Brief on WSS FROM SARKAI, LAWAGHAR TO DAWAR AND KARAK

CITY
Tehsil: Karak
District: Karak
ADP NO.250 (2021-22)

A) LOCATION
The project area is located in District Karak of Province Khyber
Pakhtunkhwa (KP). The location of KP Province and that of
District Karak is shown in the Figure.

Source of the project is Sarki Lawagher Dam which lies at


33.0440862N, 71.1890243E
B) HISTORY & DESCRIPTION OF THE SCHEME
In Pakistan, water resources crises specifically ground
water sources are under severe threat both in quantity and

1
quality. The ground water is stored in the pores of soil,
through infiltration of surface water flows over the ground,
and, its exhaustive use, due to urbanization and
industrialization, the ground water source is under stress.
As a result, it is being depleted at a rate of 0.0131 to 1.68
m/year, across the country. Due to massive ground water
extraction and decline of aquifer recharge, the quality of
water is being affected.

Public Health Engineering Division (PHED) Karak,


Government of Khyber Pakhtunkhwa is the major service
provider of water supply and sanitation in the areas falling
under its jurisdiction. PHED is responsible for planning,
designing, construction, operation & maintenance of
necessary infrastructure for provision of safe drinking water
and sanitation facilities to the beneficiaries. In the said
areas, there are various schemes based on tube wells,
installed by PHE department, however most of these are
either nonfunctional due to one or other reasons or cannot
be operated due to low voltage or continuous load
shedding. Therefore, the existing groundwater sources are
not in a position to fulfill drinking water requirements or
groundwater is under stress to meet the projected water
demand. Karak city is divided into four population zones
based upon elevation. At present 100’000 Gallon water is
being served to Karak City from another source. i.e Zabi
Dam which does not meet the total demand of the city.
2
Therefore, objective of this project is to utilize the reliable
water source facility available in the form of water storage
dam to ensure smooth provision of drinking water to un-
served and under-served population.

C) BENIFICIARY POPULATION

Baseline Population Projected Population for the year


91628 Persons 2040

D) SCOPE OF WORK

GENERAL ABSTRACT OF COST

Sr.No SUB HEAD COST (Rs in Million)

1 SUPPLY MAIN 374.808

2 SEDIMENTATION TANK 29.917

3 SLOW SAND FILTER (2 NOS) 35.713

4 STORAGE TANKS 49.007

FILTER CONTROL CHAMBER (4


5 1.447
NOS)

6 STAFF QUARTER 2.639

7 GATE AND BARBED WIRE 1.844

8 DISTRIBUTION SYSTEM 168.364

EXTRA EXCAVATION FOR PIPE


9 35.200
LINE

10 CHLORINATION 1.200

11 PROVISION MADE FOR NHA 4.500

3
ROAD CROSSING AND UN-SEEN
ITEMS

12 SUPERVISION CHARGES 20.968

13 COST OF LAND 4.000

14 ADVERTISEMENT CHARGES 0.400

TOTAL Rs. 730.007

SAY Rs. 730.000

E) APPROVED COST

Total: Rs. 730 Million

F) APPROVAL
PDWP (Date) ____/_____/_____
CDWP (Date) ____/_____/_____
ECNEC (Date) ____/_____/_____
G) COMPLETION TIME: ______ Years.
Start Date _____/____/20__.
Planned Completion Date:- ____/____/ 20__.

Client: Public Health Engineering Department.

Contractor: 1. m/s Tari Khel Constructions


2. m/s Raja Constructions
3. m/s Aurangzeb Gandapur

Consultants: ES Consultants (Pvt) Ltd

H) CONTRACT COST

Construction Cost (Name of Contractor). Million Rs.


1. m/s Tari Khel Constructions 125.40
2. m/s Raja Constructions 168.364
3. m/s Aurangzeb Gandapur 374.808

Construction Supervision (Name of Consultant). 18.722 Million Rs.

I) PHYSICAL PROGRESS (Upto 31st January, 2022)

S# Item of Work Physical Progress Remarks

4
1. Infrastructure units Excavation completed. Constructions
Sedimentation Tank, Slow Ready for PCC 1:4:8 activities have been
Sand Filters and Storage suspended due to
Tank the interference of
locals

2.

3.

J) FINANCIAL PROGRESS (As on 31st January, 2022)


(Rs. In Million)
S.NO. YEAR RELEASES EXPENDITURES
1.

2.

3.

Total:

(Through Forward (2022-23) ________ Million.)

K) CURRENT STATUS
Excavation was done to start the PCC 1:4:8 and brick masonry for boundary
wall for the infrastructure components for the Gravity main at Dabbly
Lawagher Village but further activities were suspended due to the
intervention of the locals.
L) ISSUES & CONSTRAINTS
Locals of town Sarki Lawagher and nearby areas are continuously reluctant
about the execution of the scheme saying that since water pipeline is passing
through their lands therefore PHE should fulfil their water demands before
serving to the Karak City. To resolve this issue, the whole scenario was
brought in the knowledge of Civil Administration of the District Karak after
which a series of dialogues were held in the presence of worthy Deputy
Commissioner and District Police Officer Karak. As of now all efforts
remained unsuccessful in this regard.