National Petroleum Services Company

RELIABLE, VALUE ADDED SOLUTIONS

Well: MN-254

Rig: KDC-54

Cementing Proposal for 7’’Liner_REV1


Job Number: CM019-010-002-00004

April 5th, 2019

Prepared for: Prepared By:


Yusuf Husain Nasir
(Drilling Engineer - KOC) (Field Engineer-Cementing)
NAPESCO
Company Man:
 
Index

Objective & Well Data 1.0

Procedure & Recommendations 2.0

KOC Program 3.0

Cement Lab Test Report & Charts 4.0

Preflush & Spacer Report 5.0

CEMPRO Report 6.0

CENTRA Report 7.0


 

1.0

Objective & Well Data


 
 
1. Objective:

To cement the 7”liner with single slurry (15.8 ppg) at 7,264 ft

2. Well Data:

 7” liner Depth: 7,264 ft MD / 5,528 ft TVD

 BHST: 146°F

 BHCT: 120°F

 Hole Size: 12.25” ( 30% Xs in OH )

 Previous Csg top of Window(9-5/8”csg) : 6,884 ft

 Top Of Liner Hanger : 6,240 ft

 Top Of Tail: 6,040 ft

 Well Fluid: 12.6 ppg (OBM)

 Pre-flush 1: 20 bbl/ 6 bpm @ 6.8 ppg

 Pre-flush 2 : 30 bbl /6bpm @ 8.6 ppg

 Spacer Volume: 50 bbl / 6bpm @ 13.00 ppg

 Cement Slurry Volume/Rate: 60 bbl / 4bpm @ 15.80 ppg

 Displacement Vol/Rate: +/- 147.86 bbl / 7-2 bpm

3. Technical Data:
1. ECD @ 9-5/8” Casing Window: 13.29 ppg
2. ECD @ 7” Liner shoe: 13.49 ppg

 
 

2.0

Procedure & Recommendations


TENTATIVE PROCEDURE FOR 7”liner CEMENT JOB
 
1- Hold a Pre-Job Toolbox and safety meeting.

2- Circulate for 2 cycles of Mud with YP<10 pphf.

3- Rotate the Liner during the entire job at 10-15 RPM and Up to Maximum torque.

(Limits to be decided by Liner Engineer)

4- Pressure test surface lines to 4,000psi.

5- Pump 20 bbl of PREFLUSH 1 @ 6bpm

6- Pump 30 bbl of PREFLUSH 2 @ 6bpm.

7- Pump 50 bbl of SPACER (13 ppg) @6bpm.

8- Prepare 60 bbl of Cement Slurry in Batch Mixer as per Lab Report.

9- Batch mix and pump 60 bbl of (15.8 ppg) cement slurry @ 5 bpm.

10- Drop Wiper Plug and displace the cement by +/-147.86 bbl of mud as per the following rate:

 Pump 100 bbl @ 7 bpm


 Pump 10.82 bbl @ 2 bpm (watch for pressure spike)
 Pump 32 bbl @ 7 bpm
 Pump 5.04 bbl @ 2 bpm

ALL FLUIDS CALCULATIONS HAS TO BE RE-CALCULATED AND CONFIRMED ON LOCATION


WITH THE COMPANY- MAN AS PER FINAL CASING TALLY

11- If the Plug Bumps then the Pressure up to +/- 500 psi above differential. (As per KOC Policy) bleed of
the pressure and check return.

12- If the plug does not pump make sure that no extra volume is pumped, it is not recommended to pump
half the shoe track volume only exact displacement volume to be pumped.

13- If floats hold and no back flow observed, remove cement head and WOC.

14- If the floats doesn’t hold (or) Back flow observed, then close the valves on the Cement head.

15- Set the packer as per the Liner Engineer instructions.

16- POH and reverse out the excess cement.

17- The Liner has to be rotated during the entire job.

18- WOC for 24Hrs.


19- Keep the cement sample in water bath with downhole temperature, and check when it set

RECOMMENDATIONS
 
1- Condition the Mud prior to the cement job and reduce the YP of mud less than10 (pphfs).

2- This Program is tentative, however any changes likely to take place has to b e revised in th e proposal
accordingly.

3- Actual displacement volume must be c alculated and agreed upon by the com pany man a nd the
NAPESCO supervisor prior to the job and actual well data and casing tally.

4- NAPESCO supervisor should collect samples of blend cement and mix fluid.

5- Minimize shut down time when releasing liner dart

6- Minimum 70% stand-off has to be ensured for good cement bond behind the casing.

7- Slow down the rate during plug latching. ( Supervisor to calculate the exact volume as per the Actual tally)

8- Follow the mixing order, ensure Batch mixers are clean & check salinity of water prior to mixing.

9- Displacement has to be carried out by NAPESCO cementing unit with mentioned rates.

10- Contact KOC office if we encounter total losses prior to the job.

11- Rotate the Liner during the entire job.

12- Make sure the mixing order and the lot numbers are used as per the Lab Report.

13- 16 ppg as Frac Point & 9.5 ppg as Pore Point have been considered on Simulator.

14- During reverse wash ensure that mud channel & dumping valve are free from any obstruction or clogging.

15- Quality of cement bond, being critical & crucial, should be taken after 60 -72 Hrs. This will remove any
ambiguity or doubt on isolation of water zone below and between the zones.
 

3.0

KOC Program
KOC CEMENT PROGRAMME Page: 1
MN-0254

Casing: 7 ” LINER RIG : KDC-54

A. OBJECTIVES:

Case and cement the Mutriba Formation with the Liner Top covering 9 5/8” casing by +/-
200.

