THE BUILDING SYSTEM WILL BE

CONSIDER AS SHEAR WALL


BUILDING WITH SOME COLUMNS
AND THE SLAB WILL BE AS Waffle
SLAB .THE SOFTWARE USED IN
DESIGN (CSI ETABS2016, AND CSI
SAFE2016) IS THE GENERAL
PROGRAM USED IN THIS DESIGN
job title
AL JANDOL
DR.Majid Albana
PREPARE BY DR. Majid Albana
majidalbana@hotmail.com
+9647702724811 8 /2022
THE BUILDING SYSTEM WILL BE
CONSIDER AS SHEAR WALL
BUILDING WITH SOME COLUMNS
AND THE SLAB WILL BE AS Waffle
SLAB .THE SOFTWARE USED IN
DESIGN (CSI ETABS2016, AND CSI
SAFE2016) IS THE GENERAL
PROGRAM USED IN THIS DESIGN
job title
DR.Majid Albana
PREPARE BY DR. Majid Albana
majidalbana@hotmail.com
+9647702724811 8 /2022
ABBREVIATIONS :-
GENERAL :- REINFORCED CONCRETE :- ADD ADDITIONAL
ARCH ARCHITECTURAL
1. ALL DIMENSIONS TO TAKE PRECEDENCE OVER SCALE SHOWN ON PLANS, SECTIONS AND 1. COMPRESIVE STRENGTH OF CONCRETE SHOULD BE DETERMIND BY THE TABLE BELOW :- Walk Way B BEAM
B.R.C (no. 63)
DETAILS, (DO NOT SCALE FROM DRAWINGS). Out Door Yard BOTT BOTTOM
1 LAYER OF B.R.C(gage 63) 2Ø10 C1 COLUMN TYP C1
Joint Every 25 m²
x
B.R.C (no. 63)
2. ALL DIMENSIONS ARE IN MILLIMETRES AND ALL LEVELS IN METRES (UNO). x CANT CANTILEVER
x
X X X X X CJ CONSTRUCTION JOIN
3. THE STRUCTURAL DRAWINGS SHOULD BE USED IN CONJUNCTION WITH THE ARCHITECTURAL, X X X X X X X X X X X X Nylon Sheet CL CENTRE
Ø10/200
MECHANICAL,CIVIL,PLUMBING AND ELECTRICAL DRAWINGS. C COULMN
2Ø12
150mmSub-base 90%
CONC CONCRETE
4. ALL OPENINGS SIZE AND LOCATION SHOULD BE VERIFIED AND CHECKED WITH SERVICES Nylon Sheet DET DETAIL
150mmSub-base 90%
DRAWINGS,WHERE OPENINGS SIZES ARE NOT SHOWN ON THE STRUCTURAL DRAWINGS, DIM DIMENSION
SITE ENGINEER SHALL INTRODUCE SUCH OPENINGS WITH PROPER FRAMING INCLUDING DWG DRAWING
ANY REVISION TO THE SIZES SHOWN ON THE DRAWINGS. D DEPTH
Typical Detail Of Out Door Yard Typical Sec. For Stair On Earth E.A EACH
5. DESIGN STANDARED & LOADS :-
E.F EACH FACE
DESIGN & CONSTRUCTION OF REINFORCED CONCRETE STRUCTURES MEMBERS SHALL E.J EXPANSION JOINT
IN ACCORDANCE WITH ACI-318-95 (ULTIMATE STRENGTH DESIGN METHOD). ELEV ELEVATION
E.W EACH WAY
ALL RETANING WALL STRUCTURE SHOULD BE AS BRITISH 8 97- 110 or ACI - 93 - 318. EXP EXPANSION
F FOOTING
MASONARY BRICK OR CONCRETE BLOCK ACCORDING TO B.S - 5628. F1 FOOTING TYPE-1
FDN FOUNDATION
6. LOADING :- F.F.L FINISH FLOOR LEVEL
GEN GENERAL
MINIMUM DESIGN LOAD (LIVE LOAD) ACCORDING TO IBC-09. B.R.C No.63 x x GL GRID LINE
x
SEISMIC LOAD ACCORDING TO IRAQI SEISMIC CODE 1997. x LL LIVE LOAD
100mm plain conc. x MAX MAXIMIM
WIND LOAD ACCORDING TO ASCE-05. 2. SULPHATE RESISTANT CEMENT TYPE 5 SHOULD BE USED IN ALL CONCERET WORK IN
B.R.C No.63 x

