Professional Documents
Culture Documents
Naveen Resume PDF
Naveen Resume PDF
Naveen Resume PDF
com
Naveenkumar Nagarajan +91 9551363294, 9700447573
Assistant Manager in Electromechanical Bangalore, India.
Hardware Packaging
"A self-motivated professional with 7 years and 8 months of
experience in Automotive Electromechanical Product Design
and Development /Vehicle Integration."
CERTIFICATES
WORK EXPERIENCE
Senior Design Engineer
Satyam Ventures Engineering Services Pvt Ltd.
Assistant Manager – Vehicle Integration 05/2014 – 03/2019 Hyderabad, India
OLA Electric Mobility Pvt Ltd
08/2021 – Present Bangalore, India Projects: Ford, Daimler, Mercedes Benz and Chrysler –
Design and Migration
Projects: S1 Air E-Scooter - Design and development Products: Seat Belts and Airbags (ZF TRW OSS).
Products: Motor Controller Unit – MCU In House Making /
Vehicle Integration Role – S1 Air E-Scooter
Active key Member in project 20k which involves
Migration of Occupant safety systems product from
Perform and Manage Activities of Team members Catia V4 to Catia V5 through VPM.
with Product design including Modelling, Drawings Drawing, Assembly & sub- assembly creation for Seat
and Tolerance stack-up for MCU. Belt retractors system through VPM.
Total ownership of Components from concept to Working with cross functional team to streamline
SOP. process and reduce cost.
Responsible to Review, interpret and establish Work on Value Engineering idealization, proposals
product requirement. and implementation actions
DMU Packaging of Electronic Components, Clash Perform design review meeting with Supplier to
and clearance check, BOM Managements, Weight freeze design within project deadline.
and Cost Target Validation for S1 Air E-Scooter
Mule and Main Vehicle
Establish detail break down of the activities to
meet the Project milestones.
Responsible for CFT Meeting with Respective
Aggregate, Styling Team, Manufacturing Team,
program And Sourcing Senior Design Engineer
Homologation - Incorporating and updating design Satyam Ventures Engineering Services Pvt Ltd.
changes in vehicle as per legislative requirement 05/2014 – 03/2019 Hyderabad, India
Monitoring Validation issue and Proto activities for
Mule and Main Vehicles Projects: Ford and Lincoln - New Product Development
Preparation & Release of Vehicle Technical Spec for Products: Head Lamp Switches Assembly (ZF TRW BCS).
S1 Air E-Scooter
New concept RFQ of Head lamp switches assembly
for Ford and Lincoln versions
Senior Engineer Generation of class B surfaces from provided Class A
surfaces for HLS products (Bezel, Button caps,
Valeo India Pvt Ltd
Thumbwheel )
03/2019 – 07/2021 Chennai, India
Design change proposals for HLS components like
Projects: BMW, RSA and Rivian. - Design and development Actuators, keypads, Rear Cover, Guide Structure etc
Products: Onboard Charger, Inverter and DCDC Converter Creation of Production Drawings in accordance with
ASME standards and responsible for both 3D and 2D
Release.
Perform product design including 3D Modelling, To prepare reports & arrange the internal review to
2D drawing, and Tolerance stack-up for meet the customer requirements.
powertrain Electrification products (Onboard
chargers, DC DC converter and Inverter) associated To close all product development issue and freeze
product specifications.
with Hybrid & Electric Vehicle) and E-motor Power
electronics. Check and review complete tooling feasibility of the
product to ensure Tool launch and SOP.
Total ownership of Components from concept to
SOP.
Projects: Audi, BMW, Nissan and VW – Benchmarking and
Responsible to Review, interpret and establish Product Development
product requirement from customer. Products: Steering Wheel, DAB and KNAB (ZF TRW
Experience in Manufacturing, Assembly feasibility OSS).
study (DFM/A) & Perform Internal Design review.
Working with cross functional team to streamline Product Analysis
process and reduce cost.
Functions Identification & Details
Work on Value Engineering idealization, proposals
and implementation actions Tear Down of the Module
To Perform Clearance and Creepage analysis
BOM Preparation - Part Numbering, Packing
Details, Assembly Fitment & Costing @ Part Level
manually and with Autocrear software
& Assembly Level.
Perform design review meeting with Supplier to
freeze design within project deadline.
Detail Analysis -Identification of Material,
Manufacturing Process, significance of each feature
Validate & follow-up of all Project documents using in the component.
PLM (Enovia).
Design Analysis –Assembly sequence, Mechanism,
Travels, Stopper, Illumination, Light leakage, Dust &
Water Protection, Wobble Avoiding.
Functional Comparison Analysis –Parts per
function, Cost per function.
Future Design Prospects –Identification of Best
Practices, Suggestions for Improvement, Tentative
cost savings from the suggestions
Steering Wheel Assembly LED concept design for
VW and BMW.
Design and Development of Airbag Cover for KNAB
for both PR and DR side for Nissan L21B.
DECLARATION
I do hereby declare that the above furnished details are true to the best of my knowledge.
Place: Bangalore.
Date: (Naveenkumar.N)