Professional Documents
Culture Documents
Uecp-Sd-Cul - 12.1-R00
Uecp-Sd-Cul - 12.1-R00
12/1
@ CH 11+164.787
GENERAL NOTES:
CL 1. ALL DIMENSIONS ARE IN MILLIMETERS & ALL LEVELS ARE IN METERS
ABOVE MEAN SEA LEVEL (MSL).
2. ALL WORKS SHALL BE CARRIED IN COMPLIANCE WITH RELEVANT
SPECIFICATION.
3. POROUS BACKFILL TO BE PROVIDED ALONG THE ENTIRE LENGTH OF
1100 THE HEAD WALL.
1100 600 4. WEEP HOLES TO BE PROVIDED AT 1500 mm C/C STAGGERED USING
MAHAMEEGASWEWA
SHOULDER
SHOULDER
600 07 08 09 75mm DIA. PVC PIPES
5. WING WALL DIMENSIONS AND ARRANGEMENT SHALL BE ADJUSTED
15 14 13 600mm Dia. ACCORDING TO THE SITE CONDITIONS WITH THE CONSENT OF THE
EXISTING CULVERT
SOFT
SOFT
HUME PIPE (NP2) ENGINEER.
CH 11+164.787
6. THE LEADAWAY SHALL BE CLEANCED AND DEEPEND
CARRIAGE WAY CARRIAGE WAY
CL 11+164.787 X ACCORDING TO THE SITE CONDITIONS WITH THE CONSENT OF THE
600 1068 2502 2502 1069 600 ENGINEER.
4090
300 300
WEARING 7. ALLOWABLE BEARING CAPACITY SHALL BE 150 kPa.
3350
CRUSHED STONE
LEADAWAY COURSE (50mm) BASE 150mm Y 16 02 17 Y 8. IF THE REQUIRED BEARING CAPACITY IS NOT AVAILABLE AT SITE,
600
BEARING CAPACITY SHALL BE IMPROVED WITH SUITABLE MATERIAL
-2.49% 145.783 -2.49% -4.00% 145.802 UP 01 03 DOWN 9. MINOR CHANGES OF PROPOSED CHAINAGE OF THE CULVERT SHALL
145.678 -4.00%
STREAM STREAM BE DONE ACCORDING TO THE SITE CONDITION WITH THE CONSENT
1435 1722 OF THE ENGINEER.
X 10. IF REQUIRED GROUND BELOW THE CULVERT SHALL BE IMPROVED
USING AGGREGATE BASE COURSE AND THICKNESS AT THE FILL
600
144.673 -0.50% 144.667 -0.50%
144.559 144.551 SHALL BE VARIED AS PER THE SITE CONDITION
11. CACH PIT SHALL BE PROPOSED WITH CONSENT OF THE ENGINEER.
10 11 12 12. MINER CHANGES OF PROPOSED CHAINAGE AND SETTING OUT
CONCRETE CLASS EXISTING CULVERT 143.932
143.808 04 DETAILES OF THE CULVERT SHALL BE CHANGE ACCORDING TO THE
C25/30 05 06
CARRIAGE WAY CARRIAGE WAY SITE CONDITION WITH THE CONSENT OF THE ENGINEER.
600mm Dia. HUME PIPE 1000
600mm Dia. HUME PIPE 2500 2500 13. CULVERT FLOW DIRECTION TO BE VERIFIED BEFORE
(NP2) 1000
(NP2) CONSTRUCTION AT SITE ACCORDING TO LOCAL CONDITION.
SHOULDER
WIDENING LENGTH WIDENING LENGTH
SHOULDER
TO LHS TO RHS PALUGASWEWA SPECIAL NOTES
SECTION Y-Y 1. CULVERT FINISH LEVEL IS ABOVE THE ROAD FINISHED LEVE. THE
SOFT
SCALE-1:100
SOFT
DECISION WAS TAKEN BY JOINTLY WITH THE ENGINEER ON 15.12.2021.
APPROCHES SHALL BE CONSTRUCTED AS SITE CONDITION ENSURING
SMOOTH PASSING FOR VEHICLE OVER THE CULVERT.
CL EMBANKMENT PROTECTION
CONCRETE
GRASS SODDING
3350
475 1200 1200 475 1. USE FOLLOWING CONCRETE GRADES FOR STRUCTURE OR PART OF
PLAN VIEW A STRUCTURE MENTIONED BELOW WITH REQUIREMENT OF THE
SCALE-1:100 STANDARD SPECIFICATION,
145.678
a. BLINDING CONCRETE CLASS C12/15
CL EMBANKMENT PROTECTION b. HEAD WALL BASE CONCRETE CLASS C25/30
1:1 GRASS SODDING c. HEAD WALL STEM MASS CONCRETE C16/20
.5 .5 4090
1:1 d ENCASEMENT CONCRETE CLASS C25/30
845 1200 1200 845
1200
REINFORCEMENT
145.802 1. ALL BARS MARKED “T” SHALL BE HIGH YIELD DEFORMED BARS OF
1870
144.673
YIELD STRENGTH NOT LESS THAN 460N/mm2.