II. WELL DATA:


9-5/8” Top of Window 6440’ MD
8-1/2” Hole TD 7328’MD ( TVD-5528)
Mud Weight 12.6 ppg OBM
7” Liner Shoe 7328’ MD
7”LandingCollar +/- 7208’ (3 jt above)
Liner top +/- 6240’
Liner Length +/- 1088’
Liner over lap +/- 200’

III. CASING SPECIFICATION:


7” L-80
Weight 26 lbs./ft.
Length +/- 2945 ’
Casing ID 6.276”
Casing Drift ID 6.151”
Connection Type TPCQ

CASING RATINGS: 7”, 26 lbs. /ft., L-80


Collapse 5414 psi
Burst 7240 psi
Tension 603 klbs

IV. LINER RUNNING PROCEDURE:

1. Baker-Lock all connections below the Landing Collar. Make up and Baker-Lock the
float shoe to the bottom of the 1st joint of liner, the Landing collar to bottom of the 3rd joint
of liner. Do not run any centralizer in open hole. Run 4 centralizers in liner lap.
KOC CEMENT PROGRAMME Page: 2
MN-0254

Casing: 7 ” LINER RIG : KDC-54

2. Run liner to include +/-200 ft of overlap inside casing. Fill liner every 2 jt. while RIH.
3. MU Liner Hanger/Running tool.
4. Continue running liner on drill pipe. Fill drill pipe every 5 stands.
5. Running speed for 5” drill pipe stands not more than 3-4. (min/stand)
6. RIH liner as per instructions from the BAKER Liner Engineer. Take all necessary
precautions.
7. Break circulation at 9-5/8” casing shoe then continue to run with 7” liner to 7328’(wash
down last 2 joints), Circulate at slow pumping rate (6-8 BPM) and condition the hole until
shakers are clean & MW in = MW out.
(General operation procedure for running liner is supplied with the cement program.)

LOG THE RETURNS / LOSSES IF ANY & RETURNS DURING CEMENTATION


9. Tag bottom slowly to confirm depth. PU to place the string in tension. Circulate as per
Liner Engr. & Thoroughly condition the mud. Record the Pressure after Mud In=Mud out
Circulate and bring both the 10 second and 10 minute gel Strengths to less than 10
lbs/100ft2. Circulate a Min. of 2 x1 Hole volume & until shakers clean
10. Set liner hanger as per BAKER Engineer
11. Release Setting tool
12. Prepare for cement job. (Continue circulating till cement is ready to pump)

V. LINER SLURRY DESIGN:

The 8 1/2” hole is drilled from 6440’ to 7328’ with 12.6 ppg oil Base mud. It is planned to
cement 7” liner with 60 bbls 15.8 ppg cement slurry. The cement volumes are calculated based
on annular volume plus 30% excess and 200 ft cement above top of liner.
KOC CEMENT PROGRAMME Page: 3
MN-0254

Casing: 7 ” LINER RIG : KDC-54


VI. LINER CEMENTING PROCEDURE:

CHECK MUD PUMP EFFICIENCY PRIOR TO CEMENT JOB

1. Spacer Design- Maintaining density and rheological hierarchy with well fluid and cement
slurry. Weighted spacer, loaded with surfactants and mutual solvents for effective
wettability reversal. Pump 20 bbls diesel and 30 bbls of 5% KCl water as pre flush and 50
bbls of 13 ppg spacer.
2. Batch mix and pump 60 bbls of 15.8 ppg cement slurry at 6 BPM.
3. Displace the cement with 147.86 bbls of 12.6 ppg mud. Displace at 10-12 BPM.
(Recalculate the Displacement volumes before the Job based on actualy tally) Check for
back flow.
TAKE ACTUAL MIX WATER - CEMENT SAMPLE & SEND IT TO LAB TEST
FOR VERIFICATION.
Displacement volume to be measured, as per stroke as well as actual volume pumped
by cementing unit.
4. Bump plug 1000 psi over Displacement pressure.
5. DO NOT OVER DISPLACE IF PLUG DOES NOT BUMP.
6. Check for back flow. If well static & floats OK, continue:
1) Set Liner Top Packer.
2) Reverse circulate excess cement from the top of liner.
3) POOH with setting tool
* ESTIMATED JOB TIME:
KOC CEMENT PROGRAMME Page: 4
MN-0254

Casing: 7 ” LINER RIG : KDC-54

CEMENTING COMPANY: SCHLUMBERGER

Capacity and Annulus Volumes:

7”Csg by 9 5/8”” Csg. 0.0268 Bbl/ft

7 ” Casing 0.0383 Bbl/ft

5”DP 0.01776 Bbl/ft

TOC at +/-6040 ft

Liner Top at +/-6240 ft

Top of Window in 9 5/8”


Casing 6440 ft

Landing Collar at +/- 7208 ft

7 ” Casing Shoe at +/-7328 ft


 

4.0

Cement Lab Test Report & Charts


NATIONAL PETROLEUM SERVICES CO. (K.S.C.)
P.O. Box 9801 . Ahmadi . Kuwait . Tel.: 2251000 . Fax: 22251010

LABORATORY TEST REPORT


MC
Lab Test No.: _ NPSC-19-362 Date: 27-Mar-18
0
Job Type : 7" LINER Well No. : MN-254 BHST : 146 F
0
Hole Size (in) : - Rig : KDC-54 BHCT : 120 F
Depth (ft) : MD 7328 TVD 5528 Field : MN Temp.Grdnt: 1.1 oF/100ft Lab - 02
Type of Slurry SINGLE SLURRY
Type of Cement DYCKERHOFF CLASS-G
Additives Concentration Mixing order Batch Number
NC-20 (Defoamer) 0.15 gps (PH) 1 20181120
NC-30 (Dispersant) 0.70 % (PH) 2 6642
NC-50 (Retarder) 0.03 % (PH) 3 16772BR1118
NC-42 (Fluid Loss Control) 0.70 % (PH) 4 AUB-1809212
NC-83 (Strength Enhancer) 6.00 % (PH) 5 5318BO
NC-85 (Expanding Additive) 0.25 % (PH) 6 33/16
NC-90 (Gas Block) 1.50 gps (PH) 7 CY83193008
NC-94 (Stabilizer) 0.10 gps (PH) 8 A191218LST
NC-20 (Defoamer) 0.05 gps (PH) 9 CISCO-1023T33101
Slurry Density (ppg) 15.8
Slurry Yield (cu.ft/sk) 1.239
Water Req'd. (gals/sk) 3.61
Mix Fluid Req'd. (gals/sk) 5.41
Type of Water Fresh(140mg/ltr)
Thickening Time @ BHCT
Batch Mixing (Hrs:Mins) 0:30
40 Bc (Hrs:Mins) 5:28
70 Bc (Hrs:Mins) 5:35
100 Bc (Hrs:Mins) 5:38
0 mins 5 mins 10 mins 20 mins
Atmos.Cons.at BHCT
(Bc) 13 12 12 12
RPM/Readings PV YP
Rheology
300 200 100 6 3 (cp) (pphfs)
at Surface 154 110 64 12 10 135 19
at BHCT 152 108 62 8 7 135 17
10 secs 10 mins
Gel Strength
(lb/100ft2) 12 34
Fluid Loss @ BHCT/1000 ps (mls) 20
API Free Water (%) 0.0
24-hr Comp. Strength (psi) 2588
Remarks: 1. All tests carried out according to API Recommended Practice for Testing Well Cements 10B-2 (2nd Edition - April 2013).
2. % = %BWOC (percent by weight of cement ; 94lbs/sk)
3. DB = dry-blend %BWOC
4. PH = pre-hydrated %BWOC
5. gps = gallons per sack of cement

