Nashik Smart City

Road Inventory Survey- Major

Road Type of
SN Name of Road Length (Mtr.) ROW
Pavement
From To

1 Tambat Lane Ashok Stambh Raviwar Karnja 498.00 8.80 Rigid


2 Ashok Stambh Circle Ramwadi Bridge (Gharpure Ghat) 303.00 9.40 Flexible
3 Rungtha Highschool Ganga Wadi 445.00 7.60 Rigid
4 Ramwadi Bridge (Gharpure Ghat) Ganga Wadi 463.00 6.80 Rigid
5 Lonar Lane Shaniwar Peth Gharpure Ghat 253.00 7.50 Rigid
6 Mhasoba Lane Shaniwar Peth Gnaga Wadi 278.00 7.10 Rigid
7 Tuljabhawani Temple Gangawadi Garden 100.00 6.30 Rigid
8 Raviwar Karanja Birla Eye Hospital 144.00 16.00 Flexible
9 Holkar Bridge Birla Hospital Sundar Narayan Mandir 60.00 20.30 Flexible
10 Sundar Narayan Mandir Panchwati Karanja 411.00 33.10 Rigid
11 Panchwati Karanja Dindori Naka 224.00 29.10 Rigid
12 Nimani Bus Stop Garden (Panchwati Karanja) 108.00 18.00 Flexible
13 Malwiya Chowk Katya Maruri Chowk 779.00 9.80 Flexible
14 Malwiya Chowk Ramkund 267.00 9.60 Rigid
15 Krusnaji Tower Near Sainath Chowk 155.00 10.10 Rigid
16 Sainath Chowk Shani Chowk 115.00 6.90 Rigid
17 Shani Chowk Sardar Chowk 170.00 6.90 Rigid
18 Perina Icecream Chowk Nimani Bus Stand 243.00 8.00 Flexible
19 Manas Hotel Swami Vivekanand Road 150.00 9.10 Flexible
20 Perina Icecream Chowk Near Shankar Mandir 522.00 7.30 Rigid
21 Nehru Garden Chowk MG Chowk 178.00 15.00 Flexible
22 Kalya Maruri Chowk Garden (Lakshmi Narayan Temple) 647.00 12.60 Rigid
23 Garden (Lakshmi Narayan Temple) Hotel Tuljakrupa (Near Sardar Chowk) 257.00 8.80 Rigid
24 Ramkund Hotel Tuljakrupa (Near Sardar Chowk) 252.00 8.10 Flexible
25 Bansidhar Towers Indira Gandhi Rugnalaya 158.00 7.90 Flexible
26 Malwiya Chowk Panchwati Karanja 98.00 12.50 Flexible

27 Kamathi Lane Nag Chowk Gajanan Chowk 105.00 9.70 Rigid


28 MG Road Takshila Raje Bahadur Lane 200.00 6.20 Rigid

29 Hotel Uttam Palace Indrakund 281.00 15.00 Rigid


30 Makhmanabad Naka Malegaon Stand 345.00 17.70 Flexible
31 veterinary hospital Gharpure Ghat 244.00 6.40 Flexible
32 Ashok Stambh Nandadeep 178.00 10.50 Rigid
33 VAKILWADI Shanta Park Deshdut Karyalay 240.00 13.00 Rigid
34 Dhatrak Corner Hotel Panchvati 215.00 6.10 Rigid
35 Chandvadkar Ice Factory Red Cross 111.00 9.80 Rigid
36 Red Cross M.G. Road 120.00 12.40 Rigid
37 M.G. Chowk Raviwar Karanja 386.00 15.10 Rigid
38 MAIN ROAD Mohan Talim Sangha Raviwar Karanja 578.00 9.80 Rigid
39 Meher Signal Sudarshan (Main Road) 530.00 11.30 Rigid
40 Sudarshan (main road) Gadge Maharaj Bridge 424.00 9.50 Rigid
41 Gadge Baba Statue Tivandha Chowk 340.00 19.70 Rigid
42 Tivandha Chowk Kajipura Road 396.00 6.50 Rigid
Road Type of
SN Name of Road Length (Mtr.) ROW
Pavement
From To
43 Tryambak Naka Ganjmal Signal 564.00 25.00 Flexible
44 Trimbak Darwaja Kajipura Road 333.00 6.50 Rigid
45 DAMODAR ROAD Trimbak Darwaja Damodar 294.00 9.70 Rigid
46 Tivandha Chowk Rahane Girani 198.00 6.40 Rigid
47 Rahane Girani Pinjarghat Road 163.00 6.40 Rigid
48 JUNI TAMBAT LANE Hotel Iqbal Rahane Girani 188.00 7.60 Rigid
49 Bhadrakali Mandir Juni Tambat Lane 239.00 6.80 Rigid
50 Main Road Trimbak Darwaja Police Chowky 251.00 8.20 Rigid
51 Pimpal Chowk Trimbak Darwaja Police Chowky 76.00 14.80 Rigid
52 Old Nashik Milk Market Road Ganjmal Signal 377.00 14.00 Flexible
53 Pimpal Chowk Near Main Road 206.00 6.00 Rigid
54 Bhadrakali Riksha & Taxi Stand Pimpal Chowk Next 140.00 10.50 Rigid
55 Anna Sathe Chowk Shivsena Office 418.00 11.90 Flexible
56 Kaneheri Wadi Shri Saibaba Hospital 345.00 6.50 Flexible
57 Shivaji Road Old C.B.S. Area Shalimar Chowk 440.00 18.30 Rigid
58 Shalimar Chowk Ganjmal signal 192.00 21.10 Flexible
59 Under Pass (vikas Bhavan) Shivaji Road 152.00 15.60 Rigid
60 Shivaji Road Bank of Maharashtra Nehru Garden 228.00 18.00 Flexible
61 Shalimar Chowk Bank of Maharashtra Nehru Garden 292.00 11.50 Rigid
62 Nehru Garden Chowk Navapura, Main Road 152.00 14.90 Rigid
63 Takshila Main Road 130.00 11.40 Rigid
64 Near Nehru Garden Chowk Maratha Mangal karyalaya 168.00 9.50 Rigid
65 Gadge Maharaj Bridge Garden Amardham 728.00 10.50 Flexible
66 Gadge Maharaj Bridge Garden Zaveri Dharmshala 637.00 12.70 Rigid
67 Amardham Kalya Maruti Police Chowki 805.00 20.00 Rigid
68 Hotel Tuljakrupa Gadge Maharaj Bridge Garden 200.00 12.00 Flexible/Rigid
69 Panchavati Road old Adgaon naka Nimani Bus stand 645.00 22.60 Rigid
70 Panchavati Road Nimani Bus stand Makhmalabad Naka 698.00 17.00 Rigid
71 Panchavati Road Makhmalabad Naka Ramwadi Enterance 395.48 22.10 Rigid
72 Ramwadi Road Ramwadi Enterance Ramwadi 515.00 20.00 Flexible
73 Panchavati Road Ramwadi Enterance Ramwadi Bridge 180.00 33.20 Rigid
74 Gangapur Road Ashok Stambh Old Gangapur Naka 1001.62 31.70 Flexible
75 Shivaji Nagar Road Old Gangapur Naka Kekan Hospital 220.00 20.00 Flexible
TOTAL 23542.10
Nashik Smart City

Road Inventory Survey- Minor


Road Road Road Width Type of
Name of Road Length (Mts.)
no. From To (Mts.) Pavement
R1 Ashok Stambh Circle Panchshari's Professional Academy 97.00 4 Flexible
R2 Ashok Stambh Circle R.K. Enterprises 77.70 3 Rigid
R3 Rokel Ln Ashok Stambh Circle Chaitanya Hospital 305.00 6 Flexible
R4 Near Gharapure Rd From Gharapure Rd Near Ramwadi Bridge 135.00 5 Rigid
R5 Beldar lane From Gharapure Ghat Rd Dharmvir Sambaji Raje Bhosle udyan 450.00 6 Rigid
R6 Pushpawati Rungta Kanya Vidyalaya Hanuman Mandir 75.00 3 Rigid
R7 Taraba Housing Society Glare Media Solutions Jn 47.00 6 Rigid
R8 saakar edu. academy jn, Gharapure Ghat Hari On Xerox Jn 115.00 5 Rigid
R9 New Tambat Lane Gangapure Rd Jn Pavan Medical Shop Jn., Tambat Lane 113.10 6 Rigid
R10 Shani Ln Sai baba mandir Shree sidheshwar Bhavan 118.90 4 Rigid
R11 Gadgil Ln mobile Shop Hemlata plaza cinema 117.90 4 Rigid
R12 Gadgil Ln Hemlata plaza cinema Shree Tulaja Bhavani Mandir 140.90 5.5 Rigid
R13 Abhonkar Ln Shree Renuka Shop Gangaram Mahal 134.30 6.5 Rigid
R14 Teli Gali Ravivarkaranja Jay Bajrang Mandir 146.55 6.5 Rigid
R15 Near Teli Ln Shree ram sankul Vardaman Company 49.05 6.5 Rigid
R16 Gangapur Road Gaykhe Hostel 183.07 5 Rigid
R17 Gangapur Road (SBI ATM) Corporation Bank 147.66 4.9 Rigid
R18 Thhakar Medical Gupte Cardiac Center 126.18 6.5 Rigid
R19 Ajikya Foods Meher Signal 113.05 5 Rigid
R20 Gaykhe Hostel Meher plaza 111.22 5 Rigid
R21 Near Ashok Stambh Dilkhush kacchi Dabeli Hari om Auto Services 36.97 4 Rigid
R22 ShreeSaptshrungi Missel point Ghankar Ln (vasant Distributor) 108.54 6 Rigid
R23 Shreepad tailor Shree Sdhanshree printing 116.45 5 Rigid
R24 Pitru Chya Pranav Printers 75.38 3.1 Rigid
R25 Mohini Ral Neha Enterprises 80.18 3.6 Rigid
26 Anand Book Stall Abhishak Trading Co. 122.61 3.6 Rigid
Nashik Smart City

Road Inventory Survey- Minor


Road Road Road Width Type of
Name of Road Length (Mts.)
no. From To (Mts.) Pavement
R27 Sarsubhe Ln Quick Courier's Airtel Banking point 130.65 3.4 Rigid
R28 Hiralal Ln Tri Matrix Softwr Solution Hotal Visawa 132.35 4.4 Rigid
R29 bhagwan mahavir Path Jain ice cream Parlour Gupta mistanna Bhandar 78.00 4.9 Rigid
R30 GyanupagaLn New nilkuntha Trading Co. SnehalMovies Photo Studio 111.37 9 Rigid
R31 Wad Galii Chittpawanmarrage hall Om Shree Renuka mata prasana 198.00 5 Rigid
R32 Gore Ram Ln Kamal Saree Shree dashabhuja Sidhivinayak mandir 189.53 6 Rigid
R33 Gaidhani Galli Ravivarkaranja Om Shree Renuka mata prasana 116.22 6.2 Rigid
R34 Connected To Gore ramLn Shree Murlidhar Mandir Samsthan 71.10 3 Rigid
R35 Bohor Patti Rd Laxmikant Jagannath mundad Maruti Sales Corporation 299.19 6 Rigid
R36 Murlidhar Ln Shree Sonya maruti mandir Ramsetu Bridge 158.90 6 Rigid
R37 Jijamata Chowk Jijamata Chowk Radhakrishna Jewellers 169.63 3 Rigid
R38 Ghadge maharaj path Balaji Mandir Prathmik Vidya mandir 200.84 4 Rigid
R39 Dhamaji Phire marg Saraswati nala kapad bazar 36.35 3 Rigid
R40 Bharti saree collection Shree parshwanath Jain Temple 115.18 3.6 Rigid
R41 Fawade Galli Goradhandas Khitaledas Fawade Galli 64.90 4.7 Rigid
R42 Laxmi Vilas Bank ATM Kaizen Edutech Pvt Ltd. 24.00 4 Rigid
R43 gayatri School Ganesh Medical 104.57 2.6 Rigid
R44 sai Ladies Tailor Nashik Depo 56.54 5.4 Rigid
R45 Fawade Galli gayatri School Ganesh Medical 238.00 3 Rigid
R46 Biwalkar Ln Vishwakarma Udan Arts Neptune Computer 146.11 3 Rigid
R47 Bharti saree collection Royal Distributors 127.38 3.4 Rigid
R48 ShuklaLn Kashinath Chawan Shivani Tops 103.24 3.5 Rigid
R49 Adgaonkar Brothers Saraf Jain Bakery 45.49 3 Rigid
R50 Saraf bajar Rd ShankarBalaji madkar Chowk Sakhare Store 186.34 7 Rigid
R51 Pagadbandh Ln Jijamata Chowk Apsara Shop 168.00 3.3 Rigid
R52 NagarkarLn saraswati Chowk Omkar Jewellers 192.53 2.5 Rigid
Nashik Smart City

Road Inventory Survey- Minor


Road Road Road Width Type of
Name of Road Length (Mts.)
no. From To (Mts.) Pavement
R53 Nehru Chowk Junnarkar Jwellers 82.23 4 Rigid
R54 Dharma Chaitanya Ashram Gadge Maharaj Path 67.76 2 Rigid
R55 Hotel Cool Palace Saraswat bank ATM 236.89 6.7 Rigid
R56 Hotel Cool Palace Shree Samarth BankATM 150.43 2.7 Rigid
R57 TiwariLn Main Road post Office babar bandhu saraf 159.03 5.2 Rigid
R58 Main Road Ramesh Pressing Works 54.46 4 Rigid
R59 Kailash Fono General Store Ambedkar nivas 97.61 4.8 Rigid
R60 CHAWDA But House Sundra Building 45.27 4.5 Rigid
R61 Fancey ladies New Happy Corner 49.40 5.3 Rigid
R62 saraswati Ln Hanuman Temple Badrakali mandir 156.66 3.5 Rigid
R63 Deeprabha gas Sto, Shop Hundiwala Ln 124.48 4.6 Rigid
R64 Nav Durga Temple Tiwanga Chowk 240.61 6.6 Rigid
R65 Gulab wadi oyama School Sarwanjanik Vachnalay 54.18 3.8 Rigid
R66 Veer Bapurao Gaidhani Nivas Mhasoba Mandir 72.49 6.8 Rigid
R67 Naikwadi Pura Rd Jn Veer Bapurao Gaidhani Nivas 60.57 2 Rigid
R68 Tiwandha Chowk Shree modhehswari Deari 159.12 3 Rigid
R69 Shree Renuka Collections jijamata Hospital 89.89 3.2 Rigid
R70 Kapil Traders Avinash Medical Store 138.86 2.81 Rigid
R71 Nehru garden Chowk Hotel salimar 180.05 3.1 Flexible
R72 Nehru garden Chowk salimar Chowk 100.09 4.9 Flexible
R73 Jillha Adhikshak Adhikari Karyalay Indian plywood 163.65 5.5 Rigid
R74 Mohan talim sangh Rd Mohan talim sangh Rd 106.00 2.9 Rigid
R75 Damodar Cinema Sarika Nagari shakari Patsanstha Hanuman Mandir 189.00 3.4 Rigid
R76 Datta Charni Niwas G.N. Collection 300.00 2.8 Rigid
R77 Shankar Temple Shivaji Chowk 122.26 5 Rigid
R78 Vinchurkar Diagnostics SBI Bank Bapaye Hospital 351.00 4 Flexible
Nashik Smart City

Road Inventory Survey- Minor


Road Road Road Width Type of
Name of Road Length (Mts.)
no. From To (Mts.) Pavement
R79 Udyagwardhini Asha Apartment 224.00 5.1 Flexible
R80 Koushala Tower Road 104.99 5 Flexible
R81 jain Irrigation system Ltd. Koushala Tower 176.78 6 Flexible
R82 baba hardasram Godadiwala Dham Parth Pumps India 66.69 5.2 Flexible
R83 Koushala Tower Road 93.43 6 Flexible
R84 Kotak mahindra Bank Ramesh motor School 76.86 4.2 Flexible
R85 Sree mhasoba Mandir Shri Raghunath mandir 146.10 5.3 Flexible
R86 Panchavati Karanja Road Ramvihar 79.48 2.4 Rigid
R87 Gandhi Steel Shop Malvia Chowk 62.51 3.1 Rigid
R88 Shani Chowk Road Sharma Traders 185.32 3.6 Flexible
R89 Shani Chowk Road Bansidhar Towers 185.72 4.1 Flexible
R90 raghunath Mohite Foundation Mahashakti 84.43 3.6 Flexible
R91 Panchavati Road Pathrawt Ln 130.13 2.8 Flexible
R92 Near NAG Chowk Sitaram Co-operative Housing Society Rd. 145.15 4 Rigid
R93 NAG Chowk NAG Chowk Sai Temple 183.21 5.3 Rigid
R94 Pramod Mahajan Garden 148.47 7.6 Rigid
R95 Pramod Mahajan Garden Road Shri Vitthal mandir 72.41 6.3 Flexible
R96 Shri Vitthal mandir Road laxmi narayan Temple 107.30 4.9 Flexible
TOTAL 12633.09
M1-Roads

Sr.No Tender Item No Description Unit R1 R3 R71 R72 R78 R79 R80 R81 R82 R83 R84 R85 R88 R89 R90 R91 R95 R96
Quantity Rate Amount
Total Length 2687.30 97.00 305.00 180.05 100.09 351.00 224.00 104.99 176.78 66.69 93.43 76.86 146.10 185.32 185.72 84.43 130.13 72.41 107.30
A SSR Items :-
Removing lime or lean cement concrete
including stacking the spoils as directed with all
leads, lifts etc, complete.
1 1 14.55 Cum 14.55 45.75 27.01 15.01 52.65 33.60 15.75 26.52 10.00 14.01 11.53 21.92 27.80 27.86 12.66 19.52 10.86 16.10 403.10 416.90 168,050.00
(PWD-SSR- 2018-19-BDW 8 -46.12)

Removing rich mix cement concrete including


stacking the spoils as directed with all leads, lifts
etc, complete.
2 2 9.7 Cum 9.7 30.5 18.01 10.01 35.10 22.40 10.50 17.68 6.67 9.34 7.69 14.61 18.53 18.57 8.44 13.01 7.24 10.73 268.73 694.00 186,499.00
(PWD-SSR- 2018-19-BDW 8 -46.13)

Dismantling brick masonry in lime or cement


mortar and stacking the materils as directed with
3 3 17.85 all leads, lifts etc. Cum 17.85 56.12 33.13 18.42 64.58 41.22 19.32 32.53 12.27 17.19 14.14 26.88 34.10 34.17 15.54 23.94 13.32 19.74 494.46 249.90 123,566.00

(PWD-SSR-2018-19-Road works -46.09)


Dismantling stone masonry in lime or cement
mortar including stacking the materials as
4 4 0.72 directed with all leads, lifts etc. Cum 0.72 2.27 1.34 0.74 2.61 1.67 0.78 1.32 0.50 0.70 0.57 1.09 1.38 1.38 0.63 0.97 0.54 0.79 20.00 283.50 5,670.00

(PWD-SSR- 2018-19-BDW 8 -46.11)


Removal of telephone / Electric poles including
excavation and dismantling of foundation
concrete and lines under the supervision of
concerned department, disposal with all lifts and
up to a lead of 1000 metres and stacking the
5 5 3 serviceable and unserviceable material Nos 3 10 6.00 3.00 12.00 8.00 4.00 6.00 2.00 3.00 3.00 5.00 6.00 6.00 3.00 4.00 2.00 4.00 90.00 281.40 25,326.00
separately

(PWD-SSR- 2018-19-Road works - 7.25)

Dismantling of flexible pavements and disposal


of dismantled materials up to a lead of 1000
metres, stacking serviceable and unserviceable
materials separately etc. complete.MORTH 202
6 7 91.18 Cum 91.18 286.7 169.25 94.00 329.94 210.56 98.69 166.17 62.69 87.82 72.25 137.33 174.20 174.58 79.36 122.32 68.07 100.89 2526.00 339.10 856,567.00
(PWD-SSR--Road works 2018-19-3.10)

Excavation for roadway in earth, soil of all sorts,


sand, gravel or soft murum including dressing
section to the required grade, camber and side
slopes and conveying the excavated materials
with all lifts upto a lead of 50m. and spreading
7 10 152.61 for embankment or stacking as directed. Cum 152.44 479.05 283.32 157.40 552.27 352.97 165.02 278.44 104.61 147.00 121.03 229.79 292.57 293.15 132.77 204.99 113.90 167.29 4228.01 75.60 319,638.00

(PWD-SSR- 2018-19-Road works -2.11)

Carriage of surplus excavated material over


distance exceeding 0.5 km & up to 10 KM lead
8 11 9.42 includig loading and unloading. Cum 9.42 29.62 17.49 9.72 34.09 21.76 10.20 17.17 6.48 9.07 7.46 14.19 18.00 18.04 8.20 12.64 7.03 10.42 261.00 264.42 69,014.00
(PWD -SSR 2018-19 Lead Satement C1 )
Compacting the existing Subgrade with power
roller including artificial watering etc. complete.

9 12 300.71 (SSR Lead Chart for Excavated MaterialPWD- Sqm 300.7 945.5 558.16 310.28 1088.00 694.40 325.47 548.00 206.74 289.63 238.27 453.00 574.49 575.73 261.73 403.40 224.47 333.03 8331.00 16.80 139,961.00
SSR- 2018-19-Road works - 2.31)

Dewatering on BHP basis by using water pump


including diversion of stream, providing
cofferdams, earthern bunds etc. as may be
necessary for foundation and other parts of the
the works and pumping out water during and
10 13 10 after excavation as may be required by using 3.0 Hour 10 31 18.00 10.00 35.00 22.00 11.00 18.00 7.00 9.00 8.00 15.00 19.00 19.00 8.00 13.00 7.00 9.00 269.00 144.90 38,978.00
BHP pump etc. complete.

(PWD-SSR- 2018-19-BDW 8 -12.22)

Providing earth work in embankment with


approved materials obtained from
departmental land or other sources of all lead
& lifts including minimum soaked CBR of 8 % or
more with laying in layers of 20cm. To 30cm
thickness breaking clods, dressing to the
required lines, curves, grades and section,
watering and compaction with power roller to
11 14 4.51 achieve not less than 97 % of standard proctor Cum 4.62 14 8.78 4.62 16.17 10.21 4.76 8.25 3.00 4.34 3.65 6.93 8.68 8.68 4.00 6.05 3.27 4.99 125.00 524.60 65,575.00
density etc.complete

(PWD-SSR- 2018-19-BDW 8 -2.27)

Page 7 of 493
Sr.No Tender Item No Description Unit R1 R3 R71 R72 R78 R79 R80 R81 R82 R83 R84 R85 R88 R89 R90 R91 R95 R96
Quantity Rate Amount
Conveying materials obtained from road
cutting including all lifts, laying in layers of
20cm. to 30cm. breaking clods, dressing to the
required lines, curves, grades and section,
watering and compacting to not less than 97% of
standard proctor density for a lead of 300m to
12 15 143.19 500m inclusive, from the site of excavation to Cum 143.45 451 265.94 147.96 518.00 328.60 155.00 260.71 98.70 137.93 113.30 215.76 273.51 274.15 124.02 193.21 107.86 157.90 3967.00 282.40 1,120,281.00
the site of deposition as directed.

(PWD-SSR- 2018-19- Item No.2.26)

Construction of granular sub-base by providing


close graded Material, mixing in a mechanical
mix plant at OMC, carriage of mixed Material to
work site,spreading in uniform layers with motor
grader / Paver on prepared surface and
compacting with vibratory power roller to
13 16 69.09 achieve the desired density, complete as per Cum 69.08 217.11 128.39 71.25 250.00 159.31 74.71 126.02 48.58 66.56 54.88 104.00 132.00 130.32 61.00 92.74 51.40 76.65 1914.00 2065.60 3,953,558.00
clause 401 -- Plant Mix Method and Grading -II
Material

(PWD-SSR- 2018-19-BDW 8 -3.02)

Construction of dry lean cement concrete Sub-


base over a prepared sub-grade with coarse
and fine aggregate conforming to IS: 383, the
size of coarse aggregate not exceeding 25
mm, , cement content not to be less than 150
kg/cum, optimum moisture content to be
determined during trial length construction,
concrete strength not to be less than 10 Mpa at
7 days, mixed in a batching plant/ Weigh batch
mixer, transported to site with all leads and lifts,
laid with a paver with electronic sensor /by
14 22 68.4 suitable means as approved by Engineerin- Cum 68.39 215.03 126.94 70.56 247.46 157.92 74.00 124.63 47.00 65.87 54.19 103.00 130.65 131.40 59.52 91.74 51.05 75.65 1895.00 3732.20 7,072,519.00
charge , compacting with vibratory roller,
finishing, curing and including preparation of
sub-grade surface if required etc.complete.

(PWD-SSR--Road 2018-19 works -5.13)

Providing and laying 125 micron Low Density


Polyethylene (LDPE) sheet confirming to IS
3395 : 1997 below concrete pavement including
15 23 455.89 all materials and labour complete. Sqm 455.9 1433.5 846.24 470.42 1649.70 1052.80 493.45 830.87 313.44 439.12 361.24 686.67 871.00 872.58 396.82 611.61 340.33 504.31 12630.00 19.90 251,337.00

(PWD-SSR--Road 2018-19 works -5.19)


Providing and laying in-situ M40 Grade
unreinforced plain cement concrete pavement
over a prepared sub base with 43 grade
cement , coarse and fine aggregate conforming
to IS 383, using fine and coarse aggregates
combined gradation as per Table 600-3 of
MORTH Specification 2013, mixed in a batching
and mixing plant/ non tilting mixer and Weigh
batcher as per approved mix design,
admixtures, transporting to site, spreading,
laying with approved make paver,compacted
and finished in a continuous operation, finishing
16 24 91.18 to lines and grades as directed by Engineer-in- Cum 91.18 286.7 169.25 94.08 329.94 210.56 98.69 166.17 62.69 87.82 72.25 137.33 174.20 174.60 79.36 122.32 68.00 100.86 2526.00 6515.60 16,458,406.00
charge and curing by curing compound /by
providing cement vata in cement Mortar 1:8
@0.6m X 0.6m centre to centre, admeasuring
80 mm at bottom and 40 mm at top with depth of
75mm and maintaining the same throughout
curing period by any other method approved by
Engineer-in-charge.

(PWD-SSR--Road 2018-19 works -5.09)

Cutting transverse contraction joints 6 mm wide


and depth 70mm. in concrete slab using concrete
cutting machine with diamond studded saw within 48
hours of casting of bay / slabetc. complete including
17 25 114.2 subsequent widening of the groove 8to 10 mm. wide Rmt 114.2 359 211.83 117.78 413.00 263.68 123.39 208.08 78.50 109.99 90.50 171.76 219.29 218.55 99.40 153.03 85.12 126.00 3163.10 68.30 216,040.00
at top having depth of 15 mm. as directed byEngineer
incharge.
(PWD-SSR--Road 2018-19 works -5.17)

Page 8 of 493
Sr.No Tender Item No Description Unit R1 R3 R71 R72 R78 R79 R80 R81 R82 R83 R84 R85 R88 R89 R90 R91 R95 R96
Quantity Rate Amount
Providing to contraction joints polysuphide
sealent (Pouring grade) confirming to BS : 5212
- 1989 into sawed groove widened at top for
sealent reservoir of specified size and shape as
per detailed drawing including fixing
Polyethylene foam backer rod of required
diameter (appraox. 25% larger than the initial 3
mm.to 4 mm. joint) overlaid with bond breaking
tape as per detailed drawing. Item includes
18 26 114.2 cleaning the joints with water jet / air compressor Rmt 114.2 359 211.83 117.78 413.00 263.68 123.39 208.08 78.50 109.99 90.50 171.76 219.29 218.55 99.40 153.03 85.12 126.00 3163.10 141.80 448,528.00
and allowing joint to become thoroughly dry
before sealent is applied and applying primer.(A)
Contraction and longitudinal joints (15 mm. deep
x 8mm.wide)

(PWD-SSR--Road 2018-19 works -5.18)

Providing dry trap I granite / quartzite I gneiss,


rubble stone
soling in 15 cm to 20 cm thick layers (including
19 34 5.9 hand packing Cum 5.94 18.67 10.87 6.02 21.50 12.68 6.47 10.85 4.30 5.63 4.65 8.88 11.77 11.24 5.20 7.92 4.30 6.47 163.36 1073.30 175,334.00
and compactinq), etc. compleie.

(MJP DSR 2018-19,SEC E ,18)

Providing and laying Cast in situ/Ready Mix


cement concrete in M15 of trap/
granite/quartzite/gneiss metal for steps including
steel centering, plywood/steel formwork,
laying/pumping, compacting, roughening them if
special finish is to be provided, finishing uneven
and honeycombed surface and curing etc.
complete. The Cement Mortar 1:3 plaster is
considered for rendering uneven and
honeycombed surface, only. Newly laid concrete
shall be covered by gunny bag, plastic, tarpaulin
etc. (Wooden centering will not be allowed.),with
20 35 2.56 fully automatic micro processor based PLC with Cum 2.59 8.13 4.71 2.59 9.32 5.99 2.76 4.94 1.75 2.59 2.13 3.10 4.94 4.94 2.25 3.43 1.91 2.95 71.02 5782.10 410,645.00
SCADA enabled reversible Drum Type
mixer/concrete Batch mix plant (Pan mixer) etc.
complete. With natural sand/V.S.I. quality
Artificial Sand

(PWD-SSR- 2018-19, SSR 24.04)

Providing and laying in situ / ready mix / ready


mix M25 RCC work with trap/ granite/ quartzite/
gneiss metal in well steining including
shuttering, compacting by vibrating, finishing
and curing etc. complete. (fully automatic micro
processor based PLC with SCADA enabled
concrete batch mix plant / pan mixer with natural
21 36 13.39 /artifical sand, excluding reinforcement) Cum 13.28 42.35 24.77 13.83 48.32 31.03 14.36 24.18 9.19 13.03 10.85 20.11 25.40 25.70 11.57 18.04 10.09 14.78 370.88 5750.20 2,132,643.00

(PWD-SSR- 2018-19, SSR 12.38)

Providing and fixing in position TMT - FE - 500


bar reinforcement of various diameters for
R.C.C. pile caps, footings, foundations, slabs,
beams columns, canopies, staircase, newels,
chajjas, lintels pardis, copings, fins, arches etc.
as per detailed designs, drawings and
schedules. including cutting, bending, hooking
22 37 1.24 the bars, binding with wires or tack welding and MT 1.24 3.93 2.29 1.29 4.45 2.89 1.33 2.22 0.86 1.19 1.06 1.85 2.36 2.36 1.06 1.69 0.96 1.24 34.26 67193.70 2,301,720.00
supporting as required complete.

(PWD-SSR 18-19, 26.33)

Providing, Lowering & Laying ISI standard


R.C.C. pipes in standard lengths of following
class and diameter suitable for either collar/
spigot & socket joints or rubber ring joints,
including all cost of rubber rings of Company
make all taxes (Central and local), statutary
duties and taxes such as GST levied by Gol and
GoM in all respect, inspection charges, transport
to departmental stores/site, unloading and
23 38 stacking etc. complete as per IS-458/1988,
lowering & Laying and giving satisfactory
Hydraulic testing of the laid pipe line as
specified and directed by Engineer in charge
etc. complete. NP3
(MJP,DSR,2018-19, Sec.-I(V)RCC
Pipes,1d,e,f,2)Page No.147

a a 5.5 300 mm dia Rmt 5.6 17.22 11.20 5.60 19.60 12.64 6.00 9.60 3.80 5.40 4.20 8.40 11.20 11.60 4.80 7.20 4.20 6.00 154.26 1189.40 183,477.00

Page 9 of 493
Sr.No Tender Item No Description Unit R1 R3 R71 R72 R78 R79 R80 R81 R82 R83 R84 R85 R88 R89 R90 R91 R95 R96
Quantity Rate Amount
Road Marking with Hot Applied Thermoplastic
Compound with Reflectorizing Glass Beads on
Bituminous Surface- Providing and laying of hot
applied thermoplastic compound 2.5 mm thick
including reflectorizing glass beads @ 250 gms
per sqm area, thickness of 2.5 mm is exclusive
of surface applied glass beads as per
24 42 43.65 IRC:35 .The finished surface to be level, uniform sqm 43.65 137.25 81.02 45.04 157.95 100.80 47.25 79.55 30.01 42.04 34.59 65.75 83.39 83.57 37.99 58.56 32.58 48.30 1209.30 594.30 718,687.00
and free from streaks and holes.complete.

(PWD-SSR 18-19-6.12)

Providing and fixing Cautionary/Warning sign


boards in Equilateral Triangle size of 900 mm
made out of 2 mm aluminum sheet bonded
with white retro reflective sheeting of Class C
( Type XI Micro prismatic grade sheeting) having
pressure sensitive/heat activated adhesive
retoreflective specified back ground, border and
back side retoreflctive symbols, letters,
numerals, arrow as per IRC:67-2012 Table No
8.3 Supported with back support frame 25mm x
25mm x 3mm, duly painted on back side with
grey stove enamel paint and supported on one
no. of M. S. angle iron post of size 65 mm X 65
mm X 6 mm, 3.45 m long, duly painted with with
flat oil paint having alternate black and white
25 47 3 bands of 25 cm width including G.I. fixtures etc; Nos 3 10 6.00 3.00 12.00 8.00 4.00 6.00 2.00 3.00 3.00 5.00 6.00 6.00 3.00 4.00 2.00 4.00 90.00 4894.10 440,469.00
fixing the boards in M25 grade concrete block of
size 60cm X 60cm X 75cm including
transportation etc; complete. ClassC ( Type XI
Micro prismatic grade sheeting) shall have 10
years written warranty from the manufacturer
and authorised distributor/convertor issued for
field performance including the screen printed
areas and cut-out sheeting and cut-out durable
transparent overlay film and this warranty
certificate in original should be submitted to the
Engineer in charge by the contractor/supplier.

(PWD SSR 18-19 6.30 , e)

Providing and fixing Cautionary/Warning


sign boards in Octagone
size of 900 mm made out of 2 mm aluminum
sheet bonded
with white retro reflective sheeting of Class B
( Type IV High
intensity micro-prismatic grade sheeting-HIP)
having pressure
sensitive/heat activated adhesive retoreflective
specified back
ground, border and back side retoreflctive
symbols, letters,
numerals, arrow as per IRC:67-2012 Table No
8.3 Supported with
back support frame 25mm x 25mm x 3mm, duly
26 48 2 painted on back Nos 2 6 4.00 2.00 5.00 5.00 2.00 4.00 1.00 2.00 2.00 3.00 4.00 4.00 2.00 3.00 1.00 2.00 54.00 6562.50 354,375.00
side with grey stove enamel paint and supported
on one no. of M.
S. angle iron post of size 65 mm X 65 mm X 6
mm, 3.45 m long, duly painted with with flat oil
paint having alternate black and white bands of
25 cm width including G.I. fixtures etc; fixing the
boards in M25 grade concrete block of size
60cm X 60cm X 75cm including transportation
etc; complete. Class B ( Type IV High intensity
micro- prismatic grade sheeting-HIP) shall have
7 years written warranty from the manufacturer
and authorised distributor/convertor issued for
field performance including the screen printed
areas and cut-out sheeting and cut-out durable
transparent overlay film and this warranty
Providing and fixing of retro- reflectorised
informatory sign board rectangular/Square in
shape having area less than 0.9 square meter
made out of 2 mm aluminum sheet bonded with
white retro reflective sheeting of Class B ( Type
IV High intensity micro-prismatic grade sheeting-
HIP) having pressure sensitive/heat activated
adhesive retoreflective specified back ground,
border and back side retoreflctive symbols,
letters, numerals, arrow as per IRC:67-2012
Table No 8.3, supported with back support
frame 25mm x 25mm x 3mm, duly painted on
back side with two coats of grey stove enamel
paint and supported on one no. mild steel angle
iron post 75 mm x 75 mm x 6 mm, 3.5 mt long
27 49 1.17 firmly fixed to the ground by means of properly Sqm 1.17 3.6 2.17 1.21 4.50 2.70 1.30 2.10 1.80 1.12 0.90 1.80 2.25 1.17 0.90 1.51 0.90 1.30 32.40 7769.00 251,700.00
designed foundation with M25 grade cement
concrete 45 cm x 45 cm x 60 cm, 60 cm below
ground level as per approved drawing The angle
iron post shall be duly painted with one coat of
epoxy primer and two coats of epoxy finish
paints having alternate black and white bands of
25 cm width including GI fixures and
transportation etc.complete.The nut bolts of
board with angle iron post/supporting structure
after fixing at site has to be electrically welded.
Class B ( Type IV High intensity micro-prismatic
grade sheeting-HIP) sheeting shall have 7
years written warranty from the manufacturer
and authorised distributor/convertor issued for
field performance including the screen printed
areas and cut-out sheeting and cut-out durable
transparent overlay film and this warranty
certificate in original should be submitted to the
Engineer in charge by the contractor/supplier.
Page 10 of 493
(PWD SSR 18-19, 6.33,a)
Sr.No Tender Item No Description Unit R1 R3 R71 R72 R78 R79 R80 R81 R82 R83 R84 R85 R88 R89 R90 R91 R95 R96
Quantity Rate Amount
Providing and fixing in position steel fibre
reinforced concrete (S.F.R.C.) frame and covers
of approved make including loading, unloading,
28 54 transportation, all taxes, etc. complete as
directed by Engineer-in-charge (20 tonnes
capacity)
(MJP DSR 2018-19, SEC XX 17)

a 6 cover size (0.600x0.900)mm Nos 6 18 11.00 6.00 21.00 14.00 6.00 11.00 4.00 6.00 5.00 9.00 11.00 11.00 5.00 8.00 4.00 6.00 162.00 2995.70 485,303.00
b 2 cover size (0.600x0.450) mm Nos 2 6 4.00 2.00 5.00 5.00 2.00 4.00 1.00 2.00 2.00 3.00 4.00 4.00 2.00 3.00 1.00 2.00 54.00 2370.90 128,029.00
Total Amount 39,101,895.00

Page 11 of 493
Minor Roads Flexible to Rigid Pavements
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 2687.30 1.600 1.500 6450
Light Pole cum 90 0.90 0.900 1.600 117
Utility Crossing cum 54 1.400 1.650 1.500 187
Flexible Pavement deduction cum -2526
Total 4228

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 2687.30 3.1 8331
power roller

5 Dewatering Hour 1 269

Removing lime or lean cement concrete


6 Cum 1 2687.30 1 0.15 403.095

7 Removing rich mix cement concrete Cum 1 2687.30 1 0.1 268.73


8 Dismantling brick masonry Cum 1 2687.30 0.8 0.23 494.4632
9 Dismantling stone masonry Cum 1 20
Removing all type of hume pipes and
10 stacking within a lead up to 1000 meters Rmt 54 4.70 253.8

11 Removal of telephone / Electric poles Nos 1 90 90


12 Removal of Paver Block sqm 0
13 Dismantling of flexible pavements
Bituminous courses cum 1 2687.300 4.700 0.200 2526
PaverBlock Area Deduction cum -1 0.000 0.200 0
Total 2526

14 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


15 Sqm 1 0
surface

16 Subgrade cum 0 2687.300 4.700 0.500 0


Utility Crossing cum 54 1.400 1.65 1.000 125
125

17 selected hard murum filling cum 1 2687.300 1.600 1.000 4300


deduction of pole cum -90 1.200 1.200 1.000 -130
deduction of Manhole cum -90 1.500 1.500 1.000 -203
Total 3967
18 GSB cum 1 2687.300 4.700 0.150 1895
Utility Crossing cum 54 1.400 1.65 0.150 19
Below Foothpath cum 1 0.000 0.150 0
1914

19 DLC cum 1 2687.300 4.700 0.150 1895


Sr. No. Description Unit No. Length Breadth Depth Quantity
1895

20 Polyethylene (LDPE) sheet sqm 1 2687.300 4.700 12630

21 Cement Concrete Pavement cum 1 2687.300 4.700 0.200 2526

22 polysuphide sealent Rmt 1 673.000 4.700 3163.1

23 Paver Block-80mm Thk Sqm 1 2687.300 0.000 0


0

24 Kerb Stone Rm 0 0

25 Rubble Soling
Utility Crossing Cum 54 1.400 1.650 0.230 28.69
OFC Chamber Cum 54 1.400 1.400 0.230 24.34
Electrical Chamber Cum 90 1.700 1.700 0.230 59.82
Water Chamber Cum 72 1.500 1.500 0.230 37.26
Light pole Cum 90 0.800 0.800 0.230 13.25
Total 163.36

26 PCC M15
Foothpath Cum 1 0.000 0.150 0
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 54 1.40 1.650 0.100 12.47
OFC Chamber Cum 54 1.40 1.40 0.100 10.58
Electrical Chamber Cum 90 1.70 1.70 0.100 26.01
Water Chamber Cum 72 1.50 1.50 0.100 16.2
Light pole Cum 90 0.80 0.80 0.100 5.76
Total 71.02
27 RCC M25
a Raft
OFC Chamber Cum 54 1.200 1.200 0.150 11.66
Electrical Chamber Cum 90 1.500 1.500 0.150 30.38
Water Chamber Cum 72 1.300 1.300 0.150 18.25
Total 60.29
b Wall
OFC Chamber Cum 54 4.800 0.150 1.000 38.88
Electrical Chamber Cum 90 6.000 0.150 1.500 121.5
Water Chamber Cum 72 5.200 0.150 1.000 56.16
Total 217.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 54 1.200 1.200 0.150 11.66
Electrical Chamber Cum 90 1.500 1.500 0.150 30.38
Water Chamber Cum 72 1.300 1.300 0.150 18.25
Cover Deduction Cum -162 0.900 0.600 0.150 -13.122
Cover Deduction Cum -54 -0.400 -0.600 0.200 -2.592
Total 45.00
d Pole Foundation Cum 90 0.600 0.600 1.500 48.60

28 Reinforcement
a Raft MT 110 kg/cum 6963.61
b Wall MT 100 kg/cum 22785.00
c Slab MT 95 kg/cum 4488.75
Total 34.24

29 RCC Np3 Class Pipe


600 mm dia Rmt 108 1.40 151.2

30 Painting Work
Edge Marking Line Sqm 2 2687.300 0.15 806.19
Lane Marking / Other Markings Sqm 403.095
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 90
Equilateral Triangle 90
Cautionary/Warning sign boards in
Nos. 54
b Octagone size 54
c Informatory sign board Sqm 36 0.900 32.4

32 Stud with Lense Reflector Nos 0


Zebra crossing Nos 0
Total 0.00
33 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 2687.30 21498.40
b 160 mm outer dia for HT & LT Cable Rmt 10 2687.30 26873.00

34 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 90 90
600mm
Watersupply Manhole - Size-900mm x Nos 72 72
600mm
OFC Manhole - Size-400mm x 600mm Nos 54 54
35 Barrigates Rmt 1 537.46 537
36 FRP Perforated Cover
SWD Nos 537 537
Table Top Crossing
Sr. No. Description Unit No. Length Breadth Depth Quantity

1 80mm Thick Paver Paver Block Sqm 150 15 3 6750

2 DBM Cum 150 15 3 0.15 1012.5


Cum 300 15 1 0.15 675
Total 1687.5
R1 -Ashok Stambh to Raviwar Karnja
Sr. No. Description Unit No. Length Breadth Depth Quantity

1 Dismantling of cement concrete pavement Cum 1 49.80 6.00 0.300 90

10% of Existing road for perpose of


provision only (Total length of road 491
Rmt)
Scarifying the existing granular road
2 Sqm 1 0
surface

3 DLC
Add 10% for Damage Panel Repairing cum 0.1 49.800 6.000 0.150 4
Total 4

4 Polyethylene (LDPE) sheet


Add 10% for Damage Panel Repairing sqm 0.1 49.800 6.000 30
Total 30

5 Cement Concrete Pavement


Add 10% for Damage Panel Repairing cum 0.1 49.800 6.000 0.280 8
Total 8

6 polysuphide sealent Rmt 0.1 13.000 6.000 7.8

7 Paver Block-80mm Thk


Add 10% for Damage Panel Repairing Sqm 0.2 49.800 2.800 28
28
8 Painting Work
Edge Marking Line Sqm 2 491.000 0.15 147.3
Lane Marking / Other Markings Sqm 73.65
Zebra Crossing Sqm 2 6.000 3 18
Kerb Painting Sqm
Median Painting Sqm 0
9 Signages
Cautionary/Warning sign boards in
a Nos. 15
Equilateral Triangle 15
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 10 0.900 9

10 Stud with Lense Reflector Nos 7 7


Zebra crossing Nos 2 6.000 40
Total 47.00
R2 -Ashok Stambh Circle to Ramwadi Bridge (Gharpure Ghat)
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 303.00 1.600 1.500 727
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 3 6.100 1.650 1.500 45
SWD cum 1 303.000 1.300 1.480 583
Flexible Pavement deduction cum -364
Total 991

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 303.00 7.8 2363
power roller

5 Dewatering Hour 1 30

Removing lime or lean cement concrete


6 Cum 2 90.90 1 0.15 27.27

7 Removing rich mix cement concrete Cum 2 90.90 1 0.10 18.18


8 Dismantling brick masonry Cum 2 90.90 0.8 0.23 33.4512
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 10 10
11 Removal of Paver Block sqm 2 303.00 1.7 1030.2
12 Dismantling of flexible pavements
Bituminous courses cum 1 303.000 9.400 0.200 570
PaverBlock Area Deduction cum -1 1030.200 0.200 -206
Total 364

13 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 303.000 5.600 0.500 0


Utility Crossing cum 3 6.100 1.65 0.880 27
27

16 selected hard murum filling cum 1 303.000 1.600 1.090 528


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -20 1.500 1.500 1.090 -49
Total 479
17 GSB cum 1 303.000 5.600 0.150 255
Utility Crossing cum 3 6.100 1.65 0.150 5
Below Foothpath cum 1 302.180 0.150 45
Total 305

18 WMM cum 2 0.000 0.250 0


Utility Crossing cum 3 6.100 1.650 0.250 8
8
Sr. No. Description Unit No. Length Breadth Depth Quantity

19 DBM cum 1 0.000 13.600 0.050 0


Pot Holes / profile Correction 0

20 Prime Coat sqm 1 0.000 13.600 0

21 Tack Coat sqm 1 0.000 13.600 0

22 Bituminous Concrete cum 1 0.000 13.600 0.040 0

23 DLC cum 1 303.000 5.600 0.150 255


Foothpath Cum 1 837.180 0.150 125.58
381

24 Polyethylene (LDPE) sheet sqm 1 303.000 5.600 1697

25 Cement Concrete Pavement cum 1 303.000 5.600 0.280 475

26 polysuphide sealent Rmt 1 77.000 5.600 431.2

29a Dowel Bars Nos 17 19.000 323

27 Paver Block-80mm Thk Sqm 1 361.180 361.18


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -26 1.500 1.500 -59
302.18
28 Paver Block-60mm Thk
Foothpath Area Sqm 1 535.000 535
Deduction of Tactile Tiles Sqm -1 90.900 -90.9
Total 444.1

29 Tactile tiles Sqm 1 303.000 0.3 90.9

29 Kerb Stone Rmt 1 303.000 303

30 Rubble Soling
Utility Crossing Cum 3 6.100 1.650 0.230 6.94
OFC Chamber Cum 6 1.400 1.400 0.230 2.70
Electrical Chamber Cum 20 1.700 1.700 0.230 13.29
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 303.000 1.400 0.230 97.57
Total 121.54

31 PCC M15
Kerb Stone Cum 1 303.000 0.265 0.075 6.02
Utility Crossing Cum 3 6.10 1.650 0.100 3.02
Sr. No. Description Unit No. Length Breadth Depth Quantity
OFC Chamber Cum 6 1.40 1.40 0.100 1.18
Electrical Chamber Cum 20 1.70 1.70 0.100 5.78
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 303.00 1.40 0.100 42.42
Total 58.87
32 RCC M25
a Raft
OFC Chamber Cum 6 1.200 1.200 0.150 1.30
Electrical Chamber Cum 20 1.500 1.500 0.150 6.75
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 303.000 1.300 0.150 59.09
Total 67.64
b Wall
OFC Chamber Cum 6 4.800 0.150 1.000 4.32
Electrical Chamber Cum 20 6.000 0.150 1.500 27
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 303.000 0.150 1.000 90.9
Total 124.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 6 1.200 1.200 0.150 1.30
Electrical Chamber Cum 20 1.500 1.500 0.150 6.75
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -22 0.900 0.600 0.150 -1.782
Cover Deduction Cum -6 -0.400 -0.600 0.200 -0.288
SWD Cum 1 303.000 1.300 0.150 59.09
Cover Deduction Cum -61 0.600 0.450 0.150 -2.47
Total 63.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

33 Reinforcement
a Raft MT 110 kg/cum 7812.19
b Wall MT 100 kg/cum 13020.00
c Slab MT 95 kg/cum 6284.25
Total 27.12

34 RCC Np3 Class Pipe


600 mm dia Rmt 6 6.10 36.6

35 Painting Work
Edge Marking Line Sqm 2 303.000 0.15 90.9
Lane Marking / Other Markings Sqm 45.45
Zebra Crossing Sqm 5 6.400 3 48
Kerb Painting Sqm 1 303.000 0.3 90.9
Median Painting Sqm 0 0
36 Signages
Cautionary/Warning sign boards in
a Nos. 15
Equilateral Triangle 15
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 10 0.900 9

37 Stud with Lense Reflector Nos 2 17 34


Zebra crossing Nos 5 6.400 107
Total 141.00
38 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 303.00 2424.00
b 160 mm outer dia for HT & LT Cable Rmt 10 303.00 3030.00

39 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 20 20
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 6 6
40 FRP Perforated Cover
SWD - (Size - 600 x 450 MM) Nos 61 61
41 Barrigates Rmt 1 60.6 61
Sr. No. Description Unit No. Length Breadth Depth Quantity
R3 -Rungtha Highschool to Ganga Wadi
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 445.00 2.150 1.500 1435
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 9 4.600 1.500 1.500 93
SWD cum 1 465.00 0.700 1.380 449
cum 1 465.00 0.700 1.380 449
Rigid Pavement deduction cum -1 445.000 2.150 0.300 -287
Total 2139

