Department of Public Works and Highways (DPWH)

Contract ID : 22LB0427
Contract Name : Installation of Road Safety Devices - ABS-CBN-Quimpo Blvd Div. Rd - K1514 +
470 - K1515 + 320, Davao City
Location of the Contract : Davao City

SUMMARY OF BID PRICES


(All Part of Bill of Quantities)
Duration : 99 Calendar Days
ABC : 12,250,000.00
Item No. Description Total Amount
Part B Other General Requirements
B.5 Project Billboard / Signboard (2- 4'x8' DPWH Billboard & 1- 8'x8' COA Billboard) 18,506.60
B.7(2) Occupational Safety and Health Program 152,049.90
B.8(2) Traffic Management 77,924.70
B.9 Mobilization/Demobilization 198,482.59

PART C EARTHWORK
803(1)a Structure Excavation (Common Soil) 30,975.00
804(4) Gravel Fill 27,301.37

PART H Other Miscellaneous Structures


607(3)b Internally Illuminated (Solar) Pavement Levelled Marker/Stud Flush Type (Bi-Directional) 6,780,247.85
624(1)a1 Solar LED Street Light 4,842,012.00

Sub Total for This Page: 12,127,500.00


Total of All Amount in Words

Twelve Million One Hundred Twenty Seven Thousand Five Hundred Pesos.

Name MARK JOSEPH C. RUBINOS in the capacity Authorized Managing Officer

Signed DATE : March 10, 2022

Duly authorized to signed the Bid for and on behalf of NEN Builders and Development Services Corp.
Department of Public Works and Highways (DPWH)

Contract ID : 22LB0427
Contract Name : Installation of Road Safety Devices - ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 470 -
K1515 + 320, Davao City
Location of the Contract : Davao City

BILL OF QUANTITIES
Part No. _____________ Part Description : _______________________
Part Item Description Unit Quantity Quantity Bid Price
No. (Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
PART B OTHER GENERAL REQUIREMENTS
B.5 Each 3.00 In Words In Words
Project Billboard / Signboard
Six Thousand One Hundred Sixty Eight Eighteen Thousand Five Hubdred Six Pesos
(2- 4'x8' DPWH Billboard & 1-
Pesos and 87/100. and 60/100.
8'x8' COA Billboard)
In Figures 6,168.87 In Figures 18,506.60
B.7(2) Occupational Safety and L.s 1.00 In Words In Words
Health Program One Hundred Fifty Two Thousand Forty One Hundred Fifty Two Thousand Forty
Nine Pesos and 90/100. Nine Pesos and 90/100.
In Figures 152,049.90 In Figures 152,049.90
B.8(2) Traffic Management l.s. 1.00 In Words In Words
Seventy Seven Thousand Nine Hundred Seventy Seven Thousand Nine Hundred
Twenty Four Pesos and 70/100. Twenty Four Pesos and 70/100.
In Figures 77,924.70 In Figures 77,924.70
B.9 Mobilization/Demobilization l.s. 1.00 In Words In Words
Two Hundred Forty One Thousand Eight One Hundred Ninety Eight Thousand
Hundred Pesos and 89/100. Fifty Pesos and 19/100.
In Figures 198,482.59 In Figures 198,482.59
PART C EARTHWORK
803(1)a Structure Excavation cu.m. 9.60 In Words In Words
(Common Soil) Three Thousand Two Hundred Twenty Six Thirty Thousand Nine Hundred Seventy
Pesos and 56/100. Five Pesos.
In Figures 3,226.56 In Figures 30,975.00

In Words
SUB TOTAL FOR THIS PAGE Four Hundred Forty Six Thousand Five
Hundred Thirty One Pesos and 38/100.
In Figures 477,938.79

Submitted by:

MARK JOSEPH C. RUBINOS DATE: March 10, 2022


(Name & Signature of Bidder's Representative)
Authorized Managing Officer
Position

NEN Builders & Development Services Corporation


Name of Bidder
Department of Public Works and Highways (DPWH)

Contract ID : 22LB0427
Contract Name : Installation of Road Safety Devices - ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 470 -
K1515 + 320, Davao City
Location of the Contract : Davao City

