Safety Observation Tracker
Safety Observation Tracker
Safety Observation Tracker
266 7-Jun-22
2022 June 2
267 8-Jun-22
2022 June 2
268 2022 June 2 8-Jun-22
269 9-Jun-22
2022 June 2
270 2022 June 2 9-Jun-22
271 June 2 9-Jun-22
2022
272 June 2 9-Jun-22
2022
272 2022 June 2 10-Jun-22
275 2022 June 2 10-Jun-22
274 2022 June 2 10-Jun-22
276 2022 June 2 10-Jun-22
277 2022 June 2 10-Jun-22
278 2022 June 2 10-Jun-22
279 2022 June 2 10-Jun-22
280 2022 June 2 10-Jun-22
281 2022 June 2 10-Jun-22
282 2022 June 2 10-Jun-22
283 2022 June 2 10-Jun-22
284 2022 June 2 10-Jun-22
273 2022 June 2 10-Jun-22
285 2022 June 2 11-Jun-22
287 2022 June 3 13-Jun-22
288 3 13-Jun-22
2022 June
289 3 13-Jun-22
2022 June
290 3 13-Jun-22
2022 June
293 2022 June 3 13-Jun-22
291 2022 June 3 13-Jun-22
292 2022 June 3 13-Jun-22
294 3 14-Jun-22
2022 June
295 3 14-Jun-22
2022 June
296 3 14-Jun-22
2022 June
297 3 14-Jun-22
2022 June
299 2022 June 3 14-Jun-22
300 2022 June 3 14-Jun-22
301 2022 June 3 14-Jun-22
302 2022 June 3 14-Jun-22
298 2022 June 3 14-Jun-22
303 2022 June 3 15-Jun-22
304 2022 June 3 20-Jun-22
305 2022 June 3 20-Jun-22
V
e
n
Unsafe Act Retort d A. venkatasiva
o
r
s
s
t
o
stores Dinesh
r
e
s
Unsafe Act
Unsafe Act ishida 2 S .Venkateswarlu
Unsafe Condition Fuji Gouni
Unsafe Condition ETP Gouni
Unsafe Act Beside quality Office Gouni
Unsafe Act Retort Gouni
Unsafe Condition Beside retort Gouni
Unsafe Act Ishida-2 Gouni
Unsafe Condition ishida-2 Gouni
Unsafe Condition ETP Gouni
Unsafe Condition Kitchen Hygiene corridor infrontSekhar
Unsafe Condition MATS area Sekhar
Unsafe Condition BFL secondary Sekhar
Unsafe Act BFL Sekhar
Unsafe Condition BFL Sekhar
Unsafe Condition
SFG S.Hari
Unsafe Condition BEC S.Hari
Unsafe Condition Store Chamber 1 S.Hari
Unsafe Condition
Mats 42 new S .Hari
Unsafe Condition Sfg settle rack S .Hari
Unsafe Condition
Mats 42 S .Hari
Unsafe Condition FLO parkin area A .Venkata shiva
Unsafe Condition Day store S .Hari
Unsafe Condition Bec A .Venkata shiva
Unsafe Condition Retort A .Venkata shiva
Unsafe Condition BEC A .Venkata shiva
Unsafe Condition Ishida 1 A .Venkata shiva
Unsafe Condition Ishida 1 A .Venkata shiva
Unsafe Condition Ishida 1 A .Venkata shiva
Unsafe Condition Mats 42 A .Venkata shiva
Unsafe Condition Ishida 1 A .Venkata shiva
Unsafe Condition Ishida 2 A .Venkata shiva
Unsafe Condition
Retort K. Sathish
Unsafe Condition Retort K. Sathish
Unsafe act
Retort K. Sathish
Unsafe Condition Retort K. Sathish
Unsafe Condition
Retort K. Sathish
Unsafe Condition PPC S . Venkateswarulu
Unsafe Condition PPC S . Venkateswarulu
Unsafe Condition PPC S . Venkateswarulu
Unsafe Condition PPC S . Venkateswarulu
Unsafe Condition Kitchen S . Venkateswarulu
Unsafe Condition
PPC S . Venkateswarulu
Unsafe Condition Chemical room S . Venkateswarulu
Unsafe act Safety path ways S . Venkateswarulu
Unsafe act H.K people S . Venkateswarulu
Unsafe act ETP S . Venkateswarulu
Unsafe Condition Dock 2 Mpc S . Venkateswarulu
Unsafe act BEC S . Venkateswarulu
Unsafe Condition
Micro biolagy Lab S . Venkateswarulu
Unsafe condition secondary packing arun kumar
Unsafe condition PPC out side K.Siva prakash
Unsafe condition isidha 2 U.Ranga prasad
Unsafe condition Ishida 1 U.Ranga prasad
Unsafe condition Secondary packing J.Veera rahavalu
Near miss G.Rajesh
Unsafe condition
Ishida 1 & 2 to MATS-42 S.Bodhidharma
Unsafe Condition
Veg Kicten R. Chenchiah
Unsafe Condition MATS-42 R. Chenchiah
Unsafe act Secondary packing
S. Harish
Unsafe Condition Ishida 1 S. Harish
Unsafe Condition
MATS-42 P.Venkateswarlu
Unsafe Condition
Twin pack heating mchine P.Venkateswarlu
Unsafe Condition SFG Area P.Venkateswarlu
Unsafe Condition
MATS-42 P.Venkateswarlu
Unsafe Condition
MATS-42 P.Venkateswarlu
Unsafe Condition
MATS-43 P.Venkateswarlu
Unsafe Condition Main corridor Ankita
unsafe act Tray
Ishidadenester
1 S Harish
line B earthing cable Damage
unsafe act Ishida
Filling S Harish
1 device bottom cable joint founf
unsafe act Check weigherIshida 1 cable on floor & CableS connection
earth Harish damage
Unsafe Condition Secondary
Printing conveyer D Chaitanya
packing does not have emergency button
Unsafe Condition Fuji conveyer does not have Demergency
Fuji Printing Chaitanya button
Unsafe Condition Fuji Printing conveyer
Fuji Motor does not haveDSafety
Chaitanya
Guard avaulable
Unsafe Condition Man Movement D Chaitanya
Ishida-2 ddor open close Button side ways Broken
Unsafe Condition Man Movement
Ishida 1 ddor open close Button D Chaitanya
Not properly fixed
Unsafe Condition Male
Falsehygiene
celieng station
Sheet not properly fixedD Chaitanya
at the entrance
Unsafe Condition LooseIshida
wire available
1 D Chaitanya
in cable tray under filling device
Unsafe Condition Secondary Packaging
Ishida 1 Priting Conveyer motor D Chaitanya
has no safety Guard
Unsafe Condition IshidaLoose
1 cable in ccw Bootom Mohan
side raj
Unsafe Condition Ishida D Chaitanya
Unsafe Condition Ishida D Chaitanya
Unsafe Condition MATS-30 P.Monish
Unsafe Condition Ishida-2 D Chaitanya
Unsafe Condition Hand wash station near by store P.Monish
Unsafe Condition Retort P.Monish
Unsafe Condition Retort MATS-42
Unsafe Condition Ishida D Chaitanya
Unsafe Condition Ishida D Chaitanya
Unsafe Condition MATS-42 D Chaitanya
Unsafe Condition Training Hall P.Monish
Unsafe Condition MATS-42 P.Monish
Unsafe Condition Ishida-2 D Chaitanya
Unsafe Condition All electrical panels in coridor D Chaitanya
Unsafe Condition Veg Kitchen P.Monish
Unsafe Condition Veg Kitchen P.Monish
Unsafe Condition Fuji P.Monish
Unsafe Condition Ishida to mats room D Chaitanya
Unsafe Condition Veg Kitchen P.Monish
Near Miss Mats Srinivas Gouni
Near Miss Mats Venkatesh
Engineering Engineering
Production Kitchen
Production Kitchen
