NOTES

CN
FOUNDATION PLAN FORMWORK WITH PLAN SHOWING R/F DETAIL OF RFJ001
1) ALL DIMENSIONS ARE IN MILLIMETERS (UNLESS INDICATED OTHERWISE).
TN LAYOUT OF EXCAVATION / DEMOLITION
(SCALE 1 : 25)
FOUNDATION CONCRETE QUANTITY
MK2-9#12@200(T) 2) ALL ELEVATIONS AND COORDINATES ARE IN METERS (UNLESS INDICATED OTHERWISE).
49° (SCALE 1:25) MK1-9#12@200(B) MATERIAL TOTAL QUANTITY [Cu. M]
01 FOUNDATION CONCRETE 3.18 3) PLANT DATUM H.P.P. EL.+100.000 CORRESPONDS TO EL.+15.550 METERS ABOVE THE LOW LOW WATER SPRING (LLWS).
(****) BEFORE STARTING FOUNDATION CONSTRUCTION ACTIVITIES, SUBCONTRACTOR TO VERIFY ON SITE
THAT, GIVEN COORDINATES & TOG LEVELS ARE IS IN ACCORDANCE TO EXISTING DISCHARGE . 4) ISOLATION JOINTS IN CONCRETE SLAB ON GRADE SHALL BE FORMED WITH AN APPROVED BITUMEN IMPREGNATED
REFER TO DISCHARGE LINE NUMBER 3"-PP-52099-C11A FIBERBOARD. THE UPPER 20MM SHALL BE SEALED WITH AN APPROVED BITUMINOUS SEALANT RESISTANT TO
MK2-9#12@200(T)
MK1-9#12@200(B) GROUT QUANTITY - FOUNDATION HYDROCARBONS, APPLIED STRICTLY IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS.
THE JOINTS FILLER SHALL BE FIXED FIRMLY TO THE FIRST PLACED CONCRETE BEFORE THE ADJOINING CONCRETE IS
MATERIAL TOTAL QUANTITY [Cu. M] PLACED. THE CONCRETE MUST BE THOROUGHLY COMPACTED ON BOTH SIDES OF THE EXPANSION JOINT.
LOCATION OF EXPANSION JOINTS SHALL BE AS SHOWN THE DRAWINGS WHERE REQUIRED BY DESIGN.
3 3 NON-SHRINK GROUT 0.09
OF FOUNDATION - - 01 5) ANCHOR BOLTS SUPPLY IS BY VENDOR. ANCHOR BOLT DETAILS ARE AS PER VENDOR
GENERAL ARRANGEMENT DRAWING 4239-GG-VD-LG0077553P01001.

E = 6288.366
6) BAR BENDING SCHEDULE IS INDICATIVE. CIVIL SUB-CONTRACTOR IS RESPONSIBLE FOR CHECKING
LEAN CONCRETE QUANTITY REBAR QUANTITIES & DIMENSION ACCORDING TO DRAWINGS.

MATERIAL TOTAL QUANTITY [Cu. M] 7) THIS DRAWING IS EXTRACTED FROM 3D MODEL. FNJ001, RFJ001, FN001A, ETC. ARE CONTRACTORS 3D MODEL
LEAN CONCRETE 0.18 CODES USED TO TRACK NEW FOUNDATION QUANTITIES, LOCATIONS, ETC. THROUGH THE MODEL.

1700 8) EXCAVATION EXTENT SHOWN IN THE DRAWING IS TENTATIVE. SUBCONTRACTOR TO SUITABLY DECIDE THE REQUIRED
== EXTENT AS PER SITE CONDITIONS & CONSTRUCTION REQUIREMENTS. WHEREVER POSSIBLE, EXCAVATION WITH
1050 STRAIGHT VERTICAL FACE (WITH OR WITHOUT SHORING) SHALL BE PREFERRED OVER INCLINED FACE TO MINIMIZE THE
== 8mm THK. CIRCULAR STEEL PIPE CASING FOUNDATION F/W-R/F TYPES (ref. to note 7) EXCAVATION IMPACT ON DEMOLITION OF EXISTING FACILITIES SURROUNDING PROPOSED FOUNDATION WORK.