Submitted to :
Drilling Engineer - KOC Signed:

Analyzed by : JOBI BABY Jothi Ramalingam


Lab. Technician - NAPESCO Laboratory Supervisor - NAPESCO
Company Man:

This report is the property of NAPESCO and is intended for private information of the above named party. This report nor any part thereof maybe published or disclosed to a third party without
approval of NAPESCO.
Well ID: MN-254 Client : KOC BHST: 146F
Density : 15.80PPG Comp.Strength @ 24 hrs : 2588 psi
Job : 7" LINER SGS@100lb/100ft2:3:22 Hrs
SGS@500lb/100ft2:3:40 Hrs

400 20 5000 2000

360 18 4500 1800

320 16 4000 1600

280 14 3500 1400


Static Gel Strength (lb/100ft2)
Compressive Strength (psi)
Transit Time (microsec/in)

240 12 3000 1200


Temperature (°F)

200 10 2500 1000

160 8 2000 800

120 6 1500 600

80 4 1000 400

40 2 500 200

0 0 0 0
0:00 5:00 10:00 15:00 20:00
Time (HH:MM)

NAPESCO Test File Name: KDC-54_MN-254_7 LINER 15.80PPG_NPSC-19-362


OFS-LAB
 

5.0

Preflush & Spacer Report


Preflush and Spacer for 7''Liner Cement Job:

Well : MN-254
Rig : KDC-54
Mud : 12.6 ppg OBM

Preflush 1 :

Volume : 20 bbls
Density : 6.8 ppg

1 Diesel 800 gal @ 40 gal/bbl


2 Aromatic Solvent (MS-01) 40 gal @ 2 gal/bbl

Preflush 2 :

Volume : 30 bbls
Density : 8.6 ppg

1. Water 27 bbls @ 38 gals/bbl


2. KCl 285 lbs @ 3 %
3. Chemical Wash(SAPP) 150 lbs @ 5 lbs/bbl
4 Solvent (MS-01) 30 gals @ 1 gal/bbl
5 Surfactant (CW-20) 60 gals @ 2 gal/bbl

Spacer

Volume : 50 bbls
Density : 13.0 ppg

1. Starting Water 35 bbls @ 29.6 gals/bbl


2. KCl 370 lbs @ 3%
3. Spacer Mix 750 lbs @ 15 lbs/bbl
4. Ultra Seal (E-17) 150 lbs @ 3 lbs/bbl
5. Barite 12,150 lbs @ 243 lbs/bbl
6 Mutual Solvent (MS-01) 150 gals @ 3 gals/bbl
7 Surfactant ( CW-20) 50 gals @ 1 gals/bbl
Preparation of Spacer:
1. Make sure the Mixing Tank is clean and follow mixing sequence from 1 to 5.
2. Mix slowly the Spacer Mix and let it hydrate for 10 - 15 minutes.
3. Add Barite to weight up the spacer.
4. Add required amount of Surfactant before pumping the spacer.
5. Add defoamer if needed.
 

6.0

CEMPRO Report
CEMPRO

CEMPRO+ - Mud Displacement Model

Computational Results

Report generated on 4/5/2019

Date: 4/5/2019, 5:34:43 PM Rig: KDC-54

Operator: NAPESCO Job #:

Well: MN-254 Contractor: KOC

Location: MN Job: 7" LINER

Country: KUWAIT By: HUSAIN

Casing: 7" LINER

1
Well location: On land - Forward

Pore and fracture pressures (from top down)


# Description TVD (ft) Pore (ppg) Frac. (ppg)
1 9 58 CASING 100.0 9.50 16.00
2 9 58 CASING 1000.0 9.50 16.00
3 9 58 CASING 2000.0 9.50 16.00
4 9 58 CASING 3000.0 9.50 16.00
5 9 58 CASING 4000.0 9.50 16.00
6 9 58 CASING 5000.0 9.50 16.00
7 9 58 CASING 6000.0 9.50 16.00
8 9 58 CASING 6884.0 9.50 16.00
9 OH 7000.0 9.50 16.00
10 OH 7264.0 9.50 16.00

Weak zone (ft) 6440.0 7264.0 (Not selected)

Geothermal
Surface T. = 80 (F)
Conductivity Heat Capacity T. gradient
# Lithology TVD (ft) Density (lbm/ft3) T. (F)
(Btu/h-ft-F) (Btu/lb-F) (F/100ft)
1 Shale 5526.0 140.0 0.920 0.30 1.18 145

Temperature calculation: Geothermal


Cased hole
WT MW Length
# Description Bit (in) OD (in) ID (in) Top (ft) Shoe (ft) TOC (ft) FF
(lbm/ft) (ppg) (ft)
1 95/8 casing 12.250 9.625 43.500 8.755 0.0 6440.0 0.0 11.60 0.00 6440.0

Open hole
# Description ID (in) Bottom MD (ft) Excess (%) FF Top MD (ft) Length (ft)
1 OPEN HOLE 8.500 7264.0 30 0.00 6440.0 824.0

Pipe:
Tool joint effect on hydraulics: No
Joint TJ
Length Wt TJ OD TJ ID Collapse Burst str.
# Description OD (in) ID (in) Grade length length Yield (psi)
(ft) (lbm/ft) (in) (in) str. (psi) (psi)
(ft) (in)
1 VAM DP New, 6240.0 5.000 19.500 4.276 6.625 3.250 0.0 0.000 0 0 0
23 350 (lb/ft)
2 Liner 26.000 (lb/ft) 1024.0 7.000 26.000 6.276 7.657 6.276 L80 0.0 0.000 80000 4328 5792

Fluid properties
Conduc Heat
YP Gel
Density tivity capacity Inlet T.
# Fluid Model PV (cP) (lbf/100f n K (*) (lbf/100f
(ppg) (Btu/h- (Btu/lb- (F)
t2) t2)
ft-F) F)
1 MUD 12.60 BP 31.0 21.0 - - 17.0 0.441 1.00 -
2 PF-01 6.80 BP 1.0 0.0 - - 0.0 0.000 0.00 60
3 PF-02 8.60 BP 1.0 0.0 - - 0.0 0.407 1.00 85
4 SPACER 13.00 BP 18.0 14.0 - - 0.0 0.764 0.97 60
5 TAIL 15.80 BP 96.0 18.0 - - 37.0 2.073 0.86 60
6 MUD 12.60 BP 5.0 2.0 - - 17.0 0.441 1.00 0