Production Kitchen
FLO FLO
Production PPC
PPC PPC
Quality Quality
Quality Quality
Production Kitchen
Production Kitchen
Production ishida
Production ishida
Production ishida
Production ishida
Production ishida
Production ishida
Production ishida
Production ishida
Production ishida
Production ishida
Production ishida
Production ishida
Production ishida
Production ishida
Production Mats
Production Mats
Production Mats
Production Secondary packing
Production Secondary packing
Production Secondary packing
Production Secondary packing
Production Secondary packing
Production MATS
Production MATS
Production MATS
Quality Quality
Quality Quality
Production ishida
Production ishida
Production ishida
Production Mats
Production Mats
Production Mats
Production batching
Production ishida
Production ishida
Production Mats
Production Mats
Engineering Engineering
Engineering Engineering
Production ishida
Production ishida
Production ishida
Production ishida
Production ishida
Production ishida
Quality Quality
Quality Quality
Quality Quality
Quality Quality
Quality Quality
Quality Quality
Quality Quality
Quality Quality
Quality Quality
Quality Quality
Production Batching
Production Batching
Production batching
Production kitchen
Production Kitchen
Production Kitchen
Production Kitchen
Production kitchen
Production kitchen
Production kitchen
Production kitchen
Production kitchen
Production kitchen
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Bec Bec
BEC BEC
Quality Quality
Production PPc
Production PPc
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production kitchen
Production kitchen
Engineering Electrical
Production ETP
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Kitchen
Production MATS
Production PPC
Production PPC
Production PPC
Production PPC
Projects Projects
Quality Quality
Production Secondary packing
Production Kitchen
Production Kitchen
Production Kitchen
Engineering Electrical
TPM Ishida
Production Ishida
Production Kitchen
Projects MATS
Quality Quality
Production Secondary packing
Production Secondary packing
Production Secondary packing
Prodution PPC
Prodution PPC
Prodution PPC
Production Secondary packing
Production Secondary packing
Stores Stores
Stores Stores
Engineering Electrical
Engineering Electrical
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Secondary packing
Production Ishida
Prodution PPC
Prodution PPC
Production Ishida
Production MATS
Production Ishida
Production Ishida
Production Mats
Quality Quality
Production Ishida
Production Ishida
Production Ishida
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Engineering Electrical
Engineering Electrical
Engineering Mechanical
Prodution Kitchen
Prodution Kitchen
Prodution Mats
Prodution Mats
Prodution Mats
Prodution Mats
Quality Quality
Prodution Mechanical
Prodution Mechanical
Prodution Mechanical
Prodution Mechanical
Prodution Mechanical
Prodution Mechanical
Production kitchen
Production Mechanical
Production Ishida
Production Ishida
Production PPC
Production
PPC
PPC House keeping
PPC Ishida
Engineering Mats
PPC PPC
PPC PPC
PPC PPC
PPC PPC
PPC PPC
PPC PPC
PPC PPC
PPC PPC
PPC PPC
Engineering Utility
Production QC lab
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production PPC
PPC PPC
Production Ishida
Production Ishida
Production Ishida
Production Ishida
PPC PPC
PPC PPC
PPC PPC
Production PPC
PPC
Production Ishida-1
Production Ishida-1
Production Male hygiene
Production
Mats
Production
Mats
Production Mats
Production
Mats
Production
Mats
Production
Mats
Quality QC lab
Production Ishida-1
Production Ishida-1
Production Ishida-1
Production Secondary packing
Production Fuji
Production Fuji
Production Ishida-2
Production Ishida-1
Production Ishida-1
Production Ishida-1
Production Ishida-1
Production
Production Ishida-1
Production Veg Kitchen
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida-2
Production Ishida-1
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
EHS EHS
Project Project
EHS ETP
EHS MATS
EHS Secondary packing
EHS Electrical
EHS Ishida
EHS Kitchen
Production Ishida-1
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production PPC
Production PPC
Production Ishida
Production Ishida
Production Fuji
Engineering BEC
Production Mats
Production Mats
Production Mats
Production Mats
Production Engg
Production Engg
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production PPC
Production Engg
Production Mats-42
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Engg
Production PPC
Production Engg
Production PPC
Production Engg
Production Engg
Production Production
Production Production
Production Production
Production Production
Production Production
Production Production
Production Production
Production Production
Production Mats
Production FLO
Production Engg
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Engg
Production Engg
Production Engg
Production Ishida
Production Ishida
Production Engg
Production Ishida-1
Production Ishida
Production Ishida
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Ishida-1
Production Ishida-1
Production Ishida-1
Production Ishida-1
Production Ishida-1
Production Ishida-1
Production Secondary packing
Production Secondary packing
Production Ishida
Production Ishida
Production Ishida
Production Secondary packing
Production Secondary packing
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Engg
Production Engg
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production FLO
Production FLO
Production FLO
FG FG
Sudhakar Sudhakar
Production FLO
Production FLO
Production Mats
Production Mats
Production Mats
Sudhakar Sudhakar
Production Mats
Production Ishida
Production Mats
Production Mats
Production FLO
Production FLO
Production FLO