BILL OF QUANTITIES
Part No. _____________ Part Description : _______________________
Part Item Description Unit Quantity Quantity Bid Price
No. (Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
804(4) Gravel Fill cu.m. 0.02 In Words In Words
One Million Three Hundred Sixty Five Twenty Seven Thousand Three Hundred
Thousand Sixty Eight Pesos and 25/100. One Pesos and 37/100.
In Figures 1,365,068.25 In Figures 27,301.37
PART H MISCELLANEOUS STRUCTURES
607(3)b Internally Illuminated (Solar) each 561.00 In Words In Words
Pavement Levelled Twelve Thousand Eighty Nine Pesos and Six Million Seven Hundred Eighty Thousand
Marker/Stud Flush Type (Bi- 85/100. Two Hundred Forty Seven Pesos and 85/100.
Directional) In Figures 12,086.00 In Figures 6,780,247.85
624(1)a1 Solar LED Street Light each 80.00 In Words In Words
Sixty Thousand Five Hundred Twenty Five Four Million Eight Hundred Forty Two
Pesos and 15/100. Thousand Twelve Pesos.
In Figures 60,525.15 In Figures 4,842,012.00

In Words
SUB TOTAL FOR THIS PAGE Eleven Million Six Hundred Forty Nine
Thousand Five Hundred Sixty One Pesos
and 21/100.
In Figures 11,649,561.21
In Words
Total for this Project: Twelve Million One Hundred Twenty
Seven Thousand Five Hundred Pesos.

In Figures 12,127,500.00

Submitted by:

MARK JOSEPH C. RUBINOS DATE: March 10, 2022


(Name & Signature of Bidder's Representative)
Authorized Managing Officer
Position

NEN Builders & Development Services Corporation


Name of Bidder
Department of Public Works and Highways (DPWH)+A179

Contract ID : 22LB0427
Contract Name : Installation of Road Safety Devices - ABS-CBN-Quimpo Blvd Div. Rd - K1514 +
470 - K1515 + 320, Davao City
Location of the Contract : Davao City

DETAILED ESTIMATES

Part B Description: OTHER GENERAL REQUIREMENT


Pay Item No.: B.5
Description: Project Billboard / Signboard (2- 4'x8' DPWH Billboard & 1- 8'x8' COA Billboard)
Unit of Measurement : Each Quantity : 3.00

I. EQUIPMENT RENTAL/MATERIALS:

No. of Qty. Description Rental/Unit Cost No. of days COST (ADD)


90.00 bd.ft. Post 18 - 2" x 3" x 10' 25.00 2,250.00
48.00 bd.ft. Extended Nailer 18 - 2" x 2" x 8' 25.00 1,200.00
60.00 bd.ft. Diagonal Bracing 12 - 2" x 3" x 10' 25.00 1,500.00
39.99 bd.ft. Cross Bracing 12 - 2" x 2" x 10' 25.00 999.75
15.00 bd.ft. Staking 25.00 375.00
3.00 sht. 1/2" thk x 4 x 8 Marine Plywood 714.00 2,142.00
3.00 kgs Assorted C.W. Nails 76.00 228.00
3.00 lot Painting & Lettering 1,700.00 5,100.00

TOTAL Equipment Rental/Material Cost P 13,794.75

II. DIRECT LABOR


No. of
Hours/Day
No. of Qty. Description Rate per Hour/Day s COST (ADD)
1 Project Foreman 650.00 1.0 650.00
1 Skilled Labor 475.00 1.0 475.00
4 Unskilled Labor 350.00 1.0 1,400.00

SUB-TOTAL 2,525.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 2,525.00

Total Direct Cost P 16,319.75


O.C.M. P -
Profit P 1,305.58
TAX P 881.27
Total Indirect Cost P 2,186.85
Total Cost P 18,506.60
Unit Cost P 6,168.87
Department of Public Works and Highways (DPWH)

Contract ID : 22LB0427
Contract Name : Installation of Road Safety Devices - ABS-CBN-Quimpo Blvd Div. Rd - K1514 +
470 - K1515 + 320, Davao City
Location of the Contract : Davao City

DETAILED ESTIMATES

Part B Description: OTHER GENERAL REQUIREMENT


Pay Item No.: B.7(2)
Description: Occupational Safety and Health Program
Unit of Measurement : L.s Quantity : 1.00

I. EQUIPMENT RENTAL/MATERIALS:

No. of Qty. Description Rental/Unit Cost No. of days COST (ADD)


50 pcs Safety Helmet 79.00 3,950.00
50 pcs Safety Shoes 182.36 9,117.92
50 pcs Gloves 504.94 25,247.08
50 pcs Reflectorized Safety Vest 566.17 28,308.33
3 pcs Medical Kit 5,069.17 15,207.50
1 pc Signages for Safety 14,543.16 14,543.16