*: (lbf-s^n/100ft2)

2
Pumping schedule (Total volume = 305.530 (bbl), Total time = 58.003 (min))
Time with
Liquid vol. Additional Liquid Q N2 ratio Stage Time Cumul. Time
Fluid Cement
(bbl) vol. (%) (bpm) (scf/bbl) (min) (min:sec)
(min)
PF-01 20.000 0.0 6.00 - 3.333 3:20 0.000
PF-02 30.000 0.0 6.00 - 5.000 8:20 0.000
SPACER 50.000 0.0 6.00 - 8.333 16:40 0.000
TAIL 60.000 0.0 4.00 - 15.000 31:40 15.000
MUD 100.000 0.0 7.00 - 14.286 45:57 29.286
10.490 0.0 2.00 - 5.245 51:12 34.531
30.000 0.0 7.00 - 4.286 55:29 38.816
5.040 0.0 2.00 - 2.520 58:00 41.336

Pump
Surface line length = Surface line ID = 1.820 Maxi. P. rating = 10000 Maxi. pump horsepower = Pump stroke = 0.2000
150.0 (ft) (in) (psi) 400. (HP) (bbl/stk)

No choke P.
Output Summary
P. @ ECD @ ECD @ ECD @
Flow rate Pump P. Pump Free fall
Variables 7264.0 (ft) 7264.0 (ft) 6440.0 (ft) 7264.0 (ft) Weak zone
(bpm) (psi) HHP (HP) (ft)
(psi) (ppg) (ppg) (ppg)
Maxi. value 7.00 1317 194. 3887 13.47 13.29 13.47 n/a 261.7
Mini. value 2.00 43 2. 3666 12.71 12.48 12.71 n/a 0.0
Maxi. @ time (min) 41.295 8.372 8.372 0.039 0.039 33.252 0.039 n/a 31.667
Mini. @ time (min) 45.991 45.991 45.991 45.991 45.991 51.197 45.991 n/a 0.039

Final fluid positions: ('-' means position in annulus for forward circ., and in pipe for reverse circ.)
Ann. fill - len.
Fluid Front (ft) Trail (ft) Pipe fill - len. (ft) Ann. fill - vol. (bbl) Pipe fill - vol. (bbl)
(ft)
MUD -0 -0 0.0 0.0 0.000 0.000
-0 -0 0.0 0.0 0.000 0.000
-0 -3729.8 3729.8 0.0 187.142 0.000
PF-01 -3729.8 -4128.4 398.6 0.0 19.998 0.000
PF-02 -4128.4 -4726.3 597.9 0.0 30.001 0.000
SPACER -4726.3 -5722.8 996.5 0.0 50.001 0.000
TAIL -5722.8 7146.8 1541.2 117.2 55.516 4.485
MUD 7146.8 2563.4 0.0 4583.4 0.000 100.001
2563.4 1972.8 0.0 590.6 0.000 10.490
1972.8 283.8 0.0 1689.0 0.000 30.000
283.8 0.0 0.0 283.8 0.000 5.040

Pressure at the end of the job


Depth -> @ 7264.0 (ft) @ 6440.0 (ft) @ 7264.0 (ft) Weak zone
Hydrostatic pressure (psi) 3475 3385 3475 n/a
Total pressure (psi) 3684 3537 3684 n/a
Pore/frac pressure (psi) 2744 / 4612 2690 / 4521 2744 / 4612 n/a
Hydrostatic Pout - Pin (psi) -147 -164 -147 n/a

Geometry table
Description Start (ft) End (ft) Vol. (bbl) Vol. (bbl/ft)
Pipe: ID = 4.276 (in), 6240.0 (ft) 0.0 6240.0 110.835 0.018
Pipe: ID = 6.276 (in), 1024.0 (ft) 6240.0 7264.0 39.182 0.038
Ann.: 8.755 x 5.000 (in), 6240.0 (ft) 0.0 6240.0 313.091 0.050
Ann.: 8.755 x 7.000 (in), 200.0 (ft) 6240.0 6440.0 5.372 0.027
Ann.: 8.901 x 7.000 (in), 824.0 (ft) 6440.0 7264.0 24.194 0.029
Volume inside entire pipe 0.0 7264.0 150.016 0.021
Volume in entire annulus 0.0 7264.0 342.657 0.047
Volume inside pipe and annulus 0.0 7264.0 492.674 0.068

3
Description Start (ft) End (ft) Vol. (bbl) Vol. (bbl/ft)
Pipe displacement (open ended) 0.0 7264.0 50.271 0.007
Pipe displacement (closed ended) 0.0 7264.0 200.288 0.028
Hole volume w/o pipe 0.0 7264.0 542.945 0.075
Pipe surface area 18712.6 (ft2)
Wellbore surface area 16680.9 (ft2)

Turbulence table: Ann.: 8.901 x 7.000 (in), 824.0 (ft)


Fluid Crit. rate (bpm) Crit. Vel. (ft/min) Crit. Nre
MUD 12.93 440.2 4293
PF-01 0.38 12.9 2100
PF-02 0.30 10.2 2100
SPACER 9.14 311.3 5394
TAIL 19.04 648.5 2561
MUD 3.19 108.7 6572

Annular velocity table: (ft/min)


Annulus \ Rate (bpm) 2.00 4.00 6.00 7.00

8.755 x 5.000 (in) 39.9 79.7 119.6 139.5


8.755 x 7.000 (in) 74.5 148.9 223.4 260.6
8.901 x 7.000 (in) 68.1 136.2 204.3 238.4

Critical gel str.


