Professional Documents
Culture Documents
Cementing Program For 9 58 Inch Casing
Cementing Program For 9 58 Inch Casing
C)
Well: MG-396
Rig: SP-271
Cementing Program for 9 5/8" Casing
May 2, 2019
1.0
1. Objective:
The objective of this job is to cement the 9-5/8” casing with 211 bbls of Lead (12.5 ppg) and 122 bbls of
Tail (15.8 ppg). The Lead slurry will be till surface and the Tail slurry will be 500 ft above previous
casing shoe.
2. Well Data:
9-5/8’’Csg Casing: 5,050 ft MD / 4,755 ft TVD.
BHST: 141°F
BHCT: 110°F
3. Technical Data:
2.0
7. Fly-Mix & Pump 211 bbl of Lead Cement Slurry 12.5 ppg @ 5 bpm.
9. Drop Top Plug and flush Cement lines by 10 bbl of water as displacement into the casing.
10. Displace the Cement using Rig Pump & Lines with +/-366.8 bbl of Displacement fluid.
11. If the Plug Bumps then Pressure up to 500 psi above differential.
(As Per KOC Policy)
12. If the Plug doesn’t bump, pump the calculated displacement volume plus 3 bbl.
13. If floats hold and no back flow observed, remove cement head and WOC.
14. If the float doesn’t hold (or) Back flow observed, then close the valves on the cement head and hold
pressure until cement set.
15. Conduct Top Job with 15.8 Class G Neat Cement. Each Top Job volumes not to exceed 25 BBLS. If
Well not Static Repeat Top Jobs in consultation with the base.
16. WOC for 24Hrs.
17. Keep cement sample in water bath at Downhole temperature and check when it sets
RECOMMENDATION
While Pumping or during displacement keep the pipe reciprocate or in rotation. It might help to clean the
mud properly.
100 bbl of 15.8ppg equivalent cement will be carried to the location for Top Job
Mud conditioning is recommend before doing the cement job (mud YP =10 or less).
Actual displacement volume must be calc ulated and agreed upon by the company man and the
NAPESCO supervisor prior to the job and based on actual well data and casing tally.
This program is tentative and subject to change as per actual well scenarios on location.
Collect mix fluid samples, cement samples one set of sample to company man and one set of sample
for NAPESCO Lab.
Frac Density of 16 ppg & 10 ppg of Pore Density are considered in simulator at TD.
Quality of cement bond, being critical & crucial, should be taken after 60 -72 Hrs . This will remove any
ambiguity or doubt on isolation of water Zone below and between the zones.
15.8# Class G: The first batch should be 40 bbls wi thout CaCl2. The Second batch, if
required, should be 25 bbls having 1-2% CaCl2. In case of losses, wait for 2 hrs. Before the
2nd Top Job. Subsequent Top Jobs may be of 25 - 40 bbls batch size depending on the
losses. In case of minor losse s, check static level with water before carrying out next Top
Job.
After 2nd Top Job and in case of repetition, Loosen the BOP studs keeping 4 diagonal studs
intact.
Observe the well for 1/2 hour after the 2nd t op job and set casing slips if found well to be
static.
Continue top job @ 2 hr . duration with 40 Bbls batch size through one side of well head
valve keeping the other side open till cement to surface & level static.
If there is gas inflow contact D.E. Prepar e 100 Bbls of 100 PPB heavy doze LCM pill. The
same may be pumped followed by 50 Bbls of 15.8 PPG Class-G cement treated with 1 -
2% CaCl2.
If gas influx continues contact D.E. again for next course of action.
3.0
KOC Program
CEMENT PROGRAM Option-I Date: 30-Apr-19
Data: Cmt Co: Napesco Avg Hole Size from Caliper Log
Plan TOC Density L Btm of Top of Caliper Vol Caliper Arms
@ (feet) (ppg) Yield (ft3/sx) E Interval Interval (ft3) 6/4
Lead: 0 12.5 A Bore hole Vol. 0 0 0 6
Tail: 3531 15.8 D Cement.Vol. 0 0 0 6
Casing Size: 9 5/8 47 & 43.5 PPF
Set @: 5050 feet MD OPEN HOLE VOLUMES IN BBLS
Set @: + / - 4755 feet TVD GAUGE CALIPER %Washout HOLE SIZE
Casing ID 40 p 8.835 inches 0.00 0.00 0.00 12.25
Casinf ID 43.5 8.755
9.625 "Casing
CASING DETAILS
Tensile
with SF
MD OD WEIGHT ID GRADE Collapse Burst 1.5 CONN Makeup
(feet) (inches) (lb / ft) (inches) (psi) (psi) (Klbs) Torque-ft-lb
5050 9.625 40 8.835 L-80 3090 5750 670 BTC Base of
Start Job:
TEST RIG PUMP EFFICIENCY PRIOR TO CMT. JOB
Pressure test lines to 3000 psi
Drop Bottom Plug; Pump Preflush, Pump Spacer
Lead Slurry
Tail Slurry
Drop Top plug, displace w/ Mud.
