Detailed report

12/01/2021 - 08/17/2022

Total:471:26

Date Description Duration User

06/02/2022 Issue logged 1:00 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 1:30AM - 2:30AM


Creation/QAT (Billable) - [Execution]

06/01/2022 Validate products_fnp_cost file file 2:00 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 9:30PM - 11:30PM


Creation/QAT (Billable) - [Execution]

06/01/2022 Issue logged 1:00 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 3:30AM - 4:30AM


Creation/QAT (Billable) - [Execution]

06/01/2022 RBI - Loyalty - Stand up 0:15 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 3:00AM - 3:15AM


Creation/QAT (Billable) - [Meeting]

06/01/2022 Validate beverage_modifier_fnp_cost and th_inventory_cost 0:45 Harpal Singh


files
12:00AM - 12:45AM
RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test
Creation/QAT (Billable)

05/31/2022 Validate baked_goods_food_cost and 1:00 Harpal Singh


baked_goods_paper_cost
10:30PM - 11:30PM
RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test
Creation/QAT (Billable) - [Execution]

05/31/2022 standup 0:15 Ben Jardine

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 6:01PM - 6:16PM


Creation/QAT (Billable) - [Meeting]

05/31/2022 Consulting 0:45 Ben Jardine

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 5:41PM - 6:26PM


Creation/QAT (Billable) - [Consulting]

05/31/2022 Stand-up 0:15 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 5:30PM - 5:45PM


(Billable)

05/31/2022 DSM of RBI - loyalty Phase 1 Project 0:15 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 4:45PM - 5:00PM


Code Review (Billable) - [Meeting]

05/30/2022 Validate plu_mapping file 1:30 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 11:30PM - 1:00AM


Creation/QAT (Billable) - [Execution]

05/30/2022 Internal call 0:55 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 11:00PM - 11:55PM


preparation and estimation

Clearview 1
05/30/2022 RBI - Loyalty Change Request - Approach Review 1:00 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 11:00PM - 12:00AM


preparation and estimation

05/30/2022 Proposal Preparation 0:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 10:30PM - 11:00PM


preparation and estimation

05/30/2022 Internal Communications, Project Management 0:30 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 10:00PM - 10:30PM


(Billable)

05/30/2022 Created release branches and created PR's for architect 1:30 Gaurav Garg
review.
2:30PM - 4:00PM
RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev
Code Review (Billable) - [Code Reviews]

05/30/2022 Peer Code review request created for RBI- Loyalty 3.0 0:30 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 12:00PM - 12:30PM


Code Review (Billable) - [Code Reviews]

05/28/2022 Issue logged 0:30 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 3:30AM - 4:00AM


Creation/QAT (Billable) - [Execution]

05/28/2022 Collection of Data with Manual Scripts 2:00 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 12:00AM - 2:00AM


Creation/QAT (Billable) - [Execution]

05/27/2022 Loyalty 3.0 Data Point Matrix - Refine Chart Requirements 0:40 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 8:30PM - 9:10PM


preparation and estimation

05/27/2022 Control Record Management w/ Gaurav 0:50 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 7:30PM - 8:20PM


(Billable)

05/27/2022 Loyalty 3.0 Data Point Matrix - Sample Operating Report 0:40 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 6:50PM - 7:30PM


preparation and estimation

05/27/2022 Phase 1 TSD Clarification & Updates w/ Gaurav 0:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 6:20PM - 6:50PM


(Billable)

05/27/2022 Consulting 0:30 Ben Jardine

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 5:35PM - 6:05PM


Creation/QAT (Billable) - [Consulting]

05/27/2022 Weekly status reporting , client communications 0:45 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 5:30PM - 6:15PM


(Billable)

05/27/2022 Worked on modified part of TSD and pushed into feature 3:00 Gaurav Garg
branch
10:30AM - 1:30PM
RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev
Code Review (Billable) - [Execution, Code Reviews]

05/27/2022 RBI - Loyalty - Stand up 0:30 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 3:30AM - 4:00AM


Creation/QAT (Billable) - [Meeting]

Clearview 2
05/27/2022 Tracing translations 1:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 1:00AM - 2:30AM


(Billable)

05/26/2022 Loyalty 3.0 Data Point Matrix - Data Flow 1:15 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 11:45PM - 1:00AM


preparation and estimation

05/26/2022 Internal Communications, Project Management 0:45 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 10:30PM - 11:15PM


(Billable)

05/26/2022 Validate plu_mapping file 4:00 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 10:00PM - 2:00AM


Creation/QAT (Billable) - [Execution]

05/26/2022 Setting up service CI/CD 0:45 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 4) Architecture 7:40PM - 8:25PM


Support/Review -Billable

05/26/2022 Loyalty 3.0 Data Point Matrix - Data Flow 0:40 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 7:00PM - 7:40PM


preparation and estimation

05/26/2022 RBI - Loyalty - Stand up 0:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 6:00PM - 6:30PM


(Billable)

05/26/2022 Stand-up 0:28 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:00PM - 6:28PM


(Billable)

05/26/2022 Consulting 1:00 Ben Jardine

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 5:35PM - 6:35PM


Creation/QAT (Billable) - [Consulting]

05/26/2022 DSM of RBI - loyalty Phase 1 Project 0:15 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 5:15PM - 5:30PM


Code Review (Billable) - [Meeting]

05/26/2022 Worked on existing SP which is used into RBI and made 2:45 Gaurav Garg
changes accordingly in scripts.
10:30AM - 1:15PM
RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev
Code Review (Billable) - [Execution, Code Reviews]

05/26/2022 Validate plu_mapping file 0:30 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 4:00AM - 4:30AM


Creation/QAT (Billable) - [Execution]

05/26/2022 Internal Communications, Project Management 0:30 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 2:15AM - 2:45AM


(Billable)

05/26/2022 Loyalty 3.0 Data Point Matrix - Requirements 0:50 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 1:20AM - 2:10AM


preparation and estimation

05/26/2022 Loyalty 3.0 Data Point Matrix - Finish Calculations 0:20 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 12:35AM - 12:55AM


preparation and estimation

Clearview 3
05/25/2022 Loyalty 3.0 Data Point Matrix - CV Data Points 0:20 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 11:10PM - 11:30PM


preparation and estimation

05/25/2022 Validate plu_mapping file 2:00 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 9:30PM - 11:30PM


Creation/QAT (Billable) - [Execution]

05/25/2022 Update Test Plan 1:00 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 8:30PM - 9:30PM


Creation/QAT (Billable) - [Execution]

05/25/2022 Consulting 2:15 Ben Jardine

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 6:57PM - 9:12PM


Creation/QAT (Billable) - [Consulting]

05/25/2022 Replying back to the email for QA +chat with Ken 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:30PM - 7:30PM


(Billable)