Production FLO
Production FLO
Production FLO
Production FLO
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Mats-42
Production EHS/TPM
Production EHS/TPM
Production EHS/TPM
Production EHS/TPM
Production Engg
Production Ishida-1
Production Ishida-1
Production Ishida-1
Production Ishida
Production Ishida
Production Ishida-1
Production Engg
Production Engg
Production Engg
Production Ishida
Production Secondary Packing
Production Secondary Packing
Production Ishida
Production Ishida
Production Mats
Production Mats
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Mats
Enggineering Electrical
Production Secondary Packing
Enggineering Electrical
Production Secondary Packing
Production Ishida-1
Production Ishida-1
Production Ishida-1
Production Ishida-1
Production
Mats
Production Engg
Production Ishida
Production Ishida
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Ishida-1
Production Ishida-1
Production Ishida-1
Production ishida 2
Production ishida 2
Production ishida 2
Production ishida 2
Production ishida 2
Production ishida 2
Production ishida 2
Production ishida 2
Production ishida 2
Production ishida 2
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Secondary Packing
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production PPC
Production Batching
Production Batching
Production PPC
Production Batching
Production PPC
Production Mats
Production Mats
Production Engg
Production Engg
Production Engg
EHS/TPM Stores
Production Mats
Production Mats
Production Mats
Engineering Engg
Engineering Engg
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Engg
Production Mats
Production Engg
Production Engg
Production Engg
Production Engg
Production Engg
Production Mats
Production Engg
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Ishida
Production Mats
Production Mats
Production Mats
Production Mats
Production Ishida
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Mats
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production PPC
Production Mats
Production Mats
Production Mats
Production Mats
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production PPC
Production PPC
Production Ishida
Production Ishida
Production PPC
Production PPC
Production PPC
Production PPC
Production Mats
Production Mats
Production Mats
Production PPC
Production Ishida
Production PPC
Production Mats
Production PPC
Production PPC
Production PPC
Production PPC
Production Secondary packing
Production Secondary packing
Production Secondary packing
Production Secondary packing
Production Secondary packing
Production Secondary packing
Production Secondary packing
Production Secondary packing
Production Secondary packing
Production FLO
Production EHS/TPM
Production Ishida
Production Ishida
Production Ishida
Production FLO
Production FLO
Production FLO
Production FLO
Production FLO
Production Ishida
Production Ishida
Production Ishida
Production Ishida
Production Mats-42
Production EHS/TPM
Production EHS/TPM
Production EHS/TPM
Production Ishida
Production Ishida
Production Mats
Production Mats
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Mats
Enggineering Electrical
Production Secondary Packing
Enggineering Electrical
Production Secondary Packing
Production Ishida-1
Production Ishida-1
Production Ishida-1
Production Ishida-1
Production
Mats
Production Engg
Production Ishida
Production Secondary Packing
Production Secondary Packing
Production Secondary Packing
Production Ishida-1
Production Ishida-1
Production Ishida-1
Production PPC
Production Mats
Enggineering Engg
Production Production
EHS/TPM Power conz
Production Mats 42
Production Mats 42
Production Mats 42
Production Mats 42
Production Mats 42
Production PPC
Production Mats-42
EHS/TPM Mats
Production Mats
Brief description of incident Priority Responible for
closing
Non veg kitchen hand wash station back side pipe damage R3
Drain grill are not covered and person was about to step on it.
Casuals used googles while cleaning machine parts.
GN pan lid slided out and almost about to fall down while
moving the trolley
Water present on the floor and slipped
External conveyor C/v -9 emergency button not fixing properly R3
External conveyor C/v -7 emergency button Brocken R3
External conveyor C/v -10 emergency button not fixing properly R3
Loose cables cut and left on floor and cable tangled to feet
Temporary fixing of emergency swith R3
M/C 2 Airhose on off Valuve Handle Brocken R3
Out feed conveyor side emergency button not working R3
External conveyor stacking table sharp edge is their so hand
R3
injury
R3 Civil
SFG rack area ground floor damage
BEC Dryer machine one weel missing R3 Engg
Store chamber 1 Rack nut bolt loose condition R3 Engg
Mats 42 new exit tank side fire hydrent box touching while fork R3 Engg/Safety
lift moving ime
Sfg pallet moment settele rack emegency button not working R3 Engg
Mats 42 external conveyor cv1,cv2,cv3 emergency button not R3 Engg
working
Flo parking area fire extinguishers Blocked R3 Safety
Day store Rack shaking Bolt & nut loose condition R3 Engg
Emergency exit No 3 front blocked R3 Safety
Retort machine front Steam line not insulated R3 Engg
Fire extinaugher Blocked R3 Safety
RPDB 10 /y Socket box bottam cables rooting on stand R3 Engg
Fuji to ishida 1 Conveyor motor nut and bolts not fixed R3 Engg
Main HMI Indication Light stand broken top side R3 Engg
Ishida to Mats conveyor wal conveyor no emergency button R3 Engg
Feeding Section Area tube light not fixing properly R3 Engg
Man moment door insude button box damaged R3 Engg
R3 Engg
Machine top steam line not supporting so some times shaking
Retort trollys Not weel locks R3 Engg
Condencity pipe line not insulation so trap on and off time hot R3 Engg
suface .
