Minor Road-M1-BOQ - 011220
Minor Road-M1-BOQ - 011220
Road Type of
SN Name of Road Length (Mtr.) ROW
Pavement
From To
Sr.No Tender Item No Description Unit R1 R3 R71 R72 R78 R79 R80 R81 R82 R83 R84 R85 R88 R89 R90 R91 R95 R96
Quantity Rate Amount
Total Length 2687.30 97.00 305.00 180.05 100.09 351.00 224.00 104.99 176.78 66.69 93.43 76.86 146.10 185.32 185.72 84.43 130.13 72.41 107.30
A SSR Items :-
Removing lime or lean cement concrete
including stacking the spoils as directed with all
leads, lifts etc, complete.
1 1 14.55 Cum 14.55 45.75 27.01 15.01 52.65 33.60 15.75 26.52 10.00 14.01 11.53 21.92 27.80 27.86 12.66 19.52 10.86 16.10 403.10 416.90 168,050.00
(PWD-SSR- 2018-19-BDW 8 -46.12)
9 12 300.71 (SSR Lead Chart for Excavated MaterialPWD- Sqm 300.7 945.5 558.16 310.28 1088.00 694.40 325.47 548.00 206.74 289.63 238.27 453.00 574.49 575.73 261.73 403.40 224.47 333.03 8331.00 16.80 139,961.00
SSR- 2018-19-Road works - 2.31)
Page 7 of 493
Sr.No Tender Item No Description Unit R1 R3 R71 R72 R78 R79 R80 R81 R82 R83 R84 R85 R88 R89 R90 R91 R95 R96
Quantity Rate Amount
Conveying materials obtained from road
cutting including all lifts, laying in layers of
20cm. to 30cm. breaking clods, dressing to the
required lines, curves, grades and section,
watering and compacting to not less than 97% of
standard proctor density for a lead of 300m to
12 15 143.19 500m inclusive, from the site of excavation to Cum 143.45 451 265.94 147.96 518.00 328.60 155.00 260.71 98.70 137.93 113.30 215.76 273.51 274.15 124.02 193.21 107.86 157.90 3967.00 282.40 1,120,281.00
the site of deposition as directed.
Page 8 of 493
Sr.No Tender Item No Description Unit R1 R3 R71 R72 R78 R79 R80 R81 R82 R83 R84 R85 R88 R89 R90 R91 R95 R96
Quantity Rate Amount
Providing to contraction joints polysuphide
sealent (Pouring grade) confirming to BS : 5212
- 1989 into sawed groove widened at top for
sealent reservoir of specified size and shape as
per detailed drawing including fixing
Polyethylene foam backer rod of required
diameter (appraox. 25% larger than the initial 3
mm.to 4 mm. joint) overlaid with bond breaking
tape as per detailed drawing. Item includes
18 26 114.2 cleaning the joints with water jet / air compressor Rmt 114.2 359 211.83 117.78 413.00 263.68 123.39 208.08 78.50 109.99 90.50 171.76 219.29 218.55 99.40 153.03 85.12 126.00 3163.10 141.80 448,528.00
and allowing joint to become thoroughly dry
before sealent is applied and applying primer.(A)
Contraction and longitudinal joints (15 mm. deep
x 8mm.wide)
a a 5.5 300 mm dia Rmt 5.6 17.22 11.20 5.60 19.60 12.64 6.00 9.60 3.80 5.40 4.20 8.40 11.20 11.60 4.80 7.20 4.20 6.00 154.26 1189.40 183,477.00
Page 9 of 493
Sr.No Tender Item No Description Unit R1 R3 R71 R72 R78 R79 R80 R81 R82 R83 R84 R85 R88 R89 R90 R91 R95 R96
Quantity Rate Amount
Road Marking with Hot Applied Thermoplastic
Compound with Reflectorizing Glass Beads on
Bituminous Surface- Providing and laying of hot
applied thermoplastic compound 2.5 mm thick
including reflectorizing glass beads @ 250 gms
per sqm area, thickness of 2.5 mm is exclusive
of surface applied glass beads as per
24 42 43.65 IRC:35 .The finished surface to be level, uniform sqm 43.65 137.25 81.02 45.04 157.95 100.80 47.25 79.55 30.01 42.04 34.59 65.75 83.39 83.57 37.99 58.56 32.58 48.30 1209.30 594.30 718,687.00
and free from streaks and holes.complete.
(PWD-SSR 18-19-6.12)
a 6 cover size (0.600x0.900)mm Nos 6 18 11.00 6.00 21.00 14.00 6.00 11.00 4.00 6.00 5.00 9.00 11.00 11.00 5.00 8.00 4.00 6.00 162.00 2995.70 485,303.00
b 2 cover size (0.600x0.450) mm Nos 2 6 4.00 2.00 5.00 5.00 2.00 4.00 1.00 2.00 2.00 3.00 4.00 4.00 2.00 3.00 1.00 2.00 54.00 2370.90 128,029.00
Total Amount 39,101,895.00
Page 11 of 493
Minor Roads Flexible to Rigid Pavements
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 2687.30 1.600 1.500 6450
Light Pole cum 90 0.90 0.900 1.600 117
Utility Crossing cum 54 1.400 1.650 1.500 187
Flexible Pavement deduction cum -2526
Total 4228
24 Kerb Stone Rm 0 0
25 Rubble Soling
Utility Crossing Cum 54 1.400 1.650 0.230 28.69
OFC Chamber Cum 54 1.400 1.400 0.230 24.34
Electrical Chamber Cum 90 1.700 1.700 0.230 59.82
Water Chamber Cum 72 1.500 1.500 0.230 37.26
Light pole Cum 90 0.800 0.800 0.230 13.25
Total 163.36
26 PCC M15
Foothpath Cum 1 0.000 0.150 0
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 54 1.40 1.650 0.100 12.47
OFC Chamber Cum 54 1.40 1.40 0.100 10.58
Electrical Chamber Cum 90 1.70 1.70 0.100 26.01
Water Chamber Cum 72 1.50 1.50 0.100 16.2
Light pole Cum 90 0.80 0.80 0.100 5.76
Total 71.02
27 RCC M25
a Raft
OFC Chamber Cum 54 1.200 1.200 0.150 11.66
Electrical Chamber Cum 90 1.500 1.500 0.150 30.38
Water Chamber Cum 72 1.300 1.300 0.150 18.25
Total 60.29
b Wall
OFC Chamber Cum 54 4.800 0.150 1.000 38.88
Electrical Chamber Cum 90 6.000 0.150 1.500 121.5
Water Chamber Cum 72 5.200 0.150 1.000 56.16
Total 217.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 54 1.200 1.200 0.150 11.66
Electrical Chamber Cum 90 1.500 1.500 0.150 30.38
Water Chamber Cum 72 1.300 1.300 0.150 18.25
Cover Deduction Cum -162 0.900 0.600 0.150 -13.122
Cover Deduction Cum -54 -0.400 -0.600 0.200 -2.592
Total 45.00
d Pole Foundation Cum 90 0.600 0.600 1.500 48.60
28 Reinforcement
a Raft MT 110 kg/cum 6963.61
b Wall MT 100 kg/cum 22785.00
c Slab MT 95 kg/cum 4488.75
Total 34.24
30 Painting Work
Edge Marking Line Sqm 2 2687.300 0.15 806.19
Lane Marking / Other Markings Sqm 403.095
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 90
Equilateral Triangle 90
Cautionary/Warning sign boards in
Nos. 54
b Octagone size 54
c Informatory sign board Sqm 36 0.900 32.4
3 DLC
Add 10% for Damage Panel Repairing cum 0.1 49.800 6.000 0.150 4
Total 4
5 Dewatering Hour 1 30
30 Rubble Soling
Utility Crossing Cum 3 6.100 1.650 0.230 6.94
OFC Chamber Cum 6 1.400 1.400 0.230 2.70
Electrical Chamber Cum 20 1.700 1.700 0.230 13.29
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 303.000 1.400 0.230 97.57
Total 121.54
31 PCC M15
Kerb Stone Cum 1 303.000 0.265 0.075 6.02
Utility Crossing Cum 3 6.10 1.650 0.100 3.02
Sr. No. Description Unit No. Length Breadth Depth Quantity
OFC Chamber Cum 6 1.40 1.40 0.100 1.18
Electrical Chamber Cum 20 1.70 1.70 0.100 5.78
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 303.00 1.40 0.100 42.42
Total 58.87
32 RCC M25
a Raft
OFC Chamber Cum 6 1.200 1.200 0.150 1.30
Electrical Chamber Cum 20 1.500 1.500 0.150 6.75
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 303.000 1.300 0.150 59.09
Total 67.64
b Wall
OFC Chamber Cum 6 4.800 0.150 1.000 4.32
Electrical Chamber Cum 20 6.000 0.150 1.500 27
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 303.000 0.150 1.000 90.9
Total 124.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 6 1.200 1.200 0.150 1.30
Electrical Chamber Cum 20 1.500 1.500 0.150 6.75
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -22 0.900 0.600 0.150 -1.782
Cover Deduction Cum -6 -0.400 -0.600 0.200 -0.288
SWD Cum 1 303.000 1.300 0.150 59.09
Cover Deduction Cum -61 0.600 0.450 0.150 -2.47
Total 63.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
33 Reinforcement
a Raft MT 110 kg/cum 7812.19
b Wall MT 100 kg/cum 13020.00
c Slab MT 95 kg/cum 6284.25
Total 27.12
35 Painting Work
Edge Marking Line Sqm 2 303.000 0.15 90.9
Lane Marking / Other Markings Sqm 45.45
Zebra Crossing Sqm 5 6.400 3 48
Kerb Painting Sqm 1 303.000 0.3 90.9
Median Painting Sqm 0 0
36 Signages
Cautionary/Warning sign boards in
a Nos. 15
Equilateral Triangle 15
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 10 0.900 9
7 Dewatering Hour 1 45
25 Kerb Stone Rm 0 0
26 Rubble Soling
Utility Crossing Cum 9 4.600 1.500 0.230 14.28
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 15 1.700 1.700 0.230 9.97
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 465.000 1.150 0.230 122.99
Cum 1 465.000 1.000 0.230 106.95
Total 257.03
27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 9 4.60 1.500 0.100 6.21
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 15 1.70 1.70 0.100 4.34
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 465.00 1.15 0
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cum 1 465.00 1.00 0
Total 11.78
28 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 465.00 1.050 0.150 73.24
Cum 1 465.00 0.900 0.150 62.78
Total 142.45
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 15 6.000 0.150 1.500 20.25
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 465.000 0.150 1.000 139.5
Cum 2 465.000 0.150 1.000 139.5
Total 304.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -17 0.900 0.600 0.150 -1.377
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
SWD Cum 1 465.000 1.050 0.150 73.2375
Cum 1 465.000 0.900 0.150 62.775
Cover Deduction Cum -186 0.600 0.450 0.150 -7.53
Total 133.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
29 Reinforcement
a Raft MT 110 kg/cum 16452.51
b Wall MT 100 kg/cum 31920.00
c Slab MT 95 kg/cum 13266.75
Total 61.64
31 Painting Work
Edge Marking Line Sqm 2 445.000 0.15 133.5
Lane Marking / Other Markings Sqm 66.75
Zebra Crossing Sqm 1 4.600 3 6.9
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
5 Dewatering Hour 1 46
23 Kerb Stone Rm 0 0
24 Rubble Soling
Utility Crossing Cum 5 3.500 1.650 0.230 6.64
OFC Chamber Cum 5 1.400 1.400 0.230 2.25
Electrical Chamber Cum 15 1.700 1.700 0.230 9.97
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 463.000 1.150 0.230 122.46
Cum 1 463.000 1.000 0.230 106.49
Total 248.85
25 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 5 3.50 1.650 0.100 2.89
OFC Chamber Cum 5 1.40 1.40 0.100 0.98
Electrical Chamber Cum 15 1.70 1.70 0.100 4.34
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 463.00 1.15 0.100 53.25
Cum 1 463.00 1.00 0.100 46.3
Total 108.21
Sr. No. Description Unit No. Length Breadth Depth Quantity
26 RCC M25
a Raft
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 463.000 1.050 0.150 72.92
Cum 1 463.000 0.900 0.150 62.51
Total 142.08
b Wall
OFC Chamber Cum 5 4.800 0.150 1.000 3.6
Electrical Chamber Cum 15 6.000 0.150 1.500 20.25
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 463.000 0.150 1.000 138.9
Cum 2 463.000 0.150 1.000 138.9
Total 303.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -17 0.900 0.600 0.150 -1.377
Cover Deduction Cum -5 -0.400 -0.600 0.200 -0.24
SWD Cum 1 463.000 1.050 0.150 72.92
Cum 1 463.000 0.900 0.150 62.51
Cover Deduction Cum -185 0.600 0.450 0.150 -7.49
Total 133.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
27 Reinforcement
a Raft MT 110 kg/cum 16409.89
b Wall MT 100 kg/cum 31815.00
c Slab MT 95 kg/cum 13266.75
Total 61.49
29 Painting Work
Edge Marking Line Sqm 2 463.000 0.15 138.9
Lane Marking / Other Markings Sqm 69.45
Zebra Crossing Sqm 1 3.800 3 5.7
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
30 Signages
Cautionary/Warning sign boards in
a Equilateral Triangle Nos. 15
15
Cautionary/Warning sign boards in
Nos. 8
b Octagone size 8
c Informatory sign board Sqm 5 0.900 4.5
4 Dewatering Hour 1 25
22 Kerb Stone Rm 0 0
23 Rubble Soling
Utility Crossing Cum 5 4.200 1.650 0.230 7.97
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 8 1.700 1.700 0.230 5.32
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 8 0.800 0.800 0.230 1.18
Total 16.86
24 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 5 4.20 1.650 0.100 3.47
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 8 1.70 1.70 0.100 2.31
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 8 0.80 0.80 0.100 0.51
Total 7.33
25 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 3.86
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 8 6.000 0.150 1.500 10.8
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 15.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -10 0.900 0.600 0.150 -0.81
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
Total 3.00
d Pole Foundation Cum 8 0.600 0.600 1.500 4.32
26 Reinforcement
a Raft MT 110 kg/cum 445.25
b Wall MT 100 kg/cum 1575.00
c Slab MT 95 kg/cum 299.25
Total 2.32
28 Painting Work
Edge Marking Line Sqm 2 253.000 0.15 75.9
Lane Marking / Other Markings Sqm 37.95
Zebra Crossing Sqm 4 4.500 3 27
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
29 Signages
Cautionary/Warning sign boards in
a Nos. 9
Equilateral Triangle 9
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
4 Dewatering Hour 1 28
22 Kerb Stone Rm 0 0
23 Rubble Soling
Utility Crossing Cum 6 3.800 1.650 0.230 8.65
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 9 1.700 1.700 0.230 5.98
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 278.000 0.900 0.230 57.55
Cum 1 278.000 0.900 0.230 57.55
Total 132.12
24 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 6 3.80 1.650 0.100 3.76
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 9 1.70 1.70 0.100 2.6
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 278.00 0.90 0.100 25.02
Cum 1 278.00 0.90 0.100 25.02
Total 57.44
25 RCC M25
Sr. No. Description Unit No. Length Breadth Depth Quantity
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 278.000 0.800 0.150 33.36
Cum 1 278.000 0.800 0.150 33.36
Total 70.91
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 9 6.000 0.150 1.500 12.15
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 278.000 0.150 1.000 83.4
Cum 2 278.000 0.150 1.000 83.4
Total 183.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -11 0.900 0.600 0.150 -0.891
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 278.000 0.800 0.150 33.36
Cum 1 278.000 0.800 0.150 33.36
Cover Deduction Cum -111 0.300 0.300 0.150 -1.50
Total 68.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
26 Reinforcement
a Raft MT 110 kg/cum 8190.39
b Wall MT 100 kg/cum 19215.00
c Slab MT 95 kg/cum 6783.00
Total 34.19
28 Painting Work
Edge Marking Line Sqm 2 278.000 0.15 83.4
Lane Marking / Other Markings Sqm 41.7
Zebra Crossing Sqm 4 4.100 3 24.6
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
29 Signages
Cautionary/Warning sign boards in
a Equilateral Triangle Nos. 9
9
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
Sr. No. Description Unit No. Length Breadth Depth Quantity
30 Stud with Lense Reflector Nos 2 15 30
Zebra crossing Nos 4 4.100 55
Total 85.00
31 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 278.00 2224.00
b 160 mm outer dia for HT & LT Cable Rmt 10 278.00 2780.00
4 Dewatering Hour 1 10
22 Kerb Stone Rm 0 0
23 Rubble Soling
Utility Crossing Cum 2 3.000 1.650 0.230 2.28
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 3 1.700 1.700 0.230 1.99
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 100.000 1.000 0.230 23
Cum 1 100.000 1.000 0.230 23
Total 52.21
24 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 3.00 1.650 0.100 0.99
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 3 1.70 1.70 0.100 0.87
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 100.00 1.00 0.100 10.00
Cum 1 100.00 1.00 0.100 10.00
Total 22.7
25 RCC M25
a Raft
Sr. No. Description Unit No. Length Breadth Depth Quantity
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 3 1.500 1.500 0.150 1.01
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 100.000 0.900 0.150 13.50
Cum 1 100.000 0.900 0.150 13.50
Total 28.95
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 3 6.000 0.150 1.500 4.05
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 100.000 0.150 1.000 30.00
Cum 2 100.000 0.150 1.000 30.00
Total 67.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 3 1.500 1.500 0.150 1.01
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -5 0.900 0.600 0.150 -0.405
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 2 100.000 0.900 0.150 27.00
Cum 2 100.000 0.900 0.150 27.00
Cover Deduction Cum -40 0.600 0.450 0.150 -1.62
Total 54.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
26 Reinforcement
a Raft MT 110 kg/cum 3343.90
b Wall MT 100 kg/cum 7035.00
c Slab MT 95 kg/cum 5386.50
Total 15.77
28 Painting Work
Edge Marking Line Sqm 2 100.000 0.15 30
Lane Marking / Other Markings Sqm 15
Zebra Crossing Sqm 2 3.300 3 9.9
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
29 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 2
b Octagone size 2
c Informatory sign board Sqm 2 0.900 1.8
4 Dewatering Hour 1 14
29 Rubble Soling
Utility Crossing Cum 1 12.700 1.650 0.230 4.82
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 10 1.700 1.700 0.230 6.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
Sr. No. Description Unit No. Length Breadth Depth Quantity
SWD Cum 1 144.000 1.000 0.230 33.12
Cum 1 144.000 1.000 0.230 33.12
Total 80.1
30 PCC M15
Kerb Stone Cum 1 144.000 0.265 0.075 2.86
Utility Crossing Cum 1 12.70 1.650 0.100 2.1
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 10 1.70 1.70 0.100 2.89
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 144.00 1.00 0.100 14.4
Cum 1 144.00 1.00 0.100 14.4
Total 37.69
31 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 144.000 0.900 0.150 19.44
Cum 1 144.000 0.900 0.150 19.44
Total 43.41
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 10 6.000 0.150 1.500 13.5
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 144.000 0.150 1.000 43.2
Cum 2 144.000 0.150 1.000 43.2
Total 104.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -12 0.900 0.600 0.150 -0.972
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 144.000 0.900 0.150 19.44
Cum 1 144.000 0.900 0.150 19.44
Cover Deduction Cum -58 0.600 0.600 0.150 -3.132
Total 42.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
32 Reinforcement
a Raft MT 110 kg/cum 5013.86
b Wall MT 100 kg/cum 10920.00
c Slab MT 95 kg/cum 4189.50
Total 20.12
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 RCC Np3 Class Pipe
600 mm dia Rmt 2 12.70 25.4
34 Painting Work
Edge Marking Line Sqm 4 144.000 0.15 86.4
Lane Marking / Other Markings Sqm 43.2
Zebra Crossing Sqm 3 13.000 3 58.5
Kerb Painting Sqm 1 144.000 0.3 43.2
Median Painting Sqm 0 0
35 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 5 0.900 4.5
5 Dewatering Hour 1 41
27 Rubble Soling
Utility Crossing Cum 4 29.800 1.650 0.230 45.24
OFC Chamber Cum 8 1.400 1.400 0.230 3.61
Electrical Chamber Cum 27 1.700 1.700 0.230 17.95
Water Chamber Cum 4 1.500 1.500 0.230 2.07
Light pole Cum 14 0.800 0.800 0.230 2.06
SWD Cum 1 540.000 2.400 0.230 298.08
Total 369.01
\
28 PCC M15
Kerb Stone Cum 2 411.000 0.265 0.075 16.34
Utility Crossing Cum 4 29.80 1.650 0.100 19.67
OFC Chamber Cum 8 1.40 1.40 0.100 1.57
Electrical Chamber Cum 27 1.70 1.70 0.100 7.8
Water Chamber Cum 4 1.50 1.50 0.100 0.9
Light pole Cum 14 0.80 0.80 0.100 0.9
SWD Cum 1 540.00 2.40 0.100 129.6
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 176.78
29 RCC M25
a Raft
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 27 1.500 1.500 0.150 9.11
Water Chamber Cum 4 1.300 1.300 0.150 1.01
SWD Cum 1 540.000 2.300 0.150 186.30
Total 198.15
b Wall
OFC Chamber Cum 8 4.800 0.150 1.000 5.76
Electrical Chamber Cum 27 6.000 0.150 1.500 36.45
Water Chamber Cum 4 5.200 0.150 1.000 3.12
SWD Cum 2 540.000 0.150 1.000 162
Total 207.00
c Slab
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 27 1.500 1.500 0.150 9.11
Water Chamber Cum 4 1.300 1.300 0.150 1.01
Cover Deduction Cum -31 0.900 0.600 0.150 -2.511
Cover Deduction Cum -8 -0.400 -0.600 0.200 -0.384
SWD Cum 2 540.000 2.300 0.150 372.6
Cum -108 0.900 0.600 0.150 -8.748
Total 373.00
d Pole Foundation Cum 14 0.600 0.600 1.500 7.56
30 Reinforcement
a Raft MT 110 kg/cum 22886.84
b Wall MT 100 kg/cum 21735.00
c Slab MT 95 kg/cum 37206.75
Total 81.83
32 Painting Work
Edge Marking Line Sqm 2 411.000 0.15 123.3
Lane Marking / Other Markings Sqm 61.65
Zebra Crossing Sqm 3 30.100 3 135.45
Kerb Painting Sqm 2 411.000 0.3 246.6
Median Painting Sqm 2 411.000 1 822
33 Signages
Cautionary/Warning sign boards in
a Nos. 20
Equilateral Triangle 20
Cautionary/Warning sign boards in
Nos. 8
b Octagone size 8
c Informatory sign board Sqm 6 0.900 5.4
5 Dewatering Hour 1 22
25 Rubble Soling
Utility Crossing Cum 2 25.800 1.650 0.230 19.58
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 15 1.700 1.700 0.230 9.97
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 7 0.800 0.800 0.230 1.03
SWD Cum 1 224.000 1.300 0.230 66.98
Cum 1 224.000 1.300 0.230 66.98
Total 167.38
26 PCC M15
Kerb Stone Cum 2 224.000 0.265 0.075 8.9
Utility Crossing Cum 2 25.80 1.650 0.100 8.51
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 15 1.70 1.70 0.100 4.34
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 7 0.80 0.80 0.100 0.45
SWD Cum 1 224.00 1.30 0.100 29.12
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cum 1 224.00 1.30 0.100 29.12
Total 81.67
27 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 224.000 1.200 0.150 40.32
Cum 1 224.000 1.200 0.150 40.32
Total 87.07
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 15 6.000 0.150 1.500 20.25
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 224.000 0.150 1.000 67.2
Cum 2 224.000 0.150 1.000 67.2
Total 159.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -17 0.900 0.600 0.150 -1.377
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
SWD Cum 2 224.000 1.200 0.150 80.64
Cum 2 224.000 1.200 0.150 80.64
Cover Deduction Cum -90 0.900 0.600 0.150 -7.29
Total 159.00
d Pole Foundation Cum 7 0.600 0.600 1.500 3.78
28 Reinforcement
a Raft MT 110 kg/cum 10056.99
b Wall MT 100 kg/cum 16695.00
c Slab MT 95 kg/cum 15860.25
Total 42.61
30 Painting Work
Edge Marking Line Sqm 2 224.000 0.15 67.2
Lane Marking / Other Markings Sqm 33.6
Zebra Crossing Sqm 2 26.100 3 78.3
Kerb Painting Sqm 2 224.000 0.3 134.4
Median Painting Sqm 2 224.000 1 448
31 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
Nos. 6
b Octagone size 6
c Informatory sign board Sqm 5 0.900 4.5
5 Dewatering Hour 1 11
23 DLC
Foothpath Cum 1 524.000 0.150 78.6
79
29 Rubble Soling
Utility Crossing Cum 1 14.700 1.650 0.230 5.58
OFC Chamber Cum 1 1.400 1.400 0.230 0.45
Electrical Chamber Cum 4 1.700 1.700 0.230 2.66
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 108.000 1.300 0.230 32.29
Total 42.02
30 PCC M15
Kerb Stone Cum 2 108.000 0.265 0.075 4.29
Utility Crossing Cum 1 14.70 1.650 0.100 2.43
OFC Chamber Cum 1 1.40 1.40 0.100 0.2
Sr. No. Description Unit No. Length Breadth Depth Quantity
Electrical Chamber Cum 4 1.70 1.70 0.100 1.16
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 108.00 1.30 0.100 14.04
Total 22.57
31 RCC M25
a Raft
OFC Chamber Cum 1 1.200 1.200 0.150 0.22
Electrical Chamber Cum 4 1.500 1.500 0.150 1.35
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 108.000 1.200 0.150 19.44
Total 21.51
b Wall
OFC Chamber Cum 1 4.800 0.150 1.000 0.72
Electrical Chamber Cum 4 6.000 0.150 1.500 5.4
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 108.000 0.150 1.000 32.4
Total 40.00
c Slab