PERMANENTLY EMBEDDED AND TO BE PLACED SECTION 3 9) IN CASE OF HINDRANCE SAY DUE TO SMALL PAVING SUPPORTED PIPE SUPPORTS, SWITCH & INSTRUMENT
DURING CASTING OF PEDESTAL (TYP.)
- F/W TYPE R/F TYPE QUANTITY

MK5-4#10@75
SUPPORTS etc. CONSTRUCTION SUBCONTRACTOR CAN SUITABLY CHECK & DEMOLISH THESE

MK4-4#10@75
MK5-4#10@75
325 200 650 200 325 (SCALE 1:25)
== FNJ001 RFJ001 1 PEDESTALS/SUPPORTS AFTER CONSULTING CONTRACTOR’S RESPECTIVE DISCIPLINE ENGINEER AT SITE.
FOR PIPE SUPPORT FOUNDATION DETAILS 150 750 (SKID) 150 01 CONSTRUCTION STAGES OF NEW FOUNDATION
REFER DRAWING NO. 4239-AP-DA-4100N020 FIRST PHASE

FOUNDATION TYPE SCHEDULE (ref. to note 7)


1) ALL THE ADJOINING STRUCTURES/FACILITIES SHALL BE PROPERLY PROTECTED BEFORE STARTING THE DEMOLITION

75
WORK. EXISTING EQUIPMENT ( IF ANY) SHALL BE REMOVED / DISMANTLED FROM POSITION. EXISTING PLATFORM / PIPE
DRAIN SUPPORT
OF PUMP VENT &

01 5 5 ITEM TAG F/W TYPE R/F TYPE SUPPORT ( IF ANY) ABOVE PEDESTAL SHALL BE REMOVED / DISMANTLED.
- -

150

200
41U52-EQ52P02A-FN002A FNJ001 RFJ001

150
2) EXISTING PAVING SHALL BE DEMOLISHED. EXISTING REINFORCEMENT BARS FOR PAVING SHALL BE TEMPORARILY BENT
UPWARDS DURING SOIL EXCAVATION AND TREATED WITH CORROSION INBHITOR.

750 (SKID)
1 90 N = 90218.494 1
ø4

1050

1700
3) EXISTING SUB-GRADE/SUB-BASE & SOIL SHALL BE EXCAVATED.

==
650
==

==
- OF FOUNDATION
-

MK5-9#10@150
MK4-9#10@150

MK5-9#10@150
/ PUMP 4) ANY UNDER GROUND UTILITIES IF FOUND DURING EXCAVATION SHALL BE TEMPORARILY SUPPORTED
OR RE-ROUTED AS PER INSTRUCTIONS FROM ENGINEER INCHARGE.
MK3
DEMOLITION OF PAVING CONCRETE QUANTITY
750

200
150
5) THE EXCAVATED PORTION SHALL THOROUGHLY BE CLEANED OF ANY DEBRIS.

MK2 MATERIAL TOTAL QUANTITY [Cu. M]


SECOND PHASE
PAVING CONCRETE 6.10
MK2
6) LEAN CONCRETE SHALL BE POURED.

50
01

150
4 NOS. 150X150X520 DEEP POCKETS
7) NEW FOUNDATION SHALL BE CAST WITH POCKETS FOR BOLTS.
FN-002A FOR 30 DIA ANCHOR BOLTS (TYP.)
THIS DOCUMENT IS TECNIMONT'S PROPERTY AND CANNOT BE USED BY OTHERS FOR ANY PURPOSE, WITHOUT PRIOR WRITTEN CONSENT

300
==
FNJ001
RFJ001 01 PRICE CODES 8) AFTER CASTING OF NEW FOUNDATION, THE DAMAGED UG FACILITIES SHALL BE RECONSTRUCTED.
950 440 PRICE CODES DESCRIPTION OF WORK 9) 3 COATS OF OXIDIZED BITUMINOUS PAINT SHALL BE APPLIED ON ALL THE SURFACES IN
CONTACT WITH SOIL.
300 AAA03AB21 DEMOLITION OF REINFORCED PAVING CONCRETE BY HAND
E = 6288.806

01 01 MK1
(TYP.) 10) EXCAVATED SIDES SHALL BE BACKFILLED AND COMPACTED.
ABA02AD01 LIMITED EXCAVATION BY HAND
MK1
(****)

ACA05AM01 BACKFILLING 11) NEW POLYTHENE SHEET SHALL BE PLACED.


