Jms Civil Work - RGTP p20220019 Esb Con Jms 9243 0005
Jms Civil Work - RGTP p20220019 Esb Con Jms 9243 0005
PROJECT
Contract No:
3400190474/5658
Document No: Revision: Page No:
RGTP-P20220019-ESB-CON-JMS-9243-0005 A 1 of 13
DOCUMENT TITLE
OWNER
Document Class: Z / X / O / I
TABLE OF CONTENTS
SAJ WATER TANK IMPROVEMENT
PROJECT
Contract No:
3400190474/5658
Document No: Revision: Page No:
RGTP-P20220019-ESB-CON-JMS-9243-0005 A 2 of 13
1. PURPOSE...................................................................................................................3
2. SCOPE........................................................................................................................ 3
3. RESPONSIBILITY.......................................................................................................3
3.1 Project Manager and Project Engineer.............................................................3
4 MANPOWER...............................................................................................................4
4.1 INDIRECT WORKER...........................................................................................4
4.2 DIRECT WORKER...............................................................................................5
5 EQUIPMENT AND TOOLS.........................................................................................5
6 WORK SEQUENCE FLOW.........................................................................................6
7 SITE ACTIVITIES........................................................................................................6
7.1 MOBILIZATION AND DEMOBILZATION.............................................................6
7.2 SURVEY AND SETTING OUT.............................................................................7
7.3 EXACATION AND SHORING..............................................................................8
7.4 REBAR, FORMWORK & CONCRETING WORKS...................................................9
8 HEALTH & SAFETY PRECAUTION.............................................................................12
8.1 SAFETY AT SITE....................................................................................................12
8.2 PROTECTIVE AND SAFETY EQUIPMENT............................................................12
9 . HEALTH & SAFETY PRECAUTION...........................................................................12
10 . ATTACHMENT.......................................................................................................... 12
SAJ WATER TANK IMPROVEMENT
PROJECT
Contract No:
3400190474/5658
Document No: Revision: Page No:
RGTP-P20220019-ESB-CON-JMS-9243-0005 A 3 of 13
1. PURPOSE
The purpose of this Method Statement is to outline the general requirements and
precautionary description of the Foundation Works.
2. SCOPE
Scope of this method statement is to define the sequence and methodology for the
construction involving the following activities:
1. Excavation
2. Dewatering
3. Shoring method
4. Foundation-Rebar-Formwork-Concrete
3. RESPONSIBILITY
Supervise closely, the activities designated to them and ensure that all
instructions and safety procedures are followed and strictly adhered to.
Supervise the work to ensure that technical, quality, safety, and purchase
order requirements are met; Attend daily site meetings and communicating
his daily report with the Engineer.
SAJ WATER TANK IMPROVEMENT
PROJECT
Contract No:
3400190474/5658
Document No: Revision: Page No:
RGTP-P20220019-ESB-CON-JMS-9243-0005 A 4 of 13
3. Ensure that the project’s method statement and risk assessment are
understood and complied and applied in the worksite.
4. Ensure that all workers are provided with sufficient information regarding
workplace
4 MANPOWER
The following personnel will be direct and indirect involved in piping fabrication and
installation activities. The number of workers shall be based on the works, volumes and as
where required.
No Description Qty
1 Project Manager 1
2 Project Engineer 1
3 Site Supervisor 1
5 Logistic Supervisor 1
Contract No:
3400190474/5658
Document No: Revision: Page No:
RGTP-P20220019-ESB-CON-JMS-9243-0005 A 5 of 13
No Description Qty
1 Civil Supervisor 1
Tools and equipment shall be verified and certified/stickered before deployed on site by
RGTP Inspector. Necessary approval shall be obtained from local authorities as required.
Daily visual inspection shall be conducted by operator/tool user. The following tools and
equipment will be utilized for piping fabrication and installation activities as and when
necessary, to assist the work. The quantity is depending on the scope of works.
No Description Qty
1 Excavator 1
2 Backhoe 1
5 Crane 25 Ton 1
6 Cutting Machine 1
7 Bending Machine 1
8 Manual Compactor 1
SAJ WATER TANK IMPROVEMENT
PROJECT
Contract No:
3400190474/5658
Document No: Revision: Page No:
RGTP-P20220019-ESB-CON-JMS-9243-0005 A 6 of 13
Preparation works prior to any construction are required to ensure the subsequent
construction action can be performed without much interruption. Those preparation
work shall be listed as below:
Dewatering
Preparation Survey and Excavation
Demolition (if rains)
of works setting out
Subbase
Shoring
Concreating Rebar Work Preparation
7 SITE ACTIVITIES
1. Inspection of machineries and equipment and tools for foundation activities with
IRSO and RGTP. Only fit and inspected equipment are to be utilized for the
work to have smooth and safe work execution. As such those machineries and
equipment are to be inspected for their fitness by OWNER.
2. Mobilization of equipment, material, and tools to work site by using lorry/ pick
up. All the inspected machineries and equipment are to be mobilized to ensure
smooth execution of the works.