OFC Chamber Cum 1 1.200 1.200 0.150 0.22
Electrical Chamber Cum 4 1.500 1.500 0.150 1.35
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -6 0.900 0.600 0.150 -0.486
Cover Deduction Cum -1 -0.400 -0.600 0.200 -0.048
SWD Cum 1 108.000 1.200 0.150 19.44
Cover Deduction Cum -22 0.900 0.600 0.150 -1.782
Total 19.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
32 Reinforcement
a Raft MT 110 kg/cum 2484.75
b Wall MT 100 kg/cum 4200.00
c Slab MT 95 kg/cum 1895.25
Total 8.58
34 Painting Work
Edge Marking Line Sqm 4 108.000 0.15 64.8
Lane Marking / Other Markings Sqm 32.4
Zebra Crossing Sqm 2 15.000 3 45
Kerb Painting Sqm 2 108.000 0.3 64.8
Median Painting Sqm 0 0
35 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Informatory sign board Sqm 4 0.900 3.6
5 Dewatering Hour 1 78
28 Kerb Stone Rm 0 0
29 Rubble Soling
Utility Crossing Cum 8 6.500 1.650 0.230 19.73
OFC Chamber Cum 16 1.400 1.400 0.230 7.21
Electrical Chamber Cum 52 1.700 1.700 0.230 34.56
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 779.000 1.000 0.230 179.17
Cum 1 779.000 1.000 0.230 179.17
Total 420.88
30 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 8 6.50 1.650 0.100 8.58
OFC Chamber Cum 16 1.40 1.40 0.100 3.14
Electrical Chamber Cum 52 1.70 1.70 0.100 15.03
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Sr. No. Description Unit No. Length Breadth Depth Quantity
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 779.00 1.00 0.100 77.9
Cum 1 779.00 1.00 0.100 77.9
Total 183
31 RCC M25
a Raft
OFC Chamber Cum 16 1.200 1.200 0.150 3.46
Electrical Chamber Cum 52 1.500 1.500 0.150 17.55
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 779.000 0.900 0.00
Cum 1 779.000 0.900 0.00
Total 21.51
b Wall
OFC Chamber Cum 16 4.800 0.150 1.000 11.52
Electrical Chamber Cum 52 6.000 0.150 1.500 70.2
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 779.000 0.150 1.000 233.7
Cum 2 779.000 0.150 1.000 233.7
Total 551.00
c Slab
OFC Chamber Cum 16 1.200 1.200 0.150 3.46
Electrical Chamber Cum 52 1.500 1.500 0.150 17.55
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -54 0.900 0.600 0.150 -4.374
Cover Deduction Cum -16 -0.400 -0.600 0.200 -0.768
SWD Cum 2 779.000 0.900 0.150 210.33
Cum 2 779.000 0.900 0.150 210.33
Cover Deduction Cum -312 0.600 0.450 0.150 -12.636
Total 424.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
32 Reinforcement
a Raft MT 110 kg/cum 2484.75
b Wall MT 100 kg/cum 57855.00
c Slab MT 95 kg/cum 42294.00
Total 102.63
34 Painting Work
Edge Marking Line Sqm 2 779.000 0.15 233.7
Lane Marking / Other Markings Sqm 116.85
Zebra Crossing Sqm 6 6.800 3 61.2
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
35 Signages
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
a Nos. 25
Equilateral Triangle 25
Cautionary/Warning sign boards in
Nos. 10
b Octagone size 10
c Informatory sign board Sqm 10 0.900 9
5 Dewatering Hour 1 27
`
24 Kerb Stone Rm 1 782.900 783
25 Rubble Soling
Utility Crossing Cum 3 6.300 1.650 0.230 7.17
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 9 1.700 1.700 0.230 5.98
Water Chamber Cum 3 1.500 1.500 0.230 1.55
Light pole Cum 9 0.800 0.800 0.230 1.32
SWD Cum 1 267.000 1.000 0.230 61.41
Total 78.78
26 PCC M15
Kerb Stone Cum 1 782.900 0.265 0.075 15.56
Utility Crossing Cum 3 6.30 1.650 0.100 3.12
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 9 1.70 1.70 0.100 2.6
Water Chamber Cum 3 1.50 1.50 0.100 0.68
Light pole Cum 9 0.80 0.80 0.100 0.58
SWD Cum 1 267.00 1.00 0.100 26.7
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 49.83
27 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 3 1.300 1.300 0.150 0.76
SWD Cum 1 267.000 0.900 0.150 36.05
Total 40.49
Sr. No. Description Unit No. Length Breadth Depth Quantity
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 9 6.000 0.150 1.500 12.15
Water Chamber Cum 3 5.200 0.150 1.000 2.34
SWD Cum 2 267.000 0.150 1.000 80.1
Total 97.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 3 1.300 1.300 0.150 0.76
Cover Deduction Cum -12 0.900 0.600 0.150 -0.972
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 267.000 0.900 0.150 36.05
Cover Deduction Cum -53 0.600 0.450 0.150 -2.15
Total 37.00
d Pole Foundation Cum 9 0.600 0.600 1.500 4.86
28 Reinforcement
a Raft MT 110 kg/cum 4676.71
b Wall MT 100 kg/cum 10185.00
c Slab MT 95 kg/cum 3690.75
Total 18.55
30 Painting Work
Edge Marking Line Sqm 2 267.000 0.15 80.1
Lane Marking / Other Markings Sqm 40.05
Zebra Crossing Sqm 4 6.600 3 39.6
Kerb Painting Sqm 1 782.900 0.3 234.87
Median Painting Sqm 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 6
b Octagone size 6
c Informatory sign board Sqm 5 0.900 4.5
4 Dewatering Hour 1 16
23 Rubble Soling
Utility Crossing Cum 2 6.800 1.650 0.230 5.16
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 5 1.700 1.700 0.230 3.32
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 150.000 0.900 0.230 31.05
Cum 1 150.000 0.900 0.230 31.05
Total 72.52
24 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 6.80 1.650 0.100 2.24
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 5 1.70 1.70 0.100 1.45
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 150.00 0.90 0.100 13.5
Cum 1 150.00 0.90 0.100 13.5
Total 31.53
25 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Sr. No. Description Unit No. Length Breadth Depth Quantity
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 150.000 0.800 0.150 18.00
Cum 1 150.000 0.800 0.150 18.00
Total 38.63
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 5 6.000 0.150 1.500 6.75
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 150.000 0.150 1.000 45
Cum 2 150.000 0.150 1.000 45
Total 100.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -7 0.900 0.600 0.150 -0.567
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 150.000 0.800 0.150 18.000
Cum 1 150.000 0.800 0.150 18.000
Cover Deduction Cum -60 0.600 0.450 0.150 -2.430
Total 36.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
26 Reinforcement
a Raft MT 110 kg/cum 4461.36
b Wall MT 100 kg/cum 10500.00
c Slab MT 95 kg/cum 3591.00
Total 18.55
28 Painting Work
Edge Marking Line Sqm 2 155.000 0.15 46.5
Lane Marking / Other Markings Sqm 23.25
Zebra Crossing Sqm 2 7.100 3 21.3
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0
29 Signages
Cautionary/Warning sign boards in
a Nos. 6
Equilateral Triangle 6
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 3 0.900 2.7
34 Barrigates Rmt 1 31 31
R16 -Sainath Chowk to Shani Chowk
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 115.00 1.600 1.500 276
Light Pole cum 4 0.90 0.900 1.600 5
Utility Crossing cum 2 3.600 1.650 1.500 18
Rigid Pavement deduction cum -1 -90
Total 209
5 Dewatering Hour 1 12
23 Kerb Stone Rm 0 0
24 Rubble Soling
Utility Crossing Cum 2 3.600 1.650 0.230 2.73
OFC Chamber Cum 1 1.400 1.400 0.230 0.45
Electrical Chamber Cum 4 1.700 1.700 0.230 2.66
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 4 0.800 0.800 0.230 0.59
Total 7.47
25 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 3.60 1.650 0.100 1.19
OFC Chamber Cum 1 1.40 1.40 0.100 0.2
Electrical Chamber Cum 4 1.70 1.70 0.100 1.16
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 4 0.80 0.80 0.100 0.26
Total 3.26
26 RCC M25
a Raft
OFC Chamber Cum 1 1.200 1.200 0.150 0.22
Electrical Chamber Cum 4 1.500 1.500 0.150 1.35
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 2.07
b Wall
OFC Chamber Cum 1 4.800 0.150 1.000 0.72
Electrical Chamber Cum 4 6.000 0.150 1.500 5.4
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 8.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 1 1.200 1.200 0.150 0.22
Electrical Chamber Cum 4 1.500 1.500 0.150 1.35
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -6 0.900 0.600 0.150 -0.486
Cover Deduction Cum -1 -0.400 -0.600 0.200 -0.048
Total 2.00
d Pole Foundation Cum 4 0.600 0.600 1.500 2.16
27 Reinforcement
a Raft MT 110 kg/cum 239.43
b Wall MT 100 kg/cum 840.00
c Slab MT 95 kg/cum 199.50
Total 1.28
29 Painting Work
Edge Marking Line Sqm 2 115.000 0.15 34.5
Lane Marking / Other Markings Sqm 17.25
Zebra Crossing Sqm 2 3.900 3 11.7
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
30 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 2
b Octagone size 2
c Informatory sign board Sqm 2 0.900 1.8
5 Dewatering Hour 1 17
23 Kerb Stone Rm 0 0
24 Rubble Soling
Utility Crossing Cum 3 3.600 1.650 0.230 4.1
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 6 1.700 1.700 0.230 3.99
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 6 0.800 0.800 0.230 0.88
Total 10.91
25 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 3 3.60 1.650 0.100 1.78
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 6 1.70 1.70 0.100 1.73
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 6 0.80 0.80 0.100 0.38
Total 4.73
26 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 6 1.500 1.500 0.150 2.03
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 2.96
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 6 6.000 0.150 1.500 8.1
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 11.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 6 1.500 1.500 0.150 2.03
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -8 0.900 0.600 0.150 -0.648
Sr. No. Description Unit No. Length Breadth Depth Quantity
27 Reinforcement
a Raft MT 110 kg/cum 342.34
b Wall MT 100 kg/cum 1155.00
c Slab MT 95 kg/cum 199.50
d Tie Bar MT 425 0.7 0.89 264.44
Total 1.96
29 Painting Work
Edge Marking Line Sqm 2 170.000 0.15 51
Lane Marking / Other Markings Sqm 25.5
Zebra Crossing Sqm 2 3.900 3 11.7
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
30 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
5 Dewatering Hour 1 24
24 DLC
Foothpath Cum 1 1205.980 0.150 181
30 Rubble Soling
Utility Crossing Cum 2 4.700 1.650 0.230 3.57
OFC Chamber Cum 5 1.400 1.400 0.230 2.25
Electrical Chamber Cum 16 1.700 1.700 0.230 10.64
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 257.000 0.900 0.230 53.2
Cum 1 257.000 0.900 0.230 53.2
Total 123.9
31 PCC M15
Kerb Stone Cum 0 243.000 0.265 0.075 0
Utility Crossing Cum 2 4.70 1.650 0.100 1.55
OFC Chamber Cum 5 1.40 1.40 0.100 0.98
Electrical Chamber Cum 16 1.70 1.70 0.100 4.62
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Sr. No. Description Unit No. Length Breadth Depth Quantity
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 257.00 0.90 0.100 23.13
Cum 1 257.00 0.90 0.100 23.13
Total 53.86
32 RCC M25
a Raft
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 16 1.500 1.500 0.150 5.40
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 257.000 0.800 0.150 30.84
Cum 1 257.000 0.800 0.150 30.84
Total 68.67
b Wall
OFC Chamber Cum 5 4.800 0.150 1.000 3.6
Electrical Chamber Cum 16 6.000 0.150 1.500 21.6
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 257.000 0.150 1.000 77.1
Cum 2 257.000 0.150 1.000 77.1
Total 181.00
c Slab
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 16 1.500 1.500 0.150 5.40
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -18 0.900 0.600 0.150 -1.458
Cover Deduction Cum -5 -0.400 -0.600 0.200 -0.24
SWD Cum 1 257.000 0.800 0.150 30.84
Cum 1 257.000 0.800 0.150 30.84
Cover Deduction Cum -103 0.600 0.450 0.150 -4.17
Total 63.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
33 Reinforcement
a Raft MT 110 kg/cum 7931.04
b Wall MT 100 kg/cum 19005.00
c Slab MT 95 kg/cum 6284.25
Total 33.22
35 Painting Work
Edge Marking Line Sqm 2 243.000 0.15 72.9
Lane Marking / Other Markings Sqm 36.45
Zebra Crossing Sqm 5 5.000 3 37.5
Kerb Painting Sqm 0 243.000 0.3 0
Median Painting Sqm 0 0
36 Signages
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 4 0.900 3.6
5 Dewatering Hour 1 15
28 Kerb Stone Rm 0 0
29 Rubble Soling
Utility Crossing Cum 2 5.800 1.650 0.230 4.4
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 10 1.700 1.700 0.230 6.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 144.000 1.000 0.230 33.12
Cum 1 144.000 0.900 0.230 29.81
Total 76.37
30 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 5.80 1.650 0.100 1.91
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 10 1.70 1.70 0.100 2.89
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Sr. No. Description Unit No. Length Breadth Depth Quantity
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 144.00 1.00 0.100 14.4
Cum 1 144.00 0.90 0.100 12.96
Total 33
31 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 144.000 0.900 0.150 19.44
Cum 1 144.000 0.800 0.150 17.28
Total 41.25
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 10 6.000 0.150 1.500 13.5
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 144.000 0.150 1.000 43.2
Cum 2 144.000 0.150 1.000 43.2
Total 104.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -12 0.900 0.600 0.150 -0.972
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 144.000 0.900 0.150 19.44
Cum 1 144.000 0.800 0.150 17.28
Cover Deduction Cum -58 0.600 0.450 0.150 -2.35
Total 38.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
32 Reinforcement
a Raft MT 110 kg/cum 4764.38
b Wall MT 100 kg/cum 10920.00
c Slab MT 95 kg/cum 3790.50
Total 19.48
34 Painting Work
Edge Marking Line Sqm 2 150.000 0.15 45
Lane Marking / Other Markings Sqm 22.5
Zebra Crossing Sqm 2 6.100 3 18.3
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
35 Signages
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 5 0.900 4.5
5 Dewatering Hour 1 52
24 Kerb Stone Rm 0 0
25 Rubble Soling
Utility Crossing Cum 10 4.000 1.650 0.230 15.18
OFC Chamber Cum 5 1.400 1.400 0.230 2.25
Electrical Chamber Cum 17 1.700 1.700 0.230 11.3
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 517.000 0.900 0.230 107.02
Cum 1 517.000 0.900 0.230 107.02
Total 243.81
26 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 10 4.00 1.650 0.100 6.6
OFC Chamber Cum 5 1.40 1.40 0.100 0.98
Electrical Chamber Cum 17 1.70 1.70 0.100 4.91
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 517.00 0.90 0.100 46.53
Cum 1 517.00 0.90 0.100 46.53
Total 106
27 RCC M25
a Raft
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 17 1.500 1.500 0.150 5.74
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 517.000 0.800 0.150 62.04
Cum 1 517.000 0.800 0.150 62.04
Total 131.40
b Wall
OFC Chamber Cum 5 4.800 0.150 1.000 3.6
Electrical Chamber Cum 17 6.000 0.150 1.500 22.95
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 517.000 0.150 1.000 155.1
Cum 2 517.000 0.150 1.000 155.1
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 338.00
c Slab
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 17 1.500 1.500 0.150 5.74
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -19 0.900 0.600 0.150 -1.539
Cover Deduction Cum -5 -0.400 -0.600 0.200 -0.24
SWD Cum 1 517.000 0.800 0.150 62.04
Cum 1 517.000 0.800 0.150 62.04
Cover Deduction Cum -207 0.300 0.300 0.150 -2.79
Total 127.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
28 Reinforcement
a Raft MT 110 kg/cum 15177.22
b Wall MT 100 kg/cum 35490.00
c Slab MT 95 kg/cum 12668.25
d Tie Bar MT 1305 0.7 0.89 812.00
Total 64.15
30 Painting Work
Edge Marking Line Sqm 2 522.000 0.15 156.6
Lane Marking / Other Markings Sqm 78.3
Zebra Crossing Sqm 6 4.300 3 38.7
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 20
Equilateral Triangle 20
Cautionary/Warning sign boards in
Nos. 8
b Octagone size 8
c Informatory sign board Sqm 5 0.900 4.5
5 Dewatering Hour 1 18
23 DLC
Foothpath Cum 0 806.000 0.150 0
0
29 Rubble Soling
Utility Crossing Cum 2 11.700 1.650 0.230 8.88
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 12 1.700 1.700 0.230 7.98
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 178.000 1.000 0.230 40.94
Cum 1 178.000 1.000 0.230 40.94
Total 101.58
30 PCC M15
Sr. No. Description Unit No. Length Breadth Depth Quantity
Kerb Stone Cum 2 178.000 0.265 0.075 7.08
Utility Crossing Cum 2 11.70 1.650 0.100 3.86
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 12 1.70 1.70 0.100 3.47
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 178.00 1.00 0.100 17.8
Cum 1 178.00 1.00 0.100 17.8
Total 51.24
31 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 12 1.500 1.500 0.150 4.05
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 178.000 0.900 0.150 24.03
Cum 1 178.000 0.900 0.150 24.03
Total 53.48
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 12 6.000 0.150 1.500 16.2
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 178.000 0.150 1.000 53.4
Cum 2 178.000 0.150 1.000 53.4
Total 127.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 12 1.500 1.500 0.150 4.05
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -14 0.900 0.600 0.150 -1.134
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
SWD Cum 1 178.000 0.900 0.150 24.03
Cum 1 178.000 0.900 0.150 24.03
Cover Deduction Cum -71 0.600 0.450 0.150 -2.88
Total 49.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
32 Reinforcement
a Raft MT 110 kg/cum 6177.06
b Wall MT 100 kg/cum 13335.00
c Slab MT 95 kg/cum 4887.75
Total 24.40
34 Painting Work
Edge Marking Line Sqm 4 178.000 0.15 106.8
Sr. No. Description Unit No. Length Breadth Depth Quantity
Lane Marking / Other Markings Sqm 53.4
Zebra Crossing Sqm 2 12.000 3 36
Kerb Painting Sqm 2 178.000 0.3 106.8
Median Painting Sqm 2 178.000 1 356
35 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 5 0.900 4.5
5 Dewatering Hour 1 65
26 Rubble Soling
Utility Crossing Cum 6 9.300 1.650 0.230 21.18
OFC Chamber Cum 13 1.400 1.400 0.230 5.86
Electrical Chamber Cum 43 1.700 1.700 0.230 28.58
Water Chamber Cum 6 1.500 1.500 0.230 3.11
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 712.000 1.150 0.230 188.32
Cum 1 712.000 0.900 0.230 147.38
Total 394.43
27 PCC M15
Kerb Stone Cum 2 250.000 0.265 0.075 9.94
Utility Crossing Cum 6 9.30 1.650 0.100 9.21
OFC Chamber Cum 13 1.40 1.40 0.100 2.55
Electrical Chamber Cum 43 1.70 1.70 0.100 12.43
Water Chamber Cum 6 1.50 1.50 0.100 1.35
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 712.00 1.15 0.100 81.88
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cum 1 712.00 0.90 0.100 64.08
Total 181.44
28 RCC M25
a Raft
OFC Chamber Cum 13 1.200 1.200 0.150 2.81
Electrical Chamber Cum 43 1.500 1.500 0.150 14.51
Water Chamber Cum 6 1.300 1.300 0.150 1.52
SWD Cum 1 712.000 1.050 0.150 112.14
Cum 1 712.000 0.800 0.150 85.44
Total 216.42
b Wall
OFC Chamber Cum 13 4.800 0.150 1.000 9.36
Electrical Chamber Cum 43 6.000 0.150 1.500 58.05
Water Chamber Cum 6 5.200 0.150 1.000 4.68
SWD Cum 2 712.000 0.150 1.000 213.6
Cum 2 712.000 0.150 1.000 213.6
Total 499.00
c Slab
OFC Chamber Cum 13 1.200 1.200 0.150 2.81
Electrical Chamber Cum 43 1.500 1.500 0.150 14.51
Water Chamber Cum 6 1.300 1.300 0.150 1.52
Cover Deduction Cum -49 0.900 0.600 0.150 -3.969
Cover Deduction Cum -13 -0.400 -0.600 0.200 -0.624
SWD Cum 1 712.000 1.050 0.150 112.14
Cum 1 712.000 0.800 0.150 85.44
Cover Deduction Cum -285 0.600 0.450 0.150 -11.54
Total 200.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
29 Reinforcement
a Raft MT 110 kg/cum 24996.68
b Wall MT 100 kg/cum 52395.00
c Slab MT 95 kg/cum 19950.00
Total 97.34
31 Painting Work
Edge Marking Line Sqm 2 647.000 0.15 194.1
Lane Marking / Other Markings Sqm 97.05
Zebra Crossing Sqm 2 9.600 3 28.8
Kerb Painting Sqm 2 250.000 0.3 150
Median Painting Sqm 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 16
Equilateral Triangle 16
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
Nos. 10
b Octagone size 10
c Informatory sign board Sqm 10 0.900 9
5 Dewatering Hour 1 26
23 Kerb Stone Rm 0 0
24 Rubble Soling
Utility Crossing Cum 5 5.500 1.650 0.230 10.44
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 9 1.700 1.700 0.230 5.98
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 251.000 1.150 0.230 66.39
Cum 1 251.000 1.150 0.230 66.39
Total 151.59
25 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 5 5.50 1.650 0.100 4.54
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 9 1.70 1.70 0.100 2.6
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 251.00 1.15 0.100 28.87
Cum 1 251.00 1.15 0.100 28.87
Total 65.92
26 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Sr. No. Description Unit No. Length Breadth Depth Quantity
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 251.000 1.050 0.150 39.53
Cum 1 251.000 1.050 0.150 39.53
Total 83.26
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 9 6.000 0.150 1.500 12.15
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 251.000 0.150 1.000 75.3
Cum 2 251.000 0.150 1.000 75.3
Total 166.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -11 0.900 0.600 0.150 -0.891
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 251.000 1.050 0.150 39.53
Cum 1 251.000 1.050 0.150 39.53
Cover Deduction Cum -100 0.600 0.450 0.150 -4.05
Total 78.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
27 Reinforcement
a Raft MT 110 kg/cum 9616.24
b Wall MT 100 kg/cum 17430.00
c Slab MT 95 kg/cum 7780.50
Total 34.83
29 Painting Work
Edge Marking Line Sqm 2 257.000 0.15 77.1
Lane Marking / Other Markings Sqm 38.55
Zebra Crossing Sqm 5 5.800 3 43.5
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
30 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 2 0.900 1.8
5 Dewatering Hour 1 25
23 DLC
Foothpath Cum 1 781.400 0.150 117.21
117
29 Rubble Soling
Utility Crossing Cum 3 4.800 1.650 0.230 5.46
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 8 1.700 1.700 0.230 5.32
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 255.000 1.000 0.230 58.65
Cum 1 255.000 1.900 0.230 111.44
Total 183.26
30 PCC M15
Kerb Stone Cum 0 252.000 0.265 0.075 0
Utility Crossing Cum 3 4.80 1.650 0.100 2.38
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 8 1.70 1.70 0.100 2.31
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 255.00 1.00 0.100 25.5
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cum 1 255.00 1.90 0.100 48.45
Total 79.68
31 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 255.000 0.900 0.150 34.43
Cum 1 255.000 1.800 0.150 68.85
Total 107.13
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 8 6.000 0.150 1.500 10.8
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 255.000 0.150 1.000 76.5
Cum 2 255.000 0.150 1.000 76.5
Total 168.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -10 0.900 0.600 0.150 -0.81
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 255.000 0.900 0.150 34.43
Cum 1 255.000 1.800 0.150 68.85
Cover Deduction Cum -102 0.600 0.450 0.150 -4.13
Total 102.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
32 Reinforcement
a Raft MT 110 kg/cum 12373.52
b Wall MT 100 kg/cum 17640.00
c Slab MT 95 kg/cum 10174.50
Total 40.19
34 Painting Work
Edge Marking Line Sqm 2 252.000 0.15 75.6
Lane Marking / Other Markings Sqm 37.8
Zebra Crossing Sqm 2 5.100 3 15.3
Kerb Painting Sqm 0 252.000 0.3 0
Median Painting Sqm 0 252.000 1 0