05/25/2022 Loyalty 3.0 Data Point Matrix - Finish Calculations 5:00 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 5:30PM - 10:30PM


preparation and estimation

05/25/2022 Worked on connecting with AWS S3 bucket to upload file 3:00 Gaurav Garg
using new service.
10:30AM - 1:30PM
RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev
Code Review (Billable) - [Execution, Code Reviews]

05/25/2022 RBI - Loyalty - Stand up 0:15 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 3:00AM - 3:15AM


Creation/QAT (Billable) - [Meeting]

05/25/2022 Update Test Plan 0:25 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 1:45AM - 2:10AM


Creation/QAT (Billable) - [Execution]

05/25/2022 Weekly call with RBI 0:35 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:30AM - 1:05AM


(Billable)

05/25/2022 CV/RBI - Loyalty Dashboard - Status Meeting 0:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:30AM - 1:00AM


(Billable)

05/24/2022 Internal Communications, Project Management, client facing 1:30 Megan Hayes
meeting
10:00PM - 11:30PM
RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management
(Billable)

05/24/2022 Validate plu_mapping file 3:00 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 9:00PM - 12:00AM


Creation/QAT (Billable) - [Execution]

05/24/2022 Assist Gaurav with Amazon S3 Connection 0:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 7:45PM - 8:15PM


(Billable)

05/24/2022 Call to discuss the progress 0:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 7:00PM - 7:30PM


preparation and estimation

Clearview 4
05/24/2022 Loyalty 3.0 Data Point Matrix - Review Findings w/ Megan, 0:30 Scott T.
Priyanka
7:00PM - 7:30PM
RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract
preparation and estimation

05/24/2022 Loyalty 3.0 Data Point Matrix - Review POS Data 0:20 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 6:40PM - 7:00PM


preparation and estimation

05/24/2022 Reviewing/Updating Test Plan 2:00 Ben Jardine

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 6:28PM - 8:28PM


Creation/QAT (Billable) - [Consulting]

05/24/2022 Loyalty 3.0 Data Point Matrix - Consult w/ Tim 0:25 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 6:15PM - 6:40PM


preparation and estimation

05/24/2022 standup 0:15 Ben Jardine

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 6:13PM - 6:28PM


Creation/QAT (Billable) - [Meeting]

05/24/2022 Loyalty 3.0 Data Point Matrix - Review POS Data 0:10 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 5:50PM - 6:00PM


preparation and estimation

05/24/2022 Stand-up 0:15 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 5:30PM - 5:45PM


(Billable)

05/24/2022 RBI - Loyalty - Stand up 0:20 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 5:30PM - 5:50PM


(Billable)

05/24/2022 DSM of RBI - loyalty Phase 1 Project 0:15 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 4:45PM - 5:00PM


Code Review (Billable) - [Meeting]

05/24/2022 Worked on SP's, created branch for SQL and implemented all 2:00 Gaurav Garg
script into branch
11:30AM - 1:30PM
RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev
Code Review (Billable) - [Execution, Code Reviews]

05/23/2022 Internal Communications, Project Management 0:30 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 10:00PM - 10:30PM


(Billable)

05/23/2022 Update Test Plan 3:00 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 9:30PM - 12:30AM


Creation/QAT (Billable) - [Execution]

05/23/2022 Worked on RBI Loyalty project on service part 3:00 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 10:30AM - 1:30PM


Code Review (Billable) - [Execution, Code Reviews]

05/21/2022 Test Plan updating meeting with Ben 0:30 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 3:30AM - 4:00AM


Creation/QAT (Billable) - [Consulting]

05/21/2022 Review BSD (Phase 3 - Presentation) 0:20 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:40AM - 1:00AM


(Billable)

Clearview 5
05/20/2022 Update Test Plan 2:30 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 11:30PM - 2:00AM


Creation/QAT (Billable) - [Execution]

05/20/2022 [TA] Assisting Ben with Test Strategy 0:35 Jean-Charles

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 11:25PM - 12:00AM


Creation/QAT (Billable) - [Planning, Consulting]

05/20/2022 Call with QA (Phase1) 0:24 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 6) User Acceptance Testing 11:00PM - 11:24PM


Support/UAT (Billable)

05/20/2022 Loyalty QA Questions w/ Ben, Priyanka 0:25 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 11:00PM - 11:25PM


(Billable)

05/20/2022 Assist Gaurav with Amazon S3 Connection 0:50 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 8:45PM - 9:35PM


(Billable)

05/20/2022 Loyalty QA Questions w/ Ben, Priyanka 0:05 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 6:15PM - 6:20PM


(Billable)

05/20/2022 Weekly status reporting , client communications 0:45 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 5:30PM - 6:15PM


(Billable)

05/20/2022 Consultation 3:15 Ben Jardine

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 4:30PM - 7:45PM


Creation/QAT (Billable) - [Consulting]

05/20/2022 Worked on RBI Loyalty project on service part 3:00 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 11:30AM - 2:30PM


Code Review (Billable) - [Execution, Code Reviews]

05/20/2022 RBI - Loyalty - Stand up 0:15 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 3:30AM - 3:45AM


Creation/QAT (Billable) - [Meeting]

05/19/2022 Reviewing Test Plan 1:30 Ben Jardine

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 10:54PM - 12:24AM


Creation/QAT (Billable) - [Consulting]

05/19/2022 Internal Communications, Project Management 0:45 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 10:30PM - 11:15PM


(Billable)

05/19/2022 standup 0:20 Ben Jardine

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 10:29PM - 10:49PM


Creation/QAT (Billable) - [Meeting]

05/19/2022 BSD review/Draft Test Plan 1:30 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 9:00PM - 10:30PM


Creation/QAT (Billable) - [Meeting, Analysis]

05/19/2022 Revision of document after SA review (Edited Wireframe etc.) 3:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:30PM - 9:30PM


(Billable)

Clearview 6
05/19/2022 Stand-up 0:16 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:00PM - 6:16PM


(Billable)

05/19/2022 RBI - Loyalty - Stand up 0:20 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 6:00PM - 6:20PM


(Billable)

05/19/2022 DSM of RBI - loyalty Phase 1 Project 0:15 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 5:15PM - 5:30PM


Code Review (Billable) - [Meeting]

05/19/2022 Worked on RBI Loyalty project on service part 3:00 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 10:30AM - 1:30PM


Code Review (Billable) - [Execution, Code Reviews]

05/19/2022 Internal Communications, Project Management 0:30 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 2:15AM - 2:45AM


(Billable)

05/19/2022 Call with Scott to go over feedback on BSD Phase3 0:50 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 1:25AM - 2:15AM


(Billable)

05/19/2022 Review BSD (Phase 3 - Presentation) w/ Priyanka 0:45 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 1:25AM - 2:10AM


(Billable)

05/19/2022 Loyalty 3.0 Data Point Matrix 0:25 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 1:00AM - 1:25AM


preparation and estimation

05/18/2022 BSD review/Draft Test Plan 1:30 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 11:30PM - 1:00AM


Creation/QAT (Billable) - [Meeting, Analysis]

