6 (%)
Min. / Max. side force on centralizer 0 / 927 (lbf)
Torque and drag
String MD (ft) HL - slack off w/o rot. HL - Static (lbf) HL - pick up w/o rot. ST - slack off w/o rot. ST - Static (ft-lb) ST - pick up w/o rot.
(lbf) (lbf) (ft-lb) (ft-lb)
0 0 0 0 0 0 0
100 3619 3619 3619 0 0 0
200 7239 7239 7239 0 0 0
300 10858 10858 10858 0 0 0
400 14477 14477 14477 0 0 0
500 18096 18096 18096 0 0 0
600 21716 21716 21716 0 0 0
700 25335 25335 25335 0 0 0

10 of 14
String MD (ft) HL - slack off w/o rot. HL - Static (lbf) HL - pick up w/o rot. ST - slack off w/o rot. ST - Static (ft-lb) ST - pick up w/o rot.
(lbf) (lbf) (ft-lb) (ft-lb)
800 28954 28954 28954 0 0 0
900 32574 32574 32574 0 0 0
1000 36193 36193 36193 0 0 0
1100 39812 39812 39812 0 0 0
1200 43431 43431 43431 0 0 0
1300 47051 47051 47051 0 0 0
1400 50670 50670 50670 0 0 0
1500 54289 54289 54289 0 0 0
1600 57905 57905 57905 0 0 0
1700 61514 61514 61514 0 0 0
1800 65106 65106 65106 0 0 0
1900 68668 68668 68668 0 0 0
2000 72182 72182 72182 0 0 0
2100 75645 75645 75645 0 0 0
2200 79059 79059 79059 0 0 0
2300 82416 82416 82416 0 0 0
2400 85717 85717 85717 0 0 0
2500 88970 88970 88970 0 0 0
2600 92212 92212 92212 0 0 0
2700 95457 95457 95457 0 0 0
2800 98706 98706 98706 0 0 0
2900 101957 101957 101957 0 0 0
3000 105194 105194 105194 0 0 0
3100 108432 108432 108432 0 0 0
3200 111691 111691 111691 0 0 0
3300 114946 114946 114946 0 0 0
3400 118195 118195 118195 0 0 0
3500 121456 121456 121456 0 0 0
3600 124719 124719 124719 0 0 0
3700 127965 127965 127965 0 0 0
3800 131197 131197 131197 0 0 0
3900 134456 134456 134456 0 0 0
4000 137725 137725 137725 0 0 0
4100 141000 141000 141000 0 0 0
4200 144280 144280 144280 0 0 0
4300 147552 147552 147552 0 0 0
4400 150816 150816 150816 0 0 0
4500 154072 154072 154072 0 0 0
4600 157322 157322 157322 0 0 0
4700 160572 160572 160572 0 0 0
4800 163818 163818 163818 0 0 0
4900 167063 167063 167063 0 0 0
5000 170310 170310 170310 0 0 0
5050 171931 171931 171931 0 0 0

11 of 14
Centralizer calculation
Dogleg Hole ID (in) x Pipe OD Side F. per Cent. Standoff @ Standoff @ mid Side F. @
MD (ft) Inc (deg) Azi (deg) Axial F. (lbf) Cent. type Part No. Spacing (ft)
(deg/100ft) (in) joint (lbf) setting cent. (%) span (%) cent. (lbf)