35 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 5 0.900 4.5
5 Dewatering Hour 1 16
23 DLC
Foothpath Cum 1 566.810 0.150 85.02
85
31 Rubble Soling
Utility Crossing Cum 2 4.600 1.650 0.230 3.49
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 5 1.700 1.700 0.230 3.32
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 181.000 0.900 0.230 37.47
Cum 1 181.000 0.900 0.230 37.47
Total 83.69
32 PCC M15
Kerb Stone Cum 1 70.000 0.265 0.075 1.39
Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing Cum 2 4.60 1.650 0.100 1.52
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 5 1.70 1.70 0.100 1.45
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 181.00 0.90 0.100 16.29
Cum 1 181.00 0.90 0.100 16.29
Total 37.78
33 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 181.000 0.800 0.00
Cum 1 181.000 0.800 0.00
Total 2.63
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 5 6.000 0.150 1.500 6.75
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 181.000 0.150 1.000 54.3
Cum 2 181.000 0.150 1.000 54.3
Total 118.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -7 0.900 0.600 0.150 -0.567
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 181.000 0.800 0.150 21.72
Cum 1 181.000 0.800 0.150 21.72
Cover Deduction Cum -72 0.600 0.450 0.150 -2.92
Total 42.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
34 Reinforcement
a Raft MT 110 kg/cum 303.36
b Wall MT 100 kg/cum 12390.00
c Slab MT 95 kg/cum 4189.50
Total 16.88
36 Painting Work
Edge Marking Line Sqm 2 158.000 0.15 47.4
Lane Marking / Other Markings Sqm 23.7
Sr. No. Description Unit No. Length Breadth Depth Quantity
Zebra Crossing Sqm 2 4.900 3 14.7
Kerb Painting Sqm 1 70.000 0.3 21
Median Painting Sqm 0 0
37 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 5 0.900 4.5
5 Dewatering Hour 1 10
23 DLC
Foothpath Cum 1 888.000 0.150 133.2
133
24 Polyethylene (LDPE) sheet sqm 0 0.000 0.000 0
31 Rubble Soling
Utility Crossing Cum 1 9.200 1.650 0.230 3.49
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 7 1.700 1.700 0.230 4.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 95.000 1.000 0.230 21.85
Cum 1 95.000 1.000 0.230 21.85
Total 53.78
32 PCC M15
Sr. No. Description Unit No. Length Breadth Depth Quantity
Kerb Stone Cum 1 200.000 0.265 0.075 3.98
Utility Crossing Cum 1 9.20 1.650 0.100 1.52
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 7 1.70 1.70 0.100 2.02
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 95.00 1.00 0.100 9.5
Cum 1 95.00 1.00 0.100 9.5
Total 27.36
33 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 95.000 0.900 0.150 12.83
Cum 1 95.000 0.900 0.150 12.83
Total 28.95
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 7 6.000 0.150 1.500 9.45
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 95.000 0.150 1.000 28.5
Cum 2 95.000 0.150 1.000 28.5
Total 69.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -9 0.900 0.600 0.150 -0.729
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 95.000 0.900 0.150 12.83
Cum 1 95.000 0.900 0.150 12.83
Cover Deduction Cum -38 0.600 0.450 0.150 -1.54
Total 27.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
34 Reinforcement
a Raft MT 110 kg/cum 3343.90
b Wall MT 100 kg/cum 7245.00
c Slab MT 95 kg/cum 2693.25
Total 13.28
36 Painting Work
Edge Marking Line Sqm 2 98.000 0.15 29.4
Sr. No. Description Unit No. Length Breadth Depth Quantity
Lane Marking / Other Markings Sqm 14.7
Zebra Crossing Sqm 2 9.500 3 28.5
Kerb Painting Sqm 1 200.000 0.3 60
Median Painting Sqm 0 98.000 1 0
37 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 4 0.900 3.6
5 Dewatering Hour 1 11
Page 11 of 493
Sr. No. Description Unit No. Length Breadth Depth Quantity
150
23 Kerb Stone Rm 0 0
24 Rubble Soling
Utility Crossing Cum 2 6.400 1.650 0.230 4.86
OFC Chamber Cum 1 1.400 1.400 0.230 0.45
Electrical Chamber Cum 4 1.700 1.700 0.230 2.66
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 105.000 1.000 0.230 24.15
Total 33.16
25 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 6.40 1.650 0.100 2.11
OFC Chamber Cum 1 1.40 1.40 0.100 0.2
Electrical Chamber Cum 4 1.70 1.70 0.100 1.16
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 105.00 1.00 0.100 10.5
Total 14.42
26 RCC M25
a Raft
OFC Chamber Cum 1 1.200 1.200 0.150 0.22
Electrical Chamber Cum 4 1.500 1.500 0.150 1.35
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 105.000 0.900 0.150 14.18
Total 16.25
b Wall
OFC Chamber Cum 1 4.800 0.150 1.000 0.72
Electrical Chamber Cum 4 6.000 0.150 1.500 5.4
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 105.000 0.150 1.000 31.5
Total 39.00
c Slab
Page 12 of 493
Sr. No. Description Unit No. Length Breadth Depth Quantity
OFC Chamber Cum 1 1.200 1.200 0.150 0.22
Electrical Chamber Cum 4 1.500 1.500 0.150 1.35
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -6 0.900 0.600 0.150 -0.486
Cover Deduction Cum -1 -0.400 -0.600 0.200 -0.048
SWD Cum 1 105.000 0.900 0.150 14.175
Cover Deduction Cum -21 0.600 0.600 0.150 -1.134
Total 15.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
27 Reinforcement
a Raft MT 110 kg/cum 1876.64
b Wall MT 100 kg/cum 4095.00
c Slab MT 95 kg/cum 1496.25
d Tie Bar MT 262.5 0.7 0.89 163.33
Total 7.63
29 Painting Work
Edge Marking Line Sqm 2 105.000 0.15 31.5
Lane Marking / Other Markings Sqm 15.75
Zebra Crossing Sqm 2 6.700 3 20.1
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
30 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 3 0.900 2.7
Page 13 of 493
R28 -MG Road to takshila Raje Bahadur Lane to P & T Department
Sr. No. Description Unit No. Length Width Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 200.00 1.600 1.500 480
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 4 2.900 1.650 1.500 29
SWD cum 1 200.000 0.800 1.330 213
cum 1 200.000 0.800 1.330 213
Rigid Pavement deduction cum -1 200.000 1.600 0.300 -96
Total 839
5 Dewatering Hour 1 20
24 Kerb Stone Rm 0 0
25 Rubble Soling
Utility Crossing Cum 4 2.900 1.650 0.230 4.4
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 7 1.700 1.700 0.230 4.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 200.000 1.000 0.230 46
Cum 1 200.000 1.000 0.230 46
Total 102.99
26 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 2.90 1.650 0.100 1.91
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 7 1.70 1.70 0.100 2.02
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 200.00 1.00 0.100 20
Cum 1 200.00 1.00 0.100 20
Total 44.77
27 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 200.000 0.900 0.00
Cum 1 200.000 0.900 0.00
Total 3.30
Sr. No. Description Unit No. Length Width Depth Quantity
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 7 6.000 0.150 1.500 9.45
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 200.000 0.150 1.000 60
Cum 2 200.000 0.150 1.000 60
Total 132.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -9 0.900 0.600 0.150 -0.729
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 200.000 0.900 0.150 27.00
Cum 1 200.000 0.900 0.150 27.00
Cover Deduction Cum -80 0.600 0.450 0.150 -3.24
Total 53.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
28 Reinforcement
a Raft MT 110 kg/cum 381.32
b Wall MT 100 kg/cum 13860.00
c Slab MT 95 kg/cum 5286.75
Total 19.53
30 Painting Work
Edge Marking Line Sqm 2 200.000 0.15 60
Lane Marking / Other Markings Sqm 30
Zebra Crossing Sqm 2 3.200 3 9.6
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
5 Dewatering Hour 1 28
26 Rubble Soling
Utility Crossing Cum 3 11.700 1.650 0.230 13.32
OFC Chamber Cum 6 1.400 1.400 0.230 2.70
Electrical Chamber Cum 19 1.700 1.700 0.230 12.63
Water Chamber Cum 3 1.500 1.500 0.230 1.55
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 281.000 1.150 0.230 74.32
Cum 1 281.000 1.150 0.230 74.32
Total 178.84
27 PCC M15
Kerb Stone Cum 1 1059.010 0.265 0.075 21.05
Utility Crossing Cum 3 11.70 1.650 0.100 5.79
OFC Chamber Cum 6 1.40 1.40 0.100 1.18
Electrical Chamber Cum 19 1.70 1.70 0.100 5.49
Water Chamber Cum 3 1.50 1.50 0.100 0.68
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 281.00 1.15 0.100 32.32
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cum 1 281.00 1.15 0.100 32.32
Total 98.83
28 RCC M25
a Raft
OFC Chamber Cum 6 1.200 1.200 0.150 1.30
Electrical Chamber Cum 19 1.500 1.500 0.150 6.41
Water Chamber Cum 3 1.300 1.300 0.150 0.76
SWD Cum 1 281.000 1.050 0.150 44.26
Cum 1 281.000 1.050 0.150 44.26
Total 96.98
b Wall
OFC Chamber Cum 6 4.800 0.150 1.000 4.32
Electrical Chamber Cum 19 6.000 0.150 1.500 25.65
Water Chamber Cum 3 5.200 0.150 1.000 2.34
SWD Cum 2 281.000 0.150 1.000 84.3
Cum 2 281.000 0.150 1.000 84.3
Total 201.00
c Slab
OFC Chamber Cum 6 1.200 1.200 0.150 1.30
Electrical Chamber Cum 19 1.500 1.500 0.150 6.41
Water Chamber Cum 3 1.300 1.300 0.150 0.76
Cover Deduction Cum -22 0.900 0.600 0.150 -1.782
Cover Deduction Cum -6 -0.400 -0.600 0.200 -0.288
SWD Cum 1 281.000 1.050 0.150 44.26
Cum 1 281.000 1.050 0.150 44.26
Cover Deduction Cum -112 0.600 0.450 0.150 -4.54
Total 90.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
29 Reinforcement
a Raft MT 110 kg/cum 11201.65
b Wall MT 100 kg/cum 21105.00
c Slab MT 95 kg/cum 8977.50
Total 41.28
31 Painting Work
Edge Marking Line Sqm 2 281.000 0.15 84.3
Lane Marking / Other Markings Sqm 42.15
Zebra Crossing Sqm 2 12.000 3 36
Kerb Painting Sqm 1 1059.010 0.3 317.703
Median Painting Sqm 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 4 0.900 3.6
5 Dewatering Hour 1 35
23 DLC
Foothpath Cum 0 0.000 0.150 0
0
31 Rubble Soling
Utility Crossing Cum 3 14.400 1.650 0.230 16.39
OFC Chamber Cum 7 1.400 1.400 0.230 3.16
Electrical Chamber Cum 23 1.700 1.700 0.230 15.29
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 12 0.800 0.800 0.230 1.77
Total 37.65
32 PCC M15
Kerb Stone Cum 2 345.000 0.265 0.075 13.71
Utility Crossing Cum 3 14.40 1.650 0.100 7.13
OFC Chamber Cum 7 1.40 1.40 0.100 1.37
Electrical Chamber Cum 23 1.70 1.70 0.100 6.65
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Sr. No. Description Unit No. Length Breadth Depth Quantity
Light pole Cum 12 0.80 0.80 0.100 0.77
Total 30.08
33 RCC M25
a Raft
OFC Chamber Cum 7 1.200 1.200 0.150 1.51
Electrical Chamber Cum 23 1.500 1.500 0.150 7.76
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 9.78
b Wall
OFC Chamber Cum 7 4.800 0.150 1.000 5.04
Electrical Chamber Cum 23 6.000 0.150 1.500 31.05
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 38.00
c Slab
OFC Chamber Cum 7 1.200 1.200 0.150 1.51
Electrical Chamber Cum 23 1.500 1.500 0.150 7.76
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -25 0.900 0.600 0.150 -2.025
Cover Deduction Cum -7 -0.400 -0.600 0.200 -0.336
Total 7.00
d Pole Foundation Cum 12 0.600 0.600 1.500 6.48
34 Reinforcement
a Raft MT 110 kg/cum 1129.76
b Wall MT 100 kg/cum 3990.00
c Slab MT 95 kg/cum 698.25
Total 5.82
36 Painting Work
Edge Marking Line Sqm 4 345.000 0.15 207
Lane Marking / Other Markings Sqm 103.5
Zebra Crossing Sqm 6 14.700 3 132.3
Kerb Painting Sqm 2 345.000 0.3 207
Median Painting Sqm 2 345.000 1 690
37 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 6
b Octagone size 6
c Informatory sign board Sqm 8 0.900 7.2
5 Dewatering Hour 1 24
29 Kerb Stone Rm 0 0
30 Rubble Soling
Utility Crossing Cum 2 3.100 1.650 0.230 2.35
OFC Chamber Cum 5 1.400 1.400 0.230 2.25
Electrical Chamber Cum 16 1.700 1.700 0.230 10.64
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 250.000 1.000 0.230 57.50
Cum 1 250.000 1.000 0.230 57.50
Total 131.28
31 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 3.10 1.650 0.100 1.02
Sr. No. Description Unit No. Length Breadth Depth Quantity
OFC Chamber Cum 5 1.40 1.40 0.100 0.98
Electrical Chamber Cum 16 1.70 1.70 0.100 4.62
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 250.00 1.00 0.100 25.00
Cum 1 250.00 1.00 0.100 25.00
Total 57.07
32 RCC M25
a Raft
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 16 1.500 1.500 0.150 5.40
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 250.000 0.900 0.150 33.75
Cum 1 250.000 0.900 0.150 33.75
Total 74.49
b Wall
OFC Chamber Cum 5 4.800 0.150 1.000 3.6
Electrical Chamber Cum 16 6.000 0.150 1.500 21.6
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 250.000 0.150 1.000 75
Cum 2 250.000 0.150 1.000 75
Total 177.00
c Slab
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 16 1.500 1.500 0.150 5.40
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -18 0.900 0.600 0.150 -1.458
Cover Deduction Cum -5 -0.400 -0.600 0.200 -0.24
SWD Cum 1 250.000 0.900 0.150 33.75
Cum 1 250.000 0.900 0.150 33.75
Cover Deduction Cum -100 0.600 0.450 0.150 -4.05
Total 69.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
33 Reinforcement
a Raft MT 110 kg/cum 8603.25
b Wall MT 100 kg/cum 18585.00
c Slab MT 95 kg/cum 6882.75
Total 34.07
35 Painting Work
Edge Marking Line Sqm 2 244.000 0.15 73.2
Lane Marking / Other Markings Sqm 36.6
Zebra Crossing Sqm 2 3.400 3 10.2
Sr. No. Description Unit No. Length Breadth Depth Quantity
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
36 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 5 0.900 4.5
5 Dewatering Hour 1 18
26 Rubble Soling
Utility Crossing Cum 2 11.700 1.650 0.230 8.88
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 12 1.700 1.700 0.230 7.98
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 6 0.800 0.800 0.230 0.88
Total 20.58
27 PCC M15
Kerb Stone Cum 2 178.000 0.265 0.075 7.08
Utility Crossing Cum 2 11.70 1.650 0.100 3.86
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 12 1.70 1.70 0.100 3.47
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 6 0.80 0.80 0.100 0.38
Total 16.02
28 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 12 1.500 1.500 0.150 4.05
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 5.42
Sr. No. Description Unit No. Length Breadth Depth Quantity
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 12 6.000 0.150 1.500 16.2
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 21.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 12 1.500 1.500 0.150 4.05
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -14 0.900 0.600 0.150 -1.134
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
Total 4.00
d Pole Foundation Cum 6 0.600 0.600 1.500 3.24
29 Reinforcement
a Raft MT 110 kg/cum 626.13
b Wall MT 100 kg/cum 2205.00
c Slab MT 95 kg/cum 399.00
Total 3.23
31 Painting Work
Edge Marking Line Sqm 2 178.000 0.15 53.4
Lane Marking / Other Markings Sqm 26.7
Zebra Crossing Sqm 2 12.000 3 36
Kerb Painting Sqm 2 178.000 0.3 106.8
Median Painting Sqm 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 4 0.900 3.6
5 Dewatering Hour 1 24
25 Rubble Soling
Utility Crossing Cum 2 9.700 1.650 0.230 7.36
OFC Chamber Cum 5 1.400 1.400 0.230 2.25
Electrical Chamber Cum 16 1.700 1.700 0.230 10.64
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 8 0.800 0.800 0.230 1.18
SWD Cum 1 240.000 1.000 0.230 55.2
Total 77.67
26 PCC M15
Kerb Stone Cum 2 240.000 0.265 0.075 9.54
Utility Crossing Cum 2 9.70 1.650 0.100 3.2
OFC Chamber Cum 5 1.40 1.40 0.100 0.98
Electrical Chamber Cum 16 1.70 1.70 0.100 4.62
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 8 0.80 0.80 0.100 0.51
SWD Cum 1 240.00 1.00 0.100 24
Total 43.3
27 RCC M25
a Raft
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Sr. No. Description Unit No. Length Breadth Depth Quantity
Electrical Chamber Cum 16 1.500 1.500 0.150 5.40
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 240.000 0.900 0.150 32.40
Total 39.39
b Wall
OFC Chamber Cum 5 4.800 0.150 1.000 3.6
Electrical Chamber Cum 16 6.000 0.150 1.500 21.6
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 240.000 0.150 1.000 72
Total 99.00
c Slab
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 16 1.500 1.500 0.150 5.40
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -18 0.900 0.600 0.150 -1.458
Cover Deduction Cum -5 -0.400 -0.600 0.200 -0.24
SWD Cum 1 240.000 0.900 0.200 43.2
Cover Deduction Cum -48 0.600 0.450 0.150 -1.944
Total 47.00
d Pole Foundation Cum 8 0.600 0.600 1.500 4.32
28 Reinforcement
a Raft MT 110 kg/cum 4549.20
b Wall MT 100 kg/cum 10395.00
c Slab MT 95 kg/cum 4688.25
Total 19.63
30 Painting Work
Edge Marking Line Sqm 2 240.000 0.15 72
Lane Marking / Other Markings Sqm 36
Zebra Crossing Sqm 6 10.000 3 90
Kerb Painting Sqm 2 240.000 0.3 144
Median Painting Sqm 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 4 0.900 3.6
5 Dewatering Hour 1 22
24 Kerb Stone Rm 0 0
25 Rubble Soling
Utility Crossing Cum 4 2.800 1.650 0.230 4.25
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 7 1.700 1.700 0.230 4.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 222.000 0.900 0.230 45.95
Cum 1 222.000 0.900 0.230 45.95
Total 102.74
26 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 2.80 1.650 0.100 1.85
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 7 1.70 1.70 0.100 2.02
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 222.00 0.90 0.100 19.98
Cum 1 222.00 0.90 0.100 19.98
Total 44.67
27 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 222.000 0.800 0.150 26.64
Cum 1 222.000 0.800 0.150 26.64
Total 56.58
Sr. No. Description Unit No. Length Breadth Depth Quantity
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 7 6.000 0.150 1.500 9.45
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 222.000 0.150 1.000 66.6
Cum 2 222.000 0.150 1.000 66.6
Total 146.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -9 0.900 0.600 0.150 -0.729
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 222.000 0.800 0.150 26.64
Cum 1 222.000 0.800 0.150 26.64
Cover Deduction Cum -89 0.600 0.450 0.150 -3.60
Total 52.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
28 Reinforcement
a Raft MT 110 kg/cum 6535.16
b Wall MT 100 kg/cum 15330.00
c Slab MT 95 kg/cum 5187.00
d Tie Bar MT 537.5 0.7 0.89 334.44
Total 27.39
30 Painting Work
Edge Marking Line Sqm 2 215.000 0.15 64.5
Lane Marking / Other Markings Sqm 32.25
Zebra Crossing Sqm 6 3.100 3 27.9
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
5 Dewatering Hour 1 11
26 Rubble Soling
Utility Crossing Cum 1 6.500 1.650 0.230 2.47
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 7 1.700 1.700 0.230 4.65
Water Chamber Cum 1 1.500 1.500 0.230 0.52
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 105.000 1.000 0.230 24.15
Cum 1 105.000 1.000 0.230 24.15
Total 56.84
27 PCC M15
Kerb Stone Cum 1 111.000 0.265 0.075 2.21
Utility Crossing Cum 1 6.50 1.650 0.100 1.07
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 7 1.70 1.70 0.100 2.02
Water Chamber Cum 1 1.50 1.50 0.100 0.23
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 105.00 1.00 0.100 10.50
Cum 1 105.00 1.00 0.100 10.50
Total 26.92
Sr. No. Description Unit No. Length Breadth Depth Quantity
28 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 1 1.300 1.300 0.150 0.25
SWD Cum 1 105.000 0.900 0.150 14.18
Cum 1 105.000 0.900 0.150 14.18
Total 31.40
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 7 6.000 0.150 1.500 9.45
Water Chamber Cum 1 5.200 0.150 1.000 0.78
SWD Cum 2 105.000 0.150 1.000 31.5
Cum 2 105.000 0.150 1.000 31.5
Total 75.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 1 1.300 1.300 0.150 0.25
Cover Deduction Cum -8 0.900 0.600 0.150 -0.648
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 105.000 0.900 0.150 14.18
Cum 1 105.000 0.900 0.150 14.18
Cover Deduction Cum -42 0.600 0.450 0.150 -1.70
Total 29.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
29 Reinforcement
a Raft MT 110 kg/cum 3626.47
b Wall MT 100 kg/cum 7875.00
c Slab MT 95 kg/cum 2892.75
Total 14.39
31 Painting Work
Edge Marking Line Sqm 2 111.000 0.15 33.3
Lane Marking / Other Markings Sqm 16.65
Zebra Crossing Sqm 2 6.800 3 20.4
Kerb Painting Sqm 1 111.000 0.3 33.3
Median Painting Sqm 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 3 0.900 2.7
Sr. No. Description Unit No. Length Breadth Depth Quantity
5 Dewatering Hour 1 12
25 Rubble Soling
Utility Crossing Cum 1 9.100 1.650 0.230 3.45
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 8 1.700 1.700 0.230 5.32
Water Chamber Cum 1 1.500 1.500 0.230 0.52
Light pole Cum 4 0.800 0.800 0.230 0.59
Total 10.78
26 PCC M15
Kerb Stone Cum 2 120.000 0.265 0.075 4.77
Utility Crossing Cum 1 9.10 1.650 0.100 1.5
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 8 1.70 1.70 0.100 2.31
Water Chamber Cum 1 1.50 1.50 0.100 0.23
Light pole Cum 4 0.80 0.80 0.100 0.26
Total 9.46
27 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 1 1.300 1.300 0.150 0.25
Total 3.39
Sr. No. Description Unit No. Length Breadth Depth Quantity
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 8 6.000 0.150 1.500 10.8
Water Chamber Cum 1 5.200 0.150 1.000 0.78
Total 13.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 1 1.300 1.300 0.150 0.25
Cover Deduction Cum -9 0.900 0.600 0.150 -0.729
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
Total 3.00
d Pole Foundation Cum 4 0.600 0.600 1.500 2.16
28 Reinforcement
a Raft MT 110 kg/cum 391.03
b Wall MT 100 kg/cum 1365.00
c Slab MT 95 kg/cum 299.25
Total 2.06
30 Painting Work
Edge Marking Line Sqm 2 120.000 0.15 36
Lane Marking / Other Markings Sqm 18
Zebra Crossing Sqm 2 9.400 3 28.2
Kerb Painting Sqm 2 120.000 0.3 72
Median Painting Sqm 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 3 0.900 2.7
3 DLC
Add 10% for Damage Panel Repairing cum 1 38.600 15.100 0.150 87
Total 87
11 Painting Work
Edge Marking Line Sqm 2 386.000 0.15 115.8
Lane Marking / Other Markings Sqm 57.9
Zebra Crossing Sqm 6 12.100 3 108.9
Kerb Painting Sqm 2 380.000 0.2 152
Median Painting Sqm 0
12 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 5 0.900 4.5
Sr. No. Description Unit No. Length Breadth Depth Quantity
13 Stud with Lense Reflector Nos 2 21.0 42
Zebra crossing Nos 2 12.100 81
Total 123.00
14 Barrigates Rmt 2 76 152
R38 -Mohan Talim Sangha to Raviwar Karanja
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 578.00 1.600 1.500 2774
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 6 6.500 1.650 1.500 97
SWD cum 1 578.000 0.800 1.480 684
cum 1 578.000 0.800 1.480 684
Rigid Pavement deduction cum -2 578.000 1.600 0.300 -555
Total 3684
5 Dewatering Hour 1 58
25 Rubble Soling
Utility Crossing Cum 6 6.500 1.650 0.230 14.8
OFC Chamber Cum 12 1.400 1.400 0.230 5.41
Electrical Chamber Cum 39 1.700 1.700 0.230 25.92
Water Chamber Cum 6 1.500 1.500 0.230 3.11
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 578.000 1.150 0.230 152.88
Cum 1 578.000 1.150 0.230 152.88
Total 355
26 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 6 6.50 1.650 0.100 6.44
OFC Chamber Cum 12 1.40 1.40 0.100 2.35
Electrical Chamber Cum 39 1.70 1.70 0.100 11.27
Water Chamber Cum 6 1.50 1.50 0.100 1.35
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 578.00 1.15 0.100 66.47
Cum 1 578.00 1.15 0.100 66.47