TOTAL Equipment Rental/Material Cost P 96,374.00

II. DIRECT LABOR


No. of
Hours/Day
No. of Qty. Description Rate per Hour/Day s COST (ADD)
1 Safety Officer 17,378.00 0.26 4,576.21
1 First Aider 12,582.00 2.63 33,132.60

SUB-TOTAL 37,708.81
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 37,708.81

Total Direct Cost P 134,082.80


O.C.M. P -
Profit P 10,726.62
TAX P 7,240.47
Total Indirect Cost P 17,967.10
Total Cost P 152,049.90
Unit Cost P 152,049.90
Department of Public Works and Highways (DPWH)

Contract ID : 22LB0427
Contract Name : Installation of Road Safety Devices - ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 470 -
K1515 + 320, Davao City
Location of the Contract : Davao City

DETAILED ESTIMATES

Part B Description: OTHER GENERAL REQUIREMENT


Pay Item No.: B.8(2)
Description: Traffic Management
Unit of Measurement : l.s. Quantity : 1.00

I. EQUIPMENT RENTAL/MATERIALS:

No. of Qty. Description Rental/Unit Cost No. of days COST (ADD)


1.00 l.s. Traffic Management 20,000.00 2.63 52,666.67

TOTAL Equipment Rental/Material Cost P 52,666.67

II. DIRECT LABOR


No. of
Hours/Day
No. of Qty. Description Rate per Hour/Day s COST (ADD)
1 Project Foreman 650.00 3 1,950.00
4 Skilled Labor 475.00 3 5,700.00
8 Unskilled Labor 350.00 3 8,400.00

SUB-TOTAL 16,050.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 16,050.00

Total Direct Cost P 68,716.67


O.C.M. P -
Profit P 5,497.33
TAX P 3,710.70
Total Indirect Cost P 9,208.03
Total Cost P 77,924.70
Unit Cost P 77,924.70
Department of Public Works and Highways (DPWH)

Contract ID : 22LB0427
Contract Name : Installation of Road Safety Devices - ABS-CBN-Quimpo Blvd Div. Rd - K1514 +
470 - K1515 + 320, Davao City
Location of the Contract : Davao City

DETAILED ESTIMATES

Part B Description: OTHER GENERAL REQUIREMENT


Pay Item No.: B.9
Description: Mobilization/Demobilization
Unit of Measurement : l.s. Quantity : 1.00

I. EQUIPMENT RENTAL/MATERIALS:

No. of Qty. Description Rental/Unit Cost No. of days COST (ADD)


1 units Stake Cargo 1,162.50 89.73 104,313.72
1 unit Motorized Road Grader, G710A 12 -
1 unit Vibratory Roller (10 m.t.), SP56 12 -
1 unit Bulldozer (155 Hp), D65A-8 12 -
1 unit Backhoe w/ Breaker (0.80 cu.m.) 12 -
1 unit Payload (1.50 cu.m.) 12 -
4 unit Transit Mixer (5 cu.m.) 906.25 12 43,500.00
3 unit Dumptruck (10 cu.m.) 906.25 12 32,625.00

TOTAL Equipment Rental/Material Cost P 180,438.72

II. DIRECT LABOR


No. of
Hours/Day
No. of Qty. Description Rate per Hour/Day s COST (ADD)

SUB-TOTAL -
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P -

Total Direct Cost P 180,438.72


O.C.M. P -
Profit P -
TAX P 9,021.94
Total Indirect Cost P 9,021.94
Total Cost P 198,482.59
Unit Cost P 198,482.59
Department of Public Works and Highways (DPWH)

Contract ID : 22LB0427
Contract Name : Installation of Road Safety Devices - ABS-CBN-Quimpo Blvd Div. Rd - K1514 +
470 - K1515 + 320, Davao City
Location of the Contract : Davao City

DETAILED ESTIMATES

Part C Description: EARTHWORKS


Pay Item No.: 803(1)a
Description: Structure Excavation (Common Soil)
Unit of Measurement : cu.m. Quantity : 9.60

I. EQUIPMENT RENTAL/MATERIALS:

No. of Qty. Description Rental/Unit Cost No. of days COST (ADD)


2 unit Dump Truck 7,250.00 1 14,500.00
1 unit Backhoe 8,800.00 1 8,800.00

TOTAL Equipment Rental/Material Cost P 23,300.00

II. DIRECT LABOR


No. of
Hours/Day
No. of Qty. Description Rate per Hour/Day s COST (ADD)
1 Project Foreman 650.00 1 650.00
3 Laborer 350.00 1 1,050.00

