Bridge of Weir G-28-L1-1
Current (mA)
Circuit length
Fault Protection
RCD Operate
Cable C.S.A.
Allowed ()
Temp. (C)
C.P.C. Protective Device Method
Reference
Grouping
Diversity
Ambient
BS / Type Rating S/C Max. Other
Max. Zs
method
(mm2)
(mm2)
C.S.A.
Type*
factor
BS EN (A) Cap. Discon. (State)
Way
Line
(M)
(kA) Time
Type of Cable (Seconds)
1 L1 PVC Singles 1.5 40.0 B C *20 30.0 1 1.0 88 2 6 80 0 8.52 0.4
L2
L3
*C.P.C. Type T for Trunking, C for conduit, SWA for Steel wire armour, AWA for Aluminium wire armour, Cu for copper conductor, Al for aluminium conductor
# Make reference to installation methods detailed in Table 4A2 of BS7671
Number of Rectifiers/phase L1 0 L2 L3 Rectifier Type: , ,
Design: I/We being the person(s) responsible for the design of the electrical installation (as indicated by my/our signatures below), particulars of which are described above, have exercised reasonable skill and care
when carrying out the design hereby CERTIFY that the said work for which I/we have been responsible is to the best of my/our knowledge and belief in accordance with BS7671:2008:
Details of departures from BS7671:2008 as amended (Regs 120.3, 120.4):
The extent of liability of the signatory or signatories is limited to the work described above as the subject of this certificate.
Designer Name: Digital Signature: Date:
Company Name :
Address:
Construction: I/We being the person(s) responsible for the construction of the electrical installation (as indicated by my/our signatures below), particulars of which are described above, have exercised reasonable skill
and care when carrying out the construction hereby CERTIFY that the construction work for which I/we have been responsible is to the best of my/our knowledge and belief in accordance with BS7671:2008
SCHEDULE OF INSPECTIONS
This form is based on model forms shown in Appendix 6 BS 7671:2008 © Copyright British Telecommunications plc. Registeredoffice: 81 Newgate Street, London, EC1AJ 7AJ.
Registered in England No. 1800000
1 of 3
SCHEDULE OF CIRCUIT DETAILS & INSPECTION & TEST RESULTS– STR 17
Issue 6 June 2012
This form is based on model forms shown in Appendix 6 BS 7671:2008 © Copyright British Telecommunications plc. Registeredoffice: 81 Newgate Street, London, EC1AJ 7AJ.
Registered in England No. 1800000
2 of 3
SCHEDULE OF CIRCUIT DETAILS & INSPECTION & TEST RESULTS– STR 17
Issue 6 June 2012
SITE NAME: Bridge of Weir Error: Reference source not found JOB NUMBER(NIMs): CHANGE CONTROL REFERENCE:
DB/SW Ref: G/28 G/28 Way No: 1L1
Functional test of
(Record lowest value) (M) times
Max. Measured
test – Yes / No
Part of Sample
All other
Ring circuits
EFLI Zs ()
Circuits* Comments
Neutr In 5In mS
Line/ Lines/ Lines/
Bonding
(mA)
r1 rn r2 r1+r2 r2 Earth (All) only)
Way
RCD
Line
L2
L3
* Record r1+r2 or r2
Comments on existing installation (in the case of an alteration or addition. See section 633):
TEST INSTRUMENTS All test instruments must have an associated valid calibration certificate at the time of test
Type Insulation Tester Continuity E.L.I. Tester R.C.D. Tester Other Other Other
This form is based on model forms shown in Appendix 6 BS 7671:2008 © Copyright British Telecommunications plc. Registeredoffice: 81 Newgate Street, London, EC1AJ 7AJ.
Registered in England No. 1800000
3 of 3