1 0 0.00 0.00 0.04 12.415 x 9.625 132572 35- - - - 100.0 100.0 -


2 28 0.01 11.06 0.04 12.415 x 9.625 131697 44Standoff Bow NW-ST-9 5/8-6-ST-IIIB 213 96.5 70.1 194
3 241 0.09 95.16 0.04 12.415 x 9.625 125034 76Standoff Bow NW-ST-9 5/8-6-ST-IIIB 162 94.8 70.0 288
4 403 0.15 159.12 0.04 12.415 x 9.625 119967 17Standoff Bow NW-ST-9 5/8-6-ST-IIIB 284 97.8 70.1 120
5 687 0.12 178.81 0.11 12.415 x 9.625 111084 124Standoff Bow NW-ST-9 5/8-6-ST-IIIB 131 93.7 70.2 346
6 818 0.11 71.45 0.13 12.415 x 9.625 107002 94Standoff Bow NW-ST-9 5/8-6-ST-IIIB 142 94.2 70.1 317
7 960 0.24 26.71 0.13 12.415 x 9.625 102560 17Standoff Bow NW-ST-9 5/8-6-ST-IIIB 270 98.0 70.3 111
8 1230 0.32 18.83 0.19 12.415 x 9.625 94115 122Standoff Bow NW-ST-9 5/8-6-ST-IIIB 115 93.7 70.2 343
9 1345 0.45 47.74 0.19 12.415 x 9.625 90518 383Standoff Bow NW-ST-9 5/8-6-ST-IIIB 74 87.5 70.2 685
10 1419 0.65 92.01 0.80 12.415 x 9.625 88203 567Standoff Bow NW-ST-9 5/8-6-ST-IIIB 62 84.2 70.1 865
11 1481 1.12 115.37 1.32 12.415 x 9.625 86264 756Standoff Bow NW-ST-9 5/8-6-ST-IIIB 54 81.7 70.0 1006
12 1534 1.77 126.76 1.32 12.415 x 9.625 84591 1096Standoff Bow NW-ST-9 5/8-6-ST-IIIB 43 78.8 70.2 1163
13 1577 2.58 132.63 2.59 12.415 x 9.625 83263 1416Standoff Bow NW-ST-9 5/8-6-ST-IIIB 40 74.2 68.3 1415
14 1617 3.60 136.24 2.59 12.415 x 9.625 82013 1341Standoff Bow NW-ST-9 5/8-6-ST-IIIB 40 75.6 69.9 1341
15 1657 4.60 137.92 2.25 12.415 x 9.625 80765 1135Standoff Bow NW-ST-9 5/8-6-ST-IIIB 45 76.7 70.2 1277
16 1702 5.61 137.15 2.25 12.415 x 9.625 79363 1095Standoff Bow NW-ST-9 5/8-6-ST-IIIB 40 80.1 70.4 1095
17 1742 6.51 136.67 2.25 12.415 x 9.625 78119 1599Standoff Bow NW-ST-9 5/8-6-ST-IIIB 40 70.9 63.5 1599
18 1782 7.82 136.77 3.37 12.415 x 9.625 76878 1594Standoff Bow NW-ST-9 5/8-6-ST-IIIB 40 71.0 63.1 1594
19 1822 9.17 136.91 3.37 12.415 x 9.625 75640 1636Standoff Bow NW-ST-9 5/8-6-ST-IIIB 40 70.2 62.2 1636
