– Project Name – Project Description 1


The Creative City

– Project Name – Project Description 2


Badyã – Project Presentation

30th April 2018


Badyã – The Creative City

Table of Content

 Site Location
 Introducing the Masterplan
 Planning Principles
 The 6 Districts
 Phasing Strategy
 Phase 1A
 Sustainability Strategy
 Key Visions
 Apartments
 Villas
 Marketing Material

30.04.2018 – Project Name – Project Description 4


Site Location

– Project Name – Project Description 5


Badyã – The Location

30.04.2018 – Project Name – Project Description 6


Site Location

Future developments surrounding site

Badya becoming the centre of gravity


within the 6th of October Development

13.02.18 – 6th of October Oasis 7


Site Location

Site Parameters

Site Topography Density gradient Optimizing air circulation

highest point: under 270 m in High density apartment areas Exploit potential of natural
the south shields lower density luxury cooling to ensure good
lowest point:190 m in the north housing from existing lower climate conditions on site
level change: 80 m over 3 km quality housing

13.02.18 – 6th of October Oasis 8


Introducing the Masterplan

– Project Name – Project Description 9


Introduction the Masterplan

Key Facts

Resid
en
re tia
tu l

uc
str
Infra

M
ix
s
ed
ce -U
Spa se
Green

ca. 153,000 inhabitants 3000 feddan Integrated Approach

30.04.2018 – Project Name – Project Description 10


Introduction the Masterplan

The Masterplan

decentralized
+
multifunctional
approach

30.04.2018 – Project Name – Project Description 11


Introduction the Masterplan

> 50 local centres


6 district centres
1 main urban centre

decentralized

30.04.2018 – Project Name – Project Description 12


Core
Introduction to the Project Sports Area
Villas Club
Key Facts
Apartments Apartments
Uni

Villa
Hill Int.
School
Business
Mall Park Int.
School
District
Centre

Local
Centre

Local
Centre
Villas

multifunctional
approach

– Project Name – Project Description


30.04.2018 13
Introduction the Masterplan

The Land Use Plan (for internal use)

Green/Open Space Network

International School

Transit Hub

University Campus

Urban Core Area

Sports Club

District Centre

Local Park

Neighbourhood Centre

Apartment Clusters

Villa + Townhouses

Religious Facility

Office Park

Big Box Commercial/ Mall

30.04.2018 – Project Name – Project Description 15


Planning Principles

– Project Name – Project Description 16


Planning Principles

Residential Distribution

Residential Areas Skyline Creation

47% villas + townhouses


53% Apartments

30.04.2018 – Project Name – Project Description 17


Planning Principles

Landscape Design

Green Network

22% of green open spaces Open Space Hierarchies

30.04.2018 – Project Name – Project Description 18


Planning Principles

Prime Locations

• direct access to green and


unobstructed views

• optimized local microclimate

• the lush green has cooling


effects and provides shade

30.04.2018 – Project Name – Project Description 19


Planning Principles

Indentifying Prime Locations – Parkview Analysis

30.04.2018 – Project Name – Project Description 20


Planning Principles

Masterplan Design

Special Use Areas

Neighbourhood Facilities District Facilities City Facilities


in < 5 minutes walking distance in < 10 minutes cycling distance in < 15 minutes cycling distance

30.04.2018 – Project Name – Project Description 21


Planning Principles

Principle: Distribution of Facilities

30.04.2018 – Project Name – Project Description 22


Planning Principles

Road Hierarchy
highly
connected
road network

30.04.2018 – Project Name – Project Description 23


Planning Principles

Slow Traffic Network


225 km
pedestrian and
cycle routes

• dense slow traffic network

• main routes are located within the


green network

• the slow traffic network always


offers the quickest and most direct
connection to points of interest

30.04.2018 – Project Name – Project Description 24


Planning Principles

Space Syntax Analysis


Car Metric Choice Analysis Pedestrian Metric Choice Analysis

Conduction of Space Syntax Analysis to ensure high quality of connectivity,


especially for pedestrian and cyclists.

30.04.2018 – Project Name – Project Description 25


Planning Principles

City Private Electric Transport

• private electric bus transport system

• reduction of on-site traffic

30.04.2018 – Project Name – Project Description 26


The 6 Districts

– Project Name – Project Description 27


The 6 Districts

District Concept

30.04.2018 – Project Name – Project Description 28


The 6 Districts

District Concept
1
Core Area

6
Unique Districts
with 1 district centre each

30.04.2018 – Project Name – Project Description 29


The 6 Districts

District

30.04.2018 – Project Name – Project Description 30


The 6 Districts

Core

30.04.2018 – Project Name – Project Description 31


The 6 Districts

District Structure

Badya District Center Badya Apartments Badya Villas

Serving villa and Different Different Villa


apartment clusters Apartment typologies set
with services of typologies form a in green
daily and weekly superblock which landscape -
needs is set in a green limited back-to-
landscape back
development