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 1070

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 89.000 1.50 267

Compacting the existing Subgrade with


6 Sqm 1 445.00 1.000 445
power roller

7 Dewatering Hour 1 45

Removing lime or lean cement concrete


8 Cum 2 133.50 1 0.15 40.05

9 Removing rich mix cement concrete Cum 2 133.50 1 0.1 26.7


10 Dismantling brick masonry Cum 2 133.50 0.8 0.23 49.128
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 15 15
13 Removal of Paver Block sqm 1 445.00 2.3 1023.5
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 1 445.00 3.15 0.300 421

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 445.000 1.000 0.500 0


Utility Crossing cum 9 4.600 1.5 0.920 57
57

18 selected hard murum filling cum 1 445.000 2.150 1.090 1043


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -15 1.500 1.500 1.090 -37
Total 1006
19 GSB cum 1 445.000 1.000 0.150 67
Utility Crossing cum 9 4.600 1.5 0.150 9
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 1069.500 0.150 160
Total 236

20 DLC cum 1 445.000 1.000 0.150 67


Utility Crossing cum 9 4.600 1.500 0.150 9
Add 10% for Damage Panel Repairing cum 0.1 445.000 7.600 0.150 51
Foothpath Cum 1 1069.500 0.150 160.43
Total 287

21 Polyethylene (LDPE) sheet sqm 1 445.000 1.000 445


Utility Crossing sqm 9 4.600 1.500 62
Add 10% for Damage Panel Repairing sqm 0.1 445.000 7.600 338
Total 845

22 Cement Concrete Pavement cum 1 445.000 1.000 0.280 125


Utility Crossing cum 9 4.600 1.500 0.280 17
Add 10% for Damage Panel Repairing cum 0.1 445.000 7.600 0.280 95
Total 237

23 polysuphide sealent Rmt 1 112.000 1.000 112

24a Dowel Bars Nos 25 3.000 75

24 Paver Block-80mm Thk Sqm 1 445.000 2.500 1112.5


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -19 1.500 1.500 -43
1069.5

25 Kerb Stone Rm 0 0

26 Rubble Soling
Utility Crossing Cum 9 4.600 1.500 0.230 14.28
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 15 1.700 1.700 0.230 9.97
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 465.000 1.150 0.230 122.99
Cum 1 465.000 1.000 0.230 106.95
Total 257.03

27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 9 4.60 1.500 0.100 6.21
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 15 1.70 1.70 0.100 4.34
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 465.00 1.15 0
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cum 1 465.00 1.00 0
Total 11.78
28 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 465.00 1.050 0.150 73.24
Cum 1 465.00 0.900 0.150 62.78
Total 142.45
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 15 6.000 0.150 1.500 20.25
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 465.000 0.150 1.000 139.5
Cum 2 465.000 0.150 1.000 139.5
Total 304.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -17 0.900 0.600 0.150 -1.377
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
SWD Cum 1 465.000 1.050 0.150 73.2375
Cum 1 465.000 0.900 0.150 62.775
Cover Deduction Cum -186 0.600 0.450 0.150 -7.53
Total 133.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

29 Reinforcement
a Raft MT 110 kg/cum 16452.51
b Wall MT 100 kg/cum 31920.00
c Slab MT 95 kg/cum 13266.75
Total 61.64

30 RCC Np3 Class Pipe


600 mm dia Rmt 9 4.60 41.4

31 Painting Work
Edge Marking Line Sqm 2 445.000 0.15 133.5
Lane Marking / Other Markings Sqm 66.75
Zebra Crossing Sqm 1 4.600 3 6.9
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6

33 Stud with Lense Reflector Nos 2 25 50


Zebra crossing Nos 1 4.600 15
Total 65.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 445.00 3560.00
b 160 mm outer dia for HT & LT Cable Rmt 10 445.00 4450.00

35 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 15 15
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 4 4
36 FRP Perforated Cover
SWD - (Size - 600 x 450 MM) Nos 186 186
37 Barrigates Rmt 1 89 89
R4 -Ramwadi Bridge (Gharpure Ghat) to Ganga Wadi
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 463.00 1.600 1.500 1111
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 5 3.500 1.650 1.500 43
SWD cum 1 463.000 0.800 1.480 548
cum 1 463.000 1.100 1.480 754
Rigid Pavement deduction cum -1 463.000 1.600 0.300 -222
Total 2234

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 463.00 1.000 463
power roller

5 Dewatering Hour 1 46

Removing lime or lean cement concrete


6 Cum 2 138.90 1 0.15 41.67

7 Removing rich mix cement concrete Cum 2 138.90 1 0.1 27.78


8 Dismantling brick masonry Cum 2 138.90 0.8 0.23 51.1152
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 15 15
11 Removal of Paver Block sqm 1 463.00 2.80 1296.4
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 1 463.00 2.60 0.300 361

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 463.000 1.000 0.500 0


Utility Crossing cum 5 3.500 1.65 0.920 27
27

16 selected hard murum filling cum 1 463.000 1.600 1.090 807


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -15 1.500 1.500 1.090 -37
Total 770
17 GSB cum 1 463.000 1.000 0.150 69
Utility Crossing cum 5 3.500 1.65 0.150 4
Below Foothpath cum 1 1866.220 0.150 280
Total 353

18 DLC cum 1 463.000 1.000 0.150 69


Utility Crossing cum 5 3.500 1.650 0.150 4
Add 10% for Damage Panel Repairing cum 0.1 463.000 6.800 0.150 47
Sr. No. Description Unit No. Length Breadth Depth Quantity
Foothpath Cum 1 1866.220 0.150 279.93
Total 399.93

19 Polyethylene (LDPE) sheet sqm 1 463.000 1.000 463


Utility Crossing sqm 5 3.500 1.650 29
Add 10% for Damage Panel Repairing sqm 0.1 463.000 6.800 315
Total 807

20 Cement Concrete Pavement cum 1 463.000 1.000 0.280 130


Utility Crossing cum 5 3.500 1.650 0.280 8
Add 10% for Damage Panel Repairing cum 0.1 463.000 6.800 0.280 88
Total 226

21 polysuphide sealent Rmt 1 117.000 1.000 117

24a Dowel Bars Nos 26 3.000 78

22 Paver Block-80mm Thk Sqm 1 1911.220 1911.22


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -20 1.500 1.500 -45
1866.22

23 Kerb Stone Rm 0 0

24 Rubble Soling
Utility Crossing Cum 5 3.500 1.650 0.230 6.64
OFC Chamber Cum 5 1.400 1.400 0.230 2.25
Electrical Chamber Cum 15 1.700 1.700 0.230 9.97
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 463.000 1.150 0.230 122.46
Cum 1 463.000 1.000 0.230 106.49
Total 248.85

25 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 5 3.50 1.650 0.100 2.89
OFC Chamber Cum 5 1.40 1.40 0.100 0.98
Electrical Chamber Cum 15 1.70 1.70 0.100 4.34
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 463.00 1.15 0.100 53.25
Cum 1 463.00 1.00 0.100 46.3
Total 108.21
Sr. No. Description Unit No. Length Breadth Depth Quantity
26 RCC M25
a Raft
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 463.000 1.050 0.150 72.92
Cum 1 463.000 0.900 0.150 62.51
Total 142.08
b Wall
OFC Chamber Cum 5 4.800 0.150 1.000 3.6
Electrical Chamber Cum 15 6.000 0.150 1.500 20.25
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 463.000 0.150 1.000 138.9
Cum 2 463.000 0.150 1.000 138.9
Total 303.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -17 0.900 0.600 0.150 -1.377
Cover Deduction Cum -5 -0.400 -0.600 0.200 -0.24
SWD Cum 1 463.000 1.050 0.150 72.92
Cum 1 463.000 0.900 0.150 62.51
Cover Deduction Cum -185 0.600 0.450 0.150 -7.49
Total 133.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

27 Reinforcement
a Raft MT 110 kg/cum 16409.89
b Wall MT 100 kg/cum 31815.00
c Slab MT 95 kg/cum 13266.75
Total 61.49

28 RCC Np3 Class Pipe


600 mm dia Rmt 5 3.50 17.5

29 Painting Work
Edge Marking Line Sqm 2 463.000 0.15 138.9
Lane Marking / Other Markings Sqm 69.45
Zebra Crossing Sqm 1 3.800 3 5.7
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
30 Signages
Cautionary/Warning sign boards in
a Equilateral Triangle Nos. 15
15
Cautionary/Warning sign boards in
Nos. 8
b Octagone size 8
c Informatory sign board Sqm 5 0.900 4.5

31 Stud with Lense Reflector Nos 2 26 52


Zebra crossing Nos 1 3.800 13
Total 65.00
32 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 463.00 3704.00
b 160 mm outer dia for HT & LT Cable Rmt 10 463.00 4630.00

33 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 15 15
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 5 5
34 FRP Perforated Cover
SWD - (Size - 600 x 450 MM) Nos 185 185

35 Barrigates Rmt 1 92.6 93


Sr. No. Description Unit No. Length Breadth Depth Quantity
R5 -Shaniwar Peth to Gharpure Ghat
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 253.00 2.150 1.500 816
Light Pole cum 8 0.90 0.900 1.600 10
Utility Crossing cum 5 4.200 1.650 1.500 52
Rigid Pavement deduction cum -1 253.000 2.150 0.300 -163
Total 715

1 Dismantling of flexible pavements


Scarifying the existing bituminous road
2 Sqm 1 0
surface

Compacting the existing Subgrade with


3 Sqm 1 253.00 1.000 253
power roller

4 Dewatering Hour 1 25

Removing lime or lean cement concrete


5 Cum 2 75.90 1 0.15 22.77

6 Removing rich mix cement concrete Cum 2 75.90 1 0.1 15.18


7 Dismantling brick masonry Cum 2 75.90 0.8 0.23 27.9312
8 Dismantling stone masonry Cum 1 20
9 Removal of telephone / Electric poles Nos 1 8 8
10 Removal of Paver Block sqm 1 253.00 2.00 506
11 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

12 Dismantling of cement concrete pavement Cum 1 253.00 3.15 0.300 239

Scarifying the existing granular road


13 Sqm 1 0
surface

14 Subgrade cum 0 253.000 1.000 0.500 0


Utility Crossing cum 5 4.200 1.65 0.920 32
32

15 selected hard murum filling cum 1 253.000 2.150 1.090 593


deduction of pole cum -8 1.200 1.200 1.090 -13
deduction of Manhole cum -8 1.500 1.500 1.090 -20
Total 560
16 GSB cum 1 253.000 1.000 0.150 38
Utility Crossing cum 5 4.200 1.65 0.150 5
Below Foothpath cum 1 301.110 0.150 45
Total 88

17 DLC cum 1 253.000 1.000 0.150 38


Utility Crossing cum 5 4.200 1.650 0.150 5
Add 10% for Damage Panel Repairing cum 0.1 253.000 7.500 0.150 28
Foothpath Cum 1 301.110 0.150 45.17
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 116.17

18 Polyethylene (LDPE) sheet sqm 1 253.000 1.000 253


Utility Crossing sqm 5 4.200 1.650 35
Add 10% for Damage Panel Repairing sqm 0.1 253.000 7.500 190
Total 478

19 Cement Concrete Pavement cum 1 253.000 1.000 0.280 71


Utility Crossing cum 5 4.200 1.650 0.280 10
Add 10% for Damage Panel Repairing cum 0.1 253.000 7.500 0.280 53
Total 134

20 polysuphide sealent Rmt 1 64.000 1.000 64

24a Dowel Bars Nos 14 3.000 42

21 Paver Block-80mm Thk Sqm 1 338.110 338.11


deduction of pole Sqm -8 1.200 1.200 -12
deduction of Manhole Sqm -11 1.500 1.500 -25
301.11

22 Kerb Stone Rm 0 0

23 Rubble Soling
Utility Crossing Cum 5 4.200 1.650 0.230 7.97
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 8 1.700 1.700 0.230 5.32
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 8 0.800 0.800 0.230 1.18
Total 16.86

24 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 5 4.20 1.650 0.100 3.47
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 8 1.70 1.70 0.100 2.31
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 8 0.80 0.80 0.100 0.51
Total 7.33
25 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 3.86
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 8 6.000 0.150 1.500 10.8
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 15.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -10 0.900 0.600 0.150 -0.81
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
Total 3.00
d Pole Foundation Cum 8 0.600 0.600 1.500 4.32

26 Reinforcement
a Raft MT 110 kg/cum 445.25
b Wall MT 100 kg/cum 1575.00
c Slab MT 95 kg/cum 299.25
Total 2.32

27 RCC Np3 Class Pipe


600 mm dia Rmt 5 4.20 21

28 Painting Work
Edge Marking Line Sqm 2 253.000 0.15 75.9
Lane Marking / Other Markings Sqm 37.95
Zebra Crossing Sqm 4 4.500 3 27
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
29 Signages
Cautionary/Warning sign boards in
a Nos. 9
Equilateral Triangle 9
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6

30 Stud with Lense Reflector Nos 2 14 28


Zebra crossing Nos 4 4.500 60
Total 88.00
31 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 253.00 2024.00
b 160 mm outer dia for HT & LT Cable Rmt 10 253.00 2530.00

32 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 8 8
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 3 3
33 FRP Perforated Cover
SWD Nos 0 0

34 Barrigates Rmt 1 50.6 51


R6 -Shaniwar Peth to Gnaga Wadi
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 278.00 2.150 1.500 897
cum 1 278.00 0.550 1.500 229
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 6 3.800 1.650 1.500 56
SWD cum 1 278 0.600 1.250 208
cum 1 278 0.600 1.250 208
Rigid Pavement deduction cum -1 278.000 2.150 0.300 -179
Total 1421

1 Dismantling of flexible pavements


Scarifying the existing bituminous road
2 Sqm 1 0
surface

Compacting the existing Subgrade with


3 Sqm 1 278.00 1.000 278
power roller

4 Dewatering Hour 1 28

Removing lime or lean cement concrete


5 Cum 2 83.40 1 0.15 25.02

6 Removing rich mix cement concrete Cum 2 83.40 1 0.1 16.68


7 Dismantling brick masonry Cum 2 83.40 0.8 0.23 30.6912
8 Dismantling stone masonry Cum 1 20
9 Removal of telephone / Electric poles Nos 1 9 9
10 Removal of Paver Block sqm 1 278.00 2.10 583.8
11 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

12 Dismantling of cement concrete pavement Cum 1 278.00 3.15 0.300 263

Scarifying the existing granular road


13 surface Sqm 1 0

14 Subgrade cum 0 278.000 1.000 0.500 0


Utility Crossing cum 6 3.800 1.65 0.920 35
35

15 selected hard murum filling cum 1 278.000 2.150 1.090 651


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -9 1.500 1.500 1.090 -22
Total 629
16 GSB cum 1 278.000 1.000 0.150 42
Utility Crossing cum 6 3.800 1.65 0.150 6
Below Foothpath cum 1 102.960 0.150 15
Total 63
Sr. No. Description Unit No. Length Breadth Depth Quantity
17 DLC cum 1 278.000 1.000 0.150 42
Utility Crossing cum 6 3.800 1.650 0.150 6
Add 10% for Damage Panel Repairing cum 0.1 278.000 7.100 0.150 30
Foothpath Cum 1 102.960 0.150 15.44
Total 93.44

18 Polyethylene (LDPE) sheet sqm 1 278.000 1.000 278


Utility Crossing sqm 6 3.800 1.650 38
Add 10% for Damage Panel Repairing sqm 0.1 278.000 7.100 197
Total 513

19 Cement Concrete Pavement cum 1 278.000 1.000 0.280 78


Utility Crossing cum 6 3.800 1.650 0.280 11
Add 10% for Damage Panel Repairing cum 0.1 278.000 7.100 0.280 55
Total 144

20 polysuphide sealent Rmt 1 71.000 1.000 71

24a Dowel Bars Nos 16 3.000 48

21 Paver Block-80mm Thk Sqm 1 129.960 129.96


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -12 1.500 1.500 -27
102.96

22 Kerb Stone Rm 0 0

23 Rubble Soling
Utility Crossing Cum 6 3.800 1.650 0.230 8.65
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 9 1.700 1.700 0.230 5.98
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 278.000 0.900 0.230 57.55
Cum 1 278.000 0.900 0.230 57.55
Total 132.12

24 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 6 3.80 1.650 0.100 3.76
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 9 1.70 1.70 0.100 2.6
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 278.00 0.90 0.100 25.02
Cum 1 278.00 0.90 0.100 25.02
Total 57.44
25 RCC M25
Sr. No. Description Unit No. Length Breadth Depth Quantity
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 278.000 0.800 0.150 33.36
Cum 1 278.000 0.800 0.150 33.36
Total 70.91
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 9 6.000 0.150 1.500 12.15
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 278.000 0.150 1.000 83.4
Cum 2 278.000 0.150 1.000 83.4
Total 183.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -11 0.900 0.600 0.150 -0.891
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 278.000 0.800 0.150 33.36
Cum 1 278.000 0.800 0.150 33.36
Cover Deduction Cum -111 0.300 0.300 0.150 -1.50
Total 68.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

26 Reinforcement
a Raft MT 110 kg/cum 8190.39
b Wall MT 100 kg/cum 19215.00
c Slab MT 95 kg/cum 6783.00
Total 34.19

27 RCC Np3 Class Pipe


600 mm dia Rmt 6 3.80 22.8

28 Painting Work
Edge Marking Line Sqm 2 278.000 0.15 83.4
Lane Marking / Other Markings Sqm 41.7
Zebra Crossing Sqm 4 4.100 3 24.6
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
29 Signages
Cautionary/Warning sign boards in
a Equilateral Triangle Nos. 9
9
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
Sr. No. Description Unit No. Length Breadth Depth Quantity
30 Stud with Lense Reflector Nos 2 15 30
Zebra crossing Nos 4 4.100 55
Total 85.00
31 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 278.00 2224.00
b 160 mm outer dia for HT & LT Cable Rmt 10 278.00 2780.00

32 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 9 9
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 3 3
33 FRP Perforated Cover
SWD - (Size - 300 x 300 MM) Nos 111 111

34 Barrigates Rmt 1 55.6 56


R7 -Tuljabhawani Temple to Gangawadi Garden
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 100.00 1.600 1.500 240
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 2 3.000 1.650 1.500 15
SWD cum 1 100.000 1.000 1.480 148
cum 1 100.000 0.700 1.480 104
Rigid Pavement deduction cum -1 -78
Total 429

1 Dismantling of flexible pavements


Scarifying the existing bituminous road
2 Sqm 1 0
surface

Compacting the existing Subgrade with


3 Sqm 1 100.00 1.000 100
power roller

4 Dewatering Hour 1 10

Removing lime or lean cement concrete


5 Cum 2 30.00 1 0.15 9

6 Removing rich mix cement concrete Cum 2 30.00 1 0.1 6


7 Dismantling brick masonry Cum 2 30.00 0.8 0.23 11.04
8 Dismantling stone masonry Cum 1 20
9 Removal of telephone / Electric poles Nos 1 3 3
10 Removal of Paver Block sqm 1 100.00 1.30 130
11 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

12 Dismantling of cement concrete pavement Cum 1 100.00 2.60 0.300 78

Scarifying the existing granular road


13 Sqm 1 0
surface

14 Subgrade cum 0 100.000 1.000 0.500 0


Utility Crossing cum 2 3.000 1.65 0.920 9
9

15 selected hard murum filling cum 1 100.000 1.600 1.090 174


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -3 1.500 1.500 1.090 -7
Total 167
16 GSB cum 1 100.000 1.000 0.150 15
Utility Crossing cum 2 3.000 1.65 0.150 1
Below Foothpath cum 1 190.820 0.150 29
Total 45

17 DLC cum 1 100.000 1.000 0.150 15


Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing cum 2 3.000 1.650 0.150 1
Add 10% for Damage Panel Repairing cum 0.1 100.000 6.300 0.150 9
Foothpath Cum 1 190.820 0.150 28.62
Total 53.62

18 Polyethylene (LDPE) sheet sqm 1 100.000 1.000 100


Utility Crossing sqm 2 3.000 1.650 10
Add 10% for Damage Panel Repairing sqm 0.1 100.000 6.300 63
Total 173

19 Cement Concrete Pavement cum 1 100.000 1.000 0.280 28


Utility Crossing cum 2 3.000 1.650 0.280 3
Add 10% for Damage Panel Repairing cum 0.1 100.000 6.300 0.280 18
Total 49

20 polysuphide sealent Rmt 1 26.000 1.000 26

24a Dowel Bars Nos 6 3.000 18

21 Paver Block-80mm Thk Sqm 1 201.820 201.82


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -5 1.500 1.500 -11
190.82

22 Kerb Stone Rm 0 0

23 Rubble Soling
Utility Crossing Cum 2 3.000 1.650 0.230 2.28
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 3 1.700 1.700 0.230 1.99
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 100.000 1.000 0.230 23
Cum 1 100.000 1.000 0.230 23
Total 52.21

24 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 3.00 1.650 0.100 0.99
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 3 1.70 1.70 0.100 0.87
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 100.00 1.00 0.100 10.00
Cum 1 100.00 1.00 0.100 10.00
Total 22.7
25 RCC M25
a Raft
Sr. No. Description Unit No. Length Breadth Depth Quantity
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 3 1.500 1.500 0.150 1.01
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 100.000 0.900 0.150 13.50
Cum 1 100.000 0.900 0.150 13.50
Total 28.95
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 3 6.000 0.150 1.500 4.05
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 100.000 0.150 1.000 30.00
Cum 2 100.000 0.150 1.000 30.00
Total 67.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 3 1.500 1.500 0.150 1.01
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -5 0.900 0.600 0.150 -0.405
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 2 100.000 0.900 0.150 27.00
Cum 2 100.000 0.900 0.150 27.00
Cover Deduction Cum -40 0.600 0.450 0.150 -1.62
Total 54.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

26 Reinforcement
a Raft MT 110 kg/cum 3343.90
b Wall MT 100 kg/cum 7035.00
c Slab MT 95 kg/cum 5386.50
Total 15.77

27 RCC Np3 Class Pipe


600 mm dia Rmt 2 3.00 6

28 Painting Work
Edge Marking Line Sqm 2 100.000 0.15 30
Lane Marking / Other Markings Sqm 15
Zebra Crossing Sqm 2 3.300 3 9.9
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
29 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 2
b Octagone size 2
c Informatory sign board Sqm 2 0.900 1.8

30 Stud with Lense Reflector Nos 2 6 12


Sr. No. Description Unit No. Length Breadth Depth Quantity
Zebra crossing Nos 2 3.300 22
Total 34.00
31 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 100.00 800.00
b 160 mm outer dia for HT & LT Cable Rmt 10 100.00 1000.00

32 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 3 3
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
33 FRP Perforated Cover
SWD - (Size - 600 x 450 MM) Nos 40 40
34 Barrigates Rmt 1 20 20
R8 -Raviwar Karanja to Birla Eye Hospital
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 144.00 1.600 1.500 691
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 1 12.700 1.650 1.500 31
SWD cum 1 144 0.900 1.480 192
cum 1 144 0.900 1.480 192
Flexible Pavement deduction cum -320
Total 786

1 Dismantling of flexible pavements


Scarifying the existing bituminous road
2 Sqm 1 0
surface

Compacting the existing Subgrade with


3 Sqm 1 144.00 12.8 1843
power roller

4 Dewatering Hour 1 14

Removing lime or lean cement concrete


5 Cum 2 43.20 1 0.15 12.96

6 Removing rich mix cement concrete Cum 2 43.20 1 0.1 8.64


7 Dismantling brick masonry Cum 2 43.20 0.8 0.23 15.90
8 Dismantling stone masonry Cum 1 20
Removing all type of hume pipes and
9 stacking within a lead up to 1000 meters Rmt 3 16.00 48

10 Removal of telephone / Electric poles Nos 1 5 5


11 Removal of Paver Block sqm 1 144.00 4.90 705.6
12 Dismantling of flexible pavements
Bituminous courses cum 1 144.000 16.000 0.200 461
PaverBlock Area Deduction cum -1 705.600 0.200 -141
Total 320

13 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 144.000 10.810 0.500 0


Utility Crossing cum 1 12.700 1.65 0.920 19
19

16 selected hard murum filling cum 2 144.000 1.600 1.090 502


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -10 1.500 1.500 1.090 -25
Total 477
17 GSB cum 1 144.000 10.810 0.150 233
Utility Crossing cum 1 12.700 1.65 0.150 3
Below Foothpath cum 1 220.480 0.150 33
Sr. No. Description Unit No. Length Breadth Depth Quantity
269

18 WMM cum 2 0.000 0.250 0


Utility Crossing cum 1 12.700 1.650 0.250 5
5

19 DBM cum 1 0.000 13.600 0.050 0


Pot Holes / profile Correction 0

20 Prime Coat sqm 1 0.000 13.600 0

21 Tack Coat sqm 1 0.000 13.600 0

22 Bituminous Concrete cum 1 0.000 13.600 0.040 0

23 DLC cum 1 144.000 10.810 0.150 233


Foothpath Cum 1 873.480 0.150 131.02
364

24 Polyethylene (LDPE) sheet sqm 1 144.000 10.810 1557

25 Cement Concrete Pavement cum 1 144.000 10.810 0.280 436

26 polysuphide sealent Rmt 1 37.000 10.810 399.97

26a Dowel Bars Nos 8 36.000 288

27 Paver Block-80mm Thk Sqm 1 249.480 249.48


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -13 1.500 1.500 -29
220.48

28 Paver Block-60mm Thk


Foothpath Area Sqm 1 653.000 653
Deduction of Tactile Tiles Sqm -1 43.200 -43.2
Total 609.8

29 Tactile tiles Sqm 1 144.000 0.3 43.2

28 Kerb Stone Rm 1 144.000 144

29 Rubble Soling
Utility Crossing Cum 1 12.700 1.650 0.230 4.82
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 10 1.700 1.700 0.230 6.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
Sr. No. Description Unit No. Length Breadth Depth Quantity
SWD Cum 1 144.000 1.000 0.230 33.12
Cum 1 144.000 1.000 0.230 33.12
Total 80.1

30 PCC M15
Kerb Stone Cum 1 144.000 0.265 0.075 2.86
Utility Crossing Cum 1 12.70 1.650 0.100 2.1
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 10 1.70 1.70 0.100 2.89
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 144.00 1.00 0.100 14.4
Cum 1 144.00 1.00 0.100 14.4
Total 37.69
31 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 144.000 0.900 0.150 19.44
Cum 1 144.000 0.900 0.150 19.44
Total 43.41
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 10 6.000 0.150 1.500 13.5
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 144.000 0.150 1.000 43.2
Cum 2 144.000 0.150 1.000 43.2
Total 104.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -12 0.900 0.600 0.150 -0.972
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 144.000 0.900 0.150 19.44
Cum 1 144.000 0.900 0.150 19.44
Cover Deduction Cum -58 0.600 0.600 0.150 -3.132
Total 42.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

32 Reinforcement
a Raft MT 110 kg/cum 5013.86
b Wall MT 100 kg/cum 10920.00
c Slab MT 95 kg/cum 4189.50
Total 20.12
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 RCC Np3 Class Pipe
600 mm dia Rmt 2 12.70 25.4

34 Painting Work
Edge Marking Line Sqm 4 144.000 0.15 86.4
Lane Marking / Other Markings Sqm 43.2
Zebra Crossing Sqm 3 13.000 3 58.5
Kerb Painting Sqm 1 144.000 0.3 43.2
Median Painting Sqm 0 0
35 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 5 0.900 4.5

36 Stud with Lense Reflector Nos 2 8 16


Zebra crossing Nos 3 13.000 130
Total 146.00
37 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 144.00 2304.00
b 160 mm outer dia for HT & LT Cable Rmt 20 144.00 2880.00

38 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 10 10
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 3 3
39 FRP Perforated Cover
SWD - (Size - 600 x 600 MM) Nos 58 58
40 Barrigates Rmt 2 28.8 58
R9 -Birla Hospital to Sundar Narayan Mandir
Sr. No. Description Unit No. Length Breadth Depth Quantity
Scarifying the existing granular road
1 Sqm 1 6.000 20.30 122
surface
10% of Existing road for perpose of
provision only (Total length of road
60Rmt)
1 DBM cum 1 6.000 20.300 0

2 Prime Coat sqm 1 6.000 20.300 122

3 Tack Coat sqm 2 6.000 20.300 244

4 Bituminous Concrete cum 1 6.000 20.300 0.040 5

5 Paver Block-80mm Thk


Add 10% for Damage Panel Repairing Sqm 0.2 6.000 4.000 5
5
6 Painting Work
Edge Marking Line Sqm 4 60.000 0.15 36
Lane Marking / Other Markings Sqm 18
Zebra Crossing Sqm 2 17.300 3 51.9
Kerb Painting Sqm
Median Painting Sqm 2 60.000 1 120
7 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 1 0.900 0.9

8 Stud with Lense Reflector Nos 2 3 6


Zebra crossing Nos 2 17.300 115
Total 121.00
R10 -Sundar Narayan Mandir to Panchwati Karanja
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 411.00 1.690 1.500 2084
Light Pole cum 14 0.90 0.900 1.600 18
Utility Crossing cum 4 29.800 1.650 1.500 295
SWD cum 2 540 0.900 1.480 1439
Rigid Pavement deduction cum -2 411.000 1.690 0.300 -417
Total 3419

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 411.00 1.000 411
power roller

5 Dewatering Hour 1 41

Removing lime or lean cement concrete


6 Cum 2 123.30 1 0.15 36.99

7 Removing rich mix cement concrete Cum 2 123.30 1 0.1 24.66


8 Dismantling brick masonry Cum 2 123.30 0.8 0.23 45.3744
9 Dismantling stone masonry Cum 1 20
Removing all type of hume pipes and
10 stacking within a lead up to 1000 meters Rmt 0 33.10 0

11 Removal of telephone / Electric poles Nos 1 14 14


12 Removal of Paver Block sqm 1 411.00 7.90 3246.9
13 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

14 Dismantling of cement concrete pavement Cum 2 411.00 1.69 0.300 417

Scarifying the existing granular road


15 Sqm 1 0
surface

16 Subgrade cum 0 411.000 1.000 0.500 0


Utility Crossing cum 4 29.800 1.65 0.920 181
181

17 selected hard murum filling cum 2 411.000 1.690 1.090 1514


deduction of pole cum -14 1.200 1.200 1.090 -22
deduction of Manhole cum -27 1.500 1.500 1.090 -66
Total 1426
18 GSB cum 2 411.000 1.000 0.150 123
Utility Crossing cum 4 29.800 1.65 0.150 30
Below Foothpath cum 1 3622.920 0.150 543
Total 696
Sr. No. Description Unit No. Length Breadth Depth Quantity

19 DLC cum 2 411.000 1.000 0.150 123


Utility Crossing cum 4 29.800 1.650 0.150 30
Add 10% for Damage Panel Repairing cum 0.1 411.000 33.100 0.150 204
Foothpath Cum 1 3523.920 0.150 528.59
Total 885.59

20 Polyethylene (LDPE) sheet sqm 2 411.000 1.000 822


Utility Crossing sqm 4 29.800 1.650 197
Add 10% for Damage Panel Repairing sqm 0.1 411.000 33.100 1360
Total 2379

21 Cement Concrete Pavement cum 2 411.000 1.000 0.280 230


Utility Crossing cum 4 29.800 1.650 0.280 55
Add 10% for Damage Panel Repairing cum 0.1 411.000 33.100 0.280 381
Total 666

22 polysuphide sealent Rmt 1 104.000 1.000 104

24a Dowel Bars Nos 23 3.000 69

23 Paver Block-80mm Thk Sqm 1 291.500 291.5


291.5
24 Paver Block-60mm Thk Sqm 1 3331.420 3331.42
Deduction of Tactile tiles Sqm -246.6
deduction of pole Sqm -14 1.200 1.200 -20
deduction of Manhole Sqm -35 1.500 1.500 -79
Total 2985.82
25 Tactile tiles Sqm 2 411.000 0.3 246.6

26 Kerb Stone Rm 2 411.000 822

27 Rubble Soling
Utility Crossing Cum 4 29.800 1.650 0.230 45.24
OFC Chamber Cum 8 1.400 1.400 0.230 3.61
Electrical Chamber Cum 27 1.700 1.700 0.230 17.95
Water Chamber Cum 4 1.500 1.500 0.230 2.07
Light pole Cum 14 0.800 0.800 0.230 2.06
SWD Cum 1 540.000 2.400 0.230 298.08
Total 369.01
\
28 PCC M15
Kerb Stone Cum 2 411.000 0.265 0.075 16.34
Utility Crossing Cum 4 29.80 1.650 0.100 19.67
OFC Chamber Cum 8 1.40 1.40 0.100 1.57
Electrical Chamber Cum 27 1.70 1.70 0.100 7.8
Water Chamber Cum 4 1.50 1.50 0.100 0.9
Light pole Cum 14 0.80 0.80 0.100 0.9
SWD Cum 1 540.00 2.40 0.100 129.6
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 176.78
29 RCC M25
a Raft
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 27 1.500 1.500 0.150 9.11
Water Chamber Cum 4 1.300 1.300 0.150 1.01
SWD Cum 1 540.000 2.300 0.150 186.30
Total 198.15
b Wall
OFC Chamber Cum 8 4.800 0.150 1.000 5.76
Electrical Chamber Cum 27 6.000 0.150 1.500 36.45
Water Chamber Cum 4 5.200 0.150 1.000 3.12
SWD Cum 2 540.000 0.150 1.000 162
Total 207.00
c Slab
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 27 1.500 1.500 0.150 9.11
Water Chamber Cum 4 1.300 1.300 0.150 1.01
Cover Deduction Cum -31 0.900 0.600 0.150 -2.511
Cover Deduction Cum -8 -0.400 -0.600 0.200 -0.384
SWD Cum 2 540.000 2.300 0.150 372.6
Cum -108 0.900 0.600 0.150 -8.748
Total 373.00
d Pole Foundation Cum 14 0.600 0.600 1.500 7.56

30 Reinforcement
a Raft MT 110 kg/cum 22886.84
b Wall MT 100 kg/cum 21735.00
c Slab MT 95 kg/cum 37206.75
Total 81.83

31 RCC Np3 Class Pipe


600 mm dia Rmt 8 29.80 238.4

32 Painting Work
Edge Marking Line Sqm 2 411.000 0.15 123.3
Lane Marking / Other Markings Sqm 61.65
Zebra Crossing Sqm 3 30.100 3 135.45
Kerb Painting Sqm 2 411.000 0.3 246.6
Median Painting Sqm 2 411.000 1 822
33 Signages
Cautionary/Warning sign boards in
a Nos. 20
Equilateral Triangle 20
Cautionary/Warning sign boards in
Nos. 8
b Octagone size 8
c Informatory sign board Sqm 6 0.900 5.4

34 Stud with Lense Reflector Nos 2 23 46


Sr. No. Description Unit No. Length Breadth Depth Quantity
Zebra crossing Nos 3 30.100 301
Total 347.00
35 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 411.00 6576.00
b 160 mm outer dia for HT & LT Cable Rmt 20 411.00 8220.00

36 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 27 27
600mm
Watersupply Manhole - Size-900mm x Nos 4 4
600mm
OFC Manhole - Size-400mm x 600mm Nos 8 8
37 FRP Perforated Cover
SWD - (Size - 900 x 600 MM) Nos 108 108
38 Barrigates Rmt 2 82.2 164
R11 -Panchwati Karanja to Dindori Naka
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 224.00 1.600 1.500 1075
Light Pole cum 7 0.90 0.900 1.600 9
Utility Crossing cum 2 25.800 1.650 1.500 128
SWD cum 1 224.000 0.900 1.480 298
cum 1 224.000 0.900 1.480 298
Rigid Pavement deduction cum -2 224.000 1.600 0.300 -215
Total 1593

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 224.00 1.000 224
power roller

5 Dewatering Hour 1 22

Removing lime or lean cement concrete


6 Cum 2 67.20 1 0.15 20.16

7 Removing rich mix cement concrete Cum 2 67.20 1 0.1 13.44


8 Dismantling brick masonry Cum 2 67.20 0.8 0.23 24.7296
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 7 7
11 Removal of Paver Block sqm 1 224.00 7.90 1769.6
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 2 224.00 2.60 0.300 349

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 224.000 1.000 0.500 0


Utility Crossing cum 2 25.800 1.65 0.920 78
78

16 selected hard murum filling cum 2 224.000 1.600 1.090 781


deduction of pole cum -7 1.200 1.200 1.090 -11
deduction of Manhole cum -15 1.500 1.500 1.090 -37
Total 733
17 GSB cum 2 224.000 1.000 0.150 67
Utility Crossing cum 2 25.800 1.65 0.150 13
Below Foothpath cum 1 1807.020 0.150 271
Total 351

18 DLC cum 2 224.000 1.000 0.150 67


Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing cum 2 25.800 1.650 0.150 13
Add 10% for Damage Panel Repairing cum 0.1 224.000 29.100 0.150 98
Foothpath Cum 1 1754.020 0.150 263.1
Total 441.1

19 Polyethylene (LDPE) sheet sqm 2 224.000 1.000 448


Utility Crossing sqm 2 25.800 1.650 85
Add 10% for Damage Panel Repairing sqm 0.1 224.000 29.100 652
Total 1185

20 Cement Concrete Pavement cum 2 224.000 1.000 0.280 125


Utility Crossing cum 2 25.800 1.650 0.280 24
Add 10% for Damage Panel Repairing cum 0.1 224.000 29.100 0.280 183
Total 332

21 polysuphide sealent Rmt 1 57.000 1.000 57

24a Dowel Bars Nos 13 3.000 39

22 Paver Block-80mm Thk Sqm 0


0
23 Paver Block-60mm Thk Sqm 1 1807.020 1807.02
deduction of pole Sqm -7 1.200 1.200 -10
deduction of Manhole Sqm -19 1.500 1.500 -43
Deduction of Tactile tiles Sqm -134.4
Total 1619.62

24 Tactile tiles Sqm 2 224.000 0.3 134.4

24 Kerb Stone Rmt 2 224.000 448

25 Rubble Soling
Utility Crossing Cum 2 25.800 1.650 0.230 19.58
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 15 1.700 1.700 0.230 9.97
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 7 0.800 0.800 0.230 1.03
SWD Cum 1 224.000 1.300 0.230 66.98
Cum 1 224.000 1.300 0.230 66.98
Total 167.38

26 PCC M15
Kerb Stone Cum 2 224.000 0.265 0.075 8.9
Utility Crossing Cum 2 25.80 1.650 0.100 8.51
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 15 1.70 1.70 0.100 4.34
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 7 0.80 0.80 0.100 0.45
SWD Cum 1 224.00 1.30 0.100 29.12
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cum 1 224.00 1.30 0.100 29.12
Total 81.67
27 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 224.000 1.200 0.150 40.32
Cum 1 224.000 1.200 0.150 40.32
Total 87.07
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 15 6.000 0.150 1.500 20.25
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 224.000 0.150 1.000 67.2
Cum 2 224.000 0.150 1.000 67.2
Total 159.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -17 0.900 0.600 0.150 -1.377
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
SWD Cum 2 224.000 1.200 0.150 80.64
Cum 2 224.000 1.200 0.150 80.64
Cover Deduction Cum -90 0.900 0.600 0.150 -7.29
Total 159.00
d Pole Foundation Cum 7 0.600 0.600 1.500 3.78

28 Reinforcement
a Raft MT 110 kg/cum 10056.99
b Wall MT 100 kg/cum 16695.00
c Slab MT 95 kg/cum 15860.25
Total 42.61

29 RCC Np3 Class Pipe


600 mm dia Rmt 4 25.80 103.2

30 Painting Work
Edge Marking Line Sqm 2 224.000 0.15 67.2
Lane Marking / Other Markings Sqm 33.6
Zebra Crossing Sqm 2 26.100 3 78.3
Kerb Painting Sqm 2 224.000 0.3 134.4
Median Painting Sqm 2 224.000 1 448
31 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
Nos. 6
b Octagone size 6
c Informatory sign board Sqm 5 0.900 4.5

32 Stud with Lense Reflector Nos 2 12 24


Zebra crossing Nos 2 26.100 174
Total 198.00
33 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 224.00 3584.00
b 160 mm outer dia for HT & LT Cable Rmt 20 224.00 4480.00

34 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 15 15
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 4 4
35 FRP Perforated Cover
SWD Nos 90 90
36 Barrigates Rmt 2 44.8 90
R12 -Nimani Bus Stop to Garden (Panchwati Karanja)
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 108.00 1.600 1.500 259
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 1 14.700 1.650 1.500 36
SWD cum 1 108.000 0.900 1.480 144
Flexible Pavement deduction cum -22
Total 417

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 0
power roller

5 Dewatering Hour 1 11

Removing lime or lean cement concrete


6 Cum 2 32.40 1 0.15 9.72

7 Removing rich mix cement concrete Cum 2 32.40 1 0.1 6.48


8 Dismantling brick masonry Cum 2 32.40 0.8 0.23 11.9232
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 4 4
11 Removal of Paver Block sqm 1 108.00 2.00 216
12 Dismantling of flexible pavements
Bituminous courses cum 1 108.000 3.000 0.200 65
PaverBlock Area Deduction cum -1 216.000 0.200 -43
Total 22

13 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


14 Sqm 1 108.000 15.00 1620
surface

15 Subgrade cum 1 108.000 1.000 0.500 54


Utility Crossing cum 1 14.700 1.65 1.030 25
79

16 selected hard murum filling cum 1 108.000 1.600 1.090 188


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -4 1.500 1.500 1.090 -10
Total 178
17 GSB cum 1 108.000 1.000 0.150 16
Utility Crossing cum 1 14.700 1.65 0.150 4
Below Foothpath cum 1 0.000 0.150 0
20

18 WMM cum 1 108.000 1.000 0.250 27


Utility Crossing cum 1 14.700 1.650 0.250 6
Sr. No. Description Unit No. Length Breadth Depth Quantity
33

19 DBM cum 1 108.000 15.500 0.050 84


Pot Holes / profile Correction 25

20 Prime Coat sqm 1 108.000 15.500 1674

21 Tack Coat sqm 2 108.000 15.500 3348

22 Bituminous Concrete cum 1 108.000 15.500 0.040 67

23 DLC
Foothpath Cum 1 524.000 0.150 78.6
79

24 Polyethylene (LDPE) sheet sqm 0 0.000 0.000 0

25 Cement Concrete Pavement cum 1 0.280 0

26 polysuphide sealent Rmt 1 1.000 0.000 0

27 Paver Block-80mm Thk Sqm 0

28 Paver Block-60mm Thk


Foothpath Area Sqm 1 535.000 535
Deduction of Tactile Tiles Sqm -1 64.800 -64.8
deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -5 1.500 1.500 -11
Total 459.2

29 Tactile tiles Sqm 2 108.000 0.3 64.8

28 Kerb Stone Rmt 2 108.000 216

29 Rubble Soling
Utility Crossing Cum 1 14.700 1.650 0.230 5.58
OFC Chamber Cum 1 1.400 1.400 0.230 0.45
Electrical Chamber Cum 4 1.700 1.700 0.230 2.66
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 108.000 1.300 0.230 32.29
Total 42.02

30 PCC M15
Kerb Stone Cum 2 108.000 0.265 0.075 4.29
Utility Crossing Cum 1 14.70 1.650 0.100 2.43
OFC Chamber Cum 1 1.40 1.40 0.100 0.2
Sr. No. Description Unit No. Length Breadth Depth Quantity
Electrical Chamber Cum 4 1.70 1.70 0.100 1.16
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 108.00 1.30 0.100 14.04
Total 22.57
31 RCC M25
a Raft
OFC Chamber Cum 1 1.200 1.200 0.150 0.22
Electrical Chamber Cum 4 1.500 1.500 0.150 1.35
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 108.000 1.200 0.150 19.44
Total 21.51
b Wall
OFC Chamber Cum 1 4.800 0.150 1.000 0.72
Electrical Chamber Cum 4 6.000 0.150 1.500 5.4
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 108.000 0.150 1.000 32.4
Total 40.00
c Slab
OFC Chamber Cum 1 1.200 1.200 0.150 0.22
Electrical Chamber Cum 4 1.500 1.500 0.150 1.35
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -6 0.900 0.600 0.150 -0.486
Cover Deduction Cum -1 -0.400 -0.600 0.200 -0.048
SWD Cum 1 108.000 1.200 0.150 19.44
Cover Deduction Cum -22 0.900 0.600 0.150 -1.782
Total 19.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

32 Reinforcement
a Raft MT 110 kg/cum 2484.75
b Wall MT 100 kg/cum 4200.00
c Slab MT 95 kg/cum 1895.25
Total 8.58

33 RCC Np3 Class Pipe


600 mm dia Rmt 2 14.70 29.4

34 Painting Work
Edge Marking Line Sqm 4 108.000 0.15 64.8
Lane Marking / Other Markings Sqm 32.4
Zebra Crossing Sqm 2 15.000 3 45
Kerb Painting Sqm 2 108.000 0.3 64.8
Median Painting Sqm 0 0
35 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Informatory sign board Sqm 4 0.900 3.6

36 Stud with Lense Reflector Nos 2 6 12


Zebra crossing Nos 2 15.000 100
Total 112.00
37 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 108.00 864.00
b 160 mm outer dia for HT & LT Cable Rmt 10 108.00 1080.00

38 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 4 4
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 1 1
39 FRP Perforated Cover
SWD Nos 22 22
40 Barrigates Rmt 1 21.6 22
R13 -Malwiya Chowlk to Katya Maruri Chowlk
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 779.00 1.600 1.500 1870
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 8 6.500 1.650 1.500 129
SWD cum 1 779.000 0.800 1.330 829
cum 1 779.000 0.800 1.330 829
Flexible Pavement deduction cum -1527
Total 2130

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 779.00 8.2 6388
power roller

5 Dewatering Hour 1 78

Removing lime or lean cement concrete


6 Cum 2 233.70 1 0.15 70.11

7 Removing rich mix cement concrete Cum 2 233.70 1 0.1 46.74


8 Dismantling brick masonry Cum 2 233.70 0.8 0.23 86.0016
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 26 26
11 Removal of Paver Block sqm 1 779.00 0 0
12 Dismantling of flexible pavements
Bituminous courses cum 1 779.000 9.800 0.200 1527
PaverBlock Area Deduction cum -1 0.000 0.200 0
Total 1527

13 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 779.000 5.900 0.500 0


Utility Crossing cum 8 6.500 1.65 0.880 76
76

16 selected hard murum filling cum 1 779.000 1.600 1.090 1359


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -52 1.500 1.500 1.090 -128
Total 1231
17 GSB cum 1 779.000 5.900 0.150 689
Utility Crossing cum 8 6.500 1.65 0.150 13
Below Foothpath cum 1 1493.690 0.150 224
926

18 WMM cum 2 0.000 0.250 0


Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing cum 8 6.500 1.650 0.250 21
21

19 DBM cum 1 0.000 0.000 0.050 0


Pot Holes / profile Correction 0

20 Prime Coat sqm 1 0.000 0

21 Tack Coat sqm 1 0.000 0

22 Bituminous Concrete cum 1 0.000 0.040 0

23 DLC cum 1 779.000 5.900 0.150 689


Foothpath Cum 1 1493.690 0.150 224.05
913

24 Polyethylene (LDPE) sheet sqm 1 779.000 5.900 4596

25 Cement Concrete Pavement cum 1 779.000 5.900 0.280 1287

26 polysuphide sealent Rmt 1 196.000 5.900 1156.4

24a Dowel Bars Nos 44 20.000 880

27 Paver Block-80mm Thk Sqm 1 1646.690 1646.69


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -68 1.500 1.500 -153
1493.69

28 Kerb Stone Rm 0 0

29 Rubble Soling
Utility Crossing Cum 8 6.500 1.650 0.230 19.73
OFC Chamber Cum 16 1.400 1.400 0.230 7.21
Electrical Chamber Cum 52 1.700 1.700 0.230 34.56
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 779.000 1.000 0.230 179.17
Cum 1 779.000 1.000 0.230 179.17
Total 420.88

30 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 8 6.50 1.650 0.100 8.58
OFC Chamber Cum 16 1.40 1.40 0.100 3.14
Electrical Chamber Cum 52 1.70 1.70 0.100 15.03
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Sr. No. Description Unit No. Length Breadth Depth Quantity
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 779.00 1.00 0.100 77.9
Cum 1 779.00 1.00 0.100 77.9
Total 183
31 RCC M25
a Raft
OFC Chamber Cum 16 1.200 1.200 0.150 3.46
Electrical Chamber Cum 52 1.500 1.500 0.150 17.55
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 779.000 0.900 0.00
Cum 1 779.000 0.900 0.00
Total 21.51
b Wall
OFC Chamber Cum 16 4.800 0.150 1.000 11.52
Electrical Chamber Cum 52 6.000 0.150 1.500 70.2
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 779.000 0.150 1.000 233.7
Cum 2 779.000 0.150 1.000 233.7
Total 551.00
c Slab
OFC Chamber Cum 16 1.200 1.200 0.150 3.46
Electrical Chamber Cum 52 1.500 1.500 0.150 17.55
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -54 0.900 0.600 0.150 -4.374
Cover Deduction Cum -16 -0.400 -0.600 0.200 -0.768
SWD Cum 2 779.000 0.900 0.150 210.33
Cum 2 779.000 0.900 0.150 210.33
Cover Deduction Cum -312 0.600 0.450 0.150 -12.636
Total 424.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

32 Reinforcement
a Raft MT 110 kg/cum 2484.75
b Wall MT 100 kg/cum 57855.00
c Slab MT 95 kg/cum 42294.00
Total 102.63

33 RCC Np3 Class Pipe


600 mm dia Rmt 16 6.50 104

34 Painting Work
Edge Marking Line Sqm 2 779.000 0.15 233.7
Lane Marking / Other Markings Sqm 116.85
Zebra Crossing Sqm 6 6.800 3 61.2
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
35 Signages
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
a Nos. 25
Equilateral Triangle 25
Cautionary/Warning sign boards in
Nos. 10
b Octagone size 10
c Informatory sign board Sqm 10 0.900 9

