Lug Cover
Lug Cover
CHECKED BY
RELATING
DEP'T
PROVIDED
1
DATE
PROVIDED
2
DATE
R
E
V PROVIDED
I
3
S
I DATE
O
N
PROVIDED
4
I
O
N
4
DATE
PROVIDED
5
DATE
R - 56 - 0004 1/1
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
CONTENTS
1. SCOPE
2. PURPOSE
4. FUNCTION OF QC DEPT
6. QC SECTION WORKING
7. QA SECTION WORKING
8. ATTACHMENTS
P - 0001- 02 3 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
1. SCOPE.
This regulation is stipulated for organization and division of duties in business of QC dep’t at HVS.
2. PURPOSE.
According to organization & division of duties of QC dep’t to carry out business effectively.
4. FUNTION OF QC DEP’T.
Operating quality assurance system, prevention control system and carrying out quality checking
business as well as maintaining & increasing quality of ship base on reasonable standard.
4.1 Operating quality assurance system.
4.2 Checking repair, building ship, offshore structure & controlling to reduce defect.
4.3 Control increasing quality.
P - 0001- 02 4 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
QC IN CHARGE ENGINEER
ONESELF COMPLETED
ATTENDED FOR INSPECTION.
REJECT
QC IN CHARGE ENGINEER
RESULT OF INSPECTION
* GOOD ORDER
DEAL WITH INSP'RESULT * INFORM TO PRODUCTION
DEP'T
SAIL OUT
STATISTICS/ ANALYZE FOR
RESULT OF INSPECTION AND TEST
CONCENTRATION CONTROL
P - 0001- 02 5 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
P - 0001- 02 6 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
P - 0001- 02 7 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
- Material certificate.
charge manager before taking copy and it is handed over to person who control & should keep
documents.
If owner, class needs repair plan & kind of measurement, it has to be submitted in advance.
3) Making and apprroval for work completion list.
(1) QC in charge engineer makes work completion for QC work at ship before ship sail out
about 1day & receive confirmation from captain/ the first (chief) engineer/ Superintendent.
- Close up survey.
- Hull thickness gauging.
- Safety equipment.
(3) First, work completion has to be confirmed from owner. Then in charge manager will
confirm it.Origin will be handed over to person who was responsible for controlling and
keep documents & 1 copies will be sent to sale dep’t.
(4) All job that gave to outside, QC in charge engineer should make work completion
confirmation.
P - 0001- 02 8 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
P - 0001- 02 9 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
Q.C recommendation or repair plan (Attached #4) and report to related dep’t.
3) Tank internal survey.
(1) Tank internal survey is carried out following to ship inspection in period. In case of having
requirement of owner (Superintendent), carry out following to inspection application
procedure to class.
(2) When carry out tank internal survey, QC can attend but not duty. When have the hull
damage in tank, QC in charge engineer has to attend to inspect and make repair plan.
(3) Tank internal survey is carried out following to Hull inspection standard.
(4) After finishing inspection, if have damage on internal tank, QC in charge engineer
shall be made QC recommendation or repair plan (Attached #4) following to work order of
Superintendent.
4) Hull damage check.
(1) In case of having Hull damage, QC in charge engineer has to decide repair area for
damage part together with class.
(2) When decided repair area for damage part, QC in charge engineer makes repair plan
(Attached #4) & inform to related dep’t. In case of having information exactly for repair
part in spec of owner, QC in charge engineer only carry out checking to confirm.
(3) Hull damage check is carried out following to Hull inspection standard.
5) Hull thickness gauging.
(1) When owner (Superintendent) requires hull thickness gauging, because of checking ship in
period or being necessary, QC in charge engineer shall be discussed with class/ owner,
and then has to decide thickness gauging point. Thickness gauging scope has to be followed
pointing out of class & regulation of each class.
(2) Require Hull thickness gauging at decided gauging area to NDT in charge person.
(3) NDT in charge person has to choose sub contractor who is approval by class for gauging.
(4) QC in charge engineer was responsible for controlling gauging subcontractor. When carry
out gauging, if need to have equipment, QC in charge has to require to related dept.
P - 0001- 02 10 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
(5) Gauging sub contractor has to inform gauging result to NDT in charge person and while
carrying out Hull thickness gauging, if he discover damage, he has to inform to QC in charge
engineer. Then, QC in charge engineer has to discuss with owner. (superintendent).