05/18/2022 Loyalty 3.0 Data Point Matrix 1:45 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 8:30PM - 10:15PM


preparation and estimation

05/18/2022 Request Details from Alan / Alan OOO / Request Alt Contact 0:20 Scott T.
from Jess
5:30PM - 5:50PM
RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract
preparation and estimation

05/18/2022 Worked on RBI Loyalty project on file creation 3:00 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 10:30AM - 1:30PM


Code Review (Billable) - [Execution, Code Reviews]

05/18/2022 RBI - Loyalty - Stand up 0:15 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 3:00AM - 3:15AM


Creation/QAT (Billable) - [Meeting]

05/18/2022 Loyalty 3.0 Data Point Matrix 1:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 2:20AM - 3:50AM


preparation and estimation - [Off Hours]

05/18/2022 Loyalty 3.0 Data Point Matrix 0:10 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 1:50AM - 2:00AM


preparation and estimation

Clearview 7
05/18/2022 Discuss new requirements with Scott, Tim, etc. 0:40 Geoff Bastin

RBI - RBI-404845 - Loyalty 3.0 - 4) Architecture 1:10AM - 1:50AM


Support/Review -Billable

05/18/2022 Internal call 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 1:00AM - 2:00AM


preparation and estimation

05/18/2022 RBI - Loyalty Client Requested Change Review 0:50 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 1:00AM - 1:50AM


preparation and estimation

05/18/2022 Loyalty 3.0 Data Point Matrix 0:10 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 12:50AM - 1:00AM


preparation and estimation

05/18/2022 Call with RBI 0:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:30AM - 1:00AM


(Billable)

05/18/2022 CV/RBI - Loyalty Dashboard - Status Meeting 0:20 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:30AM - 12:50AM


(Billable)

05/18/2022 Review BSD (Phase 3 - Presentation) w/ Priyanka 0:25 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:05AM - 12:30AM


(Billable)

05/17/2022 Loyalty 3.0 Data Point Matrix 0:15 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 11:50PM - 12:05AM


preparation and estimation

05/17/2022 Loyalty 3.0 Data Point Matrix 0:20 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 11:20PM - 11:40PM


preparation and estimation

05/17/2022 Loyalty 3.0 Data Point Matrix 0:05 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 10:40PM - 10:45PM


preparation and estimation

05/17/2022 Give info on rPOs loyalty implementation 0:25 Annik

RBI - RBI-404845 - Loyalty 3.0 - 4) Architecture 10:25PM - 10:50PM


Support/Review -Billable

05/17/2022 Internal Communications, Project Management, client facing 1:30 Megan Hayes
meeting
10:00PM - 11:30PM
RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management
(Billable)

05/17/2022 Submitted Test Plan 3:00 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 9:30PM - 12:30AM


Creation/QAT (Billable) - [Execution]

05/17/2022 Loyalty 3.0 Data Point Matrix 0:10 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 9:20PM - 9:30PM


preparation and estimation

05/17/2022 Export Consult w/ Gaurav 0:45 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 8:35PM - 9:20PM


(Billable)

Clearview 8
05/17/2022 Loyalty 3.0 Data Point Matrix 0:10 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 8:25PM - 8:35PM


preparation and estimation

05/17/2022 Editing BSD after Feedback 2:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 7:00PM - 9:30PM


(Billable)

05/17/2022 Research Loyalty 2.0 1:15 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 6:45PM - 8:00PM


preparation and estimation

05/17/2022 Loyalty CR Goals w/ Priyanka 0:25 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 6:20PM - 6:45PM


preparation and estimation

05/17/2022 Call with Scott to discuss changes 0:45 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 6:15PM - 7:00PM


preparation and estimation

05/17/2022 Research Loyalty 2.0 0:25 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 5:35PM - 6:00PM


preparation and estimation

05/17/2022 RBI - Loyalty - Stand up 0:05 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 5:30PM - 5:35PM


(Billable)

05/17/2022 Stand-up 0:15 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 5:30PM - 5:45PM


(Billable)

05/17/2022 Loyalty CR Goals 0:10 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 5:20PM - 5:30PM


preparation and estimation

05/17/2022 DSM of RBI - loyalty Phase 1 Project 0:15 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 5:15PM - 5:30PM


Code Review (Billable) - [Meeting]

05/17/2022 Worked on RBI Loyalty project on calculate IQM part and 2:45 Gaurav Garg
creating file.
11:30AM - 2:15PM
RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev
Code Review (Billable) - [Execution, Code Reviews]

05/17/2022 Review of the feedback received from SA 0:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 2:00AM - 2:30AM


(Billable)

05/17/2022 Review BSD (Phase 3 - Presentation) 1:15 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:50AM - 2:05AM


(Billable)

05/17/2022 Discuss Loyalty changes with Scott, and effect on project plan 0:45 Geoff Bastin
and next steps
12:00AM - 12:45AM
RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract
preparation and estimation

05/16/2022 ROM estimate's estimate 0:35 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 11:50PM - 12:25AM


preparation and estimation

Clearview 9
05/16/2022 BSD review/Draft Test Plan 2:00 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 10:30PM - 12:30AM


Creation/QAT (Billable) - [Meeting, Analysis]

05/16/2022 Internal Communications, Project Management 0:30 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 10:00PM - 10:30PM


(Billable)

05/16/2022 Review of BSD 1:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 8:00PM - 9:30PM

05/16/2022 Editing the document with pending info and translations 2:00 Priyanka Thakral
received from RBI
6:00PM - 8:00PM
RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD
(Billable)

05/16/2022 Worked on RBI Loyalty project on calculate IQM part. 2:30 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 12:30PM - 3:00PM


Code Review (Billable) - [Code Reviews, Analysis]

05/14/2022 working on document 1:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 1:00AM - 2:30AM


(Billable)

05/14/2022 RBI's change of requirements - discussion with Bill, Megan, 0:30 Geoff Bastin
Scott
12:30AM - 1:00AM
RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract
preparation and estimation

05/14/2022 Call with RBI to discuss change in project strategy+ follow-up 1:00 Priyanka Thakral
internal call
12:00AM - 1:00AM
RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other

05/14/2022 RBi/CV Loyalty Dashboard - Metrics Deep Dive 1:00 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:00AM - 1:00AM


(Billable)

05/13/2022 (Phase 3) Custom Week End Date POC 0:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 11:30PM - 12:00AM


(Billable)

05/13/2022 (Phase 3) Blackout Dates Proof of Concept 0:45 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 10:45PM - 11:30PM


(Billable)

05/13/2022 working on document 1:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 10:30PM - 12:00AM


(Billable)

05/13/2022 BSD review/Draft Test Plan 2:00 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 10:00PM - 12:00AM


Creation/QAT (Billable) - [Meeting, Analysis]

05/13/2022 (Phase 3) Research DatePicker Capability 0:35 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 9:40PM - 10:15PM


(Billable)