Total 154.35
27 RCC M25
a Raft
Sr. No. Description Unit No. Length Breadth Depth Quantity
OFC Chamber Cum 12 1.200 1.200 0.150 2.59
Electrical Chamber Cum 39 1.500 1.500 0.150 13.16
Water Chamber Cum 6 1.300 1.300 0.150 1.52
SWD Cum 1 578.000 1.050 0.150 91.04
Cum 1 578.000 1.050 0.150 91.04
Total 199.35
b Wall
OFC Chamber Cum 12 4.800 0.150 1.000 8.64
Electrical Chamber Cum 39 6.000 0.150 1.500 52.65
Water Chamber Cum 6 5.200 0.150 1.000 4.68
SWD Cum 2 578.000 0.150 1.000 173.4
Cum 2 578.000 0.150 1.000 173.4
Total 413.00
c Slab
OFC Chamber Cum 12 1.200 1.200 0.150 2.59
Electrical Chamber Cum 39 1.500 1.500 0.150 13.16
Water Chamber Cum 6 1.300 1.300 0.150 1.52
Cover Deduction Cum -45 0.900 0.600 0.150 -3.645
Cover Deduction Cum -12 -0.400 -0.600 0.200 -0.576
SWD Cum 1 578.000 1.050 0.150 91.04
Cum 1 578.000 1.050 0.150 91.04
Cover Deduction Cum -231 0.600 0.450 0.150 -9.36
Total 186.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
28 Reinforcement
a Raft MT 110 kg/cum 23024.41
b Wall MT 100 kg/cum 43365.00
c Slab MT 95 kg/cum 18553.50
Total 84.94
30 Painting Work
Edge Marking Line Sqm 2 578.000 0.15 173.4
Lane Marking / Other Markings Sqm 86.7
Zebra Crossing Sqm 2 6.800 3 20.4
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 8
b Octagone size 8
c Informatory sign board Sqm 6 0.900 5.4
5 Dewatering Hour 1 53
25 Rubble Soling
Utility Crossing Cum 5 8.000 1.650 0.230 15.18
OFC Chamber Cum 11 1.400 1.400 0.230 4.96
Electrical Chamber Cum 35 1.700 1.700 0.230 23.26
Water Chamber Cum 5 1.500 1.500 0.230 2.59
Light pole Cum 18 0.800 0.800 0.230 2.65
SWD Cum 1 535.000 1.000 0.230 123.05
Total 171.69
26 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 5 8.00 1.650 0.100 6.6
OFC Chamber Cum 11 1.40 1.40 0.100 2.16
Electrical Chamber Cum 35 1.70 1.70 0.100 10.12
Water Chamber Cum 5 1.50 1.50 0.100 1.13
Light pole Cum 18 0.80 0.80 0.100 1.15
SWD Cum 1 535.00 1.00 0.100 53.5
Total 74.66
27 RCC M25
a Raft
OFC Chamber Cum 11 1.200 1.200 0.150 2.38
Electrical Chamber Cum 35 1.500 1.500 0.150 11.81
Water Chamber Cum 5 1.300 1.300 0.150 1.27
Sr. No. Description Unit No. Length Breadth Depth Quantity
SWD Cum 1 535.000 0.900 0.150 72.23
Total 87.68
b Wall
OFC Chamber Cum 11 4.800 0.150 1.000 7.92
Electrical Chamber Cum 35 6.000 0.150 1.500 47.25
Water Chamber Cum 5 5.200 0.150 1.000 3.90
SWD Cum 2 535.000 0.150 1.000 160.5
Total 220.00
c Slab
OFC Chamber Cum 11 1.200 1.200 0.150 2.38
Electrical Chamber Cum 35 1.500 1.500 0.150 11.81
Water Chamber Cum 5 1.300 1.300 0.150 1.27
Cover Deduction Cum -40 0.900 0.600 0.150 -3.24
Cover Deduction Cum -11 -0.400 -0.600 0.200 -0.53
SWD Cum 1 535.000 0.900 0.150 72.225
Cover Deduction Cum -107 0.600 0.450 0.150 -4.33
Total 80.00
d Pole Foundation Cum 18 0.600 0.600 1.500 9.72
28 Reinforcement
a Raft MT 110 kg/cum 10127.16
b Wall MT 100 kg/cum 23100.00
c Slab MT 95 kg/cum 7980.00
Total 41.21
30 Painting Work
Edge Marking Line Sqm 2 530.000 0.15 159
Lane Marking / Other Markings Sqm 79.5
Zebra Crossing Sqm 2 8.300 3 24.9
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 15
Equilateral Triangle 15
Cautionary/Warning sign boards in
Nos. 8
b Octagone size 8
c Informatory sign board Sqm 6 0.900 5.4
6 Dewatering Hour 1 42
24 Kerb Stone Rm 0 0
25 Rubble Soling
Utility Crossing Cum 8 6.200 1.650 0.230 18.82
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 14 1.700 1.700 0.230 9.31
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 14 0.800 0.800 0.230 2.06
SWD Cum 1 424.000 1.150 0.230 112.15
Total 145.18
26 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 8 6.20 1.650 0.100 8.18
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 14 1.70 1.70 0.100 4.05
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 14 0.80 0.80 0.100 0.9
SWD Cum 1 424.00 1.15 0.100 48.76
Total 63.12
27 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 14 1.500 1.500 0.150 4.73
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 424.000 1.050 0.150 66.78
Total 72.88
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 14 6.000 0.150 1.500 18.9
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 1 424.000 0.150 1.000 63.6
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 87.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 14 1.500 1.500 0.150 4.73
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -16 0.900 0.600 0.150 -1.296
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
SWD Cum 1 424.000 1.050 0.150 66.78
Cover Deduction Cum -85 0.600 0.450 0.150 -3.44
Total 68.00
d Pole Foundation Cum 14 0.600 0.600 1.500 7.56
28 Reinforcement
a Raft MT 110 kg/cum 8417.18
b Wall MT 100 kg/cum 9135.00
c Slab MT 95 kg/cum 6783.00
d Tie Bar MT 1060 0.7 0.89 659.56
Total 25.00
30 Painting Work
Edge Marking Line Sqm 2 424.000 0.15 127.2
Lane Marking / Other Markings Sqm 63.6
Zebra Crossing Sqm 2 6.500 3 19.5
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 20
Equilateral Triangle 20
Cautionary/Warning sign boards in
Nos. 10
b Octagone size 10
c Informatory sign board Sqm 5 0.900 4.5
5 Dewatering Hour 1 34
25 Rubble Soling
Utility Crossing Cum 3 16.400 1.650 0.230 18.67
OFC Chamber Cum 7 1.400 1.400 0.230 3.16
Electrical Chamber Cum 23 1.700 1.700 0.230 15.29
Water Chamber Cum 3 1.500 1.500 0.230 1.55
Light pole Cum 11 0.800 0.800 0.230 1.62
Total 40.29
26 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 3 16.40 1.650 0.100 8.12
OFC Chamber Cum 7 1.40 1.40 0.100 1.37
Electrical Chamber Cum 23 1.70 1.70 0.100 6.65
Water Chamber Cum 3 1.50 1.50 0.100 0.68
Light pole Cum 11 0.80 0.80 0.100 0.7
Total 17.52
27 RCC M25
a Raft
OFC Chamber Cum 7 1.200 1.200 0.150 1.51
Electrical Chamber Cum 23 1.500 1.500 0.150 7.76
Water Chamber Cum 3 1.300 1.300 0.150 0.76
Total 10.04
b Wall
OFC Chamber Cum 7 4.800 0.150 1.000 5.04
Sr. No. Description Unit No. Length Breadth Depth Quantity
Electrical Chamber Cum 23 6.000 0.150 1.500 31.05
Water Chamber Cum 3 5.200 0.150 1.000 2.34
Total 38.00
c Slab
OFC Chamber Cum 7 1.200 1.200 0.150 1.51
Electrical Chamber Cum 23 1.500 1.500 0.150 7.76
Water Chamber Cum 3 1.300 1.300 0.150 0.76
Cover Deduction Cum -26 0.900 0.600 0.150 -2.106
Cover Deduction Cum -7 -0.400 -0.600 0.200 -0.336
Total 8.00
d Pole Foundation Cum 11 0.600 0.600 1.500 5.94
28 Reinforcement
a Raft MT 110 kg/cum 1159.04
b Wall MT 100 kg/cum 3990.00
c Slab MT 95 kg/cum 798.00
Total 5.95
30 Painting Work
Edge Marking Line Sqm 2 340.000 0.15 102
Lane Marking / Other Markings Sqm 51
Zebra Crossing Sqm 2 16.700 3 50.1
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 340.000 1 680
31 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 4 0.900 3.6
5 Dewatering Hour 1 40
23 Kerb Stone Rm 0 0
24 Rubble Soling
Utility Crossing Cum 8 3.200 1.650 0.230 9.72
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 13 1.700 1.700 0.230 8.64
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 13 0.800 0.800 0.230 1.91
Total 23.11
25 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 8 3.20 1.650 0.100 4.22
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 13 1.70 1.70 0.100 3.76
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 13 0.80 0.80 0.100 0.83
Total 10.04
26 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 13 1.500 1.500 0.150 4.39
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 5.76
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 13 6.000 0.150 1.500 17.55
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 22.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 13 1.500 1.500 0.150 4.39
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -15 0.900 0.600 0.150 -1.215
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
Total 4.00
d Pole Foundation Cum 13 0.600 0.600 1.500 7.02
27 Reinforcement
a Raft MT 110 kg/cum 665.11
b Wall MT 100 kg/cum 2310.00
c Slab MT 95 kg/cum 399.00
Total 3.37
29 Painting Work
Edge Marking Line Sqm 2 396.000 0.15 118.8
Lane Marking / Other Markings Sqm 59.4
Zebra Crossing Sqm 1 3.500 3 5.25
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
30 Signages
Cautionary/Warning sign boards in
a Nos. 16
Equilateral Triangle 16
Cautionary/Warning sign boards in
Nos. 6
b Octagone size 6
c Informatory sign board Sqm 10 0.900 9
5 Dewatering Hour 1 56
23 DLC
Foothpath Cum 1 3923.800 0.150 588.57
589
30 Rubble Soling
Utility Crossing Cum 6 21.700 1.650 0.230 49.41
OFC Chamber Cum 11 1.400 1.400 0.230 4.96
Electrical Chamber Cum 38 1.700 1.700 0.230 25.26
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 19 0.800 0.800 0.230 2.8
Total 83.47
31 PCC M15
Kerb Stone Cum 2 564.000 0.265 0.075 22.42
Utility Crossing Cum 6 21.70 1.650 0.100 21.48
OFC Chamber Cum 11 1.40 1.40 0.100 2.16
Electrical Chamber Cum 38 1.70 1.70 0.100 10.98
Sr. No. Description Unit No. Length Breadth Depth Quantity
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 19 0.80 0.80 0.100 1.22
Total 58.71
32 RCC M25
a Raft
OFC Chamber Cum 11 1.200 1.200 0.150 2.38
Electrical Chamber Cum 38 1.500 1.500 0.150 12.83
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 15.71
b Wall
OFC Chamber Cum 11 4.800 0.150 1.000 7.92
Electrical Chamber Cum 38 6.000 0.150 1.500 51.3
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 61.00
c Slab
OFC Chamber Cum 11 1.200 1.200 0.150 2.38
Electrical Chamber Cum 38 1.500 1.500 0.150 12.83
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -40 0.900 0.600 0.150 -3.24
Cover Deduction Cum -11 -0.400 -0.600 0.200 -0.528
Total 12.00
d Pole Foundation Cum 19 0.600 0.600 1.500 10.26
33 Reinforcement
a Raft MT 110 kg/cum 1814.27
b Wall MT 100 kg/cum 6405.00
c Slab MT 95 kg/cum 1197.00
Total 9.42
35 Painting Work
Edge Marking Line Sqm 4 564.000 0.15 338.4
Lane Marking / Other Markings Sqm 169.2
Zebra Crossing Sqm 6 22.000 3 198
Kerb Painting Sqm 2 564.000 0.3 338.4
Median Painting Sqm 2 564.000 1 1128
36 Signages
Cautionary/Warning sign boards in
a Nos. 20
Equilateral Triangle 20
Cautionary/Warning sign boards in
Nos. 10
b Octagone size 10
c Informatory sign board Sqm 8 0.900 7.2
5 Dewatering Hour 1 33
23 Kerb Stone Rm 0 0
24 Rubble Soling
Utility Crossing Cum 7 3.200 1.650 0.230 8.5
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 11 1.700 1.700 0.230 7.31
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 11 0.800 0.800 0.230 1.62
Total 19.82
25 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 7 3.20 1.650 0.100 3.7
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 11 1.70 1.70 0.100 3.18
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 11 0.80 0.80 0.100 0.7
Total 8.62
26 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 11 1.500 1.500 0.150 3.71
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 4.87
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 11 6.000 0.150 1.500 14.85
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 19.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 11 1.500 1.500 0.150 3.71
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -13 0.900 0.600 0.150 -1.053
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
Total 4.00
d Pole Foundation Cum 11 0.600 0.600 1.500 5.94
27 Reinforcement
a Raft MT 110 kg/cum 562.20
b Wall MT 100 kg/cum 1995.00
c Slab MT 95 kg/cum 399.00
Total 2.96
29 Painting Work
Edge Marking Line Sqm 2 333.000 0.15 99.9
Lane Marking / Other Markings Sqm 49.95
Zebra Crossing Sqm 1 3.500 3 5.25
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
30 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 6 0.900 5.4
7 Dewatering Hour 1 29
25 Kerb Stone Rm 0 0
26 Rubble Soling
Utility Crossing Cum 6 6.400 1.650 0.230 14.57
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 10 1.700 1.700 0.230 6.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 10 0.800 0.800 0.230 1.47
SWD Cum 1 294.000 1.400 0.230 94.67
Cum 1 294.000 1.400 0.230 94.67
Total 214.42
27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 6 6.40 1.650 0.100 6.34
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 10 1.70 1.70 0.100 2.89
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 10 0.80 0.80 0.100 0.64
SWD Cum 1 294.00 1.40 0.100 41.16
Cum 1 294.00 1.40 0.100 41.16
Total 93.23
28 RCC M25
Sr. No. Description Unit No. Length Breadth Depth Quantity
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 294.000 1.300 0.150 57.33
Cum 1 294.000 1.300 0.150 57.33
Total 119.19
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 10 6.000 0.150 1.500 13.5
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 294.000 0.150 1.000 88.2
Cum 2 294.000 0.150 1.000 88.2
Total 194.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -12 0.900 0.600 0.150 -0.972
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 294.000 1.300 0.150 57.33
Cum 1 294.000 1.300 0.150 57.33
Cover Deduction Cum -118 0.600 0.450 0.150 -4.78
Total 113.00
d Pole Foundation Cum 10 0.600 0.600 1.500 5.40
29 Reinforcement
a Raft MT 110 kg/cum 13766.45
b Wall MT 100 kg/cum 20370.00
c Slab MT 95 kg/cum 11271.75
Total 45.41
31 Painting Work
Edge Marking Line Sqm 2 294.000 0.15 88.2
Lane Marking / Other Markings Sqm 44.1
Zebra Crossing Sqm 6 6.700 3 60.3
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 6 0.900 5.4
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 Stud with Lense Reflector Nos 2 16 32
Zebra crossing Nos 6 6.700 134
Total 166.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 294.00 2352.00
b 160 mm outer dia for HT & LT Cable Rmt 10 294.00 2940.00
7 Dewatering Hour 1 20
26 Kerb Stone Rm 0 0
27 Rubble Soling
Utility Crossing Cum 4 3.100 1.650 0.230 4.71
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 7 1.700 1.700 0.230 4.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 198.000 1.400 0.230 63.76
Cum 1 198.000 1.400 0.230 63.76
Total 138.82
28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 3.10 1.650 0.100 2.05
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 7 1.70 1.70 0.100 2.02
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 198.00 1.40 0.100 27.72
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cum 1 198.00 1.40 0.100 27.72
Total 60.35
29 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 198.000 1.300 0.150 38.61
Cum 1 198.000 1.300 0.150 38.61
Total 80.52
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 7 6.000 0.150 1.500 9.45
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 198.000 0.150 1.000 59.4
Cum 2 198.000 0.150 1.000 59.4
Total 131.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -9 0.900 0.600 0.150 -0.729
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 198.000 1.300 0.150 38.61
Cum 1 198.000 1.300 0.150 38.61
Cover Deduction Cum -79 0.300 0.300 0.150 -1.07
Total 79.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
30 Reinforcement
a Raft MT 110 kg/cum 9300.23
b Wall MT 100 kg/cum 13755.00
c Slab MT 95 kg/cum 7880.25
Total 30.94
32 Painting Work
Edge Marking Line Sqm 2 198.000 0.15 59.4
Lane Marking / Other Markings Sqm 29.7
Zebra Crossing Sqm 2 3.400 3 10.2
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
33 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 5 0.900 4.5
7 Dewatering Hour 1 16
25 Kerb Stone Rm 0 0
26 Rubble Soling
Utility Crossing Cum 3 3.100 1.650 0.230 3.53
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 5 1.700 1.700 0.230 3.32
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 155.000 0.900 0.230 32.09
Cum 1 155.000 0.900 0.230 32.09
Total 72.97
27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 3 3.10 1.650 0.100 1.53
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 5 1.70 1.70 0.100 1.45
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 155.00 0.90 0.100 13.95
Cum 1 155.00 0.90 0.100 13.95
Total 31.72
28 RCC M25
Sr. No. Description Unit No. Length Breadth Depth Quantity
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 155.000 0.800 0.150 18.60
Cum 1 155.000 0.800 0.150 18.60
Total 39.83
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 5 6.000 0.150 1.500 6.75
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 155.000 0.150 1.000 46.50
Cum 2 155.000 0.150 1.000 46.50
Total 103.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -7 0.900 0.600 0.150 -0.567
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 155.000 0.800 0.150 18.60
Cum 1 155.000 0.800 0.150 18.60
Cover Deduction Cum -62 0.300 0.300 0.150 -0.84
Total 38.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
29 Reinforcement
a Raft MT 110 kg/cum 4599.96
b Wall MT 100 kg/cum 10815.00
c Slab MT 95 kg/cum 3790.50
Total 19.21
31 Painting Work
Edge Marking Line Sqm 2 163.000 0.15 48.9
Lane Marking / Other Markings Sqm 24.45
Zebra Crossing Sqm 2 3.400 3 10.2
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 4 0.900 3.6
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 Stud with Lense Reflector Nos 2 9 18
Zebra crossing Nos 2 3.400 23
Total 41.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 163.00 1304.00
b 160 mm outer dia for HT & LT Cable Rmt 10 163.00 1630.00
7 Dewatering Hour 1 19
25 Kerb Stone Rm 0 0
26 Rubble Soling
Utility Crossing Cum 4 4.300 1.650 0.230 6.53
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 6 1.700 1.700 0.230 3.99
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 191.000 0.900 0.230 39.54
Cum 1 191.000 0.900 0.230 39.54
Total 91.54
27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 4.30 1.650 0.100 2.84
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 6 1.70 1.70 0.100 1.73
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 191.00 0.90 0.100 17.19
Cum 1 191.00 0.90 0.100 17.19
Total 39.79
28 RCC M25
Sr. No. Description Unit No. Length Breadth Depth Quantity
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 6 1.500 1.500 0.150 2.03
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 191.000 0.800 0.150 22.92
Cum 1 191.000 0.800 0.150 22.92
Total 48.80
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 6 6.000 0.150 1.500 8.1
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 191.000 0.150 1.000 57.3
Cum 2 191.000 0.150 1.000 57.3
Total 126.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 6 1.500 1.500 0.150 2.03
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -8 0.900 0.600 0.150 -0.648
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 191.000 0.800 0.150 22.92
Cum 1 191.000 0.800 0.150 22.92
Cover Deduction Cum -76 0.600 0.450 0.150 -3.08
Total 45.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
29 Reinforcement
a Raft MT 110 kg/cum 5636.86
b Wall MT 100 kg/cum 13230.00
c Slab MT 95 kg/cum 4488.75
Total 23.36
31 Painting Work
Edge Marking Line Sqm 2 188.000 0.15 56.4
Lane Marking / Other Markings Sqm 28.2
Zebra Crossing Sqm 4 4.600 3 27.6
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 4 0.900 3.6
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 Stud with Lense Reflector Nos 2 10 20
Zebra crossing Nos 4 4.600 61
Total 81.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 188.00 1504.00
b 160 mm outer dia for HT & LT Cable Rmt 10 188.00 1880.00
7 Dewatering Hour 1 24
25 Kerb Stone Rm 0 0
26 Rubble Soling
Utility Crossing Cum 5 3.500 1.650 0.230 6.64
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 8 1.700 1.700 0.230 5.32
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 239.000 1.150 0.230 63.22
Cum 1 239.000 1.150 0.230 63.22
Total 140.34
27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 5 3.50 1.650 0.100 2.89
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 8 1.70 1.70 0.100 2.31
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 239.00 1.15 0.100 27.49
Cum 1 239.00 1.15 0.100 27.49
Total 61.02
28 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 239.000 1.050 0.150 37.64
Cum 1 239.000 1.050 0.150 37.64
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 78.92
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 8 6.000 0.150 1.500 10.8
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 239.000 0.150 1.000 71.7
Cum 2 239.000 0.150 1.000 71.7
Total 157.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -10 0.900 0.600 0.150 -0.81
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 239.000 1.050 0.150 37.64
Cum 1 239.000 1.050 0.150 37.64
Cover Deduction Cum -96 0.600 0.450 0.150 -3.89
Total 74.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
29 Reinforcement
a Raft MT 110 kg/cum 9115.72
b Wall MT 100 kg/cum 16485.00
c Slab MT 95 kg/cum 7381.50
d Tie Bar MT 598 0.7 0.89 371.78
Total 33.35
31 Painting Work
Edge Marking Line Sqm 2 239.000 0.15 71.7
Lane Marking / Other Markings Sqm 35.85
Zebra Crossing Sqm 2 3.800 3 11.4
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 4 0.900 3.6
7 Dewatering Hour 1 25
493
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 602.500 0.150 90
Total 134
25 Kerb Stone Rm 0 0
26 Rubble Soling
Utility Crossing Cum 5 4.900 1.650 0.230 9.3
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 8 1.700 1.700 0.230 5.32
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 190.000 0.900 0.230 39.33
Cum 1 190.000 0.900 0.230 39.33
Total 95.67
27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 5 4.90 1.650 0.100 4.04
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 8 1.70 1.70 0.100 2.31
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 190.00 0.90 0.100 17.10
Cum 1 190.00 0.90 0.100 17.10
Total 41.59
28 RCC M25
493
Sr. No. Description Unit No. Length Breadth Depth Quantity
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 190.000 0.800 0.150 22.80
Cum 1 190.000 0.800 0.150 22.80
Total 49.46
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 8 6.000 0.150 1.500 10.8
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 190.000 0.150 1.000 57
Cum 2 190.000 0.150 1.000 57
Total 129.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -10 0.900 0.600 0.150 -0.81
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 190.000 0.800 0.150 22.80
Cum 1 190.000 0.800 0.150 22.80
Cover Deduction Cum -76 0.600 0.450 0.150 -3.08
Total 45.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
29 Reinforcement
a Raft MT 110 kg/cum 5712.05
b Wall MT 100 kg/cum 13545.00
c Slab MT 95 kg/cum 4488.75
Total 23.75
31 Painting Work
Edge Marking Line Sqm 2 251.000 0.15 75.3
Lane Marking / Other Markings Sqm 37.65
Zebra Crossing Sqm 2 5.200 3 15.6
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
493
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 Stud with Lense Reflector Nos 2 14 28
Zebra crossing Nos 2 5.200 35
Total 63.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 251.00 2008.00
b 160 mm outer dia for HT & LT Cable Rmt 10 251.00 2510.00
493
R51 -Pimpal Chowk to Trimbak Darwaja Police Chowky
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 76.00 1.600 1.500 365
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 1 11.500 1.650 1.500 28
SWD cum 1 58.000 1.300 1.480 112
cum 1 58.000 1.300 1.480 112
Rigid Pavement deduction cum -2 76.000 1.600 0.300 -73