SUB-TOTAL 1,700.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 1,700.00

Total Direct Cost P 25,000.00


O.C.M. P 2,500.00
Profit P 2,000.00
TAX P 1,475.00
Total Indirect Cost P 5,975.00
Total Cost P 30,975.00
Unit Cost P 3,226.56
Department of Public Works and Highways (DPWH)

Contract ID : 22LB0427
Contract Name : Installation of Road Safety Devices - ABS-CBN-Quimpo Blvd Div. Rd - K1514 +
470 - K1515 + 320, Davao City
Location of the Contract : Davao City

DETAILED ESTIMATES

Part C Description: EARTHWORKS


Pay Item No.: 804(4)
Description: Gravel Fill
Unit of Measurement : cu.m. Quantity : 0.02

I. EQUIPMENT RENTAL/MATERIALS:

No. of Qty. Description Rental/Unit Cost No. of days COST (ADD)


1 unit Road Grader 8,250.00 1 8,250.00
1 unit Road Roller 6,700.00 1 6,700.00
1 unit Water Truck 5,725.00 1 5,725.00

0.03 cu.m. Embankment Materials 400.00 10.00

TOTAL Equipment Rental/Material Cost P 20,685.00

II. DIRECT LABOR


No. of
Hours/Day
No. of Qty. Rate per Hour/Day s COST (ADD)
1 Construction Foreman 650.00 1 650.00
2 Unskilled Labor 350.00 1 700.00

SUB-TOTAL 1,350.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 1,350.00

Total Direct Cost P 22,035.00


O.C.M. P 2,203.50
Profit P 1,762.80
TAX P 1,300.07
Total Indirect Cost P 5,266.37
Total Cost P 27,301.37
Unit Cost P 1,365,068.25
Department of Public Works and Highways (DPWH)

Contract ID : 22LB0427
Contract Name : Installation of Road Safety Devices - ABS-CBN-Quimpo Blvd Div. Rd - K1514 +
470 - K1515 + 320, Davao City
Location of the Contract : Davao City

DETAILED ESTIMATES

Part H Description: MISCELLANEOUS STRUCTURES


Pay Item No.: 607(3)b
Description: Internally Illuminated (Solar) Pavement Levelled Marker/Stud Flush Type (Bi-Directional)
Unit of Measurement : each Quantity : 561.00

I. EQUIPMENT RENTAL/MATERIALS:

No. of Qty. Description Rental/Unit Cost No. of days COST (ADD)


561.00 pc Reflectorized Solar Road Stud, Dimension 8,000.00 4,488,000.00
x 45mm thickness)
6.73 lit Concrete Epoxy A & B 1,250.00 8,415.00
TOTAL Equipment Rental P 4,496,415.00

1.00 unit Drill, CP-8 with attachment 1,560.00 140.00 218,400.00


1.00 unit Cargo Truck 9,300.00 35.00 325,500.00
1.00 unit Compressor 1,736.00 140.00 243,040.00

TOTAL Equipment Rental P 786,940.00

TOTAL Equipment Rental/Material Cost P 5,283,355.00

II. DIRECT LABOR


No. of
Hours/Day
No. of Qty. Description Rate per Hour/Day s COST (ADD)
1 Construction Foreman 650.00 140 91,000.00
2 Unskilled Labor 350.00 140 98,000.00

SUB-TOTAL 189,000.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 189,000.00

Total Direct Cost P 5,472,355.00


O.C.M. P 547,235.50
Profit P 437,788.40
TAX P 322,868.95
Total Indirect Cost P 1,307,892.85
Total Cost P 6,780,247.85
Unit Cost P 12,086.00
Department of Public Works and Highways (DPWH)

Contract ID : 22LB0427
Contract Name : Installation of Road Safety Devices - ABS-CBN-Quimpo Blvd Div. Rd - K1514 +
470 - K1515 + 320, Davao City
Location of the Contract : Davao City
DETAILED ESTIMATES

Part H Description: MISCELLANEOUS STRUCTURE


Pay Item No.: 624(1)a1
Description: Solar LED Street Light
Unit of Measurement : each Quantity : 80.00

I. EQUIPMENT RENTAL/MATERIALS:

No. of Qty. Description Rental/Unit Cost No. of days COST (ADD)