30.04.2018 – Project Name – Project Description 32


The 6 Districts

District Centre

30.04.2018 – Project Name – Project Description 33


The 6 Districts

District Structure

Badya Green Spine Badya Mobility

Interconnecting the Cycling and


entire development Pedestrian Network
through a green +
network. Public Transport
+
Individual Transport

30.04.2018 – Project Name – Project Description 34


Phasing Strategy

– Project Name – Project Description 35


Phasing Strategy

Phasing

30.04.2018 – Project Name – Project Description 36


Phasing Strategy

Phase 1 Masterplan

30.04.2018 – Project Name – Project Description 37


Phasing Strategy

Phase 1A Masterplan

Phase 1A Location

30.04.2018 – Project Name – Project Description 38


Phase 1A

– Project Name – Project Description 39


Phasing Strategy

Phase 1A Masterplan
Phase 1A – 140 ha
(332 fd)

• 37,8 % residential
• 8,3 % special use
• 22,3 % open spaces
• 31,7% infrastructure

30.04.2018 – Project Name – Project Description 40


Phase 1A
Village Green
The Green City

30.04.2018 – Project Name – Project Description 41


Phase 1A

The Green City

Urban Green
30.04.2018 – Project Name – Project Description 42
Phase 1A

The Green City

The Badya Park

30.04.2018 – Project Name – Project Description 43


Phase 1A

The Green City

> 95% of the


population lives
within 2 minutes to a
park

30.04.2018 – Project Name – Project Description 44


Phase 1A

Connecting the
neighbourhood centres

Each neighbourhood is
developed around a
central plaza.

The plazas are


Villa neighbourhood

connected through an Apartment


Neighbourhood

integrated network. District centre

Green corridors
Main connections

30.04.2018 – Project Name – Project Description 45


Phase 1A

Local Visibility Analysis


Metric R100

Enhanced legibility
through clear visual
hierarchy

Local centres are


clearly visible within
the neighbourhood

30.04.2018 – Project Name – Project Description 46


Phase 1A

The neighbourhood centres

> 99% of the


population lives
within 3 minutes to
a neighbourhood
square

30.04.2018 – Project Name – Project Description 47


Phase 1A

The Neighbourhood Centres

30.04.2018 – Project Name – Project Description 48


Phase 1A

Dense Pedestrian and Cycle Network

Dense Pedestrian and Cycle


Network within Green
Corridors

30.04.2018 – Project Name – Project Description 49


Phase 1A

Security System

Multi-layered security concept

Pedestrian Gates

Car Gates

30.04.2018 – Project Name – Project Description 50


Pleasant Design and Integration of Manned Gates at
Phase 1A Compound Entrances

Security Concept

Gate-like Landmark Structures at District Entrances

Number Plate Recognition Software Facial Recognition Software on Building Level

30.04.2018 – Project Name – Project Description 51


Phase 1A

The Grand Entrances

• The villa compounds are accessed via a


representative, landscaped alley

• feature neighbourhood building or highly


landscaped plaza with water features
provides for a pleasant visual landmark
at the end of the alley

30.04.2018 – Project Name – Project Description 52


Phase 1A

The Grand Entrances

30.04.2018 – Project Name – Project Description 53


Phase 1A

The Living Street Concept

• Shared Space Approach on a certain


road category in villa + apartment sector

• No clearly defined boundaries between


pedestrian and car space 13 m wide road with reduced speed to access villa plots

• aims to increase public realm quality and


reduce the traffic speed

• living streets can be seen as an


extension of the living space of the
residents

20 m wide road with reduced speed to access apartments

30.04.2018 – Project Name – Project Description 54


Phase 1A

The Living Street Concept

30.04.2018 – Project Name – Project Description 55


Phase 1A

Development Figures

~ 25% villa units

~ 75% apartment units

25.01.18 – 6th of October Oasis 56


Sustainability Strategy

– Project Name – Project Description 57


Sustainability Strategy

Sustainability Strategy

Reduction of Water
Consumption by 30% through Central Data Management
...

... minimising Water Loss... Smart Home Packages

... and reusing Greywater High Speed Wifi

13.02.18 – 6th of October Oasis 58


Sustainability Strategy

Sustainability in Apartment Sector

Greywater Recycling in Apartment Blocks Residential End Use of Water per


household

13.02.18 – 6th of October Oasis 59


Sustainability Strategy

Sustainability in Apartment Sector


Grey Water Reusing

- Using grey water for local sanitary use


(save up to 27% of fresh water)

- Use treated sewage water for irrigation

13.02.18 – 6th of October Oasis 60


Sustainability Strategy

Sustainability in Apartment Sector


Sustainability Measures on Building Level

13.02.18 – 6th of October Oasis 61


Key Visions

– Project Name – Project Description 62


Key Visions

Badya – Key Visions

the safe + the green + active the walkable city the smart + the creative city
livable city city sustainable city