Retort machine front Steam line not insulated R3 Engg
R3 Engg
Hydralic shaft engage and dis engage motor flang water leakage
Shoe scraber step very heigh R3 Engg
Back side emergency door area no light R3 Engg
Rice storage rack damaged leg bottam side R3 Engg
Loading shutter some times suddenly downed R3 Engg
Kitchen chiller door handle inside damaged R3 Engg
R3 Engg
Chiller door very tight oneces close the door inside not opening
There is no proper ppe in chemical room R3
People are not followed safety path ways R3 Safety
Chemical using time house keeping people not using ppe R3 Safety
Fire extinaugher Blocked R3 Safety
Shutter buttons not working, sometimes shutter not up R3 Engg
BEC Dryer machine one weel missing R3 Engg
R3
Using Brocken chairs
Forklift used without barriacate R3 Safety
No light in PPC out side R3 Engg
there is no emergency connection overhead conveyar R3 Engg
There is no emergency button connection R3 Engg
Without shoes standing in working time girls R3 Safety
Sullurpeta bus driver not wear seat belt and slleping driving
handle R4 Safety
Engg
ISHIDA -1 to Mats-42 Product conveyor is proper not removed R3
Rice mixer-2 Indication Lamp Cap Not There ,in cleaning time Engg
shock is there R3
Remote control panel door lock not there R3 Engg
In Secondary packing Machine 1 Spoon feeding near emegency R3 Engg
button broken condition
In ishida 1 CCW Tubelight Switch box Broken condition R3 Engg
In security room fall down to ground because of stairs are not
avaialbel R4 Civil
Discharge belt & manual mode operating time suddely running R3 Engg
& emergency stop working machine was not stopped
External conveyor divertor (shacking) fixing problem. Food R3 Engg
damage & jamming problem
Lasar printer not proper fixing .(man power time risk zone R3 Engg
creating)
Cable tray sharp edge R3 Engg
One fan clampbroken & sahking in runtime R3 Engg
Mchine -1 air valve damage's broken R3 Engg
machine -1& machine leg bolt (Adjustable) Bolt not proper
R3 Engg
fixing (leg bolt bending)
Secondary packing out put collecting table not fixing ; Running
R3 Engg
time shacking conveyor gap(Finger injury)
Entry tank 2 button water circulation pipe insulation sheet not R3 Engg
properly fixed
In heating machine operating panel board power indication R3 Engg
circuit openly is there
Mirror need to fix F1 operator operating vehicle that way R3 Engg
Pressure lock 1 depressurization pipe line insulation not R3 Engg
properly fixed
Microwave zone water circulation pipe insulaton not properly R3 Engg
fixed
Hold towe skid water ciculation pipe line insulation sheet R3 Engg
properly fixed
Water leakage from steam pipe R3 Engg
Tray denester line B earthing cable Damage R3 Engg
Filling device bottom cable joint founf R3 Engg
Check weigher earth cable on floor & Cable connection damage R2 Engg
Printing conveyer does not have emergency button R2 Engg
Fuji Printing conveyer does not have emergency button R2 Engg
Fuji Printing conveyer Motor does not have Safety Guard avaulable R3 Engg
Man Movement ddor open close Button side ways Broken R3 Engg
Man Movement ddor open close Button Not properly fixed R3 Engg
False celieng Sheet not properly fixed at the entrance R3 Engg
Loose wire available in cable tray under filling device R3 Engg
Secondary Packaging Priting Conveyer motor has no safety Guard R3 Engg
Loose cable in ccw Bootom side R3 Engg
Earthining cable is not properly fixed under the check weigher R3 Engg
At the bottom of the rice kettle cable tray weld removed R3 Engg
Floor damaged at backside of mats-30 due to this there may be R3 Engg
a trip hazard
Ishida to Mats food transfer conveyor motors has no safety R3 Engg
Hand was station outside electrical cables are in open condition R3 Engg
Infront of retort machine steam pipe lines has no insulation R3 Engg
Lights blinking and not prperly working in veg kitchen R3 Engg
Printing conveyor motor has no safety guard R3 Engg
Vision camera conveyor motor has no safety guard R3 Engg
Printer cables has been coverd with insulation R3 Engg
At the entrance of training hall carridor fall ceiling is in unsafe
R3 Engg
condition
In extenal conveyor Cv/5 bearing unit has no safety guard R3 Engg
Printing conveyor has no emergency stop button available R3 Engg
Electrical mat is no sticked propwerly at cornors due to this
R3 Engg
there may be a trip hazard
Fall ceiling plate not properly at the top of rice washer R3 Engg
In kitchen near rice mixer drainage grill is not properly closed R3 Engg
In fuji heating tunnel rotating chain has no safety guards R3 Engg
Floor is not in even from after removed the door there may be
a trip hazard R3 Engg
All steam kettle backside steam pipe line has no insulation R3 Engg
About to slip Due to water on floor In mats area R3 Engg
about to trip his leg due to Grill Not seated properly R3 Engg
Casual supposed
Ishida-2 materialtomovement
be trip by strucking
door wireto cleaning pipe
connecting inside
is out floor
coming R3 Engg
Screw shet outside R3 Engg
Training
Fire line supporting hallnot
clamp near top sealing
proprely fixed(Main carridor R3 Civil
ishida view class opposite) R3 Engg
FR3 Floor damage R3 Civil
Groung Floor more damage R3 Civil
SFG Pallet settle rack emergency button not working R3 Engg
Can operator machine wire are too loose R3 Engg
Manual can operator stand is unsafe condition conveyor edge R3 Safety