05/13/2022 New Phase Meeting 1:00 Ben Jardine

RBI - RBI-404845 - Loyalty 3.0 - 999)QAA - [Training] 9:05PM - 10:05PM

Clearview 10
05/13/2022 Call with Scott to discuss Mock-ups 0:40 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 9:00PM - 9:40PM


(Billable)

05/13/2022 Mock-ups for Loyalty 0:40 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 9:00PM - 9:40PM


(Billable)

05/13/2022 Discussing project in general with Scott, CR background 0:20 Geoff Bastin

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 7:30PM - 7:50PM

05/13/2022 RBI Meeting Prep 0:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 4) Architecture 7:15PM - 7:45PM


Support/Review -Billable

05/13/2022 Algorithm & TSD clarifications 0:50 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 6:25PM - 7:15PM


(Billable)

05/13/2022 working on document 2:55 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:00PM - 8:55PM


(Billable)

05/13/2022 (Without Description) 0:45 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 5:30PM - 6:15PM


(Billable)

05/13/2022 Consultation 0:20 Ben Jardine

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 5:05PM - 5:25PM


Creation/QAT (Billable) - [Consulting]

05/13/2022 Connect with Scott for consulting few points 0:30 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 4:00PM - 4:30PM


Code Review (Billable) - [Consulting]

05/13/2022 Worked on service as per TSD. 2:30 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 10:30AM - 1:00PM


Code Review (Billable) - [Analysis]

05/13/2022 BSD review/Draft Test Plan 0:30 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 4:00AM - 4:30AM


Creation/QAT (Billable) - [Meeting, Analysis]

05/13/2022 RBI - Loyalty - Stand up 0:15 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 3:30AM - 3:45AM


Creation/QAT (Billable) - [Meeting]

05/13/2022 BSD review/Draft Test Plan 1:30 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 12:30AM - 2:00AM


Creation/QAT (Billable) - [Meeting, Analysis]

05/13/2022 Test RBI Amazon S3 UAT Bucket 0:10 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:05AM - 12:15AM


(Billable)

05/12/2022 Requesting Ad-Hoc File Details (Phase 2 TSD) 0:10 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 11:35PM - 11:45PM


(Billable)

Clearview 11
05/12/2022 Requesting Ad-Hoc File Details (Phase 2 TSD) 0:10 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 11:20PM - 11:30PM


(Billable)

05/12/2022 Finding info icons from CLEARVIEW 0:15 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 11:00PM - 11:15PM


(Billable)

05/12/2022 working on document 2:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 10:30PM - 12:30AM


(Billable)

05/12/2022 (Without Description) 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 10:30PM - 10:45PM


(Billable)

05/12/2022 Phase 2 TSD - Checking S3 for new files 0:25 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 8:15PM - 8:40PM


(Billable)

05/12/2022 working on document 1:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 8:00PM - 9:30PM


(Billable)

05/12/2022 standup 0:15 Ben Jardine

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 7:12PM - 7:27PM


Creation/QAT (Billable) - [Meeting]

05/12/2022 working on document 0:40 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:15PM - 6:55PM


(Billable)

05/12/2022 Stand-up 0:15 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:00PM - 6:15PM


(Billable)

05/12/2022 RBI - Loyalty - Stand up 0:20 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 6:00PM - 6:20PM


(Billable)

05/12/2022 DSM of RBI - loyalty Phase 1 Project 0:15 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 5:15PM - 5:30PM


Code Review (Billable) - [Meeting]

05/12/2022 Code review of new service 1:30 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 12:30PM - 2:00PM


Code Review (Billable) - [Code Reviews, Analysis]

05/12/2022 Worked on Stored proc as per TSD. 2:00 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 10:30AM - 12:30PM


Code Review (Billable) - [Code Reviews]

05/12/2022 BSD review/Draft Test Plan 1:00 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 3:30AM - 4:30AM


Creation/QAT (Billable) - [Meeting, Analysis]

05/12/2022 (Without Description) 0:30 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 2:15AM - 2:45AM


(Billable)

Clearview 12
05/12/2022 Phase 2 TSD Start 1:20 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:35AM - 1:55AM


(Billable)

05/12/2022 BSD review/Draft Test Plan 2:00 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 12:30AM - 2:30AM


Creation/QAT (Billable) - [Meeting, Analysis]

05/11/2022 Phase 2 TSD Start 0:35 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 10:55PM - 11:30PM


(Billable)

05/11/2022 Documentation + Replu back to RBI with info requested 3:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 10:30PM - 1:30AM


(Billable)

05/11/2022 Documentation 0:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 9:00PM - 9:30PM


(Billable)

05/11/2022 Phase 1 TSD Clarification & Updates w/ Gaurav 0:50 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 6:40PM - 7:30PM


(Billable)

05/11/2022 Documentation 1:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:00PM - 7:30PM


(Billable)

05/11/2022 Started work on SQL part as per TSD. 2:00 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 12:30PM - 2:30PM


Code Review (Billable) - [Code Reviews, Analysis]

05/11/2022 Gone through the TSD of RBI Loyalty project 2:00 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 10:30AM - 12:30PM


Code Review (Billable) - [Analysis]

05/11/2022 RBI - Loyalty - Stand up 0:30 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 3:00AM - 3:30AM


Creation/QAT (Billable) - [Meeting]

05/11/2022 Free Tier Bucket POC 0:35 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 1:30AM - 2:05AM


(Billable)

05/11/2022 Multiple Weeks UI 0:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 4) Architecture 1:00AM - 1:30AM


Support/Review -Billable

05/11/2022 Call with RBI 0:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:30AM - 1:00AM


(Billable)

05/11/2022 CV/RBI - Loyalty Dashboard - Status Meeting 0:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:30AM - 1:00AM


(Billable)

05/10/2022 Explore AWS Free Tier 0:40 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 11:50PM - 12:30AM


(Billable)

Clearview 13
05/10/2022 Project Ref – RBI – 404845 1:00 Adil Mohammed

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 11:30PM - 12:30AM


(Billable)

05/10/2022 BSD review 1:00 Harpal Singh

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 11:00PM - 12:00AM


Creation/QAT (Billable) - [Meeting, Analysis]

05/10/2022 Documentation 2:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 10:30PM - 12:30AM


(Billable)

05/10/2022 Research on documentation on Loyalty BSD 1:00 Adil Mohammed

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 10:30PM - 11:30PM


(Billable)

05/10/2022 Layout Concerns w/ Priyanka, Megan 0:35 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 4) Architecture 10:25PM - 11:00PM


Support/Review -Billable

05/10/2022 (Without Description) 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 10:00PM - 10:15PM


(Billable)

05/10/2022 Layout Concerns w/ Priyanka, Megan 0:25 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 4) Architecture 7:35PM - 8:00PM


Support/Review -Billable

05/10/2022 Working on Mock-ups 3:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:30PM - 9:30PM


(Billable)

05/10/2022 Example Export for Gaurav 0:05 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 5:55PM - 6:00PM