IF NO CEMENT TO SURFACE AND THE WELL NOT STATIC
CONDUCT TOP JOB WITH CLASS 'G' CEMENT
REMARKS: LEAD SLURRY VOL IS DESIGNED UP TO SURFACE
TAIL SLURRY VOL IS DESIGNED UP TO 500-FT ABOVE 13 3/8" SHOE.
4.0
Submitted to :
Drilling Engineer - KOC Signed:
This report is the property of NAPESCO and is intended for private information of the above named party. This report nor any part thereof maybe published or disclosed to a third party without approval of NAPESCO.
5.0
Well : MG-396
Rig : SP-271
Mud : 11.2 ppg WBM
Preflush :
Volume : 40 bbls
Density : 8.6 ppg
Spacer
Volume : 50 bbls
Density : 12.0 ppg
6.0
CEMPRO Report
CEMPRO
Computational Results
Casing: 9 5/8"
1
Well location: On land - Forward
Geothermal
Surface T. = 85 (F)
Conductivity Heat Capacity T. gradient
# Lithology TVD (ft) Density (lbm/ft3) T. (F)
(Btu/h-ft-F) (Btu/lb-F) (F/100ft)
1 Sandstone 5050 139.3 1.080 0.17 1.1 141
Pipe:
Tool joint effect on hydraulics: No
Joint TJ
Length Wt TJ OD TJ ID Collapse Burst str.
# Description OD (in) ID (in) Grade length length Yield (psi)
(ft) (lbm/ft) (in) (in) str. (psi) (psi)
(ft) (in)
1 Casing, 40.000 5050.0 9.625 40.000 8.835 10.626 8.835 L80 0.0 0.000 80000 3088 5745
(lbm/ft)
Fluid properties
Conduc Heat
YP Gel
Density tivity capacity Inlet T.
# Fluid Model PV (cP) (lbf/100f n K (*) (lbf/100f
(ppg) (Btu/h- (Btu/lb- (F)
t2) t2)
ft-F) F)
1 MUD 11.20 BP 1.0 0.0 - - 0.0 0.000 0.00 -
2 PREFLUSH 8.60 BP 1.0 0.0 - - 0.0 0.000 0.00 60
3 SPACER 12.00 BP 1.0 0.0 - - 0.0 0.000 0.00 60
4 LEAD 12.50 BP 38.0 8.0 - - 0.0 0.000 0.00 60
5 TAIL 15.80 BP 108.0 16.0 - - 0.0 0.000 0.00 60
6 DISPLACEMENT 11.20 BP 30.0 25.0 - - 0.0 0.000 0.00 60
*: (lbf-s^n/100ft2)
Pumping schedule (Total volume = 799.800 (bbl), Total time = 140.200 (min))
Time with
Liquid vol. Additional Liquid Q N2 ratio Stage Time Cumul. Time
Fluid Cement
(bbl) vol. (%) (bpm) (scf/bbl) (min) (min:sec)
(min)
PREFLUSH 40.000 0.0 6.00 - 6.667 6:40 0.000
SPACER 50.000 0.0 6.00 - 8.333 15:00 0.000
LEAD 211.000 0.0 4.00 - 52.750 67:45 52.750
TAIL 122.000 0.0 4.00 - 30.500 98:15 83.250
DISPLACEMENT 10.000 0.0 5.00 - 2.000 100:15 85.250
2
Time with
Liquid vol. Additional Liquid Q N2 ratio Stage Time Cumul. Time
Fluid Cement
(bbl) vol. (%) (bpm) (scf/bbl) (min) (min:sec)
(min)
300.000 0.0 10.00 - 30.000 130:15 115.250
54.000 0.0 8.00 - 6.750 137:00 122.000
12.800 0.0 4.00 - 3.200 140:12 125.200
Pump
Surface line length = Surface line ID = 5.000 Maxi. P. rating = 10000 Maxi. pump horsepower = Pump stroke = 0.2000
100.0 (ft) (in) (psi) 400. (HP) (bbl/stk)
No choke P.