In ishida-1 wipping conveyor motor not covered fully R3 Safety
Check weigher induction socket cable damage R3 Engg
Ladder kept out side of production office R3 Safety
Without safety shoes doing daily activites in main carridor R3 Engg
Shop floor inside coming person not using safety shoes R3 Safety
Mats back side floor on the water R3 House keeping
Not using gloves new horigns dis mandel time R3 Safety
ConveyorF.G Racks top storage
directing cylinderplace
guard not there
belt supportguard
damaged, channels
hanging R3 Engg
in one belt
Station 2,3,4 down side conveyor cable tray cover having sharp R3 Engg
edges R3 Engg
Printing conveyor motor has no safety guard R3 Engg
In ishida-1 check weigher earthing cable is in open condition R3 Engg
In mats-42 pick and place conveyor motor has no safety guard R3 Engg
In mats-42 vaccum pump stand has no grounting R3 Engg
In mats-42 over head conveyor has no proper grounting R3 Engg
In retort
In ishida-1 food loading
material movement trolley's
doorhas no wheelpush
open/close locksbutton R3 Engg
damaged R3 Engg
Printing conveyor has no emergency stop button available R3 Engg
In ishida-2 final curve conveyor motor has nosafety guard R3 Engg
InFan
ishida-1 visionsound
abnormal cameraandconveyor
full sound motor has no safety
and vibrated guard
(fan some R3 Engg
Kitchen emergency door bolts are missing)
using H.K people's and maintainace R3 Engg
people's R3 Engg
Top side fall sealing not sticking properly R3 Engg
Chicken deforesting trolley wheel's ( damage ) one trolley R3 Engg
New joining people's are not follow safety path way R3 Safety
Chiller door handle damage R3 Engg
There is no proper ppeare
Some gum shoe's damage
in ETP (side edges
operators Safetydamage)
hemelts not R3 Safety
using
Canteen House keeping people's not wear safety shoe's R3 Safety
Spindrgen machinesometimes(
started one's using sliper's)
moving total machine another R3 Safety
side R3 Engg
Dryer bottom leg side put in stone BEC people's R3 Engg
Put motor guard in Spindryer machine R3 Engg
SecurityIncabin
side working
was height people's notstairs
,in cabin weararehelmet's
not available R3 Safety
because of one security person was slipped R3 Civil
Some time's lift sensor suddenly opened and closed R3 Engg
Support rod welding damage R3 Engg
Top side light blinking R3 Engg
Construction people's jump to dock to floor R3 Safety
Floor damage R3 Civil
HousePest control
Keeping personwas
people's wasinspray's
freezerwithout
cleaningproper mask
time tey are not R3 Safety
using sweater
In ETP Fire hydrant line near trees will grows and blocked to R3 Safety
hydrant valve R3 Safety
Chiller dooor very tight R3 Engg
Some time's tractor driver not wear helmet R3 Safety
Fire Extingusher blocked in food pallets R3 Safety
Soap oil sensor light was broken R3 House keeping
Steam
Fire extenguisherand
drop line FJP near
no.78 circulator steam
top side lineleakage
water no insulation
on the R3 Engg
floor R3 Engg
Main gate wash room area no light R3 Engg
Fire extinguisher no.78 front side top pipe line water leakage R3 Engg
All persons not using gangway R3 Safety
Retort water
Top sealing front side steeam
drops on thereturn line roof
floor and no insulation
was damaged R3 Engg
condition R3 Engg
Male hygine room in waliking time slipped R4 House keeping
All empolyes passing there the Qx machine dispatch conveyor
R3 Engg
under
Boys hygine station roof water leakes in floor R3 Engg
Fully food material stocked mats don't have space for man
R3 Safety
movement
Tot bin edges are sharp R3 Engg
Taken the glue from glue tank without hand gloves R3 Safety
Rice loading tot bin lifter don't have wheel lock R3 Engg
Cables of fuji not properly layed in cable tray R3 Engg
False ceiling broken in female hygine station R3 Civil
Office desk sliding broken in production office R3 Engg
Machine kept above drainage in PPC R3 Engg
Blander motor guard damaged in veg prep R3 Engg
A guy was about to fall due to water slip near stores R4 Safety
Combi oven cables are not properly layed (lying on floor) R3 Engg
Water in the walk of stores R3 Engg
Bubble inspection system bottom side cables booting not
R3 Engg
properly
PRE-Processed material transfer vehicle tyre puncher R3 Engg
Secondary packing area external conveyor ( curve conveyor )
R3 Engg
emergency box damaged
In secondary doing mono carton rework with wearing heat R0 Safety
resistant gloves and goggles
While cleaning top tool used proper PPE like safety gloves and
R0 Safety
goggle
Handling heater plates in machine while wearing heat resistant
R0 Safety
gloves
Cleaning sauce tank with water jet pump while wearing goggles R0 Safety
R3 Engg
In ishida-1 CCW line-A filling device below cables laying on floor
In ishida-1 man movement door button damage R3 Engg
In ishida-2 man movement door inside button damage R3 Engg
In secondary packing machine-1 stop button shacking R3 Engg
Drainage grill problem R3 Civil
Leg (external conveyor ) not proper fixing R3 Engg
Cleaning braising pan with water jet pump while wearing safety
R0 Safety
goggles
Cleaning retort machine with water jet pump wearing safety
R0 Safety
goggles and gloves
Cleaning coding problem pouches with chemical while wearing
gloves and goggles R0 Safety
True styke cable routing purpose they are wiring steel pipe R3 Engg
Titan engg team not wearing PPE's in working on height R3 Safety
Entry tank B 1 to pressure lock 1 depnessurization line shacking