20 1862 10.59 136.28 3.75 12.415 x 9.625 74408 1672Standoff Bow NW-ST-9 5/8-6-ST-IIIB 40 69.6 62.6 1672
21 1902 12.07 135.27 3.75 12.415 x 9.625 73181 1580Standoff Bow NW-ST-9 5/8-6-ST-IIIB 40 71.2 65.6 1580
22 1942 13.54 134.50 3.41 12.415 x 9.625 71961 1378Standoff Bow NW-ST-9 5/8-6-ST-IIIB 40 74.9 68.4 1378
23 1982 14.90 134.02 3.41 12.415 x 9.625 70748 1319Standoff Bow NW-ST-9 5/8-6-ST-IIIB 42 74.8 70.3 1384
24 2024 16.33 133.60 3.41 12.415 x 9.625 69483 796Standoff Bow NW-ST-9 5/8-6-ST-IIIB 53 80.8 70.6 1055
25 2077 17.62 133.99 2.36 12.415 x 9.625 67897 730Standoff Bow NW-ST-9 5/8-6-ST-IIIB 54 82.0 70.4 986
26 2131 18.93 134.19 2.75 12.415 x 9.625 66293 831Standoff Bow NW-ST-9 5/8-6-ST-IIIB 53 80.1 70.2 1090
27 2183 20.36 133.56 2.75 12.415 x 9.625 64747 658Standoff Bow NW-ST-9 5/8-6-ST-IIIB 59 82.3 70.4 970
28 2242 21.79 132.72 2.20 12.415 x 9.625 63025 499Standoff Bow NW-ST-9 5/8-6-ST-IIIB 65 85.3 70.3 804
29 2307 23.15 131.67 2.20 12.415 x 9.625 61160 531Standoff Bow NW-ST-9 5/8-6-ST-IIIB 68 83.7 70.4 895
30 2374 24.83 131.24 2.51 12.415 x 9.625 59231 159Standoff Bow NW-ST-9 5/8-6-ST-IIIB 98 92.9 70.0 388
31 2472 26.23 130.33 1.09 12.415 x 9.625 56479 449Standoff Bow NW-ST-9 5/8-6-ST-IIIB 67 86.4 70.4 746
32 2538 26.43 129.92 0.21 12.415 x 9.625 54615 610Standoff Bow NW-ST-9 5/8-6-ST-IIIB 60 83.5 70.2 907
33 2598 26.35 129.74 0.24 12.415 x 9.625 52948 614Standoff Bow NW-ST-9 5/8-6-ST-IIIB 60 83.4 70.1 914
34 2657 26.26 129.98 0.24 12.415 x 9.625 51279 597Standoff Bow NW-ST-9 5/8-6-ST-IIIB 60 83.7 70.4 895
35 2717 26.18 130.01 0.16 12.415 x 9.625 49596 585Standoff Bow NW-ST-9 5/8-6-ST-IIIB 60 84.0 70.1 878
36 2777 26.12 129.84 0.16 12.415 x 9.625 47911 637Standoff Bow NW-ST-9 5/8-6-ST-IIIB 60 82.7 70.4 947
37 2837 25.96 129.90 0.28 12.415 x 9.625 46239 432Standoff Bow NW-ST-9 5/8-6-ST-IIIB 70 86.2 70.3 756