Total 544
7 Dewatering Hour 1 8
27 Rubble Soling
Utility Crossing Cum 1 11.500 1.650 0.230 4.36
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 5 1.700 1.700 0.230 3.32
Water Chamber Cum 1 1.500 1.500 0.230 0.52
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 58.000 1.300 0.230 17.34
Cum 1 58.000 1.300 0.230 17.34
Total 43.78
28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 1 11.50 1.650 0.100 1.9
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 5 1.70 1.70 0.100 1.45
Water Chamber Cum 1 1.50 1.50 0.100 0.23
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 58.00 1.30 0.100 7.54
Cum 1 58.00 1.30 0.100 7.54
Total 19.05
Sr. No. Description Unit No. Length Breadth Depth Quantity
29 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Water Chamber Cum 1 1.300 1.300 0.150 0.25
SWD Cum 1 58.000 1.200 0.150 10.44
Cum 1 58.000 1.200 0.150 10.44
Total 23.25
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 5 6.000 0.150 1.500 6.75
Water Chamber Cum 1 5.200 0.150 1.000 0.78
SWD Cum 2 58.000 0.150 1.000 17.4
Cum 2 58.000 0.150 1.000 17.4
Total 44.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Water Chamber Cum 1 1.300 1.300 0.150 0.25
Cover Deduction Cum -6 0.900 0.600 0.150 -0.486
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 58.000 1.200 0.150 10.44
Cum 1 58.000 1.200 0.150 10.44
Cover Deduction Cum -23 0.900 0.600 0.150 -1.86
Total 21.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
30 Reinforcement
a Raft MT 110 kg/cum 2685.72
b Wall MT 100 kg/cum 4620.00
c Slab MT 95 kg/cum 2094.75
Total 9.40
32 Painting Work
Edge Marking Line Sqm 2 76.000 0.15 22.8
Lane Marking / Other Markings Sqm 11.4
Zebra Crossing Sqm 2 11.800 3 35.4
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 76.000 1 152
33 Signages
Cautionary/Warning sign boards in
a Nos. 4
Equilateral Triangle 4
Cautionary/Warning sign boards in
Nos. 2
b Octagone size 2
c Informatory sign board Sqm 4 0.900 3.6
Sr. No. Description Unit No. Length Breadth Depth Quantity
7 Dewatering Hour 1 38
31 Kerb Stone Rm 0 0
32 Rubble Soling
Utility Crossing Cum 4 10.700 1.650 0.230 16.24
OFC Chamber Cum 8 1.400 1.400 0.230 3.61
Electrical Chamber Cum 25 1.700 1.700 0.230 16.62
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 377.000 0.900 0.230 78.04
Cum 1 377.000 0.900 0.230 78.04
Total 193.59
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 10.70 1.650 0.100 7.06
OFC Chamber Cum 8 1.40 1.40 0.100 1.57
Electrical Chamber Cum 25 1.70 1.70 0.100 7.23
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 377.00 0.90 0.100 33.93
Cum 1 377.00 0.90 0.100 33.93
Total 84.17
34 RCC M25
a Raft
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 25 1.500 1.500 0.150 8.44
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 377.000 0.800 0.150 45.24
Cum 1 377.000 0.800 0.150 45.24
Total 101.15
b Wall
OFC Chamber Cum 8 4.800 0.150 1.000 5.76
Electrical Chamber Cum 25 6.000 0.150 1.500 33.75
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 377.000 0.150 1.000 113.1
Cum 2 377.000 0.150 1.000 113.1
Total 267.00
c Slab
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 25 1.500 1.500 0.150 8.44
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -27 0.900 0.600 0.150 -2.187
Cover Deduction Cum -8 -0.400 -0.600 0.200 -0.384
SWD Cum 1 377.000 0.800 0.150 45.24
Cum 1 377.000 0.800 0.150 45.24
Cover Deduction Cum -151 0.600 0.450 0.150 -6.12
Total 92.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
35 Reinforcement
a Raft MT 110 kg/cum 11683.11
b Wall MT 100 kg/cum 28035.00
c Slab MT 95 kg/cum 9177.00
Total 48.90
7 Dewatering Hour 1 21
25 Kerb Stone Rm 0 0
26 Rubble Soling
Utility Crossing Cum 4 2.700 1.650 0.230 4.1
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 7 1.700 1.700 0.230 4.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 7 0.800 0.800 0.230 1.03
Total 11.72
27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 2.70 1.650 0.100 1.78
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 7 1.70 1.70 0.100 2.02
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 7 0.80 0.80 0.100 0.45
Total 5.09
28 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 3.30
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 7 6.000 0.150 1.500 9.45
Sr. No. Description Unit No. Length Breadth Depth Quantity
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 12.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -9 0.900 0.600 0.150 -0.729
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
Total 2.00
d Pole Foundation Cum 7 0.600 0.600 1.500 3.78
29 Reinforcement
a Raft MT 110 kg/cum 381.32
b Wall MT 100 kg/cum 1260.00
c Slab MT 95 kg/cum 199.50
Total 1.84
31 Painting Work
Edge Marking Line Sqm 2 206.000 0.15 61.8
Lane Marking / Other Markings Sqm 30.9
Zebra Crossing Sqm 2 3.000 3 9
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 2
b Octagone size 2
c Informatory sign board Sqm 3 0.900 2.7
7 Dewatering Hour 1 14
27 Rubble Soling
Utility Crossing Cum 1 7.200 1.650 0.230 2.73
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 9 1.700 1.700 0.230 5.98
Water Chamber Cum 1 1.500 1.500 0.230 0.52
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 194.000 0.900 0.230 40.16
Cum 1 194.000 0.900 0.230 40.16
Total 90.9
28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 1 7.20 1.650 0.100 1.19
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 9 1.70 1.70 0.100 2.6
Water Chamber Cum 1 1.50 1.50 0.100 0.23
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 194.00 0.90 0.100 17.46
Cum 1 194.00 0.90 0.100 17.46
Total 39.53
Sr. No. Description Unit No. Length Breadth Depth Quantity
29 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 1 1.300 1.300 0.150 0.25
SWD Cum 1 194.000 0.800 0.150 23.28
Cum 1 194.000 0.800 0.150 23.28
Total 50.50
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 9 6.000 0.150 1.500 12.15
Water Chamber Cum 1 5.200 0.150 1.000 0.78
SWD Cum 2 194.000 0.150 1.000 58.2
Cum 2 194.000 0.150 1.000 58.2
Total 131.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 1 1.300 1.300 0.150 0.25
Cover Deduction Cum -10 0.900 0.600 0.150 -0.81
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 194.000 0.800 0.150 23.28
Cum 1 194.000 0.800 0.150 23.28
Cover Deduction Cum -78 0.600 0.450 0.150 -3.16
Total 46.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
30 Reinforcement
a Raft MT 110 kg/cum 5832.63
b Wall MT 100 kg/cum 13755.00
c Slab MT 95 kg/cum 4588.50
Total 24.18
32 Painting Work
Edge Marking Line Sqm 2 140.000 0.15 42
Lane Marking / Other Markings Sqm 21
Zebra Crossing Sqm 2 7.500 3 22.5
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 140.000 1 280
33 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
Sr. No. Description Unit No. Length Breadth Depth Quantity
7 Dewatering Hour 1 42
25 DLC
Foothpath Cum 1 1674.600 0.150 251.19
251
31 Rubble Soling
Utility Crossing Cum 4 8.600 1.650 0.230 13.05
OFC Chamber Cum 8 1.400 1.400 0.230 3.61
Electrical Chamber Cum 28 1.700 1.700 0.230 18.61
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 446.000 1.000 0.230 102.58
Cum 1 446.000 1.000 0.230 102.58
Total 241.47
32 PCC M15
Kerb Stone Cum 0 418.000 0.265 0.075 0
Utility Crossing Cum 4 8.60 1.650 0.100 5.68
OFC Chamber Cum 8 1.40 1.40 0.100 1.57
Sr. No. Description Unit No. Length Breadth Depth Quantity
Electrical Chamber Cum 28 1.70 1.70 0.100 8.09
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 446.00 1.00 0.100 44.60
Cum 1 446.00 1.00 0.100 44.60
Total 104.99
33 RCC M25
a Raft
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 28 1.500 1.500 0.150 9.45
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 446.000 0.900 0.150 60.21
Cum 1 446.000 0.900 0.150 60.21
Total 132.11
b Wall
OFC Chamber Cum 8 4.800 0.150 1.000 5.76
Electrical Chamber Cum 28 6.000 0.150 1.500 37.8
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 1 446.000 0.150 1.000 66.9
Cum 1 446.000 0.150 1.000 66.9
Total 179.00
c Slab
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 28 1.500 1.500 0.150 9.45
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -30 0.900 0.600 0.150 -2.43
Cover Deduction Cum -8 -0.400 -0.600 0.200 -0.384
SWD Cum 1 446.000 0.900 0.150 60.21
Cum 1 446.000 0.900 0.150 60.21
Cover Deduction Cum -178 0.600 0.450 0.150 -7.21
Total 122.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
34 Reinforcement
a Raft MT 110 kg/cum 15258.13
b Wall MT 100 kg/cum 18795.00
c Slab MT 95 kg/cum 12169.50
Total 46.22
36 Painting Work
Edge Marking Line Sqm 4 418.000 0.15 250.8
Lane Marking / Other Markings Sqm 125.4
Zebra Crossing Sqm 2 8.900 3 26.7
Kerb Painting Sqm 0 418.000 0.3 0
Sr. No. Description Unit No. Length Breadth Depth Quantity
Median Painting Sqm 2 418.000 1 836
37 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 6
b Octagone size 6
c Informatory sign board Sqm 8 0.900 7.2
7 Dewatering Hour 1 35
25 DLC
Foothpath Cum 1 828.500 0.150 124.28
124
31 Rubble Soling
Utility Crossing Cum 3 3.200 1.650 0.230 3.64
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 12 1.700 1.700 0.230 7.98
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 260.000 0.900 0.230 53.82
Cum 1 260.000 0.900 0.230 53.82
Total 121.65
32 PCC M15
Kerb Stone Cum 0 345.000 0.265 0.075 0
Utility Crossing Cum 3 3.20 1.650 0.100 1.58
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Sr. No. Description Unit No. Length Breadth Depth Quantity
Electrical Chamber Cum 12 1.70 1.70 0.100 3.47
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 260.00 0.90 0.100 23.40
Cum 1 260.00 0.90 0.100 23.40
Total 52.89
33 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 12 1.500 1.500 0.150 4.05
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 260.000 0.800 0.150 31.20
Cum 1 260.000 0.800 0.150 31.20
Total 67.61
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 12 6.000 0.150 1.500 16.2
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 260.000 0.150 1.000 78
Cum 2 260.000 0.150 1.000 78
Total 176.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 12 1.500 1.500 0.150 4.05
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -14 0.900 0.600 0.150 -1.134
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 260.000 0.800 0.150 31.20
Cum 1 260.000 0.800 0.150 31.20
Cover Deduction Cum -104 0.600 0.450 0.150 -4.21
Total 62.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
34 Reinforcement
a Raft MT 110 kg/cum 7808.38
b Wall MT 100 kg/cum 18480.00
c Slab MT 95 kg/cum 6184.50
Total 32.47
36 Painting Work
Edge Marking Line Sqm 2 345.000 0.15 103.5
Lane Marking / Other Markings Sqm 51.75
Zebra Crossing Sqm 2 3.500 3 10.5
Kerb Painting Sqm 0 345.000 0.3 0
Sr. No. Description Unit No. Length Breadth Depth Quantity
Median Painting Sqm 0 0
37 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
7 Dewatering Hour 1 44
27 Rubble Soling
Utility Crossing Cum 4 15.000 1.650 0.230 22.77
OFC Chamber Cum 9 1.400 1.400 0.230 4.06
Electrical Chamber Cum 29 1.700 1.700 0.230 19.28
Water Chamber Cum 4 1.500 1.500 0.230 2.07
Light pole Cum 15 0.800 0.800 0.230 2.21
SWD Cum 1 460.000 1.300 0.230 137.54
Total 187.93
28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 15.00 1.650 0.100 9.9
OFC Chamber Cum 9 1.40 1.40 0.100 1.76
Electrical Chamber Cum 29 1.70 1.70 0.100 8.38
Water Chamber Cum 4 1.50 1.50 0.100 0.9
Light pole Cum 15 0.80 0.80 0.100 0.96
SWD Cum 1 460.00 1.30 0.100 59.8
Total 81.7
29 RCC M25
Sr. No. Description Unit No. Length Breadth Depth Quantity
a Raft
OFC Chamber Cum 9 1.200 1.200 0.150 1.94
Electrical Chamber Cum 29 1.500 1.500 0.150 9.79
Water Chamber Cum 4 1.300 1.300 0.150 1.01
SWD Cum 1 460.000 1.200 0.150 82.80
Total 95.55
b Wall
OFC Chamber Cum 9 4.800 0.150 1.000 6.48
Electrical Chamber Cum 29 6.000 0.150 1.500 39.15
Water Chamber Cum 4 5.200 0.150 1.000 3.12
SWD Cum 1 460.000 0.150 1.000 69
Total 118.00
c Slab
OFC Chamber Cum 9 1.200 1.200 0.150 1.94
Electrical Chamber Cum 29 1.500 1.500 0.150 9.79
Water Chamber Cum 4 1.300 1.300 0.150 1.01
Cover Deduction Cum -33 0.900 0.600 0.150 -2.673
Cover Deduction Cum -9 -0.400 -0.600 0.200 -0.432
SWD Cum 1 460.000 1.200 0.150 82.8
Cover Deduction Cum -92 0.600 0.900 0.150 -7.45
Total 85.00
d Pole Foundation Cum 15 0.600 0.600 1.500 8.10
30 Reinforcement
a Raft MT 110 kg/cum 11035.51
b Wall MT 100 kg/cum 12390.00
c Slab MT 95 kg/cum 8478.75
Total 31.90
32 Painting Work
Edge Marking Line Sqm 2 440.000 0.15 132
Lane Marking / Other Markings Sqm 66
Zebra Crossing Sqm 2 15.300 3 45.9
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 440.000 1 880
33 Signages
Cautionary/Warning sign boards in
a Nos. 16
Equilateral Triangle 16
Cautionary/Warning sign boards in
Nos. 8
b Octagone size 8
c Informatory sign board Sqm 6 0.900 5.4
7 Dewatering Hour 1 19
25 DLC
Foothpath Cum 1 1344.400 0.150 201.66
202
32 Rubble Soling
Utility Crossing Cum 2 17.800 1.650 0.230 13.51
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 13 1.700 1.700 0.230 8.64
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 161.000 1.300 0.230 48.14
Cum 1 161.000 1.300 0.230 48.14
Total 121.27
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 PCC M15
Kerb Stone Cum 2 192.000 0.265 0.075 7.63
Utility Crossing Cum 2 17.80 1.650 0.100 5.87
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 13 1.70 1.70 0.100 3.76
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 161.00 1.30 0.100 20.93
Cum 1 161.00 1.30 0.100 20.93
Total 60.35
34 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 13 1.500 1.500 0.150 4.39
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 161.000 1.200 0.150 28.98
Cum 1 161.000 1.200 0.150 28.98
Total 63.72
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 13 6.000 0.150 1.500 17.55
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 161.000 0.150 1.000 48.3
Cum 2 161.000 0.150 1.000 48.3
Total 119.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 13 1.500 1.500 0.150 4.39
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -15 0.900 0.600 0.150 -1.215
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
SWD Cum 1 161.000 1.200 0.150 28.98
Cum 1 161.000 1.200 0.150 28.98
Cover Deduction Cum -64 0.600 0.900 0.150 -5.18
Total 57.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
35 Reinforcement
a Raft MT 110 kg/cum 7359.49
b Wall MT 100 kg/cum 12495.00
c Slab MT 95 kg/cum 5685.75
Total 25.54
7 Dewatering Hour 1 15
27 Rubble Soling
Utility Crossing Cum 2 12.300 1.650 0.230 9.34
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 10 1.700 1.700 0.230 6.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 5 0.800 0.800 0.230 0.74
Total 19.12
28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 12.30 1.650 0.100 4.06
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 10 1.70 1.70 0.100 2.89
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 5 0.80 0.80 0.100 0.32
Total 8.31
29 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 4.53
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Sr. No. Description Unit No. Length Breadth Depth Quantity
Electrical Chamber Cum 10 6.000 0.150 1.500 13.5
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 17.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -12 0.900 0.600 0.150 -0.972
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
Total 3.00
d Pole Foundation Cum 5 0.600 0.600 1.500 2.70
30 Reinforcement
a Raft MT 110 kg/cum 523.22
b Wall MT 100 kg/cum 1785.00
c Slab MT 95 kg/cum 299.25
Total 2.61
32 Painting Work
Edge Marking Line Sqm 2 152.000 0.15 45.6
Lane Marking / Other Markings Sqm 22.8
Zebra Crossing Sqm 2 12.600 3 37.8
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0
33 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
7 Dewatering Hour 1 23
32 Rubble Soling
Utility Crossing Cum 2 14.700 1.650 0.230 11.16
OFC Chamber Cum 5 1.400 1.400 0.230 2.25
Electrical Chamber Cum 15 1.700 1.700 0.230 9.97
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 204.000 1.600 0.230 75.07
Cum 1 204.000 1.600 0.230 75.07
Total 174.56
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 PCC M15
Kerb Stone Cum 2 228.000 0.265 0.075 9.06
Utility Crossing Cum 2 14.70 1.650 0.100 4.85
OFC Chamber Cum 5 1.40 1.40 0.100 0.98
Electrical Chamber Cum 15 1.70 1.70 0.100 4.34
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 204.00 1.60 0.100 32.64
Cum 1 204.00 1.60 0.100 32.64
Total 84.96
34 RCC M25
a Raft
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 204.000 1.500 0.150 45.90
Cum 1 204.000 1.500 0.150 45.90
Total 98.45
b Wall
OFC Chamber Cum 5 4.800 0.150 1.000 3.6
Electrical Chamber Cum 15 6.000 0.150 1.500 20.25
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 204.000 0.150 1.000 61.2
Cum 2 204.000 0.150 1.000 61.2
Total 148.00
c Slab
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -17 0.900 0.600 0.150 -1.377
Cover Deduction Cum -5 -0.400 -0.600 0.200 -0.24
SWD Cum 1 204.000 1.500 0.150 45.90
Cum 1 204.000 1.500 0.150 45.90
Cover Deduction Cum -82 0.600 0.600 0.150 -4.43
Total 92.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
35 Reinforcement
a Raft MT 110 kg/cum 11370.92
b Wall MT 100 kg/cum 15540.00
c Slab MT 95 kg/cum 9177.00
Total 36.09
37 Painting Work
Sr. No. Description Unit No. Length Breadth Depth Quantity
Edge Marking Line Sqm 4 228.000 0.15 136.8
Lane Marking / Other Markings Sqm 68.4
Zebra Crossing Sqm 4 15.000 3 90
Kerb Painting Sqm 2 228.000 0.3 136.8
Median Painting Sqm 0 0
38 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 5 0.900 4.5
7 Dewatering Hour 1 29
27 Rubble Soling
Utility Crossing Cum 3 8.200 1.650 0.230 9.34
OFC Chamber Cum 6 1.400 1.400 0.230 2.70
Electrical Chamber Cum 19 1.700 1.700 0.230 12.63
Water Chamber Cum 3 1.500 1.500 0.230 1.55
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 327.000 1.600 0.230 120.34
Cum 1 327.000 1.600 0.230 120.34
Total 266.9
28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 3 8.20 1.650 0.100 4.06
OFC Chamber Cum 6 1.40 1.40 0.100 1.18
Electrical Chamber Cum 19 1.70 1.70 0.100 5.49
Water Chamber Cum 3 1.50 1.50 0.100 0.68
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 327.00 1.60 0.100 52.32
Cum 1 327.00 1.60 0.100 52.32
Total 116.05
Sr. No. Description Unit No. Length Breadth Depth Quantity
29 RCC M25
a Raft
OFC Chamber Cum 6 1.200 1.200 0.150 1.30
Electrical Chamber Cum 19 1.500 1.500 0.150 6.41
Water Chamber Cum 3 1.300 1.300 0.150 0.76
SWD Cum 1 327.000 1.500 0.150 73.58
Cum 1 327.000 1.500 0.150 73.58
Total 155.62
b Wall
OFC Chamber Cum 6 4.800 0.150 1.000 4.32
Electrical Chamber Cum 19 6.000 0.150 1.500 25.65
Water Chamber Cum 3 5.200 0.150 1.000 2.34
SWD Cum 2 327.000 0.150 1.000 98.1
Cum 2 327.000 0.150 1.000 98.1
Total 229.00
c Slab
OFC Chamber Cum 6 1.200 1.200 0.150 1.30
Electrical Chamber Cum 19 1.500 1.500 0.150 6.41
Water Chamber Cum 3 1.300 1.300 0.150 0.76
Cover Deduction Cum -22 0.900 0.600 0.150 -1.782
Cover Deduction Cum -6 -0.400 -0.600 0.200 -0.288
SWD Cum 1 327.000 1.500 0.150 73.58
Cum 1 327.000 1.500 0.150 73.58
Cover Deduction Cum -131 0.600 0.600 0.150 -7.07
Total 146.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
30 Reinforcement
a Raft MT 110 kg/cum 17973.99
b Wall MT 100 kg/cum 24045.00
c Slab MT 95 kg/cum 14563.50
Total 56.58
32 Painting Work
Edge Marking Line Sqm 2 292.000 0.15 87.6
Lane Marking / Other Markings Sqm 43.8
Zebra Crossing Sqm 5 8.500 3 63.75
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0
33 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 6
b Octagone size 6
c Informatory sign board Sqm 6 0.900 5.4
Sr. No. Description Unit No. Length Breadth Depth Quantity
7 Dewatering Hour 1 15
27 Rubble Soling
Utility Crossing Cum 2 11.600 1.650 0.230 8.8
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 10 1.700 1.700 0.230 6.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 155.000 1.000 0.230 35.65
Cum 1 155.000 1.000 0.230 35.65
Total 89.14
28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 11.60 1.650 0.100 3.83
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 10 1.70 1.70 0.100 2.89
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 155.00 1.00 0.100 15.50
Cum 1 155.00 1.00 0.100 15.50
Total 38.76
Sr. No. Description Unit No. Length Breadth Depth Quantity
29 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 155.000 0.900 0.150 20.93
Cum 1 155.000 0.900 0.150 20.93
Total 46.38
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 10 6.000 0.150 1.500 13.5
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 155.000 0.150 1.000 46.5
Cum 2 155.000 0.150 1.000 46.5
Total 110.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -12 0.900 0.600 0.150 -0.972
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 155.000 0.900 0.150 20.93
Cum 1 155.000 0.900 0.150 20.93
Cover Deduction Cum -62 0.600 0.600 0.150 -3.35
Total 42.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
30 Reinforcement
a Raft MT 110 kg/cum 5356.89
b Wall MT 100 kg/cum 11550.00
c Slab MT 95 kg/cum 4189.50
Total 21.10
32 Painting Work
Edge Marking Line Sqm 2 152.000 0.15 45.6
Lane Marking / Other Markings Sqm 22.8
Zebra Crossing Sqm 3 11.900 3 53.55
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 152.000 1 304
33 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
Sr. No. Description Unit No. Length Breadth Depth Quantity
7 Dewatering Hour 1 13
27 Rubble Soling
Utility Crossing Cum 1 8.100 1.650 0.230 3.07
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 9 1.700 1.700 0.230 5.98
Water Chamber Cum 1 1.500 1.500 0.230 0.52
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 130.000 1.000 0.230 29.90
Cum 1 130.000 1.000 0.230 29.90
Total 70.72
28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 1 8.10 1.650 0.100 1.34
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 9 1.70 1.70 0.100 2.6
Water Chamber Cum 1 1.50 1.50 0.100 0.23
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 130.00 1.00 0.100 13.00
Cum 1 130.00 1.00 0.100 13.00
Total 30.76
Sr. No. Description Unit No. Length Breadth Depth Quantity
29 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 1 1.300 1.300 0.150 0.25
SWD Cum 1 130.000 0.900 0.150 17.55
Cum 1 130.000 0.900 0.150 17.55
Total 39.04
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 9 6.000 0.150 1.500 12.15
Water Chamber Cum 1 5.200 0.150 1.000 0.78
SWD Cum 2 130.000 0.150 1.000 39.00
Cum 2 130.000 0.150 1.000 39.00
Total 93.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 1 1.300 1.300 0.150 0.25
Cover Deduction Cum -10 0.900 0.600 0.150 -0.81
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 130.000 0.900 0.150 17.55
Cum 1 130.000 0.900 0.150 17.55
Cover Deduction Cum -52 0.450 0.600 0.150 -2.11
Total 36.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
30 Reinforcement
a Raft MT 110 kg/cum 4509.00
b Wall MT 100 kg/cum 9765.00
c Slab MT 95 kg/cum 3591.00
Total 17.87
32 Painting Work
Edge Marking Line Sqm 2 130.000 0.15 39
Lane Marking / Other Markings Sqm 19.5
Zebra Crossing Sqm 2 8.400 3 25.2
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0
33 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
Sr. No. Description Unit No. Length Breadth Depth Quantity
7 Dewatering Hour 1 17
25 Kerb Stone Rm 0 0
26 Rubble Soling
Utility Crossing Cum 3 6.200 1.650 0.230 7.06
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 6 1.700 1.700 0.230 3.99
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 168.000 1.000 0.230 38.64
Cum 1 168.000 1.000 0.230 38.64
Total 90.27
27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 3 6.20 1.650 0.100 3.07
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 6 1.70 1.70 0.100 1.73
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 168.00 1.00 0.100 16.80
Cum 1 168.00 1.00 0.100 16.80
Total 39.24
28 RCC M25
Sr. No. Description Unit No. Length Breadth Depth Quantity
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 6 1.500 1.500 0.150 2.03
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 168.000 0.900 0.150 22.68
Cum 1 168.000 0.900 0.150 22.68
Total 48.32
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 6 6.000 0.150 1.500 8.1
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 168.000 0.150 1.000 50.4
Cum 2 168.000 0.150 1.000 50.4
Total 112.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 6 1.500 1.500 0.150 2.03
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -8 0.900 0.600 0.150 -0.648
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 168.000 0.900 0.150 22.68
Cum 1 168.000 0.900 0.150 22.68
Cover Deduction Cum -67 0.450 0.600 0.150 -2.71
Total 45.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
29 Reinforcement
a Raft MT 110 kg/cum 5581.42
b Wall MT 100 kg/cum 11760.00
c Slab MT 95 kg/cum 4488.75
Total 21.83
31 Painting Work
Edge Marking Line Sqm 2 168.000 0.15 50.4
Lane Marking / Other Markings Sqm 25.2
Zebra Crossing Sqm 5 6.500 3 48.75
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 2
b Octagone size 2
c Informatory sign board Sqm 3 0.900 2.7
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 Stud with Lense Reflector Nos 2 9 18
Zebra crossing Nos 5 6.500 108
Total 126.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 168.00 1344.00
b 160 mm outer dia for HT & LT Cable Rmt 10 168.00 1680.00
7 Dewatering Hour 1 73
26 DLC
Foothpath Cum 1 2913.600 0.150 437.04
437
32 Rubble Soling
Utility Crossing Cum 7 7.200 1.650 0.230 19.13
OFC Chamber Cum 15 1.400 1.400 0.230 6.76
Electrical Chamber Cum 49 1.700 1.700 0.230 32.57
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 703.000 1.300 0.230 210.20
Cum 1 703.000 0.900 0.230 145.52
Total 415.22
33 PCC M15
Sr. No. Description Unit No. Length Breadth Depth Quantity
Kerb Stone Cum 0 728.000 0.265 0.075 0
Utility Crossing Cum 7 7.20 1.650 0.100 8.32
OFC Chamber Cum 15 1.40 1.40 0.100 2.94
Electrical Chamber Cum 49 1.70 1.70 0.100 14.16
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 703.00 1.30 0.100 91.39
Cum 1 703.00 0.90 0.100 63.27
Total 180.53
34 RCC M25
a Raft
OFC Chamber Cum 15 1.200 1.200 0.150 3.24
Electrical Chamber Cum 49 1.500 1.500 0.150 16.54
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 703.000 1.200 0.150 126.54
Cum 1 703.000 0.800 0.150 84.36
Total 231.18
b Wall
OFC Chamber Cum 15 4.800 0.150 1.000 10.8
Electrical Chamber Cum 49 6.000 0.150 1.500 66.15
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 703.000 0.150 1.000 210.9
Cum 2 703.000 0.150 1.000 210.9
Total 500.00
c Slab
OFC Chamber Cum 15 1.200 1.200 0.150 3.24
Electrical Chamber Cum 49 1.500 1.500 0.150 16.54
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -51 0.900 0.600 0.150 -4.131
Cover Deduction Cum -15 -0.400 -0.600 0.200 -0.72
SWD Cum 1 703.000 1.200 0.150 126.54
Cum 1 703.000 0.800 0.150 84.36
Cover Deduction Cum -281 0.900 0.600 0.150 -22.76
Total 204.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
35 Reinforcement
a Raft MT 110 kg/cum 26701.81
b Wall MT 100 kg/cum 52500.00
c Slab MT 95 kg/cum 20349.00
Total 99.55
37 Painting Work
Edge Marking Line Sqm 4 728.000 0.15 436.8
Sr. No. Description Unit No. Length Breadth Depth Quantity
Lane Marking / Other Markings Sqm 218.4
Zebra Crossing Sqm 5 7.500 3 56.25
Kerb Painting Sqm 0 728.000 0.3 0
Median Painting Sqm 2 728.000 1 1456
38 Signages
Cautionary/Warning sign boards in
a Nos. 25
Equilateral Triangle 25
Cautionary/Warning sign boards in
Nos. 10
b Octagone size 10
c Informatory sign board Sqm 10 0.900 9
3 DLC
Add 10% for Damage Panel Repairing cum 1 63.700 12.700 0.150 121
Total 121
7 Dewatering Hour 1 81
28 Rubble Soling
Utility Crossing Cum 8 16.700 1.650 0.230 50.7
OFC Chamber Cum 16 1.400 1.400 0.230 7.21
Electrical Chamber Cum 54 1.700 1.700 0.230 35.89
Water Chamber Cum 8 1.500 1.500 0.230 4.14
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 805.000 1.000 0.230 185.15
Cum 1 805.000 1.000 0.230 185.15
Total 468.24
29 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing Cum 8 16.70 1.650 0.100 22.04
OFC Chamber Cum 16 1.40 1.40 0.100 3.14
Electrical Chamber Cum 54 1.70 1.70 0.100 15.61
Water Chamber Cum 8 1.50 1.50 0.100 1.8
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 805.00 1.00 0.100 80.50
Cum 1 805.00 1.00 0.100 80.50
Total 203.59
30 RCC M25
a Raft
OFC Chamber Cum 16 1.200 1.200 0.150 3.46
Electrical Chamber Cum 54 1.500 1.500 0.150 18.23
Water Chamber Cum 8 1.300 1.300 0.150 2.03
SWD Cum 1 805.000 0.900 0.150 108.68
Cum 1 805.000 0.900 0.150 108.68
Total 241.06
b Wall
OFC Chamber Cum 16 4.800 0.150 1.000 11.52
Electrical Chamber Cum 54 6.000 0.150 1.500 72.9
Water Chamber Cum 8 5.200 0.150 1.000 6.24
SWD Cum 2 805.000 0.150 1.000 241.5
Cum 2 805.000 0.150 1.000 241.5
Total 574.00
c Slab
OFC Chamber Cum 16 1.200 1.200 0.150 3.46
Electrical Chamber Cum 54 1.500 1.500 0.150 18.23
Water Chamber Cum 8 1.300 1.300 0.150 2.03
Cover Deduction Cum -62 0.900 0.600 0.150 -5.022
Cover Deduction Cum -16 -0.400 -0.600 0.200 -0.768
SWD Cum 1 805.000 0.900 0.150 108.68
Cum 1 805.000 0.900 0.150 108.68
Cover Deduction Cum -322 0.450 0.600 0.150 -13.04
Total 222.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
31 Reinforcement
a Raft MT 110 kg/cum 27842.31
b Wall MT 100 kg/cum 60270.00
c Slab MT 95 kg/cum 22144.50
Total 110.26
33 Painting Work
Edge Marking Line Sqm 2 805.000 0.15 241.5
Sr. No. Description Unit No. Length Breadth Depth Quantity
Lane Marking / Other Markings Sqm 120.75
Zebra Crossing Sqm 8 17.000 3 204
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0
34 Signages
Cautionary/Warning sign boards in
a Nos. 25
Equilateral Triangle 25
Cautionary/Warning sign boards in
Nos. 12
b Octagone size 12
c Informatory sign board Sqm 20 0.900 18
7 Dewatering Hour 1 20
25 DLC
Foothpath Cum 1 802.000 0.150 120.3
120
31 Rubble Soling
Utility Crossing Cum 2 8.700 1.650 0.230 6.6
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 13 1.700 1.700 0.230 8.64
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 200.000 1.000 0.230 46.00
Cum 1 200.000 1.000 0.230 46.00
Total 110.08
32 PCC M15
Kerb Stone Cum 0 200.000 0.265 0.075 0
Utility Crossing Cum 2 8.70 1.650 0.100 2.87
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Sr. No. Description Unit No. Length Breadth Depth Quantity
Electrical Chamber Cum 13 1.70 1.70 0.100 3.76
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 200.00 1.00 0.100 20.00
Cum 1 200.00 1.00 0.100 20.00
Total 47.86
33 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 13 1.500 1.500 0.150 4.39
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 200.000 0.900 0.150 27.00
Cum 1 200.000 0.900 0.150 27.00
Total 59.76
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 13 6.000 0.150 1.500 17.55
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 200.000 0.150 1.000 60
Cum 2 200.000 0.150 1.000 60
Total 142.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 13 1.500 1.500 0.150 4.39
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -15 0.900 0.600 0.150 -1.215
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
SWD Cum 1 200.000 0.900 0.150 27.00
Cum 1 200.000 0.900 0.150 27.00
Cover Deduction Cum -80 0.450 0.600 0.150 -3.24
Total 55.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
34 Reinforcement
a Raft MT 110 kg/cum 6902.11
b Wall MT 100 kg/cum 14910.00
c Slab MT 95 kg/cum 5486.25
Total 27.30
36 Painting Work
Edge Marking Line Sqm 2 200.000 0.15 60
Lane Marking / Other Markings Sqm 30
Zebra Crossing Sqm 2 9.000 3 27
Kerb Painting Sqm 0 200.000 0.3 0
Sr. No. Description Unit No. Length Breadth Depth Quantity
Median Painting Sqm 0 200.000 1 0
37 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
7 Dewatering Hour 1 65
27 Rubble Soling
Utility Crossing Cum 6 19.300 1.650 0.230 43.95
OFC Chamber Cum 13 1.400 1.400 0.230 5.86
Electrical Chamber Cum 43 1.700 1.700 0.230 28.58
Water Chamber Cum 6 1.500 1.500 0.230 3.11
Light pole Cum 22 0.800 0.800 0.230 3.24
Total 84.74
28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 6 19.30 1.650 0.100 19.11
OFC Chamber Cum 13 1.40 1.40 0.100 2.55
Electrical Chamber Cum 43 1.70 1.70 0.100 12.43
Water Chamber Cum 6 1.50 1.50 0.100 1.35
Light pole Cum 22 0.80 0.80 0.100 1.41
Total 36.85
29 RCC M25
a Raft
OFC Chamber Cum 13 1.200 1.200 0.150 2.81
Electrical Chamber Cum 43 1.500 1.500 0.150 14.51
Water Chamber Cum 6 1.300 1.300 0.150 1.52
Total 18.84
Sr. No. Description Unit No. Length Breadth Depth Quantity
b Wall
OFC Chamber Cum 13 4.800 0.150 1.000 9.36
Electrical Chamber Cum 43 6.000 0.150 1.500 58.05
Water Chamber Cum 6 5.200 0.150 1.000 4.68
Total 72.00
c Slab
OFC Chamber Cum 13 1.200 1.200 0.150 2.81
Electrical Chamber Cum 43 1.500 1.500 0.150 14.51
Water Chamber Cum 6 1.300 1.300 0.150 1.52
Cover Deduction Cum -49 0.900 0.600 0.150 -3.969
Cover Deduction Cum -13 -0.400 -0.600 0.200 -0.624
Total 14.00
d Pole Foundation Cum 22 0.600 0.600 1.500 11.88
30 Reinforcement
a Raft MT 110 kg/cum 2176.19
b Wall MT 100 kg/cum 7560.00
c Slab MT 95 kg/cum 1396.50
Total 11.13
32 Painting Work
Edge Marking Line Sqm 2 645.000 0.15 193.5
Lane Marking / Other Markings Sqm 96.75
Zebra Crossing Sqm 7 19.600 3 205.8
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 645.000 1 1290
33 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 6 0.900 5.4
7 Dewatering Hour 1 70
27 Rubble Soling
Utility Crossing Cum 7 13.700 1.650 0.230 36.39
OFC Chamber Cum 14 1.400 1.400 0.230 6.31
Electrical Chamber Cum 47 1.700 1.700 0.230 31.24
Water Chamber Cum 7 1.500 1.500 0.230 3.62
Light pole Cum 23 0.800 0.800 0.230 3.39
Total 80.95
28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 7 13.70 1.650 0.100 15.82
OFC Chamber Cum 14 1.40 1.40 0.100 2.74
Electrical Chamber Cum 47 1.70 1.70 0.100 13.58
Water Chamber Cum 7 1.50 1.50 0.100 1.58
Light pole Cum 23 0.80 0.80 0.100 1.47
Total 35.19
29 RCC M25
a Raft
OFC Chamber Cum 14 1.200 1.200 0.150 3.02
Electrical Chamber Cum 47 1.500 1.500 0.150 15.86
Water Chamber Cum 7 1.300 1.300 0.150 1.77
Total 20.66
Sr. No. Description Unit No. Length Breadth Depth Quantity
b Wall
OFC Chamber Cum 14 4.800 0.150 1.000 10.08
Electrical Chamber Cum 47 6.000 0.150 1.500 63.45
Water Chamber Cum 7 5.200 0.150 1.000 5.46
Total 79.00
c Slab
OFC Chamber Cum 14 1.200 1.200 0.150 3.02
Electrical Chamber Cum 47 1.500 1.500 0.150 15.86
Water Chamber Cum 7 1.300 1.300 0.150 1.77
Cover Deduction Cum -54 0.900 0.600 0.150 -4.374
Cover Deduction Cum -14 -0.400 -0.600 0.200 -0.672
Total 16.00
d Pole Foundation Cum 23 0.600 0.600 1.500 12.42
30 Reinforcement
a Raft MT 110 kg/cum 2386.35
b Wall MT 100 kg/cum 8295.00
c Slab MT 95 kg/cum 1596.00
Total 12.28
32 Painting Work
Edge Marking Line Sqm 2 698.000 0.15 209.4
Lane Marking / Other Markings Sqm 104.7
Zebra Crossing Sqm 6 14.000 3 126
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 698.000 1 1396
33 Signages
Cautionary/Warning sign boards in
a Nos. 15
Equilateral Triangle 15
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 8 0.900 7.2
7 Dewatering Hour 1 40
27 Rubble Soling
Utility Crossing Cum 4 18.800 1.650 0.230 28.54
OFC Chamber Cum 8 1.400 1.400 0.230 3.61
Electrical Chamber Cum 26 1.700 1.700 0.230 17.28
Water Chamber Cum 4 1.500 1.500 0.230 2.07
Light pole Cum 13 0.800 0.800 0.230 1.91
Total 53.41
28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 18.80 1.650 0.100 12.41
OFC Chamber Cum 8 1.40 1.40 0.100 1.57
Electrical Chamber Cum 26 1.70 1.70 0.100 7.51
Water Chamber Cum 4 1.50 1.50 0.100 0.9
Light pole Cum 13 0.80 0.80 0.100 0.83
Total 23.22
29 RCC M25
a Raft
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 26 1.500 1.500 0.150 8.78
Water Chamber Cum 4 1.300 1.300 0.150 1.01
Total 11.52
Sr. No. Description Unit No. Length Breadth Depth Quantity
b Wall
OFC Chamber Cum 8 4.800 0.150 1.000 5.76
Electrical Chamber Cum 26 6.000 0.150 1.500 35.1
Water Chamber Cum 4 5.200 0.150 1.000 3.12
Total 44.00
c Slab
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 26 1.500 1.500 0.150 8.78
Water Chamber Cum 4 1.300 1.300 0.150 1.01
Cover Deduction Cum -30 0.900 0.600 0.150 -2.43
Cover Deduction Cum -8 -0.400 -0.600 0.200 -0.384
Total 9.00
d Pole Foundation Cum 13 0.600 0.600 1.500 7.02
30 Reinforcement
a Raft MT 110 kg/cum 1330.21
b Wall MT 100 kg/cum 4620.00
c Slab MT 95 kg/cum 897.75
Total 6.85
32 Painting Work
Edge Marking Line Sqm 2 395.480 0.15 118.644
Lane Marking / Other Markings Sqm 59.322
Zebra Crossing Sqm 5 19.100 3 143.25
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 395.480 1 790.96
33 Signages
Cautionary/Warning sign boards in
a Nos. 15
Equilateral Triangle 15
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 8 0.900 7.2
7 Dewatering Hour 1 52
25 DLC
Foothpath Cum 1 3609.000 0.150 541.35
541
33 PCC M15
Kerb Stone Cum 2 515.000 0.265 0.075 20.47
Utility Crossing Cum 5 16.70 1.650 0.100 13.78
OFC Chamber Cum 10 1.40 1.40 0.100 1.96
Electrical Chamber Cum 34 1.70 1.70 0.100 9.83
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 506.58 1.30 0.100 65.86
Cum 1 506.58 1.30 0.100 65.86
Total 178.21
34 RCC M25
a Raft
OFC Chamber Cum 10 1.200 1.200 0.150 2.16
Electrical Chamber Cum 34 1.500 1.500 0.150 11.48
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 506.580 1.200 0.150 91.18
Cum 1 506.580 1.200 0.150 91.18
Total 196.51
b Wall
OFC Chamber Cum 10 4.800 0.150 1.000 7.2
Electrical Chamber Cum 34 6.000 0.150 1.500 45.9
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 506.580 0.150 1.000 151.97
Cum 2 506.580 0.150 1.000 151.97
Total 359.00
c Slab
OFC Chamber Cum 10 1.200 1.200 0.150 2.16
Electrical Chamber Cum 34 1.500 1.500 0.150 11.48
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -36 0.900 0.600 0.150 -2.916
Cover Deduction Cum -10 -0.400 -0.600 0.200 -0.48
SWD Cum 1 506.580 1.200 0.150 91.18
Cum 1 506.580 1.200 0.150 91.18
Sr. No. Description Unit No. Length Breadth Depth Quantity
35 Reinforcement
a Raft MT 110 kg/cum 22697.00
b Wall MT 100 kg/cum 37695.00
c Slab MT 95 kg/cum 17655.75
Total 78.05
37 Painting Work
Edge Marking Line Sqm 4 515.000 0.15 309
Lane Marking / Other Markings Sqm 154.5
Zebra Crossing Sqm 8 17.000 3 204
Kerb Painting Sqm 2 515.000 0.3 309
Median Painting Sqm 0 1 0
38 Signages
Cautionary/Warning sign boards in
a Nos. 15
Equilateral Triangle 15
Cautionary/Warning sign boards in
Nos. 10
b Octagone size 10
c Informatory sign board Sqm 6 0.900 5.4
3 DLC
Add 10% for Damage Panel Repairing cum 1 18.000 33.200 0.150 90
Total 90
7 Dewatering Hour 1 22
30 Kerb Stone Rm 0 0
31 Rubble Soling
Utility Crossing Cum 2 16.700 1.650 0.230 12.68
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 15 1.700 1.700 0.230 9.97
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 360.000 1.000 0.230 82.80
Cum 1 360.000 1.000 0.230 82.80
Total 191.09
32 PCC M15
Sr. No. Description Unit No. Length Breadth Depth Quantity
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 16.70 1.650 0.100 5.51
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 15 1.70 1.70 0.100 4.34
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 360.00 1.00 0.100 36.00
Cum 1 360.00 1.00 0.100 36.00
Total 83.08
33 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 360.000 0.900 0.150 48.60
Cum 1 360.000 0.900 0.150 48.60
Total 103.63
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 15 6.000 0.150 1.500 20.25
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 360.000 0.150 1.000 108
Cum 2 360.000 0.150 1.000 108
Total 241.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -17 0.900 0.600 0.150 -1.377
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
SWD Cum 1 360.000 0.900 0.150 48.60
Cum 1 360.000 0.900 0.150 48.60
Cover Deduction Cum -144 0.600 0.600 0.150 -7.78
Total 94.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00
34 Reinforcement
a Raft MT 110 kg/cum 11969.67
b Wall MT 100 kg/cum 25305.00
c Slab MT 95 kg/cum 9376.50
Total 46.65
36 Painting Work
Edge Marking Line Sqm 4 220.000 0.15 132
Sr. No. Description Unit No. Length Breadth Depth Quantity
Lane Marking / Other Markings Sqm 66
Zebra Crossing Sqm 3 17.000 3 76.5
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
37 Signages
Cautionary/Warning sign boards in
a Nos. 15
Equilateral Triangle 15
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 8 0.900 7.2
24 Kerb Stone Rm 0 0
25 Rubble Soling
Utility Crossing Cum 93 1.200 1.650 0.230 42.35
OFC Chamber Cum 186 1.400 1.400 0.230 83.85
Electrical Chamber Cum 310 1.700 1.700 0.230 206.06
Water Chamber Cum 312 1.500 1.500 0.230 161.46
Light pole Cum 310 0.800 0.800 0.230 45.63
Total 539.35
26 PCC M15
Foothpath Cum 1 0.000 0.150 0
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 93 1.20 1.650 0.100 18.41
OFC Chamber Cum 186 1.40 1.40 0.100 36.46
Electrical Chamber Cum 310 1.70 1.70 0.100 89.59
Water Chamber Cum 312 1.50 1.50 0.100 70.2
Light pole Cum 310 0.80 0.80 0.100 19.84
Total 234.5
27 RCC M25
a Raft
OFC Chamber Cum 186 1.200 1.200 0.150 40.18
Electrical Chamber Cum 310 1.500 1.500 0.150 104.63
Water Chamber Cum 312 1.300 1.300 0.150 79.09
Total 223.89
b Wall
OFC Chamber Cum 186 4.800 0.150 1.000 133.92
Electrical Chamber Cum 310 6.000 0.150 1.500 418.5
Water Chamber Cum 312 5.200 0.150 1.000 243.36
Total 796.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 186 1.200 1.200 0.150 40.18
Electrical Chamber Cum 310 1.500 1.500 0.150 104.63
Water Chamber Cum 312 1.300 1.300 0.150 79.09
Cover Deduction Cum -622 0.900 0.600 0.150 -50.382
Cover Deduction Cum -186 -0.400 -0.600 0.200 -8.928
Total 165.00
d Pole Foundation Cum 310 0.600 0.600 1.500 167.40
28 Reinforcement
a Raft MT 110 kg/cum 25859.64
b Wall MT 100 kg/cum 83580.00
c Slab MT 95 kg/cum 16458.75
Total 125.90
30 Painting Work
Edge Marking Line Sqm 2 9290.000 0.15 2787
Lane Marking / Other Markings Sqm 1393.5
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 310
Equilateral Triangle 310
Cautionary/Warning sign boards in
Nos. 186
b Octagone size 186
c Informatory sign board Sqm 156 0.900 140.4
5 Dewatering Hour 1 66
24 Kerb Stone Rm 0 0
25 Rubble Soling
Utility Crossing Cum 7 2.300 1.650 0.230 6.11
OFC Chamber Cum 13 1.400 1.400 0.230 5.86
Electrical Chamber Cum 22 1.700 1.700 0.230 14.62
Water Chamber Cum 12 1.500 1.500 0.230 6.21
Light pole Cum 22 0.800 0.800 0.230 3.24
Total 36.04
26 PCC M15
Foothpath Cum 0 0.000 0.150 0
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 7 2.30 1.650 0.100 2.66
OFC Chamber Cum 13 1.40 1.40 0.100 2.55
Electrical Chamber Cum 22 1.70 1.70 0.100 6.36
Water Chamber Cum 12 1.50 1.50 0.100 2.7
Light pole Cum 22 0.80 0.80 0.100 1.41
Total 15.68
27 RCC M25
a Raft
OFC Chamber Cum 13 1.200 1.200 0.150 2.81
Electrical Chamber Cum 22 1.500 1.500 0.150 7.43
Water Chamber Cum 12 1.300 1.300 0.150 3.04
Total 13.28
b Wall
OFC Chamber Cum 13 4.800 0.150 1.000 9.36
Electrical Chamber Cum 22 6.000 0.150 1.500 29.7
Water Chamber Cum 12 5.200 0.150 1.000 9.36
Total 48.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 13 1.200 1.200 0.150 2.81
Electrical Chamber Cum 22 1.500 1.500 0.150 7.43
Water Chamber Cum 12 1.300 1.300 0.150 3.04
Cover Deduction Cum -34 0.900 0.600 0.150 -2.754
Cover Deduction Cum -13 -0.400 -0.600 0.200 -0.624
Total 10.00
d Pole Foundation Cum 22 0.600 0.600 1.500 11.88
28 Reinforcement
a Raft MT 110 kg/cum 1533.26
b Wall MT 100 kg/cum 5040.00
c Slab MT 95 kg/cum 997.50
Total 7.57
30 Painting Work
Edge Marking Line Sqm 2 656.000 0.15 196.8
Lane Marking / Other Markings Sqm 98.4
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 22
Equilateral Triangle 22
Cautionary/Warning sign boards in
Nos. 13
b Octagone size 13
c Informatory sign board Sqm 6 0.900 5.4
DI Pipes-Distribution
Dia 100 Cum 4000 0.7 0.025 70.00
Dia.150 Cum 25,011 0.9 0.025 562.75
Dia.200 Cum 3,051 0.95 0.025 72.47
Dia.250 Cum 1,588 1 0.025 39.70
Dia.300 Cum 3,706 1.05 0.025 97.27
Dia.350 Cum 3,386 1.1 0.025 93.10
Dia.400 Cum 537 1.55 0.025 20.80
Dia.500 Cum 1,172 1.25 0.025 36.63
DI Pipes-Distribution
Dia 100 Cum 4000 0.7 0.05 140.00
Dia.150 Cum 25,011 0.9 0.05 1125.50
Dia.200 Cum 3,051 0.95 0.05 144.93
Dia.250 Cum 1,588 1 0.05 79.40
Dia.300 Cum 3,706 1.05 0.05 194.54
Dia.350 Cum 3,386 1.1 0.05 186.21
Dia.400 Cum 537 1.55 0.05 41.60
Dia.500 Cum 1,172 1.25 0.05 73.25
DI Pipes-Distribution
Dia 100 Cum 1000 0.7 0.28 196.00
Dia.150 Cum 6252.8 0.95 0.28 1663.24
Dia.200 Cum 762.8 1 0.28 213.58
Dia.250 Cum 397 1.05 0.28 116.72
Dia.300 Cum 926.4 1.1 0.28 285.33
Dia.350 Cum 846.4 1.15 0.28 272.54
Dia.400 Cum 134.2 1.6 0.28 60.12
Dia.500 Cum 293 1.3 0.28 106.65
DI Pipes-Distribution
Dia.100 Cum 1000 0.7 0.1 70.00
Dia.150 Cum 6252.8 0.95 0.1 594.02
Dia.200 Cum 762.8 1 0.1 76.28
Dia.250 Cum 397 1.05 0.1 41.69
Dia.300 Cum 926.4 1.1 0.1 101.90
Dia.350 Cum 846.4 1.15 0.1 97.34
Dia.400 Cum 134.2 1.6 0.1 21.47
Dia.500 Cum 293 1.3 0.1 38.09
House hold connection
Dia.25 Cum 10000 0.3 0.1 300.00
DI Pipes-Distribution
Dia.100 Cum 1000 0.70 0.15 105.00
Dia.150 Cum 6252.8 0.95 0.15 891.02
Dia.200 Cum 762.8 1.00 0.15 114.42
Dia.250 Cum 397 1.05 0.15 62.53
Dia.300 Cum 926.4 1.10 0.15 152.86
Dia.350 Cum 846.4 1.15 0.15 146.00
Dia.400 Cum 134.2 1.60 0.15 32.21
Dia.500 Cum 293 1.30 0.15 57.14
185958
Royalty Amount Statement
Total Quntity 185958
Rate per cum 141.34
Total Amount 26,283,275.00
Test And Frequency statement
No of Test
Sr.No Item BOQ Quantity Frequency Rate Amount Reference
Testing Required
A Cement
1 Standard Consistancy 1297.71 25 3300 82,500 PWD SSR 2018-2019,
2 Fineness 25 3300 82,500 Testing Charges,
Pg.No.540
3 Specific Gravity 25 3300 82,500
4 Setting Time ( Initial & Final ), 1 Test 3300.00 25 3300 82,500
5 Soundness 25 3300 82,500
Frequency Limit,
6 50 MT
Compressive Strength 26 3300 85,800 Pg.No.540
B GSB 6271.36
Water Absorption, Specific Gravity, lmpact PWD SSR 2018-
1 63 2300 144,900 2019,Frequency Limit,
Value/Crushing Value.
