Consultant Specification
Eaton Connected
Datacenter application
Combined Power Distribution and UPS for
back-up power solution
Contents
Contents...................................................................................................................................................... 2
1 Scope................................................................................................................................................... 2
2 Introduction..................................................................................................................................... 2
3 Applicable IEC standards............................................................................................................ 2
4 Eaton Connected System Description (System Functional Description)................3
4.1 UPS Functional Description.............................................................................................. 3
4.2 LV Power Distribution System......................................................................................... 3
5 Cable Entry and Connections.................................................................................................... 4
6 Busbar and earthing system...................................................................................................... 4
7 Supply system and short-circuit level................................................................................... 5
8 General construction.................................................................................................................... 5
9 Environmental Conditions......................................................................................................... 5
10 Painting.......................................................................................................................................... 5
11 Inspection and testing............................................................................................................. 5
12 Off-loading and site storage.................................................................................................. 6
13 Site Assembly and Commissioning..................................................................................... 6
14 Specification Sheet.................................................................................................................... 7
1 Scope
2 Introduction
The offered system should be tested and verified as a total solution including inter-
connections witnessed by independent third party [DEKRA] in addition to the
product specific testing of the LV Switchgear standard IEC-61439-2 and the UPS
standard IEC 62040.
The system shall be offered as a close-coupled UPS+LV Switchgear system. The
selectivity of the breakers is pre-determined and interconnections between the UPS
and the LV Switchgear are tested. The solution is flexible to incorporate easy
extension with the upstream incoming breaker, outgoing UPS backed up feeders and
non-UPS backed feeders.
The system (Eaton Connected) is available up to power rating of 900 KVA. The system
shall be designed for nominal service voltage of 400-415V, 50-60 Hz and maximum rated
short circuit rms current of upto 100 kA.
Normal: Utilising AC power, the critical load shall be continuously supplied by the
Inverter. The Inverter shall power the load while regulating both voltage and
frequency. The rectifier shall derive power from the AC source and shall supply DC
power to the Inverter. Simultaneously, the battery charger shall charge the battery.
Battery: Upon failure of the available AC power, the critical load shall continue to be
supplied by the Inverter, which shall obtain power from the batteries without any
operator intervention. There shall be no interruption to the critical load upon failure
or restoration of the commercial AC source.
Recharge: Upon restoration of the AC source, the charger shall recharge the
batteries and simultaneously the rectifier shall provide power to the inverter. This
shall be an automatic function and shall cause no interruption to the critical load.
Static Bypass: If the UPS must be taken out of the Normal mode, the static bypass
switch shall transfer the critical load to the AC power through the static bypass
switch. Return from Bypass mode to Normal mode of operation shall be automatic
or manual. The static bypass shall always be rated according to the UPS frame
maximum capacity.
Energy Saving Mode: The UPS shall continuously monitor the voltage and
frequency of the bypass source. When the source parameters are within acceptable
limits, the UPS will utilise a minimal/optimal combination of its internal subsystems
to ensure acceptable power is always delivered to the critical load, at a system
efficiency of 99%.
The system shall be equipped with a manual Maintenance bypass switch that shall
enable safe access to UPS assemblies whilst the load is supplied by AC power
through the Maintenance bypass switch.
The distribution system shall consist of the functional units; Rectifier Input Breaker
(RIB), Bypass Input Breaker (BIB), Maintenance Bypass Switch (MBS),
Maintenance Isolation Switch (MIS) and optional battery breaker.
The functional units shall be mounted in metal compartmentalised LV Switchgear.
The RIB, BIB, and MBS shall perform dual functionality as a switch-disconnector
and circuit breaker with overcurrent protection. MIS shall be a switch-disconnector
with the capability to interrupt the nominal output current of the UPS. The RIB, BIB,
MIS and MBS shall be MCCBs in either fixed type or plug-in type execution.
The plug-in and easy to access mounting of the MCCBs/Switch Disconnector shall
enable easy access of the functional unit for maintenance and service. The MCCBs
shall be rated according to IEC-60947-2 category B.
It shall be possible to extend the LV distribution system to incorporate the
UPS backed and non-UPS backed up distribution feeders, incoming circuit
breaker by addition of LV distribution switchgear.
The MCCBs shall be ready equipped with electronic trip units capable of
achieving selectivity and tripping coordination with the UPS, and incoming
and outgoing circuit breaker feeding the connected load.
The overload and short circuit inverter characteristic curves are coordinated
with the RIB, BIB and MBS MCCBs such that the inverter trip time is less than
the MCCBs trip time. The remote operation and monitoring of MCCBs is
possible.
8 General construction
The system shall be free standing, sheet metal structure mounted on a level floor. The
enclosure shall be designed for computer room installations. The front door of the UPS shall
possess a lock for unauthorised entry.
The LV distribution switchgear outer sidewalls, back plate and all front covers are epoxy
coated. Corrosion resistant zinc coated sheet steel plates are used for the rear and inner
walls and for compartment separation.
The system height shall not be more than 2030mm.
All serviceable subassemblies shall be modular and capable of being replaced from the
front of the UPS (front access only required). Side or rear access for installation, service,
The system shall have front access.
Repair or maintenance of the UPS system shall not be required
The UPS shall possess the degree of protection as IP20. The degree of protection for the
switchgear shall be IP31 and IPXXB with open doors.
9 Environmental Conditions
The indoor climate in the switch room must comply in accordance with IEC 61439-1 par.
7.1.1 described in section 14-Specification sheet.
10 Painting
The standard painting method is as follows;
pre-treatment (degreased, phosphate coating, made passive)
powder coating (thermosetting powder with epoxy resin as base, applied electrostatically
in average layer thickness of 60 – 70 micrometers)
The system is offered in RAL-9005 colour with the option of having LV Distribution
Switchgear in RAL 7035 colour.
- IEC 61439-1, IEC 61439-2, IEC 62040-1, IEC 62040-2, IEC 62040-3
INSTALLATION ENVIRONMENT:
- Location: Indoor
- Altitude: <= 2000 m
- Ambient temperature (24 hr maximum): 40 °C,
- Humidity : 50 % at 40 °C (non-condensing), 90% at 20°C (non-condensing)
- Pollution degree: 3
- Altitude: Upto 2000m above sea level
- Degree of protection: [IP31]
SUPPLY DETAILS:
- Position: Rear
- Type of busbar: [Copper]
- Busbar Cross-Section [ (In): [1x10x40 per phase] [2x10x40 per phase]
- Rated short time withstand current (Icc): [50 kA / 1s], [100kA / 1s]
- Number of bars: L1, L2, L3, N, PE
- Neutral rating: N = 100 %
- PE – 50%