12 of 14
Dogleg Hole ID (in) x Pipe OD Side F. per Cent. Standoff @ Standoff @ mid Side F. @
MD (ft) Inc (deg) Azi (deg) Axial F. (lbf) Cent. type Part No. Spacing (ft)
(deg/100ft) (in) joint (lbf) setting cent. (%) span (%) cent. (lbf)

38 2907 26.23 129.89 1.11 12.415 x 9.625 44273 306Standoff Bow NW-ST-9 5/8-6-ST-IIIB 75 89.5 70.4 575
39 2982 26.88 129.75 0.29 12.415 x 9.625 42174 636Standoff Bow NW-ST-9 5/8-6-ST-IIIB 57 83.5 70.4 906
40 3039 26.74 129.56 0.29 12.415 x 9.625 40583 783Standoff Bow NW-ST-9 5/8-6-ST-IIIB 52 81.6 70.3 1008
41 3090 26.31 129.48 1.27 12.415 x 9.625 39141 881Standoff Bow NW-ST-9 5/8-6-ST-IIIB 52 79.3 70.3 1135
42 3142 25.66 129.52 1.27 12.415 x 9.625 37693 544Standoff Bow NW-ST-9 5/8-6-ST-IIIB 63 84.4 70.0 858
43 3205 25.66 129.27 0.41 12.415 x 9.625 35917 443Standoff Bow NW-ST-9 5/8-6-ST-IIIB 68 86.4 70.2 748
44 3272 25.95 129.39 0.91 12.415 x 9.625 34016 443Standoff Bow NW-ST-9 5/8-6-ST-IIIB 66 86.8 70.2 725
45 3338 26.34 130.41 0.91 12.415 x 9.625 32177 661Standoff Bow NW-ST-9 5/8-6-ST-IIIB 57 83.0 70.4 934
46 3394 26.06 130.64 0.68 12.415 x 9.625 30592 667Standoff Bow NW-ST-9 5/8-6-ST-IIIB 57 82.8 70.3 942
47 3451 25.72 130.65 0.47 12.415 x 9.625 29002 610Standoff Bow NW-ST-9 5/8-6-ST-IIIB 61 83.1 70.2 930
48 3512 25.51 130.21 0.47 12.415 x 9.625 27281 323Standoff Bow NW-ST-9 5/8-6-ST-IIIB 77 88.7 70.7 619
49 3588 25.75 130.13 0.56 12.415 x 9.625 25765 199Standoff Bow NW-ST-9 5/8-6-ST-IIIB 88 92.0 70.4 437
50 3676 26.44 130.19 0.93 12.415 x 9.625 24279 283Standoff Bow NW-ST-9 5/8-6-ST-IIIB 78 90.0 70.3 548
51 3754 26.70 129.97 0.49 12.415 x 9.625 22975 411Standoff Bow NW-ST-9 5/8-6-ST-IIIB 68 87.4 70.3 693
52 3821 26.38 129.57 1.30 12.415 x 9.625 21839 517Standoff Bow NW-ST-9 5/8-6-ST-IIIB 64 84.9 70.1 827
53 3885 25.56 129.32 1.30 12.415 x 9.625 20757 373Standoff Bow NW-ST-9 5/8-6-ST-IIIB 72 87.9 70.1 666
54 3957 25.30 129.10 0.14 12.415 x 9.625 19543 337Standoff Bow NW-ST-9 5/8-6-ST-IIIB 75 88.6 70.1 628
55 4031 25.21 128.89 0.18 12.415 x 9.625 18276 331Standoff Bow NW-ST-9 5/8-6-ST-IIIB 66 90.1 77.7 543
56 4097 25.15 128.65 0.30 12.250 x 9.625 17161 316Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 76 90.5 70.1 596
57 4172 25.19 128.12 0.30 12.250 x 9.625 15876 337Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 74 90.5 70.2 623
58 4246 25.19 129.94 1.17 12.250 x 9.625 14617 302Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 76 90.5 70.2 574
59 4322 25.39 130.96 0.46 12.250 x 9.625 13324 288Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 77 90.5 70.0 555
60 4399 25.72 131.16 0.53 12.250 x 9.625 12018 294Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 76 90.5 70.5 559
61 4475 26.07 130.96 0.21 12.250 x 9.625 10732 319Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 75 90.5 70.3 594
62 4550 26.21 130.84 0.21 12.250 x 9.625 9474 342Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 73 90.5 70.4 624
63 4623 26.08 130.71 0.22 12.250 x 9.625 8242 328Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 74 90.5 70.0 607
64 4697 26.13 130.25 0.43 12.250 x 9.625 6992 325Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 74 90.5 70.1 601
65 4771 26.27 129.76 0.23 12.250 x 9.625 5744 329Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 74 90.5 70.3 605
66 4844 26.37 129.54 0.25 12.250 x 9.625 4505 339Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 73 90.5 70.1 618
67 4917 26.18 129.61 0.25 12.250 x 9.625 3274 328Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 70 90.5 70.4 685
68 4970 26.31 129.50 0.44 12.250 x 9.625 2380 586- - - - 79.6 79.6 -
69 4987 26.35 129.45 0.10 12.250 x 9.625 1874 589Standoff Rigid SpiraGlider HD-9 5/8-7-Straight1250 63 90.5 70.5 927
70 5050 26.30 129.40 0.10 12.250 x 9.625 0 589Standoff Rigid SpiraGlider HD-9 5/8-7-Straight1250 63 90.5 70.5 927

13 of 14
0
Side force after cementing

450

900

1350

1800

2250
TVD (ft)

2700

3150

3600

4050

4500

4950

0 900 1800 2700 3600 4500 5400 6300

Horizontal displacement (ft)