Professional Documents
Culture Documents
Ship To Shore Drill
Ship To Shore Drill
GOOD DAY
ON 05.01.2022 AT 14:10UTC IN PORT OF TAGANROG,WHILE HATCH COVER SHIFTING OPERATION,OIL FROM THE HATCH COVER CRANE SPILLED ON PORT DECK,SCUPPER PLUGS WERE NOT CLOSED TIGHTLY,BECAUSE OF THAT NEGOTIABLE AMOUNT OF OIL SPILLED IN THE
SEA.OIL POLLUTUON TEAM MUSTERED AT MUSTER STATION AND WE CERTAINLY STARTED SOPEP PROCEDURES.
CENGIZ OKATAN