WORK OPERATING SEQUENCE
Revision:

Date:

Page:

Spatula, Grinding
Area Description Documents Control checksheets, PPE'S Metalizing costume, Gloves, Eye Tools machine,
4 METALIZING SAP routesheets protection, Overall, Safety boots, Termometers,Met
Drawings allized Machine

No. = SAFETY = QUALITY = ADVICE Time: Diagrams/Photos


Operation
1 Ensure all Protective Use PPE´s during all process
1
Equipment is weared.
3 Envarioment Conditions
When the section is inside the booth:
* Take the control sheet and register: 4
- Environmetal temperature
- Dew point
- Steel temperature 5
- Relative Humidity

ATTENTION:Than the steel temperature and relatie humidity must meet the customer specification. 6
2
4 Prepare for the proceed of *Check the procedure

metalized * Check if something does not allow to start the process.

* Perform dust test if applicable.

5 Dust Test * Record the results                                                       3


*Metalized all the areas specify on the specification.
6 Metalized
*Call the supervisor to do the Visual and DFT.

*Blow and sweep
7 Clean
* Apply zinc in the holes .

8 Zinc holes * If necesary switch on the heaters to get a proper conditions for sending the section at the spray booth.

area

9 Sap Notification *Deposit the wastes on the proper bins.

*Close the order Metallized.

Inspect the section following the control sheet
10 Inspection of Metalized
* Check DFT in the metallized area.