Slurry Critical static gel str. (lbf/100ft2)
TAIL 1621.7

Event table
ECD @ 7264.0 ECD @ 6440.0
Job time (min) Rate in (bpm) Rate out (bpm) Vol. in (bbl) Fluid in/btm/out
(ft) (ppg) (ft) (ppg)
0.039 6.00 6.00 0.232 13.47 13.27 PF-01/MUD/MUD
3.372 6.00 6.00 20.232 13.47 13.27 PF-02/MUD/MUD
8.372 6.00 6.00 50.232 13.47 13.27 SPACER/MUD/MUD
16.705 4.00 4.00 100.155 13.41 13.23 TAIL/MUD/MUD
29.002 4.00 4.99 149.341 13.44 13.25 TAIL/PF-01/MUD
31.705 7.00 5.59 160.271 13.29 13.26 MUD/PF-01/MUD
32.595 7.00 6.32 166.496 13.24 13.28 MUD/PF-02/MUD
36.964 7.00 6.77 197.083 12.98 13.02 MUD/SPACER/MUD
44.543 7.00 7.00 250.137 12.84 12.69 MUD/TAIL/MUD

Cement additives
Cement Additive Concentration Unit Amount
TAIL NP-AF01 0.01 (gal/sk) 2.6 (gal)
TAIL NP-G600W 0.80 (%) bwoc 197.30 (lbm)
TAIL NP-T01 1.00 (%) bwoc 246.62 (lbm)
TAIL NP-R01 0.08 (%) bwoc 19.73 (lbm)
TAIL NP-FL03 0.80 (%) bwoc 197.30 (lbm)
TAIL NP-CSE-02 6.00 (%) bwoc 1479.74 (lbm)

4
5
6
7
8
9
Job detail
Time Fluid Vol. in No. of Rate in Rate Pump Choke Free fall Pin - ECD @ ECD @ Pressure Fric. P. pipe Fric. P. Ann.
(min) in/btm/out (bbl) strokes (bpm) out P. (psi) P. (psi) (ft) Pout @ 7264.0 6440.0 @ 7264.0 (psi) (psi)
(stk) (bpm) 7264.0 (ft) (ppg) (ft) (ppg) (ft) (psi)
(ft) (psi)
1 0.039 2/1/1 0.232 2 6.00 6.00 532 15 0.0 0 13.47 13.27 3887 265 251
2 10.000 4/1/1 60.000 300 6.00 6.00 1303 15 0.0 0 13.47 13.27 3887 358 251
3 20.000 5/1/1 113.333 567 4.00 4.00 763 15 0.0 0 13.41 13.23 3867 277 232
4 30.000 5/2/1 153.333 767 4.00 5.40 209 15 117.3 0 13.40 13.26 3865 374 234
5 40.000 6/4/1 218.333 1092 7.00 6.10 232 15 67.2 0 12.92 12.82 3728 428 190
6 50.000 6/5/1 268.095 1341 2.00 2.00 68 15 0.0 0 12.72 12.49 3669 54 181
7 58.003 6/5/1 305.530 1528 2.00 2.00 104 15 0.0 0 12.77 12.51 3684 42 195

10
MD | TVD (ft) Annulus Casing
0 0
MUD,12.60 (ppg)
PF-01,6.80 (ppg)
PF-02,8.60 (ppg)
SPACER,13.00 (ppg)
1000 1000 TAIL,15.80 (ppg)
MUD,12.60 (ppg)

2000 2000

3000 3000

3729.8
4000 3976
4128.4

4726.3
5000 4784

5722.8
6000 5291

7000 5503
7146.8
7264 5526

11
0.0 MUD, 12.60 (ppg) PF-01, 6.80 (ppg) PF-02, 8.60 (ppg)
SPACER, 13.00 (ppg) TAIL, 15.80 (ppg) MUD, 12.60 (ppg)
550.0

1100.0

1650.0

2200.0

2750.0
TVD (ft)

3300.0

3850.0

4400.0

4950.0

5500.0

6050.0

0.0 1100.0 2200.0 3300.0 4400.0 5500.0 6600.0 7700.0


Horizontal displacement (ft)

12
13
 

7.0

CENTRA Report

 
centra

CentraDesign - Centralizer Placement Model


Computational Results

Date: 4/5/2019 Legal:

KOC Contractor: NAPESCO

MN-254 Type of job: 7lINER CEMENTATION

MN Prepared by: HUSAIN

KUWAIT

7'' Liner Centralization With 70%Standoff

1 of 12
Wellbore intervals (from top down) Well name:

DescriptionLocation: ID (in) MD (ft) Friction factor


CASED HOLE 8.755 6440 0.30
OPEN HOLE 8.500 7264 0.30
Pipes (from top down) Include the effects of bow spring centralizers on drag: YesComments:
TAW (lbf) = 0 Min. centralizer spacing = 40 (ft) Max. centralizer spacing = 100(ft)

Connection for SO calculation: No.


Description VAM DP New OVER LAP OPEN HOLE SHOE
Length (ft) 6240 200 704 120
Adjusted Wt (lb/ft) 22.030 26.000 26.000 26.000
OD (in) 5.000 7.000 7.000 7.000
ID (in) 4.276 6.276 6.276 6.276
TJ OD (in) 6.500 7.681 7.681 7.681
TJ ID (in) 4.000 6.276 6.276 6.276
TJ length (in) 14.000 0.000 0.000 14.000
Joint length (ft) 40 40 40 40
Tensile limit (lbf) 554000 415897 415897 415897
Torsional limit (ft-lb) 42700 7228 7228 7228
Density (lb/ft3) 490.0 490.0 490.0 490.0
E (psi) 30000000 30000000 30000000 30000000
Cent. setting N/A Specify spacing N/A N/A
Cent. type N/A Bow spring N/A N/A
Specified spacing (ft) N/A 50 N/A N/A
Specified standoff (%) N/A N/A N/A N/A
Incremental spacing (ft) N/A N/A N/A N/A
Part No. N/A S3122570-7-4-25 N/A N/A
Blade OD (in) N/A N/A N/A N/A
Bow spring OD (uncompressed) N/A 10.252 N/A N/A
Min. compressed OD (in) N/A 8.000 N/A N/A
Start F. (CH) (lbf) N/A 919 N/A N/A
Start F. (OH) (lbf) N/A 919 N/A N/A
Restore F. (CH) (lbf) N/A 1468 N/A N/A
Restore F. (OH) (lbf) N/A 1468 N/A N/A
FF reduction N/A 0 N/A N/A
Free to rotate N/A N/A N/A N/A
Rotational FF N/A N/A N/A N/A
#2: OVER LAP
Hole ID (in) Running F. (lbf)
8.755 501
Consider casing flotation: No
Operation data and fluids
Tripping speed = 0.0 (ft/min) Rotation speed = 0.0 (rpm) Pipe end drag or WOB = 0 (lbf) Pipe end torque or TOB = 0 (ft-lb)
MW in annulus during tripping = 12.60 (ppg) MW inside pipe during tripping = 12.60 (ppg)
Fluid in well after cement job
# Pipe fluids Density (ppg) Top MD (ft)
1 MUD 12.60 0
2 CEMENT 15.80 7144