80 each Solar LED Street Light 48,850.00 3,908,000.00

TOTAL Equipment Rental/Material Cost P 3,908,000.00

II. DIRECT LABOR


No. of
Hours/Day
No. of Qty. Description Rate per Hour/Day s COST (ADD)

SUB-TOTAL -
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P -

Total Direct Cost P 3,908,000.00


O.C.M. P 390,800.00
Profit P 312,640.00
TAX P 230,572.00
Total Indirect Cost P 934,012.00
Total Cost P 4,842,012.00
Unit Cost P 60,525.15
TIME MOTION ANALYSIS
2a/8

ITEM 102 : DISPOSAL OF WASTE MATERIALS


QUANTITY : #REF! cu.m.
Quarry Distance : 5.0 kms
Quarry Site : Tugbok
Dumptruck travel time without load = Quarry Distance
Velocity of DT w/out load
= 5.00 kms. X 60 mins./hr.
40 km/hr.
= 300.0 min. = 7.50 min.
40.0

Dumptruck travel time with load = Quarry Distance


Velocity of DT w/ load
= 5.00 kms. X 60 mins./hr.
35 km/hr.
= 300.0 min. = 8.57 min.
35.0

time loading = 10 min ; turning time = 4 min = 14.00 min.


time unloading = 4 min ; turning time = 4 min = 8.00 min.
Total DT travel time = 38.07 min.

No. of trips per day = 7.5 hrs./day x 60min./hr. = 450 = 11.82 trips/day
Total DT travel time 38.07
say 11.00 trips/day

Using No. of Units Dumptrucks: 3 units 10W Dumptrucks

Volume hauled per day: 11 trips x 3 DT x 8 cu.m = 264.00 cu.m./day

=
No. of days to complete hauling = #REF! cu.m. #REF! days

264.00 cu.m./day say #REF! days

Loader Requirement:

Capacity of Loader par day = 30 cu.m. x 8.0 hrs./day


= 240.0 cu.m.

Use the maximum Loader requirement = 264.0 cu.m.


240.0 cu.m.
= 1.10 day/s

say 1.0 Loader/s


TIME MOTION ANALYSIS
2a/8

ITEM 102 : DISPOSAL OF WASTE MATERIALS


QUANTITY : #REF! cu.m.
Quarry Distance : 5.0 kms
Quarry Site : Brgy. Langtud
Dumptruck travel time without load = Quarry Distance
Velocity of DT w/out load
= 5.00 kms. X 60 mins./hr.
40 km/hr.
= 300.0 min. = 7.50 min.
40.0

Dumptruck travel time with load = Quarry Distance


Velocity of DT w/ load
= 5.00 kms. X 60 mins./hr.
35 km/hr.
= 300.0 min. = 8.57 min.
35.0

time loading = 10 min ; turning time = 4 min = 14.00 min.


time unloading = 4 min ; turning time = 4 min = 8.00 min.
Total DT travel time = 38.07 min.

No. of trips per day = 7.5 hrs./day x 60min./hr. = 450 = 11.82 trips/day
Total DT travel time 38.07
say 11.00 trips/day

Using No. of Units Dumptrucks: 3 units 10W Dumptrucks

Volume hauled per day: 11 trips x 3 DT x 8 cu.m = 264.00 cu.m./day

=
No. of days to complete hauling = #REF! cu.m. #REF! days

264.00 cu.m./day say #REF! days

Loader Requirement:

Capacity of Loader par day = 30 cu.m. x 8.0 hrs./day


= 240.0 cu.m.

Use the maximum Loader requirement = 264.0 cu.m.


240.0 cu.m.
= 1.10 day/s

say 2.0 Loader/s

ITEM 104(5) : Boulder Fill


QUANTITY : #REF! cu.m.
Quarry Distance : 5.0 kms
Quarry Site : Brgy. Langtud
Dumptruck travel time without load = Quarry Distance
Velocity of DT w/out load
= 5.00 kms. X 60 mins./hr.
40 km/hr.
= 300.0 min. = 7.50 min.
40.0
Dumptruck travel time with load = Quarry Distance
Velocity of DT w/ load
= 5.00 kms. X 60 mins./hr.
35 km/hr.
= 300.0 min. = 8.57 min.
35.0

time loading = 10 min ; turning time = 4 min = 14.00 min.


time unloading = 4 min ; turning time = 4 min = 8.00 min.
Total DT travel time = 38.07 min.