(Billable)

05/10/2022 standup 0:15 Ben Jardine

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 5:38PM - 5:53PM


Creation/QAT (Billable) - [Meeting]

05/10/2022 Stand-up 0:15 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 5:30PM - 5:45PM


(Billable)

05/10/2022 RBI - Loyalty - Stand up 0:15 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 5:30PM - 5:45PM


(Billable)

05/10/2022 DSM of RBI - loyalty Phase 1 Project 0:15 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 5:15PM - 5:30PM


Code Review (Billable) - [Meeting]

05/10/2022 Gone through the BSD & TSD of RBI Loyalty project 4:00 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 10:30AM - 2:30PM


Code Review (Billable) - [Analysis]

05/10/2022 Working on Documentation 2:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:00AM - 2:30AM


(Billable)

Clearview 14
05/09/2022 (Without Description) 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 10:00PM - 10:15PM


(Billable)

05/09/2022 Consult on Phase 3 Layout w/ Priyanka 0:25 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 4) Architecture 9:05PM - 9:30PM


Support/Review -Billable

05/09/2022 Working on Documentation 3:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:30PM - 9:30PM


(Billable)

05/09/2022 RBI - Loyalty Full Team kickoff - Phase 1 - Export 0:50 Adil Mohammed

RBI - RBI-404845 - Loyalty 3.0 - 4) Architecture 6:30PM - 7:20PM


Support/Review -Billable

05/09/2022 Answering questions by QA 0:40 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 5:50PM - 6:30PM


(Billable)

05/09/2022 (Without Description) 0:45 Mtoner

RBI - RBI-404845 - Loyalty 3.0 - 7) Training and translation 5:30PM - 6:15PM


(Billable)

05/07/2022 Working on document 2:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:30AM - 2:30AM


(Billable)

05/06/2022 Worked on BSD- mock-up 1:45 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 8:45PM - 10:30PM


(Billable)

05/06/2022 Large org for Priyanka 0:20 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 4) Architecture 8:25PM - 8:45PM


Support/Review -Billable

05/06/2022 Quick chat with Scott 0:45 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 8:00PM - 8:45PM


(Billable)

05/06/2022 Kickoff 0:50 Ben Jardine

RBI - RBI-404845 - Loyalty 3.0 - 999)QAA - [Kick Off 7:02PM - 7:52PM


Planning]

05/06/2022 Kick-off meeting 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:30PM - 7:30PM


(Billable)

05/06/2022 Loyalty 3.0 Phase 1 0:50 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable Project 6:30PM - 7:20PM


Management

05/06/2022 Full Team kickoff - Phase 1 - Export 0:45 Alex

RBI - RBI-404845 - Loyalty 3.0 - 4) Architecture 6:30PM - 7:15PM


Support/Review -Billable

05/06/2022 Kick off team for RBI - loyalty Phase 1 Project 0:30 Gaurav Garg

RBI - RBI-404845 - Loyalty 3.0 - 3) Development and Dev 4:30PM - 5:00PM


Code Review (Billable) - [Meeting]

Clearview 15
05/05/2022 (Without Description) 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 10:30PM - 10:45PM


(Billable)

05/05/2022 Working on document 1:20 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 8:10PM - 9:30PM


(Billable)

05/05/2022 Brainstorming Presentation Layer w/ Priyanka 0:50 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:50AM - 1:40AM


(Billable)

05/04/2022 Analysis on design 3:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 11:00PM - 2:00AM


(Billable)

05/04/2022 Analysis on design 0:45 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 9:00PM - 9:45PM


(Billable)

05/04/2022 Lightspeed Sales Import - Full Team Kickoff 0:50 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 6:30PM - 7:20PM


(Billable)

05/04/2022 Looking on design for the report 1:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:00PM - 7:30PM


(Billable)

05/04/2022 Analysis after meeting 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 1:30AM - 2:30AM


(Billable)

05/04/2022 Status meeting 0:45 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:30AM - 1:15AM


(Billable)

05/04/2022 CV/RBI - Loyalty Dashboard - Status Meeting 0:50 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:30AM - 1:20AM


(Billable)

05/03/2022 TSD - Review Joe Feedback 0:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 11:30PM - 12:00AM


(Billable)

05/03/2022 TSD - peer review 0:31 Joe

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 11:02PM - 11:33PM


(Billable)

05/03/2022 (Without Description) 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 10:00PM - 10:15PM


(Billable)

05/02/2022 Email review 0:25 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 11:20PM - 11:45PM

05/02/2022 Call with PM 0:20 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 11:00PM - 11:20PM

Clearview 16
05/02/2022 (Without Description) 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 10:00PM - 10:15PM


(Billable)

05/02/2022 Quick chat with Scott 0:15 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:20PM - 6:35PM


(Billable)

05/02/2022 TSD - Finish Document Draft 1:35 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 5:55PM - 7:30PM


(Billable)

04/30/2022 Create file processing diagrams 1:00 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 2:30AM - 3:30AM


(Billable)

04/30/2022 Worked on Phase3 BSD 1:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 1:00AM - 2:30AM


(Billable)

04/30/2022 TSD - Interquartile mean 1:40 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:50AM - 2:30AM


(Billable)

04/29/2022 (Without Description) 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 10:45PM - 11:00PM


(Billable)

04/29/2022 TSD - Interquartile mean 1:25 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 10:40PM - 12:05AM


(Billable)

04/29/2022 Work with Scott on outlier detection questions 1:00 Geoff Bastin

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 9:45PM - 10:45PM


(Billable)

04/29/2022 Work with Scott on outlier detection questions 0:40 Geoff Bastin

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 6:45PM - 7:25PM


(Billable)

04/29/2022 Statistics 101 - Average Calculation in Files 2:50 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 6:15PM - 9:05PM


(Billable)

04/29/2022 Worked on Phase3 BSD 3:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:00PM - 9:30PM


(Billable)

04/29/2022 Create file processing diagrams 0:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 5:30PM - 6:00PM


(Billable)

04/29/2022 Worked on Phase3 BSD 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:30AM - 1:30AM


(Billable)

04/28/2022 (Without Description) 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 10:30PM - 10:45PM


(Billable)

Clearview 17
04/28/2022 Worked on Phase3 BSD 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 10:30PM - 11:30PM


(Billable)

04/28/2022 Worked on Phase3 BSD 1:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 8:00PM - 9:30PM


(Billable)

04/28/2022 Amazon Simple Storage Service (S3) Proof-of-Concept 1:25 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 1:00AM - 2:25AM


(Billable)

04/28/2022 Worked on Phase3 BSD 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:30AM - 1:30AM


(Billable)

04/28/2022 Amazon Simple Storage Service (S3) Research 0:15 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:30AM - 12:45AM


(Billable)

04/27/2022 Amazon Simple Storage Service (S3) Research 0:45 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 10:45PM - 11:30PM


(Billable)

04/27/2022 Worked on Phase3 BSD 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 10:30PM - 11:30PM