15
CONTACT WITH EARTH OR BELOW D.P.C LEVEL. Nylon Sheet MECH MECHANICAL
x
Nylon Sheet

0
7. FOR TYP. SECTIONS & DETAILS SEE ST-G2. x MIN MINIMUM
x
3. REINFORCMENT STEEL CONFORM TO ASTM A615 & A616 OR A617 BARS SHOULD BE GRADE x 2Ø10 x
mm MILLIMETRES
x
400 FY=410N/mm (60000psi). SEC SECTION
FOUNDATION AND EARTH WORK :- 150mmSub-base 90%
x
150mmSub-base 90%
4. PLACING OF REINFORCEMENT SHOULD BE ACCORDING TO ACI-315 DETAILING MANUAL. Ø10/200
1. FOUNDATION DESIGN BASED ACCORDING TO THE SOIL REPORT PREPARED BY THE 2Ø10
& RESEARCH ( (Report No) 2022 \ 2 \ \ 4 ). 5. MINIMUM BARS COVER :-
CONSTRUCTION OF PARTITION
2. BEARING CAPACITY ACCORDING TO THE SOIL REPORT IS (13K/m²) AT DEPTH OF (-3.00m) ON GROUND SLAB Typical Sec. Of Ramp
BELOW THE EXISTING N.G.L.
provid construction joint for max.(5mx5m)
3. A WELL COMPACTED SUB-BASE LAYERS OF A TOTAL THICK AS INDICATED IN THE DWG.
SHOULD BE USED UNDER FOOTING WITH FOLLOWING SPECIFICATIONS :-
THE DIMENSION OF THE SUB-BASE LAYERS SHOULD BE LARGER THAN THE DIMENSIONS OF
THE FOUNDATION FROM ALL SIDES BY 0.25m.
THE VALUE OF CALIFORNIA BEARING RATIO (C.B.R) SHALL NOT BE LESS THAN (35% ASTM D)
1883 AT 95% OF THE MAXIMUM DRY DENSITY ESTABLISHED ACCORDING TO (ASTM D)1557.
LIQUID LIMIT ≤ 25%.
PLASTICITY INDEX ≤ 6%. 2-Ø16(typ.)
ORGANIC MATERIAL ≤ 2%. T&B
6. MINIMUM BARS SPACING :-
SO3 ≤ 5%. 2-Ø10
CLEAR SPACING BETWEEN PARALLEL BARS SHALL NOT BE LESS THAN BAR DIAMETER Ø10@200
OR 4/3 OF MAXIMUM AGGREGATE SIZE BUT NOT LESS THAN 25mm.
TOTAL SOLUBLE SALTS ≤ 5%.
CLEAR SPACING BETWEEN LAYERS OF BARS TO BE NOT LESS THAN 25mm AND THE
GYPSUM CONTENT ≤ 10.75%.
UPPER BARS SHOULD BE OVER THE LOWER BARS .
RELATIVE COMPACTION 95% ( MODIFIED PROCTOR).
IN COLUMNS CLEAR DISTANCE BETWEEN LONGITUDINAL BARS SHOULD BE NOT LESS TYPICAL REINF. AROUND TYPICAL UP STAND DETAIL
4. SULPHATE RESISTANT CEMENT TYPE 5 SHOULD BE USED IN ALL CONCERET WORK IN THAN 1.5 BAR DIAMETER NOR LESS THAN 40mm.
CONTACT WITH EARTH OR BELOW D.P.C. LEVEL.
OPENNINGS UP TO 600 ROOF OPENNINGS
7. MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
5. BACKFILL AROUND FOOTINGS AND UTILITY TRENCH WITHIN THE BUILDING AREA SHOULD
BE DONE WITH APPROVED SELECTED CLASSIFIED MATERIAL FREE OF CLAY AND SHOULD
BE MECHANICALLY COMPACTED IN LAYERS, NOT EXCEEDING 250mm LOOSE THICKNESS
TO 90% OF MAXIMUM PROCTOR DENSITY.
PROVID 2-Ø6 PLATE (300 * 250 * 3 )
AT EVERY 5TH COURSE OF BRICK AT EVERY 5TH COURSE OF BRICK
CONSTRUCTION JOINT AND WATERPROOFING :-
1. CONSTRUCTION JOINT :- LAP LOCATION IN SLABS AND BEAMS :-
CONSTRUCTION JOINT IN FLOORS SHOULD BE LOCATED WITHIN THE MIDDLE THIRD OF * AT SUPPORT FOR BOTTOM BARS.
SPANS OF SLABS ,BEAMS & GIRDERS,JOINT IN GIRDER SHOULD BE OFFSET A MINIMUM
DISTANCE OF TWO TIMES THE WIDTH OF INTERSECTING BEAMS. * AT MID SPAN FOR TOP BARS.
AT CONSTRUCTION JOINTS SURFACES SHOULD BE ROUGHENED BY BROOMING OUT LAP LOCATION IN FOUNDATION :-
MORTAR, EXPOSING 12mm OF COARSE AGGREGATE TWO HOURS AFTER PLACING
* AT SUPPORT FOR TOP BARS.
CONCRETE.
* AT MID SPAN FOR BOTTOM BARS.
CONSTRUCTION JOINTS FOR STRUCTURAL SLAB / FOUNDATION / WALLS ETC. AND
VOLUME OF CASTING IN A POUR SHOULD BE APPROVED BY THE ENGINEER. CONECTION BETWEEN BRICK WALL CONECTION BETWEEN BRICK WALL
8. VERTICAL REINFORCEMENT IN COLUMN :-
AND R.C. COLUMN AND R.C. COLUMN
CONSTRUCTION JOINTS SHOULD BE DOWELED, KEYED AND THOROUGHLY CLEANED, ALL
CONSTRUCTION JOINTS SHOULD BE CONSTRUCTED IN ACCORDANCE WITH THE TYPICAL
WHERE COLUMN FACE ARE OFFSET 75mm OR MORE SPLICE OF VERTICAL BARS proposel 1 proposel 2
TO THE OFFSET FACE SHOULD BE MADE BY SEPARATE DOWELS OVER LAP AS SPECIFIED
CONSTRUCTION JOINT DETAILS SHOWN ON THE STRUCTURAL DRAWINGS,CONTRACTOR ABOVE.
HAVE TO PREPARE ANY MISSING DETAILS NOT COVERED IN THE STRUCTURAL DRAWINGS
AND SUBMIT FOR ENGINEER'S APPROVAL. WHERE A LONGITUDINAL BARS ARE OFFSET AT SPLICE THE SLOPE OF INCLINED ADJACENT
PORTION SHALL NOT EXCEED 1:6 (HORIZANTAL:VERTICAL). no. date initials revision
2. WATERPROOFING :-
CHANGING OF REINFORCEMENT BETWEEN FLOORS WHERE SUCH SITUATION OCCURS
WATER STOPS SHOULD BE USED AT ALL CONSTRUCTION,CONTRACTION & EXPANSION THE REINFORCEMENT OFF SHOULD BE CUT OFF AT DISTANCE 75mm BELOW FLOOR
JOINTS,WHERE WATERPROOFING SYSTEM IS APPLIED ALL INTERSECTION PIECES OF LEVEL SPACED 100mm AND PLACED BEFOR THE POINT OF BEND.
WATER STOPS SHOULD BE FACTORY MOLDED. A
a job title
WHERE LONGITUDINAL BARS OFFSET,PROVIDE 4TIES. A
ALL CONCRETE WORKS IN CONTACT WITH SOIL FOR NORMAL STRUCTURE SHOULD BE Ø10@200
COATED WITH PROTECTIVE LAYER. 9. HOT & COLD WETHERING SHOULD BE ACCORDING TO ACI-305R-99. B