2. ALL BARS MARKED “R” SHALL BE HOT ROLLED MILD STEEL BARS OF
YIELD STRENGTH NOT LESS THAN 250N/mm2.
3. REINFORCEMENT BARS SHALL BE BENT ACCORDANCE WITH
370
144.108 1:1
.5 .5 STANDARD SPECIFICATIONS.
1:1
1200
4. CONCRETE COVER TO REINFORCEMENT
300
1870
5. LAP LENGTH SHALL NOT BE LESS THAN 50 TIMES THE SMALLER
50mm thk. BLINDING 144.551 LONGITUDINAL BAR DIAMETER AT THE LAP.
50
CONCRETE CLASS.12/15
370
ELEVATION OF UPSTREAM 144.232 02
SCALE-1:50 225
300
143.932 300 4R6-07(a1~a4)-190
40
38 225 38
40
CONC. GR. 20(40)
40
50mm thk. BLINDING
50
600 600 CONCRETE CLASS.12/15
G.L 4R10-06
ELEVATION OF DOWNSTREAM
375
SCALE-1:50
75 mm thk. STONE FILTER
100
LAYER BEHIND HEAD W.
TOP
01 01
STONE LINING 980
min 250
1200
REINFORCED CONCRETE
250
MINIMUM 600mm thk. 150 680 150
1500
150
300x600mm 300
50
CLAY PUDDLE 300
02
600 max
SCALE- 1:25
680
500
500
980
600 SCALE - 1:25
300
150
CLASS C25/30 38 225 38 4R6-07(a1~a4)-190
T10-04-150
50mm thk. BLINDING T10-01-200 T10-04a-150 4R10-06
50
300
CONCRETE CLASS.12/15 T10-02-300 T10-01a-200 REINFORCED CONCRETE
T10-02a-300 CLASS C25/30
150
1100
50mm thk. BLINDING
SECTION 01-01
TYPICAL SECTION OF
150
SCALE - 1:25
CONCRETE CLASS.12/15
WING WALL
(UPSTREAM & DOWNSTREAM) SECTION X-X PLAN OF GUARD STONE
TYPE - 2 ( DETAILS OF ENCASEMENT ) SCALE- 1:25
GUARD STONE ON WING WALL
SCALE-1:50 SCALE-1:25
EMPLOYER CONSULTANT CONTRACTOR Scale As Shown Project Title UPPER ELAHERA CANAL PROJECT UECP-ICB-2A
Designed A.K FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS
Drawn M.L. Drawing Title ACCESS ROAD TO NORTHERN PORTAL
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA Checked C.J. PIPE CULVERT No.12/1 @ CH 11+164.787
MINISTRY OF IRRIGATION Sheet No. REV
MAHAWELI WATER SECURITY INVENSTMENT PROGRAM PROGRAM MANAGEMENT,DESIGN AND SUPERVISION CONSULTANT CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD. Approved Y.C.Z. 00 2022.04.08 FIRST SUBMISSION Drawing No.
UECP-SD-CUL-12/1-R00 01 OF 02 00
(PMDSC) (CSCEC) Date 2022.04.08 REV DATE DESCRIPTION
GENERAL NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS & ALL LEVELS ARE IN METERS
ABOVE MEAN SEA LEVEL (MSL).
2. ALL WORKS SHALL BE CARRIED IN COMPLIANCE WITH RELEVANT
SPECIFICATION.
3. POROUS BACKFILL TO BE PROVIDED ALONG THE ENTIRE LENGTH OF
THE HEAD WALL.
4. WEEP HOLES TO BE PROVIDED AT 1500 mm C/C STAGGERED USING
75mm DIA. PVC PIPES
5. WING WALL DIMENSIONS AND ARRANGEMENT SHALL BE ADJUSTED
ACCORDING TO THE SITE CONDITIONS WITH THE CONSENT OF THE
ENGINEER.
6. THE LEADAWAY SHALL BE CLEANCED AND DEEPEND
ACCORDING TO THE SITE CONDITIONS WITH THE CONSENT OF THE
ENGINEER.
