~: GENERAL REPORT :-
NAME OF WORK :-
ESTIMATED COST :- Rs. 600000.00
‘AUTHORITY =
NECESSITY :-
4
‘PROVISIONS :-
‘The following provisions are made in the estimate :-
4 Excevation foundation in earth soll of alltype 1.20 m depth
2 Excevation foundation in hard murum 0.60 m depth
'3.80-mm Solingin plinth & Floor.
4 Providing ang laying in Sit, P.C.C.M-10 in foundation
5 Providing & laying in Situ C.C. M-20 for R.C.C. Footing , Column, Beam
6 Providing & fixing in position Steel reinforcement
7 8.8, masonry for foundation & Super Structure,
8 Providing M-35 For Coping
9 Providing & fixing in Collasble steel Gate,
+10 Providing & fixing in mild steel grill Work.
‘The Rates adopted from S.S.R. for year 2021-22
‘Maharashtra State. The work will be carried out as per Standard
Se ee eae na
[Gp scanned with Oken ScannerESTIMATES
Division
sub Division
sanctioned Estimate No. :
Fund Head
[Gp scanned with Oken ScannerNAME OF WORK :- TIN SHED FOR
TQ:- PUSAD DIST:- YAVATMAL
GENERAL ABSTRACT
[5.NO. ITEM OF WORK [ amount}
1 COSTOF WORK 531948,00
2 ADDGST 12% 63833.76 he
5__ADD CONTINGENCIES 4218.00 ve
Seater Total] __599999.76 {
say ‘600000.00
[Gp scanned with Oken ScannerNAME OF WORK :- TIN SHED For,
TQ:- PUSAD DIST:- YAVATMAL,
ABSTRACT
[s.NO. [ITEM OF WORK
1 [Providing structural steel work in trusses, other
similar trussed purtins and members with al bracing,
susset plates etc. as per detailed designs and
Jtrawings or as directed including cutting,
fabricating, hoisting, erecting fixing in position,
ICSR INO. 23.04 PAGE NO 129
2° Providing ‘and ‘fixing corrugated galvanised Won
sheets of 0.63mm thick (24 B.W.G,) for
roofing
without wind tiles including fastening with
galvanised iron screws and bolts, lead and bitumen
washers as per drawing etc. complete.(Weight of 5.5|
Kilozram/sa.m.)
'BG.R.S, Page Number 453
ICSR I.NO. 38.04 PAGE NO 224 115.20 | 816 | _#REF! | 9403.20
3. |Filling im plinth and floors with contractors
‘material/brought from outside and approved by
[Engineer incharge in layers of 15 cm to 20 cm
including watering and compaction etc,
lcomplete.
ary. [RATE | UNIT | AMOUNT
0.66 | 106161 | MT. 70411.57
|As directed byEngineer in charge.
[CSRitem no 46.13 Page no 283 5.94] 550.00|Cum 3267.00
[a Providing and laying Cast in situ/Ready Mix
cement concrete in M-10 of trap/ granite/
jquartzite/ gneiss metal for foundation and
‘bedding including bailing out water, Steel
[CSR item no 24.01 Page no 131 3.88[ 6252.20|cum 2426.35
5 electrification inthe shed lumpsum amt. 5000.00
6 _|machinary required for the peoject. Tumpsum amt 250000.00
7 water wupply provision to the shed lumpsum amt. 3000.00)
other amenities in the shed lumpsum amt. 3500.00
TOTAL Rs. 531948.12
Say Rs. _§31948.00
—— i _____—_|_§_____say Bs._531948.00_
eae i
[Gp scanned with Oken Scanner* NAME OF WORK :- TIN SHED FoR.
TQ:- PUSAD DIST:- YAVATMAL
MEASURMENTS
Is. NO. [ITEM OF WORK NO L B_ | D/H | QTY. |UNIT
1 [Providing structural steel workin trusses, other
[similar trussed purlins and members with all
lbracing, gusset plates etc. as per detailed
Jdesigns and drawings or as directed including
Jcutting, fabricating, hoisting, erecting fixing in
CSR LNO. 23.04 PAGE NO 125
for one truss equal angles length Wt./m !
|75x75x6 mm_ 10.00 3.50 35.00 680 238.00
{SOxSOx6 mm_ 24.00 3.50 84.00 4.50 378.00
|50x50x6 mm 5.00 210 10.50 4.50 47.25
{S0x50x6 mm 0.00 1.50 0.00 4.50 0.00
0.00 6.50 0.00 4.50 0.00
663.25 kg
2.00 663.25
0.66 MT
[Providing and fixing corrugated galvanised
iron sheets of 0.63mm thick (24 B.W.G.)
