Design of Each Process of ETP

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

Kind Attn: Engr, Md.

Shahadat Hussain
Executive Dir ector

LIBAS TEXTILES LTD


Jabbar Tower , 11th Floor
House#42,Gulshan,Avenue
DHAKA-1212,BANGLADESH
USP OF KURARAY PVA GEL TECHNOLOGY

KURARAY PVA GEL(PATENTED): WITH SLUDGE REDUCTION

A REVLUTIONARY BIO-CARRIER FOR WASTEWATER TREATMENT

1
2
*Actual packaging ratio can be decided by pilot study

3
SLUDGE REDUCTION THROUGH KURARAY PVA GEL

Now a days one of the biggest problem is sludge disposal which is generated during the
process. A unique technology developed by KURARAY is SLUDGE REDUCTION- TOX.

Advantages for sludge-reduction systems


PVA gel is excellent for sludge reduction (total oxidation, TOX) due to the lesser amount
of sludge produced and higher endogenous decay rate.
PVA gel systems work well with membrane -separation processes for sludge -water
separation (including MBR type).

4
Libas Textiles Ltd. Bangladesh

Basic Design Sheet (12th Aug 2015)


Total Capacity 150 m3/hr (3,600m3/day)
(Maximum Flow rate 150 m 3/hr)

Design Capacity of Inlet wastewater

Flow COD(Cr) BOD(5) SS


Parameter pH Temp. (°C)
(m3/day) (mg/L) (mg/L) (mg/L)

Inlet 3,600 900 450 9.0~11 Max 65℃ 450

Outlet 3,600 <150 <30 6-9 <50


(Regulation)

Ambient

#Oil and grease is not include in the inlet wastewater


#Maximum Flow rate is 150m3/hr
#This biological t treatment system is for BOD, COD, SS removal.

1Primary Screen 1 (Settled before EQ tank)


Capacity of Screen: 225m3/hr × 10 mm wedge wire
Type of Screen: Wedge wire, H 2SO4 dosing pump1, pH meter (High temperature)

Primary Screen 2 (Settled before EQ tank)


Capacity of Screen: 225m3/hr × 2 mm mesh
Type of Screen: Wedge wire, Flow meter (Amount),

2 Equalization tanks (EQ tank)


Required HRT of EQ tank = 6.0 hr (Design)
Existing EQ tank -I = 325m3
New EQ tank-I I = 725 m3
EQ tank volume = 1050 m3 and Existing HRT= 7.0hr. { ETP capacity= 150m3}

Air diffuser, Level switch, Thermometer, Inlet pump, pH meter, H 2SO4 dosing pump2,

3 Heat exchanger or Cooling tower A


Total removal amount of heat: 150m3/hr×1,000×30=4,500,000kcal/hr
5
10% safety factor
(4,500,000 kcal/hr ×110%×1train = 4,950,000kcal/hr)
Cooling Tower A
Required cooling capacity: 4,950,000kcal/hr
4,500,000kcal/hr×110%×1 t rain
Heat exchanger B
Total removal amount of heat: 150m3/hr×1,000×10=1,500,000kcal/hr
* 10% safety factor
(1,500,000kcal/hr ×110%×1train = 1650,000 kcal/hr)
Cooling Tower B
Requir ed cooling capacity: 1,650,000kcal/hr
1,500,000kcal/hr×110%×1 t rain

4 PVA gel tank (Aeration tank)


Loading amount of BOD: 3,600m 3/day * 450 / 1,000 = 1,620 kg-BOD/day Loading
capacity of PVA gel for BOD removal: 30 kg-BOD/m3-gel
Required amount of PVA gel = 1,620 / 30 = 54.0m 3-PVA gel
Charging ratio of PVA gel: 12%
Required volume of PVA gel tank = 54.0 / 12% = 450m 3 (Effective water volume)
HRT of PVA gel tank = 450m3 / ,3600m3/day * 24 = 3.hrs
BOD removal rate: 90%
BOD concentration after PVA gel tank = 450mg/L * (100%-90%) = 45mg-BOD/L
BOD loading after PVA gel tank = 45mg/L×3,600m3 / 1,000 = 162.kg-BOD/day PVA gel, PVA
gel screen, Level switch, Air diffuser, Nutrients pump unit, Deformer pump unit, DO meter,

