The survey protocol documents measurements taken at a shim plate elevation at an ethane facility upgrade project. Measurements were taken at 36 points (labeled A1-1 through B2-4) and recorded for the design elevation, actual elevation, and difference between the two. Most points were within 2 units of the design elevation, but a few had larger differences. The surveyor and construction manager signatures and equipment details are also included.
The survey protocol documents measurements taken at a shim plate elevation at an ethane facility upgrade project. Measurements were taken at 36 points (labeled A1-1 through B2-4) and recorded for the design elevation, actual elevation, and difference between the two. Most points were within 2 units of the design elevation, but a few had larger differences. The surveyor and construction manager signatures and equipment details are also included.
The survey protocol documents measurements taken at a shim plate elevation at an ethane facility upgrade project. Measurements were taken at 36 points (labeled A1-1 through B2-4) and recorded for the design elevation, actual elevation, and difference between the two. Most points were within 2 units of the design elevation, but a few had larger differences. The surveyor and construction manager signatures and equipment details are also included.
Budget Item #: BI-10-01868 Location: Related Drawing: Data & Sketch: (Provide another sheet, if required) Activity: ____________________________________________________________________________
SHIM PLATE ELEVATION
Points Remarks DESIGN (+100.175) ACTUAL DIFFERENCE
A1-1 3.118 3.119 1
A1-2 3.118 3.119 1
A1-3 3.118 3.118 0
A1-4 3.118 3.119 1
A2-1 3.118 3.12 2
A2-2 3.118 3.119 1
A2-3 3.118 3.119 1
A2-4 3.118 3.12 2
B1-1 3.118 3.118 0
B1-2 3.118 3.119 1
B1-3 3.118 3.119 1
B1-4 3.118 3.12 2
B2-1 3.118 3.12 2
B2-2 3.118 3.12 2
B2-3 3.118 3.12 2
B2-4 3.118 3.12 2
Surveyor Total Station Construction Manager Name: Model: Name: Signature: Certificate # Signature: