Final Asbuilt RS Wall Submission - Section 5

Printed on: 15-Sep-22


ACTION BY ---> SUBCONTRACTOR SSP SDM

Submission Submission Submission Collect and


Section Commitment Date Commitment Date Actual Date Commitment Actual Date Latest Date Remark KLC SUBMISSION Remark Remark
Sub Contractor Soil Nail ID Construction Status
by Nehemiah by Nehemiah Submission by Date by Submission by STS Ref. No Submission to STSRev
Latest
Latest Status from SSP Date
Hardcopies Status
from SSP
submit
Hardcopies to
18.5.2022 25.5.2022 Nehemiah Subcontractor Subcontractor SSP design HQ

Not Yet Start


5.1 Nestcon Infra B12-20 2nd Stage (Section
4)

Required rectification proposal. Eg.


topping up with capping
Rectification SSP-SP3D-D2.1.9-L5771
CRJGR-NEIS-
Rectification on Rectification on CRJGR-NEIS-STS-
5.1 Nestcon Infra B12-22 Completed
progress progress INF-S5.1-CNS-
STS-INF-S5.1- 25-May-21 B Rejected 3-Jun-21
Rectification proposal submitted
CNS-REW-00024
REW-00051 on 23.8.2021 - Approved with
comment. To resubmit design
calculation

In Progress (To In Progress (To In Progress (To


5.1 Nestcon Infra
B13-05a complete during complete during complete during
Abutment B RUB23a stage 2) stage 2) stage 2)

Required rectification proposal. Eg.


topping up with capping
Rectification
SSP-SP3D-D2.1.9-L5771
Approved CRJGR- CRJGR-NEIS- Rectification Approved
Rectification on Rectification on
5.1 Nestcon Infra B13-06 Completed
progress progress
NEIS-STS-INF- STS-INF-S5.1- 6-Apr-21 A Rejected 13-Apr-21 CRJGR-NEIS-STS-INF-
Rectification proposal submitted
S5.1-CNS-REW- CNS-REW-00049 S5.1-CNS-REW-00052
on 23.8.2021 - Approved with
00052
comment. To resubmit design
calculation

Not Yet Start


5.1 Nestcon Infra B13-09 2nd Stage

Not Yet Start


5.1 Nestcon Infra B13-09a 2nd Stage

5.1 Juang Antara Bina


B13-PE-13 Not Yet Start
Abutment A BRV42 2nd Stage

5.1 Juang Antara Bina


B13-PE-15 Not Yet Start
Abutment B BRV42 2nd Stage

CRJGR-AAYU-
Approved with
5.2 AAY Construction B14-05a Completed 19-May-22 19-May-22 19-May-22 16-Feb-22 STS-INF-S5.2- 17-Feb-22 G
comments. To resubmit 23-Feb-22
CNS-REW-00016
Section 5 - Final As-built Piled Embankment Submission Tracker
Printed on: 15-Sep-22

ACTION BY ---> SUBCONTRACTOR SSP SDM


Committed Date Committed Date Hardcopies Upload to Aconex Delayed Hardcopy Collect and
Section Actual Date STS Latest Date of Hardcopies Status submit
Sub Contractor From CH To CH Construction Status STS submission STS submission Remark STS Ref. No STS Latest Rev Status from SSP Date Remarks submission to (with PE Submission
Submission STS submission from SSP Hardcopies to
18.5.22 25.5.22 SSP Endorsement) (Days) design HQ

CRJGR-JABS-STS-INF-
S5.BRV40-CNS-CBR-
Approved with
SUBCON TO 00004
5.1 Juang Antara Bina 726193 726213 Completed 1-Jun-22 23-Mar-22 A 25-Mar-22 comments. To
UPDATE CRJGR-JABS-STS-INF-
resubmit
S5.BRV40-CNS-CBR-
CRJGR-JABS-STS-INF-
00008
S5.BRV40-CNS-CBR-
Approved with
SUBCON TO 00004
5.1 Juang Antara Bina 726267 726287 Completed 1-Jun-22 23-Mar-22 A 25-Mar-22 comments. To
UPDATE CRJGR-JABS-STS-INF-
resubmit
S5.BRV40-CNS-CBR-
CRJGR-JABS-STS-INF-
00008
S5.BRV41-CNS-CBR-
00004
5.1 Juang Antara Bina 728223 728243 Completed UNDER REVIEW UNDER REVIEW 0 18-May-22 UNDER REVIEW
CRJGR-JABS-STS-INF-
S5.BRV41-CNS-CBR-
00008

CRJGR-NEIS-STS-INF-
5.1 Nestcon Infra 728700 728800 Completed 5/25/2022 25-May-22 D 31-Mar-22 Rejected 22-Apr-22
S5.1-CNS-PIL-00016

CRJGR-NEIS-STS-INF- To revise as per KLC comment on the piloting


5.1 Nestcon Infra 729075 729242 Completed 5/25/2022 25-May-22 0 5-Jan-21 Rejected 15-Feb-21
S5.1-CNS-PIL-00017 asbuilt

CRJGR-JABS-STS-INF-
Stage 1 - Completed Stage 2 in Stage 2 in Approved
5.1 Juang Antara Bina 732875 732900 S5.BRV42-CNS-CBR- 0 2-Sep-20 8-Sep-20
Stage 2 - Not Yet Started progress progress (Stage 1)
00004

CRJGR-JABS-STS-INF-
Stage 1 - Completed Stage 2 in Stage 2 in Approved
5.1 Juang Antara Bina 732976 732996 S5.BRV42-CNS-CBR- A 31-May-21 3-Jun-21
Stage 2 - Not Yet Started progress progress (Stage 1)
00008

CRJGR-JABS-STS-INF-
To revise as per KLC comment on the piloting
5.1 Juang Antara Bina 734061 734081 Completed 26-May-22 S5.BRV43-CNS-CBR- 0 22-Aug-20 Approved 25-Aug-20
asbuilt
00006
Section 5 - Final As-built Soil Nail Submission Tracker
Printed on: 15-Sep-22

ACTION BY ---> GAGASAN (SOIL NAIL SPECIALIST) AAY SSP SDM


Delayed Collect and
Section Commitment submission Commitment submission Commitment submission Latest STS Hardcopy Hardcopies Hardcopies Status submit
Sub Contractor Soil Nail ID Construction Status Status submit to AAY date for STS as of STS Ref. No Submission Latest Status from SSP Date Remark submission to
date as of 18.5.2022 date as of 25.5.2022 Submission from SSP Hardcopies to
25.5.2022 Date Rev SSP
(Days) design HQ

submit to surveyor

5.1 YTL/gagasan B13-09b Completed (BRR35) 19-May-22 SUBMITTED SUBMITTED 25-May-22

CRJGR-AAYU-STS-INF-
5.1 AAY Construction B14-01 Completed 19-May-22 SUBMITTED SUBMITTED SUBCON TO UPDATE
S5.2-CNS-SNS-00008
10-Feb-22 E REJECTED 24-Feb-22

Submitted to Surveyor CRJGR-AAYU-STS-INF-


5.1 AAY Construction B14-02 Completed
for Endorsement
SUBMITTED SUBMITTED SUBCON TO UPDATE
S5.2-CNS-SNS-00009
10-Feb-22 D REJECTED 24-Feb-22

CRJGR-AAYU-STS-INF- Pending Logo for License


5.2 AAY Construction B14-03 Completed APPROVED APPROVED APPROVED SUBCON TO UPDATE 10-Feb-22 D APPROVED
S5.2-CNS-SNS-00010 Surveyor
CRJGR-AAYU-STS-INF- Pending Logo for License
5.2 AAY Construction B14-04 Completed APPROVED APPROVED APPROVED SUBCON TO UPDATE 10-Feb-22 C APPROVED
S5.2-CNS-SNS-00011 Surveyor

CRJGR-AAYU-STS-INF- Pending Logo for License


5.2 AAY Construction B14-05 Completed APPROVED APPROVED APPROVED SUBCON TO UPDATE 10-Feb-22 B APPROVED
S5.2-CNS-SNS-00012 Surveyor

CRJGR-AAYU-STS-INF- Pending Logo for License


5.2 AAY Construction B14-06 Completed APPROVED APPROVED APPROVED SUBCON TO UPDATE 10-Feb-22 B APPROVED
S5.2-CNS-SNS-00021 Surveyor

CRJGR-AAYU-STS-INF-
5.2 AAY Construction B14-07 Completed 26-May-22 27-May-22
S5.2-CNS-SNS-00016
23-Dec-21 A REJECTED 30-Dec-21

Approved with
CRJGR-AAYU-STS-INF-
5.2 AAY Construction B14-09a Completed 26-May-22 27-May-22
S5.2-CNS-SNS-00013
11-Sep-21 A comment. to
resubmit

Completed (BRR37) To provide acad to Gagasan.


5.2 YTL/gagasan B14-BR-01a Stage 1 Pending Stage 2

Not Yet Start (BRR37) To provide acad to Gagasan.


5.2 YTL/gagasan B14-BR-01b Stage 2 Pending Stage 2

Approved with
Submitted to Surveyor CRJGR-AAYU-STS-INF-
5.2 AAY Construction B15-02 Completed
for Endorsement
SUBMITTED SUBMITTED SUBCON TO UPDATE
S5.2-CNS-SNS-00023
2-Mar-22 0 comment. to 11-Mar-22
resubmit

Pending Asbuilt slope


5.2 AAY Construction B15-05 Completed
from AAY (By 19.5.2022)
1-Jun-22

Pending Asbuilt slope


5.2 AAY Construction B15-06 Completed
from AAY (By 19.5.2022)
1-Jun-22

5.2 YTL/UEC B15-07a Completed SUBCON TO UPDATE

5.2 AAY Construction B15-11 In progress

5.2 Geo Pakar B15-12 In progress

Submitted to Surveyor CRJGR-AAYU-STS-INF-


5.2 AAY Construction B15-13 Completed
for Endorsement
SUBMITTED SUBMITTED SUBCON TO UPDATE
S5.2-CNS-SNS-00022
2-Mar-22 0 REJECTED 11-Mar-22
Section 5 - Final As-built Stone Column Submission Tracker
Printed on: 15-Sep-22

ACTION BY ---> Subcontractor SSP SDM

Stone Column Delayed Collect and


Section Sub Contractor From CH To CH Committed Date STS Committed Date STS Actual Date STS Hardcopies
Contractor Actual Date STS Hardcopy Hardcopies Status submit
Construction Status submission submission STS Ref. No STS Latest Rev Submission to Status from SSP Date Remark submission to
Submission from Subcon Submission from SSP Hardcopies to
as of 18.5.2021 as of 25.5.2021 SSP SSP
(Days) design HQ

CRJGR-NEIS-STS-INF-
5.1 Nestcon Infra Keller 725750 726193 Completed 19-May UNDER REVIEW 8-Jul-21 S5.1-CNS-EWK-00058
B 19-Feb-22 Rejected 14-Mar-22

CRJGR-NEIS-STS-INF-
5.1 Nestcon Infra Keller 726287 726775 Completed 19-May UNDER REVIEW 6-Jul-21 S5.1-CNS-EWK-00064
A 19-Feb-22 Rejected 14-Mar-22

5.1 YTL Menard 728815 729060 Completed SUBCON TO UPDATE SUBCON TO UPDATE

CRJGR-NEIS-STS-INF-
5.1 Nestcon Infra Sinus 728243 728400 Completed 26-May UNDER REVIEW 18-Jan-22 S5.1-CNS-EWK-00059
D 21-Jan-22 Rejected 9-Feb-22

CRJGR-NEIS-STS-INF-
5.1 Nestcon Infra Keller 729425 729525 Completed 19-May SUBCON TO UPDATE 8-Jul-21 S5.1-CNS-EWK-00067
A 23-Feb-22 Rejected 14-Mar-22

AAY Stage 1 Completed


5.1 Menard 734800 734950
Construction Stage 2 - Not Yet Start

Approved with PILOTING SUBMISSION


AAY CRJGR-AAYU-STS-INF-
5.1 Menard 736150 736200 Completed SUBCON TO UPDATE SUBCON TO UPDATE 6-Nov-21 C 6-Nov-21 Comment. to 17-Nov-21 TO KLC
Construction S5.1-GEO-GIC-00013
resubmit 21-Oct-21
Approved with PILOTING SUBMISSION
AAY CRJGR-AAYU-STS-INF-
5.1 Menard 736200 736375 Completed SUBCON TO UPDATE SUBCON TO UPDATE 6-Nov-21 C 6-Nov-21 Comment. to 17-Nov-21 TO KLC
Construction S5.1-GEO-GIC-00013
resubmit 21-Oct-21

AAY CRJGR-AAYU-STS-INF-
5.2 Menard 739775 739825 Completed SUBCON TO UPDATE SUBCON TO UPDATE 23-Jul-21 S5.2-GEO-GIC-00040
A 15-Sep-21 Rejected 24-Sep-21
Construction
Approved with
AAY CRJGR-AAYU-STS-INF-
5.2 Menard 740700 740800 Completed SUBCON TO UPDATE SUBCON TO UPDATE 26-Jul-21 A 22-Sep-21 Comment. to 24-Sep-21
Construction S5.2-GEO-GIC-00041
resubmit
Approved with
AAY CRJGR-AAYU-STS-INF-
5.2 Menard 740800 740850 Completed SUBCON TO UPDATE SUBCON TO UPDATE 26-Jul-21 A 22-Sep-21 Comment. to 24-Sep-21
Construction S5.2-GEO-GIC-00041
resubmit

AAY CRJGR-AAYU-STS-INF-
5.2 Menard 740900 741050 Completed 30-Sep-21 0 2-Oct-21 Rejected 13-Oct-21
Construction S5.2-GEO-GIC-00045

AAY CRJGR-AAYU-STS-INF-
5.2 Menard 741425 741575 Completed SUBCON TO UPDATE SUBCON TO UPDATE 23-Aug-21 0 25-Aug-21 Rejected 1-Sep-21
Construction S5.2-GEO-GIC-00043

AAY Stage 1 Completed


5.2 Menard 742200 742300
Construction Stage 2 - Not Yet Start

AAY CRJGR-AAYU-STS-INF-
5.2 Menard 742775 742850 Completed SUBCON TO UPDATE SUBCON TO UPDATE 6-Nov-21 S5.2-GEO-GIC-00046
0 10-Nov-21 Rejected 5-Nov-21
Construction

AAY Stage 1 Completed


5.2 Menard 746325 746675
Construction Stage 2 - Not Yet Start

AAY Stage 1 Completed


5.2 Menard 747000 747050
Construction Stage 2 - Not Yet Start

AAY Stage 1 Completed


5.2 Menard 747050 747175
Construction Stage 2 - Not Yet Start

AAY Stage 1 Completed


5.2 Menard 747175 747200
Construction Stage 2 - Not Yet Start

AAY Stage 1 Completed


5.2 Menard 747375 747450
Construction Stage 2 - Not Yet Start

AAY Stage 1 Completed


5.2 Menard 747450 747625 Stage 2 - Not Yet Start
Construction

AAY CRJGR-AAYU-STS-INF-
5.2 Menard 749275 749475 Completed SUBCON TO UPDATE SUBCON TO UPDATE 20-Aug-21 0 20-Aug-21 Rejected 26-Aug-21
Construction S5.2-GEO-GIC-00042
AAY CRJGR-AAYU-STS-INF-
5.2 Menard 750025 750250 Completed SUBCON TO UPDATE SUBCON TO UPDATE 3-Sep-21 0 3-Sep-21 Rejected 9-Sep-21
Construction S5.2-GEO-GIC-00044

AAY Stage 1 Completed


5.2 Menard 750750 751050
Construction Stage 2 - Not Yet Start

AAY CRJGR-AAYU-STS-INF-
5.2 Menard 751625 751975 Completed SUBCON TO UPDATE SUBCON TO UPDATE 23-Jul-21 A 23-Jul-21 Rejected 3-Aug-21
Construction S5.2-GEO-GIC-00039

AAY Stage 1 Completed


5.2 Menard 752570 752850
Construction Stage 2 - Not Yet Start
Section 5 - Final As-built for Earthwork Cross Sections Tracker

SECTION SUBCONTRACTOR DWG ACONEX NO

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05001

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05002

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05003

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05004

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05005

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05006

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05007

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05008

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05009

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05010

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05011

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05012

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05013

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05014

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05015

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05016

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05017

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05018

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05019

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05020

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05021

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05022

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05023

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05024

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05025

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05026


5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05027

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05028

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05029

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05030

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05031

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05032

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05033

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05034

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05035

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05036

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05037

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05038

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05039

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05040

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05041

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05042

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05043

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05044

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05045

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05046

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05047

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05048

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05049

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05050

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05051

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05052

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05053

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05054

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05055

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05056

5.1 NESTCON CRJGR-SSPS-XD-S5.1-CNS-EWS-05057

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05058

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05059


5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05060

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05061

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05062

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05063

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05064

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05065

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05066

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05067

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05068

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05069

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05070

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05071

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05072

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05073

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05074

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05075

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05076

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05077

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05078

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05079

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05080

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05081

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05082

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05083

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05084

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05085

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05086

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05087

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05088

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05089

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05090

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05091

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05092


5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05093

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05094

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05095

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05096

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05097

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05098

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05301

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05302

5.1 AAY CRJGR-SSPS-XD-S5.1-CNS-EWS-05303

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05099

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05100

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05101

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05102

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05103

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05104

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05105

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05106

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05107

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05108

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05109

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05110

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05111

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05112

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05113

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05114

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05115

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05116

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05117

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05118

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05119

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05120

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05121

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05122


5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05123

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05124

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05125

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05126

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05127

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05128

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05129

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05130

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05131

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05132

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05133

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05134

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05135

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05136

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05137

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05138

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05139

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05140

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05141

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05142

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05143

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05144

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05145

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05146

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05147

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05148

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05149

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05150

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05151

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05152

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05153

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05154

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05155


5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05156

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05157

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05158

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05159

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05160

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05161

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05162

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05163

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05164

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05165

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05166

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05167

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05168

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05169

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05170

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05171

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05172

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05173

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05174

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05175

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05176

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05177

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05178

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05179

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05180

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05181

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05182

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05183

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05184

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05185

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05186

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05187

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05188


5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05189

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05190

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05191

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05192

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05193

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05194

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05195

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05196

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05197

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05198

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05199

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05200

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05401

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05402

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05403

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05404

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05411

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05412

5.2 AAY CRJGR-SSPS-XD-S5.2-CNS-EWS-05413


ss Sections Tracker

DWG ORIGINAL NO

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5001

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5002

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5003

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5004

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5005

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5006

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5007

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5008

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5009

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5010

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5011

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5012

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5013

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5014

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5015

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5016

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5017

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5018

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5019

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5020

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5021

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5022

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5023

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5024

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5025

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5026
GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5027

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5028

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5029

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5030

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5031

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5032

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5033

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5034

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5035

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5036

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5037

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5038

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5039

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5040

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5041

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5042

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5043

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5044

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5045

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5046

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5047

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5048

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5049

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5050

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5051

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5052

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5053

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5054

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5055

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5056

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5057

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5058

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5059
GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5060

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5061

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5062

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5063

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5064

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5065

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5066

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5067

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5068

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5069

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5070

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5071

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5072

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5073

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5074

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5075

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5076

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5077

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5078

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5079

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5080

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5081

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5082

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5083

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5084

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5085

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5086

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5087

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5088

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5089

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5090

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5091

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5092
GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5093

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5094

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5095

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5096

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5097

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5098

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5301

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5302

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5303

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5099

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5100

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5101

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5102

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5103

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5104

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5105

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5106

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5107

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5108

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5109

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5110

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5111

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5112

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5113

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5114

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5115

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5116

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5117

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5118

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5119

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5120

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5121

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5122
GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5123

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5124

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5125

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5126

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5127

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5128

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5129

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5130

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5131

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5132

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5133

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5134

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5135

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5136

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5137

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5138

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5139

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5140

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5141

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5142

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5143

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5144

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5145

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5146

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5147

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5148

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5149

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5150

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5151

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5152

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5153

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5154

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5155
GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5156

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5157

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5158

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5159

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5160

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5161

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5162

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5163

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5164

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5165

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5166

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5167

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5168

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5169

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5170

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5171

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5172

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5173

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5174

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5175

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5176

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5177

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5178

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5179

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5180

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5181

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5182

GJBEDTP/CRJGR/DD/SIPY-SSP/S5.0/T-EW-CRS/5183

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5184

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5185

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5186

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5187

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5188
GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5189

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5190

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5191

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5192

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5193

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5194

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5195

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5196

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5197

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5198

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5199

GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-EW-CRS/5200

GJBEDTP/CRJGR/DD/SIPY-SSP/S5.0/T-EW-CRS/5401

GJBEDTP/CRJGR/DD/SIPY-SSP/S5.0/T-EW-CRS/5402

GJBEDTP/CRJGR/DD/SIPY-SSP/S5.0/T-EW-CRS/5403

GJBEDTP/CRJGR/DD/SIPY-SSP/S5.0/T-EW-CRS/5404

GJBEDTP/CRJGR/DD/SIPY-SSP/S5.0/T-EW-CRS/5411

GJBEDTP/CRJGR/DD/SIPY-SSP/S5.0/T-EW-CRS/5412

GJBEDTP/CRJGR/DD/SIPY-SSP/S5.0/T-EW-CRS/5413
DWG NAME

EARTHWORK CROSS SECTION CH. 724350 TO CH. 724475

EARTHWORK CROSS SECTION CH. 724500 TO CH. 724625

EARTHWORK CROSS SECTION CH. 724650 TO CH. 724775

EARTHWORK CROSS SECTION CH. 724800 TO CH. 724925

EARTHWORK CROSS SECTION CH. 724950 TO CH. 725075

EARTHWORK CROSS SECTION CH. 725100 TO CH. 725225

EARTHWORK CROSS SECTION CH. 725250 TO CH. 725375

EARTHWORK CROSS SECTION CH. 725400 TO CH. 725525

EARTHWORK CROSS SECTION CH. 725550 TO CH. 725675

EARTHWORK CROSS SECTION CH. 725700 TO CH. 725825

EARTHWORK CROSS SECTION CH. 725850 TO CH. 725975

EARTHWORK CROSS SECTION CH. 726000 TO CH. 726125

EARTHWORK CROSS SECTION CH. 726150 TO CH. 726275

EARTHWORK CROSS SECTION CH. 726300 TO CH. 726425

EARTHWORK CROSS SECTION CH. 726450 TO CH. 726575

EARTHWORK CROSS SECTION CH. 726600 TO CH. 726725

EARTHWORK CROSS SECTION CH. 726750 TO CH. 726875

EARTHWORK CROSS SECTION CH. 726900 TO CH. 727025

EARTHWORK CROSS SECTION CH. 727050 TO CH. 727175

EARTHWORK CROSS SECTION CH. 727200 TO CH. 727325

EARTHWORK CROSS SECTION CH. 727350 TO CH. 727475

EARTHWORK CROSS SECTION CH. 727500 TO CH. 727625

EARTHWORK CROSS SECTION CH. 727650 TO CH. 727775

EARTHWORK CROSS SECTION CH. 727800 TO CH. 727925

EARTHWORK CROSS SECTION CH. 727950 TO CH. 728075

EARTHWORK CROSS SECTION CH. 728100 TO CH. 728225


EARTHWORK CROSS SECTION CH. 728250 TO CH. 728375

EARTHWORK CROSS SECTION CH. 728400 TO CH. 728525

EARTHWORK CROSS SECTION CH. 728550 TO CH. 728675

EARTHWORK CROSS SECTION CH. 728700 TO CH. 728825

EARTHWORK CROSS SECTION CH. 728850 TO CH. 728975

EARTHWORK CROSS SECTION CH. 729000 TO CH. 729125

EARTHWORK CROSS SECTION CH. 729150 TO CH. 729275

EARTHWORK CROSS SECTION CH. 729300 TO CH. 729425

EARTHWORK CROSS SECTION CH. 729450 TO CH. 729575

EARTHWORK CROSS SECTION CH. 729600 TO CH. 729725

EARTHWORK CROSS SECTION CH. 729750 TO CH. 729875

EARTHWORK CROSS SECTION CH. 729900 TO CH. 730025

EARTHWORK CROSS SECTION CH. 730050 TO CH. 730175

EARTHWORK CROSS SECTION CH. 730200 TO CH. 730325

EARTHWORK CROSS SECTION CH. 730350 TO CH. 730475

EARTHWORK CROSS SECTION CH. 730500 TO CH. 730625

EARTHWORK CROSS SECTION CH. 730650 TO CH. 730775

EARTHWORK CROSS SECTION CH. 730800 TO CH. 730925

EARTHWORK CROSS SECTION CH. 730950 TO CH. 731075

EARTHWORK CROSS SECTION CH. 731100 TO CH. 731225

EARTHWORK CROSS SECTION CH. 731250 TO CH. 731375

EARTHWORK CROSS SECTION CH. 731400 TO CH. 731525

EARTHWORK CROSS SECTION CH. 731550 TO CH. 731675

EARTHWORK CROSS SECTION CH. 731700 TO CH. 731825

EARTHWORK CROSS SECTION CH. 731850 TO CH. 731975

EARTHWORK CROSS SECTION CH. 732000 TO CH. 732125

EARTHWORK CROSS SECTION CH. 732150 TO CH. 732275

EARTHWORK CROSS SECTION CH. 732300 TO CH. 732425

EARTHWORK CROSS SECTION CH. 732450 TO CH. 732575

EARTHWORK CROSS SECTION CH. 732600 TO CH. 732725

EARTHWORK CROSS SECTION CH. 732750 TO CH. 732875

EARTHWORK CROSS SECTION CH. 732900 TO CH. 733025

EARTHWORK CROSS SECTION CH. 733050 TO CH. 733175


EARTHWORK CROSS SECTION CH. 733200 TO CH. 733325

EARTHWORK CROSS SECTION CH. 733350 TO CH. 733475

EARTHWORK CROSS SECTION CH. 733500 TO CH. 733625

EARTHWORK CROSS SECTION CH. 733650 TO CH. 733775

EARTHWORK CROSS SECTION CH. 733800 TO CH. 733925

EARTHWORK CROSS SECTION CH. 733950 TO CH. 734075

EARTHWORK CROSS SECTION CH. 734100 TO CH. 734225

EARTHWORK CROSS SECTION CH. 734250 TO CH. 734375

EARTHWORK CROSS SECTION CH. 734400 TO CH. 734525

EARTHWORK CROSS SECTION CH. 734550 TO CH. 734675

EARTHWORK CROSS SECTION CH. 734700 TO CH. 734825

EARTHWORK CROSS SECTION CH. 734850 TO CH. 734975

EARTHWORK CROSS SECTION CH. 735000 TO CH. 735125

EARTHWORK CROSS SECTION CH. 735150 TO CH. 735275

EARTHWORK CROSS SECTION CH. 735300 TO CH. 735425

EARTHWORK CROSS SECTION CH. 735450 TO CH. 735575

EARTHWORK CROSS SECTION CH. 735600 TO CH. 735725

EARTHWORK CROSS SECTION CH. 735750 TO CH. 735875

EARTHWORK CROSS SECTION CH. 735900 TO CH. 736025

EARTHWORK CROSS SECTION CH. 736050 TO CH. 736175

EARTHWORK CROSS SECTION CH. 736200 TO CH. 736325

EARTHWORK CROSS SECTION CH. 736350 TO CH. 736475

EARTHWORK CROSS SECTION CH. 736500 TO CH. 736625

EARTHWORK CROSS SECTION CH. 736650 TO CH. 736775

EARTHWORK CROSS SECTION CH. 736800 TO CH. 736925

EARTHWORK CROSS SECTION CH. 736950 TO CH. 737075

EARTHWORK CROSS SECTION CH. 737100 TO CH. 737225

EARTHWORK CROSS SECTION CH. 737250 TO CH. 737375

EARTHWORK CROSS SECTION CH. 737400 TO CH. 737525

EARTHWORK CROSS SECTION CH. 737550 TO CH. 737675

EARTHWORK CROSS SECTION CH. 737700 TO CH. 737825

EARTHWORK CROSS SECTION CH. 737850 TO CH. 737975

EARTHWORK CROSS SECTION CH. 738000 TO CH. 738125


EARTHWORK CROSS SECTION CH. 738150 TO CH. 738275

EARTHWORK CROSS SECTION CH. 738300 TO CH. 738425

EARTHWORK CROSS SECTION CH. 738450 TO CH. 738575

EARTHWORK CROSS SECTION CH. 738600 TO CH. 738725

EARTHWORK CROSS SECTION CH. 738750 TO CH. 738875

EARTHWORK CROSS SECTION CH. 738900 TO CH. 739025

EARTHWORK CROSS SECTION CH. 735400 TO CH. 735450

EARTHWORK CROSS SECTION CH. 735475 TO CH. 735525

EARTHWORK CROSS SECTION CH. 735550 TO CH. 735600

EARTHWORK CROSS SECTION CH. 739050 TO CH. 739175

EARTHWORK CROSS SECTION CH. 739200 TO CH. 739325

EARTHWORK CROSS SECTION CH. 739350 TO CH. 739475

EARTHWORK CROSS SECTION CH. 739500 TO CH. 739625

EARTHWORK CROSS SECTION CH. 739650 TO CH. 739775

EARTHWORK CROSS SECTION CH. 739800 TO CH. 739925

EARTHWORK CROSS SECTION CH. 739950 TO CH. 740075

EARTHWORK CROSS SECTION CH. 740100 TO CH. 740225

EARTHWORK CROSS SECTION CH. 740250 TO CH. 740375

EARTHWORK CROSS SECTION CH. 740400 TO CH. 740525

EARTHWORK CROSS SECTION CH. 740550 TO CH. 740675

EARTHWORK CROSS SECTION CH. 740700 TO CH. 740825

EARTHWORK CROSS SECTION CH. 740850 TO CH. 740975

EARTHWORK CROSS SECTION CH. 741000 TO CH. 741125

EARTHWORK CROSS SECTION CH. 741150 TO CH. 741275

EARTHWORK CROSS SECTION CH. 741300 TO CH. 741425

EARTHWORK CROSS SECTION CH. 741450 TO CH. 741575

EARTHWORK CROSS SECTION CH. 741600 TO CH. 741725

EARTHWORK CROSS SECTION CH. 741750 TO CH. 741875

EARTHWORK CROSS SECTION CH. 741900 TO CH. 742025

EARTHWORK CROSS SECTION CH. 742050 TO CH. 742175

EARTHWORK CROSS SECTION CH. 742200 TO CH. 742325

EARTHWORK CROSS SECTION CH. 742350 TO CH. 742475

EARTHWORK CROSS SECTION CH. 742500 TO CH. 742625


EARTHWORK CROSS SECTION CH. 742650 TO CH. 742775

EARTHWORK CROSS SECTION CH. 742800 TO CH. 742925

EARTHWORK CROSS SECTION CH. 742950 TO CH. 743075

EARTHWORK CROSS SECTION CH. 743100 TO CH. 743225

EARTHWORK CROSS SECTION CH. 743250 TO CH. 743375

EARTHWORK CROSS SECTION CH. 743400 TO CH. 743525

EARTHWORK CROSS SECTION CH. 743550 TO CH. 743675

EARTHWORK CROSS SECTION CH. 743700 TO CH. 743825

EARTHWORK CROSS SECTION CH. 743850 TO CH. 743975

EARTHWORK CROSS SECTION CH. 744000 TO CH. 744125

EARTHWORK CROSS SECTION CH. 744150 TO CH. 744275

EARTHWORK CROSS SECTION CH. 744300 TO CH. 744425

EARTHWORK CROSS SECTION CH. 744450 TO CH. 744575

EARTHWORK CROSS SECTION CH. 744600 TO CH. 744725

EARTHWORK CROSS SECTION CH. 744750 TO CH. 744875

EARTHWORK CROSS SECTION CH. 744900 TO CH. 745025

EARTHWORK CROSS SECTION CH. 745050 TO CH. 745175

EARTHWORK CROSS SECTION CH. 745200 TO CH. 745325

EARTHWORK CROSS SECTION CH. 745350 TO CH. 745475

EARTHWORK CROSS SECTION CH. 745500 TO CH. 745625

EARTHWORK CROSS SECTION CH. 745650 TO CH. 745775

EARTHWORK CROSS SECTION CH. 745800 TO CH. 745925

EARTHWORK CROSS SECTION CH. 745950 TO CH. 746075

EARTHWORK CROSS SECTION CH. 746100 TO CH. 746225

EARTHWORK CROSS SECTION CH. 746250 TO CH. 746375

EARTHWORK CROSS SECTION CH. 746400 TO CH. 746525

EARTHWORK CROSS SECTION CH. 746550 TO CH. 746675

EARTHWORK CROSS SECTION CH. 746700 TO CH. 746825

EARTHWORK CROSS SECTION CH. 746850 TO CH. 746975

EARTHWORK CROSS SECTION CH. 747000 TO CH. 747125

EARTHWORK CROSS SECTION CH. 747150 TO CH. 747275

EARTHWORK CROSS SECTION CH. 747300 TO CH. 747425

EARTHWORK CROSS SECTION CH. 747450 TO CH. 747575


EARTHWORK CROSS SECTION CH. 747600 TO CH. 747725

EARTHWORK CROSS SECTION CH. 747750 TO CH. 747875

EARTHWORK CROSS SECTION CH. 747900 TO CH. 748025

EARTHWORK CROSS SECTION CH. 748050 TO CH. 748175

EARTHWORK CROSS SECTION CH. 748200 TO CH. 748325

EARTHWORK CROSS SECTION CH. 748350 TO CH. 748475

EARTHWORK CROSS SECTION CH. 748500 TO CH. 748625

EARTHWORK CROSS SECTION CH. 748650 TO CH. 748775

EARTHWORK CROSS SECTION CH. 748800 TO CH. 748925

EARTHWORK CROSS SECTION CH. 748950 TO CH. 749075

EARTHWORK CROSS SECTION CH. 749100 TO CH. 749225

EARTHWORK CROSS SECTION CH. 749250 TO CH. 749375

EARTHWORK CROSS SECTION CH. 749400 TO CH. 749525

EARTHWORK CROSS SECTION CH. 749550 TO CH. 749675

EARTHWORK CROSS SECTION CH. 749700 TO CH. 749825

EARTHWORK CROSS SECTION CH. 749850 TO CH. 749975

EARTHWORK CROSS SECTION CH. 750000 TO CH. 750125

EARTHWORK CROSS SECTION CH. 750150 TO CH. 750275

EARTHWORK CROSS SECTION CH. 750300 TO CH. 750425

EARTHWORK CROSS SECTION CH. 750450 TO CH. 750575

EARTHWORK CROSS SECTION CH. 750600 TO CH. 750725

EARTHWORK CROSS SECTION CH. 750750 TO CH. 750875

EARTHWORK CROSS SECTION CH. 750900 TO CH. 751025

EARTHWORK CROSS SECTION CH. 751050 TO CH. 751175

EARTHWORK CROSS SECTION CH. 751200 TO CH. 751325

EARTHWORK CROSS SECTION CH. 751350 TO CH. 751475

EARTHWORK CROSS SECTION CH. 751500 TO CH. 751625

EARTHWORK CROSS SECTION CH. 751650 TO CH. 751775

EARTHWORK CROSS SECTION CH. 751800 TO CH. 751925

EARTHWORK CROSS SECTION CH. 751950 TO CH. 752075

EARTHWORK CROSS SECTION CH. 752100 TO CH. 752225

EARTHWORK CROSS SECTION CH. 752250 TO CH. 752375

EARTHWORK CROSS SECTION CH. 752400 TO CH. 752525


EARTHWORK CROSS SECTION CH. 752550 TO CH. 752675

EARTHWORK CROSS SECTION CH. 752700 TO CH. 752825

EARTHWORK CROSS SECTION CH. 752850 TO CH. 752975

EARTHWORK CROSS SECTION CH. 753000 TO CH. 753125

EARTHWORK CROSS SECTION CH. 753150 TO CH. 753275

EARTHWORK CROSS SECTION CH. 753300 TO CH. 753425

EARTHWORK CROSS SECTION CH. 753450 TO CH. 753575

EARTHWORK CROSS SECTION CH. 753600 TO CH. 753725

EARTHWORK CROSS SECTION CH. 753750 TO CH. 753875

EARTHWORK CROSS SECTION CH. 753900 TO CH. 754025

EARTHWORK CROSS SECTION CH. 754050 TO CH. 754175

EARTHWORK CROSS SECTION CH. 754200 TO CH. 754209

EARTHWORK CROSS SECTION(PORT OF TANJUNG PELEPAS LINE 1) CH.0 TO CH.125

EARTHWORK CROSS SECTION(PORT OF TANJUNG PELEPAS LINE 1) CH.150 TO CH.275

EARTHWORK CROSS SECTION(PORT OF TANJUNG PELEPAS LINE 1) CH.300 TO CH.425

EARTHWORK CROSS SECTION(PORT OF TANJUNG PELEPAS LINE 1) CH.450 TO CH.500

EARTHWORK CROSS SECTION(PORT OF TANJUNG PELEPAS LINE 2) CH.600 TO CH.725

EARTHWORK CROSS SECTION(PORT OF TANJUNG PELEPAS LINE 2) CH.750 TO CH.875

EARTHWORK CROSS SECTION(PORT OF TANJUNG PELEPAS LINE 2) CH.892


SUBCON TO UPDATE SUBCON TO UPDATE

Target Commitment Date


CONSTRUCTION STATUS for Submission Actual Date of Submission
as of 10.11.2021

PARTIALLY COMPLETED 23-Oct-22

PARTIALLY COMPLETED 23-Oct-22

PARTIALLY COMPLETED 23-Oct-22

PARTIALLY COMPLETED 23-Oct-22

FULLY COMPLETED 23-Sep-22

FULLY COMPLETED 23-Sep-22

FULLY COMPLETED 23-Sep-22

FULLY COMPLETED 23-Sep-22

FULLY COMPLETED 23-Sep-22

FULLY COMPLETED 23-Sep-22

FULLY COMPLETED 23-Sep-22

FULLY COMPLETED 23-Sep-22

FULLY COMPLETED 23-Sep-22

FULLY COMPLETED 23-Sep-22

FULLY COMPLETED 23-Sep-22

15-Mar-22
FULLY COMPLETED

15-Mar-22
FULLY COMPLETED

FULLY COMPLETED 15-Mar-22 22-Mar-22

FULLY COMPLETED 15-Mar-22 22-Mar-22

FULLY COMPLETED 15-Mar-22 22-Mar-22

FULLY COMPLETED 15-Mar-22 22-Mar-22

FULLY COMPLETED 15-Mar-22 22-Mar-22

FULLY COMPLETED 15-Mar-22

FULLY COMPLETED 15-Mar-22

FULLY COMPLETED 15-Mar-22

FULLY COMPLETED 15-Mar-22


FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

PARTIALLY COMPLETED 5-Jul-22

PARTIALLY COMPLETED 5-Jul-22

PARTIALLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

PARTIALLY COMPLETED 5-Jul-22

PARTIALLY COMPLETED 5-Jul-22

PARTIALLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

FULLY COMPLETED 5-Jul-22

PARTIALLY COMPLETED 5-Jul-22

PARTIALLY COMPLETED 5-Jul-22

PARTIALLY COMPLETED 7-Mar-22

PARTIALLY COMPLETED 7-Mar-22

PARTIALLY COMPLETED 7-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22 Draft by 12.4.2022


AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022

AAY to update 13-Mar-22 Draft by 12.4.2022


AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22


AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 13-Mar-22

AAY to update 15-Apr-22

AAY to update 15-Apr-22

AAY to update 15-Apr-22

AAY to update 15-Apr-22

AAY to update 15-Apr-22

AAY to update 15-Apr-22

AAY to update 15-Apr-22

AAY to update 15-Apr-22

AAY to update 15-Apr-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22


AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22


AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22

AAY to update 31-Dec-22


Latest STS Date Submitted to
STS Document Reference
Revision SSP

CRJGR-NEIS-STS-INF-S5.1-CNS-EWS-00001 0 23-Mar-22

CRJGR-NEIS-STS-INF-S5.1-CNS-EWS-00001 0 23-Mar-22

CRJGR-NEIS-STS-INF-S5.1-CNS-EWS-00001 0 23-Mar-22

CRJGR-NEIS-STS-INF-S5.1-CNS-EWS-00001 0 23-Mar-22

CRJGR-NEIS-STS-INF-S5.1-CNS-EWS-00001 0 23-Mar-22
Status Submission STS REMARK

Rejected
Rejected
Rejected
Rejected
Rejected
Section 5 - Final As-built CBP & Sheet Pile Wall Submission Tracker
Printed on: 15-Sep-22

S
S
ACTION BY ---> P

Section Commitment submission Commitment submission Latest STS


Sub Contractor Wall ID Wall Type Construction Status date for STS as of date for STS as of STS Ref. No Submission Latest Status from SSP Date
11.1.2021 25.5.2021 Date Rev Remark

5.1 NESTCON B13-BR-01 RC Wall COMPLETED SUBCON TO UPDATE SUBCON TO UPDATE

TO RESUBMIT WITH LATEST


5.1 UEC B13-06a CBP COMPLETED 14-Jan-22 CRJGR-SIPY-STS-INF-S5.1-CNS-CBP-00004 5-Feb-21 0 Approved 7-Feb-21
FORMAT

5.1 YTL (Nazli) B13-06a Sheet Pile COMPLETED SUBCON TO UPDATE SUBCON TO UPDATE

TO RESUBMIT WITH LATEST


5.2 JF FOUNDATION B15-02 CBP COMPLETED 11-Jan-22 CRJGR-JFFM-STS-INF-S5.0-CNS-RTW-00001 15-Jan-22 0 Approved 4-Feb-22
FORMAT

Approved with
Subcon to check with RE TO RESUBMIT WITH LATEST
5.2 UEC B15-07a CBP COMPLETED
on the asbuilt
CRJGR-UECG-STS-INF-S5.2-CNS-CBP-00008 15-Jan-22 0 comment. To 27-Jan-22
FORMAT
resubmit

5.2 YTL(Chris) B15-13b Sheet Pile NOT YET START

5.2 YTL(Chris) B15-13a CBP NOT YET START

5.2 YTL(Chris) B15-13a Sheet Pile NOT YET START

5.2 YTL(Chris) Wall 1 Sheet Pile NOT YET START

5.2 YTL(Chris) Wall 8 Sheet Pile NOT YET START

5.2 YTL(Chris) Wall 9 Sheet Pile NOT YET START

5.2 YTL(Chris) Wall 2 Sheet Pile NOT YET START

5.2 YTL(Chris) Wall 3 Sheet Pile NOT YET START

5.2 YTL(Chris) Wall 4 Sheet Pile NOT YET START

5.2 YTL(Chris) Wall 5 Sheet Pile NOT YET START

5.2 YTL(Chris) Wall 6 Sheet Pile NOT YET START

5.2 YTL(Chris) Wall 7 Sheet Pile NOT YET START


Section 5 - Final As-built BRR Pier Protection Submission Tracker
Printed on: 15-Sep-22

S
S
ACTION BY ---> P

Section Commitment submission Latest STS


Commitment submission
Sub Contractor Location ID Structure Type Construction Status date for STS as of STS Ref. No Submission Latest Status from SSP Date
date for STS as of 9.2.2022 Remark
25.5.2022 Date Rev

FINAL ASBUILT TO RESUBMIT


to submit with 2nd stage
5.1 UEC BRR35 (LHS) Bore Pile COMPLETED
asbuilt together
Subcon To Update CRJGR-UECG-STS-INF-S5.ROB24-CNS-PIL-00019 20-May-21 0 Approved 10-Jun-21 WITH RHS WALL FOLLOW LATEST
ASBUILT FORMATTING

to submit with 2nd stage


YTL BRR35 (LHS) Pile Cap & Wall COMPLETED
asbuilt together
Subcon To Update

CRJGR-UECG-STS-INF-S5.ROB24-CNS-PIL-00019
5.1 UEC BRR36 Bore Pile COMPLETED Subcon To Update
CRJGR-UECG-STS-INF-S5.ROB24-CNS-PIL-00020
26-Feb-22 0 REJECTED 29-Mar-22 To revise based on SSP comment

5.2 YTL BRR36 Pile Cap & Wall COMPLETED Subcon To Update
Section 5 - Final As-built Bridges Submission Tracker
Printed on: 15-Sep-22

ACTION BY --->

Section Commitment submission Latest STS


Sub Contractor Location ID Structure Type Construction Status date for STS as of STS Ref. No Submission Latest Status from SSP
25.5.2022 Date Rev Remark

BOREPILE /
5.2 JF FOUNDATION ROB27 COMPLETED Approved CRJGR-JFFM-STS-INF-S5.ROB27-CNS-PIL-00009 13-Jan-22 E Approved
COLUMN

5.2 JF FOUNDATION ROB30 CBP COMPLETED Approved CRJGR-JFFM-STS-INF-S5.ROB30-CNS-PIL-00022 13-Jan-22 C Approved

BOREPILE /
5.2 JF FOUNDATION ROB31 COMPLETED Approved CRJGR-JFFM-STS-INF-S5.ROB31-CNS-PIL-00020 13-Jan-22 C Approved
COLUMN

BOREPILE /
5.2 JF FOUNDATION ROB32 COMPLETED Approved CRJGR-JFFM-STS-INF-S5.ROB32-CNS-PIL-00025 13-Jan-22 D Approved
COLUMN

BOREPILE /
5.2 JF FOUNDATION ROB33(I) IN PROGRESS
COLUMN

BOREPILE /
5.2 JF FOUNDATION ROB33(II) NOT YET START
COLUMN

CRJGR-JABS-STS-INF-S5.BRV39-CNS-CBR-00001

5.1 JUANG ANTARA BRV39 ALL STRUCTURES COMPLETED Approved CRJGR-JABS-STS-INF-S5.BRV39-CNS-CBR-00004 16-Dec-21 0 Approved

CRJGR-JABS-STS-INF-S5.BRV39-CNS-CBR-00005
CRJGR-JABS-STS-INF-S5.BRV40-CNS-CBR-00003

5.1 JUANG ANTARA BRV40 ALL STRUCTURES COMPLETED CRJGR-JABS-STS-INF-S5.BRV40-CNS-CBR-00006 30-Dec-21 0 REJECTED

CRJGR-JABS-STS-INF-S5.BRV41-CNS-CBR-00003
5.1 JUANG ANTARA BRV41 ALL STRUCTURES COMPLETED 11-Jan-22 0 REJECTED
CRJGR-JABS-STS-INF-S5.BRV41-CNS-CBR-00006

CRJGR-JABS-STS-INF-S5.BRV42-CNS-CBR-00001
5.1 JUANG ANTARA BRV42 ALL STRUCTURES COMPLETED 22-Jan-22 0 REJECTED
CRJGR-JABS-STS-INF-S5.BRV42-CNS-CBR-00009

CRJGR-JABS-STS-INF-S5.BRV43-CNS-CBR-00004 To amend the ECC to follow bridge


5.1 JUANG ANTARA BRV43 ALL STRUCTURES COMPLETED 15-Feb-22 0 REJECTED gridline. To resubmit whole set of
CRJGR-JABS-STS-INF-S5.BRV43-CNS-CBR-00009 asbuilt drawings

CRJGR-JABS-STS-INF-S5.BRV44-CNS-CBR-00001 To amend the ECC to follow bridge


5.1 JUANG ANTARA BRV44 ALL STRUCTURES COMPLETED 5-Aug-21 B Approved gridline. To resubmit whole set of
CRJGR-JABS-STS-INF-S5.BRV44-CNS-CBR-00004 asbuilt drawings

BOREPILE /
5.2 ECONPILE BRV45 COMPLETED Approved CRJGR-SIPY-STS-INF-S5.BRV45-CNS-PIL-00058 11-Nov-21 0 Approved
PILECAP

BOREPILE /
5.2 JF FOUNDATION BRV46 COMPLETED Approved CRJGR-JFFM-STS-INF-S5.BRV46-CNS-PIL-00025 13-Jan-22 E Approved
COLUMN

Approved with PENDING ROADWORK & MEP


5.1 JUANG ANTARA MPB06 ALL STRUCTURES STRUCTURE COMPLETED CRJGR-JABS-STS-INF-S5.MPB06-CNS-CBR-00013 27-Sep-21 0 comment. To DRAFT FOR COMPLETED WORK
resubmit TO BE SUBMITTED EARLY

5.1 JUANG ANTARA RUB11 ALL STRUCTURES COMPLETED STAGE 1 PENDING STAGE 2

BOREPILE /
5.2 JF FOUNDATION BRV SPURLINE COMPLETED CRJGR-JFFM-STS-INF-S5.BRVSPUR-CNS-PIL-00025 24-Jan-22 D Approved
COLUMN
TOTAL LETTER 27

TOTAL DRAWING NO 194

DRAWINGS UNDER REVIEW 101

DRAWINGS REPLIED 93

Date Transmit Total Nos of


No Mail No Trade Subject From Status F1 F2
(Aconex) Drawings

1 SIPY-LETTER-035889 Bridge As-Built Drawing Submission – BRV39 Structure and MEP 30-Mar-22 25 SIPY Kluang DC UNDER REVIEW 1 25

2 SIPY-LETTER-035165 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-PE-10 23-Feb-22 7 SIPY Kluang DC UNDER REVIEW 1 7

3 SIPY-LETTER-035166 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-PE-11 23-Feb-22 8 SIPY Kluang DC UNDER REVIEW 1 8

4 SIPY-LETTER-035137 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-10 21-Feb-22 7 SIPY Kluang DC UNDER REVIEW 1 7

5 SIPY-LETTER-035101 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-06a 21-Feb-22 5 SIPY Kluang DC UNDER REVIEW 1 5

6 SIPY-LETTER-035039 Wall As-Built Drawing Submission – Nehemiah wall (NW) – BRV43 Abutment A, B13-PE-18 and B13-PE-19 16-Feb-22 5 SIPY Kluang DC UNDER REVIEW 1 5

7 SIPY-LETTER-035062 Wall As-Built Drawing Submission – Nehemiah wall (NW) – BRV43 Abutment B 16-Feb-22 5 SIPY Kluang DC UNDER REVIEW 1 5

8 SIPY-LETTER-034955 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-PE-05 & B13-PE-06 14-Feb-22 5 SIPY Kluang DC UNDER REVIEW 1 5

9 SIPY-LETTER-034872 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-07 9-Feb-22 6 SIPY Kluang DC UNDER REVIEW 1 6

10 SIPY-LETTER-034870 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-PE-09 9-Feb-22 6 SIPY Kluang DC UNDER REVIEW 1 6

11 SIPY-LETTER-034279 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-PE-11a 4-Feb-22 7 SIPY Kluang DC UNDER REVIEW 1 7

12 SIPY-LETTER-034834 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-PE-07 & B13-PE-08 4-Feb-22 7 SIPY Kluang DC UNDER REVIEW 1 7

13 SIPY-LETTER-034516 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-04d 17-Jan-22 6 SIPY Kluang DC UNDER REVIEW 1 6

14 SIPY-LETTER-034515 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-03 17-Jan-22 8 SIPY Kluang DC UNDER REVIEW 1 8

15 SIPY-LETTER-034364 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-04 10-Jan-22 10 SIPY Kluang DC UNDER REVIEW 1 10

16 SIPY-LETTER-034295 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-01 6-Jan-22 6 SIPY Kluang DC REPLIED 0 0

17 SIPY-LETTER-034230 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B15-03 & B15-PE-04a 4-Jan-22 7 SIPY Kluang DC REPLIED 0 0

18 SIPY-LETTER-034225 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-PE-01 & B13-PE-02 4-Jan-22 5 SIPY Kluang DC UNDER REVIEW 1 5

19 SIPY-LETTER-034226 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-PE-03 & B13-PE-04 4-Jan-22 5 SIPY Kluang DC REPLIED 0 0

20 SIPY-LETTER-034227 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B15-PE-01 & B15-PE-02 4-Jan-22 8 SIPY Kluang DC REPLIED 0 0

21 SIPY-LETTER-034229 Wall As-Built Drawing Submission – Nehemiah wall (NW) – ROB 27 4-Jan-22 8 SIPY Kluang DC REPLIED 0 0

22 SIPY-LETTER-034228 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B15-PE-05 & B15-PE-06 4-Jan-22 5 SIPY Kluang DC REPLIED 0 0

23 SIPY-LETTER-034231 Wall As-Built Drawing Submission – Nehemiah wall (NW) – ROB 31 4-Jan-22 9 SIPY Kluang DC REPLIED 0 0

24 SIPY-LETTER-034233 Wall As-Built Drawing Submission – Nehemiah wall (NW) – ROB 32 4-Jan-22 7 SIPY Kluang DC REPLIED 0 0

25 SIPY-LETTER-034224 Wall As-Built Drawing Submission – Nehemiah wall (NW) – B13-02 4-Jan-22 7 SIPY Kluang DC REPLIED 0 0

26 SIPY-LETTER-033553 Ground Treatment As-Built Drawing Submission – Stone Column @ Ch736200-Ch736900 1-Dec-21 11 SIPY Kluang DC REPLIED 0 0

27 SIPY-LETTER-033388 Ground Treatment As-Built Drawing Submission – Piled Embankment Ch728700- Ch728800 25-Nov-21 20 SIPY Kluang DC REPLIED 0 0

28 SIPY-LETTER-033391 Wall Pilot As-Built Drawing Submission – Revised Soil Nail B14-01 Slope Protection 25-Nov-21 4 SIPY Kluang DC UNDER REVIEW 1 4