Output Summary
P. @ ECD @ ECD @
Flow rate Pump P. Pump Free fall
Variables 5050.0 (ft) 5050.0 (ft) 4031.0 (ft) Weak zone Weak zone
(bpm) (psi) HHP (HP) (ft)
(psi) (ppg) (ppg)
Maxi. value 38.94 711 129. 3444 13.88 13.30 n/a n/a 855.5
Mini. value 0.00 15 2. 2737 11.02 11.02 n/a n/a 0.0
Maxi. @ time (min) 102.680 140.201 137.000 140.201 140.201 140.201 n/a n/a 92.999
Mini. @ time (min) 94.108 29.861 29.861 85.883 85.883 106.606 n/a n/a 0.093
Final fluid positions: ('-' means position in annulus for forward circ., and in pipe for reverse circ.)
Ann. fill - len.
Fluid Front (ft) Trail (ft) Pipe fill - len. (ft) Ann. fill - vol. (bbl) Pipe fill - vol. (bbl)
(ft)
PREFLUSH -0 -0 0.0 0.0 0.000 0.000
SPACER -0 -0 0.0 0.0 0.000 0.000
LEAD -0 -3518.6 3518.6 0.0 210.185 0.000
TAIL -3518.6 4969.2 1531.4 80.8 115.871 6.130
DISPLACEMENT 4969.2 4837.3 0.0 131.9 0.000 10.000
4837.3 881.0 0.0 3956.3 0.000 299.997
881.0 168.9 0.0 712.1 0.000 54.000
168.9 0.0 0.0 168.9 0.000 12.804
Geometry table
Description Start (ft) End (ft) Vol. (bbl) Vol. (bbl/ft)
Pipe: ID = 8.835 (in), 5050.0 (ft) 0.0 5050.0 382.931 0.076
Ann.: 12.415 x 9.625 (in), 4031.0 (ft) 0.0 4031.0 240.793 0.060
Ann.: 13.371 x 9.625 (in), 1019.0 (ft) 4031.0 5050.0 85.263 0.084
Volume inside entire pipe 0.0 5050.0 382.931 0.076
Volume in entire annulus 0.0 5050.0 326.056 0.065
Volume inside pipe and annulus 0.0 5050.0 708.987 0.140
Pipe displacement (open ended) 0.0 5050.0 71.543 0.014
Pipe displacement (closed ended) 0.0 5050.0 454.474 0.090
Hole volume w/o pipe 0.0 5050.0 780.530 0.155
Pipe surface area 24405.7 (ft2)
Wellbore surface area 16668.6 (ft2)
3
Fluid Crit. rate (bpm) Crit. Vel. (ft/min) Crit. Nre
TAIL 37.56 448.8 3104
DISPLACEMENT 33.16 396.4 6995
Event table
ECD @ 5050.0 ECD @ 4031.0
Job time (min) Rate in (bpm) Rate out (bpm) Vol. in (bbl) Fluid in/btm/out
(ft) (ppg) (ft) (ppg)
0.093 6.00 6.00 0.561 11.25 11.26 PREFLUSH /MUD/MUD
6.760 6.00 6.00 40.561 11.25 11.26 SPACER/MUD/MUD
15.093 4.00 4.00 90.374 11.23 11.23 LEAD/MUD/MUD
67.843 4.00 4.38 301.374 11.23 11.23 TAIL/MUD/MUD
79.807 4.00 5.53 349.229 11.25 11.25 TAIL/PREFLUSH /MUD
84.574 4.00 9.07 368.296 11.08 11.32 TAIL/SPACER/MUD
98.343 5.00 0.00 423.467 11.04 11.20 DISPLACEMENT/SPACER/MUD
102.774 10.00 37.95 458.236 12.47 12.79 DISPLACEMENT/LEAD/MUD
124.084 10.00 7.66 671.340 12.02 11.84 DISPLACEMENT/TAIL/MUD
127.916 10.00 10.00 709.661 12.43 12.08 DISPLACEMENT/TAIL/PREFLUSH
132.306 8.00 8.00 749.450 13.31 12.77 DISPLACEMENT/TAIL/SPACER
140.084 4.00 4.00 799.338 13.87 13.29 DISPLACEMENT/TAIL/LEAD
4
5
6
7
8
Job detail
Time Fluid Vol. in No. of Rate in Rate Pump Choke Free Pin - ECD @ ECD @ Pressure Fric. P. pipe Fric. P. Ann.