R3 Engg
continuosly & no support is there
Engg Person using steel stool for entering vessel maintainance R3 Safety
Steam condeset return line steam trap steam leake (walking all
persons the walkway) R3 Engg
Twin pack machine heater machine top motor safety guard not
R3 Engg
their
Twin pack machine heater machine emergency switch not their R3 Engg
Retort steam pipe line not support in top side (pipe line
shacking comes) R3 Engg
Cooling water supply pipe line water leake all persons walking
R3 Engg
the way
Retort front side steam condeset return line insulation not their R3 Engg
Welding working near gas cylinder have no support stand there R3 Engg
Manual movemnet door ishida in side open bottom box broken R3 Engg
RPDB -10/Y4 socket box cable rolling on stand R3 Engg
Ishida -2 fall ceilling sheets is damaged on AHU near R3 Engg
Back side guard fixing glasses is damaged in bottom net near R3 Engg
M<ats-42 hand wash near steam condesor line is water
R3 Engg
dropping
Air hose pipes there is on floor R3 Safety
Sauce tank near primary conveyor is damaged for floor R3 Engg
Laser printer safety guard is not available R3 Engg
Braising pan back side drain grill is not proper R3 Engg
Rice washer top side fall ceilling damaged R3 Engg
Turbo dicer near machine machine blades is fixing & proper
R3 Engg
door io there
External control board unsafe condition R3 Engg
Shutter near electrical box top side water leakge R3 Engg
Walkway stream trap leakage R3 Engg
Fire xtinguisher no:124 hose is damage R3 Safety
Retort area front side steam water on the floor walking time R2 House keeping
slips
Qx machine back side near transformer bottom side cable
R3 Engg
laying on floor
Fuji printing conveyor near drianage gril space found R3 Engg
Fuji printing conveyor panel board off button not working R3 Engg
Fuji near drine open condition not available for gril R3 Engg
Mats 42+ steam pipe in floor not properly closed R3 Engg
Manual cane operner stand edge is sharp
Manual station disconnector cables laying on floor R3 Engg
Manpower used proper PPE's in working time
New joining people's are not follow safety path way R3 Safety
Not using safety helmets in ETP R3 Safety
Floor damage R3 Engg
Full of floor water R3 Safety
HMI front side machine running time full swetting fan is not
R3 Engg
available
HMI front side machine running time full swetting fan is not
R3 Engg
available
HMI front side fan was not working R3 Engg
Construction people's not wear goggle's R3 Safety
Check weigher induction socket removed R3 Engg
Block emergency door ( In pallets) R3 Safety
Mats 45 machine area steps not their external conveyor ( down
side going on work area every time carrier loading & carrier R3 Engg
unloading)
Block the fire extingushier (stores) R3 Safety
No closing lid/gurard for ozone closer in vegetable washer R3 Engg
Daystore door damage R3 Engg
NO motor guard for spin dryer in encrusting room R3 Engg
Curve conveyor mat groung fixing R3 Engg
Machine-1 air hose valve damaged R3 Engg
Laser printing not for proper fixing & shaking fell down (near
R3 Engg
miss)
CFB'S lable machine not in used R3 Engg
Vision camera infeed conveyor not ground fixing R3 Engg
Machine-1 discharge line automatically reverse running R3 Engg
Tapping machine checkweigher conveyor; roller table not fixing
R3 Engg
(grounding)
Machine 1&2 leg's damaged & bending not properly fixing R3 Engg
Twin pack machine not perment placing; (more place changing)
R3 Engg
standard one place
Exit external conveyor chsin bracket cover reverse fixing; sharp
R3 Engg
edges there
Mats42 steps position changed the after; sharp edge ( both side
R3 Engg
) man power working time suddenly(injury head)
Reflecting sensor fixing in infeed line reflecting taping remove
R3 Engg
that time (gluing suddenly on)in infeed
Discharge big conveyor leg not proper grounding R3 Engg
Discharge table conveyor centre space pinch point R3 Engg
Male hygine room in waliking time slipped R3 Engg
A guy was about to fall due to water slip near stores R3 House keeping
In male hygine hand wash station back side water drop and fall R3 Engg
down
Production office opposite Floor damage chances to forklift
R3 Engg
wheel damage
Mats-42 conveyor cleaning time water in floor no board R3 House keeping
displayed just slip in floor
Mats Drainage grills is UnEven Manpower Walk Time Slip In R3 Engg
The Drainage
Mats Drainage grills is UnEven Manpower Walk Time Slip In R3 Engg
The Drainage
Drainage covers removed and no sign board R3 House keeping
R3 Engg
Up side fall ceiling was in loose condition any will be fall down
Accendo welder used proper PPE for welding work
Shutter door not open propey R3 Engg
Without PPE doing welding R3 Safety
Door shutter not open properly ,it may cause head injury R3 Engg
R3 Safety
Water stagnation at hygiene corridor
Cleaning chambers with IP in BFL machine while wearing proper
PPE
Cleaning external conveyor with soap oil while wearing goggles
and gloves
When going tank top using safety belt and helmet safe work
Mats-45 continusining the tig truck top side using proper
PPE( Safery belt,helmet)
Tray poure time all man poure proper cutting glovse using
Mats-40 cleaning time all man power properly using for (PPE)
gloves and goggles
Accendo team earing the goggles using at welding time
Tray rework time all manpower proper cutting cloves using
Ishida-1&2 cleaning time all manpower properly(PPE)using