2 Sieve Analysis 63 600 37,800 Pg.No.394
100 Cum Testing Charges,
3 Abrasion Value 63 1050 66,150 Pg.No.540
4 Flakiness Index & Elongation Index. 63 750 47,250
5 Soundness. 63 2200 138,600
6 Mix Design 1 14300 14,300
C WMM #NAME?
Water Absorption, Specific Gravity, lmpact PWD SSR 2018-
1 #NAME? 2300 #NAME? 2019,Frequency Limit,
Value/Crushing Value.
2 Sieve Analysis #NAME? 600 #NAME? Pg.No.394
100 Cum Testing Charges,
3 Abrasion Value #NAME? 1050 #NAME? Pg.No.540
4 Flakiness Index & Elongation Index. #NAME? 750 #NAME?
5 Soundness. #NAME? 2200 #NAME?
6 Mix Desing 1 14300 14,300
D Sand
Fineness Modulus ( Sieve Analysis ),Silt & Clay PWD SSR 2018-2019,
1 25 1200 30,000 Testing Charges, Pg.No
Content 2177.00
2 Chloride & Sulphate Content 25 700 17,500 540
3 Silt Factor 25 750 18,750
E Brick
Water Absorption (Set of 5 Bricks),Compressive PWD SSR 2018-
1 Strength( Set of 5 Bricks),Efflorescence (Set of 5 #NAME? 50000 2 1900 3,800 2019,Frequency Limit,
Bricks) Pg.No.540
F Concrete
MoRT&H- Section 900
1 Compressive Strength OF C.C. Cube (Set of 3 4862.90 50 cum Quality control for
cubes) 64.83868666667 600 38,903 Roads , Pg.No.541
2 Concrete Mix Design (With all Tests on basic
materials) 10 12100 121,000
No of Test
Sr.No Item BOQ Quantity Frequency Rate Amount Reference
Testing Required
3 permeability Test. 1350 -
4 Concrete mix design by Accelerated curing
method. (By Accelerated curing method) 10 14300 143,000
5 Taking of core samples in concrete pavement.
(Excluding Dead Journey Charges) 2967.90 100 2500 250,000
G Paving Block
PWD SSR 2018-
1 Compressive Strength, Water Absorption,(Set of 8 2019,Testing Charges,
Blocks) #NAME? 50 2200 110,000 Pg.No.540
K Bitumen
Penetration, Softening Point, Flash & Fire Point, PWD SSR 2018-2019,
1
Specific Gravity 25 2750 68,750 Testing Charges,
2 Viscosity 25 1700 42,500 Pg.No.542
Frequency Limit,
3 Ducility I Elastic Recovery 25 800 20,000
4 Extraction Test,(For OGC) 50 1400 70,000
BITUMINOUS
L
EMULSION
% Residue Test By Evaporation I Sieve Test 5 550 2,750 PWD SSR 2018-2019,
Testing Charges,
Pg.No.543
Partical Charge Test 5 350 1,750 Frequency Limit,
M Water
PWD SSR 2018-2019,
PHValue, Sulphate & Chloride Content. Testing Charges,
5 1000 5,000 Pg.No.543
STEEL BAR
O
TESTING 34.26 MT
Upto 16 mm (Set of 3 Bars) Per lot 25 1100 27,500 PWD SSR 2018-2019,
Above 16 mm (Set of 3 Bars), (Tensile strength, 1400 Testing Charges,
%, Elongation, Yield Proof Stress.) Pg.No.544
Stress,Weight-Per Meter, Bend I Rebend Test,
Per lot 25 35,000
Nitrol Solution Test. (Set of 3 Bars) Per lot 25 3400 85,000
PAINT / THERMO-
P PLASTIC PAINT
1209.30 Sqm
Glass bead contents & grading analysis. 5 3400 17,000 PWD SSR 2018-2019,
Reflectance & yellowness index. 5 1000 5,000 Testing Charges,
Flowability.(Percentage residue). 5 1000 5,000 Pg.No544
Softening Point. (Ring & ball method). 5 900 4,500
Drying Time. 5 700 3,500
ROAD SIGN
Q BOARD
PWD SSR 2018-2019,
Testing Charges,
Retro Reflective Test. 176.40 5% 9 3500 31,500 Pg.No545
OVERLA Y
R DESIGN
PWD SSR 2018-2019,
Benkelman Beam Test Testing Charges,
(Excluding Dead Journey Charges) 4.30 per KM 4.30 12450 53,535 Pg.No545
No of Test
Sr.No Item BOQ Quantity Frequency Rate Amount Reference
Testing Required
Total #NAME?
Rate Analysis Per RMT
Sr. No. Description Quantity Rate Unit Amount
1 Contract Market Rate Material Component
Bus Lane Divider Bus Lane Divider 1 2330.00 Nos 2330.0
Achor Bolts With Nut along 3
Contract Market Rate With Drilling 38.00 Nos 114
2 LabourComponent
Loading / Unloading /
Frieght/ Handling 20% 2444.00 Rs 488.80
Material Cost
3 Total Cost (1+2) 2932.80
Miscallaneous Charges 2% 58.66
4
Add 10 % Contractor's profit 10.00% 293.28
and overheads
7 Excavation
Water Line & Utility Trench cum 1 97.00 1.600 1.500
Light Pole cum 3 0.90 0.900 1.600
Utility Crossing cum 2 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 2 1.400 1.650 0.230
OFC Chamber Cum 2 1.400 1.400 0.230
Electrical Chamber Cum 3 1.700 1.700 0.230
Water Chamber Cum 3 1.500 1.500 0.230
Light pole Cum 3 0.800 0.800 0.230
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 2 1.40 1.650 0.100
OFC Chamber Cum 2 1.40 1.40 0.100
Electrical Chamber Cum 3 1.70 1.70 0.100
Water Chamber Cum 3 1.50 1.50 0.100
Light pole Cum 3 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000
Electrical Chamber Cum 3 6.000 0.150 1.500
Water Chamber Cum 3 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Cover Deduction Cum -6 0.900 0.600 0.150
Cover Deduction Cum -2 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 3 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 97.000 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 3
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 2
26 Octagone size
27 Informatory sign board Sqm 1 1.170
91.18
0 10043.00
91.18
232.8
3.89
6.93
-91.18
152.44
9.42
300.70
10
0
4.62
4.62
155.2
-4.32
-7.43
143.45
68.39
0.69
0
69.08
68.39
68.39
455.90
91.18
114.2
114.2
1.06
0.90
1.99
1.55
0.44
5.94
0
0
0.46
0.39
0.87
0.68
0.19
2.59
0.43
1.01
0.76
2.21
1.44
4.05
2.34
7.83
0.43
1.01
0.76
-0.486
-0.096
1.62
1.62
13.28
255.26
822.15
161.60
1.24
5.6
29.1
14.55
2
1.17
2
Minor Roads Flexible to Rigid Pavements-MR3
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 305.00 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 305.00 1.600 1.500
Light Pole cum 10 0.90 0.900 1.600
Utility Crossing cum 6 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 6 1.400 1.650 0.230
OFC Chamber Cum 6 1.400 1.400 0.230
Electrical Chamber Cum 10 1.700 1.700 0.230
Water Chamber Cum 9 1.500 1.500 0.230
Light pole Cum 10 0.800 0.800 0.230
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 6 1.40 1.650 0.100
OFC Chamber Cum 6 1.40 1.40 0.100
Electrical Chamber Cum 10 1.70 1.70 0.100
Water Chamber Cum 9 1.50 1.50 0.100
Light pole Cum 10 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 6 1.200 1.200 0.150
Electrical Chamber Cum 10 1.500 1.500 0.150
Water Chamber Cum 9 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 6 4.800 0.150 1.000
Electrical Chamber Cum 10 6.000 0.150 1.500
Water Chamber Cum 9 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 6 1.200 1.200 0.150
Electrical Chamber Cum 10 1.500 1.500 0.150
Water Chamber Cum 9 1.300 1.300 0.150
Cover Deduction Cum -19 0.900 0.600 0.150
Cover Deduction Cum -6 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 10 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 305.000 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 10
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 6
26 Octagone size
27 Informatory sign board Sqm 4 0.900
20 Kerb Stone Rm 0
12.2
29 Barrigates Rmt 1 61
30 FRP Perforated Cover
SWD Nos 61
Length of Road 305.00 M
Quantity ROW 4.70 M
45.75
Existing Carriageway 4.70 M
OFC Manhole Nos 6 No
30.5
LT and HT Manhole 10 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
56.12 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
2.27 No. of water chamber 9 nos
Total PaverBlock Crust 0.41 1
10
Condition-1, Flexible to Rigid
286.7
0 10251.00
286.7
732
12.96
20.79
-286.7
479.05
29.62
945.5
31
0
14
14
488
-14
-23
451
215.03
2.08
0
217.11
215.03
215.03
1433.5
286.7
359
359
3.19
2.70
6.65
4.66
1.47
18.67
0
0
1.39
1.18
2.89
2.03
0.64
8.13
1.30
3.38
2.28
6.95
4.32
13.5
7.02
25.00
1.30
3.38
2.28
-1.539
-0.288
5.00
5.40
42.35
803.01
2625.00
498.75
3.93
17.22
91.5
45.75
10
6
3.6
6
383
96
28.2
0
0
0
0
0
0.00
2440.00
3050.00
61
61
Minor Roads Flexible to Rigid Pavements-MR71
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 180.05 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 180.05 1.600 1.500
Light Pole cum 6 0.90 0.900 1.450
Utility Crossing cum 4 1.400 1.650 1.450
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 4 1.400 1.650 0.230
OFC Chamber Cum 4 1.400 1.400 0.230
Electrical Chamber Cum 6 1.700 1.700 0.230
Water Chamber Cum 4 1.500 1.500 0.230
Light pole Cum 6 0.800 0.800 0.230
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 4 1.40 1.650 0.075
OFC Chamber Cum 4 1.40 1.40 0.100
Electrical Chamber Cum 6 1.70 1.70 0.100
Water Chamber Cum 5 1.50 1.50 0.100
Light pole Cum 6 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 4 4.800 0.120 1.000
Electrical Chamber Cum 6 6.000 0.150 1.500
Water Chamber Cum 5 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Cover Deduction Cum -11 0.900 0.600 0.150
Cover Deduction Cum -4 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 6 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 180.050 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 6
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 4
26 Octagone size
27 Informatory sign board Sqm 2 1.084
20 Kerb Stone Rm 0
7.202
29 Barrigates Rmt 1 36.01
30 FRP Perforated Cover
SWD Nos 36
Length of Road 180.05 M
Quantity ROW 4.70 M
27.0075
Existing Carriageway 4.70 M
OFC Manhole Nos 4 No
18.005
LT and HT Manhole 6 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
33.1292 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
1.34 No. of water chamber 5 nos
Total PaverBlock Crust 0.41 1
6
Condition-1, Flexible to Rigid
169.25
0 10126.05
169.25
432.12
7.05
13.4
-169.25
283.32
17.49
558.16
18
0
8.78
8.78
288.08
-8.64
-13.5
265.94
127
1.39
0
128.39
126.94
126.94
846.24
169.25
211.83 #NAME?
211.83
2.13
1.80
3.99
2.07
0.88
10.87
0
0
0.69
0.78
1.73
1.13
0.38
4.71
0.86
2.03
1.27
4.16
2.304
8.1
3.9
14.30
0.86
2.03
1.27
-0.891
-0.192
3.07
3.24
24.77
480.48
1501.50
306.23
2.29
11.2
54.015
27.0075
4
2.168 1.0845
4
227
57
18.8
0
0
0
0
0
0.00
1440.40
1800.50
36
36
Minor Roads Flexible to Rigid Pavements-MR72
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 100.09 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 100.09 1.600 1.500
Light Pole cum 3 0.90 1.050 1.500
Utility Crossing cum 2 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 2 1.500 1.650 0.230
OFC Chamber Cum 2 1.400 1.400 0.230
Electrical Chamber Cum 3 1.700 1.700 0.230
Water Chamber Cum 3 1.500 1.500 0.230
Light pole Cum 3 0.800 0.800 0.230
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 2 1.40 1.650 0.100
OFC Chamber Cum 2 1.40 1.40 0.100
Electrical Chamber Cum 3 1.70 1.70 0.100
Water Chamber Cum 3 1.50 1.50 0.100
Light pole Cum 3 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000
Electrical Chamber Cum 3 6.000 0.150 1.500
Water Chamber Cum 3 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Cover Deduction Cum -6 0.900 0.600 0.150
Cover Deduction Cum -2 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 3 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 100.090 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 3
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 2
26 Octagone size
27 Informatory sign board Sqm 1 1.210
20 Kerb Stone Rm 0
4.0036
29 Barrigates Rmt 1 20.018
30 FRP Perforated Cover
SWD Nos 20
Length of Road 100.09 M
Quantity ROW 4.70 M
15.0135
Existing Carriageway 4.70 M
OFC Manhole Nos 2 No
10.009
LT and HT Manhole 3 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
18.41656 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.74 No. of water chamber 3 nos
Total PaverBlock Crust 0.41 1
3
Condition-1, Flexible to Rigid
94
0 10046.09
94
240.22
4.25
6.93
-94
157.4
9.72
310.28
10
0
4.62
4.62
160.14
-4.75
-7.43
147.96
70.56
0.69
0
71.25
70.56
70.56
470.42
94.08
117.78
117.78
1.14
0.90
1.99
1.55
0.44
6.02
0
0
0.46
0.39
0.87
0.68
0.19
2.59
0.43
1.01
0.76
2.21
1.44
4.05
2.34
8.00
0.43
1.01
0.76
-0.486
-0.096
2.00
1.62
13.83
254.68
840.00
199.50
1.29
5.6
30.027
15.0135
2
1.21
2
126
31
9.4
0
0
0
0
0
0.00
800.72
1000.90
20
20
Minor Roads Flexible to Rigid Pavements-MR78
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 351.00 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 351.00 1.600 1.500
Light Pole cum 12 0.90 0.900 1.600
Utility Crossing cum 7 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 7 1.400 1.650 0.230
OFC Chamber Cum 7 1.400 1.400 0.230
Electrical Chamber Cum 12 1.700 1.700 0.230
Water Chamber Cum 10 1.500 1.500 0.220
Light pole Cum 12 0.800 0.800 0.220
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 7 1.40 1.650 0.090
OFC Chamber Cum 7 1.40 1.40 0.100
Electrical Chamber Cum 12 1.70 1.70 0.100
Water Chamber Cum 10 1.50 1.50 0.100
Light pole Cum 12 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 7 1.200 1.200 0.150
Electrical Chamber Cum 12 1.500 1.500 0.150
Water Chamber Cum 10 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 7 4.800 0.150 0.900
Electrical Chamber Cum 12 6.000 0.150 1.500
Water Chamber Cum 10 5.200 0.150 0.900
Total
c Slab
OFC Chamber Cum 7 1.200 1.200 0.150
Electrical Chamber Cum 12 1.500 1.500 0.150
Water Chamber Cum 10 1.300 1.300 0.150
Cover Deduction Cum -22 0.900 0.600 0.150
Cover Deduction Cum -7 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 12 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 351.000 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 12
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 5
26 Octagone size
27 Informatory sign board Sqm 5 0.900
20 Kerb Stone Rm 0
14.04
29 Barrigates Rmt 1 70.2
30 FRP Perforated Cover
SWD Nos 70
Length of Road 351.00 M
Quantity ROW 4.70 M
52.65
Existing Carriageway 4.70 M
OFC Manhole Nos 7 No
35.1
LT and HT Manhole 12 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
64.584 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
2.61 No. of water chamber 10 nos
Total PaverBlock Crust 0.41 1
12
Condition-1, Flexible to Rigid
329.94
0 10297.00
329.94
842.4
15.55
24.26
-329.94
552.27
34.09
1088
35
0
16.17
16.17
562
-19
-25
518
247.46
2.43
0
250
247.46
247.46
1649.7
329.94
413
413
3.72
3.16
7.98
4.95
1.69
21.5
0
0
1.46
1.37
3.47
2.25
0.77
9.32
1.51
4.05
2.54
8.10
4.536
16.2
7.02
27.76
1.51
4.05
2.54
-1.782
-0.336
5.98
6.48
48.32
935.55
2914.80
596.51
4.45
19.6
105.3
52.65
12
5
4.5 1.0575
11
10
5
442
110
32.9
0
0
0
0
0
0.00
2808.00
3510.00
70
70
Minor Roads Flexible to Rigid Pavements-MR79
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 224.00 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 224.00 1.600 1.500
Light Pole cum 7 0.90 0.900 1.600
Utility Crossing cum 4 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 4 1.400 1.650 0.230
OFC Chamber Cum 4 1.400 1.400 0.230
Electrical Chamber Cum 7 1.700 1.700 0.230
Water Chamber Cum 6 1.500 1.500 0.230
Light pole Cum 7 0.800 0.800 0.220
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.150
Utility Crossing Cum 4 1.40 1.650 0.150
OFC Chamber Cum 4 1.40 1.40 0.100
Electrical Chamber Cum 7 1.70 1.70 0.100
Water Chamber Cum 6 1.50 1.50 0.100
Light pole Cum 7 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 7 1.500 1.500 0.150
Water Chamber Cum 6 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 4 4.800 0.150 1.200
Electrical Chamber Cum 7 6.000 0.150 1.500
Water Chamber Cum 6 5.200 0.150 1.200
Total
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 7 1.500 1.500 0.150
Water Chamber Cum 6 1.300 1.300 0.150
Cover Deduction Cum -13 0.900 0.600 0.150
Cover Deduction Cum -4 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 7 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 224.000 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 8
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 5
26 Octagone size
27 Informatory sign board Sqm 3 0.900
20 Kerb Stone Rm 0
8.96
29 Barrigates Rmt 1 44.8
30 FRP Perforated Cover
SWD Nos 45
Length of Road 224.00 M
Quantity ROW 4.70 M
33.6
Existing Carriageway 4.70 M
OFC Manhole Nos 4 No
22.4
LT and HT Manhole 7 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
41.216 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
1.67 No. of water chamber 6 nos
Total PaverBlock Crust 0.41 1
8
Condition-1, Flexible to Rigid
210.56
0 10170.00
210.56
537.6
9.07
13.86
-207.56
352.97
21.76
694.4
22
0
10.21
10.21
356.6
-10
-18
328.6
157.92
1.39
0
159.31
157.92
157.92
1052.8
210.56
263.682
263.682
2.13
1.80
4.65
3.11
0.99
12.68
0
0
1.39
0.78
2.02
1.35
0.45
5.99
0.86
2.36
1.52
4.75
3.456
9.45
5.616
19.00
0.86
2.36
1.52
-1.053
-0.192
3.50
3.78
31.03
548.63
1995.00
349.13
2.89
12.64
67.2
33.6
5
2.7
5
282
71
18.8
0
0
0
0
0
0.00
1792.00
2240.00
45
45
Minor Roads Flexible to Rigid Pavements-MR80
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 104.99 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 104.99 1.600 1.500
Light Pole cum 3 1.00 1.000 1.600
Utility Crossing cum 2 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 3 1.400 1.650 0.230
OFC Chamber Cum 2 1.400 1.400 0.230
Electrical Chamber Cum 3 1.700 1.700 0.230
Water Chamber Cum 3 1.500 1.500 0.230
Light pole Cum 3 0.800 0.800 0.230
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.150
Utility Crossing Cum 2 1.40 1.650 0.110
OFC Chamber Cum 2 1.40 1.40 0.110
Electrical Chamber Cum 3 1.70 1.70 0.110
Water Chamber Cum 3 1.50 1.50 0.100
Light pole Cum 3 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000
Electrical Chamber Cum 3 6.000 0.150 1.500
Water Chamber Cum 3 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Cover Deduction Cum -6 0.900 0.600 0.150
Cover Deduction Cum -2 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 5 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 110 kg/cum
c Slab MT 100 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 104.990 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 4
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 2
26 Octagone size
27 Informatory sign board Sqm 2 0.650
20 Kerb Stone Rm 0
4.1996
29 Barrigates Rmt 1 20.998
30 FRP Perforated Cover
SWD Nos 21
Length of Road 104.99 M
Quantity ROW 4.70 M
15.7485
Existing Carriageway 4.70 M
OFC Manhole Nos 2 No
10.499
LT and HT Manhole 3 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
19.31816 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.78 No. of water chamber 3 nos
Total PaverBlock Crust 0.41 1
4
Condition-1, Flexible to Rigid
98.69
0 10050.99
98.69
251.98
4.8
6.93
-98.69
165.02
10.2
325.47
11
0
4.76
4.76
168
-6
-7
155
74.02
0.69
0
74.71
74
74
493.45
98.69
123.39
123.39
1.59
0.90
1.99
1.55
0.44
6.47
0
0
0.51
0.43
0.95
0.68
0.19
2.76
0.43
1.01
0.76
2.21
1.44
4.05
2.34
7.83
0.43
1.01
0.76
-0.486
-0.096
1.62
2.70
14.36
255.26
904.37
170.10
1.33
31.497
15.7485
2
1.3
2
132
33
9.4
0
0
0
0
0
0.00
839.92
1049.90
21
21
Minor Roads Flexible to Rigid Pavements-MR81
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 176.78 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 176.78 1.600 1.500
Light Pole cum 6 0.90 0.800 1.500
Utility Crossing cum 4 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 3 1.400 1.650 0.230
OFC Chamber Cum 4 1.400 1.400 0.230
Electrical Chamber Cum 6 1.700 1.700 0.230
Water Chamber Cum 5 1.500 1.500 0.230
Light pole Cum 6 0.800 0.800 0.230
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 4 1.40 1.650 0.100
OFC Chamber Cum 4 1.40 1.40 0.100
Electrical Chamber Cum 6 1.70 1.70 0.100
Water Chamber Cum 5 1.50 1.50 0.100
Light pole Cum 6 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000
Electrical Chamber Cum 6 6.000 0.150 1.500
Water Chamber Cum 5 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Cover Deduction Cum -11 0.900 0.600 0.150
Cover Deduction Cum -3 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 6 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 176.780 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 6
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 4
26 Octagone size
27 Informatory sign board Sqm 3 0.700
20 Kerb Stone Rm 0
7.0712
29 Barrigates Rmt 1 35.356
30 FRP Perforated Cover
SWD Nos 35
Length of Road 176.78 M
Quantity ROW 4.70 M
26.517
Existing Carriageway 4.70 M
OFC Manhole Nos 4 No
17.678
LT and HT Manhole 6 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
32.52752 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
1.32 No. of water chamber 5 nos
Total PaverBlock Crust 0.41 1
6
Condition-1, Flexible to Rigid
166.17
0 10122.78
166.17
424.27
6.48
13.86
-166.17
278.44
17.17
548
18
0
8.25
8.25
282.85
-8.64
-13.5
260.71
124.63
1.39
0
126.02
124.63
124.63
830.87
166.17
208.08 #NAME?