h
(A)
10. ALL REINFORCING BAR BENDS TO BE MADE COLD. 250 250 drawing title
a B
all dim. from ARCH D.W.G.
11. IN ONE-WAY SLAB, SHRINKAGE & TEMPERATURE REINF. STEEL EXTENDING IN THE LONG SEC. ( a - a ) GENERAL NOTES
DIRECTION SHALL BE PLACED IN THE PLACE OF, AND TIED TO THE MAIN REINF. L<2000, h=200 , A=B=2-Ø12
EXTENDING IN THE SHORT DIRECTION. L<5000, h=400 , A=2-Ø12 , B=2-Ø16 designed project manager
DR..ENG : Majid Albana
12. MIXING & PLACING CONCRETE SHOULD BE DONE ACCORDING TO ACI - 318M - 95 (CHAPTER 5) checked scale date
CONDUIT OR PIPE SIZE SHALL NOT EXCEED 30% OF SLAB THICKNESS UNLESS SPECIFICALLY LINTEL REINFORCEMENT ENG : Majid Albana
2
drawn job no. sheet no.
DETAILED,OTHERWISE CONCENTRATIONS OF CONDUITS OR PIPES SHOULD BE AVOIDED EXCEPT ENG : Majid Albana
WHERE DETAILED OPENINGS ARE PROVIDED, ALL SUBJECTED TO ENGINEER'S APPROVAL. approved
C C
B B
A A
1 1
add Ø25@200 B
L= 3.0m