gloves ,goggles,mask
Mats-40 cleaning time all manpower properly for (PPE)
gloves,goggles mask
While display wall at cables ,cable trays time using proper PPE
Mats 45 Commising time Going Tank top using Proper PPE
Bonfigloli Cleaning Time Operator Using Proper PPE
Mats 45 Commising time Going Tank top using Proper PPE
Bonfigloli Cleaning Time Operator Using Proper PPE
FG Loading Manpower Manual Trolly Handling safely Working
safely
Bonfigloli Cleaning Time Operator Using Proper PPE
Waste Mono Cotton Shudding Proper using PPE
Retort Cleaning Time Operator Using Proper PPE
Retort Cleaning Time Operator Using Proper PPE
Gloue Tank Is Very Hot So Handlling Time Use Insulation PPE
FLO Operators Fork Lift Driving Time Using Proper PPe
FLO Operators Fork Lift Driving Time Using Proper PPe
Fuji Machine Cleaning Time Man power using Gogles And
Gloves Proper PPE
Toyo Machine Eqipment Cleaning Time Man power Used
Proper PPE
Office Windos Cleaning Time House Keeping People Used
Proper PPeE
Office Windos Cleaning Time House Keeping People Used
Proper PPeE
Mats 42 External conveyor Cleaning Time usining Jet Pump
while Using Proper PPE
In Boiler Maintanance time While Going Boiler top Side Using
Proper PPE
Man Power Cleaning Time Proper PPE Using
Mats 45 Skid Area Vinayaka Vendors Welding Working Doing
Used Proper PPE
Floor Painters Used Proper PPE In Working Time
House keeping people working time using proper PPE Gloves
and Gogles Mask
FLO Operator Used proper eqipment using for Pallet down time
Store Persons Used Proper Helmat for Going inside Stores
Manpower Used Gogles And Hand Gloves,Mask For Machine
Clening Time
In height work time they are using proper PPE's like safety
helmet and safety belt
In Titan engg contract working time using welding sheet and
gloves
In Ms enterprises contract working time they are using proprer
PPE's
Engineering team cable laying time using proper ladders
These people are using proper PPE's
PL-3 pressure guage not their R3 Engg
External conveyor 06&08 motor safety guard not their R3 Engg
PL-1 Pressure guage not their R3 Engg
Mats 42 eixt tank side cable not routing properly on the floor R3 House keeping
water
Back side tank side one electrical cable not routing ( cable R3 Engg/House Keeping
bottom side on the floor water)
Male hygiene station door is manual but opening and closeing R3 Engg
time too hard
R3 Engg
Male hygiene to shop floor inside door not workking(Strucking)
Mats 30 and Mats 42 area floor full of water R3 House keeping
Floor was full water leakage in mats 42 area one person leg was R3 Safety
slipped
z
Basic cause
Man power on/off time hand touch in the
steam pipe it will be happen is come
So product lifting time miss handling in
the tod is slip in man power is come
Run time collect the product it fixing p b c
happened is come
Manpower moment jurck or slip in touch
in the the went it will be some happened
is come
So manpower moment time conveyor is
jurak it will be happened is there
Man power door switch on time ss rode
to earth is coming chance
Basic PPE'S not maintaining
Removed Pallet
Routing Done
Routing Done
Routing Done
Routing Done
Routing Done
fixed properly
Corrected
Corrected
WIP
Cable routing
Corrected
Corrected
Corrected
Corrected
WIP
WIP
Training given
Training given
Corrected
Training given
Training given
Inform safety
Asked HK to clean the area
Corrected
Corrected
New Requirement
Corrected
Corrected
Corrected
Corrected
Replaced
Repeated
Corrected
NA
WIP
WIP
Corrected
Training given
Corrected
Corrected
Training given
Training given and removed
Training given
Replaced
Corrected
Corrected
Corrected
NA
Repeated
Connected
Corrected
Corrected
Removed
Rmoved
NA
Repeated
WIP
So please stickin the hazard identification
Infoemed to maintainance
To fix the power indication cap and closed the circuit board
Provide safety guards for motors
Infoermed to maintaince put (bolt grounding spindrger bottom side) point closed
Informed maintainance
Better to clear the material at man movement area at Mats tool room front side
Better to clear the vehicle movement area at Mats back side and front of the total room area
Better to gave the safety induction about safety vilation
Better to provide as soon as possible stair case for creossing the conveyor
Better to remove steel pipe and provide pvc pipe for cable routing
Better to gave safety violation in breif
03 February 1900
04 February 1900
05 February 1900
06 February 1900
07 February 1900
08 February 1900
12 February 1900
13 February 1900
09 February 1900
10 February 1900
11 February 1900
16 February 1900
14 February 1900
15 February 1900
17 February 1900
18 February 1900
20 February 1900
25 February 1900
19 February 1900
21 February 1900
22 February 1900
23 February 1900
24 February 1900
26 February 1900
31 March 1900
01 April 1900
02 April 1900
03 April 1900
04 April 1900
05 April 1900
06 April 1900
07 April 1900
Electrical 08 April 1900
Hr 09 April 1900
01 March 1900
24 March 1900
28 February 1900
04 March 1900
05 March 1900
06 March 1900
16 March 1900
20 March 1900
22 March 1900
23 March 1900
Hr 28 March 1900
29 March 1900
02 March 1900
07 March 1900
08 March 1900
09 March 1900
10 March 1900
11 March 1900
12 March 1900
13 March 1900
14 March 1900
15 March 1900
17 March 1900
18 March 1900
19 March 1900
21 March 1900
25 March 1900
26 March 1900
HR 27 March 1900
30 March 1900
27 February 1900
