Professional Documents
Culture Documents
Inspection Report Shore Quantity Report Ullage Report Time Sheet / Time Log Sample Report Quality Report
Inspection Report Shore Quantity Report Ullage Report Time Sheet / Time Log Sample Report Quality Report
A
RODOVIA MG 443 - KM 07 FAZENDA DO CADETE
OURO BRANCO - MG - BRAZIL. CNPJ: 17.227.422/0001-05
VESSEL : M/T"BOW CAROLINE"
VOYAGE NR. : 2022-04
PRODUCT : 212,230 METRIC TONS OF BENZENE AND MIXTURES HAVING 10% BENZENE OR
MORE
PORT OF LOADING : SANTOS, BRAZIL
PORT OF DISCHARGE : TERMINAL QUÍMICO DE ARATU S.A. - TEQUIMAR, ALEMOA
TERMINAL OF DISCHARGE : ROTTERDAM, THE NETHERLANDS
DATE : May 26th, 2022
REPORT : O/S OG&C 20023142/22
INDEX 7 PAGES
INSPECTION REPORT
SHORE QUANTITY REPORT
ULLAGE REPORT
TIME SHEET / TIME LOG
SAMPLE REPORT
QUALITY REPORT
gac.
This document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/en/Terms-and-Conditions.aspx. Attention is drawn to the limitation of
liability, identification and jurisdiction issues defined therein. Any holder of this document is advised that information contained hereon reflects the Company’s findings at the time of its
intervention only and within the limits of Client’s instructions, if any. The Company’s sole responsibility is to its Client and this document does not exonerate parties to a transaction from
exercising all their rights and obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and
offenders may be prosecuted to the fullest extent of the law.
Page 1 of 7
We hereby report that we have inspected on May 25nd, 2022 at 16:35 hours where accessible vessel's cargo tank(s) below,
respective pump, line and connecting lines of the above mentioned vessel before loading and found same empty, dry,
cleaned in our opinion based on visual inspection before loading and considering cleaning procedures used as previous
cargo informations received from the Master/Chief Officer, we formed the opinion that the designed cargo tanks were in
satisfactory clean conditions to receive a cargo of 212,230 metric tons of Benzene and Mixtures Having 10% Benzene or
More
Last Cargo 2nd Last Cargo 3rd Last Cargo Tank Capacity (m³) 98% Material / Coating Material
gac.
This inspection was based on tank cleaning conditions in the date and time of inspection, not extending to the quality or tank coating guarantee that perhaps can change the characteristics of the cargo to be
stowed. This report does not exempt suppliers or terminals of its contractual obligations.
This document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/en/Terms-and-Conditions.aspx. Attention is drawn to the limitation of liability, indemnification
and jurisdiction issues defined therein.
Any holder of this document is advised that the information contained hereon is limited to visual examination of the safely and readily accessible portions of the consignment and reflects the Company’s findings at
the time of its intervention only and within the limits of Client’s instructions, if any. The Company’s sole responsibility is to its Client and this document does not exonerate parties to a transaction from exercising all
their rights and obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the
fullest extent of the law.
Page 2 of 7
gac.
This document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/en/Terms-and-Conditions.aspx. Attention is drawn to the limitation of
liability, identification and jurisdiction issues defined therein. Any holder of this document is advised that information contained hereon reflects the Company’s findings at the time of its
intervention only and within the limits of Client’s instructions, if any. The Company’s sole responsibility is to its Client and this document does not exonerate parties to a transaction from
exercising all their rights and obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and
offenders may be prosecuted to the fullest extent of the law.
Page 3 of 7
ANP TABLES
gac.
This document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/en/Terms-and-Conditions.aspx. Attention is drawn to
the limitation of liability, identification and jurisdiction issues defined therein. Any holder of this document is advised that information contained hereon reflects the
Company’s findings at the time of its intervention only and within the limits of Client’s instructions, if any. The Company’s sole responsibility is to its Client and this
document does not exonerate parties to a transaction from exercising all their rights and obligations under the transaction documents. Any unauthorized alteration, forgery
or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the fullest extent of the law.
Page 4 of 7
gac.
This document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/en/Terms-and-Conditions.aspx. Attention is drawn to the
limitation of liability, identification and jurisdiction issues defined therein. Any holder of this document is advised that information contained hereon reflects the Company’s findings at
the time of its intervention only and within the limits of Client’s instructions, if any. The Company’s sole responsibility is to its Client and this document does not exonerate parties to a
transaction from exercising all their rights and obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this
document is unlawful and offenders may be prosecuted to the fullest extent of the law.
Page 5 of 7
May 26th, 2022 00:00 / 00:35 Awaiting terminal to filling up shore line LP 02
00:35 / 01:50 Filling up shore line LP12 from shore tank 16-1004
01:50 / 02:00 Sampling at shore manifold - visually approved
02:00 / 02:10 Samples at ship manifold - visually approved
02:10 Commenced loading
02:10 / 02:20 Filling up ship line untill pumpstack - visually approved
02:20 Commenced loading ship tank 4P
02:40 / 02:50 Sampling from first foot of ship tank - visually approved
08:15 Completed loading
08:20 Commenced blowing
08:20 / 09:15 Completed blowing
09:15 / 11:00 Pigging of shore line
11:00 / 11:05 Blowing shore hose and ship line
11:05 Completed loading
11:05 / 11:40 Awaiting for ship tanks stabilize
11:40 / 12:20 Measurements and calculations on board after loading
12:30 / 12:40 Cargo and vapour return hose disconnection
gac.
This document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/en/Terms-and-Conditions.aspx. Attention is drawn to the limitation of
liability, identification and jurisdiction issues defined therein. Any holder of this document is advised that information contained hereon reflects the Company’s findings at the time of its
intervention only and within the limits of Client’s instructions, if any. The Company’s sole responsibility is to its Client and this document does not exonerate parties to a transaction from
exercising all their rights and obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and
offenders may be prosecuted to the fullest extent of the law.
Page 6 of 7
Before loading operation, samples were drawn from shore tank, sealed and distributed as follows:
1x½ liter for the consignee;
1x½ liter for analysis in our Laboratory (upper / middle / lower);
1x½ liter to be kept by us at your disposal for 06 (six) months (upper / middle / lower).
Before loading operation, one sample was drawn from shore manifold, sealed and distributed as follows:
1x½ liter to be kept by us at your disposal for 06 (six) months.
Before loading operation, one sample was drawn from ship manifold, sealed and distributed as follows:
1x½ liter to be kept by us at your disposal for 06 (six) months.
On start loading operation, one sample was drawn from pumpstack, sealed and distributed as follows:
1x½ liter to be kept by us at your disposal for 06 (six) months.
During loading operation, one sample of first-foot was drawn from ship tanks, sealed and distributed as follow:
1x½ liter to be kept by us at your disposal for 06 (six) months.
gac.
This document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/en/Terms-and-Conditions.aspx. Attention is drawn to the limitation of liability,
identification and jurisdiction issues defined therein. Any holder of this document is advised that information contained hereon reflects the Company’s findings at the time of its intervention only and
within the limits of Client’s instructions, if any. The Company’s sole responsibility is to its Client and this document does not exonerate parties to a transaction from exercising all their rights and
obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the
fullest extent of the law.
Page 7 of 7