No. of trips per day = 7.5 hrs./day x 60min./hr. = 450 = 11.82 trips/day
Total DT travel time 38.07
say 11.00 trips/day

Using No. of Units Dumptrucks: 3 units 10W Dumptrucks

Volume hauled per day: 11 trips x 3 DT x 8 cu.m = 264.00 cu.m./day

=
No. of days to complete hauling = #REF! cu.m. #REF! days

264.00 cu.m./day say #REF! days

Loader Requirement:

Capacity of Loader par day = 30 cu.m. x 8.0 hrs./day


= 240.0 cu.m.

Use the maximum Loader requirement = 264.0 cu.m.


240.0 cu.m.
= 1.10 day/s

say 2.0 Loader/s

ITEM 200 : AGGREGATE SUB-BASE COURSE


QUANTITY : #REF! cu.m.
Quarry Distance : 20.0 kms
Quarry Site : Maragusan River, Maragusan
Dumptruck travel time without load = Quarry Distance
Velocity of DT w/out load
= 20.00 kms. X 60 mins./hr.
40 km/hr.
= 1,200.0 min. = 30.00 min.
40.0

Dumptruck travel time with load = Quarry Distance


Velocity of DT w/ load
= 20.00 kms. X 60 mins./hr.
35 km/hr.
= 1,200.0 min. = 34.29 min.
35.0
time loading = 10 min ; turning time = 4 min = 14.00 min.
time unloading = 4 min ; turning time = 4 min = 8.00 min.
Total DT travel time = 86.29 min.

No. of trips per day = 7.5 hrs./day x 60min./hr. = 450 = 5.21 trips/day
Total DT travel time 86.29
say 5.00 trips/day

Using No. of Units Dumptrucks: 3 units 10W Dumptrucks

Volume hauled per day: 5 trips x 3 DT x 8 cu.m. = 120.00 cu.m./day

=
No. of days to complete hauling = #REF! cu.m. #REF! days

120.00 cu.m./day say #REF! days

Loader Requirement:

Capacity of Loader par day = 30 cu.m. x 8.0 hrs./day


= 240.0 cu.m.

Use the maximum Loader requirement = 120.0 cu.m.


240.0 cu.m.
= 0.50 day/s

say 1.0 Loader/s

TIME MOTION ANALYSIS (batching)


Page: 8b/12
ITEM 311(1) : PCC PAVEMENT (UNREINFORCED)
QUA : cu.m.
Distance : 0.50 kms
Batching Plant Site Within Project Site
Transit Mixer travel time without load = Quarry Distance
Velocity of TM w/out load
= 0.5 kms. X 60 mins./hr.
15 km/hr.
= 30.0 min. = 2.00 min.
15.0

Transit Mixer travel time with = Quarry Distance


Velocity of TM w/ load
= 0.5 kms. X 60 mins./hr.
15 km/hr.
= 30.0 min. = 2.00 min.
15.0

time loading = 30 min ; turning time = 4 min = 34.00 min.


time unloading = 30 min ; turning time = 4 min = 34.00 min.
Total TM travel time = 72.00 min.
No. of batch per da = 6 hrs./day x 60min./hr. = 360 = 5.00 batch/day
Total TM travel time 72.00
say 5.00 batch/day
.
Using No. of Units Transit Mi 1 units Transit Mixer

Volume hauled per day: 5 trips x 1 TM x 10 cu.m = 50.00 cu.m./day

No. of days to complete hauli = - cu.m. - days


=
50.00 cu.m./day say - days
BACK-UP COMPUTATION
3a/8

ITEM 104: EMBANKMENT


NOTE: Please refer to the quantity sheet for the total volume

Volume = #REF! cu.m


Shrinkage Factor:@ 25% #REF! cu.m x 1.25 = #REF! cu.m

Equipments Required:
GRADER: for spreading 1 unit
Capacity: 60 cu.m/hr 7 hrs/day
Capacity/day: 1 unit x 60 x 7 = 420.00 sq.m/day
No.of days required: #REF! / 420.00 = #REF! days say #REF! days

COMPACTOR: 1 unit
Capacity: 30 cu.m/hr 7 hrs/day
Capacity/day: 1 unit x 30 x 7 = 210.00 cu.m/day
No. of days required: #REF! / 210.00 = #REF! days say #REF! days