(Billable)

04/27/2022 TSD - Feature 1 (Export Service) 1:45 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 7:50PM - 9:35PM


(Billable)

04/27/2022 Review BSD Update (PLU Map File Format) 0:20 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 1:45AM - 2:05AM


(Billable)

04/27/2022 Edited BSD after call 1:20 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 1:10AM - 2:30AM


(Billable)

04/27/2022 Call with RBI 0:40 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:30AM - 1:10AM


(Billable)

04/27/2022 CV/RBI - Loyalty Dashboard - Status Meeting 1:00 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:30AM - 1:30AM


(Billable)

04/26/2022 TSD - Feature 1 (Export Service) 0:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 10:50PM - 11:20PM


(Billable)

04/26/2022 (Without Description) 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 10:00PM - 10:15PM


(Billable)

04/26/2022 TSD - Feature 1 (Export Service) 0:25 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 8:00PM - 8:25PM


(Billable)

Clearview 18
04/26/2022 TSD - Feature 1 (Export Service) 0:40 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 7:00PM - 7:40PM


(Billable)

04/26/2022 TSD - Consult w/ Joshua 0:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 6:30PM - 7:00PM


(Billable)

04/26/2022 tsd design discussion with scott t. 0:31 Joshua

RBI - RBI-404845 - Loyalty 3.0 - 4) Architecture 6:26PM - 6:57PM


Support/Review -Billable

04/25/2022 TSD - Feature 1 (Export Service) 1:50 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 11:40PM - 1:30AM


(Billable)

04/25/2022 BSD Consult w/ Priyanka 0:05 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 11:35PM - 11:40PM


(Billable)

04/25/2022 Create TSD Outline 0:15 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 11:20PM - 11:35PM


(Billable)

04/25/2022 Call with Megan and sending email to RBI 1:50 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 11:10PM - 1:00AM


(Billable)

04/25/2022 (Without Description) 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 10:00PM - 10:15PM


(Billable)

04/25/2022 Create TSD Outline 1:05 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 6:30PM - 7:35PM


(Billable)

04/23/2022 Working on presentation layer 1:45 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:45AM - 2:30AM


(Billable)

04/22/2022 Working on presentation layer 2:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 7:30PM - 9:30PM


(Billable)

04/22/2022 Discussion with SAs and email to PM 0:50 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:30PM - 7:20PM


(Billable)

04/22/2022 Loyalty Menu Item Transformations File 0:25 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 6:20PM - 6:45PM


(Billable)

04/22/2022 Email from RBI +Chat with Addison on the RBI question 0:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 5:30PM - 6:00PM


(Billable)

04/22/2022 Menu Item Cost Script Handoff 1:05 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:54AM - 1:59AM


(Billable)

Clearview 19
04/22/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:15AM - 12:15AM


(Billable)

04/22/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:15AM - 12:15AM


(Billable)

04/21/2022 Working on presentation layer 3:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 11:30PM - 2:30AM


(Billable)

04/21/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/21/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/21/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/21/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/21/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/21/2022 Internal Communications/Client Communications 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:15PM


(Billable)

04/21/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/21/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/21/2022 Call with PO - Presentation Layer 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 10:30PM - 11:30PM


(Billable)

04/20/2022 Looking at the SOW other documents as started work on 4:00 Priyanka Thakral
Presentation Layer
10:30PM - 2:30AM
RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other

04/20/2022 Looking at the SOW other documents as started work on 1:30 Priyanka Thakral
Presentation Layer
6:00PM - 7:30PM
RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other

04/20/2022 Sitting in to support transition to Scott 0:15 Geoff Bastin

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 12:30AM - 12:45AM

Clearview 20
04/20/2022 CV/RBI - Loyalty Dashboard - Status Meeting 0:15 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 4) Architecture 12:30AM - 12:45AM


Support/Review -Billable

04/19/2022 Quick call with addison 0:50 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 6:10PM - 7:00PM

04/18/2022 phase 2 BSD 4:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 10:30PM - 2:30AM


(Billable)

04/18/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

04/18/2022 Internal communication 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:30PM


(Billable)

04/18/2022 Internal communication 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:30PM


(Billable)

04/18/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

04/18/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

04/18/2022 Completed phase 1 BSD and sent to RBI 3:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:00PM - 9:30PM


(Billable)

04/15/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:15AM - 12:15AM


(Billable)

04/15/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:15AM - 12:15AM


(Billable)

04/14/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/14/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/14/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/14/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

Clearview 21
04/14/2022 Internal Communications/Client Communications 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:15PM


(Billable)

04/14/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/14/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/14/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/13/2022 Call with PO on the file transfer approac 0:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 6:30PM - 7:00PM


(Billable)

04/11/2022 Internal communication 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:30PM


(Billable)

04/11/2022 Internal communication 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:30PM


(Billable)

04/11/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

04/11/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

04/11/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

04/09/2022 Worked on menu export scripts 3:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:10AM - 3:10AM


(Billable)

04/09/2022 Churn related to not having a file transfer decided on 1:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:10AM - 1:10AM


(Billable)

04/08/2022 Internal Communication and status reporting 0:30 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:45PM - 10:15PM


(Billable)

04/08/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:15AM - 12:15AM


(Billable)

04/08/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:15AM - 12:15AM


(Billable)

Clearview 22
04/08/2022 Worked on menu export scripts 3:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:10AM - 3:10AM


(Billable)

04/08/2022 Churn related to not having a file transfer decided on 1:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:10AM - 1:10AM


(Billable)

04/07/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/07/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/07/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/07/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/07/2022 Internal Communications/Client Communications 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:15PM


(Billable)

04/07/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/07/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/07/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

04/07/2022 Churn related to not having a file transfer decided on 1:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:10AM - 1:10AM


(Billable)

04/07/2022 Worked on TSD for Phase 1 2:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:10AM - 2:10AM


(Billable)

04/06/2022 Churn related to not having a file transfer decided on 1:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:10AM - 1:10AM


(Billable)

04/05/2022 Worked on TSD for Phase 1 3:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 8:25PM - 11:25PM


(Billable)

04/05/2022 Churn related to not having a file transfer decided on 1:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:10AM - 1:10AM


(Billable)

Clearview 23
04/04/2022 Internal communication 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:30PM


(Billable)

04/04/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

04/04/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

04/04/2022 Internal communication 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:30PM


(Billable)

04/04/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

04/04/2022 Worked on TSD for Phase 1 4:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 8:25PM - 12:25AM


(Billable)

04/01/2022 Internal Communication and status reporting 0:30 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:45PM - 10:15PM


(Billable)

04/01/2022 Worked on TSD for Phase 1 4:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 7:14PM - 11:14PM


(Billable)

04/01/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:15AM - 12:15AM


(Billable)

04/01/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:15AM - 12:15AM


(Billable)

03/31/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/31/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/31/2022 Internal Communications/Client Communications 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:15PM


