Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

NANYANG TECHNOLOGICAL UNIVERSITY

SINGAPORE CENTRE FOR 3D PRINTING


Non-SC3DP EQUIPMENT USAGE DETAILS FORM

Section A:
Full name:

For NTU personnel only


Designation: RF RAssoc RAsst PO REng Intern/attachment
PhD Masters UG Others: _____________________________
NTU Email address:
S/D/C:

For non-NTU project collaborator only:


Name of company:
Position at company:
Email address at company:
Tel:

Project title:

Note: Title should be full


1
project title listed on official
financial/legal/grant
document

Does the project allow No Yes


1a NTU equipment usage
expenses to be charged?

State WBS* to be charged


for consumables, machine
spare parts and if the need
2
arise, repairs:
Note: WBS* should be
linked to point 1

Linkage of project to AM
3
research objective:
Department
‐ that project is
listed under (e.g. MAE,
4 Alibaba NTU Singapore
Joint Research Institute,
etc.):
Specific SC3DP
5
machine(s) required:
Material to be used with
6
machine(s) in point 5:
Details of requester
(relevant technical
7 experience with machine in
point 5 & any other
relevant info):
Frequency of usage
expected (on a monthly
basis):

Note: Actual usage and


booking slot approved is
8 subject to availability of
machine with usage
priority given to SC3DP &
NAMIC@NTU projects
and/or availability of
personnel providing
support
Duration of usage for
9 project (e.g. 30/3/2020 –
30/6/2020):
Reason for request to
use SC3DP’s (please
10 include reason other NTU
Facilities regardless of
charge are not applicable)

11 Any other relevant info

Important: Completion of form does not constitute acceptance of usage.


Note: If working on more than 1 project, please declare other project(s) on a fresh copy of form. If there is a need
to add on other equipment after submission, please submit a new form instead.

Verified by applicant's
RO/project supervisor: Signature Name of signatory
_____________________________________________________________________________________________

Section B:
Verified by lab TIC on
compatibility of request to
machine Signature Name of signatory
_____________________________________________________________________________________________

Section C:
Approved by Equipment PI
for machines:
1.
2.
3.
4. Signature Name of signatory

Approved by Equipment PI
for machines:
1.
2.
3.
4. Signature Name of signatory

You might also like