Spatula, Grinding
Area Description Documents Control checksheets, PPE'S Metalizing costume, Gloves, Eye Tools machine,
4 METALIZING SAP routesheets protection, Overall, Safety boots, Termometers,Met
Drawings allized Machine
ATTENTION:Than the steel temperature and relatie humidity must meet the customer specification. 6
2
4 Prepare for the proceed of *Check the procedure
metalized * Check if something does not allow to start the process.
* Perform dust test if applicable.
*Blow and sweep
7 Clean
* Apply zinc in the holes .
8 Zinc holes * If necesary switch on the heaters to get a proper conditions for sending the section at the spray booth.
area
9 Sap Notification *Deposit the wastes on the proper bins.
*Close the order Metallized.
Inspect the section following the control sheet
10 Inspection of Metalized
* Check DFT in the metallized area.
* Put the values in the control sheet.