10 April 1900
11 April 1900
30 April 1900
01 May 1900
12 April 1900
13 April 1900
14 April 1900
15 April 1900
16 April 1900
17 April 1900
18 April 1900
19 April 1900
20 April 1900
21 April 1900
22 April 1900
23 April 1900
24 April 1900
25 April 1900
26 April 1900
27 April 1900
10 May 1900
Mechanical 24 May 1900
Houskeeping 11 May 1900
12 May 1900
Civil
Mechanical 28 July 1900
Mechanical 14 August 1900
16 August 1900
Electrical 17 August 1900
Electrical 01 August 1900
02 August 1900
Mechanical 03 August 1900
04 August 1900
Mechanical 05 August 1900
Electrical
Mechanical
Electrical
Electrical
Electrical
Mechanical
Mechanical
02 September 1900
Electrical 03 September 1900
Mechanical
Mechanical 19 August 1900
Mechanical 20 August 1900
Mechanical 21 August 1900
22 August 1900
23 August 1900
Production
Electrical
Electrical
Electrical
Mechanical
Mechanical
Mechanical
Prroducton
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Production
Mechanicl
Electrical
Electrical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Electrical
Mechanical
Mechanical
Electrical
Mechanical
Mechanical
Electrical
Mechanical
Electrical
Mechanical
2-Jul-22
9-Jul-22
19-Jul-22
19-Jul-22
19-Jul-22
19-Jul-22
20-Jul-22
21-Jul-22
21-Jul-22
23-Jul-22
23-Jul
Point pending for (days) Action status Action closed date
0
04 May 2022
0 04 May 2022
0
0 02 May 2022
0
0 04 May 2022
0 02 May 2022
0
0
0 04 May 2022
0
-44810
-44809
-44808
-44807
-44804
-44803
-44801
-44800
-44799
-44798
-44797
-44796
-44789
-44788
-44787
-44806
-44805
-44795
-44794
-44793
-44792
-44791
-44791
-44802
-44786
-44785
-44784
-44783
-44782
-44781
-44777
-44776
-44780
-44779
-44778
-44773
-44775
-44774
-44772
-44771
-44769
-44764
-44770
-44768
-44767
-44766
-44765
-44763
-44730
-44729
-44728
-44727
-44726
-44725
-44724
-44723
-44722
-44721
-44760
-44758
-44737
-44761
-44757
-44756
-44755
-44745
-44741
-44739
-44738
-44733
-44732
-44759
-44754
-44753
-44752
-44751
-44750
-44749
-44748
-44747
-44746
-44744
-44743
-44742
-44740
-44736
-44735
-44734
-44731
-44762
-44720
-44719
-44700
-44699
-44718
-44717
-44716
-44715
-44714
-44713
-44712
-44711
-44710
-44709
-44708
-44707
-44706
-44705
-44704
-44703
-44702
-44701
-44698
-44697
-44696
-44695
-44694
-44679
-44674
-44685
-44682
-44681
-44680
-44684
-44690
-44676
-44689
-44688
-44687
-44686
-44691
-44686
-44678
-44670
-44677
-44659
-44669
-44670
-44672
-44664
-44672
-44660
-44658
-44656
-44655
-44654
-44653
-44652
-44651
-44649
-44650
-44630
-44649
-44650
-44643
-44642
-44641
-44639
-44638
-44637
-44636
-44635
-44634
-44633
-44645
-44648
-44646
-44629
-44628
-44627
-44626
-44625
-44624
-44622
-44623
-44621
-44620
-44619
-44618
-44617
-44616
-44614
-44612
-44610
-44612
-44611
-44594
-44592
-44591
-44607
-44606
-44605
-44604
-44603
-44575
-44574
-44589
-44588
-44587
-44586
-44585
Remarks Closed in days Priority2
R2
R2
R2
R2
R2
R2
R2
R2
R2
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
10 Medium
10 Medium
10 Medium
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
1 R1
1 R1
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
30 R4
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
30 R4
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
30 R4
15 R3
15 R3
15 R3
15 R3
15 R3
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
15 R3
15 R3
15 R3
30 R4
30 R4
30 R4
15 R3
0 0
0 0
0 0
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
0 R0
0 R0
0 R0
15 R3
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
15 R3
15 R3
15 R3
15 R3
15 R3
30 R4
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
0 R0
15 R3
15 R3
15 R3
15 R3
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
30 R4
0 R0
0 R0
0 R0
0 R0
0 R0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
15
0 R0
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
0 R0
0 R0
0 R0
0 R0
0 R0
0 R0
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
30 R4
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
0 R0
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
0 R0
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R2
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
15 R3
30 R2
30 R2
30 R2
30 R2
30 R2
30 R2
30 R2
30 R2
30 R2
15 R3
15 R3
15 R3
30 R2
15 R3
R3 15
R3 15
R3 15
R3 15
R3 15
R3 15
R3 15
R3 15
R2 30
Month wise Safety Observations FY 22-23
Month Count Chart
Apr-22 90 800
May-22 102
700
Jun-22 103
Jul-22 227 600
Aug-22 232
500
Sep-22
Oct-22 400
Nov-22 300
Dec-22
200
Jan-23 102 103
90
Feb-23 100
Mar-23 0
Total 754 44652 44682 44713
Chart Title
754
227 232
90 102 103
44774 Total
Last First Aid Case 5-Sep-21 sep'21 25
Oct'21 31
Nov'21 30
Dec'21 31
Jan'22 31
Feb'22 28
Mar'22 31
Apr'22 30
8
Trained Manhours
Month Trained Number Duration Trai
Apr-22 113 75
800
May-22 128 73
Jun-22 247 381 700
Jul-22 189 153 600
Aug 169 304
Total 677 682 500
400
300
200 128
113
100 75 73
0
44652 44682
Train
Trained Manhours FY 22-23
677 682
381
304
247
189 169
128 153
75 73
150
100
50
0
Apr-22 May-22 Jun-22 Jul-22 Aug-22
90
85
80
75
70
Apr-22 May-22 Jun-22 Jul-22
Chart Title
Chart Title
160
140
120
100
80
60
40 83
52 51
20
14 12 5
0 0 2 0 0
Apr-22 May-22 Jun-22
R2-within 7 days R3-Within 15 days R1-within 1 day R2-within 7 days R3-Within 15 days
Open Observations
R1 R2 R3
Apr'22 0 0 24
May'22 0 0 37
Jun'22 0 0 15
Jul'22 0 0 28 Chart Title
Aug'22 0 0 38
40
35
30
25
20
15
10
5
0
Apr'22 May'22 Jun'22 Jul'22
R1 R2 R3
Chart Title
R1 R2 R3