OF PUMP VENT & ADA08AA01 LEAN CONCRETE
DISCHARGE 12) EXISTING REINFORCEMENT BARS FOR PAVING SHALL BE REPLACED IN THE ORIGINAL POSITION
DRAIN SUPPORT SECTION 5 ADA08AB02 CONCRETE FOR FOUNDATION BEFORE POURING OF NEW CONCRETE FOR RESTORING THE PAVING. PAVING SHALL BE RESTORED.

01 (SCALE 1 : 25) - ADA09AA01 FORMWORK FOR FOUNDATION CONCRETE 13) ANCHOR BOLTS ARE INSTALLED IN THE POCKETS.
FORMWORK FOR EXECUTION OF ANCHOR BOLT BOXES - WET 14) NEW GROUT SHALL BE POURED FOR SKID LEVELING.
ADA09BA01/02/03 01
MK3-4#20 CONTOUR AREA UP TO 0.50 m2

ADA10AA02 SUPPLY AND INSTALLATION OF REBARS

MK5 INSTALLATION IN EXISTING BOXES OF ANCHOR BOLTS UPTO


MK5 ADA11EB01
DIA. 20 mm.

MK3-6#20
MK3-6#20
INSTALLATION IN EXISTING BOXES OF ANCHOR BOLTS ABOVE
ADA11EB02
DA 20mm UPTO DIA. 40 mm.
REFERENCE DOCUMENTS
MK5 ADA12AB01 NON-SHRINK GROUT DRAWING NO. DESCRIPTION
MK5 MK4
SECTION 1 ADA16AA01 THREE COATS OF OXIDIZED BITUMINOUS PAINT 4239-AA-DX-00000005 CONCRETE GENERAL NOTES
ADA16AB01 POLYETHYLENE SHEET DEMOLITION SCHEDULE FOR PUMP FOUNDATIONÚREA OFFSITE - TOTAL DEMOLITION (SHEET 2)
(SCALE 1:25) - 8mm THK. CIRCULAR STEEL PIPE CASING MK3-4#20
4239-AA-DC-41U53RD001
4239-GG-VD-LG0077552P02001
AEA08AG01 CONCRETE FOR PAVING GENERAL ARRANGEMENT DRAWING FOR C3 LPG VAPOUR TRANSFER PUMPS- 52P02A
PERMANENTLY EMBEDDED AND TO BE PLACED
DURING CASTING OF PEDESTAL (TYP.) 4239-AA-DA-4100N001 FOUNDATION LAYOUT FOR AREA OFFSITE
(*) SUB-CONTRACTOR TO INFORM CONTRACTOR IN CASE OF HIGHER SUPPLY, CUTTING, MACHINING AND INSTALLATION OF WIRE
AEA10AB01
PAVING THICKNESS. WELDED MESH
01 01
DETAIL A
KEYPLAN (AREA-OFFSITE)
(****) BEFORE STARTING FOUNDATION CONSTRUCTION ACTIVITIES, SUBCONTRACTOR TO VERIFY ON SITE
-

CEMENT BASED GROUT


THAT, GIVEN COORDINATES & TOG LEVELS ARE IS IN ACCORDANCE TO EXISTING DISCHARGE . (SCALE 1:10)

50 THK. NON-SHRINK
REFER TO DISCHARGE LINE NUMBER 3"-PP-52099-C11A
CN
01 ROAD 12

EXSISTING
TN

X = 6345.000
S/S C S/S E
OF FOUNDATION PUMP BASE FRAME
49°
CEMENT BASED GROUT

( BY VENDOR)
50 THK. NON-SHRINK

52 TK 51 F

ROAD 11
Y = 90380.000
OFFSITE - AREA 5
53P543

HORTON
OFFSITE - AREA 5

53P515

OFFSITE - AREA 5

91
53P514

OFFSITE - AREA 5

AVENUE A
52P504A

OFFSITE - AREA 5

01 37 SPHERE
53P519

OFFSITE - AREA 5
52P504B

38 OFFSITE - AREA 5
53P518

A 01 39 52 TK 51 G
OFFSITE - AREA 5

53P517

OFFSITE - AREA 5

53P516

P= 140
OFFSITE - AREA 5
53P541

2 1 A B 93
EL.+99.931 (TOG) (****) SEE NOTE 1

ROAD 7
- 01 01 52P02A AVENUE B
52 TK 51
C D

RAILWAYS
EL.+99.881 (TOC) Y = 90332.000
95
20 THK. ISOLATION JOINTS (TYP.) 52 TK 102
EL.+99.881 (TOC) (****)
OFFSITE - AREA 5