36 Stud with Lense Reflector Nos 2 43.000 86


Zebra crossing Nos 6 6.800 136
Total 222.00
37 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 779.00 12464.00
b 160 mm outer dia for HT & LT Cable Rmt 20 779.00 15580.00

38 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 52 52
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 16 16
39 FRP Perforated Cover
SWD Nos 312 312
40 Barrigates Rmt 1 155.8 156
R14 -Malwiya Chowk to Ramkund
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 267.00 1.600 1.500 641
Light Pole cum 9 0.90 0.900 1.600 12
Utility Crossing cum 3 6.300 1.650 1.500 47
SWD cum 1 267.000 0.800 1.480 316
Rigid Pavement deduction cum -1 267.000 1.600 0.300 -128
Total 888
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation 710

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation 178
3.0m)

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 267.00 1.000 267
power roller

5 Dewatering Hour 1 27

Removing lime or lean cement concrete


6 Cum 2 80.10 1 0.15 24.03

7 Removing rich mix cement concrete Cum 2 80.10 1 0.1 16.02


8 Dismantling brick masonry Cum 2 80.10 0.8 0.23 29.4768
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 9 9
11 Removal of Paver Block sqm 1 267.00 4.70 1254.9
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 1 267.00 2.60 0.300 208

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 267.000 1.000 0.500 0


Utility Crossing cum 3 6.300 1.65 0.920 29
29

16 selected hard murum filling cum 1 267.000 1.600 1.090 466


deduction of pole cum -9 1.200 1.200 1.090 -14
deduction of Manhole cum -9 1.500 1.500 1.090 -22
Total 430
17 GSB cum 1 267.000 1.000 0.150 40
Utility Crossing cum 3 6.300 1.65 0.150 5
Below Foothpath cum 1 782.900 0.150 117
Total 162
Sr. No. Description Unit No. Length Breadth Depth Quantity

18 DLC cum 1 267.000 1.000 0.150 40


Utility Crossing cum 3 6.300 1.650 0.150 5
Add 10% for Damage Panel Repairing cum 0.1 267.000 9.600 0.150 38
Foothpath Cum 1 1017.770 0.150 152.67
Total 235.67

19 Polyethylene (LDPE) sheet sqm 1 267.000 1.000 267


Utility Crossing sqm 3 6.300 1.650 31
Add 10% for Damage Panel Repairing sqm 0.1 267.000 9.600 256
Total 554

20 Cement Concrete Pavement cum 1 267.000 1.000 0.280 75


Utility Crossing cum 3 6.300 1.650 0.280 9
Add 10% for Damage Panel Repairing cum 0.1 267.000 9.600 0.280 72
Total 156

21 polysuphide sealent Rmt 1 68.000 1.000 68

21a Dowel Bars Nos 15 3.000 45

22 Paver Block-80mm Thk Sqm 0


0
23 Paver Block-60mm Thk Sqm 1 782.900 782.9
deduction of pole Sqm -9 1.200 1.200 -13
deduction of Manhole Sqm -12 1.500 1.500 -27
Deduction of Tactile tiles Sqm -234.87
Total 508.03

24 Tactile tiles Sqm 1 782.900 0.3 234.87

`
24 Kerb Stone Rm 1 782.900 783

25 Rubble Soling
Utility Crossing Cum 3 6.300 1.650 0.230 7.17
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 9 1.700 1.700 0.230 5.98
Water Chamber Cum 3 1.500 1.500 0.230 1.55
Light pole Cum 9 0.800 0.800 0.230 1.32
SWD Cum 1 267.000 1.000 0.230 61.41
Total 78.78

26 PCC M15
Kerb Stone Cum 1 782.900 0.265 0.075 15.56
Utility Crossing Cum 3 6.30 1.650 0.100 3.12
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 9 1.70 1.70 0.100 2.6
Water Chamber Cum 3 1.50 1.50 0.100 0.68
Light pole Cum 9 0.80 0.80 0.100 0.58
SWD Cum 1 267.00 1.00 0.100 26.7
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 49.83
27 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 3 1.300 1.300 0.150 0.76
SWD Cum 1 267.000 0.900 0.150 36.05
Total 40.49
Sr. No. Description Unit No. Length Breadth Depth Quantity
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 9 6.000 0.150 1.500 12.15
Water Chamber Cum 3 5.200 0.150 1.000 2.34
SWD Cum 2 267.000 0.150 1.000 80.1
Total 97.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 3 1.300 1.300 0.150 0.76
Cover Deduction Cum -12 0.900 0.600 0.150 -0.972
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 267.000 0.900 0.150 36.05
Cover Deduction Cum -53 0.600 0.450 0.150 -2.15
Total 37.00
d Pole Foundation Cum 9 0.600 0.600 1.500 4.86

28 Reinforcement
a Raft MT 110 kg/cum 4676.71
b Wall MT 100 kg/cum 10185.00
c Slab MT 95 kg/cum 3690.75
Total 18.55

29 RCC Np3 Class Pipe


600 mm dia Rmt 6 6.30 37.8

30 Painting Work
Edge Marking Line Sqm 2 267.000 0.15 80.1
Lane Marking / Other Markings Sqm 40.05
Zebra Crossing Sqm 4 6.600 3 39.6
Kerb Painting Sqm 1 782.900 0.3 234.87
Median Painting Sqm 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 6
b Octagone size 6
c Informatory sign board Sqm 5 0.900 4.5

32 Stud with Lense Reflector Nos 2 15 30


Zebra crossing Nos 4 6.600 88
Total 118.00
33 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 267.00 2136.00
b 160 mm outer dia for HT & LT Cable Rmt 10 267.00 2670.00

34 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 9 9
600mm
Watersupply Manhole - Size-900mm x Nos 3 3
600mm
OFC Manhole - Size-400mm x 600mm Nos 3 3
Sr. No. Description Unit No. Length Breadth Depth Quantity
35 FRP Perforated Cover
SWD Nos 53 53
36 Barrigates Rmt 1 53.4 53
R15 -Krusnaji Tower to Near Sainath Chowk
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 155.00 1.600 1.500 372
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 2 6.800 1.650 1.500 34
SWD cum 1 150.000 0.800 1.480 178
cum 1 150.000 0.800 1.480 178
Rigid Pavement deduction cum -1 155.000 1.600 0.300 -74
Total 688

1 Dismantling of flexible pavements


Scarifying the existing bituminous road
2 Sqm 1 0
surface

Compacting the existing Subgrade with


3 Sqm 1 155.00 1.000 155
power roller

4 Dewatering Hour 1 16

Removing lime or lean cement concrete


5 Cum 2 46.50 1 0.15 13.95

6 Removing rich mix cement concrete Cum 2 46.50 1 0.1 9.3


7 Dismantling brick masonry Cum 2 46.50 0.8 0.23 17.112
8 Dismantling stone masonry Cum 1 20
9 Removal of telephone / Electric poles Nos 1 5 5
10 Removal of Paver Block sqm 1 155.00 5.30 821.5
11 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

12 Dismantling of cement concrete pavement Cum 1 155.00 2.60 0.300 121

Scarifying the existing granular road


13 Sqm 1 0
surface

14 Subgrade cum 0 155.000 1.000 0.500 0


Utility Crossing cum 2 6.800 1.65 0.920 21
21

15 selected hard murum filling cum 1 155.000 1.600 1.090 270


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -5 1.500 1.500 1.090 -12
Total 258
16 GSB cum 1 155.000 1.000 0.150 23
Utility Crossing cum 2 6.800 1.65 0.150 3
Below Foothpath cum 1 407.640 0.150 61
Total 87

17 DLC cum 1 155.000 1.000 0.150 23


Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing cum 2 6.800 1.650 0.150 3
Add 10% for Damage Panel Repairing cum 0.1 155.000 10.100 0.150 23
Foothpath Cum 1 407.640 0.150 61.15
Total 110.15

18 Polyethylene (LDPE) sheet sqm 1 155.000 1.000 155


Utility Crossing sqm 2 6.800 1.650 22
Add 10% for Damage Panel Repairing sqm 0.1 155.000 10.100 157
Total 334

19 Cement Concrete Pavement cum 1 155.000 1.000 0.280 43


Utility Crossing cum 2 6.800 1.650 0.280 6
Add 10% for Damage Panel Repairing cum 0.1 155.000 10.100 0.280 44
Total 93

20 polysuphide sealent Rmt 1 40.000 1.000 40

21 Paver Block-80mm Thk Sqm 1 423.640 423.64


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -7 1.500 1.500 -16
407.64

22 Kerb Stone Rm 0 0.000 0

23 Rubble Soling
Utility Crossing Cum 2 6.800 1.650 0.230 5.16
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 5 1.700 1.700 0.230 3.32
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 150.000 0.900 0.230 31.05
Cum 1 150.000 0.900 0.230 31.05
Total 72.52

24 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 6.80 1.650 0.100 2.24
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 5 1.70 1.70 0.100 1.45
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 150.00 0.90 0.100 13.5
Cum 1 150.00 0.90 0.100 13.5
Total 31.53
25 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Sr. No. Description Unit No. Length Breadth Depth Quantity
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 150.000 0.800 0.150 18.00
Cum 1 150.000 0.800 0.150 18.00
Total 38.63
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 5 6.000 0.150 1.500 6.75
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 150.000 0.150 1.000 45
Cum 2 150.000 0.150 1.000 45
Total 100.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -7 0.900 0.600 0.150 -0.567
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 150.000 0.800 0.150 18.000
Cum 1 150.000 0.800 0.150 18.000
Cover Deduction Cum -60 0.600 0.450 0.150 -2.430
Total 36.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

26 Reinforcement
a Raft MT 110 kg/cum 4461.36
b Wall MT 100 kg/cum 10500.00
c Slab MT 95 kg/cum 3591.00
Total 18.55

27 RCC Np3 Class Pipe


600 mm dia Rmt 4 6.80 27.2

28 Painting Work
Edge Marking Line Sqm 2 155.000 0.15 46.5
Lane Marking / Other Markings Sqm 23.25
Zebra Crossing Sqm 2 7.100 3 21.3
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0
29 Signages
Cautionary/Warning sign boards in
a Nos. 6
Equilateral Triangle 6
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 3 0.900 2.7

30 Stud with Lense Reflector Nos 2 9 18


Zebra crossing Nos 2 7.100 47
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 65.00
31 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 155.00 2480.00
b 160 mm outer dia for HT & LT Cable Rmt 20 155.00 3100.00

32 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 5 5
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
33 FRP Perforated Cover
SWD Nos 60 60

34 Barrigates Rmt 1 31 31
R16 -Sainath Chowk to Shani Chowk
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 115.00 1.600 1.500 276
Light Pole cum 4 0.90 0.900 1.600 5
Utility Crossing cum 2 3.600 1.650 1.500 18
Rigid Pavement deduction cum -1 -90
Total 209

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 115.00 1.000 115
power roller

5 Dewatering Hour 1 12

Removing lime or lean cement concrete


6 Cum 2 34.50 1 0.15 10.35

7 Removing rich mix cement concrete Cum 2 34.50 1 0.1 6.9


8 Dismantling brick masonry Cum 2 34.50 0.8 0.23 12.696
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 4 4
11 Removal of Paver Block sqm 1 115.00 1.90 218.5
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 1 115.00 2.60 0.300 90

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 115.000 1.000 0.500 0


Utility Crossing cum 2 3.600 1.65 0.920 11
11

16 selected hard murum filling cum 1 115.000 1.600 1.090 201


deduction of pole cum -4 1.200 1.200 1.090 -6
deduction of Manhole cum -4 1.500 1.500 1.090 -10
Total 185
17 GSB cum 1 115.000 1.000 0.150 17
Utility Crossing cum 2 3.600 1.65 0.150 2
Below Foothpath cum 1 192.780 0.150 29
Total 48

18 DLC cum 1 115.000 1.000 0.150 17


Utility Crossing cum 2 3.600 1.650 0.150 2
Add 10% for Damage Panel Repairing cum 0.1 115.000 6.900 0.150 12
Sr. No. Description Unit No. Length Breadth Depth Quantity
Foothpath Cum 1 192.780 0.150 28.92
Total 60

19 Polyethylene (LDPE) sheet sqm 1 115.000 1.000 115


Utility Crossing sqm 2 3.600 1.650 12
Add 10% for Damage Panel Repairing sqm 0.1 115.000 6.900 79
Total 206

20 Cement Concrete Pavement cum 1 115.000 1.000 0.280 32


Utility Crossing cum 2 3.600 1.650 0.280 3
Add 10% for Damage Panel Repairing cum 0.1 115.000 6.900 0.280 22
Total 57

21 polysuphide sealent Rmt 1 30.000 1.000 30

22 Paver Block-80mm Thk Sqm 1 209.780 209.78


deduction of pole Sqm -4 1.200 1.200 -6
deduction of Manhole Sqm -5 1.500 1.500 -11
192.78

23 Kerb Stone Rm 0 0

24 Rubble Soling
Utility Crossing Cum 2 3.600 1.650 0.230 2.73
OFC Chamber Cum 1 1.400 1.400 0.230 0.45
Electrical Chamber Cum 4 1.700 1.700 0.230 2.66
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 4 0.800 0.800 0.230 0.59
Total 7.47

25 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 3.60 1.650 0.100 1.19
OFC Chamber Cum 1 1.40 1.40 0.100 0.2
Electrical Chamber Cum 4 1.70 1.70 0.100 1.16
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 4 0.80 0.80 0.100 0.26
Total 3.26
26 RCC M25
a Raft
OFC Chamber Cum 1 1.200 1.200 0.150 0.22
Electrical Chamber Cum 4 1.500 1.500 0.150 1.35
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 2.07
b Wall
OFC Chamber Cum 1 4.800 0.150 1.000 0.72
Electrical Chamber Cum 4 6.000 0.150 1.500 5.4
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 8.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 1 1.200 1.200 0.150 0.22
Electrical Chamber Cum 4 1.500 1.500 0.150 1.35
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -6 0.900 0.600 0.150 -0.486
Cover Deduction Cum -1 -0.400 -0.600 0.200 -0.048
Total 2.00
d Pole Foundation Cum 4 0.600 0.600 1.500 2.16

27 Reinforcement
a Raft MT 110 kg/cum 239.43
b Wall MT 100 kg/cum 840.00
c Slab MT 95 kg/cum 199.50
Total 1.28

28 RCC Np3 Class Pipe


600 mm dia Rmt 2 3.60 7.2

29 Painting Work
Edge Marking Line Sqm 2 115.000 0.15 34.5
Lane Marking / Other Markings Sqm 17.25
Zebra Crossing Sqm 2 3.900 3 11.7
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
30 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 2
b Octagone size 2
c Informatory sign board Sqm 2 0.900 1.8

31 Stud with Lense Reflector Nos 2 6 12


Zebra crossing Nos 2 3.900 26
Total 38.00
32 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 115.00 920.00
b 160 mm outer dia for HT & LT Cable Rmt 10 115.00 1150.00

33 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 4 4
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 1 1
34 FRP Perforated Cover
SWD Nos 0 0
35 Barrigates Rmt 1 23 23
R17 -Shani Chowk to Sardar Chowk
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 170.00 1.600 1.500 408
Light Pole cum 6 0.90 0.900 1.600 8
Utility Crossing cum 3 3.600 1.650 1.500 27
Rigid Pavement deduction cum -1 170.000 1.600 0.300 -82
Total 361

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 170.00 5.3 901
power roller

5 Dewatering Hour 1 17

Removing lime or lean cement concrete


6 Cum 2 51.00 1 0.15 15.3

7 Removing rich mix cement concrete Cum 2 51.00 1 0.1 10.2


8 Dismantling brick masonry Cum 2 51.00 0.8 0.23 18.768
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 6 6
11 Removal of Paver Block sqm 1 170.00 1.90 323
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 1 170.00 5.00 0.300 255

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 170.000 4.000 0.500 0


Utility Crossing cum 3 3.600 1.65 0.920 16
16

16 selected hard murum filling cum 1 170.000 1.600 1.090 296


deduction of pole cum -6 1.200 1.200 1.090 -9
deduction of Manhole cum -6 1.500 1.500 1.090 -15
Total 272
17 GSB cum 1 170.000 4.000 0.150 102
Utility Crossing cum 3 3.600 1.65 0.150 3
Below Foothpath cum 1 208.170 0.150 31
136

18 DLC cum 1 170.000 4.000 0.150 102


Foothpath Cum 1 208.170 0.150 31.23
133
Sr. No. Description Unit No. Length Breadth Depth Quantity

19 Polyethylene (LDPE) sheet sqm 1 170.000 4.000 680

20 Cement Concrete Pavement cum 1 170.000 4.000 0.280 190

21 polysuphide sealent Rmt 1 44.000 4.000 176

24a Dowel Bars Nos 10 13.000 130

22 Paver Block-80mm Thk Sqm 1 235.170 235.17


deduction of pole Sqm -6 1.200 1.200 -9
deduction of Manhole Sqm -8 1.500 1.500 -18
208.17

23 Kerb Stone Rm 0 0

24 Rubble Soling
Utility Crossing Cum 3 3.600 1.650 0.230 4.1
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 6 1.700 1.700 0.230 3.99
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 6 0.800 0.800 0.230 0.88
Total 10.91

25 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 3 3.60 1.650 0.100 1.78
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 6 1.70 1.70 0.100 1.73
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 6 0.80 0.80 0.100 0.38
Total 4.73
26 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 6 1.500 1.500 0.150 2.03
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 2.96
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 6 6.000 0.150 1.500 8.1
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 11.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 6 1.500 1.500 0.150 2.03
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -8 0.900 0.600 0.150 -0.648
Sr. No. Description Unit No. Length Breadth Depth Quantity

Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096


Total 2.00
d Pole Foundation Cum 6 0.600 0.600 1.500 3.24

27 Reinforcement
a Raft MT 110 kg/cum 342.34
b Wall MT 100 kg/cum 1155.00
c Slab MT 95 kg/cum 199.50
d Tie Bar MT 425 0.7 0.89 264.44
Total 1.96

28 RCC Np3 Class Pipe


600 mm dia Rmt 3 3.60 10.8

29 Painting Work
Edge Marking Line Sqm 2 170.000 0.15 51
Lane Marking / Other Markings Sqm 25.5
Zebra Crossing Sqm 2 3.900 3 11.7
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
30 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6

31 Stud with Lense Reflector Nos 2 9 18


Zebra crossing Nos 2 3.900 26
Total 44.00
32 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 170.00 1360.00
b 160 mm outer dia for HT & LT Cable Rmt 10 170.00 1700.00

33 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 6 6
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
34 FRP Perforated Cover
SWD Nos 0 0
35 Barrigates Rmt 1 34 34
R18 -Perina Icecream Chowk to Nimani Bus Stand
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 243.00 2.15 1.500 784
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 2 4.700 1.650 1.500 23
SWD cum 1 257.000 0.800 1.480 304
cum 1 257.000 0.800 1.480 304
Flexible Pavement deduction cum 92
Total 1507
754
2 Dismantling of flexible pavements
Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 0
power roller

5 Dewatering Hour 1 24

Removing lime or lean cement concrete


6 Cum 2 72.90 1 0.15 21.87

7 Removing rich mix cement concrete Cum 2 72.90 1 0.1 14.58


8 Dismantling brick masonry Cum 2 72.90 0.8 0.23 26.8272
9 Dismantling stone masonry Cum 1 20
Removing all type of hume pipes and
10 stacking within a lead up to 1000 meters Rmt 5 8.00 40

11 Removal of telephone / Electric poles Nos 1 8 8


12 Removal of Paver Block sqm 1 243.00 4.90 1190.7
13 Dismantling of flexible pavements
Bituminous courses cum 1 243.000 3.000 0.200 146
PaverBlock Area Deduction cum -1 1190.700 0.200 -238
Total -92

14 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


15 Sqm 1 243.000 5.00 1215
surface

16 Subgrade cum 2 243.000 1.000 0.500 243


Utility Crossing cum 2 4.700 1.65 1.030 16
259

17 selected hard murum filling cum 1 243.000 2.150 1.090 569


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -16 1.500 1.500 1.090 -39
Total 530
18 GSB cum 2 243.000 1.000 0.150 73
Utility Crossing cum 2 4.700 1.65 0.150 2
Below Foothpath cum 1 1205.980 0.150 181
Sr. No. Description Unit No. Length Breadth Depth Quantity
256

19 WMM cum 2 243.000 1.000 0.250 122


Utility Crossing cum 2 4.700 1.650 0.250 4
126

20 DBM cum 1 243.000 4.160 0.050 51


Pot Holes / profile Correction 15

21 Prime Coat sqm 1 243.000 4.160 1011

22 Tack Coat sqm 2 243.000 4.160 2022

23 Bituminous Concrete cum 1 243.000 4.160 0.040 40

24 DLC
Foothpath Cum 1 1205.980 0.150 181

25 Polyethylene (LDPE) sheet sqm 0 0.000 0.000 0

26 Cement Concrete Pavement cum 1 0.280 0

27 polysuphide sealent Rmt 1 1.000 0.000 0

28 Paver Block-80mm Thk Sqm 1 1252.980 1252.98


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -21 1.500 1.500 -47
1205.98

29 Kerb Stone Rm 0 243.000 0

30 Rubble Soling
Utility Crossing Cum 2 4.700 1.650 0.230 3.57
OFC Chamber Cum 5 1.400 1.400 0.230 2.25
Electrical Chamber Cum 16 1.700 1.700 0.230 10.64
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 257.000 0.900 0.230 53.2
Cum 1 257.000 0.900 0.230 53.2
Total 123.9

31 PCC M15
Kerb Stone Cum 0 243.000 0.265 0.075 0
Utility Crossing Cum 2 4.70 1.650 0.100 1.55
OFC Chamber Cum 5 1.40 1.40 0.100 0.98
Electrical Chamber Cum 16 1.70 1.70 0.100 4.62
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Sr. No. Description Unit No. Length Breadth Depth Quantity
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 257.00 0.90 0.100 23.13
Cum 1 257.00 0.90 0.100 23.13
Total 53.86
32 RCC M25
a Raft
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 16 1.500 1.500 0.150 5.40
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 257.000 0.800 0.150 30.84
Cum 1 257.000 0.800 0.150 30.84
Total 68.67
b Wall
OFC Chamber Cum 5 4.800 0.150 1.000 3.6
Electrical Chamber Cum 16 6.000 0.150 1.500 21.6
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 257.000 0.150 1.000 77.1
Cum 2 257.000 0.150 1.000 77.1
Total 181.00
c Slab
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 16 1.500 1.500 0.150 5.40
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -18 0.900 0.600 0.150 -1.458
Cover Deduction Cum -5 -0.400 -0.600 0.200 -0.24
SWD Cum 1 257.000 0.800 0.150 30.84
Cum 1 257.000 0.800 0.150 30.84
Cover Deduction Cum -103 0.600 0.450 0.150 -4.17
Total 63.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

33 Reinforcement
a Raft MT 110 kg/cum 7931.04
b Wall MT 100 kg/cum 19005.00
c Slab MT 95 kg/cum 6284.25
Total 33.22

34 RCC Np3 Class Pipe


600 mm dia Rmt 4 4.70 18.8

35 Painting Work
Edge Marking Line Sqm 2 243.000 0.15 72.9
Lane Marking / Other Markings Sqm 36.45
Zebra Crossing Sqm 5 5.000 3 37.5
Kerb Painting Sqm 0 243.000 0.3 0
Median Painting Sqm 0 0
36 Signages
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 4 0.900 3.6

37 Stud with Lense Reflector Nos 2 14 28


Zebra crossing Nos 5 5.000 83
Total 111.00
38 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 243.00 3888.00
b 160 mm outer dia for HT & LT Cable Rmt 20 243.00 4860.00

39 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 16 16
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 5 5
40 FRP Perforated Cover
SWD Nos 103 103
41 Barrigates Rmt 1 48.6 49
R19 -Manas Hotel to Swami Vivekanand Road
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 150.00 1.600 1.500 360
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 2 5.800 1.650 1.500 29
SWD cum 1 144.000 0.800 1.480 170
cum 1 144.000 0.800 1.480 170
Flexible Pavement deduction cum -183
Total 546

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 150.00 7.5 1125
power roller

5 Dewatering Hour 1 15

Removing lime or lean cement concrete


6 Cum 2 45.00 1 0.15 13.5

7 Removing rich mix cement concrete Cum 2 45.00 1 0.1 9


8 Dismantling brick masonry Cum 2 45.00 0.8 0.23 16.56
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 5 5
11 Removal of Paver Block sqm 1 150.00 3.00 450
12 Dismantling of flexible pavements
Bituminous courses cum 1 150.000 9.100 0.200 273
PaverBlock Area Deduction cum -1 450.000 0.200 -90
Total 183

13 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 150.000 4.300 0.500 0


Utility Crossing cum 2 5.800 1.65 0.880 17
17

16 selected hard murum filling cum 1 150.000 1.600 1.090 262


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -10 1.500 1.500 1.090 -25
Total 237
17 GSB cum 1 150.000 4.300 0.150 97
Utility Crossing cum 2 5.800 1.65 0.150 3
Below Foothpath cum 1 85.850 0.150 13
113

18 WMM cum 2 0.000 0.250 0


Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing cum 2 5.800 1.650 0.250 5
5

19 DBM cum 1 0.000 13.600 0.050 0


Pot Holes / profile Correction 0

20 Prime Coat sqm 1 0.000 13.600 0

21 Tack Coat sqm 1 0.000 13.600 0

22 Bituminous Concrete cum 1 0.000 13.600 0.040 0

23 DLC cum 1 150.000 4.300 0.150 97


Foothpath Cum 1 85.850 0.150 12.88
110

24 Polyethylene (LDPE) sheet sqm 1 150.000 4.300 645

25 Cement Concrete Pavement cum 1 150.000 4.300 0.280 181

26 polysuphide sealent Rmt 1 39.000 4.300 167.7

29a Dowel Bars Nos 9 14.000 126

27 Paver Block-80mm Thk Sqm 1 114.850 114.85


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -13 1.500 1.500 -29
85.85

28 Kerb Stone Rm 0 0

29 Rubble Soling
Utility Crossing Cum 2 5.800 1.650 0.230 4.4
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 10 1.700 1.700 0.230 6.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 144.000 1.000 0.230 33.12
Cum 1 144.000 0.900 0.230 29.81
Total 76.37

30 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 5.80 1.650 0.100 1.91
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 10 1.70 1.70 0.100 2.89
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Sr. No. Description Unit No. Length Breadth Depth Quantity
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 144.00 1.00 0.100 14.4
Cum 1 144.00 0.90 0.100 12.96
Total 33
31 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 144.000 0.900 0.150 19.44
Cum 1 144.000 0.800 0.150 17.28
Total 41.25
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 10 6.000 0.150 1.500 13.5
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 144.000 0.150 1.000 43.2
Cum 2 144.000 0.150 1.000 43.2
Total 104.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -12 0.900 0.600 0.150 -0.972
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 144.000 0.900 0.150 19.44
Cum 1 144.000 0.800 0.150 17.28
Cover Deduction Cum -58 0.600 0.450 0.150 -2.35
Total 38.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

32 Reinforcement
a Raft MT 110 kg/cum 4764.38
b Wall MT 100 kg/cum 10920.00
c Slab MT 95 kg/cum 3790.50
Total 19.48

33 RCC Np3 Class Pipe


600 mm dia Rmt 4 5.80 23.2

34 Painting Work
Edge Marking Line Sqm 2 150.000 0.15 45
Lane Marking / Other Markings Sqm 22.5
Zebra Crossing Sqm 2 6.100 3 18.3
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
35 Signages
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 5 0.900 4.5

36 Stud with Lense Reflector Nos 2 8.000 16


Zebra crossing Nos 2 6.100 41
Total 57.00
37 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 150.00 1200.00
b 160 mm outer dia for HT & LT Cable Rmt 10 150.00 1500.00

38 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 10 10
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 3 3
39 FRP Perforated Cover
SWD Nos 58 58
40 Barrigates Rmt 1 30 30
R20 -Perina Icecream Chowk to Near Shankar Mandir
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 522.00 1.600 1.500 1253
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 10 4.000 1.650 1.500 99
SWD cum 1 517.00 0.600 1.480 459
cum 1 517.00 0.600 1.480 459
Rigid Pavement deduction cum -1 522.000 1.600 0.300 -251
Total 2019

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 522.00 5.7 2975
power roller

5 Dewatering Hour 1 52

Removing lime or lean cement concrete


6 Cum 2 156.60 1 0.15 46.98

7 Removing rich mix cement concrete Cum 2 156.60 1 0.1 31.32


8 Dismantling brick masonry Cum 2 156.60 0.8 0.23 57.6288
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 17 17
11 Removal of Paver Block sqm 1 522.00 2.30 1200.6
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 1 522.00 5.00 0.300 783

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 522.000 6.100 0.500 0


Utility Crossing cum 10 4.000 1.65 1.200 79
79

16 selected hard murum filling cum 1 522.000 1.600 1.090 910


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -17 1.500 1.500 1.090 -42
Total 868
17 GSB cum 1 522.000 6.100 0.150 478
Utility Crossing cum 10 4.000 1.65 0.150 10
488

18 DLC cum 1 522.000 6.100 0.150 478


478
Sr. No. Description Unit No. Length Breadth Depth Quantity

19 Polyethylene (LDPE) sheet sqm

20 Cement Concrete Pavement cum 1 522.000 3.900 0

21 polysuphide sealent Rmt

21a Dowel Bars Nos

22 Cobble stone Sqm 1 522.000 6.100 3184

23 Paver Block-80mm Thk

24 Kerb Stone Rm 0 0

25 Rubble Soling
Utility Crossing Cum 10 4.000 1.650 0.230 15.18
OFC Chamber Cum 5 1.400 1.400 0.230 2.25
Electrical Chamber Cum 17 1.700 1.700 0.230 11.3
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 517.000 0.900 0.230 107.02
Cum 1 517.000 0.900 0.230 107.02
Total 243.81

26 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 10 4.00 1.650 0.100 6.6
OFC Chamber Cum 5 1.40 1.40 0.100 0.98
Electrical Chamber Cum 17 1.70 1.70 0.100 4.91
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 517.00 0.90 0.100 46.53
Cum 1 517.00 0.90 0.100 46.53
Total 106
27 RCC M25
a Raft
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 17 1.500 1.500 0.150 5.74
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 517.000 0.800 0.150 62.04
Cum 1 517.000 0.800 0.150 62.04
Total 131.40
b Wall
OFC Chamber Cum 5 4.800 0.150 1.000 3.6
Electrical Chamber Cum 17 6.000 0.150 1.500 22.95
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 517.000 0.150 1.000 155.1
Cum 2 517.000 0.150 1.000 155.1
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 338.00
c Slab
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 17 1.500 1.500 0.150 5.74
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -19 0.900 0.600 0.150 -1.539
Cover Deduction Cum -5 -0.400 -0.600 0.200 -0.24
SWD Cum 1 517.000 0.800 0.150 62.04
Cum 1 517.000 0.800 0.150 62.04
Cover Deduction Cum -207 0.300 0.300 0.150 -2.79
Total 127.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

28 Reinforcement
a Raft MT 110 kg/cum 15177.22
b Wall MT 100 kg/cum 35490.00
c Slab MT 95 kg/cum 12668.25
d Tie Bar MT 1305 0.7 0.89 812.00
Total 64.15

29 RCC Np3 Class Pipe


600 mm dia Rmt 10 4.00 40

30 Painting Work
Edge Marking Line Sqm 2 522.000 0.15 156.6
Lane Marking / Other Markings Sqm 78.3
Zebra Crossing Sqm 6 4.300 3 38.7
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 20
Equilateral Triangle 20
Cautionary/Warning sign boards in
Nos. 8
b Octagone size 8
c Informatory sign board Sqm 5 0.900 4.5

32 Stud with Lense Reflector Nos 2 29 58


Zebra crossing Nos 6 4.300 86
Total 144.00
33 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 522.00 4176.00
b 160 mm outer dia for HT & LT Cable Rmt 10 522.00 5220.00

34 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 17 17
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
Sr. No. Description Unit No. Length Breadth Depth Quantity
OFC Manhole - Size-400mm x 600mm Nos 5 5
35 FRP Perforated Cover
SWD Nos 207 207
36 Barrigates Rmt 1 104.4 104
R21 -Nehru Garden Chowk to MG Chowk
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 178.00 1.600 1.500 854
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 2 11.700 1.650 1.500 58
SWD cum 1 178.00 0.900 1.480 237
cum 1 178.00 0.900 1.480 237
Flexible Pavement deduction cum -25
Total 1361

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 0
power roller

5 Dewatering Hour 1 18

Removing lime or lean cement concrete


6 Cum 2 53.40 1 0.15 16.02

7 Removing rich mix cement concrete Cum 2 53.40 1 0.1 10.68


8 Dismantling brick masonry Cum 2 53.40 0.8 0.23 19.6512
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 6 6
11 Removal of Paver Block sqm 1 178.00 2.30 409.4
12 Dismantling of flexible pavements
Bituminous courses cum 1 178.000 3.000 0.200 107
PaverBlock Area Deduction cum -1 409.400 0.200 -82
Total 25

13 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


14 Sqm 1 178.000 12.00 2136
surface

15 Subgrade cum 2 178.000 1.000 0.500 178


Utility Crossing cum 2 11.700 1.65 1.030 40
218

16 selected hard murum filling cum 2 178.000 1.600 1.090 621


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -12 1.500 1.500 1.090 -29
Total 592
17 GSB cum 2 178.000 1.000 0.150 53
Utility Crossing cum 2 11.700 1.65 0.150 6
Below Foothpath cum 1 0.000 0.150 0
59

18 WMM cum 2 178.000 1.000 0.250 89


Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing cum 2 11.700 1.650 0.250 10
99

19 DBM cum 1 178.000 10.000 0.050 89


Pot Holes / profile Correction 27

20 Prime Coat sqm 1 178.000 10.000 1780

21 Tack Coat sqm 2 178.000 10.000 3560

22 Bituminous Concrete cum 1 178.000 10.000 0.040 71

23 DLC
Foothpath Cum 0 806.000 0.150 0
0

24 Polyethylene (LDPE) sheet sqm 0 0.000 0.000 0

25 Cement Concrete Pavement cum 1 0.280 0

26 polysuphide sealent Rmt 1 1.000 0.000 0

27 Paver Block-80mm Thk Sqm 0


0
28 Paver Block-60mm Thk
Foothpath Area Sqm 1 842.000 842
deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -16 1.500 1.500 -36
Deduction of Tactile Tiles Sqm -1 106.800 -106.8
Total 699.2

29 Tactile tiles Sqm 2 178.000 0.3 106.8

28 Kerb Stone Rm 2 178.000 356

29 Rubble Soling
Utility Crossing Cum 2 11.700 1.650 0.230 8.88
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 12 1.700 1.700 0.230 7.98
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 178.000 1.000 0.230 40.94
Cum 1 178.000 1.000 0.230 40.94
Total 101.58

30 PCC M15
Sr. No. Description Unit No. Length Breadth Depth Quantity
Kerb Stone Cum 2 178.000 0.265 0.075 7.08
Utility Crossing Cum 2 11.70 1.650 0.100 3.86
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 12 1.70 1.70 0.100 3.47
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 178.00 1.00 0.100 17.8
Cum 1 178.00 1.00 0.100 17.8
Total 51.24
31 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 12 1.500 1.500 0.150 4.05
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 178.000 0.900 0.150 24.03
Cum 1 178.000 0.900 0.150 24.03
Total 53.48
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 12 6.000 0.150 1.500 16.2
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 178.000 0.150 1.000 53.4
Cum 2 178.000 0.150 1.000 53.4
Total 127.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 12 1.500 1.500 0.150 4.05
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -14 0.900 0.600 0.150 -1.134
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
SWD Cum 1 178.000 0.900 0.150 24.03
Cum 1 178.000 0.900 0.150 24.03
Cover Deduction Cum -71 0.600 0.450 0.150 -2.88
Total 49.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

32 Reinforcement
a Raft MT 110 kg/cum 6177.06
b Wall MT 100 kg/cum 13335.00
c Slab MT 95 kg/cum 4887.75
Total 24.40

33 RCC Np3 Class Pipe


600 mm dia Rmt 4 11.70 46.8

34 Painting Work
Edge Marking Line Sqm 4 178.000 0.15 106.8
Sr. No. Description Unit No. Length Breadth Depth Quantity
Lane Marking / Other Markings Sqm 53.4
Zebra Crossing Sqm 2 12.000 3 36
Kerb Painting Sqm 2 178.000 0.3 106.8
Median Painting Sqm 2 178.000 1 356
35 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 5 0.900 4.5

36 Stud with Lense Reflector Nos 2 10 20


Zebra crossing Nos 2 12.000 80
Total 100.00
37 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 178.00 2848.00
b 160 mm outer dia for HT & LT Cable Rmt 20 178.00 3560.00

38 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 12 12
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 4 4
39 FRP Perforated Cover
SWD Nos 71 71
40 Barrigates Rmt 2 35.6 71
R22 -Kalya Maruri Chowk to Garden (Lakshmi Narayan Temple)
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 647.00 1.600 1.500 3106
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 6 9.300 1.650 1.500 138
SWD cum 1 712.00 0.800 1.480 843
cum 1 712.00 0.800 1.480 843
Rigid Pavement deduction cum -2 647.000 1.600 0.300 -621
Total 4309

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 647.00 1.000 647
power roller

5 Dewatering Hour 1 65

Removing lime or lean cement concrete


6 Cum 2 194.10 1 0.15 58.23

7 Removing rich mix cement concrete Cum 2 194.10 1 0.1 38.82


8 Dismantling brick masonry Cum 2 194.10 0.8 0.23 71.4288
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 22 22
11 Removal of Paver Block sqm 1 647.00 4.7 3040.9
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 2 647.00 2.60 0.300 1009

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 647.000 1.000 0.500 0


Utility Crossing cum 6 9.300 1.65 0.920 85
85

16 selected hard murum filling cum 2 647.000 1.600 1.090 2257


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -43 1.500 1.500 1.090 -105
Total 2152
17 GSB cum 2 647.000 1.000 0.150 194
Utility Crossing cum 6 9.300 1.65 0.150 14
Below Foothpath cum 1 2309.030 0.150 346
Total 554

18 DLC cum 2 647.000 1.000 0.150 194


Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing cum 6 9.300 1.650 0.150 14
Add 10% for Damage Panel Repairing cum 0.1 647.000 12.600 0.150 122
Foothpath Cum 1 2309.030 0.150 346.35
Total 676

19 Polyethylene (LDPE) sheet sqm 2 647.000 1.000 1294


Utility Crossing sqm 6 9.300 1.650 92
Add 10% for Damage Panel Repairing sqm 0.1 647.000 12.600 815
Total 2201

20 Cement Concrete Pavement cum 2 647.000 1.000 0.280 362


Utility Crossing cum 6 9.300 1.650 0.280 26
Add 10% for Damage Panel Repairing cum 0.1 647.000 12.600 0.280 228
Total 616

21 polysuphide sealent Rmt 1 163.000 1.000 163

24a Dowel Bars Nos 36 3.000 108

22 Paver Block-80mm Thk Sqm 1 2014.990 2014.99


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -56 1.500 1.500 -126
1888.99
23 Paver Block-60mm Thk Sqm 1 420.040 420.04
Deduction of Tactile Tiles Sqm -1 150.000 -150
Total 270.04

24 Tactile tiles Sqm 2 250.000 0.3 150

25 Kerb Stone Rm 2 250.000 500

26 Rubble Soling
Utility Crossing Cum 6 9.300 1.650 0.230 21.18
OFC Chamber Cum 13 1.400 1.400 0.230 5.86
Electrical Chamber Cum 43 1.700 1.700 0.230 28.58
Water Chamber Cum 6 1.500 1.500 0.230 3.11
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 712.000 1.150 0.230 188.32
Cum 1 712.000 0.900 0.230 147.38
Total 394.43

27 PCC M15
Kerb Stone Cum 2 250.000 0.265 0.075 9.94
Utility Crossing Cum 6 9.30 1.650 0.100 9.21
OFC Chamber Cum 13 1.40 1.40 0.100 2.55
Electrical Chamber Cum 43 1.70 1.70 0.100 12.43
Water Chamber Cum 6 1.50 1.50 0.100 1.35
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 712.00 1.15 0.100 81.88
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cum 1 712.00 0.90 0.100 64.08
Total 181.44
28 RCC M25
a Raft
OFC Chamber Cum 13 1.200 1.200 0.150 2.81
Electrical Chamber Cum 43 1.500 1.500 0.150 14.51
Water Chamber Cum 6 1.300 1.300 0.150 1.52
SWD Cum 1 712.000 1.050 0.150 112.14
Cum 1 712.000 0.800 0.150 85.44
Total 216.42
b Wall
OFC Chamber Cum 13 4.800 0.150 1.000 9.36
Electrical Chamber Cum 43 6.000 0.150 1.500 58.05
Water Chamber Cum 6 5.200 0.150 1.000 4.68
SWD Cum 2 712.000 0.150 1.000 213.6
Cum 2 712.000 0.150 1.000 213.6
Total 499.00
c Slab
OFC Chamber Cum 13 1.200 1.200 0.150 2.81
Electrical Chamber Cum 43 1.500 1.500 0.150 14.51
Water Chamber Cum 6 1.300 1.300 0.150 1.52
Cover Deduction Cum -49 0.900 0.600 0.150 -3.969
Cover Deduction Cum -13 -0.400 -0.600 0.200 -0.624
SWD Cum 1 712.000 1.050 0.150 112.14
Cum 1 712.000 0.800 0.150 85.44
Cover Deduction Cum -285 0.600 0.450 0.150 -11.54
Total 200.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

29 Reinforcement
a Raft MT 110 kg/cum 24996.68
b Wall MT 100 kg/cum 52395.00
c Slab MT 95 kg/cum 19950.00
Total 97.34

30 RCC Np3 Class Pipe


600 mm dia Rmt 12 9.30 111.6

31 Painting Work
Edge Marking Line Sqm 2 647.000 0.15 194.1
Lane Marking / Other Markings Sqm 97.05
Zebra Crossing Sqm 2 9.600 3 28.8
Kerb Painting Sqm 2 250.000 0.3 150
Median Painting Sqm 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 16
Equilateral Triangle 16
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
Nos. 10
b Octagone size 10
c Informatory sign board Sqm 10 0.900 9

33 Stud with Lense Reflector Nos 2 36 72


Zebra crossing Nos 2 9.600 64
Total 136.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 647.00 10352.00
b 160 mm outer dia for HT & LT Cable Rmt 20 647.00 12940.00

35 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 43 43
600mm
Watersupply Manhole - Size-900mm x Nos 6 6
600mm
OFC Manhole - Size-400mm x 600mm Nos 13 13
36 FRP Perforated Cover
SWD Nos 285 285
37 Barrigates Rmt 2 129.4 259
R23 -Garden (Lakshmi Narayan Temple) to Hotel Tuljakrupa (Near Sardar Chowk)
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 257.00 1.600 1.500 617
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 5 5.500 1.650 1.500 68
SWD cum 1 251.000 0.800 1.480 297
cum 1 251.000 0.800 1.480 297
Rigid Pavement deduction cum -1 -463
Total 816

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 257.00 1.000 257
power roller

5 Dewatering Hour 1 26

Removing lime or lean cement concrete


6 Cum 2 77.10 1 0.15 23.13

7 Removing rich mix cement concrete Cum 2 77.10 1 0.1 15.42


8 Dismantling brick masonry Cum 2 77.10 0.8 0.23 28.3728
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 9 9
11 Removal of Paver Block sqm 1 257.00 2.80 719.6
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 1 257.00 6.00 0.300 463

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 257.000 1.000 0.500 0


Utility Crossing cum 5 5.500 1.65 1.200 54
54

16 selected hard murum filling cum 1 257.000 1.600 1.090 448


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -9 1.500 1.500 1.090 -22
Total 426
17 GSB cum 1 257.000 1.000 0.150 39
Utility Crossing cum 5 5.500 1.65 0.150 7
Cobble stone cum 1 257.000 7.200 0.150 277.56
Total 323.56

18 DLC cum 1 257.000 1.000 0.150 39


Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing cum 5 5.500 1.650 0.150 7
Cobble stone Cum 1 257.000 7.200 0.150 277.56
Total 324

19 Polyethylene (LDPE) sheet sqm


Utility Crossing sqm
Add 10% for Damage Panel Repairing sqm
Total 0

20 Cement Concrete Pavement cum 1 257.000 1.000 0


Utility Crossing cum 5 5.500 1.650 0
Add 10% for Damage Panel Repairing cum 0.1 257.000 8.800 0
Total 0

21 polysuphide sealent Rmt

24a Dowel Bars Nos

22 Paver Block-80mm Thk Sqm 1 257.000 0.000 0


0

23 Cobble stone Sqm 1 257.000 7.200 1850

23 Kerb Stone Rm 0 0

24 Rubble Soling
Utility Crossing Cum 5 5.500 1.650 0.230 10.44
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 9 1.700 1.700 0.230 5.98
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 251.000 1.150 0.230 66.39
Cum 1 251.000 1.150 0.230 66.39
Total 151.59

25 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 5 5.50 1.650 0.100 4.54
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 9 1.70 1.70 0.100 2.6
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 251.00 1.15 0.100 28.87
Cum 1 251.00 1.15 0.100 28.87
Total 65.92
26 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Sr. No. Description Unit No. Length Breadth Depth Quantity
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 251.000 1.050 0.150 39.53
Cum 1 251.000 1.050 0.150 39.53
Total 83.26
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 9 6.000 0.150 1.500 12.15
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 251.000 0.150 1.000 75.3
Cum 2 251.000 0.150 1.000 75.3
Total 166.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -11 0.900 0.600 0.150 -0.891
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 251.000 1.050 0.150 39.53
Cum 1 251.000 1.050 0.150 39.53
Cover Deduction Cum -100 0.600 0.450 0.150 -4.05
Total 78.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

27 Reinforcement
a Raft MT 110 kg/cum 9616.24
b Wall MT 100 kg/cum 17430.00
c Slab MT 95 kg/cum 7780.50
Total 34.83

28 RCC Np3 Class Pipe


600 mm dia Rmt 5 5.50 27.5

29 Painting Work
Edge Marking Line Sqm 2 257.000 0.15 77.1
Lane Marking / Other Markings Sqm 38.55
Zebra Crossing Sqm 5 5.800 3 43.5
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
30 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 2 0.900 1.8

31 Stud with Lense Reflector Nos 2 14 28


Zebra crossing Nos 5 5.800 97
Total 125.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
32 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 257.00 2056.00
b 160 mm outer dia for HT & LT Cable Rmt 10 257.00 2570.00

33 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 9 9
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 3 3
34 FRP Perforated Cover
SWD Nos 100 100
35 Barrigates Rmt 1 51.4 51
R24 -Ramkund to Hotel Tuljakrupa (Near Sardar Chowk)
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 252.00 1.600 1.500 605
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 3 4.800 1.650 1.500 36
SWD cum 1 255.000 0.800 1.480 302
cum 1 255.000 0.800 1.480 302
Flexible Pavement deduction cum -16
Total 1229

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 0
power roller

5 Dewatering Hour 1 25

Removing lime or lean cement concrete


6 Cum 2 75.60 1 0.15 22.68

7 Removing rich mix cement concrete Cum 2 75.60 1 0.1 15.12


8 Dismantling brick masonry Cum 2 75.60 0.8 0.23 27.8208
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 8 8
11 Removal of Paver Block sqm 1 252.00 3.70 932.4
12 Dismantling of flexible pavements
Bituminous courses cum 1 252.000 4.000 0.200 202
PaverBlock Area Deduction cum -1 932.400 0.200 -186
Total 16

13 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


14 Sqm 1 252.000 4.10 1033
surface

15 Subgrade cum 1 252.000 1.000 0.500 126


Utility Crossing cum 3 4.800 1.65 1.030 24
150

16 selected hard murum filling cum 1 252.000 1.600 1.090 439


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -8 1.500 1.500 1.090 -20
Total 419
17 GSB cum 1 252.000 1.000 0.150 38
Utility Crossing cum 3 4.800 1.65 0.150 4
Below Foothpath cum 1 781.400 0.150 117
159

18 WMM cum 1 252.000 1.000 0.250 63


Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing cum 3 4.800 1.650 0.250 6
69

19 DBM cum 1 252.000 3.300 0.050 42


Pot Holes / profile Correction 13

20 Prime Coat sqm 1 252.000 3.300 832

21 Tack Coat sqm 2 252.000 3.300 1663

22 Bituminous Concrete cum 1 252.000 3.300 0.040 33

23 DLC
Foothpath Cum 1 781.400 0.150 117.21
117

24 Polyethylene (LDPE) sheet sqm 0 0.000 0.000 0

25 Cement Concrete Pavement cum 1 0.280 0

26 polysuphide sealent Rmt 1 1.000 0.000 0

27 Paver Block-80mm Thk Sqm 1 252.000 3.200 806.4


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -11 1.500 1.500 -25
781.4

28 Kerb Stone Rm 0 252.000 0

29 Rubble Soling
Utility Crossing Cum 3 4.800 1.650 0.230 5.46
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 8 1.700 1.700 0.230 5.32
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 255.000 1.000 0.230 58.65
Cum 1 255.000 1.900 0.230 111.44
Total 183.26

30 PCC M15
Kerb Stone Cum 0 252.000 0.265 0.075 0
Utility Crossing Cum 3 4.80 1.650 0.100 2.38
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 8 1.70 1.70 0.100 2.31
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 255.00 1.00 0.100 25.5
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cum 1 255.00 1.90 0.100 48.45
Total 79.68
31 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 255.000 0.900 0.150 34.43
Cum 1 255.000 1.800 0.150 68.85
Total 107.13
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 8 6.000 0.150 1.500 10.8
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 255.000 0.150 1.000 76.5
Cum 2 255.000 0.150 1.000 76.5
Total 168.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -10 0.900 0.600 0.150 -0.81
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 255.000 0.900 0.150 34.43
Cum 1 255.000 1.800 0.150 68.85
Cover Deduction Cum -102 0.600 0.450 0.150 -4.13
Total 102.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