5 Aeration TANK A
New Anoxic tank volume: 450m3
HRT of tank = 450 m3 / 150 m3/hr = 3.0hr
BOD/ ANOXI C tank volume rate = 162.kg/day / 450m3 = 0.36kg-BOD/m3-tank/day
Air diffuser, return sludge pump, DO meter, M LSS meter, Mixer for sludge
6 Activated sludge/Aeration tank B (AS tank)
New AS tank B volume: 677m3
HRT of AS tank = (677 / 3,600m3/day * 24 = 4.51hr
BOD/AS tank volume rate = 162.0kg/day / 677m3 = 0.23 kg-BOD/m3-tank/day
Air diffuser, return sludge pump, DO meter, M LSS meter, Mixer for sludge

6
7 Clarifier
Conventional clarifier: TS type
Quantity of inlet water: 3600m3/day
Load ofwater surface: 21.6 m3/m2/day
Required surface area: 169 m2= 1 units
Sludge tank with Air diffuser, sludge pump unit, return sludge pump.

8 Treated water tank


HRT= 5 min
Tank volume= (150 m3/hr/60 min) * 5 min= 12.5 m3
Air diffuser, pH meter, pH pump unit, discharge pump, NaOCl.

9 Air Blower for Reactor

a) For PVA gel tank


(3600m3/day x 450)/1000/1.43/0.21/7%/24= 3211 Nm3/hr (53 Nm3/min)
Required blower air capacity: 3211 Nm3/hr …………….. ①

# Oxygen requirement (kg O2/h)/(1.43 kg/m3 x 0.21 x 7%)


#1.43 kg/m3 is the density of oxygen.
#0.21 is the volume of oxygen in the atmosphere
#7% is the air-water transfer efficiency (which may vary based on the type of diffuser) Strength of
air = 3,211 Nm3/hr / 450m3 = 7.1 (>4.5)

b) For Aeration tank A

(0.132 x 3600)/0.07/0.8/0.8/.21/0.8/24) = 561.22 Nm3/hr ……….②


Required blower air capacity: 561.22 Nm3/hr
Strength of air = 561.22 Nm3/hr /450m3 =1.25 (>1.5)
Required blower air capacity = 450m3 * 1.5 = 675 Nm3/hr

c) For AS tank/ Aeration tank B


(0.03 x 3600)/0.07/0.8/0.8/.21/0.8/24) = 127.55 Nm3/hr (5.35 Nm3/min)
Required blower air capacity: 127.55 Nm3/hr・・・・・・・・・・・・③
Strength of air = 127.55 Nm3/hr /677m3 =0.22 (>1.5)
Required blower air capacity = 677m3 * 1.5 = 1,015 Nm3/hr

d) Other air consumptions

7
- EQ tank 1,051m3×1.5 = 1,576m3/hr ---④
- Treated water tank 15m3×1.0 = 15m3/hr ---⑤
- PVA gel screen 40 m3/hr×1.0unit s = 40m3/hr ---⑥

e) Total blower capacity


6532 m3/hr (= 3,211+675+1015+1,576+15+40)
Safety factor : 120%
Blower capacity: 6532 m3/hr×120% / 60 = 130.64 m3/min
Blower, Inverter (related with DO meter)

10 Dehydrator
Loading amount of Inlet TSS: 3,600m 3/day×450mg/L /1,000=1,620 kg-SS/day #
75% inlet TSS may be treated at primary screen 1,2,3 and at biological tank.
Loading amount of Inlet TSS: 1,620×25%= 405kg-
SS/day ----------------------------------- 1)
Total BOD loading: 1,620 kg-BOD/day
Biological sludge amount =1,620kg/day×25% = 405 kg-dry-sludge/day・・・・・・・・2)
Concentration of PAC for sedimentation: 300mg/L
Volume of PAC: 3,600m3/day×300×0.1529/1,000=165kgDS/day・・・・・・・・・・・・3)
Total bio-sludge volume :1) ①+2)②+3)③=975 kg DS/day
#Inlet TSS after separated by using primary screen shall be treated in regular waste
disposal.

Dehydrator Pump from clarifier to dehydrator.


Total sludge volume: 975 kgDS/day
Type : 44 kg DS /hr
Operating time : 22hrs/day

***************** END***************