Professional Documents
Culture Documents
02) 320a MCCB Distribution (MCC-PS)
02) 320a MCCB Distribution (MCC-PS)
F F
04
Drawn by: Mirza Basith Baig
02
Checked by: Eng Zahid Sikandar
01
00 18-10-2021 First Issue
E Approved by: Eng Yasser Fouda E
Rev.No Date Nature of Revision Drawn by
Manufacturer:
Client:
Al kaprish co
Project:
C C
-----------------------
Consultant :
Panel name :
Document status::
As Built Production
A A
Item No: Quantity: Scale: Sheet No: Next Sheet:
01 1 No NTS 01 02
1 2 3 4 5 6 7
1600.00
1600.00
60.00
800.00 600.00 600.00
FRONT OUTSIDE VIEW -WITH MAIN DOOR RIGHTSIDE VIEW
600.00
ENCLOSURE:-
AL-MANARA MAKE .
800.00 600.00
Panel Name : Rev: Description of Revisions Date Drawn by: Mirza Basith Baig
00 First Issue 18-10-2021 Checked by: Eng Zahid Sikandar
02) 320A MCCB DISTRIBUTION (MCC-PS) AL-MANARA FACTORY
Client : FOR Panel Board 01 Approved by: Eng Yasser Fouda
Al kaprish co 02 Drawing No:
Project : 03
MF 635/21/HQ-REV(00)
----------------------- Sheet: 02 Scale: NTS 04
R Y B ACCESSORIES
Schneider
DM
32A
32A
1600.00
1600.00
63A
100A 100A
320A 63A
CONTACTOR
CONTACTOR
63A
INCOMING
SOFT STARTER
SOFT STARTER
100A
NB
EB
L2
L3
N
Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10
400/ 5A
S1
L1
S2 S1
L2
S2 S1
L3 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P
S2
100AT 100AT 100AT 63AT 63AT 63AT 63AT 32AT 32AT 20AT
E 160AF 160AF 160AF 160AF 160AF 160AF 160AF 160AF 160AF 160AF
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
N ON OFF TRIP ON OFF TRIP
QM
320AT
320AF
MCCB OFF
OFF
PILOT LAMPS
ON
ON
N R Y B
N
L1
L2 SOFT SOFT
L3
DM STARTER STARTER
S/S S/S
INCOMER
LOAD SOFT STARTER 37KW SOFT STARTER 37KW ------------------ ------------------ ------------------ ------------------ ------------------ ------------------ ------------------ ------------------
Panel Name : Rev: Description of Revisions Date Drawn by: Mirza Basith Baig
00 First Issue 18-10-2021 Checked by: Eng Zahid Sikandar
02) 320A MCCB DISTRIBUTION (MCC-PS) AL-MANARA FACTORY
Client : FOR Panel Board 01 Approved by: Eng Yasser Fouda
Al kaprish co 02 Drawing No:
Project : 03
MF 635/21/HQ-REV(00)
----------------------- Sheet: 04 Scale: NTS 04
02) 320A MCCB DISTRIBUTION (MCC-PS)
Q1 Q1
100AT 2P MCB 100AT 2P MCB
3P 3P
160AF 160AF
K1 K2
AF96-30-11-13 AF96-30-11-13
(CONTACTOR) (CONTACTOR)
K1 K2
L L
N N
F5 F5
1P 2A 1P 2A
1/L1
3/L2
5/L3
1/L1
3/L2
5/L3
CL1
CL2
CL1
CL2
PSE72-600-70 PSE72-600-70
START
START
+24V
+24V
STOP
PTC1
PTC2
STOP
PTC1
PTC2
AO1
AO1
R1C
R2C
R3C
2/T1
4/T2
6/T3
R1C
R2C
R3C
2/T1
4/T2
6/T3
LO+
LO+
R1A
R2A
R3A
LO1
LO2
R1A
R2A
R3A
LO1
LO2
L14
L13
L14
L13
C2
C2
A2
A2
B2
B2
SIGNAL
SIGNAL
SIGNAL
SIGNAL
BYPASS
BYPASS
FAULT
FAULT
R1 R1
N U V W E N U V W E
Panel Name : Rev: Description of Revisions Date Drawn by: Mirza Basith Baig
00 First Issue 18-10-2021 Checked by: Eng Zahid Sikandar
02) 320A MCCB DISTRIBUTION (MCC-PS) AL-MANARA FACTORY
Client : FOR Panel Board 01 Approved by: Eng Yasser Fouda
Al kaprish co 02 Drawing No:
Project : 03
MF 635/21/HQ-REV(00)
----------------------- Sheet: 06 Scale: NTS 04