32 Reinforcement
a Raft MT 110 kg/cum 12373.52
b Wall MT 100 kg/cum 17640.00
c Slab MT 95 kg/cum 10174.50
Total 40.19

33 RCC Np3 Class Pipe


600 mm dia Rmt 6 4.80 28.8

34 Painting Work
Edge Marking Line Sqm 2 252.000 0.15 75.6
Lane Marking / Other Markings Sqm 37.8
Zebra Crossing Sqm 2 5.100 3 15.3
Kerb Painting Sqm 0 252.000 0.3 0
Median Painting Sqm 0 252.000 1 0
35 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 5 0.900 4.5

36 Stud with Lense Reflector Nos 2 14 28


Zebra crossing Nos 2 5.100 34
Total 62.00
37 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 252.00 2016.00
b 160 mm outer dia for HT & LT Cable Rmt 10 252.00 2520.00

38 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 8 8
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 3 3
39 FRP Perforated Cover
SWD Nos 102 102
40 Barrigates Rmt 1 50.4 50
R25 - Bansidhar Towers to Indira Gandhi Rugnalaya
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 158.00 1.600 1.500 379
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 2 4.600 1.650 1.500 23
SWD cum 1 181.000 0.800 1.330 193
cum 1 181.000 0.800 1.330 193
Flexible Pavement deduction cum 22
Total 810

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 0
power roller

5 Dewatering Hour 1 16

Removing lime or lean cement concrete


6 Cum 2 47.40 1 0.15 14.22

7 Removing rich mix cement concrete Cum 2 47.40 1 0.1 9.48


8 Dismantling brick masonry Cum 2 47.40 0.8 0.23 17.4432
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 5 5
11 Removal of Paver Block sqm 1 158.00 3.70 584.6
12 Dismantling of flexible pavements
Bituminous courses cum 1 158.000 3.000 0.200 95
PaverBlock Area Deduction cum -1 584.600 0.200 -117
Total -22

13 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


14 Sqm 1 158.000 4.90 774
surface

15 Subgrade cum 1 158.000 1.000 0.500 79


Utility Crossing cum 2 4.600 1.65 1.030 16
95

16 selected hard murum filling cum 1 158.000 1.600 1.090 276


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -5 1.500 1.500 1.090 -12
Total 264
17 GSB cum 1 158.000 1.000 0.150 24
Utility Crossing cum 2 4.600 1.65 0.150 2
Below Foothpath cum 1 438.810 0.150 66
92

18 WMM cum 1 158.000 1.000 0.250 40


Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing cum 2 4.600 1.650 0.250 4
44

19 DBM cum 1 158.000 3.800 0.050 30


Pot Holes / profile Correction 9

20 Prime Coat sqm 1 158.000 3.800 600

21 Tack Coat sqm 2 158.000 3.800 1201

22 Bituminous Concrete cum 1 158.000 3.800 0.040 24

23 DLC
Foothpath Cum 1 566.810 0.150 85.02
85

24 Polyethylene (LDPE) sheet sqm 0 0.000 0.000 0

25 Cement Concrete Pavement cum 1 0.280 0

26 polysuphide sealent Rmt 1 1.000 0.000 0

27 Paver Block-80mm Thk Sqm 1 454.810 454.81


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -7 1.500 1.500 -16
438.81
28 Paver Block-60mm Thk
Foothpath Area Sqm 1 128.000 128
Deduction of Tactile Tiles Sqm -1 21.000 -21
Total 107

29 Tactile tiles Sqm 1 70.000 0.3 21

30 Kerb Stone Rm 1 70.000 70

31 Rubble Soling
Utility Crossing Cum 2 4.600 1.650 0.230 3.49
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 5 1.700 1.700 0.230 3.32
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 181.000 0.900 0.230 37.47
Cum 1 181.000 0.900 0.230 37.47
Total 83.69

32 PCC M15
Kerb Stone Cum 1 70.000 0.265 0.075 1.39
Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing Cum 2 4.60 1.650 0.100 1.52
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 5 1.70 1.70 0.100 1.45
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 181.00 0.90 0.100 16.29
Cum 1 181.00 0.90 0.100 16.29
Total 37.78
33 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 181.000 0.800 0.00
Cum 1 181.000 0.800 0.00
Total 2.63
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 5 6.000 0.150 1.500 6.75
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 181.000 0.150 1.000 54.3
Cum 2 181.000 0.150 1.000 54.3
Total 118.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -7 0.900 0.600 0.150 -0.567
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 181.000 0.800 0.150 21.72
Cum 1 181.000 0.800 0.150 21.72
Cover Deduction Cum -72 0.600 0.450 0.150 -2.92
Total 42.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

34 Reinforcement
a Raft MT 110 kg/cum 303.36
b Wall MT 100 kg/cum 12390.00
c Slab MT 95 kg/cum 4189.50
Total 16.88

35 RCC Np3 Class Pipe


600 mm dia Rmt 4 4.60 18.4

36 Painting Work
Edge Marking Line Sqm 2 158.000 0.15 47.4
Lane Marking / Other Markings Sqm 23.7
Sr. No. Description Unit No. Length Breadth Depth Quantity
Zebra Crossing Sqm 2 4.900 3 14.7
Kerb Painting Sqm 1 70.000 0.3 21
Median Painting Sqm 0 0
37 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 5 0.900 4.5

38 Stud with Lense Reflector Nos 36 36


Zebra crossing Nos 2 4.900 33
Total 69.00
39 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 158.00 1264.00
b 160 mm outer dia for HT & LT Cable Rmt 10 158.00 1580.00

40 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 5 5
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
41 FRP Perforated Cover
SWD Nos 72 72
42 Barrigates Rmt 1 31.6 32
R26 - Malwiya Chowk to Panchwati Karanja
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 98.00 1.600 1.500 470
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 1 9.200 1.650 1.500 23
SWD cum 1 95.000 0.900 1.480 127
cum 1 95.000 0.900 1.480 127
Flexible Pavement deduction cum 5
Total 752

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 0
power roller

5 Dewatering Hour 1 10

Removing lime or lean cement concrete


6 Cum 2 29.40 1 0.15 8.82

7 Removing rich mix cement concrete Cum 2 29.40 1 0.1 5.88


8 Dismantling brick masonry Cum 2 29.40 0.8 0.23 10.8192
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 3 3
11 Removal of Paver Block sqm 1 98.00 8.50 833
12 Dismantling of flexible pavements
Bituminous courses cum 1 98.000 4.000 0.200 78
PaverBlock Area Deduction cum -0.5 833.000 0.200 -83
Total -5

13 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


14 Sqm 1 98.000 8.50 833
surface

15 Subgrade cum 2 98.000 1.000 0.500 98


Utility Crossing cum 1 9.200 1.65 1.030 16
114

16 selected hard murum filling cum 2 98.000 1.600 1.090 342


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -7 1.500 1.500 1.090 -17
Total 325
17 GSB cum 2 98.000 1.000 0.150 29
Utility Crossing cum 1 9.200 1.65 0.150 2
Below Foothpath cum 1 0.000 0.150 0
31

18 WMM cum 2 98.000 1.000 0.250 49


Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing cum 1 9.200 1.650 0.250 4
53

19 DBM cum 1 98.000 4.000 0.050 20


Pot Holes / profile Correction 6

20 Prime Coat sqm 1 98.000 4.000 392

21 Tack Coat sqm 2 98.000 4.000 784

22 Bituminous Concrete cum 1 98.000 4.000 0.040 16

23 DLC
Foothpath Cum 1 888.000 0.150 133.2
133
24 Polyethylene (LDPE) sheet sqm 0 0.000 0.000 0

25 Cement Concrete Pavement cum 1 0.280 0

26 polysuphide sealent Rmt 1 1.000 0.000 0

27 Paver Block-80mm Thk Sqm 0


0

28 Paver Block-60mm Thk


Foothpath Area Sqm 1 908.000 908
deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -9 1.500 1.500 -20
Deduction of Tactile Tiles Sqm -1 60.000 -60
Total 828

29 Tactile tiles Sqm 1 200.000 0.3 60

30 Kerb Stone Rm 1 200.000 200

31 Rubble Soling
Utility Crossing Cum 1 9.200 1.650 0.230 3.49
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 7 1.700 1.700 0.230 4.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 95.000 1.000 0.230 21.85
Cum 1 95.000 1.000 0.230 21.85
Total 53.78

32 PCC M15
Sr. No. Description Unit No. Length Breadth Depth Quantity
Kerb Stone Cum 1 200.000 0.265 0.075 3.98
Utility Crossing Cum 1 9.20 1.650 0.100 1.52
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 7 1.70 1.70 0.100 2.02
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 95.00 1.00 0.100 9.5
Cum 1 95.00 1.00 0.100 9.5
Total 27.36
33 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 95.000 0.900 0.150 12.83
Cum 1 95.000 0.900 0.150 12.83
Total 28.95
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 7 6.000 0.150 1.500 9.45
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 95.000 0.150 1.000 28.5
Cum 2 95.000 0.150 1.000 28.5
Total 69.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -9 0.900 0.600 0.150 -0.729
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 95.000 0.900 0.150 12.83
Cum 1 95.000 0.900 0.150 12.83
Cover Deduction Cum -38 0.600 0.450 0.150 -1.54
Total 27.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

34 Reinforcement
a Raft MT 110 kg/cum 3343.90
b Wall MT 100 kg/cum 7245.00
c Slab MT 95 kg/cum 2693.25
Total 13.28

35 RCC Np3 Class Pipe


600 mm dia Rmt 2 9.20 18.4

36 Painting Work
Edge Marking Line Sqm 2 98.000 0.15 29.4
Sr. No. Description Unit No. Length Breadth Depth Quantity
Lane Marking / Other Markings Sqm 14.7
Zebra Crossing Sqm 2 9.500 3 28.5
Kerb Painting Sqm 1 200.000 0.3 60
Median Painting Sqm 0 98.000 1 0
37 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 4 0.900 3.6

38 Stud with Lense Reflector Nos 23 23


Zebra crossing Nos 2 9.500 63
Total 86.00
HDPE pipe having corrugation on the
39 both Surface
a 63 mm outer dia for Control Rmt 16 98.00 1568.00
b 160 mm outer dia for HT & LT Cable Rmt 20 98.00 1960.00

40 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 7 7
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
41 FRP Perforated Cover
SWD Nos 38 38
41 Barrigates Rmt 2 19.6 39
R27 -Nag Chowk to Gajanan Chowk
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 105.00 1.600 1.500 252
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 2 6.400 1.650 1.500 32
Rigid Pavement deduction cum -1 105.000 1.600 0.300 -50
SWD cum 1 105.000 0.900 1.480 140
Total 374

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 105.00 8.1 851
power roller

5 Dewatering Hour 1 11

Removing lime or lean cement concrete


6 Cum 2 31.50 1 0.15 9.45

7 Removing rich mix cement concrete Cum 2 31.50 1 0.1 6.3


8 Dismantling brick masonry Cum 2 31.50 0.8 0.23 11.592
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 4 4
11 Removal of Paver Block sqm 1 105.00 4.70 493.5
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 1 105.00 5.00 0.300 158

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 105.000 5.500 0.500 0


Utility Crossing cum 2 6.400 1.65 0.920 19
19

16 selected hard murum filling cum 1 105.000 1.600 1.090 183


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -4 1.500 1.500 1.090 -10
Total 173
17 GSB cum 1 105.000 5.500 0.150 87
Utility Crossing cum 2 6.400 1.65 0.150 3
Below Foothpath cum 1 419.680 0.150 63
153

18 DLC cum 1 105.000 5.500 0.150 87


Foothpath Cum 1 419.680 0.150 62.95

Page 11 of 493
Sr. No. Description Unit No. Length Breadth Depth Quantity
150

19 Polyethylene (LDPE) sheet sqm 1 105.000 5.500 578

20 Cement Concrete Pavement cum 1 105.000 5.500 0.280 162

21 polysuphide sealent Rmt 1 27.000 5.500 148.5

24a Dowel Bars Nos 6 18.000 108

22 Paver Block-80mm Thk Sqm 1 430.680 430.68


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -5 1.500 1.500 -11
419.68

23 Kerb Stone Rm 0 0

24 Rubble Soling
Utility Crossing Cum 2 6.400 1.650 0.230 4.86
OFC Chamber Cum 1 1.400 1.400 0.230 0.45
Electrical Chamber Cum 4 1.700 1.700 0.230 2.66
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 105.000 1.000 0.230 24.15
Total 33.16

25 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 6.40 1.650 0.100 2.11
OFC Chamber Cum 1 1.40 1.40 0.100 0.2
Electrical Chamber Cum 4 1.70 1.70 0.100 1.16
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 105.00 1.00 0.100 10.5
Total 14.42
26 RCC M25
a Raft
OFC Chamber Cum 1 1.200 1.200 0.150 0.22
Electrical Chamber Cum 4 1.500 1.500 0.150 1.35
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 105.000 0.900 0.150 14.18
Total 16.25
b Wall
OFC Chamber Cum 1 4.800 0.150 1.000 0.72
Electrical Chamber Cum 4 6.000 0.150 1.500 5.4
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 105.000 0.150 1.000 31.5
Total 39.00
c Slab

Page 12 of 493
Sr. No. Description Unit No. Length Breadth Depth Quantity
OFC Chamber Cum 1 1.200 1.200 0.150 0.22
Electrical Chamber Cum 4 1.500 1.500 0.150 1.35
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -6 0.900 0.600 0.150 -0.486
Cover Deduction Cum -1 -0.400 -0.600 0.200 -0.048
SWD Cum 1 105.000 0.900 0.150 14.175
Cover Deduction Cum -21 0.600 0.600 0.150 -1.134
Total 15.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

27 Reinforcement
a Raft MT 110 kg/cum 1876.64
b Wall MT 100 kg/cum 4095.00
c Slab MT 95 kg/cum 1496.25
d Tie Bar MT 262.5 0.7 0.89 163.33
Total 7.63

28 RCC Np3 Class Pipe


600 mm dia Rmt 2 6.40 12.8

29 Painting Work
Edge Marking Line Sqm 2 105.000 0.15 31.5
Lane Marking / Other Markings Sqm 15.75
Zebra Crossing Sqm 2 6.700 3 20.1
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
30 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 3 0.900 2.7

31 Stud with Lense Reflector Nos 2 6 12


Zebra crossing Nos 2 6.700 45
Total 57.00
32 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 105.00 840.00
b 160 mm outer dia for HT & LT Cable Rmt 10 105.00 1050.00

33 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 4 4
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 1 1
34 FRP Perforated Cover
SWD Nos 21 21
35 Barrigates Rmt 1 21 21

Page 13 of 493
R28 -MG Road to takshila Raje Bahadur Lane to P & T Department
Sr. No. Description Unit No. Length Width Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 200.00 1.600 1.500 480
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 4 2.900 1.650 1.500 29
SWD cum 1 200.000 0.800 1.330 213
cum 1 200.000 0.800 1.330 213
Rigid Pavement deduction cum -1 200.000 1.600 0.300 -96
Total 839

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 200.00 4.6 920
power roller

5 Dewatering Hour 1 20

Removing lime or lean cement concrete


6 Cum 1 60.00 1 0.15 9

7 Removing rich mix cement concrete Cum 1 60.00 1 0.1 6


8 Dismantling brick masonry Cum 1 60.00 0.8 0.23 11.04
9 Dismantling stone masonry Cum 1 20
Removing all type of hume pipes and
10 stacking within a lead up to 1000 meters Rmt 4 6.20 24.8

11 Removal of telephone / Electric poles Nos 1 7 7


12 Removal of Paver Block sqm 1 200.00 2.0 400
13 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

14 Dismantling of cement concrete pavement Cum 1 200.00 4.20 0.300 252

Scarifying the existing granular road


15 Sqm 1 0
surface

16 Subgrade cum 0 200.000 2.800 0.500 0


Utility Crossing cum 4 2.900 1.65 0.920 18
18

17 selected hard murum filling cum 1 200.000 1.600 1.090 349


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -7 1.500 1.500 1.090 -17
Total 332
18 GSB cum 1 200.000 2.800 0.150 84
Utility Crossing cum 4 2.900 1.65 0.150 3
Below Foothpath cum 1 735.860 0.150 110
Sr. No. Description Unit No. Length Width Depth Quantity
197

19 DLC cum 1 200.000 2.800 0.150 84


Foothpath Cum 1 735.860 0.150 110.38
194

20 Polyethylene (LDPE) sheet sqm 1 200.000 2.800 560

21 Cement Concrete Pavement cum 1 200.000 2.8 0.280 157

22 polysuphide sealent Rmt 1 51.000 2.800 142.8

24a Dowel Bars Nos 11 9.000 99

23 Paver Block-80mm Thk Sqm 1 755.860 755.86


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -9 1.500 1.500 -20
735.86

24 Kerb Stone Rm 0 0

25 Rubble Soling
Utility Crossing Cum 4 2.900 1.650 0.230 4.4
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 7 1.700 1.700 0.230 4.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 200.000 1.000 0.230 46
Cum 1 200.000 1.000 0.230 46
Total 102.99

26 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 2.90 1.650 0.100 1.91
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 7 1.70 1.70 0.100 2.02
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 200.00 1.00 0.100 20
Cum 1 200.00 1.00 0.100 20
Total 44.77
27 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 200.000 0.900 0.00
Cum 1 200.000 0.900 0.00
Total 3.30
Sr. No. Description Unit No. Length Width Depth Quantity
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 7 6.000 0.150 1.500 9.45
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 200.000 0.150 1.000 60
Cum 2 200.000 0.150 1.000 60
Total 132.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -9 0.900 0.600 0.150 -0.729
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 200.000 0.900 0.150 27.00
Cum 1 200.000 0.900 0.150 27.00
Cover Deduction Cum -80 0.600 0.450 0.150 -3.24
Total 53.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

28 Reinforcement
a Raft MT 110 kg/cum 381.32
b Wall MT 100 kg/cum 13860.00
c Slab MT 95 kg/cum 5286.75
Total 19.53

29 RCC Np3 Class Pipe


600 mm dia Rmt 4 2.90 11.6

30 Painting Work
Edge Marking Line Sqm 2 200.000 0.15 60
Lane Marking / Other Markings Sqm 30
Zebra Crossing Sqm 2 3.200 3 9.6
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6

32 Stud with Lense Reflector Nos 2 11 22


Zebra crossing Nos 2 3.200 21
Total 43.00
33 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 200.00 1600.00
b 160 mm outer dia for HT & LT Cable Rmt 10 200.00 2000.00
Sr. No. Description Unit No. Length Width Depth Quantity
34 FRP Cover C\C
Electrical Manhole - Size-900mm x Nos 7 7
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
35 FRP Perforated Cover
SWD Nos 80 80
35 Barrigates Rmt 1 40 40
R29 -Hotel Uttam Palace to Indrakund
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 281.00 1.600 1.500 1349
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 3 11.700 1.650 1.500 87
SWD cum 1 281.000 0.700 1.480 291
cum 1 281.000 0.700 1.480 291
Rigid Pavement deduction cum -2 281.000 1.600 0.300 -270
Total 1748

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 281.00 1.000 281
power roller

5 Dewatering Hour 1 28

Removing lime or lean cement concrete


6 Cum 2 84.30 1 0.15 25.29

7 Removing rich mix cement concrete Cum 2 84.30 1 0.1 16.86


8 Dismantling brick masonry Cum 2 84.30 0.8 0.23 31.0224
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 9 9
11 Removal of Paver Block sqm 1 281.00 6.00 1686
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 2 281.00 2.60 0.300 438

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 281.000 1.000 0.500 0


Utility Crossing cum 3 11.700 1.65 0.920 53
53

16 selected hard murum filling cum 2 281.000 1.600 1.090 980


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -19 1.500 1.500 1.090 -47
Total 933
17 GSB cum 2 281.000 1.000 0.150 84
Utility Crossing cum 3 11.700 1.65 0.150 9
Below Foothpath cum 1 1059.010 0.150 159
Total 252

18 DLC cum 2 281.000 1.000 0.150 84


Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing cum 3 11.700 1.650 0.150 9
Add 10% for Damage Panel Repairing cum 0.1 281.000 15.000 0.150 63
Foothpath Cum 1 1003.010 0.150 150.45
Total 306.45

19 Polyethylene (LDPE) sheet sqm 2 281.000 1.000 562


Utility Crossing sqm 3 11.700 1.650 58
Add 10% for Damage Panel Repairing sqm 0.1 281.000 15.000 422
Total 1042

20 Cement Concrete Pavement cum 2 281.000 1.000 0.280 157


Utility Crossing cum 3 11.700 1.650 0.280 16
Add 10% for Damage Panel Repairing cum 0.1 281.000 15.000 0.280 118
Total 291

21 polysuphide sealent Rmt 1 71.000 1.000 71

21a Dowel Bars Nos 16 3.000 48

22 Paver Block-80mm Thk Sqm 0


0
23 Paver Block-60mm Thk Sqm 1 1059.010 1059.01
deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -25 1.500 1.500 -56
Deduction of Tactile Tiles Sqm -1 168.600 -168.6
Total 834.41

24 Tactile tiles Sqm 2 281.000 0.3 168.6

25 Kerb Stone Rm 1 1059.010 1060

26 Rubble Soling
Utility Crossing Cum 3 11.700 1.650 0.230 13.32
OFC Chamber Cum 6 1.400 1.400 0.230 2.70
Electrical Chamber Cum 19 1.700 1.700 0.230 12.63
Water Chamber Cum 3 1.500 1.500 0.230 1.55
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 281.000 1.150 0.230 74.32
Cum 1 281.000 1.150 0.230 74.32
Total 178.84

27 PCC M15
Kerb Stone Cum 1 1059.010 0.265 0.075 21.05
Utility Crossing Cum 3 11.70 1.650 0.100 5.79
OFC Chamber Cum 6 1.40 1.40 0.100 1.18
Electrical Chamber Cum 19 1.70 1.70 0.100 5.49
Water Chamber Cum 3 1.50 1.50 0.100 0.68
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 281.00 1.15 0.100 32.32
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cum 1 281.00 1.15 0.100 32.32
Total 98.83
28 RCC M25
a Raft
OFC Chamber Cum 6 1.200 1.200 0.150 1.30
Electrical Chamber Cum 19 1.500 1.500 0.150 6.41
Water Chamber Cum 3 1.300 1.300 0.150 0.76
SWD Cum 1 281.000 1.050 0.150 44.26
Cum 1 281.000 1.050 0.150 44.26
Total 96.98
b Wall
OFC Chamber Cum 6 4.800 0.150 1.000 4.32
Electrical Chamber Cum 19 6.000 0.150 1.500 25.65
Water Chamber Cum 3 5.200 0.150 1.000 2.34
SWD Cum 2 281.000 0.150 1.000 84.3
Cum 2 281.000 0.150 1.000 84.3
Total 201.00
c Slab
OFC Chamber Cum 6 1.200 1.200 0.150 1.30
Electrical Chamber Cum 19 1.500 1.500 0.150 6.41
Water Chamber Cum 3 1.300 1.300 0.150 0.76
Cover Deduction Cum -22 0.900 0.600 0.150 -1.782
Cover Deduction Cum -6 -0.400 -0.600 0.200 -0.288
SWD Cum 1 281.000 1.050 0.150 44.26
Cum 1 281.000 1.050 0.150 44.26
Cover Deduction Cum -112 0.600 0.450 0.150 -4.54
Total 90.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

29 Reinforcement
a Raft MT 110 kg/cum 11201.65
b Wall MT 100 kg/cum 21105.00
c Slab MT 95 kg/cum 8977.50
Total 41.28

30 RCC Np3 Class Pipe


600 mm dia Rmt 6 11.70 70.2

31 Painting Work
Edge Marking Line Sqm 2 281.000 0.15 84.3
Lane Marking / Other Markings Sqm 42.15
Zebra Crossing Sqm 2 12.000 3 36
Kerb Painting Sqm 1 1059.010 0.3 317.703
Median Painting Sqm 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 4 0.900 3.6

33 Stud with Lense Reflector Nos 32 32


Zebra crossing Nos 2 12.000 80
Total 112.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 281.00 4496.00
b 160 mm outer dia for HT & LT Cable Rmt 20 281.00 5620.00

35 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 19 19
600mm
Watersupply Manhole - Size-900mm x Nos 3 3
600mm
OFC Manhole - Size-400mm x 600mm Nos 6 6
36 FRP Perforated Cover
SWD Nos 112 112
37 Barrigates Rmt 2 56.2 112
R30 - Makhmanabad Naka to Malegaon Stand
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 345.00 1.600 1.500 1656
Light Pole cum 12 0.90 0.900 1.600 16
Utility Crossing cum 3 14.400 1.650 1.500 107
Flexible Pavement deduction cum 76
Total 1855

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 0
power roller

5 Dewatering Hour 1 35

Removing lime or lean cement concrete


6 Cum 2 103.50 1 0.15 31.05

7 Removing rich mix cement concrete Cum 2 103.50 1 0.1 20.7


8 Dismantling brick masonry Cum 2 103.50 0.8 0.23 38.088
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 12 12
11 Removal of Paver Block sqm 1 345.00 4.10 1414.5
12 Dismantling of flexible pavements
Bituminous courses cum 1 345.000 3.000 0.200 207
PaverBlock Area Deduction cum -1 1414.500 0.200 -283
Total -76

13 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


14 Sqm 1 345.000 14.70 5072
surface

15 Subgrade cum 2 345.000 1.000 0.500 345


Utility Crossing cum 3 14.400 1.65 1.030 73
418

16 selected hard murum filling cum 2 345.000 1.600 1.090 1203


deduction of pole cum -12 1.200 1.200 1.090 -19
deduction of Manhole cum -23 1.500 1.500 1.090 -56
Total 1128
17 GSB cum 2 345.000 1.000 0.150 104
Utility Crossing cum 3 14.400 1.65 0.150 11
Below Foothpath cum 1 0.000 0.150 0
115

18 WMM cum 2 345.000 1.000 0.250 173


Utility Crossing cum 3 14.400 1.650 0.250 18
191
Sr. No. Description Unit No. Length Breadth Depth Quantity

19 DBM cum 1 345.000 13.000 0.050 224


Pot Holes / profile Correction 67

20 Prime Coat sqm 1 345.000 13.000 4485

21 Tack Coat sqm 2 345.000 13.000 8970

22 Bituminous Concrete cum 1 345.000 13.000 0.040 179

23 DLC
Foothpath Cum 0 0.000 0.150 0
0

24 Polyethylene (LDPE) sheet sqm 0 0.000 0.000 0

25 Cement Concrete Pavement cum 1 0.280 0

26 polysuphide sealent Rmt 1 1.000 0.000 0

27 Paver Block-80mm Thk Sqm 0


0
28 Paver Block-60mm Thk
Foothpath Area Sqm 1 1898.000 1898
deduction of pole Sqm -12 1.200 1.200 -17
deduction of Manhole Sqm -30 1.500 1.500 -68
Deduction of Tactile Tiles Sqm -1 207.000 -207
Total 1606

29 Tactile tiles Sqm 2 345.000 0.3 207

30 Kerb Stone Rm 2 345.000 690

31 Rubble Soling
Utility Crossing Cum 3 14.400 1.650 0.230 16.39
OFC Chamber Cum 7 1.400 1.400 0.230 3.16
Electrical Chamber Cum 23 1.700 1.700 0.230 15.29
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 12 0.800 0.800 0.230 1.77
Total 37.65

32 PCC M15
Kerb Stone Cum 2 345.000 0.265 0.075 13.71
Utility Crossing Cum 3 14.40 1.650 0.100 7.13
OFC Chamber Cum 7 1.40 1.40 0.100 1.37
Electrical Chamber Cum 23 1.70 1.70 0.100 6.65
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Sr. No. Description Unit No. Length Breadth Depth Quantity
Light pole Cum 12 0.80 0.80 0.100 0.77
Total 30.08
33 RCC M25
a Raft
OFC Chamber Cum 7 1.200 1.200 0.150 1.51
Electrical Chamber Cum 23 1.500 1.500 0.150 7.76
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 9.78
b Wall
OFC Chamber Cum 7 4.800 0.150 1.000 5.04
Electrical Chamber Cum 23 6.000 0.150 1.500 31.05
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 38.00
c Slab
OFC Chamber Cum 7 1.200 1.200 0.150 1.51
Electrical Chamber Cum 23 1.500 1.500 0.150 7.76
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -25 0.900 0.600 0.150 -2.025
Cover Deduction Cum -7 -0.400 -0.600 0.200 -0.336
Total 7.00
d Pole Foundation Cum 12 0.600 0.600 1.500 6.48

34 Reinforcement
a Raft MT 110 kg/cum 1129.76
b Wall MT 100 kg/cum 3990.00
c Slab MT 95 kg/cum 698.25
Total 5.82

35 RCC Np3 Class Pipe


600 mm dia Rmt 6 14.40 86.4

36 Painting Work
Edge Marking Line Sqm 4 345.000 0.15 207
Lane Marking / Other Markings Sqm 103.5
Zebra Crossing Sqm 6 14.700 3 132.3
Kerb Painting Sqm 2 345.000 0.3 207
Median Painting Sqm 2 345.000 1 690
37 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 6
b Octagone size 6
c Informatory sign board Sqm 8 0.900 7.2

38 Stud with Lense Reflector Nos 2 19.000 38


Zebra crossing Nos 6 14.700 294
Total 332.00
39 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 345.00 5520.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
b 160 mm outer dia for HT & LT Cable Rmt 20 345.00 6900.00

40 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 23 23
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 7 7
41 FRP Perforated Cover
SWD Nos 0 0
42 Barrigates Rmt 2 69 138
R31 - Veterinary hospital to Gharpure Ghat
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 244.00 1.600 1.500 586
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 2 3.100 1.650 1.500 15
SWD cum 1 250.000 0.700 1.480 259

Flexible Pavement deduction cum -244


Total 616

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 244.00 4.8 1171
power roller

5 Dewatering Hour 1 24

Removing lime or lean cement concrete


6 Cum 2 73.20 1 0.15 21.96

7 Removing rich mix cement concrete Cum 2 73.20 1 0.1 14.64


8 Dismantling brick masonry Cum 2 73.20 0.8 0.23 26.9376
9 Dismantling stone masonry Cum 1 20
Removing all type of hume pipes and
10 stacking within a lead up to 1000 meters Rmt 5 6.40 32

11 Removal of telephone / Electric poles Nos 1 8 8


12 Removal of Paver Block sqm 1 244.00 1.40 341.6
13 Dismantling of flexible pavements
Bituminous courses cum 1 244.000 6.400 0.200 312
PaverBlock Area Deduction cum -1 341.600 0.200 -68
Total 244

14 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


15 Sqm 1 0
surface

16 Subgrade cum 0 244.000 3.700 0.500 0


Utility Crossing cum 2 3.100 1.65 0.880 9
9

17 selected hard murum filling cum 1 244.000 1.600 1.090 426


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -16 1.500 1.500 1.090 -39
Total 387
18 GSB cum 1 244.000 3.700 0.150 135
Utility Crossing cum 2 3.100 1.65 0.150 2
Below Foothpath cum 1 1298.100 0.150 195
Sr. No. Description Unit No. Length Breadth Depth Quantity
332

19 WMM cum 2 0.000 0.250 0


Utility Crossing cum 2 3.100 1.650 0.250 3
3

20 DBM cum 1 0.000 13.600 0.050 0


Pot Holes / profile Correction 0

21 Prime Coat sqm 1 0.000 13.600 0

22 Tack Coat sqm 1 0.000 13.600 0

23 Bituminous Concrete cum 1 0.000 13.600 0.040 0

24 DLC cum 1 244.000 3.700 0.150 135


Foothpath Cum 1 1298.100 0.150 194.72
330

25 Polyethylene (LDPE) sheet sqm 1 244.000 3.700 903

26 Cement Concrete Pavement cum 1 244.000 3.700 0.280 253

27 polysuphide sealent Rmt 1 62.000 3.700 229.4

27a Dowel Bars Nos 14 12.000 168

28 Paver Block-80mm Thk Sqm 1 1345.100 1345.1


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -21 1.500 1.500 -47
1298.1

29 Kerb Stone Rm 0 0

30 Rubble Soling
Utility Crossing Cum 2 3.100 1.650 0.230 2.35
OFC Chamber Cum 5 1.400 1.400 0.230 2.25
Electrical Chamber Cum 16 1.700 1.700 0.230 10.64
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 250.000 1.000 0.230 57.50
Cum 1 250.000 1.000 0.230 57.50
Total 131.28

31 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 3.10 1.650 0.100 1.02
Sr. No. Description Unit No. Length Breadth Depth Quantity
OFC Chamber Cum 5 1.40 1.40 0.100 0.98
Electrical Chamber Cum 16 1.70 1.70 0.100 4.62
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 250.00 1.00 0.100 25.00
Cum 1 250.00 1.00 0.100 25.00
Total 57.07
32 RCC M25
a Raft
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 16 1.500 1.500 0.150 5.40
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 250.000 0.900 0.150 33.75
Cum 1 250.000 0.900 0.150 33.75
Total 74.49
b Wall
OFC Chamber Cum 5 4.800 0.150 1.000 3.6
Electrical Chamber Cum 16 6.000 0.150 1.500 21.6
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 250.000 0.150 1.000 75
Cum 2 250.000 0.150 1.000 75
Total 177.00
c Slab
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 16 1.500 1.500 0.150 5.40
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -18 0.900 0.600 0.150 -1.458
Cover Deduction Cum -5 -0.400 -0.600 0.200 -0.24
SWD Cum 1 250.000 0.900 0.150 33.75
Cum 1 250.000 0.900 0.150 33.75
Cover Deduction Cum -100 0.600 0.450 0.150 -4.05
Total 69.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

33 Reinforcement
a Raft MT 110 kg/cum 8603.25
b Wall MT 100 kg/cum 18585.00
c Slab MT 95 kg/cum 6882.75
Total 34.07

34 RCC Np3 Class Pipe


600 mm dia Rmt 4 3.10 12.4

35 Painting Work
Edge Marking Line Sqm 2 244.000 0.15 73.2
Lane Marking / Other Markings Sqm 36.6
Zebra Crossing Sqm 2 3.400 3 10.2
Sr. No. Description Unit No. Length Breadth Depth Quantity
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
36 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 5 0.900 4.5

37 Stud with Lense Reflector Nos 0 0


Zebra crossing Nos 2 3.400 23
Total 23.00
38 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 244.00 3904.00
b 160 mm outer dia for HT & LT Cable Rmt 20 244.00 4880.00

39 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 16 16
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 5 5
40 FRP Perforated Cover
SWD Nos 100 100
40 Barrigates Rmt 1 48.8 49
R32 -Ashok Stambh to Nandadeep
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 178.00 1.600 1.500 854
Light Pole cum 6 0.90 0.900 1.600 8
Utility Crossing cum 2 11.700 1.650 1.500 58
Rigid Pavement deduction cum -2 178.000 1.600 0.300 -171
Total 749

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 2 178.00 1.000 356
power roller

5 Dewatering Hour 1 18

Removing lime or lean cement concrete


6 Cum 2 53.40 1 0.15 16.02

7 Removing rich mix cement concrete Cum 2 53.40 1 0.1 10.68


8 Dismantling brick masonry Cum 2 53.40 0.8 0.23 19.6512
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 6 6
11 Removal of Paver Block sqm 1 178.00 6.00 1068
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 2 178.00 2.60 0.300 278

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 178.000 1.000 0.500 0


Utility Crossing cum 2 11.700 1.65 0.920 36
36

16 selected hard murum filling cum 2 178.000 1.600 1.090 621


deduction of pole cum -6 1.200 1.200 1.090 -9
deduction of Manhole cum -12 1.500 1.500 1.090 -29
Total 583
17 GSB cum 2 178.000 1.000 0.150 53
Utility Crossing cum 2 11.700 1.65 0.150 6
Below Foothpath cum 1 787.810 0.150 118
Total 177

18 DLC cum 2 178.000 1.000 0.150 53


Utility Crossing cum 2 11.700 1.650 0.150 6
Add 10% for Damage Panel Repairing cum 0.1 178.000 15.000 0.150 40
Sr. No. Description Unit No. Length Breadth Depth Quantity
Foothpath Cum 1 742.810 0.150 111.42
Total 210

19 Polyethylene (LDPE) sheet sqm 2 178.000 1.000 356


Utility Crossing sqm 2 11.700 1.650 39
Add 10% for Damage Panel Repairing sqm 0.1 178.000 15.000 267
Total 662

20 Cement Concrete Pavement cum 2 178.000 1.000 0.280 100


Utility Crossing cum 2 11.700 1.650 0.280 11
Add 10% for Damage Panel Repairing cum 0.1 178.000 15.000 0.280 75
Total 186

21 polysuphide sealent Rmt 1 46.000 1.000 46

22 Paver Block-80mm Thk Sqm 0


0
23 Paver Block-60mm Thk Sqm 1 787.810 787.81
deduction of pole Sqm -6 1.200 1.200 -9
deduction of Manhole Sqm -16 1.500 1.500 -36
Deduction of Tactile Tiles Sqm -1 106.800 -106.8
Total 636.01

24 Tactile tiles Sqm 2 178.000 0.3 106.8

25 Kerb Stone Rm 2 178.000 356

26 Rubble Soling
Utility Crossing Cum 2 11.700 1.650 0.230 8.88
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 12 1.700 1.700 0.230 7.98
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 6 0.800 0.800 0.230 0.88
Total 20.58

27 PCC M15
Kerb Stone Cum 2 178.000 0.265 0.075 7.08
Utility Crossing Cum 2 11.70 1.650 0.100 3.86
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 12 1.70 1.70 0.100 3.47
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 6 0.80 0.80 0.100 0.38
Total 16.02
28 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 12 1.500 1.500 0.150 4.05
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 5.42
Sr. No. Description Unit No. Length Breadth Depth Quantity
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 12 6.000 0.150 1.500 16.2
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 21.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 12 1.500 1.500 0.150 4.05
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -14 0.900 0.600 0.150 -1.134
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
Total 4.00
d Pole Foundation Cum 6 0.600 0.600 1.500 3.24

29 Reinforcement
a Raft MT 110 kg/cum 626.13
b Wall MT 100 kg/cum 2205.00
c Slab MT 95 kg/cum 399.00
Total 3.23

30 RCC Np3 Class Pipe


600 mm dia Rmt 4 11.70 46.8

31 Painting Work
Edge Marking Line Sqm 2 178.000 0.15 53.4
Lane Marking / Other Markings Sqm 26.7
Zebra Crossing Sqm 2 12.000 3 36
Kerb Painting Sqm 2 178.000 0.3 106.8
Median Painting Sqm 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 4 0.900 3.6

33 Stud with Lense Reflector Nos 21 21


Zebra crossing Nos 2 12.000 80
Total 101.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 178.00 2848.00
b 160 mm outer dia for HT & LT Cable Rmt 20 178.00 3560.00

35 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 12 12
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 4 4
Sr. No. Description Unit No. Length Breadth Depth Quantity
36 FRP Perforated Cover
SWD Nos 0 0
37 Barrigates Rmt 2 35.6 71
R33 -Shanta Park to Deshdut Karyalay
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 240.00 1.600 1.500 1152
Light Pole cum 8 0.90 0.900 1.600 10
Utility Crossing cum 2 9.700 1.650 1.500 48
SWD cum 1 240.000 0.800 1.480 284
Rigid Pavement deduction cum -2 240.000 1.600 0.300 -230
Total 1264

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 240.00 1.000 240
power roller

5 Dewatering Hour 1 24

Removing lime or lean cement concrete


6 Cum 2 72.00 1 0.15 21.6

7 Removing rich mix cement concrete Cum 2 72.00 1 0.1 14.4


8 Dismantling brick masonry Cum 2 72.00 0.8 0.23 26.496
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 8 8
11 Removal of Paver Block sqm 1 240.00 6.00 1440
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 2 240.00 2.60 0.300 374

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 240.000 1.000 0.500 0


Utility Crossing cum 2 9.700 1.65 0.920 29
29

16 selected hard murum filling cum 2 240.000 1.600 1.090 837


deduction of pole cum -8 1.200 1.200 1.090 -13
deduction of Manhole cum -16 1.500 1.500 1.090 -39
Total 785
17 GSB cum 2 240.000 1.000 0.150 72
Utility Crossing cum 2 9.700 1.65 0.150 5
Below Foothpath cum 1 1444.170 0.150 217
Total 294

18 DLC cum 2 240.000 1.000 0.150 72


Utility Crossing cum 2 9.700 1.650 0.150 5
Sr. No. Description Unit No. Length Breadth Depth Quantity
Add 10% for Damage Panel Repairing cum 0.1 240.000 13.000 0.150 47
Foothpath Cum 1 1444.170 0.150 216.63
Total 340.63

19 Polyethylene (LDPE) sheet sqm 2 240.000 1.000 480


Utility Crossing sqm 2 9.700 1.650 32
Add 10% for Damage Panel Repairing sqm 0.1 240.000 13.000 312
Total 824

20 Cement Concrete Pavement cum 2 240.000 1.000 0.280 134


Utility Crossing cum 2 9.700 1.650 0.280 9
Add 10% for Damage Panel Repairing cum 0.1 240.000 13.000 0.280 87
Total 230

21 polysuphide sealent Rmt 1 61.000 1.000 61

22 Paver Block-80mm Thk Sqm 0


0
23 Paver Block-60mm Thk Sqm 1 1444.170 1444.17
deduction of pole Sqm -8 1.200 1.200 -12
deduction of Manhole Sqm -21 1.500 1.500 -47
Deduction of Tactile Tiles Sqm -1 144.000 -144
Total 1241.17

24 Tactile tiles Sqm 2 240.000 0.3 144

24 Kerb Stone Rm 2 240.000 480

25 Rubble Soling
Utility Crossing Cum 2 9.700 1.650 0.230 7.36
OFC Chamber Cum 5 1.400 1.400 0.230 2.25
Electrical Chamber Cum 16 1.700 1.700 0.230 10.64
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 8 0.800 0.800 0.230 1.18
SWD Cum 1 240.000 1.000 0.230 55.2
Total 77.67

26 PCC M15
Kerb Stone Cum 2 240.000 0.265 0.075 9.54
Utility Crossing Cum 2 9.70 1.650 0.100 3.2
OFC Chamber Cum 5 1.40 1.40 0.100 0.98
Electrical Chamber Cum 16 1.70 1.70 0.100 4.62
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 8 0.80 0.80 0.100 0.51
SWD Cum 1 240.00 1.00 0.100 24
Total 43.3
27 RCC M25
a Raft
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Sr. No. Description Unit No. Length Breadth Depth Quantity
Electrical Chamber Cum 16 1.500 1.500 0.150 5.40
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 240.000 0.900 0.150 32.40
Total 39.39
b Wall
OFC Chamber Cum 5 4.800 0.150 1.000 3.6
Electrical Chamber Cum 16 6.000 0.150 1.500 21.6
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 240.000 0.150 1.000 72
Total 99.00
c Slab
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 16 1.500 1.500 0.150 5.40
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -18 0.900 0.600 0.150 -1.458
Cover Deduction Cum -5 -0.400 -0.600 0.200 -0.24
SWD Cum 1 240.000 0.900 0.200 43.2
Cover Deduction Cum -48 0.600 0.450 0.150 -1.944
Total 47.00
d Pole Foundation Cum 8 0.600 0.600 1.500 4.32

28 Reinforcement
a Raft MT 110 kg/cum 4549.20
b Wall MT 100 kg/cum 10395.00
c Slab MT 95 kg/cum 4688.25
Total 19.63

29 RCC Np3 Class Pipe


600 mm dia Rmt 4 9.70 38.8

30 Painting Work
Edge Marking Line Sqm 2 240.000 0.15 72
Lane Marking / Other Markings Sqm 36
Zebra Crossing Sqm 6 10.000 3 90
Kerb Painting Sqm 2 240.000 0.3 144
Median Painting Sqm 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 4 0.900 3.6

32 Stud with Lense Reflector Nos 28 28


Zebra crossing Nos 6 10.000 200
Total 228.00
33 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 240.00 3840.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
b 160 mm outer dia for HT & LT Cable Rmt 20 240.00 4800.00

34 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 16 16
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 5 5
35 FRP Perforated Cover
SWD Nos 48 48
36 Barrigates Rmt 2 48 96
R34 -Dhatrak Cornere to Hotel Panchvati
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 215.00 1.600 1.500 516
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 4 2.800 1.650 1.500 28
SWD cum 1 222.000 0.700 1.480 230
cum 1 222.000 0.700 1.480 230
Rigid Pavement deduction cum -1 215.000 1.600 0.300 -103
Total 901

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 215.00 4.5 968
power roller

5 Dewatering Hour 1 22

Removing lime or lean cement concrete


6 Cum 2 64.50 1 0.15 19.35

7 Removing rich mix cement concrete Cum 2 64.50 1 0.1 12.9


8 Dismantling brick masonry Cum 2 64.50 0.8 0.23 23.736
9 Dismantling stone masonry Cum 1 20
Removing all type of hume pipes and
10 stacking within a lead up to 1000 meters Rmt 4 6.10 24.4

11 Removal of telephone / Electric poles Nos 1 7 7


12 Removal of Paver Block sqm 1 215.00 1.1 236.5
13 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

14 Dismantling of cement concrete pavement Cum 1 215.00 5.00 0.300 323

Scarifying the existing granular road


15 Sqm 1 0
surface

16 Subgrade cum 0 215.000 3.100 0.500 0


Utility Crossing cum 4 2.800 1.65 0.920 17
17

17 selected hard murum filling cum 1 215.000 1.600 1.090 375


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -7 1.500 1.500 1.090 -17
Total 358
18 GSB cum 1 215.000 3.100 0.150 100
Utility Crossing cum 4 2.800 1.65 0.150 3
Below Foothpath cum 1 324.000 0.150 49
Sr. No. Description Unit No. Length Breadth Depth Quantity
152

19 DLC cum 1 215.000 3.100 0.150 100


Foothpath Cum 1 324.000 0.150 48.6
149

20 Polyethylene (LDPE) sheet sqm 1 215.000 3.100 667

21 Cement Concrete Pavement cum 1 215.000 3.100 0.280 187

22 polysuphide sealent Rmt 1 55.000 3.100 170.5

24a Dowel Bars Nos 12 10.000 120

23 Paver Block-80mm Thk Sqm 1 215.000 1.600 344


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -9 1.500 1.500 -20
324

24 Kerb Stone Rm 0 0

25 Rubble Soling
Utility Crossing Cum 4 2.800 1.650 0.230 4.25
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 7 1.700 1.700 0.230 4.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 222.000 0.900 0.230 45.95
Cum 1 222.000 0.900 0.230 45.95
Total 102.74

26 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 2.80 1.650 0.100 1.85
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 7 1.70 1.70 0.100 2.02
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 222.00 0.90 0.100 19.98
Cum 1 222.00 0.90 0.100 19.98
Total 44.67
27 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 222.000 0.800 0.150 26.64
Cum 1 222.000 0.800 0.150 26.64
Total 56.58
Sr. No. Description Unit No. Length Breadth Depth Quantity
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 7 6.000 0.150 1.500 9.45
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 222.000 0.150 1.000 66.6
Cum 2 222.000 0.150 1.000 66.6
Total 146.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -9 0.900 0.600 0.150 -0.729
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 222.000 0.800 0.150 26.64
Cum 1 222.000 0.800 0.150 26.64
Cover Deduction Cum -89 0.600 0.450 0.150 -3.60
Total 52.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

28 Reinforcement
a Raft MT 110 kg/cum 6535.16
b Wall MT 100 kg/cum 15330.00
c Slab MT 95 kg/cum 5187.00
d Tie Bar MT 537.5 0.7 0.89 334.44
Total 27.39

29 RCC Np3 Class Pipe


600 mm dia Rmt 4 2.80 11.2

30 Painting Work
Edge Marking Line Sqm 2 215.000 0.15 64.5
Lane Marking / Other Markings Sqm 32.25
Zebra Crossing Sqm 6 3.100 3 27.9
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6

32 Stud with Lense Reflector Nos 2 12 24


Zebra crossing Nos 6 3.100 62
Total 86.00
33 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 215.00 1720.00
b 160 mm outer dia for HT & LT Cable Rmt 10 215.00 2150.00
Sr. No. Description Unit No. Length Breadth Depth Quantity

34 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 7 7
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
35 FRP Perforated Cover
SWD Nos 89 89
36 Barrigates Rmt 1 43 43
R35 -Chandvadkar Ice Factory to Red Cross
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 111.00 1.600 1.500 533
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 1 6.500 1.650 1.500 16
SWD cum 1 105.000 0.800 1.480 124
cum 1 105.000 0.800 1.480 124
Rigid Pavement deduction cum -2 111.000 1.600 0.300 -107
Total 690

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 111.00 1.000 111
power roller

5 Dewatering Hour 1 11

Removing lime or lean cement concrete


6 Cum 2 33.30 1 0.15 9.99

7 Removing rich mix cement concrete Cum 2 33.30 1 0.1 6.66


8 Dismantling brick masonry Cum 2 33.30 0.8 0.23 12.2544
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 4 4
11 Removal of Paver Block sqm 1 111.00 3.80 421.8
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 2 111.00 2.60 0.300 173

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 111.000 1.000 0.500 0


Utility Crossing cum 1 6.500 1.65 0.920 10
10

16 selected hard murum filling cum 2 111.000 1.600 1.090 387


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -7 1.500 1.500 1.090 -17
Total 370
17 GSB cum 2 111.000 1.000 0.150 33
Utility Crossing cum 1 6.500 1.65 0.150 2
Below Foothpath cum 1 406.350 0.150 61
Total 96

18 DLC cum 2 111.000 1.000 0.150 33


Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing cum 1 6.500 1.650 0.150 2
Add 10% for Damage Panel Repairing cum 0.1 111.000 9.800 0.150 16
Foothpath Cum 1 386.350 0.150 57.95
Total 108.95

19 Polyethylene (LDPE) sheet sqm 2 111.000 1.000 222


Utility Crossing sqm 1 6.500 1.650 11
Add 10% for Damage Panel Repairing sqm 0.1 111.000 9.800 109
Total 342

20 Cement Concrete Pavement cum 2 111.000 1.000 0.280 62


Utility Crossing cum 1 6.500 1.650 0.280 3
Add 10% for Damage Panel Repairing cum 0.1 111.000 9.800 0.280 30
Total 95