208.08
1.59
1.80
3.99
2.59
0.88
10.85
0
0
0.92
0.78
1.73
1.13
0.38
4.94
0.65
2.03
1.27
3.94
2.16
8.1
3.9
14.00
0.65
2.03
1.27
-0.891
-0.144
3.00
3.24
24.18
455.07
1470.00
299.25
2.22
9.6
53.034
26.517
4
2.1
4
223
56
18.8
0
0
0
0
0
0.00
1414.24
1767.80
35
35
Minor Roads Flexible to Rigid Pavements-MR82
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 66.69 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 66.69 1.600 1.500
Light Pole cum 2 0.90 0.900 1.900
Utility Crossing cum 1 1.400 1.650 1.800
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 1 1.400 1.650 0.230
OFC Chamber Cum 1 1.400 1.400 0.230
Electrical Chamber Cum 2 1.700 1.700 0.230
Water Chamber Cum 3 1.500 1.500 0.230
Light pole Cum 3 0.800 0.800 0.230
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 1 1.40 1.650 0.100
OFC Chamber Cum 1 1.40 1.40 0.100
Electrical Chamber Cum 2 1.70 1.70 0.100
Water Chamber Cum 2 1.50 1.50 0.100
Light pole Cum 3 0.80 0.80 0.150
Total
21 RCC M25
a Raft
OFC Chamber Cum 1 1.200 1.200 0.150
Electrical Chamber Cum 2 1.500 1.500 0.150
Water Chamber Cum 2 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 1 4.800 0.150 1.000
Electrical Chamber Cum 2 6.000 0.150 1.500
Water Chamber Cum 2 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 1 1.200 1.200 0.150
Electrical Chamber Cum 2 1.500 1.500 0.150
Water Chamber Cum 2 1.300 1.300 0.150
Cover Deduction Cum -4 0.900 0.600 0.150
Cover Deduction Cum -1 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 3 0.600 0.600 1.650
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 110 kg/cum
c Slab MT 110 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 66.690 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 2
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 1
26 Octagone size
27 Informatory sign board Sqm 2 0.900
20 Kerb Stone Rm 0
2.6676
29 Barrigates Rmt 1 13.338
30 FRP Perforated Cover
SWD Nos 13
Length of Road 66.69 M
Quantity ROW 4.70 M
10.0035
Existing Carriageway 4.70 M
OFC Manhole Nos 1 No
6.669
LT and HT Manhole 2 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
12.27096 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.5 No. of water chamber 2 nos
Total PaverBlock Crust 0.41 1
2
Condition-1, Flexible to Rigid
62.69
0 10012.69
62.69
160.06
3.08
4.16
-62.69
104.61
6.48
206.74
0
3
3
106.7
-3
-5
98.7
48.58
0
0
48.58
47
47
313.44
62.69
78.498
78.498
0.53
0.45
1.33
1.55
0.44
4.3
0
0
0.23
0.2
0.58
0.45
0.29
1.75
0.22
0.68
0.51
1.40
0.72
2.7
1.56
4.98
0.22
0.68
0.51
-0.324
-0.048
1.03
1.78
9.19
161.70
575.19
118.97
0.86
3.8
20.007
10.0035
1
1.8
1
84
21
4.7
0
0
0
0
0
0.00
533.52
666.90
13
13
Minor Roads Flexible to Rigid Pavements-MR83
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 93.43 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 93.43 1.600 1.500
Light Pole cum 3 0.90 0.900 1.600
Utility Crossing cum 2 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 2 1.400 1.550 0.230
OFC Chamber Cum 2 1.400 1.300 0.230
Electrical Chamber Cum 3 1.700 1.600 0.230
Water Chamber Cum 3 1.500 1.450 0.230
Light pole Cum 3 0.800 0.750 0.230
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 2 1.40 1.650 0.100
OFC Chamber Cum 2 1.40 1.40 0.100
Electrical Chamber Cum 3 1.70 1.70 0.100
Water Chamber Cum 3 1.50 1.50 0.100
Light pole Cum 3 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000
Electrical Chamber Cum 3 6.000 0.150 1.500
Water Chamber Cum 3 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 2 1.200 1.200 0.100
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Cover Deduction Cum -6 0.900 0.600 0.150
Cover Deduction Cum -2 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 3 0.600 0.600 1.400
Total
22 Reinforcement
a Raft MT 100 kg/cum
b Wall MT 100 kg/cum
c Slab MT 90 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 93.430 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 3
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 2
26 Octagone size
27 Informatory sign board Sqm 2 0.560
20 Kerb Stone Rm 0
3.7372
29 Barrigates Rmt 1 18.686
30 FRP Perforated Cover
SWD Nos 19
Length of Road 93.43 M
Quantity ROW 4.70 M
14.0145
Existing Carriageway 4.70 M
OFC Manhole Nos 2 No
9.343
LT and HT Manhole 3 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
17.19112 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.7 No. of water chamber 3 nos
Total PaverBlock Crust 0.41 1
3
Condition-1, Flexible to Rigid
87.82
0 10039.43
87.82
224
4
7
-87.82
147
9.07
289.63
0
4.34
4.34
149
-4.32
-6.75
137.93
65.87
0.69
0
66.56
65.87
65.87
439.12
87.82
109.992
109.992
1
0.84
1.88
1.5
0.41
5.63
0
0
0.46
0.39
0.87
0.68
0.19
2.59
0.43
1.01
0.76
2.21
1.44
4.05
2.34
7.83
0.29
1.01
0.76
-0.486
-0.096
1.48
1.51
13.03
232.05
822.15
139.86
1.19
5.4
28.029
14.0145
2
1.12
2
118
29
9.4
0
0
0
0
0
0.00
747.44
934.30
19
19
Minor Roads Flexible to Rigid Pavements-MR84
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 76.86 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 76.86 1.600 1.500
Light Pole cum 3 0.90 0.900 1.600
Utility Crossing cum 2 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 2 1.400 1.450 0.230
OFC Chamber Cum 2 1.400 1.200 0.230
Electrical Chamber Cum 3 1.700 1.500 0.230
Water Chamber Cum 2 1.500 1.300 0.230
Light pole Cum 3 0.700 0.600 0.230
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 2 1.40 1.650 0.075
OFC Chamber Cum 2 1.40 1.40 0.075
Electrical Chamber Cum 3 1.70 1.70 0.100
Water Chamber Cum 2 1.50 1.50 0.100
Light pole Cum 3 0.70 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 2 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000
Electrical Chamber Cum 3 6.000 0.150 1.500
Water Chamber Cum 2 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 2 1.200 1.100 0.150
Electrical Chamber Cum 3 1.500 1.400 0.150
Water Chamber Cum 2 1.300 1.200 0.150
Cover Deduction Cum -5 0.900 0.500 0.150
Cover Deduction Cum -2 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 2 0.500 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 76.860 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 3
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 2
26 Octagone size
27 Informatory sign board Sqm 1 0.900
20 Kerb Stone Rm 0
3.0744
29 Barrigates Rmt 1 15.372
30 FRP Perforated Cover
SWD Nos 15
Length of Road 76.86 M
Quantity ROW 4.70 M
11.529
Existing Carriageway 4.70 M
OFC Manhole Nos 2 No
7.686
LT and HT Manhole 3 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
14.14224 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.57 No. of water chamber 2 nos
Total PaverBlock Crust 0.41 1
3
Condition-1, Flexible to Rigid
72.25
0 10022.86
72.25
184.46
3.89
6.93
-74.25
121.03
7.46
238.27
0
3.65
3.65
123.74
-4.14
-6.3
113.3
54.19
0.69
0
54.88
54.19
54.19
361.24
72.25
90.5
90.5
0.93
0.77
1.76
0.9
0.29
4.65
0
0
0.35
0.29
0.87
0.45
0.17
2.13
0.43
1.01
0.51
1.95
1.44
4.05
1.56
7.00
0.40
0.95
0.47
-0.3375
-0.096
1.00
0.90
10.85
225.23
735.00
99.75
1.06
4.2
23.058
11.529
2
0.9
2
97
24
9.4
0
0
0
0
0
0.00
614.88
768.60
15
15
Minor Roads Flexible to Rigid Pavements-MR85
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 146.10 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 146.10 1.600 1.500
Light Pole cum 5 0.90 0.900 1.600
Utility Crossing cum 3 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 3 1.400 1.650 0.230
OFC Chamber Cum 3 1.400 1.400 0.230
Electrical Chamber Cum 5 1.700 1.700 0.230
Water Chamber Cum 4 1.500 1.500 0.220
Light pole Cum 5 0.800 0.800 0.200
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 3 1.40 1.650 0.090
OFC Chamber Cum 3 1.40 1.40 0.100
Electrical Chamber Cum 5 1.70 1.70 0.100
Water Chamber Cum 4 1.50 1.50 0.100
Light pole Cum 5 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150
Electrical Chamber Cum 5 1.500 1.500 0.150
Water Chamber Cum 4 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000
Electrical Chamber Cum 5 6.000 0.150 1.400
Water Chamber Cum 4 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150
Electrical Chamber Cum 5 1.500 1.500 0.150
Water Chamber Cum 4 1.300 1.300 0.150
Cover Deduction Cum -9 0.900 0.600 0.150
Cover Deduction Cum -3 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 5 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 146.100 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 5
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 3
26 Octagone size
27 Informatory sign board Sqm 2 0.900
20 Kerb Stone Rm 0
5.844
29 Barrigates Rmt 1 29.22
30 FRP Perforated Cover
SWD Nos 29
Length of Road 146.10 M
Quantity ROW 4.70 M
21.915
Existing Carriageway 4.70 M
OFC Manhole Nos 3 No
14.61
LT and HT Manhole 5 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
26.8824 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
1.09 No. of water chamber 4 nos
Total PaverBlock Crust 0.41 1
5
Condition-1, Flexible to Rigid
137.33
0 10092.10
137.33
350.64
6.48
10.4
-137.73
229.79
14.19
453
15
0
6.93
6.93
233.76
-7
-11
215.76
103
1
0
104
103
103
686.67
137.33
171.76
171.76
1.59
1.35
3.32
1.98
0.64
8.88
0
0
0.62
0.59
1.45
0.9
0.32
3.1
0.65
1.69
1.01
3.35
2.16
6.3
3.12
11.58
0.65
1.69
1.01
-0.729
-0.144
2.48
2.70
20.11
386.93
1215.90
247.38
1.85
8.4
43.83
21.915
3
1.8
3
184
46
14.1
0
0
0
0
0
0.00
1168.80
1461.00
29
29
Minor Roads Flexible to Rigid Pavements-MR88
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 185.32 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 185.32 1.600 1.500
Light Pole cum 6 0.90 0.900 1.600
Utility Crossing cum 4 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 4 1.400 1.650 0.230
OFC Chamber Cum 4 1.400 1.400 0.230
Electrical Chamber Cum 6 1.700 1.700 0.230
Water Chamber Cum 5 1.500 1.500 0.220
Light pole Cum 6 0.800 0.800 0.220
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 4 1.40 1.650 0.100
OFC Chamber Cum 4 1.40 1.40 0.100
Electrical Chamber Cum 6 1.70 1.70 0.100
Water Chamber Cum 5 1.50 1.50 0.100
Light pole Cum 6 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000
Electrical Chamber Cum 6 6.000 0.150 1.500
Water Chamber Cum 5 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Cover Deduction Cum -11 0.900 0.600 0.150
Cover Deduction Cum -4 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 6 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 185.320 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 6
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 4
26 Octagone size
27 Informatory sign board Sqm 3 0.750
20 Kerb Stone Rm 0
7.4128
29 Barrigates Rmt 1 37.064
30 FRP Perforated Cover
SWD Nos 37
Length of Road 185.32 M
Quantity ROW 4.70 M
27.798
Existing Carriageway 4.70 M
OFC Manhole Nos 4 No
18.532
LT and HT Manhole 6 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
34.09888 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
1.38 No. of water chamber 5 nos
Total PaverBlock Crust 0.41 1
6
Condition-1, Flexible to Rigid
174.2
0 10131.32
174.2
444.77
8
14
-174.2
292.57
18
574.49
19
0
8.68
8.68
296.51
-9
-14
273.51
131
1
0
132
130.65
130.65
871
174.2
219.29
219.29
2.13
1.80
3.99
2.48
0.84
11.77
0
0
0.92
0.78
1.73
1.13
0.38
4.94
0.86
2.03
1.27
4.16
2.88
8.1
3.9
15.00
0.86
2.03
1.27
-0.891
-0.192
3.00
3.24
25.40
480.48
1575.00
299.25
2.36
11.2
55.596
27.798
4
2.25
4
234
59
18.8
0
0
0
0
0
0.00
1482.56
1853.20
37
37
Minor Roads Flexible to Rigid Pavements-MR89
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 185.72 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 185.72 1.600 1.500
Light Pole cum 6 0.90 0.900 1.600
Utility Crossing cum 4 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 4 1.400 1.650 0.230
OFC Chamber Cum 4 1.400 1.400 0.230
Electrical Chamber Cum 6 1.700 1.700 0.230
Water Chamber Cum 5 1.500 1.500 0.220
Light pole Cum 6 0.800 0.800 0.220
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 4 1.40 1.650 0.100
OFC Chamber Cum 4 1.40 1.40 0.100
Electrical Chamber Cum 6 1.70 1.70 0.100
Water Chamber Cum 5 1.50 1.50 0.100
Light pole Cum 6 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000
Electrical Chamber Cum 6 6.000 0.150 1.500
Water Chamber Cum 5 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Cover Deduction Cum -11 0.900 0.600 0.150
Cover Deduction Cum -4 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 6 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 185.720 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 6
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 4
26 Octagone size
27 Informatory sign board Sqm 3 0.750
20 Kerb Stone Rm 0
7.4288
29 Barrigates Rmt 1 37.144
30 FRP Perforated Cover
SWD Nos 37
Length of Road 185.72 M
Quantity ROW 4.70 M
27.858
Existing Carriageway 4.70 M
OFC Manhole Nos 4 No
18.572
LT and HT Manhole 6 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
34.17248 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
1.38 No. of water chamber 5 nos
Total PaverBlock Crust 0.41 1
6
Condition-1, Flexible to Rigid
174.58
0 10131.72
174.58
445.73
8
14
-174.58
293.15
18.04
575.73
19
0
8.68
8.68
297.15
-9
-14
274.15
130.93
1.39
0
130.32
130.93
131.4
872.58
174.6
218.55
218.55
2.13
1.80
3.99
2.48
0.84
11.24
0
0
0.92
0.78
1.73
1.13
0.38
4.94
0.86
2.03
1.27
4.16
2.88
8.1
3.9
15.00
0.86
2.03
1.27
-0.891
-0.192
3.00
3.24
25.70
480.48
1575.00
299.25
2.36
11.6
55.716
27.858
4
1.17
4
235
59
18.8
0
0
0
0
0
0.00
1485.76
1857.20
37
37
Minor Roads Flexible to Rigid Pavements-MR90
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 84.43 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 84.43 1.600 1.500
Light Pole cum 3 0.90 0.900 1.600
Utility Crossing cum 2 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 2 1.400 1.650 0.220
OFC Chamber Cum 2 1.400 1.400 0.220
Electrical Chamber Cum 3 1.700 1.700 0.220
Water Chamber Cum 2 1.500 1.500 0.220
Light pole Cum 3 0.800 0.800 0.220
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 2 1.40 1.650 0.075
OFC Chamber Cum 2 1.40 1.40 0.100
Electrical Chamber Cum 3 1.70 1.70 0.100
Water Chamber Cum 2 1.50 1.50 0.100
Light pole Cum 3 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 2 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000
Electrical Chamber Cum 3 6.000 0.150 1.500
Water Chamber Cum 2 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 2 1.300 1.300 0.150
Cover Deduction Cum -5 0.900 0.600 0.150
Cover Deduction Cum -2 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 3 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 84.430 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 3
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 2
26 Octagone size
27 Informatory sign board Sqm 1 0.900
20 Kerb Stone Rm 0
3.3772
29 Barrigates Rmt 1 16.886
30 FRP Perforated Cover
SWD Nos 17
Length of Road 84.43 M
Quantity ROW 4.70 M
12.6645
Existing Carriageway 4.70 M
OFC Manhole Nos 2 No
8.443
LT and HT Manhole 3 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
15.53512 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.63 No. of water chamber 2 nos
Total PaverBlock Crust 0.41 1
3
Condition-1, Flexible to Rigid
79.36
0 10030.43
79.36
202.63
4
7
-80.86
132.77
8.2
261.73
0
4
4
135.09
-4.32
-6.75
124.02
60
1
0
61
59.52
59.52
396.82
79.36
99.396
99.396
1.02
0.86
1.91
0.99
0.42
5.2
0
0
0.35
0.39
0.87
0.45
0.19
2.25
0.43
1.01
0.51
1.95
1.44
4.05
1.56
7.00
0.43
1.01
0.51
-0.405
-0.096
1.00
1.62
11.57
225.23
735.00
99.75
1.06
4.8
25.329
12.6645
2
0.9
2
106
27
9.4
0
0
0
0
0
0.00
675.44
844.30
17
17
Minor Roads Flexible to Rigid Pavements-MR91
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 130.13 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 130.13 1.600 1.500
Light Pole cum 4 0.90 0.900 1.600
Utility Crossing cum 3 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 3 1.400 1.650 0.220
OFC Chamber Cum 3 1.400 1.400 0.220
Electrical Chamber Cum 4 1.700 1.700 0.220
Water Chamber Cum 4 1.500 1.500 0.220
Light pole Cum 4 0.800 0.800 0.230
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 3 1.40 1.650 0.075
OFC Chamber Cum 3 1.40 1.40 0.100
Electrical Chamber Cum 4 1.70 1.70 0.100
Water Chamber Cum 4 1.50 1.50 0.100
Light pole Cum 4 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.120
Electrical Chamber Cum 4 1.500 1.500 0.150
Water Chamber Cum 4 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000
Electrical Chamber Cum 4 6.000 0.150 1.500
Water Chamber Cum 4 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150
Electrical Chamber Cum 4 1.500 1.500 0.150
Water Chamber Cum 4 1.300 1.300 0.150
Cover Deduction Cum -8 0.900 0.600 0.150
Cover Deduction Cum -3 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 4 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 130.130 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 4
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 3
26 Octagone size
27 Informatory sign board Sqm 2 0.755
20 Kerb Stone Rm 0
5.2052
29 Barrigates Rmt 1 26.026
30 FRP Perforated Cover
SWD Nos 26
Length of Road 130.13 M
Quantity ROW 4.70 M
19.5195
Existing Carriageway 4.70 M
OFC Manhole Nos 3 No
13.013
LT and HT Manhole 4 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
23.94392 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.97 No. of water chamber 4 nos
Total PaverBlock Crust 0.41 1
4
Condition-1, Flexible to Rigid
122.32
0 10076.13
122.32
312.31
5
10
-122.32
204.99
12.64
403.4
13
0
6.05
6.05
208.21
-6
-9
193.21
91.74
1
0
92.74
91.74
91.74
611.61
122.32
153.034
153.034
1.52
1.29
2.54
1.98
0.59
7.92
0
0
0.52
0.59
1.16
0.9
0.26
3.43
0.52
1.35
1.01
2.88
2.16
5.4
3.12
11.00
0.65
1.35
1.01
-0.648
-0.144
2.00
2.16
18.04
332.64
1155.00
199.50
1.69
7.2
39.039
19.5195
3
1.51
3
164
41
14.1
0
0
0
0
0
0.00
1041.04
1301.30
26
26
Minor Roads Flexible to Rigid Pavements-MR95
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 72.41 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 72.41 1.600 1.500
Light Pole cum 2 0.90 0.900 1.600
Utility Crossing cum 1 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 1 1.400 1.650 0.230
OFC Chamber Cum 1 1.400 1.400 0.230
Electrical Chamber Cum 2 1.700 1.700 0.230
Water Chamber Cum 3 1.500 1.500 0.230
Light pole Cum 3 0.800 0.800 0.230
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 1 1.40 1.650 0.150
OFC Chamber Cum 1 1.40 1.40 0.150
Electrical Chamber Cum 2 1.70 1.70 0.120
Water Chamber Cum 2 1.50 1.50 0.100
Light pole Cum 2 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 1 1.200 1.200 0.200
Electrical Chamber Cum 2 1.500 1.500 0.200
Water Chamber Cum 2 1.300 1.300 0.200
Total
b Wall
OFC Chamber Cum 1 4.800 0.150 1.500
Electrical Chamber Cum 2 6.000 0.150 1.500
Water Chamber Cum 2 5.200 0.150 1.500
Total
c Slab
OFC Chamber Cum 1 1.200 1.200 0.150
Electrical Chamber Cum 2 1.500 1.500 0.150
Water Chamber Cum 2 1.300 1.300 0.150
Cover Deduction Cum -4 0.900 0.600 0.150
Cover Deduction Cum -1 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 2 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 72.410 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 2
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 1
26 Octagone size
27 Informatory sign board Sqm 1 0.900
20 Kerb Stone Rm 0
2.8964
29 Barrigates Rmt 1 14.482
30 FRP Perforated Cover
SWD Nos 14
Length of Road 72.41 M
Quantity ROW 4.70 M
10.8615
Existing Carriageway 4.70 M
OFC Manhole Nos 1 No
7.241
LT and HT Manhole 2 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
13.32344 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.54 No. of water chamber 2 nos
Total PaverBlock Crust 0.41 1
2
Condition-1, Flexible to Rigid
68.07
0 10018.41
68.07
173.78
2.59
3
-65.47
113.9
7.03
224.47
0
3.27
3.27
115.86
-3
-5
107.86
51.05
0.35
0
51.4
51.05
51.05
340.33
68
85.12
85.12
0.53
0.45
1.33
1.55
0.44
4.3
0
0
0.35
0.29
0.69
0.45
0.13
1.91
0.29
0.90
0.68
1.86
1.08
2.7
2.34
6.12
0.22
0.68
0.51
-0.324
-0.048
1.03
1.08
10.09
214.83
642.60
102.74
0.96
4.2
21.723
10.8615
1
0.9
1
91
23
4.7
0
0
0
0
0
0.00
579.28
724.10
14
14
Minor Roads Flexible to Rigid Pavements-MR96
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 107.30 1 0.15
concrete
7 Excavation
Water Line & Utility Trench cum 1 107.30 1.600 1.500
Light Pole cum 4 0.90 0.900 1.600
Utility Crossing cum 2 1.400 1.650 1.500
Flexible Pavement deduction cum
Total
10 Dewatering Hour 1
19 Rubble Soling
Utility Crossing Cum 2 1.400 1.650 0.220
OFC Chamber Cum 2 1.400 1.400 0.220
Electrical Chamber Cum 4 1.700 1.700 0.220
Water Chamber Cum 3 1.500 1.500 0.220
Light pole Cum 4 0.800 0.800 0.220
Total
20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 2 1.40 1.650 0.100
OFC Chamber Cum 2 1.40 1.40 0.100
Electrical Chamber Cum 4 1.70 1.70 0.100
Water Chamber Cum 3 1.50 1.50 0.100
Light pole Cum 4 0.80 0.80 0.100
Total
21 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.100
Electrical Chamber Cum 4 1.500 1.500 0.100
Water Chamber Cum 3 1.300 1.300 0.100
Total
b Wall
OFC Chamber Cum 2 4.800 0.150 0.900
Electrical Chamber Cum 4 6.000 0.150 1.500
Water Chamber Cum 3 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 4 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Cover Deduction Cum -7 0.900 0.600 0.150
Cover Deduction Cum -2 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 4 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 95 kg/cum
c Slab MT 95 kg/cum
Total
24 Painting Work
Edge Marking Line Sqm 2 107.300 0.15
Lane Marking / Other Markings Sqm
Signages
Cautionary/Warning sign boards in
25 Nos. 4
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 2
26 Octagone size
27 Informatory sign board Sqm 2 0.650
20 Kerb Stone Rm 0
4.292
29 Barrigates Rmt 1 21.46
30 FRP Perforated Cover
SWD Nos 21
Length of Road 107.30 M
Quantity ROW 4.70 M
16.095
Existing Carriageway 4.70 M
OFC Manhole Nos 2 No
10.73
LT and HT Manhole 4 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
19.7432 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.79 No. of water chamber 3 nos
Total PaverBlock Crust 0.41 1
4
Condition-1, Flexible to Rigid
100.86
0 10053.30
100.89
257.52
5
7
-100.89
167.29
10.42
333.03
0
4.95
4.99
171.68
-6
-7
157.9
75.65
1
0
76.65
75.65
75.65
504.31
100.86
126
126
1.02
0.86
2.54
1.49
0.56
6.47
0
0
0.46
0.39
1.16
0.68
0.26
2.95
0.29
0.90
0.51
1.70
1.296
5.4
2.34
9.04
0.43
1.35
0.76
-0.567
-0.096
1.88
2.16
14.78
196.35
901.74
187.53
1.24
32.2
16.1
2
1.3
2
134
33
9.4
0
0
0
0
0
0.00
858.40
1073.00
21
21