(min) in/btm/out (bbl) strokes (bpm) out P. (psi) P. (psi) fall (ft) Pout @ 5050.0 4031.0 @ 5050.0 (psi) (psi)
(stk) (bpm) 5050.0 (ft) (ppg) (ft) (ppg) (ft) (psi)
(ft) (psi)
1 0.093 2/1/1 0.561 3 6.00 6.00 30 15 0.0 0 11.25 11.26 2794 2 13
2 10.000 3/1/1 60.000 300 6.00 6.00 91 15 0.0 0 11.25 11.26 2794 2 13
3 20.000 4/1/1 110.000 550 4.00 4.00 50 15 0.0 0 11.23 11.23 2788 3 6
4 30.000 4/1/1 150.000 750 4.00 4.15 16 15 0.3 0 11.23 11.23 2788 4 7
5 40.000 4/1/1 190.000 951 4.00 4.50 15 15 64.5 0 11.23 11.24 2789 6 8
6 50.000 4/1/1 230.000 1151 4.00 4.40 15 15 122.7 0 11.23 11.23 2789 8 8
7 60.000 4/1/1 270.000 1351 4.00 4.40 15 15 174.7 0 11.23 11.23 2789 9 8
8 70.000 5/1/1 310.000 1550 4.00 5.51 17 15 252.5 0 11.25 11.25 2792 13 11
9 80.000 5/2/1 350.000 1750 4.00 6.37 17 15 457.4 0 11.25 11.27 2794 17 14
10 90.000 5/3/1 390.000 1950 4.00 4.90 17 15 820.6 0 11.05 11.24 2745 20 9
11 100.000 6/3/1 431.750 2160 5.00 0.00 17 15 463.2 319 11.04 11.20 2742 2 0
12 110.000 6/4/1 530.500 2653 10.00 7.62 18 15 584.4 0 11.46 11.14 2845 35 36
13 120.000 6/4/1 630.500 3153 10.00 7.71 18 15 291.7 0 11.85 11.62 2941 44 59
14 130.000 6/5/2 730.419 3653 9.57 9.57 270 15 0.0 0 12.90 12.46 3202 52 104
15 140.000 6/5/3 799.000 3995 4.00 4.00 705 15 0.0 0 13.87 13.29 3441 51 105
16 140.201 6/5/4 799.804 4000 4.00 4.00 711 15 0.0 0 13.88 13.30 3444 51 106
9
MD | TVD (ft) Annulus Casing
0 0 0.0
MUD,11.20 (ppg)
PREF...,8.60 (ppg)
SPACER,12.00 (ppg)
LEAD,12.50 (ppg)
TAIL,15.80 (ppg)
DISP...,11.20 (ppg)
1000 1000
2000 1994
3000 2906
3518.6
4000 3805
10
0.0
MUD, 11.20 (ppg) PREFLUSH , 8.60 (ppg) SPACER, 12.00 (ppg)
LEAD, 12.50 (ppg) TAIL, 15.80 (ppg) DISPLACEMENT, 11.20 (ppg)
450.0
900.0
1350.0
1800.0
2250.0
TVD (ft)
2700.0
3150.0
3600.0
4050.0
4500.0
4950.0
11
12
7.0
CENTRA Report
centra 70standoff
KUWAIT
1 of 14
Wellbore intervals (from top down) Well name:
2 of 14
MD (ft) Inc (deg) Azi (deg) TVD (ft) Vsec (ft) N+/S- (ft) E+/W- (ft) Dogleg
(deg/100ft)
3 of 14
4 of 14
5 of 14
6 of 14
Section view
0
500
1000
1500
2000
TVD (ft)
2500
3000
3500
4000
4500
5000
0 1000 2000 3000 4000 5000 6000 7000
7 of 14
Plan view
100
-100
-200
-300
N+/S- (ft)
-400
-500
-600
-700
-800
-900
0 200 400 600 800 1000 1200 1400
E+/W- (ft)
3D View
8 of 14
9 of 14
Summary
Total number of centralizers required 68
10 of 14
String MD (ft) HL - slack off w/o rot. HL - Static (lbf) HL - pick up w/o rot. ST - slack off w/o rot. ST - Static (ft-lb) ST - pick up w/o rot.