(Billable)

03/31/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/31/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

Clearview 24
03/31/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/31/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/31/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/31/2022 Started TSD for Phase 1 5:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 7:14PM - 12:14AM


(Billable)

03/31/2022 reviewing documents for phase3 (SOW, change request etc.) 2:30 Priyanka Thakral
again
6:30PM - 9:00PM
RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other

03/31/2022 Refactoring existing manual extract scripts 3:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 1:10AM - 4:10AM


(Billable)

03/30/2022 BSD Edits (Phase1) After RBI reverted with the changed 0:20 Priyanka Thakral
design
10:30PM - 10:50PM
RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD
(Billable)

03/30/2022 BSD Edits (Phase1) After RBI reverted with the changed 0:30 Priyanka Thakral
design
9:00PM - 9:30PM
RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD
(Billable)

03/30/2022 Started TSD for Phase 1 1:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 7:14PM - 8:14PM


(Billable)

03/30/2022 Met with Scott T and Ken about the menu export logic and 1:30 Addison
design
1:52AM - 3:22AM
RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD
(Billable)

03/30/2022 Meeting with the client to talk about file format and 0:30 Addison
connections
1:22AM - 1:52AM
RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD
(Billable)

03/30/2022 Refactoring existing manual extract scripts 4:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 1:10AM - 5:10AM


(Billable)

03/30/2022 Editing BSD Phase1 1:45 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:45AM - 2:30AM


(Billable)

03/30/2022 Compiling notes from meeting 0:15 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 12:30AM - 12:45AM

Clearview 25
03/30/2022 Call with RBI Tech team 0:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:00AM - 12:30AM


(Billable)

03/29/2022 Consult w/ Addison, Ken on Menu Export 1:05 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 4) Architecture 10:40PM - 11:45PM


Support/Review -Billable

03/29/2022 Client working session 0:30 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:45PM


(Billable)

03/29/2022 Editing BSD 0:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 9:00PM - 9:30PM


(Billable)

03/29/2022 Review of the feedback email 2:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 7:00PM - 9:00PM

03/29/2022 Refactoring existing manual extract scripts 5:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 1:10AM - 6:10AM


(Billable)

03/28/2022 BSD Phase3 - Initial work 2:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 10:30PM - 12:30AM

03/28/2022 Internal communication 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:30PM


(Billable)

03/28/2022 Internal communication 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:30PM


(Billable)

03/28/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

03/28/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

03/28/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

03/28/2022 KPI Review, Excel- Noting questions 2:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 7:30PM - 9:30PM


(Billable)

03/26/2022 Refactoring existing manual extract scripts 5:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 1:10AM - 6:10AM


(Billable)

03/25/2022 Initial draft on Phase3 BSD 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 8:30PM - 9:30PM


(Billable)

Clearview 26
03/25/2022 Refactoring existing manual extract scripts 3:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 1:10AM - 4:10AM


(Billable)

03/25/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:15AM - 12:15AM


(Billable)

03/25/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:15AM - 12:15AM


(Billable)

03/24/2022 Internal Communications/Client Communications 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:15PM


(Billable)

03/24/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/24/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/24/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/24/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/24/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/24/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/24/2022 Internal Communications/Client Communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/24/2022 Looked at the KPI documentation before starting to work on 3:15 Priyanka Thakral
Phase3
6:15PM - 9:30PM
RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other

03/24/2022 Refactoring existing manual extract scripts 6:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 1:10AM - 7:10AM


(Billable)

03/23/2022 Reviewing BSD and editing phase2 2:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 10:30PM - 12:30AM


(Billable)

03/23/2022 Discussion with Hillary - Review of Import doc etc. 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 6:30PM - 7:30PM

Clearview 27
03/23/2022 Helped Priyanka with BSD 0:30 Addison

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 5:25AM - 5:55AM


(Billable)

03/23/2022 Refactoring existing manual extract scripts 1:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 1:10AM - 2:10AM


(Billable)

03/23/2022 reviewed existing manual extract scripts 5:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 1:10AM - 6:10AM


(Billable)

03/23/2022 TSD Consult on File Export 0:25 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 12:20AM - 12:45AM


(Billable)

03/22/2022 Discussion with SA + Sending pending questions to RBI for 2:00 Priyanka Thakral
Phase2
10:30PM - 12:30AM
RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD
(Billable)

03/22/2022 Worked on Phase 2 BSD documentation 1:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 8:00PM - 9:30PM

03/22/2022 Discussion with Hillary 0:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 7:30PM - 8:00PM


(Billable)

03/22/2022 Meeting to talk about Menu item transformation file 0:30 Addison

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 3:09AM - 3:39AM


(Billable)

03/22/2022 Reviewed BSD 1:30 Addison

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 3:09AM - 4:39AM


(Billable)

03/22/2022 Started TSD 1:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 1:10AM - 2:10AM


(Billable)

03/22/2022 waiting for details from RBI on how to connect to AWS; did 3:00 Addison
more research to try to figure it out without it
1:10AM - 4:10AM
RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD
(Billable)

03/22/2022 Worked on Phase2 BSD (Wireframe etc.) 2:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:30AM - 2:30AM


(Billable)

03/21/2022 Editing BSD after SA Feedback 1:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 10:30PM - 12:00AM


(Billable)

03/21/2022 Internal communication 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:30PM


(Billable)

03/21/2022 Internal communication 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:30PM


(Billable)

Clearview 28
03/21/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

03/21/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

03/21/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

03/21/2022 Editing BSD after last discussion with RBI 2:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 7:30PM - 9:30PM


(Billable)

03/21/2022 Discussion with SA and PM on the Internal file spec cation 0:15 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 7:00PM - 7:15PM


(Billable)

03/21/2022 Discussion with SA on the file specification 0:20 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 5:50PM - 6:10PM


(Billable)

03/19/2022 status reporting 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:15AM


(Billable)

03/19/2022 status reporting 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:00AM


(Billable)

03/19/2022 status reporting 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:00AM


(Billable)

03/19/2022 status reporting 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:00AM


(Billable)

03/18/2022 Researched how to connect to AWS; frameworks 3:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 11:39AM - 2:39PM


(Billable)

03/18/2022 Talked to Ken about the export file for loyalty to understand 1:00 Addison
how menu item transformations work.
10:39AM - 11:39AM
RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD
(Billable)

03/18/2022 Meeting with the client to talk about file format and 0:45 Addison
connections
6:24AM - 7:09AM
RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD
(Billable)

03/18/2022 Researched how to connect to AWS 2:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 3:54AM - 5:54AM


(Billable)

03/18/2022 Helped Priyanka with BSD 0:45 Addison

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 3:09AM - 3:54AM


(Billable)

Clearview 29
03/18/2022 Discussion with SA on file 0:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 1:00AM - 1:30AM


(Billable)

03/18/2022 Export file discussion with RBI 0:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 12:30AM - 1:00AM


(Billable)