OFFSITE - AREA 5 OFFSITE - AREA 5

50P534A

0.3MM THICK POLYTHENE


50P539B
50P534C

OFFSITE - AREA 5

A A B
(see note - 4)
50P539C

L.P.G.
PAVING TO BE RESTORED SHEET (TYP.) 52 TK 54 52 TK 53

STREET 8

STREET 9
VENT STACK
(as per stage 12) B C C D
150 (*)

OFFSITE - AREA 5

62P547

30 DIA ANCHOR BOLT 4 3 B14 B15


195

EL.+99.686 (HPP) REFER NOTE-5 OFFSITE


OFFSITE
R 52
OFFSITE

OFFSITE

53P09A
OFFSITE
OFFSITE - AREA 5
62P553B OFFSITE - AREA 5
62P553A

P8 P9
OFFSITE
OFFSITE
56P11A 56P11B
52P03A 52P03B

53P09B

Y = 90208.000
53P09C

OFFSITE - JETTY

OFFSITE - JETTY
OFFSITE OFFSITE
OFFSITE
OFFSITE OFFSITE
OFFSITE OFFSITE OFFSITE OFFSITE
69P01A 69P01B
52P08A
52P08B
52P09 52P02A 52P02B 53P01A
53P01B 53P02 53P10
520

AVENUE D
EXISTING DITCH
EXISTING PIPE WAY BOTTLING

REINFORCEMENT QUANTITY OFFSITE - AREA 5

50P534B
1590

BAR DIAMETER [mm] UNIT WEIGHT [kg/m] BAR LENGTH [mm] WEIGHT [kg]
1405

10 0.62 85215 52.83 01


2200

12 0.89 83340 74.17


150 (SQ.) 20 2.47 46000 113.62 01 07.Sep.2022 IFA - ISSUE FOR APPROVAL P. Redekar V.Rama Rao A.Frigerio
⌀ 490 ==
8 TOTAL 214555 240.63 00 08. Aug.2022 IFA - ISSUE FOR APPROVAL P. Redekar V.Rama Rao A.Frigerio
(TYP.)

01 Issue Date Reason for Issue - Revision Description Prepared Checked Approved

1 Digital signature
1
1
600

EL.+97.681 (BOF)
SOIL BELOW EXISTING PAVING
BAR BENDING SCHEDULE - REINFORCEMENT TYPE RFJ001
TECNIMONT IDENTIFICATION CODE
TO BE EXCAVATED AND BACKFILLED AFTER 01 BAR MARK BAR DIAMETER [mm] BAR LENGTH [mm] QUANTITY (Nos) TOTAL BAR LENGTH [mm] a b c d e g SHAPE WEIGHT [kg]
REHABILITATION OF Job-EC-Type-N
CONSTRUCTION OF NEW FOUNDATION (TYP.)
PORT HARCOURT 4239-AA-DC-41U52RN001

MODEL NAME:4239-AA3D-41U52-EQ52P02A
MK1 12 2290 18 41220 0 375 1550 375 0 0 36.69 REFINERY PROJECT
8mm THK. CIRCULAR STEEL PIPE CASING 500 605 490 605 3 COATS OF OXIDIZED NUMBER OF SHEET DOC. CLASS. ISSUE

BITUMINOUS PAINT. (TYP.) (Port Harcourt - Nigeria) 1 01


PERMANENTLY EMBEDDED AND TO BE PLACED (TYP.)
DURING CASTING OF PEDESTAL (TYP.) MK2 12 2340 18 42120 0 400 1550 400 0 0 37.49
CLIENT IDENTIFICATION CODE
50 THK. LEAN CONCRETE PORT HARCOURT
10 THK. PLATE (TYP.) (TYP.) 01 01
01 MK3 20 2300 20 46000 01 0 2055 300 0 0 0 113.62 01 REFINING COMPANY
01 LIMITED (PHRC)
MK4 10 3715 13 48295 90 900 900 900 900 90 29.94
MOD-CADA1 E rev.1

TITLE
CONCRETE DRAWING
MK5 10 710 52 36920 01 90 530 0 0 0 90 22.89 01
PUMP 52P02A (OFFSITE AREA)
F/W & R/F DETAILS OF FOUNDATION SCALE
1:25,1:10
ORIG. SIZE
A1