(6) After gauging thickness, if result has hull damage, QC in charge engineer needs to make repair
plan (attached #4) following to work order of superintendent and inform to related dept.
(7) Hull thickness gauging reports have to be reported & submitted to owner & class.
6) S.E.
(1) If have requirement of owner (superintendent) for checking ship in period, QC in charge
engineer will check related S.E & inform to S.E in charge person.
(2) S.E in charge person makes outside repair order ( Form of material dep’t) & inform to
material dep’t to choose S.E sub contractor who has been approved by class.
(3) QC in charge engineer was responsible for controlling S.E sub contractor. When needs
equipment (to transfer S.E or others…), can request to related dep’t.
(4) Checking S.E is carried out following to safety equipment checking regulation & lifeboat
& Davit checking standard.
P - 0001- 02 11 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
(2) After finishing preparation, it needs to test wear down measurement immediately.
(3) Propeller wear down measurement has to following to shaft inspection standard.
(4) If QC in charge engineer finish gauging, he has to confirm that if the result is good or not
& make report to owner (superintendent)/ class.
P - 0001- 02 12 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
receives approval from G.Manager & owner/ class & informs to related dep’t.
3) While carrying out work referring to special procedure, QC in charge engineer has to check
(Patrol) continuously to keep working procedure correctly.
P - 0001- 02 13 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
6.5.3 After ship sail out, according to result from work completion list, in charge has to settle
work completion.
Manufacturing to
Issue MRS Purchasing scan/inspection QC Import
Material dep't
QC Confirm of main
Production Control/ware
confirmation gate guards
house
P - 0001- 02 14 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
6.6.2 Material checking control is carried base on material inspection control regulation.
P - 0001- 02 15 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
Checking
Tension meter Load test 1 year
outside company
Gauging &
inspection
Hardness testing
Material list " "
machine
Face
Gauging thickness of painting
gauging Scrap gauging
scrap
" "
machinery
Checking inside
Weight Weight Load test 5 year
company.
P - 0001- 02 16 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
P - 0001- 02 17 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
APPLICATION RECEIPT
APPLICATION
PLAN ATTENDED
RETRAINING
WELDING TEST
ACCEPT
P - 0001- 02 18 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
PQ W.P.S PREPARATION
APPLICATION
APPLICATION OF
REVIEW
W.P.S
REVIEW ACCEPT
PROVIDED
PLAN & WELDER &
ORDER TEST PIECE
WELDING
NDT
CONFIRM
MATERIAL
MACHINE UP FOR
TEST PIECE
REJECT ACCEPT
P.Q
QULIFICATION
P - 0001- 02 19 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
P - 0001- 02 20 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
7.8.6 According to work completion list, in charge make work confirmation of sub contractor
inside 3 days. After receiving approval of manager, G.Manager, he has to send it to
material dep’t.
Inspection plan
Approval of class for . Ship inspection plan Provide certificate for
ship inspection NDT . Detail inspection plan L.P.T spector
. Ship gauging plan
Application
(before 1 day) * Inspection NDT for repair
ship
* Ship regularity inspection
RT.UT.MT.PT
* Onself control inspection
HULL THICKNESS Carrying out checking
* Welding test piece inspection
GAUGING
* Material importing control
* Sub contractor checking
Decipher/Analyse control
Inform result
Analyzing statistic
from
checking result
P - 0001- 02 21 / 44
SECRET
QUALITY CONTROL DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-21-0001
WORK DIVISION
8. ATTACHMENT.
P - 0001- 02 22 / 44
SECRET
DESIGN DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-56-0001
WORK DIVISION
CONTENTS
1. SCOPE
2. PURPOSE
9. ATTACHMENTS
Page 23 of 44
SECRET
DESIGN DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-56-0001
WORK DIVISION
1. SCOPE.
This regulation is stipulated for organization and division of duties in business of Design Dep’t at HVS.
2. PURPOSE.
According to organization & division of duties of Design Dep’t to carry out business effectively.
Page 24 of 44
SECRET
DESIGN DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-56-0001
WORK DIVISION
6. GUIDANCE FOR DRAWING READING:
6.1 KIND OF LINES ON DRAWING:
Symbol using in Drawing following the common mark using in HVS. If in the drawing have some
special symbol it will be noted .
attachment #3.