03/18/2022 Client facing meeting for requirement gathering 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:15AM - 12:30AM


(Billable)

03/17/2022 Client facing meeting for requirement gathering 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/17/2022 Client facing meeting for requirement gathering 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:15PM


(Billable)

03/17/2022 Client facing meeting for requirement gathering 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/17/2022 Client facing meeting for requirement gathering 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/16/2022 BSD questions 1:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 11:30PM - 1:00AM


(Billable)

03/15/2022 BSD questions 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 11:30PM - 12:30AM


(Billable)

03/15/2022 clarification questions internal discussion 0:20 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 9:45PM - 10:05PM


(Billable)

03/15/2022 Internal Communication, Client meeting reviewing kickoff 1:00 Megan Hayes
details and timeline
9:00PM - 10:00PM
RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management
(Billable)

03/15/2022 Internal Communication, Client meeting reviewing kickoff 0:00 Megan Hayes
details and timeline
9:00PM - 9:00PM
RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management
(Billable)

03/14/2022 discussion on answers received from RBI 1:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 10:30PM - 12:00AM


(Billable)

03/14/2022 Internal communication 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:30PM


(Billable)

03/14/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

Clearview 30
03/14/2022 BSD for Phase 2 (Initial work) 2:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 7:30PM - 9:30PM


(Billable)

03/12/2022 status reporting 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:00AM


(Billable)

03/12/2022 status reporting 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:15AM


(Billable)

03/12/2022 status reporting 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:00AM


(Billable)

03/12/2022 status reporting 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:00AM


(Billable)

03/11/2022 Review of Import details to draft BSD 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 9:30PM - 10:30PM


(Billable)

03/10/2022 Internal communications 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:15PM


(Billable)

03/10/2022 Internal communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/10/2022 Internal communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/10/2022 Internal communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/09/2022 Training Team on Translations 2:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 9:30PM - 11:30PM

03/09/2022 Worked on BSD 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 7:30PM - 8:30PM


(Billable)

03/08/2022 Call with Ken (Clarification on questions) 0:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 9:00PM - 9:30PM


(Billable)

03/08/2022 Internal Communication 1:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:00PM - 10:00PM


(Billable)

03/08/2022 Internal Communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:00PM - 9:00PM


(Billable)

Clearview 31
03/07/2022 BSD 2:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 11:30PM - 1:30AM


(Billable)

03/07/2022 Internal communication 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:30PM


(Billable)

03/07/2022 Internal communication 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:15PM


(Billable)

03/05/2022 status reporting 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:00AM


(Billable)

03/05/2022 status reporting 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:15AM


(Billable)

03/03/2022 Internal communications 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:15PM


(Billable)

03/03/2022 Internal communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

03/02/2022 BSD Export document 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 8:30PM - 9:30PM


(Billable)

03/01/2022 updating project details, creating timeline 1:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:00PM - 10:00PM


(Billable)

02/28/2022 Internal communication 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 9:15PM - 9:30PM


(Billable)

02/26/2022 status reporting 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:15AM


(Billable)

02/26/2022 status reporting 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:00AM


(Billable)

02/24/2022 Internal communications 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:15PM


(Billable)

02/24/2022 Internal communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

02/22/2022 BSD Initial draft 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 11:30PM - 12:30AM


(Billable)

Clearview 32
02/22/2022 BSD Initial draft 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 8:30PM - 9:30PM


(Billable)

02/19/2022 Update ROM 2:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 2:30AM - 5:00AM


preparation and estimation

02/19/2022 Update ROM 1:15 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 1:00AM - 2:15AM


preparation and estimation

02/19/2022 Update ROM 0:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 12:00AM - 12:30AM


preparation and estimation

02/19/2022 status reporting 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:15AM


(Billable)

02/19/2022 status reporting 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:00AM


(Billable)

02/18/2022 BSD Initial draft 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 8:30PM - 9:30PM


(Billable)

02/18/2022 Update ROM 2:00 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 8:30PM - 10:30PM


preparation and estimation

02/18/2022 BSD Initial draft 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 7:30PM - 8:30PM

02/18/2022 Update ROM 0:30 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 6:30PM - 7:00PM


preparation and estimation

02/17/2022 Meeting with PO 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 11:30PM - 12:30AM


(Billable)

02/17/2022 Internal communications 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:15PM


(Billable)

02/17/2022 Internal communications 0:00 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:00PM


(Billable)

02/17/2022 Meeting with Chase to understand the export files 0:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - 1) Business Analysis/BSD 8:00PM - 8:30PM


(Billable)

02/17/2022 worked on ROM 6:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable Design and 7:16PM - 1:16AM


Development

Clearview 33
02/16/2022 Dashboard estimation meeting 0:30 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 11:30PM - 12:00AM

02/16/2022 worked on ROM 4:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable Design and 7:16PM - 11:16PM


Development

02/16/2022 Review of the project - initial analysis of the documents 2:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 12:15AM - 2:15AM

02/15/2022 Review of the project - initial analysis of the documents 1:00 Priyanka Thakral

RBI - RBI-404845 - Loyalty 3.0 - Non-Billable - Other 8:30PM - 9:30PM

02/12/2022 [Estimation] Loyalty Dashboard Estimation 1:35 Jean-Charles

RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test 12:30AM - 2:05AM


Creation/QAT (Billable) - [Planning]

02/12/2022 status reporting 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:15AM


(Billable)

02/10/2022 Internal communications 0:15 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:15PM


(Billable)

02/09/2022 [Meeting] RBI Loyalty Dashboard SOW - estimation kick-off 0:30 Jean-Charles
meeting
1:30AM - 2:00AM
RBI - RBI-404845 - Loyalty 3.0 - 5) Testing and Test
Creation/QAT (Billable) - [Planning]

02/08/2022 Project meeting 1:30 Ssteven

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 1:26PM - 2:56PM


preparation and estimation

02/05/2022 talking about requirements 1:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 6:02AM - 7:02AM


(Billable)

02/05/2022 project setup work 0:30 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 12:00AM - 12:30AM


(Billable)

02/04/2022 kickoff meeting 1:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 6:02AM - 7:02AM


(Billable)

02/03/2022 BSD Kickoff Meeting 0:30 Megan Hayes

RBI - RBI-404845 - Loyalty 3.0 - 99) Project Management 11:00PM - 11:30PM


(Billable)

02/03/2022 kickoff meeting 1:00 Addison

RBI - RBI-404845 - Loyalty 3.0 - 2) Technical Analysis /TSD 6:02AM - 7:02AM


(Billable)

02/02/2022 Project overview 1:00 Ssteven

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 1:18PM - 2:18PM


preparation and estimation

Clearview 34
12/16/2021 RBI WIP SOW WAG (Loyalty 3.0 Pipeline) 1:11 Scott T.

RBI - RBI-404845 - Loyalty 3.0 - Non Billable - Contract 8:30PM - 9:41PM


preparation and estimation - [Consulting]

Clearview 35