21 polysuphide sealent Rmt 1 29.000 1.000 29

22 Paver Block-80mm Thk Sqm 0


0
23 Paver Block-60mm Thk Sqm 1 406.350 406.35
deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -9 1.500 1.500 -20
Deduction of Tactile Tiles Sqm -1 66.600 -66.6
Total 319.75

24 Tactile tiles Sqm 2 111.000 0.3 66.6

25 Kerb Stone Rm 1 111.000 111

26 Rubble Soling
Utility Crossing Cum 1 6.500 1.650 0.230 2.47
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 7 1.700 1.700 0.230 4.65
Water Chamber Cum 1 1.500 1.500 0.230 0.52
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 105.000 1.000 0.230 24.15
Cum 1 105.000 1.000 0.230 24.15
Total 56.84

27 PCC M15
Kerb Stone Cum 1 111.000 0.265 0.075 2.21
Utility Crossing Cum 1 6.50 1.650 0.100 1.07
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 7 1.70 1.70 0.100 2.02
Water Chamber Cum 1 1.50 1.50 0.100 0.23
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 105.00 1.00 0.100 10.50
Cum 1 105.00 1.00 0.100 10.50
Total 26.92
Sr. No. Description Unit No. Length Breadth Depth Quantity
28 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 1 1.300 1.300 0.150 0.25
SWD Cum 1 105.000 0.900 0.150 14.18
Cum 1 105.000 0.900 0.150 14.18
Total 31.40
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 7 6.000 0.150 1.500 9.45
Water Chamber Cum 1 5.200 0.150 1.000 0.78
SWD Cum 2 105.000 0.150 1.000 31.5
Cum 2 105.000 0.150 1.000 31.5
Total 75.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 1 1.300 1.300 0.150 0.25
Cover Deduction Cum -8 0.900 0.600 0.150 -0.648
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 105.000 0.900 0.150 14.18
Cum 1 105.000 0.900 0.150 14.18
Cover Deduction Cum -42 0.600 0.450 0.150 -1.70
Total 29.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

29 Reinforcement
a Raft MT 110 kg/cum 3626.47
b Wall MT 100 kg/cum 7875.00
c Slab MT 95 kg/cum 2892.75
Total 14.39

30 RCC Np3 Class Pipe


600 mm dia Rmt 2 6.50 13

31 Painting Work
Edge Marking Line Sqm 2 111.000 0.15 33.3
Lane Marking / Other Markings Sqm 16.65
Zebra Crossing Sqm 2 6.800 3 20.4
Kerb Painting Sqm 1 111.000 0.3 33.3
Median Painting Sqm 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 3 0.900 2.7
Sr. No. Description Unit No. Length Breadth Depth Quantity

33 Stud with Lense Reflector Nos 13 13


Zebra crossing Nos 2 6.800 45
Total 58.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 111.00 1776.00
b 160 mm outer dia for HT & LT Cable Rmt 20 111.00 2220.00

35 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 7 7
600mm
Watersupply Manhole - Size-900mm x Nos 1 1
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
36 FRP Perforated Cover
SWD Nos 42 42
36 Barrigates Rmt 2 22.2 44
R36 -Red Cross to M.G. Road
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 120.00 1.600 1.500 576
Light Pole cum 4 0.90 0.900 1.600 5
Utility Crossing cum 1 9.100 1.650 1.500 23
Rigid Pavement deduction cum -2 120.000 1.600 0.300 -115
Total 489

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 120.00 1.000 120
power roller

5 Dewatering Hour 1 12

Removing lime or lean cement concrete


6 Cum 1 36.00 1 0.15 5.4

7 Removing rich mix cement concrete Cum 1 36.00 1 0.1 3.6


8 Dismantling brick masonry Cum 1 36.00 0.8 0.23 6.624
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 4 4
11 Removal of Paver Block sqm 1 120.00 2.40 288
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 2 120.00 2.60 0.300 187

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 120.000 1.000 0.500 0


Utility Crossing cum 1 9.100 1.65 0.920 14
14

16 selected hard murum filling cum 2 120.000 1.600 1.090 419


deduction of pole cum -4 1.200 1.200 1.090 -6
deduction of Manhole cum -8 1.500 1.500 1.090 -20
Total 393
17 GSB cum 2 120.000 1.000 0.150 36
Utility Crossing cum 1 9.100 1.65 0.150 2
Below Foothpath cum 1 590.510 0.150 89
Total 127

18 DLC cum 2 120.000 1.000 0.150 36


Utility Crossing cum 1 9.100 1.650 0.150 2
Add 10% for Damage Panel Repairing cum 0.1 120.000 12.400 0.150 22
Sr. No. Description Unit No. Length Breadth Depth Quantity
Foothpath Cum 1 590.510 0.150 88.58
Total 148.58

19 Polyethylene (LDPE) sheet sqm 2 120.000 1.000 240


Utility Crossing sqm 1 9.100 1.650 15
Add 10% for Damage Panel Repairing sqm 0.1 120.000 12.400 149
Total 404

20 Cement Concrete Pavement cum 2 120.000 1.000 0.280 67


Utility Crossing cum 1 9.100 1.650 0.280 4
Add 10% for Damage Panel Repairing cum 0.1 120.000 12.400 0.280 42
Total 113

21 polysuphide sealent Rmt 1 31.000 1.000 31

22 Paver Block-80mm Thk Sqm 1 231.610 231.61


deduction of pole Sqm -4 1.200 1.200 -6
deduction of Manhole Sqm -10 1.500 1.500 -23
202.61
23 Paver Block-60mm Thk Sqm 1 387.900 387.9
Deduction of Tactile Tiles Sqm -1 72.000 -72
Total 315.9

24 Tactile tiles Sqm 2 120.000 0.3 72

24 Kerb Stone Rm 2 120.000 240

25 Rubble Soling
Utility Crossing Cum 1 9.100 1.650 0.230 3.45
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 8 1.700 1.700 0.230 5.32
Water Chamber Cum 1 1.500 1.500 0.230 0.52
Light pole Cum 4 0.800 0.800 0.230 0.59
Total 10.78

26 PCC M15
Kerb Stone Cum 2 120.000 0.265 0.075 4.77
Utility Crossing Cum 1 9.10 1.650 0.100 1.5
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 8 1.70 1.70 0.100 2.31
Water Chamber Cum 1 1.50 1.50 0.100 0.23
Light pole Cum 4 0.80 0.80 0.100 0.26
Total 9.46
27 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 1 1.300 1.300 0.150 0.25
Total 3.39
Sr. No. Description Unit No. Length Breadth Depth Quantity
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 8 6.000 0.150 1.500 10.8
Water Chamber Cum 1 5.200 0.150 1.000 0.78
Total 13.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 1 1.300 1.300 0.150 0.25
Cover Deduction Cum -9 0.900 0.600 0.150 -0.729
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
Total 3.00
d Pole Foundation Cum 4 0.600 0.600 1.500 2.16

28 Reinforcement
a Raft MT 110 kg/cum 391.03
b Wall MT 100 kg/cum 1365.00
c Slab MT 95 kg/cum 299.25
Total 2.06

29 RCC Np3 Class Pipe


600 mm dia Rmt 2 9.10 18.2

30 Painting Work
Edge Marking Line Sqm 2 120.000 0.15 36
Lane Marking / Other Markings Sqm 18
Zebra Crossing Sqm 2 9.400 3 28.2
Kerb Painting Sqm 2 120.000 0.3 72
Median Painting Sqm 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 3 0.900 2.7

32 Stud with Lense Reflector Nos 14 14


Zebra crossing Nos 2 9.400 63
Total 77.00
33 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 120.00 1920.00
b 160 mm outer dia for HT & LT Cable Rmt 20 120.00 2400.00

34 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 8 8
600mm
Watersupply Manhole - Size-900mm x Nos 1 1
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
Sr. No. Description Unit No. Length Breadth Depth Quantity
35 FRP Perforated Cover
SWD Nos 0 0
35 Barrigates Rmt 2 24 48
R37 -M.G. Chowk to Raviwar Karanja
Sr. No. Description Unit No. Length Breadth Depth Quantity

1 Dismantling of cement concrete pavement Cum 1 38.60 15.10 0.300 175

10% of Existing road for perpose of


provision only (Total length of road 386
Rmt)
Scarifying the existing granular road
2 Sqm 1 0
surface

3 DLC
Add 10% for Damage Panel Repairing cum 1 38.600 15.100 0.150 87
Total 87

4 Polyethylene (LDPE) sheet


Add 10% for Damage Panel Repairing sqm 1 38.600 15.100 583
Total 583

5 Cement Concrete Pavement


Add 10% for Damage Panel Repairing cum 1 38.600 15.100 0.280 163
Total 163

6 polysuphide sealent Rmt 1 11.000 15.100 166.1

7 Paver Block-80mm Thk


Add 10% for Damage Panel Repairing Sqm 1 38.600 4.000 154
154
8 Paver Block-60mm Thk
Foothpath Area Sqm 1 2109.210 2109.21
Deduction of Tactile Tiles Sqm -1 228.000 -228
Total 1881.21

9 Tactile tiles Sqm 2 380.000 0.3 228

10 Kerb Stone Rmt 2 380.000 760

11 Painting Work
Edge Marking Line Sqm 2 386.000 0.15 115.8
Lane Marking / Other Markings Sqm 57.9
Zebra Crossing Sqm 6 12.100 3 108.9
Kerb Painting Sqm 2 380.000 0.2 152
Median Painting Sqm 0
12 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 5 0.900 4.5
Sr. No. Description Unit No. Length Breadth Depth Quantity
13 Stud with Lense Reflector Nos 2 21.0 42
Zebra crossing Nos 2 12.100 81
Total 123.00
14 Barrigates Rmt 2 76 152
R38 -Mohan Talim Sangha to Raviwar Karanja
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 578.00 1.600 1.500 2774
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 6 6.500 1.650 1.500 97
SWD cum 1 578.000 0.800 1.480 684
cum 1 578.000 0.800 1.480 684
Rigid Pavement deduction cum -2 578.000 1.600 0.300 -555
Total 3684

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 578.00 1.000 578
power roller

5 Dewatering Hour 1 58

Removing lime or lean cement concrete


6 Cum 2 173.40 1 0.15 52.02

7 Removing rich mix cement concrete Cum 2 173.40 1 0.1 34.68


8 Dismantling brick masonry Cum 2 173.40 0.8 0.23 63.8112
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 19 19
11 Removal of Paver Block sqm 1 578.00 3.80 2196.4
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 2 578.00 2.60 0.300 902

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 578.000 1.000 0.500 0


Utility Crossing cum 6 6.500 1.65 0.920 59
59

16 selected hard murum filling cum 2 578.000 1.600 1.090 2016


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -39 1.500 1.500 1.090 -96
Total 1920
17 GSB cum 2 578.000 1.000 0.150 173
Utility Crossing cum 6 6.500 1.65 0.150 10
Below Foothpath cum 1 3584.200 0.150 538
Total 721

18 DLC cum 2 578.000 1.000 0.150 173


Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing cum 6 6.500 1.650 0.150 10
Add 10% for Damage Panel Repairing cum 0.1 578.000 9.800 0.150 85
Foothpath Cum 1 3584.200 0.150 537.63
Total 805.63

19 Polyethylene (LDPE) sheet sqm 2 578.000 1.000 1156


Utility Crossing sqm 6 6.500 1.650 64
Add 10% for Damage Panel Repairing sqm 0.1 578.000 9.800 566
Total 1786

20 Cement Concrete Pavement cum 2 578.000 1.000 0.280 324


Utility Crossing cum 6 6.500 1.650 0.280 18
Add 10% for Damage Panel Repairing cum 0.1 578.000 9.800 0.280 159
Total 501

21 polysuphide sealent Rmt 1 146.000 1.000 146

24a Dowel Bars Nos 32 3.000 96

22 Paver Block-80mm Thk Sqm 2 578.000 3.200 3699.2


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -51 1.500 1.500 -115
3584.2
23 Paver Block-60mm Thk Sqm 0

24 Kerb Stone Rm 0 0.000 0

25 Rubble Soling
Utility Crossing Cum 6 6.500 1.650 0.230 14.8
OFC Chamber Cum 12 1.400 1.400 0.230 5.41
Electrical Chamber Cum 39 1.700 1.700 0.230 25.92
Water Chamber Cum 6 1.500 1.500 0.230 3.11
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 578.000 1.150 0.230 152.88
Cum 1 578.000 1.150 0.230 152.88
Total 355

26 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 6 6.50 1.650 0.100 6.44
OFC Chamber Cum 12 1.40 1.40 0.100 2.35
Electrical Chamber Cum 39 1.70 1.70 0.100 11.27
Water Chamber Cum 6 1.50 1.50 0.100 1.35
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 578.00 1.15 0.100 66.47
Cum 1 578.00 1.15 0.100 66.47
Total 154.35
27 RCC M25
a Raft
Sr. No. Description Unit No. Length Breadth Depth Quantity
OFC Chamber Cum 12 1.200 1.200 0.150 2.59
Electrical Chamber Cum 39 1.500 1.500 0.150 13.16
Water Chamber Cum 6 1.300 1.300 0.150 1.52
SWD Cum 1 578.000 1.050 0.150 91.04
Cum 1 578.000 1.050 0.150 91.04
Total 199.35
b Wall
OFC Chamber Cum 12 4.800 0.150 1.000 8.64
Electrical Chamber Cum 39 6.000 0.150 1.500 52.65
Water Chamber Cum 6 5.200 0.150 1.000 4.68
SWD Cum 2 578.000 0.150 1.000 173.4
Cum 2 578.000 0.150 1.000 173.4
Total 413.00
c Slab
OFC Chamber Cum 12 1.200 1.200 0.150 2.59
Electrical Chamber Cum 39 1.500 1.500 0.150 13.16
Water Chamber Cum 6 1.300 1.300 0.150 1.52
Cover Deduction Cum -45 0.900 0.600 0.150 -3.645
Cover Deduction Cum -12 -0.400 -0.600 0.200 -0.576
SWD Cum 1 578.000 1.050 0.150 91.04
Cum 1 578.000 1.050 0.150 91.04
Cover Deduction Cum -231 0.600 0.450 0.150 -9.36
Total 186.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

28 Reinforcement
a Raft MT 110 kg/cum 23024.41
b Wall MT 100 kg/cum 43365.00
c Slab MT 95 kg/cum 18553.50
Total 84.94

29 RCC Np3 Class Pipe


600 mm dia Rmt 12 6.50 78

30 Painting Work
Edge Marking Line Sqm 2 578.000 0.15 173.4
Lane Marking / Other Markings Sqm 86.7
Zebra Crossing Sqm 2 6.800 3 20.4
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 8
b Octagone size 8
c Informatory sign board Sqm 6 0.900 5.4

32 Stud with Lense Reflector Nos 65 65


Sr. No. Description Unit No. Length Breadth Depth Quantity
Zebra crossing Nos 2 6.800 45
Total 110.00
33 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 578.00 9248.00
b 160 mm outer dia for HT & LT Cable Rmt 20 578.00 11560.00

34 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 39 39
600mm
Watersupply Manhole - Size-900mm x Nos 6 6
600mm
OFC Manhole - Size-400mm x 600mm Nos 12 12
35 FRP Perforated Cover
SWD Nos 231 231
36 Barrigates Rmt 2 115.6 231
R39 -Meher Signal to Sudarshan (Main Road)
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 530.00 1.600 1.500 2544
Light Pole cum 18 0.90 0.900 1.600 23
Utility Crossing cum 5 8.000 1.650 1.500 99
SWD cum 1 535.000 0.800 1.480 633
Rigid Pavement deduction cum -2 530.000 1.600 0.300 -509
Total 2790

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 530.00 1.000 530
power roller

5 Dewatering Hour 1 53

Removing lime or lean cement concrete


6 Cum 2 159.00 1 0.15 47.7

7 Removing rich mix cement concrete Cum 2 159.00 1 0.1 31.8


8 Dismantling brick masonry Cum 2 159.00 0.8 0.23 58.512
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 18 18
11 Removal of Paver Block sqm 1 530.00 3.70 1961
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 2 530.00 2.60 0.300 827

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 530.000 1.000 0.500 0


Utility Crossing cum 5 8.000 1.65 0.920 61
61

16 selected hard murum filling cum 2 530.000 1.600 1.090 1849


deduction of pole cum -18 1.200 1.200 1.090 -28
deduction of Manhole cum -35 1.500 1.500 1.090 -86
Total 1735
17 GSB cum 2 530.000 1.000 0.150 159
Utility Crossing cum 5 8.000 1.65 0.150 10
Below Foothpath cum 1 3474.000 0.150 521
Total 690

18 DLC cum 2 530.000 1.000 0.150 159


Utility Crossing cum 5 8.000 1.650 0.150 10
Sr. No. Description Unit No. Length Breadth Depth Quantity
Add 10% for Damage Panel Repairing cum 0.1 530.000 11.300 0.150 90
Foothpath Cum 1 3474.000 0.150 521.1
Total 780.1

19 Polyethylene (LDPE) sheet sqm 2 530.000 1.000 1060


Utility Crossing sqm 5 8.000 1.650 66
Add 10% for Damage Panel Repairing sqm 0.1 530.000 11.300 599
Total 1725

20 Cement Concrete Pavement cum 2 530.000 1.000 0.280 297


Utility Crossing cum 5 8.000 1.650 0.280 18
Add 10% for Damage Panel Repairing cum 0.1 530.000 11.300 0.280 168
Total 483

21 polysuphide sealent Rmt 1 134.000 1.000 134

24a Dowel Bars Nos 30 3.000 90

22 Paver Block-80mm Thk Sqm 2 530.000 3.400 3604


deduction of pole Sqm -18 1.200 1.200 -26
deduction of Manhole Sqm -46 1.500 1.500 -104
3474
23 Paver Block-60mm Thk Sqm 0

24 Kerb Stone Rm 0 0.000 0

25 Rubble Soling
Utility Crossing Cum 5 8.000 1.650 0.230 15.18
OFC Chamber Cum 11 1.400 1.400 0.230 4.96
Electrical Chamber Cum 35 1.700 1.700 0.230 23.26
Water Chamber Cum 5 1.500 1.500 0.230 2.59
Light pole Cum 18 0.800 0.800 0.230 2.65
SWD Cum 1 535.000 1.000 0.230 123.05
Total 171.69

26 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 5 8.00 1.650 0.100 6.6
OFC Chamber Cum 11 1.40 1.40 0.100 2.16
Electrical Chamber Cum 35 1.70 1.70 0.100 10.12
Water Chamber Cum 5 1.50 1.50 0.100 1.13
Light pole Cum 18 0.80 0.80 0.100 1.15
SWD Cum 1 535.00 1.00 0.100 53.5
Total 74.66
27 RCC M25
a Raft
OFC Chamber Cum 11 1.200 1.200 0.150 2.38
Electrical Chamber Cum 35 1.500 1.500 0.150 11.81
Water Chamber Cum 5 1.300 1.300 0.150 1.27
Sr. No. Description Unit No. Length Breadth Depth Quantity
SWD Cum 1 535.000 0.900 0.150 72.23
Total 87.68
b Wall
OFC Chamber Cum 11 4.800 0.150 1.000 7.92
Electrical Chamber Cum 35 6.000 0.150 1.500 47.25
Water Chamber Cum 5 5.200 0.150 1.000 3.90
SWD Cum 2 535.000 0.150 1.000 160.5
Total 220.00
c Slab
OFC Chamber Cum 11 1.200 1.200 0.150 2.38
Electrical Chamber Cum 35 1.500 1.500 0.150 11.81
Water Chamber Cum 5 1.300 1.300 0.150 1.27
Cover Deduction Cum -40 0.900 0.600 0.150 -3.24
Cover Deduction Cum -11 -0.400 -0.600 0.200 -0.53
SWD Cum 1 535.000 0.900 0.150 72.225
Cover Deduction Cum -107 0.600 0.450 0.150 -4.33
Total 80.00
d Pole Foundation Cum 18 0.600 0.600 1.500 9.72

28 Reinforcement
a Raft MT 110 kg/cum 10127.16
b Wall MT 100 kg/cum 23100.00
c Slab MT 95 kg/cum 7980.00
Total 41.21

29 RCC Np3 Class Pipe


600 mm dia Rmt 10 8.00 80

30 Painting Work
Edge Marking Line Sqm 2 530.000 0.15 159
Lane Marking / Other Markings Sqm 79.5
Zebra Crossing Sqm 2 8.300 3 24.9
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 15
Equilateral Triangle 15
Cautionary/Warning sign boards in
Nos. 8
b Octagone size 8
c Informatory sign board Sqm 6 0.900 5.4

32 Stud with Lense Reflector Nos 60 60


Zebra crossing Nos 2 8.300 55
Total 115.00
33 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 530.00 8480.00
b 160 mm outer dia for HT & LT Cable Rmt 20 530.00 10600.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
34 FRP Cover C\C
Electrical Manhole - Size-900mm x Nos 35 35
600mm
Watersupply Manhole - Size-900mm x Nos 5 5
600mm
OFC Manhole - Size-400mm x 600mm Nos 11 11
35 FRP Perforated Cover
SWD Nos 107 107
36 Barrigates Rmt 2 106 212
R40 -Sudarshan (main road) to Gadge Maharaj Bridge
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 424.00 1.600 1.500 1018
Light Pole cum 14 0.90 0.900 1.600 18
Utility Crossing cum 8 6.200 1.650 1.500 123
SWD cum 1 424.000 0.700 1.480 439
Rigid Pavement deduction cum -1 424.000 1.600 0.300 -204
Total 1394

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

4 strutting & shoring Sqm 2 84.800 1.50 254

Compacting the existing Subgrade with


5 Sqm 1 424.00 7.9 3350
power roller

6 Dewatering Hour 1 42

Removing lime or lean cement concrete


7 Cum 2 127.20 1 0.15 38.16

8 Removing rich mix cement concrete Cum 2 127.20 1 0.1 25.44


9 Dismantling brick masonry Cum 2 127.20 0.8 0.23 46.81
10 Dismantling stone masonry Cum 1 20
11 Removal of telephone / Electric poles Nos 1 14 14
12 Removal of Paver Block sqm 1 424.00 2.5 1060
13 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

14 Dismantling of cement concrete pavement Cum 1 424.00 7.00 0.300 890

Scarifying the existing granular road


15 Sqm 1 0
surface

16 Subgrade cum 0 424.000 6.300 0.500 0


Utility Crossing cum 8 6.200 1.65 0.920 75
75

17 selected hard murum filling cum 1 424.000 1.600 1.090 739


deduction of pole cum -14 1.200 1.200 1.090 -22
deduction of Manhole cum -14 1.500 1.500 1.090 -34
Total 683
18 GSB cum 1 424.000 6.300 0.150 401
Utility Crossing cum 8 6.200 1.65 0.150 12
Below Foothpath cum 1 999.000 0.150 150
563
Sr. No. Description Unit No. Length Breadth Depth Quantity
19 DLC cum 1 424.000 6.300 0.150 401
Foothpath Cum 1 999.000 0.150 149.85
551

20 Polyethylene (LDPE) sheet sqm 1 424.000 6.300 2671

21 Cement Concrete Pavement cum 1 424.000 6.300 0.280 748

22 polysuphide sealent Rmt 1 107.000 6.300 674.1

24a Dowel Bars Nos 24 21.000 504

23 Paver Block-80mm Thk Sqm 1 424.000 2.500 1060


deduction of pole Sqm -14 1.200 1.200 -20
deduction of Manhole Sqm -18 1.500 1.500 -41
999

24 Kerb Stone Rm 0 0

25 Rubble Soling
Utility Crossing Cum 8 6.200 1.650 0.230 18.82
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 14 1.700 1.700 0.230 9.31
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 14 0.800 0.800 0.230 2.06
SWD Cum 1 424.000 1.150 0.230 112.15
Total 145.18

26 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 8 6.20 1.650 0.100 8.18
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 14 1.70 1.70 0.100 4.05
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 14 0.80 0.80 0.100 0.9
SWD Cum 1 424.00 1.15 0.100 48.76
Total 63.12
27 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 14 1.500 1.500 0.150 4.73
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 424.000 1.050 0.150 66.78
Total 72.88
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 14 6.000 0.150 1.500 18.9
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 1 424.000 0.150 1.000 63.6
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 87.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 14 1.500 1.500 0.150 4.73
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -16 0.900 0.600 0.150 -1.296
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
SWD Cum 1 424.000 1.050 0.150 66.78
Cover Deduction Cum -85 0.600 0.450 0.150 -3.44
Total 68.00
d Pole Foundation Cum 14 0.600 0.600 1.500 7.56

28 Reinforcement
a Raft MT 110 kg/cum 8417.18
b Wall MT 100 kg/cum 9135.00
c Slab MT 95 kg/cum 6783.00
d Tie Bar MT 1060 0.7 0.89 659.56
Total 25.00

29 RCC Np3 Class Pipe


600 mm dia Rmt 8 6.20 49.6

30 Painting Work
Edge Marking Line Sqm 2 424.000 0.15 127.2
Lane Marking / Other Markings Sqm 63.6
Zebra Crossing Sqm 2 6.500 3 19.5
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 20
Equilateral Triangle 20
Cautionary/Warning sign boards in
Nos. 10
b Octagone size 10
c Informatory sign board Sqm 5 0.900 4.5

32 Stud with Lense Reflector Nos 2 24 48


Zebra crossing Nos 2 6.500 43
Total 91.00
33 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 424.00 3392.00
b 160 mm outer dia for HT & LT Cable Rmt 10 424.00 4240.00

34 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 14 14
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 4 4
35 FRP Perforated Cover
Sr. No. Description Unit No. Length Breadth Depth Quantity
SWD Nos 85 85
36 Barrigates Rmt 1 84.8 85
R41 -Panchwati Karanja to Dindori Naka
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 340.00 1.600 1.500 1632
Light Pole cum 11 0.90 0.900 1.600 14
Utility Crossing cum 3 16.400 1.650 1.500 122
Rigid Pavement deduction cum -2 340.000 1.600 0.300 -326
Total 1442

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 340.00 1.000 340
power roller

5 Dewatering Hour 1 34

Removing lime or lean cement concrete


6 Cum 2 102.00 1 0.15 30.6

7 Removing rich mix cement concrete Cum 2 102.00 1 0.1 20.4


8 Dismantling brick masonry Cum 2 102.00 0.8 0.23 37.536
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 11 11
11 Removal of Paver Block sqm 1 340.00 4.10 1394
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 2 340.00 2.60 0.300 530

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 340.000 1.000 0.500 0


Utility Crossing cum 3 16.400 1.65 0.920 75
75

16 selected hard murum filling cum 2 340.000 1.600 1.090 1186


deduction of pole cum -11 1.200 1.200 1.090 -17
deduction of Manhole cum -23 1.500 1.500 1.090 -56
Total 1113
17 GSB cum 2 340.000 1.000 0.150 102
Utility Crossing cum 3 16.400 1.65 0.150 12
Below Foothpath cum 1 2697.200 0.150 405
Total 519

18 DLC cum 2 340.000 1.000 0.150 102


Utility Crossing cum 3 16.400 1.650 0.150 12
Add 10% for Damage Panel Repairing cum 0.1 340.000 19.700 0.150 100
Sr. No. Description Unit No. Length Breadth Depth Quantity
Foothpath Cum 1 2697.200 0.150 404.58
Total 618.58

19 Polyethylene (LDPE) sheet sqm 2 340.000 1.000 680


Utility Crossing sqm 3 16.400 1.650 81
Add 10% for Damage Panel Repairing sqm 0.1 340.000 19.700 670
Total 1431

20 Cement Concrete Pavement cum 2 340.000 1.000 0.280 190


Utility Crossing cum 3 16.400 1.650 0.280 23
Add 10% for Damage Panel Repairing cum 0.1 340.000 19.700 0.280 188
Total 401

21 polysuphide sealent Rmt 1 86.000 1.000 86

24a Dowel Bars Nos 19 3.000 57

22 Paver Block-80mm Thk Sqm 2 340.000 4.090 2781.2


deduction of pole Sqm -11 1.200 1.200 -16
deduction of Manhole Sqm -30 1.500 1.500 -68
2697.2
23 Paver Block-60mm Thk Sqm 0

24 Kerb Stone Rm 0 0.000 0

25 Rubble Soling
Utility Crossing Cum 3 16.400 1.650 0.230 18.67
OFC Chamber Cum 7 1.400 1.400 0.230 3.16
Electrical Chamber Cum 23 1.700 1.700 0.230 15.29
Water Chamber Cum 3 1.500 1.500 0.230 1.55
Light pole Cum 11 0.800 0.800 0.230 1.62
Total 40.29

26 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 3 16.40 1.650 0.100 8.12
OFC Chamber Cum 7 1.40 1.40 0.100 1.37
Electrical Chamber Cum 23 1.70 1.70 0.100 6.65
Water Chamber Cum 3 1.50 1.50 0.100 0.68
Light pole Cum 11 0.80 0.80 0.100 0.7
Total 17.52
27 RCC M25
a Raft
OFC Chamber Cum 7 1.200 1.200 0.150 1.51
Electrical Chamber Cum 23 1.500 1.500 0.150 7.76
Water Chamber Cum 3 1.300 1.300 0.150 0.76
Total 10.04
b Wall
OFC Chamber Cum 7 4.800 0.150 1.000 5.04
Sr. No. Description Unit No. Length Breadth Depth Quantity
Electrical Chamber Cum 23 6.000 0.150 1.500 31.05
Water Chamber Cum 3 5.200 0.150 1.000 2.34
Total 38.00
c Slab
OFC Chamber Cum 7 1.200 1.200 0.150 1.51
Electrical Chamber Cum 23 1.500 1.500 0.150 7.76
Water Chamber Cum 3 1.300 1.300 0.150 0.76
Cover Deduction Cum -26 0.900 0.600 0.150 -2.106
Cover Deduction Cum -7 -0.400 -0.600 0.200 -0.336
Total 8.00
d Pole Foundation Cum 11 0.600 0.600 1.500 5.94

28 Reinforcement
a Raft MT 110 kg/cum 1159.04
b Wall MT 100 kg/cum 3990.00
c Slab MT 95 kg/cum 798.00
Total 5.95

29 RCC Np3 Class Pipe


600 mm dia Rmt 6 16.40 98.4

30 Painting Work
Edge Marking Line Sqm 2 340.000 0.15 102
Lane Marking / Other Markings Sqm 51
Zebra Crossing Sqm 2 16.700 3 50.1
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 340.000 1 680
31 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 4 0.900 3.6

32 Stud with Lense Reflector Nos 39 39


Zebra crossing Nos 2 16.700 111
Total 150.00
33 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 340.00 5440.00
b 160 mm outer dia for HT & LT Cable Rmt 20 340.00 6800.00

34 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 23 23
600mm
Watersupply Manhole - Size-900mm x Nos 3 3
600mm
OFC Manhole - Size-400mm x 600mm Nos 7 7
35 FRP Perforated Cover
SWD Nos 0 0
Sr. No. Description Unit No. Length Breadth Depth Quantity
36 Barrigates Rmt 2 68 136
R42 -Tivandha Chowk to Kajipura Road
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 396.00 1.600 1.500 950
Light Pole cum 13 0.90 0.900 1.600 17
Utility Crossing cum 8 3.200 1.650 1.500 63
Rigid Pavement deduction cum -1 -309
Total 721

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 396.00 1.000 396
power roller

5 Dewatering Hour 1 40

Removing lime or lean cement concrete


6 Cum 2 118.80 1 0.15 35.64

7 Removing rich mix cement concrete Cum 2 118.80 1 0.1 23.76


8 Dismantling brick masonry Cum 2 118.80 0.8 0.23 43.7184
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 13 13
11 Removal of Paver Block sqm 1 396.00 3.80 1504.8
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 1 396.00 2.60 0.300 309

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 396.000 1.000 0.500 0


Utility Crossing cum 8 3.200 1.65 0.920 39
39

16 selected hard murum filling cum 1 396.000 1.600 1.090 691


deduction of pole cum -13 1.200 1.200 1.090 -20
deduction of Manhole cum -13 1.500 1.500 1.090 -32
Total 639
17 GSB cum 1 396.000 1.000 0.150 59
Utility Crossing cum 8 3.200 1.65 0.150 6
Below Foothpath cum 1 1606.200 0.150 241
Total 306

18 DLC cum 1 396.000 1.000 0.150 59


Utility Crossing cum 8 3.200 1.650 0.150 6
Add 10% for Damage Panel Repairing cum 0.1 396.000 6.500 0.150 39
Sr. No. Description Unit No. Length Breadth Depth Quantity
Foothpath Cum 1 1606.200 0.150 240.93
Total 344.93

19 Polyethylene (LDPE) sheet sqm 1 396.000 1.000 396


Utility Crossing sqm 8 3.200 1.650 42
Add 10% for Damage Panel Repairing sqm 0.1 396.000 6.500 257
Total 695

20 Cement Concrete Pavement cum 1 396.000 1.000 0.280 111


Utility Crossing cum 8 3.200 1.650 0.280 12
Add 10% for Damage Panel Repairing cum 0.1 396.000 6.500 0.280 72
Total 195

21 polysuphide sealent Rmt 1 100.000 1.000 100

22 Paver Block-80mm Thk Sqm 1 396.000 4.200 1663.2


deduction of pole Sqm -13 1.200 1.200 -19
deduction of Manhole Sqm -17 1.500 1.500 -38
1606.2

23 Kerb Stone Rm 0 0

24 Rubble Soling
Utility Crossing Cum 8 3.200 1.650 0.230 9.72
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 13 1.700 1.700 0.230 8.64
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 13 0.800 0.800 0.230 1.91
Total 23.11

25 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 8 3.20 1.650 0.100 4.22
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 13 1.70 1.70 0.100 3.76
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 13 0.80 0.80 0.100 0.83
Total 10.04
26 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 13 1.500 1.500 0.150 4.39
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 5.76
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 13 6.000 0.150 1.500 17.55
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 22.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 13 1.500 1.500 0.150 4.39
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -15 0.900 0.600 0.150 -1.215
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
Total 4.00
d Pole Foundation Cum 13 0.600 0.600 1.500 7.02

27 Reinforcement
a Raft MT 110 kg/cum 665.11
b Wall MT 100 kg/cum 2310.00
c Slab MT 95 kg/cum 399.00
Total 3.37

28 RCC Np3 Class Pipe


600 mm dia Rmt 8 3.20 25.6

29 Painting Work
Edge Marking Line Sqm 2 396.000 0.15 118.8
Lane Marking / Other Markings Sqm 59.4
Zebra Crossing Sqm 1 3.500 3 5.25
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
30 Signages
Cautionary/Warning sign boards in
a Nos. 16
Equilateral Triangle 16
Cautionary/Warning sign boards in
Nos. 6
b Octagone size 6
c Informatory sign board Sqm 10 0.900 9

31 Stud with Lense Reflector Nos 2 22 44


Zebra crossing Nos 1 3.500 12
Total 56.00
32 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 396.00 3168.00
b 160 mm outer dia for HT & LT Cable Rmt 10 396.00 3960.00

33 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 13 13
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 4 4
34 FRP Perforated Cover
SWD Nos 0 0
35 Barrigates Rmt 1 79.2 79
R43 - Makhmanabad Naka to Malegaon Stand
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 564.00 1.600 1.500 2707
Light Pole cum 19 0.90 0.900 1.600 25
Utility Crossing cum 6 21.700 1.650 1.500 322
Flexible Pavement deduction cum 11
Total 3065

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 0
power roller

5 Dewatering Hour 1 56

Removing lime or lean cement concrete


6 Cum 2 169.20 1 0.15 50.76

7 Removing rich mix cement concrete Cum 2 169.20 1 0.1 33.84


8 Dismantling brick masonry Cum 2 169.20 0.8 0.23 62.2656
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 19 19
11 Removal of Paver Block sqm 1 564.00 4.10 2312.4
12 Dismantling of flexible pavements
Bituminous courses cum 1 564.000 4.000 0.200 451
PaverBlock Area Deduction cum -1 2312.400 0.200 -462
Total -11

13 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


14 Sqm 1 564.000 21.00 11844
surface

15 Subgrade cum 2 564.000 1.000 0.500 564


Utility Crossing cum 6 21.700 1.65 1.030 221
785

16 selected hard murum filling cum 2 564.000 1.600 1.090 1967


deduction of pole cum -19 1.200 1.200 1.090 -30
deduction of Manhole cum -38 1.500 1.500 1.090 -93
Total 1844
17 GSB cum 2 564.000 1.000 0.150 169
Utility Crossing cum 6 21.700 1.65 0.150 32
Below Foothpath cum 1 2231.800 0.150 335
536

18 WMM cum 2 564.000 1.000 0.250 282


Utility Crossing cum 6 21.700 1.650 0.250 54
Sr. No. Description Unit No. Length Breadth Depth Quantity
336

19 DBM cum 1 564.000 17.800 0.050 502


Pot Holes / profile Correction 151

20 Prime Coat sqm 1 564.000 17.800 10039

21 Tack Coat sqm 2 564.000 17.800 20078

22 Bituminous Concrete cum 1 564.000 17.800 0.040 402

23 DLC
Foothpath Cum 1 3923.800 0.150 588.57
589

24 Polyethylene (LDPE) sheet sqm 0 0.000 0.000 0

25 Cement Concrete Pavement cum 1 0.280 0

26 polysuphide sealent Rmt 1 1.000 0.000 0

27 Paver Block-80mm Thk Sqm 1 564.000 7.200 4060.8


deduction of pole Sqm -19 1.200 1.200 -27
deduction of Manhole Sqm -49 1.500 1.500 -110
Deduction of Raised Foothpath Sqm -1692
2231.8
28 Paver Block-60mm Thk Sqm 2 564.000 1.500 1692
Deduction of Tactile tiles Sqm -338.4
1353.6
29 Tactile tiles Sqm 2 564.000 0.3 338.4

29 Kerb Stone Rm 2 564.000 1128

30 Rubble Soling
Utility Crossing Cum 6 21.700 1.650 0.230 49.41
OFC Chamber Cum 11 1.400 1.400 0.230 4.96
Electrical Chamber Cum 38 1.700 1.700 0.230 25.26
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 19 0.800 0.800 0.230 2.8
Total 83.47

31 PCC M15
Kerb Stone Cum 2 564.000 0.265 0.075 22.42
Utility Crossing Cum 6 21.70 1.650 0.100 21.48
OFC Chamber Cum 11 1.40 1.40 0.100 2.16
Electrical Chamber Cum 38 1.70 1.70 0.100 10.98
Sr. No. Description Unit No. Length Breadth Depth Quantity
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 19 0.80 0.80 0.100 1.22
Total 58.71
32 RCC M25
a Raft
OFC Chamber Cum 11 1.200 1.200 0.150 2.38
Electrical Chamber Cum 38 1.500 1.500 0.150 12.83
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 15.71
b Wall
OFC Chamber Cum 11 4.800 0.150 1.000 7.92
Electrical Chamber Cum 38 6.000 0.150 1.500 51.3
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 61.00
c Slab
OFC Chamber Cum 11 1.200 1.200 0.150 2.38
Electrical Chamber Cum 38 1.500 1.500 0.150 12.83
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -40 0.900 0.600 0.150 -3.24
Cover Deduction Cum -11 -0.400 -0.600 0.200 -0.528
Total 12.00
d Pole Foundation Cum 19 0.600 0.600 1.500 10.26

33 Reinforcement
a Raft MT 110 kg/cum 1814.27
b Wall MT 100 kg/cum 6405.00
c Slab MT 95 kg/cum 1197.00
Total 9.42

34 RCC Np3 Class Pipe


600 mm dia Rmt 12 21.70 260.4

35 Painting Work
Edge Marking Line Sqm 4 564.000 0.15 338.4
Lane Marking / Other Markings Sqm 169.2
Zebra Crossing Sqm 6 22.000 3 198
Kerb Painting Sqm 2 564.000 0.3 338.4
Median Painting Sqm 2 564.000 1 1128
36 Signages
Cautionary/Warning sign boards in
a Nos. 20
Equilateral Triangle 20
Cautionary/Warning sign boards in
Nos. 10
b Octagone size 10
c Informatory sign board Sqm 8 0.900 7.2

37 Stud with Lense Reflector Nos 2 31.000 62


Zebra crossing Nos 6 22.000 440
Total 502.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
38 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 564.00 9024.00
b 160 mm outer dia for HT & LT Cable Rmt 20 564.00 11280.00

39 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 38 38
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 11 11
40 FRP Perforated Cover
SWD Nos 0 0
41 Barrigates Rmt 2 112.8 226
R44 -Trimbak Darwaja to Kajipura Road
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 333.00 1.600 1.500 799
Light Pole cum 11 0.90 0.900 1.600 14
Utility Crossing cum 7 3.200 1.650 1.500 55
Rigid Pavement deduction cum -1 -260
Total 608

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 333.00 1.000 333
power roller

5 Dewatering Hour 1 33

Removing lime or lean cement concrete


6 Cum 1 99.90 1 0.15 14.985

7 Removing rich mix cement concrete Cum 1 99.90 1 0.1 9.99


8 Dismantling brick masonry Cum 1 99.90 0.8 0.23 18.3816
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 11 11
11 Removal of Paver Block sqm 1 333.00 3.80 1265.4
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 1 333.00 2.60 0.300 260

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 333.000 1.000 0.500 0


Utility Crossing cum 7 3.200 1.65 0.920 34
34

16 selected hard murum filling cum 1 333.000 1.600 1.090 581


deduction of pole cum -11 1.200 1.200 1.090 -17
deduction of Manhole cum -11 1.500 1.500 1.090 -27
Total 537
17 GSB cum 1 333.000 1.000 0.150 50
Utility Crossing cum 7 3.200 1.65 0.150 6
Below Foothpath cum 1 1284.000 0.150 193
Total 249

18 DLC cum 1 333.000 1.000 0.150 50


Utility Crossing cum 7 3.200 1.650 0.150 6
Add 10% for Damage Panel Repairing cum 0.1 333.000 6.500 0.150 32
Sr. No. Description Unit No. Length Breadth Depth Quantity
Foothpath Cum 1 1284.000 0.150 192.6
Total 280.6

19 Polyethylene (LDPE) sheet sqm 1 333.000 1.000 333


Utility Crossing sqm 7 3.200 1.650 37
Add 10% for Damage Panel Repairing sqm 0.1 333.000 6.500 216
Total 586

20 Cement Concrete Pavement cum 1 333.000 1.000 0.280 93


Utility Crossing cum 7 3.200 1.650 0.280 10
Add 10% for Damage Panel Repairing cum 0.1 333.000 6.500 0.280 61
Total 164

21 polysuphide sealent Rmt 1 84.000 1.000 84

22 Paver Block-80mm Thk Sqm 1 333.000 4.000 1332


deduction of pole Sqm -11 1.200 1.200 -16
deduction of Manhole Sqm -14 1.500 1.500 -32
1284

23 Kerb Stone Rm 0 0

24 Rubble Soling
Utility Crossing Cum 7 3.200 1.650 0.230 8.5
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 11 1.700 1.700 0.230 7.31
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 11 0.800 0.800 0.230 1.62
Total 19.82

25 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 7 3.20 1.650 0.100 3.7
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 11 1.70 1.70 0.100 3.18
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 11 0.80 0.80 0.100 0.7
Total 8.62
26 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 11 1.500 1.500 0.150 3.71
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 4.87
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 11 6.000 0.150 1.500 14.85
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 19.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 11 1.500 1.500 0.150 3.71
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -13 0.900 0.600 0.150 -1.053
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
Total 4.00
d Pole Foundation Cum 11 0.600 0.600 1.500 5.94

27 Reinforcement
a Raft MT 110 kg/cum 562.20
b Wall MT 100 kg/cum 1995.00
c Slab MT 95 kg/cum 399.00
Total 2.96

28 RCC Np3 Class Pipe


600 mm dia Rmt 7 3.20 22.4

29 Painting Work
Edge Marking Line Sqm 2 333.000 0.15 99.9
Lane Marking / Other Markings Sqm 49.95
Zebra Crossing Sqm 1 3.500 3 5.25
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
30 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 6 0.900 5.4

31 Stud with Lense Reflector Nos 2 19 38


Zebra crossing Nos 1 3.500 12
Total 50.00
32 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 333.00 2664.00
b 160 mm outer dia for HT & LT Cable Rmt 10 333.00 3330.00

33 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 11 11
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 3 3
34 FRP Perforated Cover
SWD Nos 0 0
35 Barrigates Rmt 1 66.6 67
R45 -Trimbak Darwaja to Damodar
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 294.00 1.600 1.500 706
Light Pole cum 10 0.90 0.900 1.600 13
Utility Crossing cum 6 6.400 1.650 1.500 95
SWD cum 1 294.000 0.800 1.480 348
cum 1 294.000 0.800 1.480 348
Rigid Pavement deduction cum -1 -229
Total 1281

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 641

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 58.800 1.50 176

Compacting the existing Subgrade with


6 Sqm 1 294.00 1.000 294
power roller

7 Dewatering Hour 1 29

Removing lime or lean cement concrete


8 Cum 2 88.20 1 0.15 26.46

9 Removing rich mix cement concrete Cum 2 88.20 1 0.1 17.64


10 Dismantling brick masonry Cum 2 88.20 0.8 0.23 32.4576
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 10 10
13 Removal of Paver Block sqm 1 294.00 1.35 396.9
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 1 294.00 2.60 0.300 229

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 294.000 1.000 0.500 0


Utility Crossing cum 6 6.400 1.65 0.920 58
58

18 selected hard murum filling cum 1 294.000 1.600 1.090 513


deduction of pole cum -10 1.200 1.200 1.090 -16
deduction of Manhole cum -10 1.500 1.500 1.090 -25
Total 472
19 GSB cum 1 294.000 1.000 0.150 44
Utility Crossing cum 6 6.400 1.65 0.150 10
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 692.000 0.150 104
Total 158

20 DLC cum 1 294.000 1.000 0.150 44


Utility Crossing cum 6 6.400 1.650 0.150 10
Add 10% for Damage Panel Repairing cum 0.1 294.000 9.700 0.150 43
Foothpath Cum 1 692.000 0.150 103.8
Total 200.8

21 Polyethylene (LDPE) sheet sqm 1 294.000 1.000 294


Utility Crossing sqm 6 6.400 1.650 63
Add 10% for Damage Panel Repairing sqm 0.1 294.000 9.700 285
Total 642

22 Cement Concrete Pavement cum 1 294.000 1.000 0.280 82


Utility Crossing cum 6 6.400 1.650 0.280 18
Add 10% for Damage Panel Repairing cum 0.1 294.000 9.700 0.280 80
Total 180

23 polysuphide sealent Rmt 1 75.000 1.000 75

24 Paver Block-80mm Thk Sqm 1 294.000 2.500 735


deduction of pole Sqm -10 1.200 1.200 -14
deduction of Manhole Sqm -13 1.500 1.500 -29
692

25 Kerb Stone Rm 0 0

26 Rubble Soling
Utility Crossing Cum 6 6.400 1.650 0.230 14.57
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 10 1.700 1.700 0.230 6.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 10 0.800 0.800 0.230 1.47
SWD Cum 1 294.000 1.400 0.230 94.67
Cum 1 294.000 1.400 0.230 94.67
Total 214.42

27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 6 6.40 1.650 0.100 6.34
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 10 1.70 1.70 0.100 2.89
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 10 0.80 0.80 0.100 0.64
SWD Cum 1 294.00 1.40 0.100 41.16
Cum 1 294.00 1.40 0.100 41.16
Total 93.23
28 RCC M25
Sr. No. Description Unit No. Length Breadth Depth Quantity
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 294.000 1.300 0.150 57.33
Cum 1 294.000 1.300 0.150 57.33
Total 119.19
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 10 6.000 0.150 1.500 13.5
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 294.000 0.150 1.000 88.2
Cum 2 294.000 0.150 1.000 88.2
Total 194.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -12 0.900 0.600 0.150 -0.972
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 294.000 1.300 0.150 57.33
Cum 1 294.000 1.300 0.150 57.33
Cover Deduction Cum -118 0.600 0.450 0.150 -4.78
Total 113.00
d Pole Foundation Cum 10 0.600 0.600 1.500 5.40

29 Reinforcement
a Raft MT 110 kg/cum 13766.45
b Wall MT 100 kg/cum 20370.00
c Slab MT 95 kg/cum 11271.75
Total 45.41

30 RCC Np3 Class Pipe


600 mm dia Rmt 6 6.40 38.4

31 Painting Work
Edge Marking Line Sqm 2 294.000 0.15 88.2
Lane Marking / Other Markings Sqm 44.1
Zebra Crossing Sqm 6 6.700 3 60.3
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 6 0.900 5.4
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 Stud with Lense Reflector Nos 2 16 32
Zebra crossing Nos 6 6.700 134
Total 166.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 294.00 2352.00
b 160 mm outer dia for HT & LT Cable Rmt 10 294.00 2940.00

35 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 10 10
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 3 3
36 FRP Perforated Cover
SWD Nos 118 118
37 Barrigates Rmt 1 58.8 59
R46 -Trimbak Darwaja to Damodar
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 198.00 1.600 1.500 475
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 4 3.100 1.650 1.500 31
SWD cum 1 198.000 1.400 1.480 410
cum 1 198.000 1.400 1.480 410
Rigid Pavement deduction cum -1 -154
Total 1172

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 586

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 39.600 1.50 119

Compacting the existing Subgrade with


6 Sqm 1 198.00 1.000 198
power roller

7 Dewatering Hour 1 20

Removing lime or lean cement concrete


8 Cum 2 59.40 1 0.15 17.82

9 Removing rich mix cement concrete Cum 2 59.40 1 0.1 11.88


10 Dismantling brick masonry Cum 2 59.40 0.8 0.23 21.8592
11 Dismantling stone masonry Cum 1 20
Removing all type of hume pipes and
12 stacking within a lead up to 1000 meters Rmt 4 6.40 25.6