# Annular fluids Density (ppg) Top MD (ft)


1 MUD 12.60 0
2 CEMENT 15.80 6040
Survey data

2 of 12
MD (ft) Inc (deg) Azi (deg) TVD (ft) Vsec (ft) N+/S- (ft) E+/W- (ft) Dogleg

(deg/100ft)

0 0.00 0.00 0 0 0 0 0.00


100 0.01 263.56 100 0 0 0 0.01
200 0.02 263.56 200 0 0 0 0.01
300 0.03 263.56 300 0 0 0 0.01
400 0.04 263.56 400 0 0 0 0.01
500 0.05 263.56 500 0 0 0 0.01
600 0.04 262.74 600 0 0 0 0.01
700 0.09 276.76 700 0 0 0 0.05
800 0.18 285.98 800 1 0 -1 0.09
900 0.24 295.75 900 1 0 -1 0.07
1000 0.22 314.35 1000 1 0 -1 0.08
1100 0.14 313.75 1100 2 1 -2 0.08
1200 0.10 307.73 1200 2 1 -2 0.04
1300 0.19 301.57 1300 2 1 -2 0.09
1400 0.25 291.03 1400 2 1 -2 0.07
1500 0.15 306.65 1500 3 1 -3 0.11
1600 0.11 289.90 1600 3 1 -3 0.05
1700 0.05 228.83 1700 3 1 -3 0.10
1800 0.08 262.37 1800 3 1 -3 0.05
1900 0.11 216.21 1900 3 1 -3 0.08
2000 0.12 201.96 2000 3 1 -3 0.03
2100 0.18 212.54 2100 3 1 -3 0.07
2200 0.14 220.90 2200 4 1 -3 0.05
2300 0.16 213.00 2300 4 0 -4 0.03
2370 0.17 212.82 2370 4 0 -4 0.01
2431 0.27 209.39 2431 4 0 -4 0.17
2523 0.37 209.22 2523 4 0 -4 0.11
2618 0.06 312.28 2618 4 -1 -4 0.41
2714 0.08 186.33 2714 5 -1 -4 0.13
2808 0.06 35.44 2808 4 -1 -4 0.14
2906 0.15 51.92 2906 4 -1 -4 0.10
2977 0.03 267.30 2977 4 0 -4 0.25
3005 0.04 340.27 3005 4 0 -4 0.15
3100 1.24 291.49 3100 5 0 -5 1.28
3195 3.61 288.46 3195 9 1 -9 2.50
3290 6.03 287.97 3290 17 4 -17 2.55
3386 8.82 288.58 3385 29 8 -28 2.91
3482 10.15 290.17 3479 45 13 -43 1.41
3576 11.57 292.23 3572 63 19 -60 1.57
3667 14.01 290.34 3660 83 27 -79 2.72
3762 16.36 288.18 3752 108 35 -102 2.54
3860 19.28 288.00 3845 138 44 -131 2.98
3955 22.12 288.31 3934 171 55 -163 2.99
4052 24.91 288.75 4023 210 67 -199 2.88
4144 26.68 288.94 4106 250 80 -237 1.93
4235 28.79 287.98 4187 293 93 -277 2.37
4331 31.12 289.21 4270 340 108 -323 2.51
4428 33.58 290.71 4352 392 126 -371 2.67
4523 35.71 291.04 4430 446 145 -422 2.25
4703 40.10 292.22 4572 557 186 -525 2.47
4799 42.82 292.32 4644 620 210 -583 2.83
4895 45.53 291.02 4713 687 235 -646 2.98
4995 48.02 288.22 4781 760 259 -714 3.22

3 of 12
MD (ft) Inc (deg) Azi (deg) TVD (ft) Vsec (ft) N+/S- (ft) E+/W- (ft) Dogleg

(deg/100ft)

5087 50.08 286.93 4841 829 280 -781 2.48


5181 52.70 286.76 4900 903 302 -851 2.79
5276 54.95 284.84 4956 979 323 -925 2.88
5374 57.16 283.27 5011 1060 342 -1003 2.62
5469 58.76 280.59 5061 1140 359 -1082 2.92
5566 60.96 277.90 5110 1223 372 -1165 3.30
5660 63.25 275.31 5154 1305 382 -1248 3.44
5755 64.55 273.85 5196 1388 389 -1333 1.94
5850 66.37 272.07 5235 1472 393 -1419 2.56
5946 68.36 269.98 5272 1558 395 -1507 2.89
6042 70.78 267.94 5306 1645 393 -1597 3.21
6136 71.91 266.10 5336 1730 388 -1686 2.21
6230 73.11 263.86 5364 1816 381 -1776 2.61
6327 75.29 261.54 5390 1904 369 -1868 3.22
6422 77.53 259.72 5413 1991 354 -1959 3.00
6440 78.67 260.00 5416 2007 351 -1977 6.51
6454 79.35 260.00 5419 2020 348 -1990 4.86
6469 79.98 260.00 5422 2034 346 -2005 4.20
6626 82.67 263.58 5445 2182 324 -2158 2.83
6720 80.31 261.86 5459 2272 312 -2250 3.09
6812 80.18 261.53 5475 2359 299 -2340 0.38
6908 81.23 264.38 5490 2451 287 -2434 3.13
7005 83.19 266.06 5504 2545 279 -2530 2.65
7101 85.44 267.09 5513 2639 273 -2625 2.58
7197 85.55 268.51 5521 2734 270 -2721 1.48
7264 85.55 269.40 5526 268 -2788 2801 1.32

4 of 12
5 of 12
6 of 12
7 of 12
Summary
Total number of centralizers required 5

VAM DP New - 5.000 x 4.276 (in) No cent.


Depth interval 0 - 6240 (ft)
Inclination angle range 0 - 73 (deg)
Azimuth angle range 0 - 264 (deg)

OVER LAP - 7.000 x 6.276 (in) Specify spacing Bow


Depth interval 6240 - 6440 (ft)
Inclination angle range 73 - 79 (deg)
Azimuth angle range 264 - 260 (deg)
Centralizer part No. S3122570-7-4-25 (3/16'')
Specified centralizer spacing 50 (ft)
Specified standoff at mid span N/A (%)
Incremental spacing N/A (ft)
Number of centralizers required 5
Average centralizer spacing 50 (ft)
Min. / Max. annular clearance at mid span 0.000 / 0.511 (in)
Min. / Max. standoff at mid span 0.0 / 58.3 (%)
Min. / Max. side force on centralizer 64 / 678 (lbf)

OPEN HOLE - 7.000 x 6.276 (in) No cent.