3.0

2 2
add Ø25@200 B
L= 3.0m
Ø25@200 B. MESH

Ø25@200 T. MESH
3.0
add Ø25@200 B
L= 3.0m

3.0

3 3
add Ø25@200 B
L= 3.0m
3.0
Ø25@200 B. MESH Ø25@200 T. MESH
4 4
F F
E E
no. date initials revision
BOTTOM. MESH TOP. MESH
job title
Foundation Plan MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
(A)
drawing title
PLAN OF FOUNDATION
THICK. = 1000 mm
REINFORCEMENT&SEC.
designed project manager
DR.ENG : Majid Albana
checked scale date
all dim. from ARCH D.W.G. ENG : Majid Albana 1-1008 /2022
3
drawn job no. sheet no.
ENG : Majid Albana
approved ST/D/02
C
B
A
250 250
Ø12@200 E.F
1 Ø12@200 E.F
Raft foundation
B

1000
Well compacted subbase 95 % blinding
2
3
WALL REINFORCEMENT
4 Ø16 A. D.D
3Ø16 arround
door opening
VERTICAL REINFORCEMENT
HORIZONTAL REINFORCEMENT 3Ø16
door opening
4
3Ø16
DETAIL A
DETAIL A
F
E
W1 Reinf.
no. date initials revision
job title
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
(A)
drawing title
Foundation Plan PLAN OF FOUNDATION
REINFORCEMENT&SEC.
designed project manager
DR.ENG : Majid Albana
THICK. = 1000 mm checked scale
ENG : Majid Albana
date
8 /2022 1-100
4
drawn job no. sheet no.
all dim. from ARCH D.W.G. ENG : Majid Albana
approved ST/D/02
C
B

B
UP
B

SECTION B-B (between Foundation & landing )


no. date initials revision
SECTION B-B (between slab & landing )
Ø25@200 B. MESH Ø25@200 T. MESH job title
protective layer
(A)
drawing title

1000
screed 5cm
Lean Conc.
Well compacted subbase 95 % blinding 10cm designed project manager
DR.ENG : Majid Albana
checked scale date
ENG : Majid Albana 1-1008 /2022
Typical Section (A-A) of raft foundation
5
drawn job no. sheet no.
ENG : Majid Albana
approved ST/D/02
C
B
A
C1
C1 C1
1 C1 SCHEDULE OF COLUMNS AND WALLS
C1
SIZE
C1 350 800
2 C1 C3
C4
C2 400 700
C3 450 800
C1 C4 350 800
3 C1 C3
W1 250 lift
C2 C1
C2
4 C1
no. date initials revision
F
E
job title
(A)
drawing title
COLUMNS KEY PLAN
COLUMNS KEY PLAN
designed project manager
DR.ENG : Majid Albana
checked scale date
1-1008 /2021
drawn job no. sheet no.
approved 6 ST/D/02
8 - Ø25 8 - Ø25 12 - Ø25 10- Ø25
Ø10@200 Ø10@200 Ø10@200 Ø10@200
2Ties/Set 2Ties/Set
Main Bar Roof Floor 2Ties/Set 2Ties/Set
Ties

Column Reinf.
Rest See
C 50
Section
2 rd Floor
Main Bar 2 rd Floor 8- Ø25 8 - Ø25 12 - Ø25 10- Ø25
Ties Ø10@200 Ø10@200 Ø10@200 Ø10@200
2Ties/Set 2Ties/Set 2Ties/Set 2Ties/Set

Rest See Column Reinf.


C 50
Section
Ground Level
foundation
level
8 - Ø25 8 - Ø25 12- Ø25 10 - Ø25
Dowels
C1 C2 C3 C4

Rest See Column Reinf.


no. date initials revision
job title
(A)
drawing title
SCHEDULE OF COLUMN
designed project manager
DR.ENG : Majid Albana
Typ. Sec. For Column scale date
checked
1-1008/2022
drawn job no. sheet no.
approved 7
B C
A
HB2 80X38

B1
TABLE OF Hidden Beams
MODEL BOTTOM TOP
STIRR./m
NO. RFT. RFT.
B1 HB1 8 12 8 12 5 10/m'
B1
HB2 6 12 6 16 5 10/m'
1 HB2 80X38
B1
TABLE OF RIBS
MODEL
HB2 80X38