7. ALLOWABLE BEARING CAPACITY SHALL BE 150 kPa.
8. IF THE REQUIRED BEARING CAPACITY IS NOT AVAILABLE AT SITE,
BEARING CAPACITY SHALL BE IMPROVED WITH SUITABLE MATERIAL
9. MINOR CHANGES OF PROPOSED CHAINAGE OF THE CULVERT SHALL
BE DONE ACCORDING TO THE SITE CONDITION WITH THE CONSENT
OF THE ENGINEER.
10. IF REQUIRED GROUND BELOW THE CULVERT SHALL BE IMPROVED
USING AGGREGATE BASE COURSE AND THICKNESS AT THE FILL
SHALL BE VARIED AS PER THE SITE CONDITION
11. CACH PIT SHALL BE PROPOSED WITH CONSENT OF THE ENGINEER.
12. MINER CHANGES OF PROPOSED CHAINAGE AND SETTING OUT
NO. OF DETAILES OF THE CULVERT SHALL BE CHANGE ACCORDING TO THE
MEMBER BAR TYPE AND NO. OF TOTAL LENGTH OF SHAPE A* B* C* D* E* SITE CONDITION WITH THE CONSENT OF THE ENGINEER.
BARS IN F/R* mm BAR SHAPE
MARK SIZE MBRS NO. EACH BAR † mm CODE mm mm mm mm mm 13. CULVERT FLOW DIRECTION TO BE VERIFIED BEFORE
EACH
CONSTRUCTION AT SITE ACCORDING TO LOCAL CONDITION.
STREAM
C
T
A
3230
BASE
01a T 10 21 01 21 1300 21 180 980 180 SMOOTH PASSING FOR VEHICLE OVER THE CULVERT.
DOWN
02 02a A
CONCRETE
02a T 10 05 01 05 3975 00 3970
1. USE FOLLOWING CONCRETE GRADES FOR STRUCTURE OR PART OF
03 T 10 10 01 10 2150 21 665 860 665 A STRUCTURE MENTIONED BELOW WITH REQUIREMENT OF THE
03
C
A
B
STANDARD SPECIFICATION,
STREAM
UP
C
A
04 b. HEAD WALL BASE CONCRETE CLASS C25/30
B
c. HEAD WALL STEM MASS CONCRETE C16/20
ENCASEMENT
A
d ENCASEMENT CONCRETE CLASS C25/30
05 T 10 24 01 24 1325 00 1315 05
PIPE
REINFORCEMENT
03a T 10 12 01 12 2150 21 665 860 665 03a
C
A
1. ALL BARS MARKED “T” SHALL BE HIGH YIELD DEFORMED BARS OF
B YIELD STRENGTH NOT LESS THAN 460N/mm2.
STREAM
DOWN
2. ALL BARS MARKED “R” SHALL BE HOT ROLLED MILD STEEL BARS OF
04a T 10 12 01 12 2150 21 665 860 665 04a YIELD STRENGTH NOT LESS THAN 250N/mm2.
C
A
B 3. REINFORCEMENT BARS SHALL BE BENT ACCORDANCE WITH
STANDARD SPECIFICATIONS.
05a T 10 24 01 24 1600 00 1605 05a A 4. CONCRETE COVER TO REINFORCEMENT
- BASE FOUNDATION - 60 mm.
B C - ENCASEMENT - 60 mm.
5. LAP LENGTH SHALL NOT BE LESS THAN 50 TIMES THE SMALLER
06 R 10 04 06 24 725 99 90 200 340 90 06
LONGITUDINAL BAR DIAMETER AT THE LAP.
A D
GUARD
STONE
A
C
07(a1~a4) 180 ~ 180 ~ 07
R 06 04 06 24 725 ~ 1050 51 50 50
260 260
B
D
EMPLOYER CONSULTANT CONTRACTOR Scale As Shown Project Title UPPER ELAHERA CANAL PROJECT UECP-ICB-2A
Designed A.K FROM 27+509KM TO 55+600KM INCLUDING 27.7KM LONG TUNNELS
Drawn M.L. Drawing Title ACCESS ROAD TO NORTHERN PORTAL
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA Checked C.J. PIPE CULVERT No.12/1 @ CH 11+164.787
MINISTRY OF IRRIGATION Sheet No. REV
MAHAWELI WATER SECURITY INVENSTMENT PROGRAM PROGRAM MANAGEMENT,DESIGN AND SUPERVISION CONSULTANT CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD. Approved Y.C.Z. 00 2022.04.08 FIRST SUBMISSION Drawing No.
UECP-SD-CUL-12/1-R00 02 OF 02 00
(PMDSC) (CSCEC) Date 2022.04.08 REV DATE DESCRIPTION