Depth interval 6440 - 7144 (ft)
Inclination angle range 79 - 85 (deg)
Azimuth angle range 260 - 268 (deg)

SHOE - 7.000 x 6.276 (in) No cent.


Depth interval 7144 - 7264 (ft)
Inclination angle range 85 - 86 (deg)
Azimuth angle range 268 - 269 (deg)
Torque and drag
String MD (ft) HL - slack off w/o rot. HL - Static (lbf) HL - pick up w/o rot. ST - slack off w/o rot. ST - Static (ft-lb) ST - pick up w/o rot.
(lbf) (lbf) (ft-lb) (ft-lb)
0 0 0 0 0 0 0
100 2106 2106 2106 0 0 0
200 4212 4212 4212 0 0 0
300 6318 6318 6318 0 0 0
400 8424 8424 8424 0 0 0
500 10529 10529 10529 0 0 0
600 12635 12635 12635 0 0 0
700 14741 14741 14741 0 0 0
800 16847 16847 16847 0 0 0
900 18953 18953 18953 0 0 0
1000 21059 21059 21059 0 0 0
1100 22976 22976 22976 0 0 0
1200 24834 24834 24834 0 0 0
1300 26692 26692 26692 0 0 0
1400 28549 28549 28549 0 0 0
1500 30407 30407 30407 0 0 0
1600 32265 32265 32265 0 0 0
1700 34122 34122 34122 0 0 0
1800 35980 35980 35980 0 0 0
1900 37838 37838 37838 0 0 0

8 of 12
String MD (ft) HL - slack off w/o rot. HL - Static (lbf) HL - pick up w/o rot. ST - slack off w/o rot. ST - Static (ft-lb) ST - pick up w/o rot.
(lbf) (lbf) (ft-lb) (ft-lb)
2000 39696 39696 39696 0 0 0
2100 41553 41553 41553 0 0 0
2200 43411 43411 43411 0 0 0
2300 45269 45269 45269 0 0 0
2400 47127 47127 47127 0 0 0
2500 48984 48984 48984 0 0 0
2600 50842 50842 50842 0 0 0
2700 52700 52700 52700 0 0 0
2800 54558 54558 54558 0 0 0
2900 56415 56415 56415 0 0 0
3000 58273 58273 58273 0 0 0
3100 60131 60131 60131 0 0 0
3200 61987 61987 61987 0 0 0
3300 63836 63836 63836 0 0 0
3400 65675 65675 65675 0 0 0
3500 67502 67502 67502 0 0 0
3600 69320 69320 69320 0 0 0
3700 71120 71120 71120 0 0 0
3800 72893 72893 72893 0 0 0
3900 74637 74637 74637 0 0 0
4000 76342 76342 76342 0 0 0
4100 78008 78008 78008 0 0 0
4200 79637 79637 79637 0 0 0
4300 81230 81230 81230 0 0 0
4400 82777 82777 82777 0 0 0
4500 84277 84277 84277 0 0 0
4600 85729 85729 85729 0 0 0
4700 87127 87127 87127 0 0 0
4800 88467 88467 88467 0 0 0
4900 89739 89739 89739 0 0 0
5000 90948 90948 90948 0 0 0
5100 92094 92094 92094 0 0 0
5200 93176 93176 93176 0 0 0
5300 94184 94184 94184 0 0 0
5400 95134 95134 95134 0 0 0
5500 96025 96025 96025 0 0 0
5600 96860 96860 96860 0 0 0
5700 97626 97626 97626 0 0 0
5800 98339 98339 98339 0 0 0
5900 99006 99006 99006 0 0 0
6000 99602 99602 99602 0 0 0
6100 100140 100140 100140 0 0 0
6200 100626 100626 100626 0 0 0
6300 101076 101076 101076 0 0 0
6400 101451 101451 101451 0 0 0
6500 101725 101725 101725 0 0 0
6600 101917 101917 101917 0 0 0
6700 102111 102111 102111 0 0 0
6800 102351 102351 102351 0 0 0
6900 102593 102593 102593 0 0 0
7000 102791 102791 102791 0 0 0
7100 102915 102915 102915 0 0 0
7200 103004 103004 103004 0 0 0
7264 103065 103065 103065 0 0 0

9 of 12
Centralizer calculation
Dogleg Hole ID (in) x Pipe OD Side F. per Cent. Standoff @ Standoff @ mid Side F. @
MD (ft) Inc (deg) Azi (deg) Axial F. (lbf) Cent. type Part No. Spacing (ft)
(deg/100ft) (in) joint (lbf) setting cent. (%) span (%) cent. (lbf)

1 0 0.00 0.00 0.01 8.755 x 5.000 101889 9N/A


2 100 0.01 263.56 0.01 8.755 x 5.000 100032 7N/A
3 200 0.02 263.56 0.01 8.755 x 5.000 98174 6N/A
4 300 0.03 263.56 0.01 8.755 x 5.000 96316 6N/A
5 400 0.04 263.56 0.01 8.755 x 5.000 94458 6N/A
6 500 0.05 263.56 0.01 8.755 x 5.000 92601 7N/A
7 600 0.04 262.74 0.01 8.755 x 5.000 90743 32N/A
8 700 0.09 276.76 0.05 8.755 x 5.000 88885 55N/A
9 800 0.18 285.98 0.09 8.755 x 5.000 87027 39N/A
10 900 0.24 295.75 0.07 8.755 x 5.000 85170 46N/A
11 1000 0.22 314.35 0.08 8.755 x 5.000 83312 48N/A
12 1100 0.14 313.75 0.08 8.755 x 5.000 81454 25N/A
13 1200 0.10 307.73 0.04 8.755 x 5.000 79597 48N/A
14 1300 0.19 301.57 0.09 8.755 x 5.000 77739 36N/A
15 1400 0.25 291.03 0.07 8.755 x 5.000 75881 61N/A
16 1500 0.15 306.65 0.11 8.755 x 5.000 74023 29N/A
17 1600 0.11 289.90 0.05 8.755 x 5.000 72166 52N/A
18 1700 0.05 228.83 0.10 8.755 x 5.000 70308 23N/A
19 1800 0.08 262.37 0.05 8.755 x 5.000 68450 38N/A
20 1900 0.11 216.21 0.08 8.755 x 5.000 66592 13N/A
21 2000 0.12 201.96 0.03 8.755 x 5.000 64735 27N/A
22 2100 0.18 212.54 0.07 8.755 x 5.000 62877 22N/A
23 2200 0.14 220.90 0.05 8.755 x 5.000 61019 11N/A
24 2300 0.16 213.00 0.03 8.755 x 5.000 59161 21N/A
25 2400 0.22 211.13 0.17 8.755 x 5.000 57304 45N/A
26 2500 0.35 209.26 0.11 8.755 x 5.000 55446 154N/A
27 2600 0.12 292.75 0.41 8.755 x 5.000 53588 57N/A
28 2700 0.08 204.70 0.13 8.755 x 5.000 51730 66N/A
29 2800 0.06 48.28 0.14 8.755 x 5.000 49873 26N/A
30 2900 0.14 50.91 0.10 8.755 x 5.000 48015 56N/A
31 3000 0.04 327.24 0.15 8.755 x 5.000 46157 384N/A
32 3100 1.24 291.49 1.28 8.755 x 5.000 44299 709N/A
33 3200 3.74 288.40 2.55 8.755 x 5.000 42443 667N/A
34 3300 6.32 288.06 2.91 8.755 x 5.000 40593 630N/A
35 3400 9.01 288.84 1.41 8.755 x 5.000 38752 249N/A
36 3500 10.42 290.61 1.57 8.755 x 5.000 36921 297N/A
37 3600 12.21 291.66 2.72 8.755 x 5.000 35099 449N/A