13 Removal of telephone / Electric poles Nos 1 7 7


14 Removal of Paver Block sqm 1 198.00 1.2 237.6
15 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

16 Dismantling of cement concrete pavement Cum 1 198.00 2.60 0.300 154

Scarifying the existing granular road


17 Sqm 1 0
surface

18 Subgrade cum 0 198.000 1.000 0.500 0


Utility Crossing cum 4 3.100 1.65 0.920 19
19

19 selected hard murum filling cum 1 198.000 1.600 1.090 345


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -7 1.500 1.500 1.090 -17
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 328
20 GSB cum 1 198.000 1.000 0.150 30
Utility Crossing cum 4 3.100 1.65 0.150 3
Below Foothpath cum 1 475.000 0.150 71
Total 104

21 DLC cum 1 198.000 1.000 0.150 30


Utility Crossing cum 4 3.100 1.650 0.150 3
Add 10% for Damage Panel Repairing cum 0.1 198.000 6.400 0.150 19
Foothpath Cum 1 475.000 0.150 71.25
Total 123.25

22 Polyethylene (LDPE) sheet sqm 1 198.000 1.000 198


Utility Crossing sqm 4 3.100 1.650 20
Add 10% for Damage Panel Repairing sqm 0.1 198.000 6.400 127
Total 345

23 Cement Concrete Pavement cum 1 198.000 1.000 0.280 55


Utility Crossing cum 4 3.100 1.650 0.280 6
Add 10% for Damage Panel Repairing cum 0.1 198.000 6.400 0.280 35
Total 96

24 polysuphide sealent Rmt 1 51.000 1.000 51

25 Paver Block-80mm Thk Sqm 1 198.000 2.500 495


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -9 1.500 1.500 -20
475

26 Kerb Stone Rm 0 0

27 Rubble Soling
Utility Crossing Cum 4 3.100 1.650 0.230 4.71
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 7 1.700 1.700 0.230 4.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 198.000 1.400 0.230 63.76
Cum 1 198.000 1.400 0.230 63.76
Total 138.82

28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 3.10 1.650 0.100 2.05
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 7 1.70 1.70 0.100 2.02
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 198.00 1.40 0.100 27.72
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cum 1 198.00 1.40 0.100 27.72
Total 60.35
29 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 198.000 1.300 0.150 38.61
Cum 1 198.000 1.300 0.150 38.61
Total 80.52
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 7 6.000 0.150 1.500 9.45
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 198.000 0.150 1.000 59.4
Cum 2 198.000 0.150 1.000 59.4
Total 131.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -9 0.900 0.600 0.150 -0.729
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 198.000 1.300 0.150 38.61
Cum 1 198.000 1.300 0.150 38.61
Cover Deduction Cum -79 0.300 0.300 0.150 -1.07
Total 79.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

30 Reinforcement
a Raft MT 110 kg/cum 9300.23
b Wall MT 100 kg/cum 13755.00
c Slab MT 95 kg/cum 7880.25
Total 30.94

31 RCC Np3 Class Pipe


600 mm dia Rmt 4 3.10 12.4

32 Painting Work
Edge Marking Line Sqm 2 198.000 0.15 59.4
Lane Marking / Other Markings Sqm 29.7
Zebra Crossing Sqm 2 3.400 3 10.2
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
33 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Sr. No. Description Unit No. Length Breadth Depth Quantity
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 5 0.900 4.5

34 Stud with Lense Reflector Nos 2 11 22


Zebra crossing Nos 2 3.400 23
Total 45.00
35 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 198.00 1584.00
b 160 mm outer dia for HT & LT Cable Rmt 10 198.00 1980.00

36 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 7 7
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
37 FRP Perforated Cover
SWD Nos 79 79
38 Barrigates Rmt 1 39.6 40
R47 -Rahane Girani to Pinjarghat Road
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 163.00 1.600 1.500 391
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 3 3.100 1.650 1.500 23
SWD cum 1 155.000 0.900 1.480 206
cum 1 155.000 0.900 1.480 206
Rigid Pavement deduction cum -1 -127
Total 699

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 350

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 32.600 1.50 98

Compacting the existing Subgrade with


6 Sqm 1 163.00 1.000 163
power roller

7 Dewatering Hour 1 16

Removing lime or lean cement concrete


8 Cum 2 48.90 1 0.15 14.67

9 Removing rich mix cement concrete Cum 2 48.90 1 0.1 9.78


10 Dismantling brick masonry Cum 2 48.90 0.8 0.23 17.9952
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 5 5
13 Removal of Paver Block sqm 1 163.00 1.2 195.6
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 1 163.00 2.60 0.300 127

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 163.000 1.000 0.500 0


Utility Crossing cum 3 3.100 1.65 0.920 14
14

18 selected hard murum filling cum 1 163.000 1.600 1.090 284


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -5 1.500 1.500 1.090 -12
Total 272
19 GSB cum 1 163.000 1.000 0.150 24
Utility Crossing cum 3 3.100 1.65 0.150 2
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 391.500 0.150 59
Total 85

20 DLC cum 1 163.000 1.000 0.150 24


Utility Crossing cum 3 3.100 1.650 0.150 2
Add 10% for Damage Panel Repairing cum 0.1 163.000 6.400 0.150 16
Foothpath Cum 1 391.500 0.150 58.73
Total 100.73

21 Polyethylene (LDPE) sheet sqm 1 163.000 1.000 163


Utility Crossing sqm 3 3.100 1.650 15
Add 10% for Damage Panel Repairing sqm 0.1 163.000 6.400 104
Total 282

22 Cement Concrete Pavement cum 1 163.000 1.000 0.280 46


Utility Crossing cum 3 3.100 1.650 0.280 4
Add 10% for Damage Panel Repairing cum 0.1 163.000 6.400 0.280 29
Total 79

23 polysuphide sealent Rmt 1 42.000 1.000 42

24 Paver Block-80mm Thk Sqm 1 163.000 2.500 407.5


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -7 1.500 1.500 -16
391.5

25 Kerb Stone Rm 0 0

26 Rubble Soling
Utility Crossing Cum 3 3.100 1.650 0.230 3.53
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 5 1.700 1.700 0.230 3.32
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 155.000 0.900 0.230 32.09
Cum 1 155.000 0.900 0.230 32.09
Total 72.97

27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 3 3.10 1.650 0.100 1.53
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 5 1.70 1.70 0.100 1.45
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 155.00 0.90 0.100 13.95
Cum 1 155.00 0.90 0.100 13.95
Total 31.72
28 RCC M25
Sr. No. Description Unit No. Length Breadth Depth Quantity
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 155.000 0.800 0.150 18.60
Cum 1 155.000 0.800 0.150 18.60
Total 39.83
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 5 6.000 0.150 1.500 6.75
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 155.000 0.150 1.000 46.50
Cum 2 155.000 0.150 1.000 46.50
Total 103.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -7 0.900 0.600 0.150 -0.567
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 155.000 0.800 0.150 18.60
Cum 1 155.000 0.800 0.150 18.60
Cover Deduction Cum -62 0.300 0.300 0.150 -0.84
Total 38.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

29 Reinforcement
a Raft MT 110 kg/cum 4599.96
b Wall MT 100 kg/cum 10815.00
c Slab MT 95 kg/cum 3790.50
Total 19.21

30 RCC Np3 Class Pipe


600 mm dia Rmt 3 3.10 9.3

31 Painting Work
Edge Marking Line Sqm 2 163.000 0.15 48.9
Lane Marking / Other Markings Sqm 24.45
Zebra Crossing Sqm 2 3.400 3 10.2
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 4 0.900 3.6
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 Stud with Lense Reflector Nos 2 9 18
Zebra crossing Nos 2 3.400 23
Total 41.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 163.00 1304.00
b 160 mm outer dia for HT & LT Cable Rmt 10 163.00 1630.00

35 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 5 5
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
36 FRP Perforated Cover
SWD Nos 62 62
37 Barrigates Rmt 1 32.6 33
R48 -Hotel Iqbal to Rahane Girani
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 188.00 1.600 1.500 451
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 4 4.300 1.650 1.500 43
SWD cum 1 191.000 0.900 1.480 254
cum 1 191.000 0.900 1.480 254
Rigid Pavement deduction cum -1 -147
Total 855

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 428

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 37.600 1.50 113

Compacting the existing Subgrade with


6 Sqm 1 188.00 1.000 188
power roller

7 Dewatering Hour 1 19

Removing lime or lean cement concrete


8 Cum 2 56.40 1 0.15 16.92

9 Removing rich mix cement concrete Cum 2 56.40 1 0.1 11.28


10 Dismantling brick masonry Cum 2 56.40 0.8 0.23 20.7552
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 6 6
13 Removal of Paver Block sqm 1 188.00 1.8 338.4
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 1 188.00 2.60 0.300 147

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 188.000 1.000 0.500 0


Utility Crossing cum 4 4.300 1.65 0.920 26
26

18 selected hard murum filling cum 1 188.000 1.600 1.090 328


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -6 1.500 1.500 1.090 -15
Total 313
19 GSB cum 1 188.000 1.000 0.150 28
Utility Crossing cum 4 4.300 1.65 0.150 4
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 452.000 0.150 68
Total 100

20 DLC cum 1 188.000 1.000 0.150 28


Utility Crossing cum 4 4.300 1.650 0.150 4
Add 10% for Damage Panel Repairing cum 0.1 188.000 7.600 0.150 21
Foothpath Cum 1 452.000 0.150 67.8
Total 120.8

21 Polyethylene (LDPE) sheet sqm 1 188.000 1.000 188


Utility Crossing sqm 4 4.300 1.650 28
Add 10% for Damage Panel Repairing sqm 0.1 188.000 7.600 143
Total 359

22 Cement Concrete Pavement cum 1 188.000 1.000 0.280 53


Utility Crossing cum 4 4.300 1.650 0.280 8
Add 10% for Damage Panel Repairing cum 0.1 188.000 7.600 0.280 40
Total 101

23 polysuphide sealent Rmt 1 48.000 1.000 48

24 Paver Block-80mm Thk Sqm 1 188.000 2.500 470


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -8 1.500 1.500 -18
452

25 Kerb Stone Rm 0 0

26 Rubble Soling
Utility Crossing Cum 4 4.300 1.650 0.230 6.53
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 6 1.700 1.700 0.230 3.99
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 191.000 0.900 0.230 39.54
Cum 1 191.000 0.900 0.230 39.54
Total 91.54

27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 4.30 1.650 0.100 2.84
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 6 1.70 1.70 0.100 1.73
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 191.00 0.90 0.100 17.19
Cum 1 191.00 0.90 0.100 17.19
Total 39.79
28 RCC M25
Sr. No. Description Unit No. Length Breadth Depth Quantity
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 6 1.500 1.500 0.150 2.03
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 191.000 0.800 0.150 22.92
Cum 1 191.000 0.800 0.150 22.92
Total 48.80
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 6 6.000 0.150 1.500 8.1
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 191.000 0.150 1.000 57.3
Cum 2 191.000 0.150 1.000 57.3
Total 126.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 6 1.500 1.500 0.150 2.03
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -8 0.900 0.600 0.150 -0.648
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 191.000 0.800 0.150 22.92
Cum 1 191.000 0.800 0.150 22.92
Cover Deduction Cum -76 0.600 0.450 0.150 -3.08
Total 45.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

29 Reinforcement
a Raft MT 110 kg/cum 5636.86
b Wall MT 100 kg/cum 13230.00
c Slab MT 95 kg/cum 4488.75
Total 23.36

30 RCC Np3 Class Pipe


600 mm dia Rmt 4 4.30 17.2

31 Painting Work
Edge Marking Line Sqm 2 188.000 0.15 56.4
Lane Marking / Other Markings Sqm 28.2
Zebra Crossing Sqm 4 4.600 3 27.6
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 3
b Octagone size 3
c Informatory sign board Sqm 4 0.900 3.6
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 Stud with Lense Reflector Nos 2 10 20
Zebra crossing Nos 4 4.600 61
Total 81.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 188.00 1504.00
b 160 mm outer dia for HT & LT Cable Rmt 10 188.00 1880.00

35 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 6 6
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
36 FRP Perforated Cover
SWD Nos 76 76
37 Barrigates Rmt 1 37.6 38
R49 -Bhadrakali Mandir to Juni Tambat Lane
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 239.00 1.600 1.500 574
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 5 3.500 1.650 1.500 43
SWD cum 1 239.000 1.150 1.480 407
cum 1 239.000 1.150 1.480 407
Rigid Pavement deduction cum -1 239.000 1.600 0.300 -115
Total 1316

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 658

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 47.800 1.50 143

Compacting the existing Subgrade with


6 Sqm 1 239.00 5.2 1243
power roller

7 Dewatering Hour 1 24

Removing lime or lean cement concrete


8 Cum 2 71.70 1 0.15 21.51

9 Removing rich mix cement concrete Cum 2 71.70 1 0.1 14.34


10 Dismantling brick masonry Cum 2 71.70 0.8 0.23 26.3856
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 8 8
13 Removal of Paver Block sqm 1 239.00 1.4 334.6
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 1 239.00 5.40 0.300 387

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 239.000 4.300 0.500 0


Utility Crossing cum 5 3.500 1.65 0.920 27
27

18 selected hard murum filling cum 1 239.000 1.600 1.090 417


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -8 1.500 1.500 1.090 -20
Total 397
19 GSB cum 1 239.000 4.300 0.150 154
Utility Crossing cum 5 3.500 1.65 0.150 4
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 574.500 0.150 86
244

20 DLC cum 1 239.000 4.300 0.150 154


Foothpath Cum 1 574.500 0.150 86.18
240

21 Polyethylene (LDPE) sheet sqm 1 239.000 4.300 1028

22 Cement Concrete Pavement cum 1 239.000 4.300 0.280 288

23 polysuphide sealent Rmt 1 61.000 4.300 262.3

24a Dowel Bars Nos 14 14.000 196

24 Paver Block-80mm Thk Sqm 1 239.000 2.500 597.5


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -10 1.500 1.500 -23
574.5

25 Kerb Stone Rm 0 0

26 Rubble Soling
Utility Crossing Cum 5 3.500 1.650 0.230 6.64
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 8 1.700 1.700 0.230 5.32
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 239.000 1.150 0.230 63.22
Cum 1 239.000 1.150 0.230 63.22
Total 140.34

27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 5 3.50 1.650 0.100 2.89
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 8 1.70 1.70 0.100 2.31
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 239.00 1.15 0.100 27.49
Cum 1 239.00 1.15 0.100 27.49
Total 61.02
28 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 239.000 1.050 0.150 37.64
Cum 1 239.000 1.050 0.150 37.64
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 78.92
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 8 6.000 0.150 1.500 10.8
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 239.000 0.150 1.000 71.7
Cum 2 239.000 0.150 1.000 71.7
Total 157.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -10 0.900 0.600 0.150 -0.81
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 239.000 1.050 0.150 37.64
Cum 1 239.000 1.050 0.150 37.64
Cover Deduction Cum -96 0.600 0.450 0.150 -3.89
Total 74.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

29 Reinforcement
a Raft MT 110 kg/cum 9115.72
b Wall MT 100 kg/cum 16485.00
c Slab MT 95 kg/cum 7381.50
d Tie Bar MT 598 0.7 0.89 371.78
Total 33.35

30 RCC Np3 Class Pipe


600 mm dia Rmt 5 3.50 17.5

31 Painting Work
Edge Marking Line Sqm 2 239.000 0.15 71.7
Lane Marking / Other Markings Sqm 35.85
Zebra Crossing Sqm 2 3.800 3 11.4
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 10
Equilateral Triangle 10
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 4 0.900 3.6

33 Stud with Lense Reflector Nos 2 13 26


Zebra crossing Nos 2 3.800 25
Total 51.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 239.00 1912.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
b 160 mm outer dia for HT & LT Cable Rmt 10 239.00 2390.00

35 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 8 8
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
36 FRP Perforated Cover
SWD Nos 96 96
37 Barrigates Rmt 1 47.8 48
R50 -Main Road to Trimbak Darwaja Police Chowky
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 251.00 1.600 1.500 602
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 5 4.900 1.650 1.500 61
SWD cum 1 190.000 0.900 1.480 253
cum 1 190.000 0.900 1.480 253
Rigid Pavement deduction cum -1 -196
Total 973

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 487

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 50.200 1.50 151

Compacting the existing Subgrade with


6 Sqm 1 251.00 1.000 251
power roller

7 Dewatering Hour 1 25

Removing lime or lean cement concrete


8 Cum 2 75.30 1 0.15 22.59

9 Removing rich mix cement concrete Cum 2 75.30 1 0.1 15.06


10 Dismantling brick masonry Cum 2 75.30 0.8 0.23 27.7104
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 8 8
13 Removal of Paver Block sqm 1 251.00 1.3 326.3
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 1 251.00 2.60 0.300 196

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 251.000 1.000 0.500 0


Utility Crossing cum 5 4.900 1.65 0.920 37
37

18 selected hard murum filling cum 1 251.000 1.600 1.090 438


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -8 1.500 1.500 1.090 -20
Total 418
19 GSB cum 1 251.000 1.000 0.150 38
Utility Crossing cum 5 4.900 1.65 0.150 6

493
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 602.500 0.150 90
Total 134

20 DLC cum 1 251.000 1.000 0.150 38


Utility Crossing cum 5 4.900 1.650 0.150 6
Add 10% for Damage Panel Repairing cum 0.1 251.000 8.200 0.150 31
Foothpath Cum 1 602.500 0.150 90.38
Total 165.38

21 Polyethylene (LDPE) sheet sqm 1 251.000 1.000 251


Utility Crossing sqm 5 4.900 1.650 40
Add 10% for Damage Panel Repairing sqm 0.1 251.000 8.200 206
Total 497

22 Cement Concrete Pavement cum 1 251.000 1.000 0.280 70


Utility Crossing cum 5 4.900 1.650 0.280 11
Add 10% for Damage Panel Repairing cum 0.1 251.000 8.200 0.280 58
Total 139

23 polysuphide sealent Rmt 1 64.000 1.000 64

24 Paver Block-80mm Thk Sqm 1 251.000 2.500 627.5


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -11 1.500 1.500 -25
602.5

25 Kerb Stone Rm 0 0

26 Rubble Soling
Utility Crossing Cum 5 4.900 1.650 0.230 9.3
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 8 1.700 1.700 0.230 5.32
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 190.000 0.900 0.230 39.33
Cum 1 190.000 0.900 0.230 39.33
Total 95.67

27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 5 4.90 1.650 0.100 4.04
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 8 1.70 1.70 0.100 2.31
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 190.00 0.90 0.100 17.10
Cum 1 190.00 0.90 0.100 17.10
Total 41.59
28 RCC M25

493
Sr. No. Description Unit No. Length Breadth Depth Quantity
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 190.000 0.800 0.150 22.80
Cum 1 190.000 0.800 0.150 22.80
Total 49.46
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 8 6.000 0.150 1.500 10.8
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 190.000 0.150 1.000 57
Cum 2 190.000 0.150 1.000 57
Total 129.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 8 1.500 1.500 0.150 2.70
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -10 0.900 0.600 0.150 -0.81
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 190.000 0.800 0.150 22.80
Cum 1 190.000 0.800 0.150 22.80
Cover Deduction Cum -76 0.600 0.450 0.150 -3.08
Total 45.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

29 Reinforcement
a Raft MT 110 kg/cum 5712.05
b Wall MT 100 kg/cum 13545.00
c Slab MT 95 kg/cum 4488.75
Total 23.75

30 RCC Np3 Class Pipe


600 mm dia Rmt 5 4.90 24.5

31 Painting Work
Edge Marking Line Sqm 2 251.000 0.15 75.3
Lane Marking / Other Markings Sqm 37.65
Zebra Crossing Sqm 2 5.200 3 15.6
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6

493
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 Stud with Lense Reflector Nos 2 14 28
Zebra crossing Nos 2 5.200 35
Total 63.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 251.00 2008.00
b 160 mm outer dia for HT & LT Cable Rmt 10 251.00 2510.00

35 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 8 8
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 3 3
36 FRP Perforated Cover
SWD Nos 76 76
37 Barrigates Rmt 1 50.2 50

493
R51 -Pimpal Chowk to Trimbak Darwaja Police Chowky
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 76.00 1.600 1.500 365
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 1 11.500 1.650 1.500 28
SWD cum 1 58.000 1.300 1.480 112
cum 1 58.000 1.300 1.480 112
Rigid Pavement deduction cum -2 76.000 1.600 0.300 -73
Total 544

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 272

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 15.200 1.50 46

Compacting the existing Subgrade with


6 Sqm 1 76.00 1.000 76
power roller

7 Dewatering Hour 1 8

Removing lime or lean cement concrete


8 Cum 2 22.80 1 0.15 6.84

9 Removing rich mix cement concrete Cum 2 22.80 1 0.1 4.56


10 Dismantling brick masonry Cum 2 22.80 0.8 0.23 8.3904
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 3 3
13 Removal of Paver Block sqm 1 76.00 1.4 106.4
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 2 76.00 2.60 0.300 119

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 76.000 1.000 0.500 0


Utility Crossing cum 1 11.500 1.65 0.920 17
17

18 selected hard murum filling cum 2 76.000 1.600 1.090 265


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -5 1.500 1.500 1.090 -12
Total 253
19 GSB cum 2 76.000 1.000 0.150 23
Utility Crossing cum 1 11.500 1.65 0.150 3
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 288.000 0.150 43
Total 69

20 DLC cum 2 76.000 1.000 0.150 23


Utility Crossing cum 1 11.500 1.650 0.150 3
Add 10% for Damage Panel Repairing cum 0.1 76.000 14.800 0.150 17
Foothpath Cum 1 288.000 0.150 43.2
Total 86.2

21 Polyethylene (LDPE) sheet sqm 2 76.000 1.000 152


Utility Crossing sqm 1 11.500 1.650 19
Add 10% for Damage Panel Repairing sqm 0.1 76.000 14.800 112
Total 283

22 Cement Concrete Pavement cum 2 76.000 1.000 0.280 43


Utility Crossing cum 1 11.500 1.650 0.280 5
Add 10% for Damage Panel Repairing cum 0.1 76.000 14.800 0.280 31
Total 79

23 polysuphide sealent Rmt 1 20.000 1.000 20

24 Paver Block-80mm Thk Sqm 2 76.000 2.000 304


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -7 1.500 1.500 -16
288
25 Paver Block-60mm Thk Sqm 0

26 Kerb Stone Rm 0 0.000 0

27 Rubble Soling
Utility Crossing Cum 1 11.500 1.650 0.230 4.36
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 5 1.700 1.700 0.230 3.32
Water Chamber Cum 1 1.500 1.500 0.230 0.52
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 58.000 1.300 0.230 17.34
Cum 1 58.000 1.300 0.230 17.34
Total 43.78

28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 1 11.50 1.650 0.100 1.9
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 5 1.70 1.70 0.100 1.45
Water Chamber Cum 1 1.50 1.50 0.100 0.23
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 58.00 1.30 0.100 7.54
Cum 1 58.00 1.30 0.100 7.54
Total 19.05
Sr. No. Description Unit No. Length Breadth Depth Quantity
29 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Water Chamber Cum 1 1.300 1.300 0.150 0.25
SWD Cum 1 58.000 1.200 0.150 10.44
Cum 1 58.000 1.200 0.150 10.44
Total 23.25
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 5 6.000 0.150 1.500 6.75
Water Chamber Cum 1 5.200 0.150 1.000 0.78
SWD Cum 2 58.000 0.150 1.000 17.4
Cum 2 58.000 0.150 1.000 17.4
Total 44.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 5 1.500 1.500 0.150 1.69
Water Chamber Cum 1 1.300 1.300 0.150 0.25
Cover Deduction Cum -6 0.900 0.600 0.150 -0.486
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 58.000 1.200 0.150 10.44
Cum 1 58.000 1.200 0.150 10.44
Cover Deduction Cum -23 0.900 0.600 0.150 -1.86
Total 21.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

30 Reinforcement
a Raft MT 110 kg/cum 2685.72
b Wall MT 100 kg/cum 4620.00
c Slab MT 95 kg/cum 2094.75
Total 9.40

31 RCC Np3 Class Pipe


600 mm dia Rmt 2 11.50 23

32 Painting Work
Edge Marking Line Sqm 2 76.000 0.15 22.8
Lane Marking / Other Markings Sqm 11.4
Zebra Crossing Sqm 2 11.800 3 35.4
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 76.000 1 152
33 Signages
Cautionary/Warning sign boards in
a Nos. 4
Equilateral Triangle 4
Cautionary/Warning sign boards in
Nos. 2
b Octagone size 2
c Informatory sign board Sqm 4 0.900 3.6
Sr. No. Description Unit No. Length Breadth Depth Quantity

34 Stud with Lense Reflector Nos 9 9


Zebra crossing Nos 2 11.800 79
Total 88.00
35 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 76.00 1216.00
b 160 mm outer dia for HT & LT Cable Rmt 20 76.00 1520.00

36 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 5 5
600mm
Watersupply Manhole - Size-900mm x Nos 1 1
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
37 FRP Perforated Cover
SWD Nos 23 23
38 Barrigates Rmt 2 15.2 30
R52 -Old Nashik Milk Market Road to Ganjmal Signal
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 377.00 1.600 1.500 1810
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 4 10.700 1.650 1.500 106
SWD cum 1 377.000 0.900 1.480 502
cum 1 377.000 0.900 1.480 502
Flexible Pavement deduction cum -981
Total 1939

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 970

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 75.400 1.50 226

Compacting the existing Subgrade with


6 Sqm 1 377.00 10.8 4072
power roller

7 Dewatering Hour 1 38

Removing lime or lean cement concrete


8 Cum 2 113.10 1 0.15 33.93

9 Removing rich mix cement concrete Cum 2 113.10 1 0.1 22.62


10 Dismantling brick masonry Cum 2 113.10 0.8 0.23 41.6208
11 Dismantling stone masonry Cum 1 20
Removing all type of hume pipes and
12 stacking within a lead up to 1000 meters Rmt 8 14.00 112

13 Removal of telephone / Electric poles Nos 1 13 13


14 Removal of Paver Block sqm 1 377.00 1 377
15 Dismantling of flexible pavements
Bituminous courses cum 1 377.000 14.000 0.200 1056
PaverBlock Area Deduction cum -1 377.000 0.200 -75
Total 981

16 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


17 Sqm 1 0
surface

18 Subgrade cum 0 377.000 9.000 0.500 0


Utility Crossing cum 4 10.700 1.65 0.880 62
62

19 selected hard murum filling cum 2 377.000 1.600 1.090 1315


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -25 1.500 1.500 1.090 -61
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 1254
20 GSB cum 1 377.000 9.000 0.150 509
Utility Crossing cum 4 10.700 1.65 0.150 11
Below Foothpath cum 1 1811.000 0.150 272
792

21 WMM cum 2 0.000 0.250 0


Utility Crossing cum 4 10.700 1.650 0.250 18
18

22 DBM cum 1 0.000 13.600 0.050 0


Pot Holes / profile Correction 0

23 Prime Coat sqm 1 0.000 13.600 0

24 Tack Coat sqm 1 0.000 13.600 0

25 Bituminous Concrete cum 1 0.000 13.600 0.040 0

26 DLC cum 1 377.000 9.000 0.150 509


Foothpath Cum 1 1811.000 0.150 271.65
781

27 Polyethylene (LDPE) sheet sqm 1 377.000 9.000 3393

28 Cement Concrete Pavement cum 1 377.000 9.000 0.280 950

29 polysuphide sealent Rmt 1 95.000 9.000 855

24a Dowel Bars Nos 21 30.000 630

30 Paver Block-80mm Thk Sqm 1 377.000 5.000 1885


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -33 1.500 1.500 -74
1811

31 Kerb Stone Rm 0 0

32 Rubble Soling
Utility Crossing Cum 4 10.700 1.650 0.230 16.24
OFC Chamber Cum 8 1.400 1.400 0.230 3.61
Electrical Chamber Cum 25 1.700 1.700 0.230 16.62
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 377.000 0.900 0.230 78.04
Cum 1 377.000 0.900 0.230 78.04
Total 193.59
Sr. No. Description Unit No. Length Breadth Depth Quantity

33 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 10.70 1.650 0.100 7.06
OFC Chamber Cum 8 1.40 1.40 0.100 1.57
Electrical Chamber Cum 25 1.70 1.70 0.100 7.23
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 377.00 0.90 0.100 33.93
Cum 1 377.00 0.90 0.100 33.93
Total 84.17
34 RCC M25
a Raft
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 25 1.500 1.500 0.150 8.44
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 377.000 0.800 0.150 45.24
Cum 1 377.000 0.800 0.150 45.24
Total 101.15
b Wall
OFC Chamber Cum 8 4.800 0.150 1.000 5.76
Electrical Chamber Cum 25 6.000 0.150 1.500 33.75
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 377.000 0.150 1.000 113.1
Cum 2 377.000 0.150 1.000 113.1
Total 267.00
c Slab
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 25 1.500 1.500 0.150 8.44
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -27 0.900 0.600 0.150 -2.187
Cover Deduction Cum -8 -0.400 -0.600 0.200 -0.384
SWD Cum 1 377.000 0.800 0.150 45.24
Cum 1 377.000 0.800 0.150 45.24
Cover Deduction Cum -151 0.600 0.450 0.150 -6.12
Total 92.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

35 Reinforcement
a Raft MT 110 kg/cum 11683.11
b Wall MT 100 kg/cum 28035.00
c Slab MT 95 kg/cum 9177.00
Total 48.90

36 RCC Np3 Class Pipe


600 mm dia Rmt 8 10.70 85.6
Sr. No. Description Unit No. Length Breadth Depth Quantity
37 Painting Work
Edge Marking Line Sqm 4 377.000 0.15 226.2
Lane Marking / Other Markings Sqm 113.1
Zebra Crossing Sqm 2 11.000 3 33
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
38 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 5 0.900 4.5

39 Stud with Lense Reflector Nos 2 21.000 42


Zebra crossing Nos 2 11.000 73
Total 115.00
40 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 377.00 6032.00
b 160 mm outer dia for HT & LT Cable Rmt 20 377.00 7540.00

41 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 25 25
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 8 8
42 FRP Perforated Cover
SWD Nos 151 151
43 Barrigates Rmt 2 75.4 151
R53 -Pimpal Chowk to Near Main Road
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 206.00 1.600 1.500 494
Light Pole cum 7 0.90 0.900 1.600 9
Utility Crossing cum 4 2.700 1.650 1.500 27
Rigid Pavement deduction cum -1 -161
Total 369

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 185

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 41.200 1.50 124

Compacting the existing Subgrade with


6 Sqm 1 206.00 1.000 206
power roller

7 Dewatering Hour 1 21

Removing lime or lean cement concrete


8 Cum 2 61.80 1 0.15 18.54

9 Removing rich mix cement concrete Cum 2 61.80 1 0.1 12.36


10 Dismantling brick masonry Cum 2 61.80 0.8 0.23 22.7424
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 7 7
13 Removal of Paver Block sqm 1 206.00 0.65 133.9
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 1 206.00 2.60 0.300 161

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 206.000 1.000 0.500 0


Utility Crossing cum 4 2.700 1.65 0.920 16
16

18 selected hard murum filling cum 1 206.000 1.600 1.090 359


deduction of pole cum -7 1.200 1.200 1.090 -11
deduction of Manhole cum -7 1.500 1.500 1.090 -17
Total 331
19 GSB cum 1 206.000 1.000 0.150 31
Utility Crossing cum 4 2.700 1.65 0.150 3
Below Foothpath cum 1 485.000 0.150 73
Total 107
Sr. No. Description Unit No. Length Breadth Depth Quantity
20 DLC cum 1 206.000 1.000 0.150 31
Utility Crossing cum 4 2.700 1.650 0.150 3
Add 10% for Damage Panel Repairing cum 0.1 206.000 6.000 0.150 19
Foothpath Cum 1 485.000 0.150 72.75
Total 125.75

21 Polyethylene (LDPE) sheet sqm 1 206.000 1.000 206


Utility Crossing sqm 4 2.700 1.650 18
Add 10% for Damage Panel Repairing sqm 0.1 206.000 6.000 124
Total 348

22 Cement Concrete Pavement cum 1 206.000 1.000 0.280 58


Utility Crossing cum 4 2.700 1.650 0.280 5
Add 10% for Damage Panel Repairing cum 0.1 206.000 6.000 0.280 35
Total 98

23 polysuphide sealent Rmt 1 53.000 1.000 53

24 Paver Block-80mm Thk Sqm 1 206.000 2.500 515


deduction of pole Sqm -7 1.200 1.200 -10
deduction of Manhole Sqm -9 1.500 1.500 -20
485

25 Kerb Stone Rm 0 0

26 Rubble Soling
Utility Crossing Cum 4 2.700 1.650 0.230 4.1
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 7 1.700 1.700 0.230 4.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 7 0.800 0.800 0.230 1.03
Total 11.72

27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 2.70 1.650 0.100 1.78
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 7 1.70 1.70 0.100 2.02
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 7 0.80 0.80 0.100 0.45
Total 5.09
28 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 3.30
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 7 6.000 0.150 1.500 9.45
Sr. No. Description Unit No. Length Breadth Depth Quantity
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 12.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 7 1.500 1.500 0.150 2.36
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -9 0.900 0.600 0.150 -0.729
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
Total 2.00
d Pole Foundation Cum 7 0.600 0.600 1.500 3.78

29 Reinforcement
a Raft MT 110 kg/cum 381.32
b Wall MT 100 kg/cum 1260.00
c Slab MT 95 kg/cum 199.50
Total 1.84

30 RCC Np3 Class Pipe


600 mm dia Rmt 4 2.70 10.8

31 Painting Work
Edge Marking Line Sqm 2 206.000 0.15 61.8
Lane Marking / Other Markings Sqm 30.9
Zebra Crossing Sqm 2 3.000 3 9
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 2
b Octagone size 2
c Informatory sign board Sqm 3 0.900 2.7

33 Stud with Lense Reflector Nos 2 11 22


Zebra crossing Nos 2 3.000 20
Total 42.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 206.00 1648.00
b 160 mm outer dia for HT & LT Cable Rmt 10 206.00 2060.00

35 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 7 7
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
36 FRP Perforated Cover
SWD Nos 0 0
37 Barrigates Rmt 1 41.2 41
R54 -Bhadrakali Riksha & Taxi Stand to Pimpal Chowk Next
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 140.00 1.600 1.500 672
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 1 7.200 1.650 1.500 18
SWD cum 1 194.000 0.900 1.480 258
cum 1 194.000 0.900 1.480 258
Rigid Pavement deduction cum -2 140.000 1.600 0.300 -134
Total 1072

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 536

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 28.000 1.50 84

Compacting the existing Subgrade with


6 Sqm 1 140.00 1.000 140
power roller

7 Dewatering Hour 1 14

Removing lime or lean cement concrete


8 Cum 2 42.00 1 0.15 12.6

9 Removing rich mix cement concrete Cum 2 42.00 1 0.1 8.4


10 Dismantling brick masonry Cum 2 42.00 0.8 0.23 15.456
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 5 5
13 Removal of Paver Block sqm 1 140.00 1.25 175
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 2 140.00 2.60 0.300 218

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 140.000 1.000 0.500 0


Utility Crossing cum 1 7.200 1.65 0.920 11
11

18 selected hard murum filling cum 2 140.000 1.600 1.090 488


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -9 1.500 1.500 1.090 -22
Total 466
19 GSB cum 2 140.000 1.000 0.150 42
Utility Crossing cum 1 7.200 1.65 0.150 2
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 533.000 0.150 80
Total 124

20 DLC cum 2 140.000 1.000 0.150 42


Utility Crossing cum 1 7.200 1.650 0.150 2
Add 10% for Damage Panel Repairing cum 0.1 140.000 10.500 0.150 22
Foothpath Cum 1 533.000 0.150 79.95
Total 145.95

21 Polyethylene (LDPE) sheet sqm 2 140.000 1.000 280


Utility Crossing sqm 1 7.200 1.650 12
Add 10% for Damage Panel Repairing sqm 0.1 140.000 10.500 147
Total 439

22 Cement Concrete Pavement cum 2 140.000 1.000 0.280 78


Utility Crossing cum 1 7.200 1.650 0.280 3
Add 10% for Damage Panel Repairing cum 0.1 140.000 10.500 0.280 41
Total 122

23 polysuphide sealent Rmt 1 36.000 1.000 36

24 Paver Block-80mm Thk Sqm 2 140.000 2.000 560


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -12 1.500 1.500 -27
533
25 Paver Block-60mm Thk Sqm 0

26 Kerb Stone Rm 0 0.000 0

27 Rubble Soling
Utility Crossing Cum 1 7.200 1.650 0.230 2.73
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 9 1.700 1.700 0.230 5.98
Water Chamber Cum 1 1.500 1.500 0.230 0.52
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 194.000 0.900 0.230 40.16
Cum 1 194.000 0.900 0.230 40.16
Total 90.9

28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 1 7.20 1.650 0.100 1.19
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 9 1.70 1.70 0.100 2.6
Water Chamber Cum 1 1.50 1.50 0.100 0.23
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 194.00 0.90 0.100 17.46
Cum 1 194.00 0.90 0.100 17.46
Total 39.53
Sr. No. Description Unit No. Length Breadth Depth Quantity
29 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 1 1.300 1.300 0.150 0.25
SWD Cum 1 194.000 0.800 0.150 23.28
Cum 1 194.000 0.800 0.150 23.28
Total 50.50
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 9 6.000 0.150 1.500 12.15
Water Chamber Cum 1 5.200 0.150 1.000 0.78
SWD Cum 2 194.000 0.150 1.000 58.2
Cum 2 194.000 0.150 1.000 58.2
Total 131.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 1 1.300 1.300 0.150 0.25
Cover Deduction Cum -10 0.900 0.600 0.150 -0.81
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 194.000 0.800 0.150 23.28
Cum 1 194.000 0.800 0.150 23.28
Cover Deduction Cum -78 0.600 0.450 0.150 -3.16
Total 46.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

30 Reinforcement
a Raft MT 110 kg/cum 5832.63
b Wall MT 100 kg/cum 13755.00
c Slab MT 95 kg/cum 4588.50
Total 24.18

31 RCC Np3 Class Pipe


600 mm dia Rmt 2 7.20 14.4

32 Painting Work
Edge Marking Line Sqm 2 140.000 0.15 42
Lane Marking / Other Markings Sqm 21
Zebra Crossing Sqm 2 7.500 3 22.5
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 140.000 1 280
33 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
Sr. No. Description Unit No. Length Breadth Depth Quantity

34 Stud with Lense Reflector Nos 17 17


Zebra crossing Nos 2 7.500 50
Total 67.00
35 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 140.00 2240.00
b 160 mm outer dia for HT & LT Cable Rmt 20 140.00 2800.00

36 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 9 9
600mm
Watersupply Manhole - Size-900mm x Nos 1 1
600mm
OFC Manhole - Size-400mm x 600mm Nos 3 3
37 FRP Perforated Cover
SWD Nos 78 78
38 Barrigates Rmt 2 28 56
R55 - Anna Sathe Chowk to Shivsena Office
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 418.00 1.600 1.500 2006
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 4 8.600 1.650 1.500 85
SWD cum 1 446.000 1.000 1.480 660
cum 1 446.000 1.000 1.480 660
Flexible Pavement deduction cum -113
Total 3298

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 1649

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 83.600 1.50 251

Compacting the existing Subgrade with


6 Sqm 0
power roller

7 Dewatering Hour 1 42

Removing lime or lean cement concrete


8 Cum 2 125.40 1 0.15 37.62

9 Removing rich mix cement concrete Cum 2 125.40 1 0.1 25.08


10 Dismantling brick masonry Cum 2 125.40 0.8 0.23 46.1472
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 14 14
13 Removal of Paver Block sqm 1 418.00 1.65 689.7
14 Dismantling of flexible pavements
Bituminous courses cum 1 418.000 3.000 0.200 251
PaverBlock Area Deduction cum -1 689.700 0.200 -138
Total 113

15 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


16 Sqm 1 418.000 8.90 3720
surface

17 Subgrade cum 2 418.000 1.000 0.500 418


Utility Crossing cum 4 8.600 1.65 1.030 58
476

18 selected hard murum filling cum 2 418.000 1.600 1.090 1458


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -28 1.500 1.500 1.090 -69
Total 1389
19 GSB cum 2 418.000 1.000 0.150 125
Utility Crossing cum 4 8.600 1.65 0.150 9
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 1674.600 0.150 251
385

20 WMM cum 2 418.000 1.000 0.250 209


Utility Crossing cum 4 8.600 1.650 0.250 14
223

21 DBM cum 1 418.000 7.700 0.050 161


Pot Holes / profile Correction 48

22 Prime Coat sqm 1 418.000 7.700 3219

23 Tack Coat sqm 2 418.000 7.700 6437

24 Bituminous Concrete cum 1 418.000 7.700 0.040 129

25 DLC
Foothpath Cum 1 1674.600 0.150 251.19
251

26 Polyethylene (LDPE) sheet sqm 0 0.000 0.000 0

27 Cement Concrete Pavement cum 1 0.280 0

28 polysuphide sealent Rmt 1 1.000 0.000 0

29 Paver Block-80mm Thk Sqm 1 418.000 4.200 1755.6


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -36 1.500 1.500 -81
1674.6

30 Kerb Stone Rm 0 418.000 0

31 Rubble Soling
Utility Crossing Cum 4 8.600 1.650 0.230 13.05
OFC Chamber Cum 8 1.400 1.400 0.230 3.61
Electrical Chamber Cum 28 1.700 1.700 0.230 18.61
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 446.000 1.000 0.230 102.58
Cum 1 446.000 1.000 0.230 102.58
Total 241.47

32 PCC M15
Kerb Stone Cum 0 418.000 0.265 0.075 0
Utility Crossing Cum 4 8.60 1.650 0.100 5.68
OFC Chamber Cum 8 1.40 1.40 0.100 1.57
Sr. No. Description Unit No. Length Breadth Depth Quantity
Electrical Chamber Cum 28 1.70 1.70 0.100 8.09
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 446.00 1.00 0.100 44.60
Cum 1 446.00 1.00 0.100 44.60
Total 104.99
33 RCC M25
a Raft
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 28 1.500 1.500 0.150 9.45
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 446.000 0.900 0.150 60.21
Cum 1 446.000 0.900 0.150 60.21
Total 132.11
b Wall
OFC Chamber Cum 8 4.800 0.150 1.000 5.76
Electrical Chamber Cum 28 6.000 0.150 1.500 37.8
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 1 446.000 0.150 1.000 66.9
Cum 1 446.000 0.150 1.000 66.9
Total 179.00
c Slab
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 28 1.500 1.500 0.150 9.45
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -30 0.900 0.600 0.150 -2.43
Cover Deduction Cum -8 -0.400 -0.600 0.200 -0.384
SWD Cum 1 446.000 0.900 0.150 60.21
Cum 1 446.000 0.900 0.150 60.21
Cover Deduction Cum -178 0.600 0.450 0.150 -7.21
Total 122.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

34 Reinforcement
a Raft MT 110 kg/cum 15258.13
b Wall MT 100 kg/cum 18795.00
c Slab MT 95 kg/cum 12169.50
Total 46.22

35 RCC Np3 Class Pipe


600 mm dia Rmt 8 8.60 68.8

36 Painting Work
Edge Marking Line Sqm 4 418.000 0.15 250.8
Lane Marking / Other Markings Sqm 125.4
Zebra Crossing Sqm 2 8.900 3 26.7
Kerb Painting Sqm 0 418.000 0.3 0
Sr. No. Description Unit No. Length Breadth Depth Quantity
Median Painting Sqm 2 418.000 1 836
37 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 6
b Octagone size 6
c Informatory sign board Sqm 8 0.900 7.2

38 Stud with Lense Reflector Nos 2 23.000 46


Zebra crossing Nos 2 8.900 59
Total 105.00
39 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 418.00 6688.00
b 160 mm outer dia for HT & LT Cable Rmt 20 418.00 8360.00

40 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 28 28
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 8 8
41 FRP Perforated Cover
SWD Nos 178 178
42 Barrigates Rmt 2 83.6 167
R56 - Kaneheri Wadi to Shri Saibaba Hospital
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 345.00 1.600 1.500 828
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 3 3.200 1.650 1.500 24
SWD cum 1 260.000 0.900 1.480 346
cum 1 260.000 0.900 1.480 346
Flexible Pavement deduction cum -138
Total 1406

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 703

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 1 69.000 1.50 104

Compacting the existing Subgrade with


6 Sqm 0
power roller

7 Dewatering Hour 1 35

Removing lime or lean cement concrete


8 Cum 2 103.50 1 0.15 31.05

9 Removing rich mix cement concrete Cum 2 103.50 1 0.1 20.7


10 Dismantling brick masonry Cum 2 103.50 0.8 0.23 38.088
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 12 12
13 Removal of Paver Block sqm 1 345.00 0 0
14 Dismantling of flexible pavements
Bituminous courses cum 1 345.000 2.000 0.200 138
PaverBlock Area Deduction cum -1 0.000 0.200 0
Total 138

15 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


16 Sqm 1 345.000 4.50 1553
surface

17 Subgrade cum 1 345.000 1.000 0.500 173


Utility Crossing cum 3 3.200 1.65 1.030 16
189

18 selected hard murum filling cum 1 345.000 1.600 1.090 602


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -12 1.500 1.500 1.090 -29
Total 573
19 GSB cum 1 345.000 1.000 0.150 52
Utility Crossing cum 3 3.200 1.65 0.150 2
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 828.500 0.150 124
178

20 WMM cum 1 345.000 1.000 0.250 86


Utility Crossing cum 3 3.200 1.650 0.250 4
90

21 DBM cum 1 345.000 4.000 0.050 69


Pot Holes / profile Correction 21

22 Prime Coat sqm 1 345.000 4.000 1380

23 Tack Coat sqm 2 345.000 4.000 2760

24 Bituminous Concrete cum 1 345.000 4.000 0.040 55

25 DLC
Foothpath Cum 1 828.500 0.150 124.28
124

26 Polyethylene (LDPE) sheet sqm 0 0.000 0.000 0

27 Cement Concrete Pavement cum 1 0.280 0

28 polysuphide sealent Rmt 1 1.000 0.000 0

29 Paver Block-80mm Thk Sqm 1 345.000 2.500 862.5


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -15 1.500 1.500 -34
828.5

30 Kerb Stone Rm 0 345.000 0

31 Rubble Soling
Utility Crossing Cum 3 3.200 1.650 0.230 3.64
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 12 1.700 1.700 0.230 7.98
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 260.000 0.900 0.230 53.82
Cum 1 260.000 0.900 0.230 53.82
Total 121.65

32 PCC M15
Kerb Stone Cum 0 345.000 0.265 0.075 0
Utility Crossing Cum 3 3.20 1.650 0.100 1.58
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Sr. No. Description Unit No. Length Breadth Depth Quantity
Electrical Chamber Cum 12 1.70 1.70 0.100 3.47
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 260.00 0.90 0.100 23.40
Cum 1 260.00 0.90 0.100 23.40
Total 52.89
33 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 12 1.500 1.500 0.150 4.05
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 260.000 0.800 0.150 31.20
Cum 1 260.000 0.800 0.150 31.20
Total 67.61
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 12 6.000 0.150 1.500 16.2
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 260.000 0.150 1.000 78
Cum 2 260.000 0.150 1.000 78
Total 176.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 12 1.500 1.500 0.150 4.05
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -14 0.900 0.600 0.150 -1.134
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 260.000 0.800 0.150 31.20
Cum 1 260.000 0.800 0.150 31.20
Cover Deduction Cum -104 0.600 0.450 0.150 -4.21
Total 62.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

34 Reinforcement
a Raft MT 110 kg/cum 7808.38
b Wall MT 100 kg/cum 18480.00
c Slab MT 95 kg/cum 6184.50
Total 32.47

35 RCC Np3 Class Pipe


600 mm dia Rmt 6 3.20 19.2

36 Painting Work
Edge Marking Line Sqm 2 345.000 0.15 103.5
Lane Marking / Other Markings Sqm 51.75
Zebra Crossing Sqm 2 3.500 3 10.5
Kerb Painting Sqm 0 345.000 0.3 0
Sr. No. Description Unit No. Length Breadth Depth Quantity
Median Painting Sqm 0 0
37 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6

38 Stud with Lense Reflector Nos 2 19.000 38


Zebra crossing Nos 2 3.500 23
Total 61.00
39 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 345.00 2760.00
b 160 mm outer dia for HT & LT Cable Rmt 10 345.00 3450.00

40 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 12 12
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 3 3
41 FRP Perforated Cover
SWD Nos 104 104
42 Barrigates Rmt 1 69 69
R57 -Old C.B.S. Area to Shalimar Chowk
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 440.00 1.600 1.500 2112
Light Pole cum 15 0.90 0.900 1.600 19
Utility Crossing cum 4 15.000 1.650 1.500 149
SWD cum 1 460.000 1.300 1.480 885
Rigid Pavement deduction cum -2 440.000 1.600 0.300 -422
Total 2743

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 1372

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 88.000 1.50 264

Compacting the existing Subgrade with


6 Sqm 1 440.00 1.000 440
power roller

7 Dewatering Hour 1 44

Removing lime or lean cement concrete


8 Cum 2 132.00 1 0.15 39.6

9 Removing rich mix cement concrete Cum 2 132.00 1 0.1 26.4


10 Dismantling brick masonry Cum 2 132.00 0.8 0.23 48.576
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 15 15
13 Removal of Paver Block sqm 1 440.00 1.2 528
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 2 440.00 2.60 0.300 686

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 440.000 1.000 0.500 0


Utility Crossing cum 4 15.000 1.65 0.920 91
91

18 selected hard murum filling cum 2 440.000 1.600 1.090 1535


deduction of pole cum -15 1.200 1.200 1.090 -24
deduction of Manhole cum -29 1.500 1.500 1.090 -71
Total 1440
19 GSB cum 2 440.000 1.000 0.150 132
Utility Crossing cum 4 15.000 1.65 0.150 15
Below Foothpath cum 1 1652.000 0.150 248
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 395

20 DLC cum 2 440.000 1.000 0.150 132


Utility Crossing cum 4 15.000 1.650 0.150 15
Add 10% for Damage Panel Repairing cum 0.1 440.000 18.300 0.150 121
Foothpath Cum 1 1652.000 0.150 247.8
Total 515.8