(lbf) (lbf) (ft-lb) (ft-lb)
800 28954 28954 28954 0 0 0
900 32574 32574 32574 0 0 0
1000 36193 36193 36193 0 0 0
1100 39812 39812 39812 0 0 0
1200 43431 43431 43431 0 0 0
1300 47051 47051 47051 0 0 0
1400 50670 50670 50670 0 0 0
1500 54289 54289 54289 0 0 0
1600 57905 57905 57905 0 0 0
1700 61514 61514 61514 0 0 0
1800 65106 65106 65106 0 0 0
1900 68668 68668 68668 0 0 0
2000 72182 72182 72182 0 0 0
2100 75645 75645 75645 0 0 0
2200 79059 79059 79059 0 0 0
2300 82416 82416 82416 0 0 0
2400 85717 85717 85717 0 0 0
2500 88970 88970 88970 0 0 0
2600 92212 92212 92212 0 0 0
2700 95457 95457 95457 0 0 0
2800 98706 98706 98706 0 0 0
2900 101957 101957 101957 0 0 0
3000 105194 105194 105194 0 0 0
3100 108432 108432 108432 0 0 0
3200 111691 111691 111691 0 0 0
3300 114946 114946 114946 0 0 0
3400 118195 118195 118195 0 0 0
3500 121456 121456 121456 0 0 0
3600 124719 124719 124719 0 0 0
3700 127965 127965 127965 0 0 0
3800 131197 131197 131197 0 0 0
3900 134456 134456 134456 0 0 0
4000 137725 137725 137725 0 0 0
4100 141000 141000 141000 0 0 0
4200 144280 144280 144280 0 0 0
4300 147552 147552 147552 0 0 0
4400 150816 150816 150816 0 0 0
4500 154072 154072 154072 0 0 0
4600 157322 157322 157322 0 0 0
4700 160572 160572 160572 0 0 0
4800 163818 163818 163818 0 0 0
4900 167063 167063 167063 0 0 0
5000 170310 170310 170310 0 0 0
5050 171931 171931 171931 0 0 0
11 of 14
Centralizer calculation
Dogleg Hole ID (in) x Pipe OD Side F. per Cent. Standoff @ Standoff @ mid Side F. @
MD (ft) Inc (deg) Azi (deg) Axial F. (lbf) Cent. type Part No. Spacing (ft)
(deg/100ft) (in) joint (lbf) setting cent. (%) span (%) cent. (lbf)
12 of 14
Dogleg Hole ID (in) x Pipe OD Side F. per Cent. Standoff @ Standoff @ mid Side F. @
MD (ft) Inc (deg) Azi (deg) Axial F. (lbf) Cent. type Part No. Spacing (ft)
(deg/100ft) (in) joint (lbf) setting cent. (%) span (%) cent. (lbf)
38 2907 26.23 129.89 1.11 12.415 x 9.625 44273 306Standoff Bow NW-ST-9 5/8-6-ST-IIIB 75 89.5 70.4 575
39 2982 26.88 129.75 0.29 12.415 x 9.625 42174 636Standoff Bow NW-ST-9 5/8-6-ST-IIIB 57 83.5 70.4 906
40 3039 26.74 129.56 0.29 12.415 x 9.625 40583 783Standoff Bow NW-ST-9 5/8-6-ST-IIIB 52 81.6 70.3 1008
41 3090 26.31 129.48 1.27 12.415 x 9.625 39141 881Standoff Bow NW-ST-9 5/8-6-ST-IIIB 52 79.3 70.3 1135
42 3142 25.66 129.52 1.27 12.415 x 9.625 37693 544Standoff Bow NW-ST-9 5/8-6-ST-IIIB 63 84.4 70.0 858
43 3205 25.66 129.27 0.41 12.415 x 9.625 35917 443Standoff Bow NW-ST-9 5/8-6-ST-IIIB 68 86.4 70.2 748
44 3272 25.95 129.39 0.91 12.415 x 9.625 34016 443Standoff Bow NW-ST-9 5/8-6-ST-IIIB 66 86.8 70.2 725
45 3338 26.34 130.41 0.91 12.415 x 9.625 32177 661Standoff Bow NW-ST-9 5/8-6-ST-IIIB 57 83.0 70.4 934
46 3394 26.06 130.64 0.68 12.415 x 9.625 30592 667Standoff Bow NW-ST-9 5/8-6-ST-IIIB 57 82.8 70.3 942