10 of 12
Dogleg Hole ID (in) x Pipe OD Side F. per Cent. Standoff @ Standoff @ mid Side F. @
MD (ft) Inc (deg) Azi (deg) Axial F. (lbf) Cent. type Part No. Spacing (ft)
(deg/100ft) (in) joint (lbf) setting cent. (%) span (%) cent. (lbf)

38 3700 14.82 289.51 2.54 8.755 x 5.000 33293 390N/A


39 3800 17.49 288.11 2.98 8.755 x 5.000 31508 378N/A
40 3900 20.48 288.14 2.99 8.755 x 5.000 29752 299N/A
41 4000 23.41 288.53 2.88 8.755 x 5.000 28028 138N/A
42 4100 25.83 288.85 1.93 8.755 x 5.000 26340 52N/A
43 4200 27.98 288.33 2.37 8.755 x 5.000 24683 45N/A
44 4300 30.37 288.83 2.51 8.755 x 5.000 23061 116N/A
45 4400 32.87 290.30 2.67 8.755 x 5.000 21479 106N/A
46 4500 35.19 290.96 2.25 8.755 x 5.000 19939 141N/A
47 4600 37.59 291.57 2.47 8.755 x 5.000 18444 182N/A
48 4700 40.03 292.20 2.47 8.755 x 5.000 16996 185N/A
49 4800 42.85 292.32 2.98 8.755 x 5.000 15603 259N/A
50 4900 45.65 290.87 3.22 8.755 x 5.000 14273 365N/A
51 5000 48.13 288.15 2.48 8.755 x 5.000 13003 381N/A
52 5100 50.44 286.90 2.79 8.755 x 5.000 11791 384N/A
53 5200 53.15 286.37 2.88 8.755 x 5.000 10642 459N/A
54 5300 55.49 284.45 2.62 8.755 x 5.000 9559 504N/A
55 5400 57.59 282.53 2.92 8.755 x 5.000 8535 550N/A
56 5500 59.46 279.72 3.30 8.755 x 5.000 7565 551N/A
57 5600 61.78 276.95 3.44 8.755 x 5.000 6653 585N/A
58 5700 63.80 274.69 1.94 8.755 x 5.000 5804 617N/A
59 5800 65.41 273.00 2.56 8.755 x 5.000 5007 624N/A
60 5900 67.40 270.97 2.89 8.755 x 5.000 4263 636N/A
61 6000 69.72 268.82 3.21 8.755 x 5.000 3584 591N/A
62 6100 71.48 266.80 2.21 8.755 x 5.000 3032 562N/A
63 6200 72.72 264.57 2.61 8.755 x 5.000 2562 562N/A
64 6240 73.33 263.62 3.22 8.755 x 7.000 2383 530Spacing Bow S3122570-7-4-25 (3/16'') 50 84.9 51.1 667
65 6290 74.46 262.42 3.22 8.755 x 7.000 2179 536Spacing Bow S3122570-7-4-25 (3/16'') 50 84.7 50.6 673
66 6340 75.60 261.29 3.00 8.755 x 7.000 1990 540Spacing Bow S3122570-7-4-25 (3/16'') 50 84.6 50.4 678
67 6390 76.77 260.33 3.00 8.755 x 7.000 1815 529Spacing Bow S3122570-7-4-25 (3/16'') 50 84.9 58.3 667
68 6440 78.67 260.00 6.51 8.755 x 7.000 1659 545Spacing Bow S3122570-7-4-25 (3/16'') 50 99.3 0.0 64
69 6500 80.51 260.71 2.83 8.500 x 7.000 1500 565N/A
70 6600 82.22 262.99 2.83 8.500 x 7.000 1280 591N/A
71 6700 80.81 262.23 3.09 8.500 x 7.000 1064 582N/A
72 6800 80.20 261.57 0.38 8.500 x 7.000 822 575N/A
73 6900 81.14 264.14 3.13 8.500 x 7.000 584 576N/A
74 7000 83.09 265.97 2.65 8.500 x 7.000 383 580N/A
75 7100 85.42 267.08 2.58 8.500 x 7.000 236 584N/A
76 7144 85.49 267.73 1.48 8.500 x 7.000 185 790N/A

11 of 12
Dogleg Hole ID (in) x Pipe OD Side F. per Cent. Standoff @ Standoff @ mid Side F. @
MD (ft) Inc (deg) Azi (deg) Axial F. (lbf) Cent. type Part No. Spacing (ft)
(deg/100ft) (in) joint (lbf) setting cent. (%) span (%) cent. (lbf)

77 7200 85.55 268.54 1.32 8.500 x 7.000 98 790N/A


78 7264 85.55 269.40 1.32 8.500 x 7.000 0 790N/A

0
Side force after cementing
550

1100

1650

2200
TVD (ft)

2750

3300

3850

4400

4950

5500

6050

0 1100 2200 3300 4400 5500 6600 7700

Horizontal displacement (ft)

12 of 12