21 Polyethylene (LDPE) sheet sqm 2 440.000 1.000 880


Utility Crossing sqm 4 15.000 1.650 99
Add 10% for Damage Panel Repairing sqm 0.1 440.000 18.300 805
Total 1784

22 Cement Concrete Pavement cum 2 440.000 1.000 0.280 246


Utility Crossing cum 4 15.000 1.650 0.280 28
Add 10% for Damage Panel Repairing cum 0.1 440.000 18.300 0.280 225
Total 499

23 polysuphide sealent Rmt 1 111.000 1.000 111

24a Dowel Bars Nos 25 3.000 75

24 Paver Block-80mm Thk Sqm 2 440.000 2.000 1760


deduction of pole Sqm -15 1.200 1.200 -22
deduction of Manhole Sqm -38 1.500 1.500 -86
1652
25 Paver Block-60mm Thk Sqm 0

26 Kerb Stone Rm 0 0.000 0

27 Rubble Soling
Utility Crossing Cum 4 15.000 1.650 0.230 22.77
OFC Chamber Cum 9 1.400 1.400 0.230 4.06
Electrical Chamber Cum 29 1.700 1.700 0.230 19.28
Water Chamber Cum 4 1.500 1.500 0.230 2.07
Light pole Cum 15 0.800 0.800 0.230 2.21
SWD Cum 1 460.000 1.300 0.230 137.54
Total 187.93

28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 15.00 1.650 0.100 9.9
OFC Chamber Cum 9 1.40 1.40 0.100 1.76
Electrical Chamber Cum 29 1.70 1.70 0.100 8.38
Water Chamber Cum 4 1.50 1.50 0.100 0.9
Light pole Cum 15 0.80 0.80 0.100 0.96
SWD Cum 1 460.00 1.30 0.100 59.8
Total 81.7
29 RCC M25
Sr. No. Description Unit No. Length Breadth Depth Quantity
a Raft
OFC Chamber Cum 9 1.200 1.200 0.150 1.94
Electrical Chamber Cum 29 1.500 1.500 0.150 9.79
Water Chamber Cum 4 1.300 1.300 0.150 1.01
SWD Cum 1 460.000 1.200 0.150 82.80
Total 95.55
b Wall
OFC Chamber Cum 9 4.800 0.150 1.000 6.48
Electrical Chamber Cum 29 6.000 0.150 1.500 39.15
Water Chamber Cum 4 5.200 0.150 1.000 3.12
SWD Cum 1 460.000 0.150 1.000 69
Total 118.00
c Slab
OFC Chamber Cum 9 1.200 1.200 0.150 1.94
Electrical Chamber Cum 29 1.500 1.500 0.150 9.79
Water Chamber Cum 4 1.300 1.300 0.150 1.01
Cover Deduction Cum -33 0.900 0.600 0.150 -2.673
Cover Deduction Cum -9 -0.400 -0.600 0.200 -0.432
SWD Cum 1 460.000 1.200 0.150 82.8
Cover Deduction Cum -92 0.600 0.900 0.150 -7.45
Total 85.00
d Pole Foundation Cum 15 0.600 0.600 1.500 8.10

30 Reinforcement
a Raft MT 110 kg/cum 11035.51
b Wall MT 100 kg/cum 12390.00
c Slab MT 95 kg/cum 8478.75
Total 31.90

31 RCC Np3 Class Pipe


600 mm dia Rmt 8 15.00 120

32 Painting Work
Edge Marking Line Sqm 2 440.000 0.15 132
Lane Marking / Other Markings Sqm 66
Zebra Crossing Sqm 2 15.300 3 45.9
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 440.000 1 880
33 Signages
Cautionary/Warning sign boards in
a Nos. 16
Equilateral Triangle 16
Cautionary/Warning sign boards in
Nos. 8
b Octagone size 8
c Informatory sign board Sqm 6 0.900 5.4

34 Stud with Lense Reflector Nos 2 24 48


Zebra crossing Nos 2 15.300 102
Total 150.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
35 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 440.00 7040.00
b 160 mm outer dia for HT & LT Cable Rmt 20 440.00 8800.00

36 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 29 29
600mm
Watersupply Manhole - Size-900mm x Nos 4 4
600mm
OFC Manhole - Size-400mm x 600mm Nos 9 9
37 FRP Perforated Cover
SWD Nos 92 92
38 Barrigates Rmt 2 88 176
R58 - Shalimar Chowk to Ganjmal signal
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 192.00 1.600 1.500 922
Light Pole cum 0.90 0.900 1.600 0
Utility Crossing cum 2 17.800 1.650 1.500 88
SWD cum 1 161.000 1.300 1.480 310
cum 1 161.000 1.300 1.480 310
Flexible Pavement deduction cum -60
Total 1570

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 785

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 38.400 1.50 115

Compacting the existing Subgrade with


6 Sqm 0
power roller

7 Dewatering Hour 1 19

Removing lime or lean cement concrete


8 Cum 2 57.60 1 0.15 17.28

9 Removing rich mix cement concrete Cum 2 57.60 1 0.1 11.52


10 Dismantling brick masonry Cum 2 57.60 0.8 0.23 21.1968
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 6 6
13 Removal of Paver Block sqm 1 192.00 2.45 470.4
14 Dismantling of flexible pavements
Bituminous courses cum 1 192.000 4.000 0.200 154
PaverBlock Area Deduction cum -1 470.400 0.200 -94
Total 60

15 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


16 Sqm 1 192.000 17.10 3283
surface

17 Subgrade cum 2 192.000 1.000 0.500 192


Utility Crossing cum 2 17.800 1.65 1.030 61
253

18 selected hard murum filling cum 2 192.000 1.600 1.090 670


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -13 1.500 1.500 1.090 -32
Total 638
19 GSB cum 2 192.000 1.000 0.150 58
Utility Crossing cum 2 17.800 1.65 0.150 9
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 768.400 0.150 115
182

20 WMM cum 2 192.000 1.000 0.250 96


Utility Crossing cum 2 17.800 1.650 0.250 15
111

21 DBM cum 1 192.000 13.900 0.050 133


Pot Holes / profile Correction 40

22 Prime Coat sqm 1 192.000 13.900 2669

23 Tack Coat sqm 2 192.000 13.900 5338

24 Bituminous Concrete cum 1 192.000 13.900 0.040 107

25 DLC
Foothpath Cum 1 1344.400 0.150 201.66
202

26 Polyethylene (LDPE) sheet sqm 0 0.000 0.000 0

27 Cement Concrete Pavement cum 1 0.280 0

28 polysuphide sealent Rmt 1 1.000 0.000 0

29 Paver Block-80mm Thk Sqm 1 192.000 7.200 1382.4


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -17 1.500 1.500 -38
Deduction of Raised Foothpath Sqm -576
768.4
30 Paver Block-60mm Thk Sqm 2 192.000 1.500 576
Deduction of Tactile tiles Sqm -115.2
460.8
31 Tactile tiles Sqm 2 192.000 0.3 115.2

31 Kerb Stone Rm 2 192.000 384

32 Rubble Soling
Utility Crossing Cum 2 17.800 1.650 0.230 13.51
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 13 1.700 1.700 0.230 8.64
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 161.000 1.300 0.230 48.14
Cum 1 161.000 1.300 0.230 48.14
Total 121.27
Sr. No. Description Unit No. Length Breadth Depth Quantity

33 PCC M15
Kerb Stone Cum 2 192.000 0.265 0.075 7.63
Utility Crossing Cum 2 17.80 1.650 0.100 5.87
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 13 1.70 1.70 0.100 3.76
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 161.00 1.30 0.100 20.93
Cum 1 161.00 1.30 0.100 20.93
Total 60.35
34 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 13 1.500 1.500 0.150 4.39
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 161.000 1.200 0.150 28.98
Cum 1 161.000 1.200 0.150 28.98
Total 63.72
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 13 6.000 0.150 1.500 17.55
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 161.000 0.150 1.000 48.3
Cum 2 161.000 0.150 1.000 48.3
Total 119.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 13 1.500 1.500 0.150 4.39
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -15 0.900 0.600 0.150 -1.215
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
SWD Cum 1 161.000 1.200 0.150 28.98
Cum 1 161.000 1.200 0.150 28.98
Cover Deduction Cum -64 0.600 0.900 0.150 -5.18
Total 57.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

35 Reinforcement
a Raft MT 110 kg/cum 7359.49
b Wall MT 100 kg/cum 12495.00
c Slab MT 95 kg/cum 5685.75
Total 25.54

36 RCC Np3 Class Pipe


600 mm dia Rmt 4 17.80 71.2
Sr. No. Description Unit No. Length Breadth Depth Quantity
37 Painting Work
Edge Marking Line Sqm 4 192.000 0.15 115.2
Lane Marking / Other Markings Sqm 57.6
Zebra Crossing Sqm 3 18.100 3 81.45
Kerb Painting Sqm 2 192.000 0.3 115.2
Median Painting Sqm 2 192.000 1 384
38 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6

39 Stud with Lense Reflector Nos 2 11.000 22


Zebra crossing Nos 3 18.100 181
Total 203.00
40 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 192.00 3072.00
b 160 mm outer dia for HT & LT Cable Rmt 20 192.00 3840.00

41 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 13 13
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 4 4
42 FRP Perforated Cover
SWD Nos 64 64
43 Barrigates Rmt 2 38.4 77
R59 -Under Pass (vikas Bhavan) to Shivaji Road
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 152.00 1.600 1.500 730
Light Pole cum 5 0.90 0.900 1.600 6
Utility Crossing cum 2 12.300 1.650 1.500 61
Rigid Pavement deduction cum -2 152.000 1.600 0.300 -146
Total 651

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 326

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 30.400 1.50 91

Compacting the existing Subgrade with


6 Sqm 1 152.00 1.000 152
power roller

7 Dewatering Hour 1 15

Removing lime or lean cement concrete


8 Cum 1 45.60 1 0.15 6.84

9 Removing rich mix cement concrete Cum 1 45.60 1 0.1 4.56


10 Dismantling brick masonry Cum 1 45.60 0.8 0.23 8.3904
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 5 5
13 Removal of Paver Block sqm 1 152.00 3.5 532
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 2 152.00 2.60 0.300 237

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 152.000 1.000 0.500 0


Utility Crossing cum 2 12.300 1.65 0.920 37
37

18 selected hard murum filling cum 2 152.000 1.600 1.090 530


deduction of pole cum -5 1.200 1.200 1.090 -8
deduction of Manhole cum -10 1.500 1.500 1.090 -25
Total 497
19 GSB cum 2 152.000 1.000 0.150 46
Utility Crossing cum 2 12.300 1.65 0.150 6
Below Foothpath cum 1 1180.000 0.150 177
Total 229
Sr. No. Description Unit No. Length Breadth Depth Quantity
20 DLC cum 2 152.000 1.000 0.150 46
Utility Crossing cum 2 12.300 1.650 0.150 6
Add 10% for Damage Panel Repairing cum 0.1 152.000 15.600 0.150 36
Foothpath Cum 1 1180.000 0.150 177
Total 265

21 Polyethylene (LDPE) sheet sqm 2 152.000 1.000 304


Utility Crossing sqm 2 12.300 1.650 41
Add 10% for Damage Panel Repairing sqm 0.1 152.000 15.600 237
Total 582

22 Cement Concrete Pavement cum 2 152.000 1.000 0.280 85


Utility Crossing cum 2 12.300 1.650 0.280 11
Add 10% for Damage Panel Repairing cum 0.1 152.000 15.600 0.280 66
Total 162

23 polysuphide sealent Rmt 1 39.000 1.000 39

24 Paver Block-80mm Thk Sqm 2 152.000 4.000 1216


deduction of pole Sqm -5 1.200 1.200 -7
deduction of Manhole Sqm -13 1.500 1.500 -29
1180
25 Paver Block-60mm Thk Sqm 0

26 Kerb Stone Rm 0 0.000 0

27 Rubble Soling
Utility Crossing Cum 2 12.300 1.650 0.230 9.34
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 10 1.700 1.700 0.230 6.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 5 0.800 0.800 0.230 0.74
Total 19.12

28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 12.30 1.650 0.100 4.06
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 10 1.70 1.70 0.100 2.89
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 5 0.80 0.80 0.100 0.32
Total 8.31
29 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Total 4.53
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Sr. No. Description Unit No. Length Breadth Depth Quantity
Electrical Chamber Cum 10 6.000 0.150 1.500 13.5
Water Chamber Cum 2 5.200 0.150 1.000 1.56
Total 17.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -12 0.900 0.600 0.150 -0.972
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
Total 3.00
d Pole Foundation Cum 5 0.600 0.600 1.500 2.70

30 Reinforcement
a Raft MT 110 kg/cum 523.22
b Wall MT 100 kg/cum 1785.00
c Slab MT 95 kg/cum 299.25
Total 2.61

31 RCC Np3 Class Pipe


600 mm dia Rmt 4 12.30 49.2

32 Painting Work
Edge Marking Line Sqm 2 152.000 0.15 45.6
Lane Marking / Other Markings Sqm 22.8
Zebra Crossing Sqm 2 12.600 3 37.8
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0
33 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6

34 Stud with Lense Reflector Nos 2 8 16


Zebra crossing Nos 2 12.600 84
Total 100.00
35 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 152.00 2432.00
b 160 mm outer dia for HT & LT Cable Rmt 20 152.00 3040.00

36 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 10 10
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 3 3
37 FRP Perforated Cover
SWD Nos 0 0
38 Barrigates Rmt 2 30.4 61
R60 -Shivaji Road to Bank of Maharashtra Nehru Gardenl
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 228.00 1.600 1.500 1094
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 2 14.700 1.650 1.500 73
SWD cum 1 204.000 1.600 1.480 483
cum 1 204.000 1.600 1.480 483
Flexible Pavement deduction cum -737
Total 1396
2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 698

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 45.600 1.50 137

Compacting the existing Subgrade with


6 Sqm 1 228.00 14.8 3374
power roller

7 Dewatering Hour 1 23

Removing lime or lean cement concrete


8 Cum 2 68.40 1 0.15 20.52

9 Removing rich mix cement concrete Cum 2 68.40 1 0.1 13.68


10 Dismantling brick masonry Cum 2 68.40 0.8 0.23 25.1712
11 Dismantling stone masonry Cum 1 20
Removing all type of hume pipes and
12 stacking within a lead up to 1000 meters Rmt 5 18.00 90

13 Removal of telephone / Electric poles Nos 1 8 8


14 Removal of Paver Block sqm 1 228.00 1.85 421.8
15 Dismantling of flexible pavements
Bituminous courses cum 1 228.000 18.000 0.200 821
PaverBlock Area Deduction cum -1 421.800 0.200 -84
Total 737

16 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


17 Sqm 1 0
surface

18 Subgrade cum 0 228.000 13.000 0.500 0


Utility Crossing cum 2 14.700 1.65 0.880 43
43

19 selected hard murum filling cum 2 228.000 1.600 1.090 795


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -15 1.500 1.500 1.090 -37
Total 758
Sr. No. Description Unit No. Length Breadth Depth Quantity
20 GSB cum 1 228.000 13.000 0.150 445
Utility Crossing cum 2 14.700 1.65 0.150 7
Below Foothpath cum 1 1095.000 0.150 164
616

21 WMM cum 2 0.000 0.250 0


Utility Crossing cum 2 14.700 1.650 0.250 12
12

22 DBM cum 1 0.000 13.600 0.050 0


Pot Holes / profile Correction 0

23 Prime Coat sqm 1 0.000 13.600 0

24 Tack Coat sqm 1 0.000 13.600 0

25 Bituminous Concrete cum 1 0.000 13.600 0.040 0

26 DLC cum 1 228.000 13.000 0.150 445


Foothpath Cum 1 1095.000 0.150 164.25
609

27 Polyethylene (LDPE) sheet sqm 1 228.000 13.000 2964

28 Cement Concrete Pavement cum 1 228.000 13.000 0.280 830

29 polysuphide sealent Rmt 1 58.000 13.000 754

24a Dowel Bars Nos 13 43.000 559

30 Paver Block-80mm Thk Sqm 1 228.000 5.000 1140


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -20 1.500 1.500 -45
1095

31 Kerb Stone Rm 2 228.000 456

32 Rubble Soling
Utility Crossing Cum 2 14.700 1.650 0.230 11.16
OFC Chamber Cum 5 1.400 1.400 0.230 2.25
Electrical Chamber Cum 15 1.700 1.700 0.230 9.97
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 204.000 1.600 0.230 75.07
Cum 1 204.000 1.600 0.230 75.07
Total 174.56
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 PCC M15
Kerb Stone Cum 2 228.000 0.265 0.075 9.06
Utility Crossing Cum 2 14.70 1.650 0.100 4.85
OFC Chamber Cum 5 1.40 1.40 0.100 0.98
Electrical Chamber Cum 15 1.70 1.70 0.100 4.34
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 204.00 1.60 0.100 32.64
Cum 1 204.00 1.60 0.100 32.64
Total 84.96
34 RCC M25
a Raft
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 204.000 1.500 0.150 45.90
Cum 1 204.000 1.500 0.150 45.90
Total 98.45
b Wall
OFC Chamber Cum 5 4.800 0.150 1.000 3.6
Electrical Chamber Cum 15 6.000 0.150 1.500 20.25
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 204.000 0.150 1.000 61.2
Cum 2 204.000 0.150 1.000 61.2
Total 148.00
c Slab
OFC Chamber Cum 5 1.200 1.200 0.150 1.08
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -17 0.900 0.600 0.150 -1.377
Cover Deduction Cum -5 -0.400 -0.600 0.200 -0.24
SWD Cum 1 204.000 1.500 0.150 45.90
Cum 1 204.000 1.500 0.150 45.90
Cover Deduction Cum -82 0.600 0.600 0.150 -4.43
Total 92.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

35 Reinforcement
a Raft MT 110 kg/cum 11370.92
b Wall MT 100 kg/cum 15540.00
c Slab MT 95 kg/cum 9177.00
Total 36.09

36 RCC Np3 Class Pipe


600 mm dia Rmt 4 14.70 58.8

37 Painting Work
Sr. No. Description Unit No. Length Breadth Depth Quantity
Edge Marking Line Sqm 4 228.000 0.15 136.8
Lane Marking / Other Markings Sqm 68.4
Zebra Crossing Sqm 4 15.000 3 90
Kerb Painting Sqm 2 228.000 0.3 136.8
Median Painting Sqm 0 0
38 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 5 0.900 4.5

39 Stud with Lense Reflector Nos 2 13.000 26


Zebra crossing Nos 4 15.000 200
Total 226.00
40 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 228.00 3648.00
b 160 mm outer dia for HT & LT Cable Rmt 20 228.00 4560.00

41 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 15 15
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 5 5
42 FRP Perforated Cover
SWD Nos 82 82
43 Barrigates Rmt 2 45.6 91
R61 -Shalimar Chowk to Bank of Maharashtra Nehru Garden
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 292.00 1.600 1.500 1402
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 3 8.200 1.650 1.500 61
SWD cum 1 327.000 1.600 1.480 774
cum 1 327.000 1.600 1.480 774
Rigid Pavement deduction cum -2 292.000 1.600 0.300 -280
Total 2731

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 1366

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 58.400 1.50 175

Compacting the existing Subgrade with


6 Sqm 1 292.00 1.000 292
power roller

7 Dewatering Hour 1 29

Removing lime or lean cement concrete


8 Cum 2 87.60 1 0.15 26.28

9 Removing rich mix cement concrete Cum 2 87.60 1 0.1 17.52


10 Dismantling brick masonry Cum 2 87.60 0.8 0.23 32.2368
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 10 10
13 Removal of Paver Block sqm 1 292.00 1.25 365
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 2 292.00 2.60 0.300 456

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 292.000 1.000 0.500 0


Utility Crossing cum 3 8.200 1.65 0.920 37
37

18 selected hard murum filling cum 2 292.000 1.600 1.090 1018


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -19 1.500 1.500 1.090 -47
Total 971
19 GSB cum 2 292.000 1.000 0.150 88
Utility Crossing cum 3 8.200 1.65 0.150 6
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 2280.000 0.150 342
Total 436

20 DLC cum 2 292.000 1.000 0.150 88


Utility Crossing cum 3 8.200 1.650 0.150 6
Add 10% for Damage Panel Repairing cum 0.1 292.000 11.500 0.150 50
Foothpath Cum 1 2280.000 0.150 342
Total 486

21 Polyethylene (LDPE) sheet sqm 2 292.000 1.000 584


Utility Crossing sqm 3 8.200 1.650 41
Add 10% for Damage Panel Repairing sqm 0.1 292.000 11.500 336
Total 961

22 Cement Concrete Pavement cum 2 292.000 1.000 0.280 164


Utility Crossing cum 3 8.200 1.650 0.280 11
Add 10% for Damage Panel Repairing cum 0.1 292.000 11.500 0.280 94
Total 269

23 polysuphide sealent Rmt 1 74.000 1.000 74

24 Paver Block-80mm Thk Sqm 2 292.000 4.000 2336


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -25 1.500 1.500 -56
2280
25 Paver Block-60mm Thk Sqm 0

26 Kerb Stone Rm 0 0.000 0

27 Rubble Soling
Utility Crossing Cum 3 8.200 1.650 0.230 9.34
OFC Chamber Cum 6 1.400 1.400 0.230 2.70
Electrical Chamber Cum 19 1.700 1.700 0.230 12.63
Water Chamber Cum 3 1.500 1.500 0.230 1.55
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 327.000 1.600 0.230 120.34
Cum 1 327.000 1.600 0.230 120.34
Total 266.9

28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 3 8.20 1.650 0.100 4.06
OFC Chamber Cum 6 1.40 1.40 0.100 1.18
Electrical Chamber Cum 19 1.70 1.70 0.100 5.49
Water Chamber Cum 3 1.50 1.50 0.100 0.68
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 327.00 1.60 0.100 52.32
Cum 1 327.00 1.60 0.100 52.32
Total 116.05
Sr. No. Description Unit No. Length Breadth Depth Quantity
29 RCC M25
a Raft
OFC Chamber Cum 6 1.200 1.200 0.150 1.30
Electrical Chamber Cum 19 1.500 1.500 0.150 6.41
Water Chamber Cum 3 1.300 1.300 0.150 0.76
SWD Cum 1 327.000 1.500 0.150 73.58
Cum 1 327.000 1.500 0.150 73.58
Total 155.62
b Wall
OFC Chamber Cum 6 4.800 0.150 1.000 4.32
Electrical Chamber Cum 19 6.000 0.150 1.500 25.65
Water Chamber Cum 3 5.200 0.150 1.000 2.34
SWD Cum 2 327.000 0.150 1.000 98.1
Cum 2 327.000 0.150 1.000 98.1
Total 229.00
c Slab
OFC Chamber Cum 6 1.200 1.200 0.150 1.30
Electrical Chamber Cum 19 1.500 1.500 0.150 6.41
Water Chamber Cum 3 1.300 1.300 0.150 0.76
Cover Deduction Cum -22 0.900 0.600 0.150 -1.782
Cover Deduction Cum -6 -0.400 -0.600 0.200 -0.288
SWD Cum 1 327.000 1.500 0.150 73.58
Cum 1 327.000 1.500 0.150 73.58
Cover Deduction Cum -131 0.600 0.600 0.150 -7.07
Total 146.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

30 Reinforcement
a Raft MT 110 kg/cum 17973.99
b Wall MT 100 kg/cum 24045.00
c Slab MT 95 kg/cum 14563.50
Total 56.58

31 RCC Np3 Class Pipe


600 mm dia Rmt 6 8.20 49.2

32 Painting Work
Edge Marking Line Sqm 2 292.000 0.15 87.6
Lane Marking / Other Markings Sqm 43.8
Zebra Crossing Sqm 5 8.500 3 63.75
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0
33 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 6
b Octagone size 6
c Informatory sign board Sqm 6 0.900 5.4
Sr. No. Description Unit No. Length Breadth Depth Quantity

34 Stud with Lense Reflector Nos 2 16 32


Zebra crossing Nos 5 8.500 142
Total 174.00
35 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 292.00 4672.00
b 160 mm outer dia for HT & LT Cable Rmt 20 292.00 5840.00

36 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 19 19
600mm
Watersupply Manhole - Size-900mm x Nos 3 3
600mm
OFC Manhole - Size-400mm x 600mm Nos 6 6
37 FRP Perforated Cover
SWD Nos 131 131
38 Barrigates Rmt 2 58.4 117
R62 -Nehru Garden Chowk to Navapura, Main Road
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 152.00 1.600 1.500 730
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 2 11.600 1.650 1.500 57
SWD cum 1 155.000 1.000 1.480 229
cum 1 155.000 1.000 1.480 229
Rigid Pavement deduction cum -2 152.000 1.600 0.300 -146
Total 1099

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 550

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 30.400 1.50 91

Compacting the existing Subgrade with


6 Sqm 1 152.00 1.000 152
power roller

7 Dewatering Hour 1 15

Removing lime or lean cement concrete


8 Cum 2 45.60 1 0.15 13.68

9 Removing rich mix cement concrete Cum 2 45.60 1 0.1 9.12


10 Dismantling brick masonry Cum 2 45.60 0.8 0.23 16.7808
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 5 5
13 Removal of Paver Block sqm 1 152.00 1.3 197.6
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 2 152.00 2.60 0.300 237

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 152.000 1.000 0.500 0


Utility Crossing cum 2 11.600 1.65 0.920 35
35

18 selected hard murum filling cum 2 152.000 1.600 1.090 530


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -10 1.500 1.500 1.090 -25
Total 505
19 GSB cum 2 152.000 1.000 0.150 46
Utility Crossing cum 2 11.600 1.65 0.150 6
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 579.000 0.150 87
Total 139

20 DLC cum 2 152.000 1.000 0.150 46


Utility Crossing cum 2 11.600 1.650 0.150 6
Add 10% for Damage Panel Repairing cum 0.1 152.000 14.900 0.150 34
Foothpath Cum 1 579.000 0.150 86.85
Total 172.85

21 Polyethylene (LDPE) sheet sqm 2 152.000 1.000 304


Utility Crossing sqm 2 11.600 1.650 38
Add 10% for Damage Panel Repairing sqm 0.1 152.000 14.900 226
Total 568

22 Cement Concrete Pavement cum 2 152.000 1.000 0.280 85


Utility Crossing cum 2 11.600 1.650 0.280 11
Add 10% for Damage Panel Repairing cum 0.1 152.000 14.900 0.280 63
Total 159

23 polysuphide sealent Rmt 1 39.000 1.000 39

24 Paver Block-80mm Thk Sqm 2 152.000 2.000 608


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -13 1.500 1.500 -29
579
25 Paver Block-60mm Thk Sqm 0

26 Kerb Stone Rm 0 0.000 0

27 Rubble Soling
Utility Crossing Cum 2 11.600 1.650 0.230 8.8
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 10 1.700 1.700 0.230 6.65
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 155.000 1.000 0.230 35.65
Cum 1 155.000 1.000 0.230 35.65
Total 89.14

28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 11.60 1.650 0.100 3.83
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 10 1.70 1.70 0.100 2.89
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 155.00 1.00 0.100 15.50
Cum 1 155.00 1.00 0.100 15.50
Total 38.76
Sr. No. Description Unit No. Length Breadth Depth Quantity
29 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 155.000 0.900 0.150 20.93
Cum 1 155.000 0.900 0.150 20.93
Total 46.38
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 10 6.000 0.150 1.500 13.5
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 155.000 0.150 1.000 46.5
Cum 2 155.000 0.150 1.000 46.5
Total 110.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 10 1.500 1.500 0.150 3.38
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -12 0.900 0.600 0.150 -0.972
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 155.000 0.900 0.150 20.93
Cum 1 155.000 0.900 0.150 20.93
Cover Deduction Cum -62 0.600 0.600 0.150 -3.35
Total 42.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

30 Reinforcement
a Raft MT 110 kg/cum 5356.89
b Wall MT 100 kg/cum 11550.00
c Slab MT 95 kg/cum 4189.50
Total 21.10

31 RCC Np3 Class Pipe


600 mm dia Rmt 4 11.60 46.4

32 Painting Work
Edge Marking Line Sqm 2 152.000 0.15 45.6
Lane Marking / Other Markings Sqm 22.8
Zebra Crossing Sqm 3 11.900 3 53.55
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 152.000 1 304
33 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
Sr. No. Description Unit No. Length Breadth Depth Quantity

34 Stud with Lense Reflector Nos 2 8 16


Zebra crossing Nos 3 11.900 119
Total 135.00
35 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 152.00 2432.00
b 160 mm outer dia for HT & LT Cable Rmt 20 152.00 3040.00

36 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 10 10
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 3 3
37 FRP Perforated Cover
SWD Nos 62 62
38 Barrigates Rmt 2 30.4 61
R63 -Takshila to Main Road
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 130.00 1.600 1.500 624
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 1 8.100 1.650 1.500 20
SWD cum 1 130.000 1.000 1.480 192
cum 1 130.000 1.000 1.480 192
Rigid Pavement deduction cum -2 130.000 1.600 0.300 -125
Total 903

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 452

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 26.000 1.50 78

Compacting the existing Subgrade with


6 Sqm 1 130.00 1.000 130
power roller

7 Dewatering Hour 1 13

Removing lime or lean cement concrete


8 Cum 2 39.00 1 0.15 11.7

9 Removing rich mix cement concrete Cum 2 39.00 1 0.1 7.8


10 Dismantling brick masonry Cum 2 39.00 0.8 0.23 14.352
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 4 4
13 Removal of Paver Block sqm 1 130.00 1.9 247
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 2 130.00 2.60 0.300 203

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 130.000 1.000 0.500 0


Utility Crossing cum 1 8.100 1.65 0.920 12
12

18 selected hard murum filling cum 2 130.000 1.600 1.090 453


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -9 1.500 1.500 1.090 -22
Total 431
19 GSB cum 2 130.000 1.000 0.150 39
Utility Crossing cum 1 8.100 1.65 0.150 2
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 493.000 0.150 74
Total 115

20 DLC cum 2 130.000 1.000 0.150 39


Utility Crossing cum 1 8.100 1.650 0.150 2
Add 10% for Damage Panel Repairing cum 0.1 130.000 11.400 0.150 22
Foothpath Cum 1 493.000 0.150 73.95
Total 136.95

21 Polyethylene (LDPE) sheet sqm 2 130.000 1.000 260


Utility Crossing sqm 1 8.100 1.650 13
Add 10% for Damage Panel Repairing sqm 0.1 130.000 11.400 148
Total 421

22 Cement Concrete Pavement cum 2 130.000 1.000 0.280 73


Utility Crossing cum 1 8.100 1.650 0.280 4
Add 10% for Damage Panel Repairing cum 0.1 130.000 11.400 0.280 41
Total 118

23 polysuphide sealent Rmt 1 34.000 1.000 34

24 Paver Block-80mm Thk Sqm 2 130.000 2.000 520


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -12 1.500 1.500 -27
493
25 Paver Block-60mm Thk Sqm 0

26 Kerb Stone Rm 0 0.000 0

27 Rubble Soling
Utility Crossing Cum 1 8.100 1.650 0.230 3.07
OFC Chamber Cum 3 1.400 1.400 0.230 1.35
Electrical Chamber Cum 9 1.700 1.700 0.230 5.98
Water Chamber Cum 1 1.500 1.500 0.230 0.52
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 130.000 1.000 0.230 29.90
Cum 1 130.000 1.000 0.230 29.90
Total 70.72

28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 1 8.10 1.650 0.100 1.34
OFC Chamber Cum 3 1.40 1.40 0.100 0.59
Electrical Chamber Cum 9 1.70 1.70 0.100 2.6
Water Chamber Cum 1 1.50 1.50 0.100 0.23
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 130.00 1.00 0.100 13.00
Cum 1 130.00 1.00 0.100 13.00
Total 30.76
Sr. No. Description Unit No. Length Breadth Depth Quantity
29 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 1 1.300 1.300 0.150 0.25
SWD Cum 1 130.000 0.900 0.150 17.55
Cum 1 130.000 0.900 0.150 17.55
Total 39.04
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000 2.16
Electrical Chamber Cum 9 6.000 0.150 1.500 12.15
Water Chamber Cum 1 5.200 0.150 1.000 0.78
SWD Cum 2 130.000 0.150 1.000 39.00
Cum 2 130.000 0.150 1.000 39.00
Total 93.00
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150 0.65
Electrical Chamber Cum 9 1.500 1.500 0.150 3.04
Water Chamber Cum 1 1.300 1.300 0.150 0.25
Cover Deduction Cum -10 0.900 0.600 0.150 -0.81
Cover Deduction Cum -3 -0.400 -0.600 0.200 -0.144
SWD Cum 1 130.000 0.900 0.150 17.55
Cum 1 130.000 0.900 0.150 17.55
Cover Deduction Cum -52 0.450 0.600 0.150 -2.11
Total 36.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

30 Reinforcement
a Raft MT 110 kg/cum 4509.00
b Wall MT 100 kg/cum 9765.00
c Slab MT 95 kg/cum 3591.00
Total 17.87

31 RCC Np3 Class Pipe


600 mm dia Rmt 2 8.10 16.2

32 Painting Work
Edge Marking Line Sqm 2 130.000 0.15 39
Lane Marking / Other Markings Sqm 19.5
Zebra Crossing Sqm 2 8.400 3 25.2
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0
33 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6
Sr. No. Description Unit No. Length Breadth Depth Quantity

34 Stud with Lense Reflector Nos 2 7 14


Zebra crossing Nos 2 8.400 56
Total 70.00
35 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 130.00 2080.00
b 160 mm outer dia for HT & LT Cable Rmt 20 130.00 2600.00

36 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 9 9
600mm
Watersupply Manhole - Size-900mm x Nos 1 1
600mm
OFC Manhole - Size-400mm x 600mm Nos 3 3
37 FRP Perforated Cover
SWD Nos 52 52
38 Barrigates Rmt 2 26 52
R64 -Near Nehru Garden Chowk to Maratha Mangal karyalaya
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 168.00 1.600 1.500 403
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 3 6.200 1.650 1.500 46
SWD cum 1 168.000 1.000 1.480 249
cum 1 168.000 1.000 1.480 249
Rigid Pavement deduction cum -1 -131
Total 816

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 408

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 33.600 1.50 101

Compacting the existing Subgrade with


6 Sqm 1 168.00 1.000 168
power roller

7 Dewatering Hour 1 17

Removing lime or lean cement concrete


8 Cum 2 50.40 1 0.15 15.12

9 Removing rich mix cement concrete Cum 2 50.40 1 0.1 10.08


10 Dismantling brick masonry Cum 2 50.40 0.8 0.23 18.5472
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 6 6
13 Removal of Paver Block sqm 1 168.00 1.25 210
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 1 168.00 2.60 0.300 131

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 168.000 1.000 0.500 0


Utility Crossing cum 3 6.200 1.65 0.920 28
28

18 selected hard murum filling cum 1 168.000 1.600 1.090 293


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -6 1.500 1.500 1.090 -15
Total 278
19 GSB cum 1 168.000 1.000 0.150 25
Utility Crossing cum 3 6.200 1.65 0.150 5
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 402.000 0.150 60
Total 90

20 DLC cum 1 168.000 1.000 0.150 25


Utility Crossing cum 3 6.200 1.650 0.150 5
Add 10% for Damage Panel Repairing cum 0.1 168.000 9.500 0.150 24
Foothpath Cum 1 402.000 0.150 60.3
Total 114.3

21 Polyethylene (LDPE) sheet sqm 1 168.000 1.000 168


Utility Crossing sqm 3 6.200 1.650 31
Add 10% for Damage Panel Repairing sqm 0.1 168.000 9.500 160
Total 359

22 Cement Concrete Pavement cum 1 168.000 1.000 0.280 47


Utility Crossing cum 3 6.200 1.650 0.280 9
Add 10% for Damage Panel Repairing cum 0.1 168.000 9.500 0.280 45
Total 101

23 polysuphide sealent Rmt 1 43.000 1.000 43

24 Paver Block-80mm Thk Sqm 1 168.000 2.500 420


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -8 1.500 1.500 -18
402

25 Kerb Stone Rm 0 0

26 Rubble Soling
Utility Crossing Cum 3 6.200 1.650 0.230 7.06
OFC Chamber Cum 2 1.400 1.400 0.230 0.90
Electrical Chamber Cum 6 1.700 1.700 0.230 3.99
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 168.000 1.000 0.230 38.64
Cum 1 168.000 1.000 0.230 38.64
Total 90.27

27 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 3 6.20 1.650 0.100 3.07
OFC Chamber Cum 2 1.40 1.40 0.100 0.39
Electrical Chamber Cum 6 1.70 1.70 0.100 1.73
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 168.00 1.00 0.100 16.80
Cum 1 168.00 1.00 0.100 16.80
Total 39.24
28 RCC M25
Sr. No. Description Unit No. Length Breadth Depth Quantity
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 6 1.500 1.500 0.150 2.03
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 168.000 0.900 0.150 22.68
Cum 1 168.000 0.900 0.150 22.68
Total 48.32
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000 1.44
Electrical Chamber Cum 6 6.000 0.150 1.500 8.1
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 168.000 0.150 1.000 50.4
Cum 2 168.000 0.150 1.000 50.4
Total 112.00
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150 0.43
Electrical Chamber Cum 6 1.500 1.500 0.150 2.03
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -8 0.900 0.600 0.150 -0.648
Cover Deduction Cum -2 -0.400 -0.600 0.200 -0.096
SWD Cum 1 168.000 0.900 0.150 22.68
Cum 1 168.000 0.900 0.150 22.68
Cover Deduction Cum -67 0.450 0.600 0.150 -2.71
Total 45.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

29 Reinforcement
a Raft MT 110 kg/cum 5581.42
b Wall MT 100 kg/cum 11760.00
c Slab MT 95 kg/cum 4488.75
Total 21.83

30 RCC Np3 Class Pipe


600 mm dia Rmt 3 6.20 18.6

31 Painting Work
Edge Marking Line Sqm 2 168.000 0.15 50.4
Lane Marking / Other Markings Sqm 25.2
Zebra Crossing Sqm 5 6.500 3 48.75
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
32 Signages
Cautionary/Warning sign boards in
a Nos. 5
Equilateral Triangle 5
Cautionary/Warning sign boards in
Nos. 2
b Octagone size 2
c Informatory sign board Sqm 3 0.900 2.7
Sr. No. Description Unit No. Length Breadth Depth Quantity
33 Stud with Lense Reflector Nos 2 9 18
Zebra crossing Nos 5 6.500 108
Total 126.00
34 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 168.00 1344.00
b 160 mm outer dia for HT & LT Cable Rmt 10 168.00 1680.00

35 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 6 6
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 2 2
36 FRP Perforated Cover
SWD Nos 67 67
37 Barrigates Rmt 1 33.6 34
R65 - Gadge Maharaj Bridge Garden to Amardham
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 728.00 1.600 1.500 3494
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 7 7.200 1.650 1.500 125
SWD cum 1 703.000 1.300 1.480 1353
cum 1 703.000 0.900 1.480 936
Flexible Pavement deduction cum -255
Total 5653

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 2827

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 145.600 1.50 437

Compacting the existing Subgrade with


6 Sqm 0
power roller

7 Dewatering Hour 1 73

Removing lime or lean cement concrete


8 Cum 1 728.00 1 0.15 109.2

9 Removing rich mix cement concrete Cum 1 728.00 1 0.1 72.8


10 Dismantling brick masonry Cum 1 728.00 0.8 0.23 133.952
11 Dismantling stone masonry Cum 1 20
Removing all type of hume pipes and
12 stacking within a lead up to 1000 meters Rmt 15 10.50 157.5

13 Removal of telephone / Electric poles Nos 1 24 24


14 Removal of Paver Block sqm 1 728.00 1.25 910
15 Dismantling of flexible pavements
Bituminous courses cum 1 728.000 3.000 0.200 437
PaverBlock Area Deduction cum -1 910.000 0.200 -182
Total 255

16 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


17 Sqm 1 728.000 7.50 5460
surface

18 Subgrade cum 2 728.000 1.000 0.500 728


Utility Crossing cum 7 7.200 1.65 1.030 86
814

19 selected hard murum filling cum 2 728.000 1.600 1.090 2539


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -49 1.500 1.500 1.090 -120
Sr. No. Description Unit No. Length Breadth Depth Quantity
Total 2419
20 GSB cum 2 728.000 1.000 0.150 218
Utility Crossing cum 7 7.200 1.65 0.150 12
Below Foothpath cum 1 2913.600 0.150 437
667

21 WMM cum 2 728.000 1.000 0.250 364


Utility Crossing cum 7 7.200 1.650 0.250 21
385

22 DBM cum 1 728.000 6.300 0.050 229


Pot Holes / profile Correction 69

23 Prime Coat sqm 1 728.000 6.300 4586

24 Tack Coat sqm 2 728.000 6.300 9173

25 Bituminous Concrete cum 1 728.000 6.300 0.040 183

26 DLC
Foothpath Cum 1 2913.600 0.150 437.04
437

27 Polyethylene (LDPE) sheet sqm 0 0.000 0.000 0

28 Cement Concrete Pavement cum 1 0.280 0

29 polysuphide sealent Rmt 1 1.000 0.000 0

30 Paver Block-80mm Thk Sqm 1 728.000 4.200 3057.6


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -64 1.500 1.500 -144
2913.6

31 Kerb Stone Rm 0 728.000 0

32 Rubble Soling
Utility Crossing Cum 7 7.200 1.650 0.230 19.13
OFC Chamber Cum 15 1.400 1.400 0.230 6.76
Electrical Chamber Cum 49 1.700 1.700 0.230 32.57
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 703.000 1.300 0.230 210.20
Cum 1 703.000 0.900 0.230 145.52
Total 415.22

33 PCC M15
Sr. No. Description Unit No. Length Breadth Depth Quantity
Kerb Stone Cum 0 728.000 0.265 0.075 0
Utility Crossing Cum 7 7.20 1.650 0.100 8.32
OFC Chamber Cum 15 1.40 1.40 0.100 2.94
Electrical Chamber Cum 49 1.70 1.70 0.100 14.16
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 703.00 1.30 0.100 91.39
Cum 1 703.00 0.90 0.100 63.27
Total 180.53
34 RCC M25
a Raft
OFC Chamber Cum 15 1.200 1.200 0.150 3.24
Electrical Chamber Cum 49 1.500 1.500 0.150 16.54
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 703.000 1.200 0.150 126.54
Cum 1 703.000 0.800 0.150 84.36
Total 231.18
b Wall
OFC Chamber Cum 15 4.800 0.150 1.000 10.8
Electrical Chamber Cum 49 6.000 0.150 1.500 66.15
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 703.000 0.150 1.000 210.9
Cum 2 703.000 0.150 1.000 210.9
Total 500.00
c Slab
OFC Chamber Cum 15 1.200 1.200 0.150 3.24
Electrical Chamber Cum 49 1.500 1.500 0.150 16.54
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -51 0.900 0.600 0.150 -4.131
Cover Deduction Cum -15 -0.400 -0.600 0.200 -0.72
SWD Cum 1 703.000 1.200 0.150 126.54
Cum 1 703.000 0.800 0.150 84.36
Cover Deduction Cum -281 0.900 0.600 0.150 -22.76
Total 204.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

35 Reinforcement
a Raft MT 110 kg/cum 26701.81
b Wall MT 100 kg/cum 52500.00
c Slab MT 95 kg/cum 20349.00
Total 99.55

36 RCC Np3 Class Pipe


600 mm dia Rmt 14 7.20 100.8

37 Painting Work
Edge Marking Line Sqm 4 728.000 0.15 436.8
Sr. No. Description Unit No. Length Breadth Depth Quantity
Lane Marking / Other Markings Sqm 218.4
Zebra Crossing Sqm 5 7.500 3 56.25
Kerb Painting Sqm 0 728.000 0.3 0
Median Painting Sqm 2 728.000 1 1456
38 Signages
Cautionary/Warning sign boards in
a Nos. 25
Equilateral Triangle 25
Cautionary/Warning sign boards in
Nos. 10
b Octagone size 10
c Informatory sign board Sqm 10 0.900 9

39 Stud with Lense Reflector Nos 2 40.000 80


Zebra crossing Nos 5 7.500 125
Total 205.00
40 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 728.00 11648.00
b 160 mm outer dia for HT & LT Cable Rmt 20 728.00 14560.00

41 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 49 49
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 15 15
42 FRP Perforated Cover
SWD Nos 281 281
43 Barrigates Rmt 2 145.6 291
R66 -Gadge Maharaj Bridge Garden to Zaveri Dharmshala
Sr. No. Description Unit No. Length Breadth Depth Quantity

1 Dismantling of cement concrete pavement Cum 1 63.70 12.70 0.300 243

10% of Existing road for perpose of


provision only (Total length of road 637
Rmt)
Scarifying the existing granular road
2 Sqm 1 0
surface

3 DLC
Add 10% for Damage Panel Repairing cum 1 63.700 12.700 0.150 121
Total 121

4 Polyethylene (LDPE) sheet


Add 10% for Damage Panel Repairing sqm 1 63.700 12.700 809
Total 809

5 Cement Concrete Pavement


Add 10% for Damage Panel Repairing cum 1 63.700 12.700 0.280 227
Total 227

6 polysuphide sealent Rmt 1 17.000 12.700 215.9

7 Paver Block-80mm Thk


Add 10% for Damage Panel Repairing Sqm 1 63.700 3.000 191
191
8 Painting Work
Edge Marking Line Sqm 2 637.000 0.15 191.1
Lane Marking / Other Markings Sqm 95.55
Zebra Crossing Sqm 7 9.700 3 101.85
Kerb Painting Sqm
Median Painting Sqm 0
9 Signages
Cautionary/Warning sign boards in
a Nos. 15
Equilateral Triangle 15
Cautionary/Warning sign boards in
Nos. 10
b Octagone size 10
c Informatory sign board Sqm 8 0.900 7.2

10 Stud with Lense Reflector Nos 2 35.000 70


Zebra crossing Nos 7 9.700 226
Total 296.00
11 Barrigates Rmt 1 12.74 13
R67 - Amardham to Kalya Maruti Police Chowki
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 805.00 1.600 1.500 3864
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 8 16.700 1.650 1.500 331
SWD cum 1 805.000 1.000 1.480 1191
cum 1 805.000 1.000 1.480 1191
Rigid Pavement deduction cum -2 805.000 1.600 0.300 -773
Total 5804

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 2902

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 161.000 1.50 483

Compacting the existing Subgrade with


6 Sqm 1 805.00 1.000 805
power roller

7 Dewatering Hour 1 81

Removing lime or lean cement concrete


8 Cum 2 241.50 1 0.15 72.45

9 Removing rich mix cement concrete Cum 2 241.50 1 0.1 48.3


10 Dismantling brick masonry Cum 2 241.50 0.8 0.23 88.872
11 Dismantling stone masonry Cum 1 20
Removing all type of hume pipes and
12 stacking within a lead up to 1000 meters Rmt 16 20.00 320

13 Removal of telephone / Electric poles Nos 1 27 27


14 Removal of Paver Block sqm 1 805.00 1.25 1006.25
15 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

16 Dismantling of cement concrete pavement Cum 2 805.00 2.60 0.300 1256

Scarifying the existing granular road


17 Sqm 1 0
surface

18 Subgrade cum 0 805.000 1.000 0.500 0


Utility Crossing cum 8 16.700 1.65 0.920 203
203

19 selected hard murum filling cum 2 805.000 1.600 1.090 2808


deduction of pole cum 0 1.200 1.200 1.090 0
Sr. No. Description Unit No. Length Breadth Depth Quantity
deduction of Manhole cum -54 1.500 1.500 1.090 -132
Total 2676
20 GSB cum 2 805.000 1.000 0.150 242
Utility Crossing cum 8 16.700 1.65 0.150 33
Below Foothpath cum 1 3062.000 0.150 459
Total 734

21 DLC cum 2 805.000 1.000 0.150 242


Utility Crossing cum 8 16.700 1.650 0.150 33
Add 10% for Damage Panel Repairing cum 0.1 805.000 20.000 0.150 242
Foothpath Cum 1 3062.000 0.150 459.3
Total 976.3

22 Polyethylene (LDPE) sheet sqm 2 805.000 1.000 1610


Utility Crossing sqm 8 16.700 1.650 220
Add 10% for Damage Panel Repairing sqm 0.1 805.000 20.000 1610
Total 3440

23 Cement Concrete Pavement cum 2 805.000 1.000 0.280 451


Utility Crossing cum 8 16.700 1.650 0.280 62
Add 10% for Damage Panel Repairing cum 0.1 805.000 20.000 0.280 451
Total 964

24 polysuphide sealent Rmt 1 202.000 1.000 202

24a Dowel Bars Nos 45 3.000 135

25 Paver Block-80mm Thk Sqm 2 805.000 2.000 3220


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -70 1.500 1.500 -158
3062
26 Paver Block-60mm Thk Sqm 0

27 Kerb Stone Rm 0 0.000 0

28 Rubble Soling
Utility Crossing Cum 8 16.700 1.650 0.230 50.7
OFC Chamber Cum 16 1.400 1.400 0.230 7.21
Electrical Chamber Cum 54 1.700 1.700 0.230 35.89
Water Chamber Cum 8 1.500 1.500 0.230 4.14
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 805.000 1.000 0.230 185.15
Cum 1 805.000 1.000 0.230 185.15
Total 468.24