30.04.2018 – Project Name – Project Description 63


The Apartments

– Project Name – Project Description 64


Architecture

Courtyard Building Typology

– Project Name – Project Description


30.04.2018 65
The Apartments

Green Courtyards

Example for Layering of green elements to provide shade and privacy on all levels

13.02.18 – 6th of October Oasis 66


Architecture

Exclusive Apartments Luxurious


Penthouses

Enhanced
privacy through
Shading
layered
Structures
landscape
design

Water
Feature
Lush Green
Courtyards

– Project Name – Project Description


30.04.2018 67
The Apartments

Green Courtyards

• Shaded gathering areas and playgrounds

• Vegetative elements in different layers should be


used as shade donors

• Garbage areas must be framed by green buffer to


provide a visual and odour barrier

• Fire service accesses must be provided

13.02.18 – 6th of October Oasis 68


Architecture

The Apartments – Linear Typology

– Project Name – Project Description


30.04.2018 69
The Renderings – Apartment – Linear 01

13.02.18 – 6th of October Oasis 70


The Renderings – Apartment – Linear 02

13.02.18 – 6th of October Oasis 71


Architecture

The Apartments – Corner Typologies

– Project Name – Project Description


30.04.2018 72
The Renderings – Apartment – Corner 01

13.02.18 – 6th of October Oasis 73


The Renderings – Apartment – Corner 02

13.02.18 – 6th of October Oasis 74


The Renderings – Apartment – Corner 03

13.02.18 – 6th of October Oasis 75


Architecture

The Apartments – Punctiform Types

– Project Name – Project Description


30.04.2018 76
The Renderings – Apartment – Point 01

13.02.18 – 6th of October Oasis 77


The Renderings – Apartment – Point 02

13.02.18 – 6th of October Oasis 78


The Renderings – Apartment – End Type 01

13.02.18 – 6th of October Oasis 79


The Renderings – Apartment – End Type 02

13.02.18 – 6th of October Oasis 80


Architecture

High Quality Public Realm – Linear Parks

– Project Name – Project Description


30.04.2018 81
Architecture

High Quality Public Realm – Local Centres

– Project Name – Project Description


30.04.2018 82
The Townhouses

– Project Name – Project Description 83


The Renderings – Townhouse v01

13.02.18 – 6th of October Oasis 84


The Renderings – Townhouse v02

13.02.18 – 6th of October Oasis 85


The Renderings – Townhouse

13.02.18 – 6th of October Oasis 86


The Twinhouses

– Project Name – Project Description 87


The Renderings – Twinhouse 01

13.02.18 – 6th of October Oasis 88


The Renderings – Twinhouse 02

13.02.18 – 6th of October Oasis 89


The Renderings – Twinhouse 03

13.02.18 – 6th of October Oasis 90


Villa B

– Project Name – Project Description 91


The Renderings – Villa B v01

13.02.18 – 6th of October Oasis 92


The Renderings – Villa B v02

13.02.18 – 6th of October Oasis 93


The Renderings – Villa B 01

13.02.18 – 6th of October Oasis 94


The Renderings – Villa B 02

13.02.18 – 6th of October Oasis 95


Villa C

– Project Name – Project Description 96


The Renderings – Villa C v01

13.02.18 – 6th of October Oasis 97


The Renderings – Villa C v02

13.02.18 – 6th of October Oasis 98


The Renderings – Villa C 01

13.02.18 – 6th of October Oasis 99


The Renderings – Villa C 02

13.02.18 – 6th of October Oasis 100


Architecture

Villa

– Project Name – Project Description


30.04.2018 101
Villa D

– Project Name – Project Description 102


The Renderings – Villa D v01

13.02.18 – 6th of October Oasis 103


The Renderings – Villa D v02

13.02.18 – 6th of October Oasis 104


The Renderings – Villa D 01

13.02.18 – 6th of October Oasis 105


The Renderings – Villa D 02

13.02.18 – 6th of October Oasis 106


Typology Location

Location of Apartment + Villa Typologies in Phase 1A

30.04.2018 – Project Name – Project Description 107


Marketing Material

– Project Name – Project Description 108


Marketing Material

The Physical Model

• Modell of entire site, high detail level


• 3,5 x 4,5m, in 9 pieces for transport

30.04.2018 – Project Name – Project Description 109


Marketing Material

The Physical Model

30.04.2018 – Project Name – Project Description 110


Marketing Material

The Projectors

• 4 high class professional projectors


• media server, splitter
• touchpad control system

30.04.2018 – Project Name – Project Description 111


Marketing Material

The Model Animation

30.04.2018 – Project Name – Project Description 112


Marketing Material

The Model Animation

Projection Video

30.04.2018 – Project Name – Project Description 113