WATERTRUCK: Every 1 unit 3 days interval of compactor


No. of days required: #REF! / 3 = #REF! days say #REF! days

TECHNICAL: = No. of days of Hauling + No. of days of compaction/2


= #REF! + #REF! = #REF! days say #REF! days

Volume = #REF! cu.m


Shrinkage Factor:@ 25% #REF! cu.m x 1.25 = #REF! cu.m

Equipments Required:
GRADER: for spreading 1 unit
Capacity: 60 cu.m/hr 7 hrs/day
Capacity/day: 1 unit x 60 x 7 = 420.00 sq.m/day
No.of days required: #REF! / 420.00 = #REF! days say #REF! days

COMPACTOR: 1 unit
Capacity: 30 cu.m/hr 7 hrs/day
Capacity/day: 1 unit x 30 x 7 = 210.00 cu.m/day
No. of days required: #REF! / 210.00 = #REF! days say #REF! days

WATERTRUCK: Every 1 unit 3 days interval of compactor


No. of days required: #REF! / 3 = #REF! days say #REF! days

TECHNICAL: = No. of days of Hauling + No. of days of compaction/2


= 5.00 + #REF! = #REF! days say #REF! days

BACK-UP COMPUTATION
5b/8

ITEM 200: AGGREGATE SUB-BASE COURSE

Volume = #REF! cu.m. 1 = #REF! cu.m


Shrinkage Factor: @ 15 % #REF! x 1.15 = #REF! cu.m

Equipments Required :
GRADER: for spreading 1 unit
Capacity: 60 cu.m/hr 7 hrs/day
Capacity/day: 1 unit x 60 x 7 = 420.00 cu.m/day
No. of days required: #REF! / 420 = #REF! days say #REF! days

COMPACTOR: 1 unit
Capacity: 30 cu.m/hr 7 hrs/day
Capacity/day: 1 unit x 30 x 7 = 210.00 cu.m/day
No. of days required: #REF! / 210.00 = #REF! days say #REF! days

WATERTRUCK: Every 1 unit 3 days interval of compactor


No. of days required: #REF! / 3 = #REF! days say #REF! days

TECHNICAL: = No. of days of Hauling + No. of days of compaction/2


= #REF! + #REF! = #REF! days say #REF! days

BACK - UP COMPUTATION

ITEM SCOPE OF WORK

505(2) GROUTED RIPRAP

Volume = = #REF! say #REF! cu.m.

Quantity:
Volume Multiplier
Cement = #REF! x 3.5 = #REF! bags say #REF! bags
Sand = #REF! x 0.625 = #REF! say #REF! cu.m.
Boulders = #REF! x 0.95 = #REF! say #REF! cu.m.

506 STONE MASONRY

Volume = = #REF! say #REF! cu.m.

Quantity:
Volume Multiplier
Cement = #REF! x 4.25 = #REF! bags say #REF! bags
Sand = #REF! x 0.625 = #REF! say #REF! cu.m.
Boulders = #REF! x 0.95 = #REF! say #REF! cu.m.
Department of Public Works and Highways (DPWH)

Contract ID :22LB0427
Contract Name : Installation of Road Safety Devices - ABS-CBN-Quimpo Blvd Div. Rd - K1514 +
470 - K1515 + 320, Davao City
Location of the Contract Davao City

SUMMARY DATA SHEET

MANPOWER
Project Engineer 1,000.00 / day
C & M Foreman / Eng'ng Assistant 650.00 / day
Laborer / T&C Helper 350.00 / day
Mason/ Steelman/ Carpenter/ Painter 475.00 / day
Welder/Eletrician 420.00 / day
H.E.O. (Bulldozer/Excavator/Loader/Grader/Crane/Prime Mover) 550.00 / day
Driver (Dumptruck/Water Truck) 475.00 / day
L.E.O. (Compactor, Vibrator, Mixer) 425.00 / day