3. All the equipment and machineries shall be properly barricaded at work site
using appropriate barricaded markers. Hoarding in some situation is deem
necessary as the hoarding barricade to prevent other workers who are not
associated with the work to enter the work site.
4. Put the signage around the barricade area. The required signages shall be
provided at the work area to alert all the workers. The signages that have been
identified for this excavation work are as follow.
SAJ WATER TANK IMPROVEMENT
PROJECT
Contract No:
3400190474/5658
Document No: Revision: Page No:
RGTP-P20220019-ESB-CON-JMS-9243-0005 A 7 of 13
1. Before work start, contractor should establish baseline and benchmarks from which
co-ordinates and elevations will be taken out the foundation works.
7.3 DEMOLITION
Excavation certificate
Permit to Work (PTW)
3. Identify nearby existing facilities (foundation, cable and etc) prior to start
excavation work.
4. The backhoe operator and workers shall be briefed on the risk assessment,
method statement and PTW.
5. Excavation will generally be executed in open cut to the size, slope and
elevation shown in the dimension below:
Contract No:
3400190474/5658
Document No: Revision: Page No:
RGTP-P20220019-ESB-CON-JMS-9243-0005 A 8 of 13
6. It is estimated that the total of 145 m3 of soil to be removed for the excavation
work. This volume amounted to approximately 215 tons.
7. Excavation will be carried out with excavator and the excavated material
loaded directly into lorry tipper and transport out to the dumped area inside the
RGTP area.
8. A small bucket or manual digging will be used when reaching the final bottom
of the foundation.
10. After excavation works has been completed, proceed with next activities while
checking the integrity of shoring from time to time.
11. Used black canvas size 2m x 100m and cut as per dimension of the excavate
area to prevent from the ground collapsing.
12. The excavated ground shall have risk of ground collapsing if without proper
protection or mitigation. For our excavation work, the protection from the
collapsed earth shall be avoided.
13. The subbase shall be compacted to the required compaction requirement. The
manual compactor with 500kg spec shall be utilized for this activity. Crusher
run shall be laid and finally level up with the 50mm lean concrete to set the
bottom level of the foundation.
14. Proceed with construction when the excavation area has been stabilized
Contract No:
3400190474/5658
Document No: Revision: Page No:
RGTP-P20220019-ESB-CON-JMS-9243-0005 A 9 of 13
1. Standard length of rebar shall be cut to the required length according to the
approved bar bending schedule/ cutting sheet.
2. Used rebar as mentioned in approved doc RGTP-EHSB-CVS-MTO-001.
3. The cutting machine operator will setup length and quantity of rebar to be cut.
After that, rebar will be grouped per size and diameter.
4. Cut the rebar by using rebar cutting machine as the CONTRACTOR will
fabricate the rebar at their own workshop.
5. The rebar shall be bend as per drawing RGTP-EHSB-CVS-DTL-001.
6. Rebar bending work will be carried out using rebar bending machines.
7. Used galvanized iron wire and welding to create the shape of the foundation as
per drawing and create at their own workshop.
8. Completed cut and bent rebar shall be inspected and approved cut and bend
rebar shall be properly bundled before sent to the work area at RGTP.
Contract No:
3400190474/5658
Document No: Revision: Page No:
RGTP-P20220019-ESB-CON-JMS-9243-0005 A 10 of 13
Contract No:
3400190474/5658
Document No: Revision: Page No:
RGTP-P20220019-ESB-CON-JMS-9243-0005 A 11 of 13
1. Ensure that all reinforcement and other cast in items are properly installed and
checked.
2. Concrete mixer lorry will pour the ready-mix concrete to the concrete bucket
that had attach to the crane.
3. The dimension of the concrete bucket is 1.2m height x 0.8m width. Pour half of
the concrete to the concrete bucket to prevent overload of the weight.
4. Concrete bucket can support at least 120 kg weight.
5. Using the same method as lifting the rebar for the concrete bucket.
6. Concrete finishing level shall be marked on formwork and verified by the site
engineer. Provide level guide when necessary.
7. During concreting, concrete must be properly vibrated to ensure good
compaction.
8. Level the concrete and finish the surface either with wood or steel trowel
depending on the requirement.
9. After the concrete set, apply curing compound or water for curing.
10. After removing the mold, the extra spacing will pour with crusher run.
Contract No:
3400190474/5658
Document No: Revision: Page No:
RGTP-P20220019-ESB-CON-JMS-9243-0005 A 12 of 13
8.1 SAFETY AT SITE
8.1.1 All personnel shall attend PGB-RGTP induction to enter PIC. All
employees and subcontractors will be made aware during daily site
toolbox talk of any risks their work can expose themselves and
others in the vicinity. Work will only commence when adequate
protection is in place. Site supervisor will liaise with the OWNER
Construction Team on matter of safety to ensure worker protection.
Assign work leader shall attend RGTP WL Training to become work
leader. All personnel shall obtain valid Working at Height Training
before working at height.
8.1.2 Obtain valid PTW and any other certificate related of the works.
All workers engaged in the job site shall wear mandatory PPE and provide emergency
medical facilities or kit in accordance to HSE plan.
10 . ATTACHMENT
1. RGTP-EHSB-CVS-DTL-001