Page 25 of 44
SECRET
DESIGN DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-56-0001
WORK DIVISION
8. DESIGN DEP'T SECTION WORKING
8.1 Duty flow Design.
SALE DEP'T DESIGN DEP'T PROD' DIV' OWNER & CLASS
DISTRIBUTION
MAKE THE PRODUCTION TO RELATED ATTENDED FOR
DRAWING DEP'T INSP' & TEST&
APPOVAL
FINAL CONTRACT
PRODUCTION
RECEIPT
Page 26 of 44
SECRET
DESIGN DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-56-0001
WORK DIVISION
8.2 Design procedure.
8.2.1 Receiver requirement of owner form Sales Dept' make the innitial drawings to get contract
2) Together with Sales Dep't discuss above Innitial drawing with ship owner to meet final decision.
3) According to major job of ship, manager will make plan , statistic data, schedule for contract.
1) Base on innitial design such as: type of vessel, size, speed, etc. make the Line Drawing.
2) Base on Line Drawing make the Shell expansion, Construction profile, Midship section.
(Attached #5) with approval of G. Manager.
1) Base on Shell expansion, Construction profile, Midship make the production drawing to satisfy
Production Dep't can fabricate to correct procedure (Attached #6).
Page 27 of 44
SECRET
DESIGN DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-56-0001
WORK DIVISION
Fabrication Drawing will be made with all parts with accurate details for all section such as:
Hull, Machinery, Electric, and Paint.
Erection Drawing will make to satisfy with truly condition at working place. That make for all
sections
Testing Planning will be made to qualify and rules for inspection during contract period.
No mark
Mild Steel B E
on Dwg. D
Page 28 of 44
SECRET
DESIGN DEP'T
DEPARTMENT PROCEDURE REVISION No 0
DOCUMENT No R-56-0001
WORK DIVISION
8.4.3 Piping
Size of pipe, valve, flange, etc. will calculate from pressure, strength, flow, technical require, etc.
8.4.4 Instrument:
Oder base on owner, class require
8.4.5 Machinery:
Main machine will order to fabricate before 9 months. Specification, size, etc will decide after
basic design.
9. ATTACHMENT.
Page 29 of 44
Page 30 of 44
p’t at HVS.
mbers of
of drawing.
Page 31 of 44
ve some
Page 32 of 44
inal decision.
contract.
g to satisfy
Page 33 of 44
ke for all
Page 34 of 44
e, shape of
al require, etc.
ecide after
Page 35 of 44
ATTACHMENT #1
TOTAL 16
3 N.V.CHEÁ 3 L.M.VÖÔNG 3
5 N.Ñöùc Ñieän
1. Design the Hull & Outfitting of Vessel. 1. Design the Match./Piping & Elec. system.
R-56-0001 8/8
Sheet #1
aprroval
SHIP APPLICATION
NO DATE DATE
NO Inspection & Test item Kind of Test Time Location Leader Remark
SHIP APPLICATION
NO DATE
DATE
NO Inspection & Test item Kind of Test Time Location Leader Remark
R-21-0001-01
Sheet #2
HYUNDAI VINASHIN
APPLICATION FOR 01 BOX HON KHOI POST OFFICE, NINH HOA, KHANH
HOA, VIETNAM
SHIPYARD CO.,LTD.
INSPECTION & TEST Tel.: +84-58-622019/20 Fax.: +84-58-622061
SHIP
NAME
OWNER HISTORY CARD
CLASS INSP
SERIAL No A : ACCEPT B : Q.M.C R : REJECT
DATE
NO. I T E M TIME PLACE P/T RESULT OWNER COMMENT CLASS COMMENT
Q.C.C
Q.C IN CHARGE
(TEL 2149)
R-21-0001-02
Sheet #3
SHIP IN
CLASS TYPE
NAME CHARGE
WORK
OWNER COUNTRY
TIME
HULL AND HULL
OUTFITTING
MACHINERY AND ELECTRIC
PAINTING
MANAGE
R
QUALITY CONTROL
IN
CHARGE
R-21-0001-03
Sheet #4
G.MANAGER DIVISION
MANAGER
R-21-0001-04
Sheet #4
R-21-0001-04
Sheet # 5
RESULT OF INSPECTION
SHEET NO. 001
PLACE OF
ARTICLE INS
INSPECTION MEASUREMENT DECISION DATE OF
ITEM INS
R-21-0001-05
Sheet # 5
R-21-0001-05
Sheet # 6
MONTH
DATE
IN CHARGE
R-21-0001-06