32,00 3.00 1.20 115.20. Sq.m.
115.20 _Sq.m._
nth and floors with contractors
from outside and approved
ge in layers of 15 cm to
watering and compaction
byEngineer in charge.
0 13 Pi
[Gp scanned with Oken Scanner[electrification in the shea Tumpsum amount
Imachinary required for the peoject lumpsum amount
[water wupply provision to the shed
lumpsum amount
‘g_ other amenities in the shed lumpsum amount
=
[Gp scanned with Oken ScannerNAME OF WORK :- TIN SHED FOR.
TQ:- PUSAD DIST:- YAVATMAL
RATE ANALYSIS
7 Providing structural steel work in trusses, other similar trussed purlins and members with all bracing, gusset
plates etc. as per detailed designs and drawings or as directed including cutting, fabricating, hoisting,
CSRI.NO. 23.04 PAGE NO 129
CSR RATE Rs, 105909 MT
add carting for stee! } irae Bem
TOTAL Rs. 106161 MT
2 Providing and fixing corrugated galvanised iron sheets of 0.63mm thick (24 B.W.G.) for roofing
without wind tiles including fastening with galvanised iron screws and bolts, lead and bitumen washers as per
drawing etc. complete.(Weight of 5.5 Kilogram/sq.m.).
BARS, Page Number 453
CSR LNO. 38.04 PAGE NO 224
CSR RATE Rs. 816 Sq.m,
TOTAL Rs. 816 Sq.m.
3 Filling in plinth and floors with contractors material/brought from outside and approved by Engineer |
incharge in layers of 15 cm to 20 cm including watering and compaction ete.
(CSR Item no 46.13 Page no 283
CSRRATE Re. = 550. Cum
Total rate, 350
4 Providing and laying Cast in situReady Mix cement concrete in M-10 of trap/ granite/ quartzite!
‘gneiss metal for foundation and bedding including balling out water, Steel centering, formwork,
SSRITNo, 2401 PNo. 5538.00 CUM
| DEDUCT scada 5% 120.00
5819.00 |
| 4 Add for Carting of Metal 094 Cum 422.38 397.05 |
2.Add for Carting of sand 0.470 Cum 809.81 380.61 |
3.Add Carting of Cement 4.40 Bag. 12.62 55.53 |
Total Rate Re 6252.19 /CUM
SayRsi- 6252.20 CUM
5 electrification in the shed ‘As per quotation
6 machinary required for the peoject. ‘As per quotation
7 water wupply provision to the shed ‘As per quotation
‘As per quotation
8 other amenities in the shedNAME OF WORK :-TIN SHED FoR.
LEAD STATEMENT
SNo] Material
Quarry Lead in Lead | Remark
Location Km Charges
i Total lead | __Unit
3 Cr. Metal 12/20 |nimbhi 20.00 422.39 Cum
21.00 435.76 ‘Cum
2_| 40mm Metal crusher _|rimbhi 20.00 422.39 ‘Cum
21.00 435.76
3 40mm Metal [nimbhi 20.00 422.39 ‘Cum
21.00 435.76
80mm Metal [nimbhi 20.00 404.79 ‘Cum
21.00 298.43
3 imbhi 20.00 516.75 ‘Cum
Masonry Stone/Rubble = ia
6 Sand [Dhanoda 55.00 809.81 ‘Cum
3 56.00 819.18
eg. BRICKS. [pusad 15.00 812.99 Cum
Re 16.00 850.04 ‘Cum
| [8 [FLOORING TILES [pusad 15.00 25.24 ‘Cum
16.00 26.39 Cum
PAVER BLOCKS _ |pusad 15.00 360.62 ‘Cum
16.00 377.06 ‘Cum
Murum [pusad 15.00 340.69 ‘Cum
15.00 340.69
‘Cement pusad a ears. 00) 252.43, 12.62,
16.00 263.94 13.20
Per Bag |
Steel [pusad 15.00 252.43 Per MT
16.00 263.94