Corrective Done 655 Dasmarinas Palapala
Corrective Done 655 Dasmarinas Palapala
Corrective Done 655 Dasmarinas Palapala
Comments:
VALENTINO DEL ROSARIO JEROME T. GRETA WATO - (Site Owner) WATO - Supervisor
SFEM - PROJECT
SFEM-OPS
ENGR
CONTRACTOR CONTRACTOR'S REPRESENTATIVE
CHECKLIST
I.I. Installation of Ga. 24 pre-painted "SMART white" RIB G.I. sheet (incudes all necessary fixing accessories)
I.II. Installation of Ga. 22 GI flushing (includes blind rivets, vulca seal , and other accessories)
I.III. Installation of Ga. 24 "SMART Blue" colored pre-fabricated gutters complete with downspout strainers.
III.I. Replacement of dilapidated/damage ceiling using 6.35mm marine plywood with Paintworks
Comments:
VALENTINO DEL ROSARIO JEROME T. GRETA WATO - (Site Owner) WATO - Supervisor
SFEM - PROJECT
SFEM-OPS
ENGR CONTRACTOR CONTRACTOR'S REPRESENTATIVE
CS Calayag JM Jumawan
SUBCON REPRESENTATIVE (NAME po at signature)
Sr. Supervisor Supervisor
\
BEFORE
SMART COMMUNICATIONS INC.
During
SMART COMMUNICATIONS INC.
After
SI No.
SMART COMMUNICATIONS INC.
( LAYOUT PLAN )
LAYOUT PLAN
RIB TYPE
RIB TYPE
RIB TYPE
VALENTINO DEL ROSARIO JEROME T. GRETA WATO - (Site Owner) WATO - Supervisor
SFEM - PROJECT
SFEM-OPS
ENGR CONTRACTOR CONTRACTOR'S REPRESENTATIVE
CS Calayag JM Jumawan
SUBCON REPRESENTATIVE (NAME po at signature)
Sr. Supervisor Supervisor