HB2 80X38 BOTTOM TOP


STIRR./m
NO. RFT. RFT.
HB1 80X38

R1 2 16 2 16 7 10/m'
HB2 80X38

R2 2 12 2 12 5 10/m'
5 12/m
2 HB2 80X38 HB2 80X38 5 10/m
HB2 80X38

2 16 / Rib
HB1 80X38

HB. Width
5 10/m'
HB2 80X38
5 10/m'
5 10/m'
3 HB2 80X38 HB2 80X38

HB2 80X38
HB2 80X38
HB1 80X38

HB2 80X38

HB2 80X38
HB2 80X38
HB2 80X38
4 B1
HB2 80X38
F
E
no. date initials revision
job title
(A)
drawing title
PLAN OF SLAB
REINFORCEMENT&SEC.
designed project manager
ENG : Majid Albana
SLAB REINFORCEMENT GROUND FLOOR ) checked
ENG : Majid Albana
scale
1-100
date
8 /2022
drawn job no. sheet no.
8
ENG : Majid Albana
approved ST/D/02
B C
A
HB2 80X38

B1
TABLE OF Hidden Beams
MODEL BOTTOM TOP
STIRR./m
NO. RFT. RFT.
HB1 8 12 8 12 5 10/m'
B1
HB2 6 12 6 16 5 10/m'
1 HB2 80X38
B1
TABLE OF RIBS
MODEL
HB2 80X38

HB2 80X38 HB2 80X38 BOTTOM TOP


STIRR./m
NO. RFT. RFT.
HB1 80X38

R1 2 16 2 16 7 10/m'
HB2 80X38

R2 2 12 2 12 5 10/m'
5 12/m
2 HB2 80X38 HB2 80X38 5 10/m
HB2 80X38

2 16 / Rib
HB1 80X38

HB. Width
5 10/m'
HB2 80X38
5 10/m'
5 10/m'
3 HB2 80X38 HB2 80X38

HB2 80X38
HB2 80X38
HB1 80X38

HB2 80X38

HB2 80X38
HB2 80X38
HB2 80X38
4 B1
HB2 80X38
F
E
no. date initials revision
job title
(A)
drawing title
PLAN OF SLAB
REINFORCEMENT&SEC.
designed project manager
ENG : Majid Albana
SLAB REINFORCEMENT FIRST FLOOR ) checked
ENG : Majid Albana
scale
1-100
date
8 /2022
drawn job no. sheet no.
9
ENG : Majid Albana
approved ST/D/02
B C
A
HB2 80X38

B1
TABLE OF Hidden Beams
MODEL BOTTOM TOP
STIRR./m
NO. RFT. RFT.
HB1 8 12 8 12 5 10/m'
B1
HB2 6 12 6 16 5 10/m'
1 HB2 80X38
B1
TABLE OF RIBS
MODEL
HB2 80X38

HB2 80X38 HB2 80X38 BOTTOM TOP


STIRR./m
NO. RFT. RFT.
HB1 80X38

R1 2 16 2 16 7 10/m'
HB2 80X38

R2 2 12 2 12 5 10/m'
5 12/m
2 HB2 80X38 HB2 80X38 5 10/m
HB2 80X38

2 16 / Rib
HB1 80X38

HB. Width
5 10/m'
HB2 80X38
5 10/m'
5 10/m'
3 HB2 80X38 HB2 80X38

HB2 80X38
HB2 80X38
HB1 80X38

HB2 80X38

HB2 80X38
HB2 80X38
HB2 80X38
4 B1
HB2 80X38
F
E
no. date initials revision
job title
(A)
drawing title
PLAN OF SLAB
REINFORCEMENT&SEC.
designed project manager
ENG : Majid Albana
SLAB REINFORCEMENT 2nd,3rd,4rt,5th & 6th FLOOR ) checked
ENG : Majid Albana
scale
1-100
date
8 /2022
drawn job no. sheet no.
10
ENG : Majid Albana
approved ST/D/02
C
B
A
B2
Ø16@200 T. MESH

1
B2 B2
Ø16@200 T. MESH
B2
2
B2
3
4
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :- no. date initials revision
F
E job title
(A)
drawing title
PLAN OF SLAB
SLAB REINFORCEMENT PENHOUSE) REINFORCEMENT&SEC.
designed project manager
ENG : Majid Albana
checked scale date
ENG : Majid Albana 1-100 8 /2022
drawn job no. sheet no.
11
ENG : Majid Albana
approved ST/D/02

You might also like