47 3451 25.72 130.65 0.47 12.415 x 9.625 29002 610Standoff Bow NW-ST-9 5/8-6-ST-IIIB 61 83.1 70.2 930
48 3512 25.51 130.21 0.47 12.415 x 9.625 27281 323Standoff Bow NW-ST-9 5/8-6-ST-IIIB 77 88.7 70.7 619
49 3588 25.75 130.13 0.56 12.415 x 9.625 25765 199Standoff Bow NW-ST-9 5/8-6-ST-IIIB 88 92.0 70.4 437
50 3676 26.44 130.19 0.93 12.415 x 9.625 24279 283Standoff Bow NW-ST-9 5/8-6-ST-IIIB 78 90.0 70.3 548
51 3754 26.70 129.97 0.49 12.415 x 9.625 22975 411Standoff Bow NW-ST-9 5/8-6-ST-IIIB 68 87.4 70.3 693
52 3821 26.38 129.57 1.30 12.415 x 9.625 21839 517Standoff Bow NW-ST-9 5/8-6-ST-IIIB 64 84.9 70.1 827
53 3885 25.56 129.32 1.30 12.415 x 9.625 20757 373Standoff Bow NW-ST-9 5/8-6-ST-IIIB 72 87.9 70.1 666
54 3957 25.30 129.10 0.14 12.415 x 9.625 19543 337Standoff Bow NW-ST-9 5/8-6-ST-IIIB 75 88.6 70.1 628
55 4031 25.21 128.89 0.18 12.415 x 9.625 18276 331Standoff Bow NW-ST-9 5/8-6-ST-IIIB 66 90.1 77.7 543
56 4097 25.15 128.65 0.30 12.250 x 9.625 17161 316Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 76 90.5 70.1 596
57 4172 25.19 128.12 0.30 12.250 x 9.625 15876 337Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 74 90.5 70.2 623
58 4246 25.19 129.94 1.17 12.250 x 9.625 14617 302Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 76 90.5 70.2 574
59 4322 25.39 130.96 0.46 12.250 x 9.625 13324 288Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 77 90.5 70.0 555
60 4399 25.72 131.16 0.53 12.250 x 9.625 12018 294Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 76 90.5 70.5 559
61 4475 26.07 130.96 0.21 12.250 x 9.625 10732 319Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 75 90.5 70.3 594
62 4550 26.21 130.84 0.21 12.250 x 9.625 9474 342Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 73 90.5 70.4 624
63 4623 26.08 130.71 0.22 12.250 x 9.625 8242 328Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 74 90.5 70.0 607
64 4697 26.13 130.25 0.43 12.250 x 9.625 6992 325Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 74 90.5 70.1 601
65 4771 26.27 129.76 0.23 12.250 x 9.625 5744 329Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 74 90.5 70.3 605
66 4844 26.37 129.54 0.25 12.250 x 9.625 4505 339Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 73 90.5 70.1 618
67 4917 26.18 129.61 0.25 12.250 x 9.625 3274 328Standoff Rigid SpiraGlider SC-9 5/8-7-Straight1225 70 90.5 70.4 685
68 4970 26.31 129.50 0.44 12.250 x 9.625 2380 586- - - - 79.6 79.6 -
69 4987 26.35 129.45 0.10 12.250 x 9.625 1874 589Standoff Rigid SpiraGlider HD-9 5/8-7-Straight1250 63 90.5 70.5 927
70 5050 26.30 129.40 0.10 12.250 x 9.625 0 589Standoff Rigid SpiraGlider HD-9 5/8-7-Straight1250 63 90.5 70.5 927
13 of 14
0
Side force after cementing
450
900
1350
1800
2250
TVD (ft)
2700
3150
3600
4050
4500
4950
14 of 14