conv 10-09
MAINTENANCE LOG
Helpful malntenance information and problem solving case studies from suppliers of plant equipment and services,
CROSS SECTION OF STEAM EJECTOR
‘Combination
head and throat
‘Steam ejectors chosen after a detailed evaluation placed
‘them ahead of mechanical and hybrid vacuum systems. In
4 set ‘actual performance and comparison tests, liquid ring pumps
Suction were unable to pull the desired vacuum.
Two-Stage Ejector
Improves Vacuum Drying
igen is ges lai staan
he Raleigh, NC, plant of Aji- A 20 mm vacuum ‘mm vacuum would do the required job,
s.
tninoaeit he itpalcomponens | .- WOUId do thig "| bate luting pas wer: nb
cfprotcin.Allthe plan's aminoacids {required job, but.the| — the pamps were wearing and eroding,
‘are pharmaceutical-grade in pure crys- Scatiaraate 2 allowing particles of erosion to sweej
talline form tht are used in drugs, | “liquid ring pumps~| Sordatisai ae eee
hangers tad ‘nuttoalsaple, ‘wrere Wnable tos 7 | ytiepume ras ap crane’
‘ments. Ten individual amino acids are ., produce that :..- ‘various options fora replacement dryer
produced, as well as custom-blended
mixtures.
‘vacuum System. Augmentation of the
existing system was ruled out, as the
vacuum.
‘The amino acids are produced by fer- | «. feted existing pumps were wearing, and their
‘mentation with highly complex pro- inability to achieve desired vacuum was
cxsse of separation, concentration, and a fallingilm evaporator. Vacuum for limiting overall capability.
Purification. High points include cell the final drying stage was originally Three types of equipment were con-
‘Separation, resin treatment, and ula il- produced by single-stage liquid ring sidered: a two-stage steam ejector sys
tration, The final processes include crys- vacuum pumps. tem, a two-stage mechanical vacuum
tallization, centifugationto separate out The liquid ring pumps met their pump, and a two-stage hybrid system
solids, and vacuum drying. original rating of 75 mm of vacuum. of ejector plus liquid ring pump. Eval-
Since the process line went on But that was not sufficient to achieve uation factors are noted in Fig. 1
sream in the early 1980s, an ejector the quick drying cycle required to pro- including first cost, operating cost,
system from Croll-ReynoldsCo,,Inc, due a quality product. Processing maintenance cost, reliability, and
‘Westield, NJ, has supplied vacuum for engineers atthe plant decided thata20 maintainability.
Reprinted trom MAINTENANCE TECHNOLOGY/SEPTEMBER 1999