EQUIPMENT FUEL CONSUMPTION OPERATED Rental 100%


Bulldozer 80.00 lit. / day 15,600.00 / day
Back hoe 60.00 lit. / day 8,800.00 / day
Dump Truck 50.00 lit. / day 7,250.00 / day
Water Truck 35.00 lit. / day 5,725.00 / day
Road Grader 50.00 lit. / day 8,250.00 / day
Road Roller 40.00 lit. / day 6,700.00 / day
Pay Loader 50.00 lit. / day 11,550.00 / day
Transit Mixer 40.00 lit. / day 7,250.00 / day
PRIME MOVER/ LOW BED TRAILER 60.00 lit. / day 9,300.00 / day
Single Bagger Concrete Mixer 6.00 lit. / day 1,736.00 / day
Concrete Vibrator 6.00 lit. / day 1,030.00 / day
PLATE COMPACTOR 5.00 lit. / day 750.00 / day
Chainsaw Operated 2,400.00 / day
Concrete Cutter Operated 1,250.00 / day
BAR CUTTER /BAR SHEAR Operated 110.00 / day
BAR BENDER Operated 40.00 / day
Crane Operated 39,000.00 / day
Asphalt Distributor, 10 ft. wide (5 tons) 50.00 lit. / day 10,238.00 / day
Power Broom (20 m. wide) 50.00 lit. / day 3,794.32 / day
Pneumatic Tire Roller (10 m.t.) 40.00 lit. / day 6,184.00 / day
Tandem Steel Roller (10.1 m.t.), CC421 60.00 lit. / day 17,176.00 / day
Tandem Steel Roller (10.1 m.t.), CC421 6.00 lit. / day 13,255.60 / day

Submitted by:

MARK JOSEPH C. RUBINOS DATE: March 10, 2022


(Name & Signature of Bidder's Representative)
Authorized Managing Officer
Position
NEN Builders & Development Services Corporation
Name of Bidder
Department of Public Works and Highways (DPWH)

Contract ID :22LB0427
Contract NamInstallation of Road Safety Devices - ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 470 -
K1515 + 320, Davao City
Location of the Contract Davao City

SUMMARY DATA SHEET

BAR CUTTER /BAR SHEAR Operated 1,750.00 / day


BAR BENDER Operated 1,100.00 / day
Concrete Batch Plant 14,100.00 / day
Concrete Screeder 4,360.00 / day
Concrete Saw 260.00 / day
Asphalt Distributor, 10 ft. wide (5 tons) - lit. / day 7,488.00 / day
Asphalt Distributor, 10 ft. wide (5 tons) - lit. / day 7,488.00 / day
PORTLAND CEMENT 258.00 / bag
CHB 4" 8.00 / pc.
Reinforcing bar (Grade 40) 44.00 / kg.
TIE WIRE # 16 85.00 / kgs.
HACKSAW BLADE 70.00 / pc.
WASHED GRAVEL 1,000.00 / cu.m.
WASHED GRAVEL Y-Y 700.00 / cu.m.
WASHED SAND 858.00 / cu.m.
AGGREGATE BASE COARSE 500.00 / cu.m.
AGGREGATE SUB-BASE COARSE 500.00 / cu.m.
BOULDERS 1,200.00 / cu.m.
GOODMIX 400.00 / cu.m.
BORROW HAUL 65.00 / cu.m.
Steel Form 2,214.00 / pc.
Emulsified Asphalt SS-1 266,409.62 / m.t.
Bituminous Concrete Surface, (With Anti-Rutting Additive) Hot-Laid, 30mm 450,152.33 / m.t.
Bituminous Concrete Surface, (With Anti-Rutting Additive) Hot-Laid, 50mm 540,182.79 / m.t.
610 mm PIPE CULVERT 1,560.00 / pcs
1220 mm PIPE CULVERT 7,500.00 / pcs
Assorted CW Nails 76.00 / kgs.
Coco Lumber 25.00 / bd.ft.
Lauan Lumber 34.00 / bd.ft.

Submitted by:

MARK JOSEPH C. RUBINOS DATE: March 10, 2022


(Name & Signature of Bidder's Representative)
Authorized Managing Officer
Position

NEN Builders & Development Services Corporation


Name of Bidder
Department of Public Works and Highways (DPWH)

Contract ID : 22LB0427
Contract Name : Installation of Road Safety Devices - ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 470 - K1515 + 320, Davao City
Location of the Contract : Davao City
ABC : 12,250,000.00

CASH FLOW BY QUARTER

YEAR
PARTICULAR TOTAL
FIRST QUARTER SECOND QUARTER THIRD QUARTER FOURTH QUARTER
Percentage Accomplishment 100.00% 24.52% 26.16% 27.67% 21.66%
AMOUNT 2,973,646.75 3,172,129.34 3,355,154.24 2,626,569.66
Cumulative Percentage Accomplishment 100.00% 24.52% 50.68% 78.34% 100.00%
AMOUNT 2,973,646.75 6,145,776.10 9,500,930.34 12,127,500.00

Submitted by:

MARK JOSEPH C. RUBINOS DATE: March 10, 2022


(Name & Signature of Bidder's Representative)
Authorized Managing Officer
Position
NEN Builders & Development Services Corporation
Name of Bidder