29 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Sr. No. Description Unit No. Length Breadth Depth Quantity
Utility Crossing Cum 8 16.70 1.650 0.100 22.04
OFC Chamber Cum 16 1.40 1.40 0.100 3.14
Electrical Chamber Cum 54 1.70 1.70 0.100 15.61
Water Chamber Cum 8 1.50 1.50 0.100 1.8
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 805.00 1.00 0.100 80.50
Cum 1 805.00 1.00 0.100 80.50
Total 203.59
30 RCC M25
a Raft
OFC Chamber Cum 16 1.200 1.200 0.150 3.46
Electrical Chamber Cum 54 1.500 1.500 0.150 18.23
Water Chamber Cum 8 1.300 1.300 0.150 2.03
SWD Cum 1 805.000 0.900 0.150 108.68
Cum 1 805.000 0.900 0.150 108.68
Total 241.06
b Wall
OFC Chamber Cum 16 4.800 0.150 1.000 11.52
Electrical Chamber Cum 54 6.000 0.150 1.500 72.9
Water Chamber Cum 8 5.200 0.150 1.000 6.24
SWD Cum 2 805.000 0.150 1.000 241.5
Cum 2 805.000 0.150 1.000 241.5
Total 574.00
c Slab
OFC Chamber Cum 16 1.200 1.200 0.150 3.46
Electrical Chamber Cum 54 1.500 1.500 0.150 18.23
Water Chamber Cum 8 1.300 1.300 0.150 2.03
Cover Deduction Cum -62 0.900 0.600 0.150 -5.022
Cover Deduction Cum -16 -0.400 -0.600 0.200 -0.768
SWD Cum 1 805.000 0.900 0.150 108.68
Cum 1 805.000 0.900 0.150 108.68
Cover Deduction Cum -322 0.450 0.600 0.150 -13.04
Total 222.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

31 Reinforcement
a Raft MT 110 kg/cum 27842.31
b Wall MT 100 kg/cum 60270.00
c Slab MT 95 kg/cum 22144.50
Total 110.26

32 RCC Np3 Class Pipe


600 mm dia Rmt 16 16.70 267.2

33 Painting Work
Edge Marking Line Sqm 2 805.000 0.15 241.5
Sr. No. Description Unit No. Length Breadth Depth Quantity
Lane Marking / Other Markings Sqm 120.75
Zebra Crossing Sqm 8 17.000 3 204
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0
34 Signages
Cautionary/Warning sign boards in
a Nos. 25
Equilateral Triangle 25
Cautionary/Warning sign boards in
Nos. 12
b Octagone size 12
c Informatory sign board Sqm 20 0.900 18

35 Stud with Lense Reflector Nos 2 45 90


Zebra crossing Nos 8 17.000 453
Total 543.00
36 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 805.00 12880.00
b 160 mm outer dia for HT & LT Cable Rmt 20 805.00 16100.00

37 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 54 54
600mm
Watersupply Manhole - Size-900mm x Nos 8 8
600mm
OFC Manhole - Size-400mm x 600mm Nos 16 16
38 FRP Perforated Cover
SWD Nos 322 322
39 Barrigates Rmt 2 161 322
R68 -Hotel Tuljakrupa to Gadge Maharaj Bridge Garden
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 200.00 1.600 1.500 960
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 2 8.700 1.650 1.500 43
SWD cum 1 200.000 1.000 1.480 296
cum 1 200.000 1.000 1.480 296
Flexible Pavement deduction cum -88
Total 1507

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 754

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 40.000 1.50 120

Compacting the existing Subgrade with


6 Sqm 0
power roller

7 Dewatering Hour 1 20

Removing lime or lean cement concrete


8 Cum 2 60.00 1 0.15 18

9 Removing rich mix cement concrete Cum 2 60.00 1 0.1 12


10 Dismantling brick masonry Cum 2 60.00 0.8 0.23 22.08
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 7 7
13 Removal of Paver Block sqm 1 200.00 0.8 160
14 Dismantling of flexible pavements
Bituminous courses cum 1 200.000 3.000 0.200 120
PaverBlock Area Deduction cum -1 160.000 0.200 -32
Total 88

15 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


16 Sqm 1 200.000 9.00 1800
surface

17 Subgrade cum 2 200.000 1.000 0.500 200


Utility Crossing cum 2 8.700 1.65 1.030 30
230

18 selected hard murum filling cum 2 200.000 1.600 1.090 698


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -13 1.500 1.500 1.090 -32
Total 666
19 GSB cum 2 200.000 1.000 0.150 60
Utility Crossing cum 2 8.700 1.65 0.150 4
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 802.000 0.150 120
184

20 WMM cum 2 200.000 1.000 0.250 100


Utility Crossing cum 2 8.700 1.650 0.250 7
107

21 DBM cum 1 200.000 7.800 0.050 78


Pot Holes / profile Correction 23

22 Prime Coat sqm 1 200.000 7.800 1560

23 Tack Coat sqm 2 200.000 7.800 3120

24 Bituminous Concrete cum 1 200.000 7.800 0.040 62

25 DLC
Foothpath Cum 1 802.000 0.150 120.3
120

26 Polyethylene (LDPE) sheet sqm 0 0.000 0.000 0

27 Cement Concrete Pavement cum 1 0.280 0

28 polysuphide sealent Rmt 1 1.000 0.000 0

29 Paver Block-80mm Thk Sqm 1 200.000 4.200 840


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -17 1.500 1.500 -38
802

30 Kerb Stone Rm 0 200.000 0

31 Rubble Soling
Utility Crossing Cum 2 8.700 1.650 0.230 6.6
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 13 1.700 1.700 0.230 8.64
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 200.000 1.000 0.230 46.00
Cum 1 200.000 1.000 0.230 46.00
Total 110.08

32 PCC M15
Kerb Stone Cum 0 200.000 0.265 0.075 0
Utility Crossing Cum 2 8.70 1.650 0.100 2.87
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Sr. No. Description Unit No. Length Breadth Depth Quantity
Electrical Chamber Cum 13 1.70 1.70 0.100 3.76
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 200.00 1.00 0.100 20.00
Cum 1 200.00 1.00 0.100 20.00
Total 47.86
33 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 13 1.500 1.500 0.150 4.39
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 200.000 0.900 0.150 27.00
Cum 1 200.000 0.900 0.150 27.00
Total 59.76
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 13 6.000 0.150 1.500 17.55
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 200.000 0.150 1.000 60
Cum 2 200.000 0.150 1.000 60
Total 142.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 13 1.500 1.500 0.150 4.39
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -15 0.900 0.600 0.150 -1.215
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
SWD Cum 1 200.000 0.900 0.150 27.00
Cum 1 200.000 0.900 0.150 27.00
Cover Deduction Cum -80 0.450 0.600 0.150 -3.24
Total 55.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

34 Reinforcement
a Raft MT 110 kg/cum 6902.11
b Wall MT 100 kg/cum 14910.00
c Slab MT 95 kg/cum 5486.25
Total 27.30

35 RCC Np3 Class Pipe


600 mm dia Rmt 4 8.70 34.8

36 Painting Work
Edge Marking Line Sqm 2 200.000 0.15 60
Lane Marking / Other Markings Sqm 30
Zebra Crossing Sqm 2 9.000 3 27
Kerb Painting Sqm 0 200.000 0.3 0
Sr. No. Description Unit No. Length Breadth Depth Quantity
Median Painting Sqm 0 200.000 1 0
37 Signages
Cautionary/Warning sign boards in
a Nos. 8
Equilateral Triangle 8
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 4 0.900 3.6

38 Stud with Lense Reflector Nos 2 11.000 22


Zebra crossing Nos 2 9.000 60
Total 82.00
39 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 200.00 3200.00
b 160 mm outer dia for HT & LT Cable Rmt 20 200.00 4000.00

40 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 13 13
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 4 4
41 FRP Perforated Cover
SWD Nos 80 80
42 Barrigates Rmt 2 40 80
R69 -old Adgaon naka to Nimani Bus stand
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 645.00 1.600 1.500 3096
Light Pole cum 22 0.90 0.900 1.600 29
Utility Crossing cum 6 19.300 1.650 1.500 287
Rigid Pavement deduction cum -2 645.000 1.600 0.300 -619
Total 2793

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 1397

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 129.000 1.50 387

Compacting the existing Subgrade with


6 Sqm 1 645.00 1.000 645
power roller

7 Dewatering Hour 1 65

Removing lime or lean cement concrete


8 Cum 2 193.50 1 0.15 58.05

9 Removing rich mix cement concrete Cum 2 193.50 1 0.1 38.7


10 Dismantling brick masonry Cum 2 193.50 0.8 0.23 71.208
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 22 22
13 Removal of Paver Block sqm 1 645.00 4 2580
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 2 645.00 2.60 0.300 1006

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 645.000 1.000 0.500 0


Utility Crossing cum 6 19.300 1.65 0.920 176
176

18 selected hard murum filling cum 2 645.000 1.600 1.090 2250


deduction of pole cum -22 1.200 1.200 1.090 -35
deduction of Manhole cum -43 1.500 1.500 1.090 -105
Total 2110
19 GSB cum 2 645.000 1.000 0.150 194
Utility Crossing cum 6 19.300 1.65 0.150 29
Below Foothpath cum 1 3712.000 0.150 557
Total 780
Sr. No. Description Unit No. Length Breadth Depth Quantity

20 DLC cum 2 645.000 1.000 0.150 194


Utility Crossing cum 6 19.300 1.650 0.150 29
Add 10% for Damage Panel Repairing cum 0.1 645.000 22.600 0.150 219
Foothpath Cum 1 3712.000 0.150 556.8
Total 998.8

21 Polyethylene (LDPE) sheet sqm 2 645.000 1.000 1290


Utility Crossing sqm 6 19.300 1.650 191
Add 10% for Damage Panel Repairing sqm 0.1 645.000 22.600 1458
Total 2939

22 Cement Concrete Pavement cum 2 645.000 1.000 0.280 361


Utility Crossing cum 6 19.300 1.650 0.280 53
Add 10% for Damage Panel Repairing cum 0.1 645.000 22.600 0.280 408
Total 822

23 polysuphide sealent Rmt 1 162.000 1.000 162

24 Paver Block-80mm Thk Sqm 2 645.000 3.000 3870


deduction of pole Sqm -22 1.200 1.200 -32
deduction of Manhole Sqm -56 1.500 1.500 -126
3712
25 Paver Block-60mm Thk Sqm 0

26 Kerb Stone Rm 0 0.000 0

27 Rubble Soling
Utility Crossing Cum 6 19.300 1.650 0.230 43.95
OFC Chamber Cum 13 1.400 1.400 0.230 5.86
Electrical Chamber Cum 43 1.700 1.700 0.230 28.58
Water Chamber Cum 6 1.500 1.500 0.230 3.11
Light pole Cum 22 0.800 0.800 0.230 3.24
Total 84.74

28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 6 19.30 1.650 0.100 19.11
OFC Chamber Cum 13 1.40 1.40 0.100 2.55
Electrical Chamber Cum 43 1.70 1.70 0.100 12.43
Water Chamber Cum 6 1.50 1.50 0.100 1.35
Light pole Cum 22 0.80 0.80 0.100 1.41
Total 36.85
29 RCC M25
a Raft
OFC Chamber Cum 13 1.200 1.200 0.150 2.81
Electrical Chamber Cum 43 1.500 1.500 0.150 14.51
Water Chamber Cum 6 1.300 1.300 0.150 1.52
Total 18.84
Sr. No. Description Unit No. Length Breadth Depth Quantity
b Wall
OFC Chamber Cum 13 4.800 0.150 1.000 9.36
Electrical Chamber Cum 43 6.000 0.150 1.500 58.05
Water Chamber Cum 6 5.200 0.150 1.000 4.68
Total 72.00
c Slab
OFC Chamber Cum 13 1.200 1.200 0.150 2.81
Electrical Chamber Cum 43 1.500 1.500 0.150 14.51
Water Chamber Cum 6 1.300 1.300 0.150 1.52
Cover Deduction Cum -49 0.900 0.600 0.150 -3.969
Cover Deduction Cum -13 -0.400 -0.600 0.200 -0.624
Total 14.00
d Pole Foundation Cum 22 0.600 0.600 1.500 11.88

30 Reinforcement
a Raft MT 110 kg/cum 2176.19
b Wall MT 100 kg/cum 7560.00
c Slab MT 95 kg/cum 1396.50
Total 11.13

31 RCC Np3 Class Pipe


600 mm dia Rmt 12 19.30 231.6

32 Painting Work
Edge Marking Line Sqm 2 645.000 0.15 193.5
Lane Marking / Other Markings Sqm 96.75
Zebra Crossing Sqm 7 19.600 3 205.8
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 645.000 1 1290
33 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 6 0.900 5.4

34 Stud with Lense Reflector Nos 2 36 72


Zebra crossing Nos 7 19.600 457
Total 529.00
35 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 645.00 10320.00
b 160 mm outer dia for HT & LT Cable Rmt 20 645.00 12900.00

36 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 43 43
600mm
Watersupply Manhole - Size-900mm x Nos 6 6
600mm
OFC Manhole - Size-400mm x 600mm Nos 13 13
Sr. No. Description Unit No. Length Breadth Depth Quantity
37 FRP Perforated Cover
SWD Nos 0 0
38 Barrigates Rmt 2 129 258
R70 -Nimani Bus stand to Makhmalabad Naka
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 698.00 1.600 1.500 3350
Light Pole cum 23 0.90 0.900 1.600 30
Utility Crossing cum 7 13.700 1.650 1.500 237
Rigid Pavement deduction cum -2 698.000 1.600 0.300 -670
Total 2947

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 1474

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 139.600 1.50 419

Compacting the existing Subgrade with


6 Sqm 1 698.00 1.000 698
power roller

7 Dewatering Hour 1 70

Removing lime or lean cement concrete


8 Cum 2 209.40 1 0.15 62.82

9 Removing rich mix cement concrete Cum 2 209.40 1 0.1 41.88


10 Dismantling brick masonry Cum 2 209.40 0.8 0.23 77.0592
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 23 23
13 Removal of Paver Block sqm 1 698.00 1.2 837.6
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 2 698.00 2.60 0.300 1089

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 698.000 1.000 0.500 0


Utility Crossing cum 7 13.700 1.65 0.920 146
146

18 selected hard murum filling cum 2 698.000 1.600 1.090 2435


deduction of pole cum -23 1.200 1.200 1.090 -36
deduction of Manhole cum -47 1.500 1.500 1.090 -115
Total 2284
19 GSB cum 2 698.000 1.000 0.150 209
Utility Crossing cum 7 13.700 1.65 0.150 24
Below Foothpath cum 1 2622.000 0.150 393
Total 626
Sr. No. Description Unit No. Length Breadth Depth Quantity

20 DLC cum 2 698.000 1.000 0.150 209


Utility Crossing cum 7 13.700 1.650 0.150 24
Add 10% for Damage Panel Repairing cum 0.1 698.000 17.000 0.150 178
Foothpath Cum 1 2622.000 0.150 393.3
Total 804.3

21 Polyethylene (LDPE) sheet sqm 2 698.000 1.000 1396


Utility Crossing sqm 7 13.700 1.650 158
Add 10% for Damage Panel Repairing sqm 0.1 698.000 17.000 1187
Total 2741

22 Cement Concrete Pavement cum 2 698.000 1.000 0.280 391


Utility Crossing cum 7 13.700 1.650 0.280 44
Add 10% for Damage Panel Repairing cum 0.1 698.000 17.000 0.280 332
Total 767

23 polysuphide sealent Rmt 1 176.000 1.000 176

24 Paver Block-80mm Thk Sqm 2 698.000 2.000 2792


deduction of pole Sqm -23 1.200 1.200 -33
deduction of Manhole Sqm -61 1.500 1.500 -137
2622
25 Paver Block-60mm Thk Sqm 0

26 Kerb Stone Rm 0 0.000 0

27 Rubble Soling
Utility Crossing Cum 7 13.700 1.650 0.230 36.39
OFC Chamber Cum 14 1.400 1.400 0.230 6.31
Electrical Chamber Cum 47 1.700 1.700 0.230 31.24
Water Chamber Cum 7 1.500 1.500 0.230 3.62
Light pole Cum 23 0.800 0.800 0.230 3.39
Total 80.95

28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 7 13.70 1.650 0.100 15.82
OFC Chamber Cum 14 1.40 1.40 0.100 2.74
Electrical Chamber Cum 47 1.70 1.70 0.100 13.58
Water Chamber Cum 7 1.50 1.50 0.100 1.58
Light pole Cum 23 0.80 0.80 0.100 1.47
Total 35.19
29 RCC M25
a Raft
OFC Chamber Cum 14 1.200 1.200 0.150 3.02
Electrical Chamber Cum 47 1.500 1.500 0.150 15.86
Water Chamber Cum 7 1.300 1.300 0.150 1.77
Total 20.66
Sr. No. Description Unit No. Length Breadth Depth Quantity
b Wall
OFC Chamber Cum 14 4.800 0.150 1.000 10.08
Electrical Chamber Cum 47 6.000 0.150 1.500 63.45
Water Chamber Cum 7 5.200 0.150 1.000 5.46
Total 79.00
c Slab
OFC Chamber Cum 14 1.200 1.200 0.150 3.02
Electrical Chamber Cum 47 1.500 1.500 0.150 15.86
Water Chamber Cum 7 1.300 1.300 0.150 1.77
Cover Deduction Cum -54 0.900 0.600 0.150 -4.374
Cover Deduction Cum -14 -0.400 -0.600 0.200 -0.672
Total 16.00
d Pole Foundation Cum 23 0.600 0.600 1.500 12.42

30 Reinforcement
a Raft MT 110 kg/cum 2386.35
b Wall MT 100 kg/cum 8295.00
c Slab MT 95 kg/cum 1596.00
Total 12.28

31 RCC Np3 Class Pipe


600 mm dia Rmt 14 13.70 191.8

32 Painting Work
Edge Marking Line Sqm 2 698.000 0.15 209.4
Lane Marking / Other Markings Sqm 104.7
Zebra Crossing Sqm 6 14.000 3 126
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 698.000 1 1396
33 Signages
Cautionary/Warning sign boards in
a Nos. 15
Equilateral Triangle 15
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 8 0.900 7.2

34 Stud with Lense Reflector Nos 2 39 78


Zebra crossing Nos 6 14.000 280
Total 358.00
35 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 698.00 11168.00
b 160 mm outer dia for HT & LT Cable Rmt 20 698.00 13960.00

36 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 47 47
600mm
Watersupply Manhole - Size-900mm x Nos 7 7
600mm
OFC Manhole - Size-400mm x 600mm Nos 14 14
Sr. No. Description Unit No. Length Breadth Depth Quantity
37 FRP Perforated Cover
SWD Nos 0 0
38 Barrigates Rmt 2 139.6 279
R71 -Makhmalabad Naka to Ramwadi Enterance
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 395.48 1.600 1.500 1898
Light Pole cum 13 0.90 0.900 1.600 17
Utility Crossing cum 4 18.800 1.650 1.500 186
Rigid Pavement deduction cum -2 395.480 1.600 0.300 -380
Total 1721

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 861

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 79.096 1.50 237

Compacting the existing Subgrade with


6 Sqm 1 395.48 1.000 395
power roller

7 Dewatering Hour 1 40

Removing lime or lean cement concrete


8 Cum 2 118.64 1 0.15 35.5932

9 Removing rich mix cement concrete Cum 2 118.64 1 0.1 23.7288


10 Dismantling brick masonry Cum 2 118.64 0.8 0.23 43.660992
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 13 13
13 Removal of Paver Block sqm 1 395.48 1.2 474.576
14 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

15 Dismantling of cement concrete pavement Cum 2 395.48 2.60 0.300 617

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 395.480 1.000 0.500 0


Utility Crossing cum 4 18.800 1.65 0.920 114
114

18 selected hard murum filling cum 2 395.480 1.600 1.090 1379


deduction of pole cum -13 1.200 1.200 1.090 -20
deduction of Manhole cum -26 1.500 1.500 1.090 -64
Total 1295
19 GSB cum 2 395.480 1.000 0.150 119
Utility Crossing cum 4 18.800 1.65 0.150 19
Below Foothpath cum 1 1485.920 0.150 223
Total 361
Sr. No. Description Unit No. Length Breadth Depth Quantity

20 DLC cum 2 395.480 1.000 0.150 119


Utility Crossing cum 4 18.800 1.650 0.150 19
Add 10% for Damage Panel Repairing cum 0.1 395.480 22.100 0.150 131
Foothpath Cum 1 1485.920 0.150 222.89
Total 491.89

21 Polyethylene (LDPE) sheet sqm 2 395.480 1.000 791


Utility Crossing sqm 4 18.800 1.650 124
Add 10% for Damage Panel Repairing sqm 0.1 395.480 22.100 874
Total 1789

22 Cement Concrete Pavement cum 2 395.480 1.000 0.280 221


Utility Crossing cum 4 18.800 1.650 0.280 35
Add 10% for Damage Panel Repairing cum 0.1 395.480 22.100 0.280 245
Total 501

23 polysuphide sealent Rmt 1 100.000 1.000 100

24 Paver Block-80mm Thk Sqm 2 395.480 2.000 1581.92


deduction of pole Sqm -13 1.200 1.200 -19
deduction of Manhole Sqm -34 1.500 1.500 -77
1485.92
25 Paver Block-60mm Thk Sqm 0

26 Kerb Stone Rm 0 0.000 0

27 Rubble Soling
Utility Crossing Cum 4 18.800 1.650 0.230 28.54
OFC Chamber Cum 8 1.400 1.400 0.230 3.61
Electrical Chamber Cum 26 1.700 1.700 0.230 17.28
Water Chamber Cum 4 1.500 1.500 0.230 2.07
Light pole Cum 13 0.800 0.800 0.230 1.91
Total 53.41

28 PCC M15
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 4 18.80 1.650 0.100 12.41
OFC Chamber Cum 8 1.40 1.40 0.100 1.57
Electrical Chamber Cum 26 1.70 1.70 0.100 7.51
Water Chamber Cum 4 1.50 1.50 0.100 0.9
Light pole Cum 13 0.80 0.80 0.100 0.83
Total 23.22
29 RCC M25
a Raft
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 26 1.500 1.500 0.150 8.78
Water Chamber Cum 4 1.300 1.300 0.150 1.01
Total 11.52
Sr. No. Description Unit No. Length Breadth Depth Quantity
b Wall
OFC Chamber Cum 8 4.800 0.150 1.000 5.76
Electrical Chamber Cum 26 6.000 0.150 1.500 35.1
Water Chamber Cum 4 5.200 0.150 1.000 3.12
Total 44.00
c Slab
OFC Chamber Cum 8 1.200 1.200 0.150 1.73
Electrical Chamber Cum 26 1.500 1.500 0.150 8.78
Water Chamber Cum 4 1.300 1.300 0.150 1.01
Cover Deduction Cum -30 0.900 0.600 0.150 -2.43
Cover Deduction Cum -8 -0.400 -0.600 0.200 -0.384
Total 9.00
d Pole Foundation Cum 13 0.600 0.600 1.500 7.02

30 Reinforcement
a Raft MT 110 kg/cum 1330.21
b Wall MT 100 kg/cum 4620.00
c Slab MT 95 kg/cum 897.75
Total 6.85

31 RCC Np3 Class Pipe


600 mm dia Rmt 8 18.80 150.4

32 Painting Work
Edge Marking Line Sqm 2 395.480 0.15 118.644
Lane Marking / Other Markings Sqm 59.322
Zebra Crossing Sqm 5 19.100 3 143.25
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 2 395.480 1 790.96
33 Signages
Cautionary/Warning sign boards in
a Nos. 15
Equilateral Triangle 15
Cautionary/Warning sign boards in
Nos. 4
b Octagone size 4
c Informatory sign board Sqm 8 0.900 7.2

34 Stud with Lense Reflector Nos 2 22 44


Zebra crossing Nos 5 19.100 318
Total 362.00
35 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 395.48 6327.68
b 160 mm outer dia for HT & LT Cable Rmt 20 395.48 7909.60

36 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 26 26
600mm
Watersupply Manhole - Size-900mm x Nos 4 4
600mm
OFC Manhole - Size-400mm x 600mm Nos 8 8
Sr. No. Description Unit No. Length Breadth Depth Quantity
37 FRP Perforated Cover
SWD Nos 0 0
38 Barrigates Rmt 2 79.096 158
R72 - Ramwadi Enterance to Ramwadi
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 515.00 1.600 1.500 2472
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 5 16.700 1.650 1.500 207
SWD cum 1 506.580 1.300 1.480 975
cum 1 506.580 1.300 1.480 975
Flexible Pavement deduction cum -139
Total 4490

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 2245

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 103.000 1.50 309

Compacting the existing Subgrade with


6 Sqm 0
power roller

7 Dewatering Hour 1 52

Removing lime or lean cement concrete


8 Cum 2 154.50 1 0.15 46.35

9 Removing rich mix cement concrete Cum 2 154.50 1 0.1 30.9


10 Dismantling brick masonry Cum 2 154.50 0.8 0.23 56.856
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 17 17
13 Removal of Paver Block sqm 1 515.00 2.65 1364.75
14 Dismantling of flexible pavements
Bituminous courses cum 1 515.000 4.000 0.200 412
PaverBlock Area Deduction cum -1 1364.750 0.200 -273
Total 139

15 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


16 Sqm 1 515.000 16.00 8240
surface

17 Subgrade cum 2 515.000 1.000 0.500 515


Utility Crossing cum 5 16.700 1.65 1.030 142
657

18 selected hard murum filling cum 2 515.000 1.600 1.090 1796


deduction of pole cum 0 1.200 1.200 1.090 0
Sr. No. Description Unit No. Length Breadth Depth Quantity
deduction of Manhole cum -34 1.500 1.500 1.090 -83
Total 1713
19 GSB cum 2 515.000 1.000 0.150 155
Utility Crossing cum 5 16.700 1.65 0.150 21
Below Foothpath cum 1 2064.000 0.150 310
486

20 WMM cum 2 515.000 1.000 0.250 258


Utility Crossing cum 5 16.700 1.650 0.250 34
292

21 DBM cum 1 515.000 12.800 0.050 330


Pot Holes / profile Correction 99

22 Prime Coat sqm 1 515.000 12.800 6592

23 Tack Coat sqm 2 515.000 12.800 13184

24 Bituminous Concrete cum 1 515.000 12.800 0.040 264

25 DLC
Foothpath Cum 1 3609.000 0.150 541.35
541

26 Polyethylene (LDPE) sheet sqm 0 0.000 0.000 0

27 Cement Concrete Pavement cum 1 0.280 0

28 polysuphide sealent Rmt 1 1.000 0.000 0

29 Paver Block-80mm Thk Sqm 1 515.000 7.200 3708


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -44 1.500 1.500 -99
Deduction of Raised Foothpath Sqm -1545
2064
30 Paver Block-60mm Thk Sqm 2 515.000 1.500 1545
Deduction of Tactile tiles Sqm -309
1236
31 Tactile tiles Sqm 2 515.000 0.3 309

31 Kerb Stone Rm 2 515.000 1030


Sr. No. Description Unit No. Length Breadth Depth Quantity
32 Rubble Soling
Utility Crossing Cum 5 16.700 1.650 0.230 31.69
OFC Chamber Cum 10 1.400 1.400 0.230 4.51
Electrical Chamber Cum 34 1.700 1.700 0.230 22.6
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 506.580 1.300 0.230 151.47
Cum 1 506.580 1.300 0.230 151.47
Total 362.78

33 PCC M15
Kerb Stone Cum 2 515.000 0.265 0.075 20.47
Utility Crossing Cum 5 16.70 1.650 0.100 13.78
OFC Chamber Cum 10 1.40 1.40 0.100 1.96
Electrical Chamber Cum 34 1.70 1.70 0.100 9.83
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 506.58 1.30 0.100 65.86
Cum 1 506.58 1.30 0.100 65.86
Total 178.21
34 RCC M25
a Raft
OFC Chamber Cum 10 1.200 1.200 0.150 2.16
Electrical Chamber Cum 34 1.500 1.500 0.150 11.48
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 506.580 1.200 0.150 91.18
Cum 1 506.580 1.200 0.150 91.18
Total 196.51
b Wall
OFC Chamber Cum 10 4.800 0.150 1.000 7.2
Electrical Chamber Cum 34 6.000 0.150 1.500 45.9
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 506.580 0.150 1.000 151.97
Cum 2 506.580 0.150 1.000 151.97
Total 359.00
c Slab
OFC Chamber Cum 10 1.200 1.200 0.150 2.16
Electrical Chamber Cum 34 1.500 1.500 0.150 11.48
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -36 0.900 0.600 0.150 -2.916
Cover Deduction Cum -10 -0.400 -0.600 0.200 -0.48
SWD Cum 1 506.580 1.200 0.150 91.18
Cum 1 506.580 1.200 0.150 91.18
Sr. No. Description Unit No. Length Breadth Depth Quantity

Cover Deduction Cum -203 0.900 0.600 0.150 -16.44


Total 177.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

35 Reinforcement
a Raft MT 110 kg/cum 22697.00
b Wall MT 100 kg/cum 37695.00
c Slab MT 95 kg/cum 17655.75
Total 78.05

36 RCC Np3 Class Pipe


600 mm dia Rmt 10 16.70 167

37 Painting Work
Edge Marking Line Sqm 4 515.000 0.15 309
Lane Marking / Other Markings Sqm 154.5
Zebra Crossing Sqm 8 17.000 3 204
Kerb Painting Sqm 2 515.000 0.3 309
Median Painting Sqm 0 1 0
38 Signages
Cautionary/Warning sign boards in
a Nos. 15
Equilateral Triangle 15
Cautionary/Warning sign boards in
Nos. 10
b Octagone size 10
c Informatory sign board Sqm 6 0.900 5.4

39 Stud with Lense Reflector Nos 2 29.000 58


Zebra crossing Nos 8 17.000 453
Total 511.00
40 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 515.00 8240.00
b 160 mm outer dia for HT & LT Cable Rmt 20 515.00 10300.00

41 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 34 34
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 10 10
42 FRP Perforated Cover
SWD Nos 203 203
43 Barrigates Rmt 2 103 206
R73 -Ramwadi Enterance to Ramwadi Bridge
Sr. No. Description Unit No. Length Breadth Depth Quantity

1 Dismantling of cement concrete pavement Cum 1 18.00 33.20 0.300 179

10% of Existing road for perpose of


provision only (Total length of road 173.72
Rmt)
Scarifying the existing granular road
2 Sqm 1 0
surface

3 DLC
Add 10% for Damage Panel Repairing cum 1 18.000 33.200 0.150 90
Total 90

4 Polyethylene (LDPE) sheet


Add 10% for Damage Panel Repairing sqm 1 18.000 33.200 598
Total 598

5 Cement Concrete Pavement


Add 10% for Damage Panel Repairing cum 1 18.000 33.200 0.280 167
Total 167

6 polysuphide sealent Rmt 1 6.000 33.200 199.2

7 Paver Block-80mm Thk


Add 10% for Damage Panel Repairing Sqm 1 18.000 4.000 72
72
8 Painting Work
Edge Marking Line Sqm 2 18.000 0.15 5.4
Lane Marking / Other Markings Sqm 2.7
Zebra Crossing Sqm 2 30.200 3 90.6
Kerb Painting Sqm
Median Painting Sqm 0
9 Signages
Cautionary/Warning sign boards in
a Nos. 12
Equilateral Triangle 12
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 10 0.900 9

10 Stud with Lense Reflector Nos 2 10.000 20


Zebra crossing Nos 2 30.200 201
Total 221.00
R74 -Ashok Stambh to Old Gangapur Naka
Sr. No. Description Unit No. Length Breadth Depth Quantity
Scarifying the existing granular road
1 Sqm 1 100.162 31.70 3175
surface
10% of Existing road for perpose of
provision only (Total length of road
1001.62 Rmt)
2 DBM cum 1 100.162 31.700 0.050 159

3 Prime Coat sqm 1 100.162 31.700 3175

4 Tack Coat sqm 2 100.162 31.700 6350

5 Bituminous Concrete cum 1 100.162 31.700 0.040 127

6 Paver Block-80mm Thk


Add 10% for Damage Panel Repairing Sqm 1 100.162 6.000 601
601
7 Painting Work
Edge Marking Line Sqm 4 1001.620 0.15 600.972
Lane Marking / Other Markings Sqm 300.486
Zebra Crossing Sqm 7 28.700 3 301.35
Kerb Painting Sqm
Median Painting Sqm 2 1001.620 1 2003.24
8 Signages
Cautionary/Warning sign boards in
a Nos. 25
Equilateral Triangle 25
Cautionary/Warning sign boards in
Nos. 10
b Octagone size 10
c Informatory sign board Sqm 15 0.900 13.5

9 Stud with Lense Reflector Nos 2 56.000 112


Zebra crossing Nos 7 28.700 670
Total 782.00
R75 -Old Gangapur Naka to Kekan Hospital
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 2 220.00 1.600 1.500 1056
Light Pole cum 0 0.90 0.900 1.600 0
Utility Crossing cum 2 16.700 1.650 1.500 83
SWD cum 1 360.000 1.000 1.480 533
cum 1 360.000 1.000 1.480 533
Flexible Pavement deduction cum -638
Total 1567

2 Removal of Unserviceable Soil cum 50% of Tatal Excavation 784

3 Dismantling of flexible pavements


Scarifying the existing bituminous road
4 Sqm 1 0
surface

5 strutting & shoring Sqm 2 44.000 1.50 132

Compacting the existing Subgrade with


6 Sqm 1 220.00 16.8 3696
power roller

7 Dewatering Hour 1 22

Removing lime or lean cement concrete


8 Cum 2 66.00 1 0.15 19.8

9 Removing rich mix cement concrete Cum 2 66.00 1 0.1 13.2


10 Dismantling brick masonry Cum 2 66.00 0.8 0.23 24.288
11 Dismantling stone masonry Cum 1 20
12 Removal of telephone / Electric poles Nos 1 7 7
13 Removal of Paver Block sqm 1 220.00 5.5 1210
14 Dismantling of flexible pavements
Bituminous courses cum 1 220.000 20.000 0.200 880
PaverBlock Area Deduction cum -1 1210.000 0.200 -242
Total 638

15 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


16 Sqm 1 0
surface

17 Subgrade cum 0 220.000 14.000 0.500 0


Utility Crossing cum 2 16.700 1.65 0.880 48
48

18 selected hard murum filling cum 2 220.000 1.600 1.090 767


deduction of pole cum 0 1.200 1.200 1.090 0
deduction of Manhole cum -15 1.500 1.500 1.090 -37
Total 730
19 GSB cum 1 220.000 14.000 0.150 462
Utility Crossing cum 2 16.700 1.65 0.150 8
Sr. No. Description Unit No. Length Breadth Depth Quantity
Below Foothpath cum 1 1277.000 0.150 192
662

20 WMM cum 2 0.000 0.250 0


Utility Crossing cum 2 16.700 1.650 0.250 14
14

21 DBM cum 1 0.000 13.600 0.050 0


Pot Holes / profile Correction 0

22 Prime Coat sqm 1 0.000 13.600 0

23 Tack Coat sqm 1 0.000 13.600 0

24 Bituminous Concrete cum 1 0.000 13.600 0.040 0

25 DLC cum 1 220.000 14.000 0.150 462


Foothpath Cum 1 1277.000 0.150 191.55
654

26 Polyethylene (LDPE) sheet sqm 1 220.000 14.000 3080

27 Cement Concrete Pavement cum 1 220.000 14.000 0.280 862

28 polysuphide sealent Rmt 1 56.000 14.000 784

24a Dowel Bars Nos 12 47.000 564

29 Paver Block-80mm Thk Sqm 1 220.000 6.000 1320


deduction of pole Sqm 0 1.200 1.200 0
deduction of Manhole Sqm -19 1.500 1.500 -43
1277

30 Kerb Stone Rm 0 0

31 Rubble Soling
Utility Crossing Cum 2 16.700 1.650 0.230 12.68
OFC Chamber Cum 4 1.400 1.400 0.230 1.80
Electrical Chamber Cum 15 1.700 1.700 0.230 9.97
Water Chamber Cum 2 1.500 1.500 0.230 1.04
Light pole Cum 0 0.800 0.800 0.230 0
SWD Cum 1 360.000 1.000 0.230 82.80
Cum 1 360.000 1.000 0.230 82.80
Total 191.09

32 PCC M15
Sr. No. Description Unit No. Length Breadth Depth Quantity
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 2 16.70 1.650 0.100 5.51
OFC Chamber Cum 4 1.40 1.40 0.100 0.78
Electrical Chamber Cum 15 1.70 1.70 0.100 4.34
Water Chamber Cum 2 1.50 1.50 0.100 0.45
Light pole Cum 0 0.80 0.80 0.100 0
SWD Cum 1 360.00 1.00 0.100 36.00
Cum 1 360.00 1.00 0.100 36.00
Total 83.08
33 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
SWD Cum 1 360.000 0.900 0.150 48.60
Cum 1 360.000 0.900 0.150 48.60
Total 103.63
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000 2.88
Electrical Chamber Cum 15 6.000 0.150 1.500 20.25
Water Chamber Cum 2 5.200 0.150 1.000 1.56
SWD Cum 2 360.000 0.150 1.000 108
Cum 2 360.000 0.150 1.000 108
Total 241.00
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150 0.86
Electrical Chamber Cum 15 1.500 1.500 0.150 5.06
Water Chamber Cum 2 1.300 1.300 0.150 0.51
Cover Deduction Cum -17 0.900 0.600 0.150 -1.377
Cover Deduction Cum -4 -0.400 -0.600 0.200 -0.192
SWD Cum 1 360.000 0.900 0.150 48.60
Cum 1 360.000 0.900 0.150 48.60
Cover Deduction Cum -144 0.600 0.600 0.150 -7.78
Total 94.00
d Pole Foundation Cum 0 0.600 0.600 1.500 0.00

34 Reinforcement
a Raft MT 110 kg/cum 11969.67
b Wall MT 100 kg/cum 25305.00
c Slab MT 95 kg/cum 9376.50
Total 46.65

35 RCC Np3 Class Pipe


600 mm dia Rmt 4 16.70 66.8

36 Painting Work
Edge Marking Line Sqm 4 220.000 0.15 132
Sr. No. Description Unit No. Length Breadth Depth Quantity
Lane Marking / Other Markings Sqm 66
Zebra Crossing Sqm 3 17.000 3 76.5
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
37 Signages
Cautionary/Warning sign boards in
a Nos. 15
Equilateral Triangle 15
Cautionary/Warning sign boards in
Nos. 5
b Octagone size 5
c Informatory sign board Sqm 8 0.900 7.2

38 Stud with Lense Reflector Nos 2 12.000 24


Zebra crossing Nos 3 17.000 170
Total 194.00
39 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 16 220.00 3520.00
b 160 mm outer dia for HT & LT Cable Rmt 20 220.00 4400.00

40 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 15 15
600mm
Watersupply Manhole - Size-900mm x Nos 2 2
600mm
OFC Manhole - Size-400mm x 600mm Nos 4 4
41 FRP Perforated Cover
SWD Nos 144 144
42 Barrigates Rmt 2 44 88
Minor Roads Rigid to Rigid Pavements
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 9290.00 1.600 1.500 22296
Light Pole cum 310 0.90 0.900 1.600 402
Utility Crossing cum 93 1.200 1.650 1.500 276
Flexible Pavement deduction cum -8361
Total 14613

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 9290.00 2.9 26941
power roller

5 Dewatering Hour 1 929

Removing lime or lean cement concrete


6 Cum 1 9290.00 1 0.15 1393.5

7 Removing rich mix cement concrete Cum 1 9290.00 1 0.1 929


8 Dismantling brick masonry Cum 1 9290.00 0.8 0.23 1709.36
9 Dismantling stone masonry Cum 1 20
Removing all type of hume pipes and
10 stacking within a lead up to 1000 meters Rmt 186 4.50 837

11 Removal of telephone / Electric poles Nos 1 310 310


12 Removal of Paver Block sqm 0
13 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

14 Dismantling of cement concrete pavement Cum 1 9290.00 4.50 0.2 8361

Scarifying the existing granular road


15 Sqm 1 0
surface

16 Subgrade cum 0 9290.000 4.500 0.500 0


Utility Crossing cum 93 1.200 1.65 1.000 184
184

17 selected hard murum filling cum 1 9290.000 1.600 1.000 14864


deduction of pole cum -310 1.200 1.200 1.000 -446
deduction of Manhole cum -310 1.500 1.500 1.000 -698
Total 13720
18 GSB cum 1 9290.000 4.500 0.150 6271
Utility Crossing cum 93 1.200 1.65 0.150 28
Below Foothpath cum 1 0.000 0.150 0
6299

19 DLC cum 1 9290.000 4.500 0.150 6271


Sr. No. Description Unit No. Length Breadth Depth Quantity
6271

20 Polyethylene (LDPE) sheet sqm 1 9290.000 4.500 41805

21 Cement Concrete Pavement cum 1 9290.000 4.500 0.200 8361

22 polysuphide sealent Rmt 1 2324.000 4.500 10458

23 Paver Block-80mm Thk Sqm 1 9290.000 0.000 0


0

24 Kerb Stone Rm 0 0

25 Rubble Soling
Utility Crossing Cum 93 1.200 1.650 0.230 42.35
OFC Chamber Cum 186 1.400 1.400 0.230 83.85
Electrical Chamber Cum 310 1.700 1.700 0.230 206.06
Water Chamber Cum 312 1.500 1.500 0.230 161.46
Light pole Cum 310 0.800 0.800 0.230 45.63
Total 539.35

26 PCC M15
Foothpath Cum 1 0.000 0.150 0
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 93 1.20 1.650 0.100 18.41
OFC Chamber Cum 186 1.40 1.40 0.100 36.46
Electrical Chamber Cum 310 1.70 1.70 0.100 89.59
Water Chamber Cum 312 1.50 1.50 0.100 70.2
Light pole Cum 310 0.80 0.80 0.100 19.84
Total 234.5
27 RCC M25
a Raft
OFC Chamber Cum 186 1.200 1.200 0.150 40.18
Electrical Chamber Cum 310 1.500 1.500 0.150 104.63
Water Chamber Cum 312 1.300 1.300 0.150 79.09
Total 223.89
b Wall
OFC Chamber Cum 186 4.800 0.150 1.000 133.92
Electrical Chamber Cum 310 6.000 0.150 1.500 418.5
Water Chamber Cum 312 5.200 0.150 1.000 243.36
Total 796.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 186 1.200 1.200 0.150 40.18
Electrical Chamber Cum 310 1.500 1.500 0.150 104.63
Water Chamber Cum 312 1.300 1.300 0.150 79.09
Cover Deduction Cum -622 0.900 0.600 0.150 -50.382
Cover Deduction Cum -186 -0.400 -0.600 0.200 -8.928
Total 165.00
d Pole Foundation Cum 310 0.600 0.600 1.500 167.40

28 Reinforcement
a Raft MT 110 kg/cum 25859.64
b Wall MT 100 kg/cum 83580.00
c Slab MT 95 kg/cum 16458.75
Total 125.90

29 RCC Np3 Class Pipe


600 mm dia Rmt 186 1.20 223.2

30 Painting Work
Edge Marking Line Sqm 2 9290.000 0.15 2787
Lane Marking / Other Markings Sqm 1393.5
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 310
Equilateral Triangle 310
Cautionary/Warning sign boards in
Nos. 186
b Octagone size 186
c Informatory sign board Sqm 156 0.900 140.4

32 Stud with Lense Reflector Nos 0


Zebra crossing Nos 0
Total 0.00
33 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 9290.00 74320.00
b 160 mm outer dia for HT & LT Cable Rmt 10 9290.00 92900.00

34 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 310 310
600mm
Watersupply Manhole - Size-900mm x Nos 312 312
600mm
OFC Manhole - Size-400mm x 600mm Nos 186 186
35 Barrigates Rmt 1 1858 1858
36 FRP Perforated Cover
SWD Nos 1858 1858
Minor Roads Rigid to Cobble stone
Sr. No. Description Unit No. Length Breadth Depth Quantity
1 Excavation
Water Line & Utility Trench cum 1 656.00 1.600 1.500 1574
Light Pole cum 22 0.90 0.900 1.600 29
Utility Crossing cum 7 2.300 1.650 1.500 40
Flexible Pavement deduction cum -735
Total 908

2 Dismantling of flexible pavements


Scarifying the existing bituminous road
3 Sqm 1 0
surface

Compacting the existing Subgrade with


4 Sqm 1 656.00 4 2624
power roller

5 Dewatering Hour 1 66

Removing lime or lean cement concrete


6 Cum 1 656.00 1 0.15 98.4

7 Removing rich mix cement concrete Cum 1 656.00 1 0.1 65.6


8 Dismantling brick masonry Cum 1 656.00 0.8 0.23 120.704
9 Dismantling stone masonry Cum 1 20
10 Removal of telephone / Electric poles Nos 1 22 22
11 Removal of Paver Block sqm 0
12 Dismantling of flexible pavements
Bituminous courses cum
PaverBlock Area Deduction cum
Total 0

13 Dismantling of cement concrete pavement Cum 1 656.00 5.60 0.2 735

Scarifying the existing granular road


14 Sqm 1 0
surface

15 Subgrade cum 0 656.000 5.600 0.500 0


Utility Crossing cum 7 2.300 1.65 1.200 32
32

16 selected hard murum filling cum 1 656.000 1.600 1.070 1123


deduction of pole cum -22 1.200 1.200 1.070 -34
deduction of Manhole cum -22 1.500 1.500 1.070 -53
Total 1036
17 GSB cum 1 656.000 5.600 0.150 551
Utility Crossing cum 7 2.300 1.65 0.150 4
Below Foothpath cum 1 0.000 0.150 0
555

18 DLC cum 1 656.000 5.600 0.150 551


551

19 Polyethylene (LDPE) sheet sqm


Sr. No. Description Unit No. Length Breadth Depth Quantity

20 Cement Concrete Pavement cum

21 polysuphide sealent Rmt

22 Paver Block-80mm Thk Sqm


0
23 Cobble stone-80mm Thk Sqm 1 656.000 5.60 3673.6

24 Kerb Stone Rm 0 0

25 Rubble Soling
Utility Crossing Cum 7 2.300 1.650 0.230 6.11
OFC Chamber Cum 13 1.400 1.400 0.230 5.86
Electrical Chamber Cum 22 1.700 1.700 0.230 14.62
Water Chamber Cum 12 1.500 1.500 0.230 6.21
Light pole Cum 22 0.800 0.800 0.230 3.24
Total 36.04

26 PCC M15
Foothpath Cum 0 0.000 0.150 0
Kerb Stone Cum 0 0.000 0.265 0.075 0
Utility Crossing Cum 7 2.30 1.650 0.100 2.66
OFC Chamber Cum 13 1.40 1.40 0.100 2.55
Electrical Chamber Cum 22 1.70 1.70 0.100 6.36
Water Chamber Cum 12 1.50 1.50 0.100 2.7
Light pole Cum 22 0.80 0.80 0.100 1.41
Total 15.68
27 RCC M25
a Raft
OFC Chamber Cum 13 1.200 1.200 0.150 2.81
Electrical Chamber Cum 22 1.500 1.500 0.150 7.43
Water Chamber Cum 12 1.300 1.300 0.150 3.04
Total 13.28
b Wall
OFC Chamber Cum 13 4.800 0.150 1.000 9.36
Electrical Chamber Cum 22 6.000 0.150 1.500 29.7
Water Chamber Cum 12 5.200 0.150 1.000 9.36
Total 48.00
Sr. No. Description Unit No. Length Breadth Depth Quantity
c Slab
OFC Chamber Cum 13 1.200 1.200 0.150 2.81
Electrical Chamber Cum 22 1.500 1.500 0.150 7.43
Water Chamber Cum 12 1.300 1.300 0.150 3.04
Cover Deduction Cum -34 0.900 0.600 0.150 -2.754
Cover Deduction Cum -13 -0.400 -0.600 0.200 -0.624
Total 10.00
d Pole Foundation Cum 22 0.600 0.600 1.500 11.88

28 Reinforcement
a Raft MT 110 kg/cum 1533.26
b Wall MT 100 kg/cum 5040.00
c Slab MT 95 kg/cum 997.50
Total 7.57

29 RCC Np3 Class Pipe


600 mm dia Rmt 14 2.30 32.2

30 Painting Work
Edge Marking Line Sqm 2 656.000 0.15 196.8
Lane Marking / Other Markings Sqm 98.4
Kerb Painting Sqm 0 0.000 0.3 0
Median Painting Sqm 0 0
31 Signages
Cautionary/Warning sign boards in
a Nos. 22
Equilateral Triangle 22
Cautionary/Warning sign boards in
Nos. 13
b Octagone size 13
c Informatory sign board Sqm 6 0.900 5.4

32 Stud with Lense Reflector Nos 0


Zebra crossing Nos 0
Total 0.00
33 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 656.00 5248.00
b 160 mm outer dia for HT & LT Cable Rmt 10 656.00 6560.00

34 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 22 22
600mm
Watersupply Manhole - Size-900mm x Nos 12 12
600mm
OFC Manhole - Size-400mm x 600mm Nos 13 13
35 Barrigates Rmt 1 131.2 131
Municipal
Final Rate with
Area
Sr.No. Description Unit Qty Basic Rate Municipal Area Amount Reference
Weightage @
Weightage
5%
Construction of granular sub-base by
providing close graded material, spreading in
uniform layers with motor grader / Paver on
prepared surface, mixing by mix in place
method with rotavator at OMC, and
compacting with vibratory roller to achieve the Cum 1 1 0.2 0.20 1114 55.7 1169.7 234 SSR 17-18,3.04
desired density, complete as per clause 401 --
By Mix in Place Method and Grading - I
Material

DENSE BITUMINOUS MACADAM: Proving


and laying dense bituminous macadam using
crushed aggregates of grading 2, premixed
with bituminous binder VG-30 Bitumen @ 4.50
per cent by weight of total mix and filler,
transported to site with VTS , laid over a
previously prepared surface, finished to the
required grade, level, alignment, and rolling to
achieve the desired density for 50/75 mm
Cum 1 1 0.07 0.07 4733 236.65 4969.65 348 SSR 17-18,3.45
compacted thickness .USING 80 TPH Batch
mix type hot mix plant with SCADA, Sensor
Paver, Intelligent Compactor with compaction
analyzer and V-Sat attachment with Stone
Dust filler.

Wet Mix Macadam -- Providing, laying,


spreading and compacting graded stone
aggregate to wet mix macadam specification
including premixing the Material with water at
OMC in mechanical mix plant carriage of
mixed Material by tipper to site, laying in Cum 1 1 0.25 0.25 1421 71.05 1492.05 374 SSR 17-18,3.23
uniform layers with paver in sub- base / base
course on well prepared surface and
compacting with vibratory roller to achieve the
desired density. Laying By Grader/Paver.

Prime coat - Providing and applying primer


coat with bitumen emulsion on prepared
surface of granular Base including cleaning of
road surface and spraying, primer at the rate Sqm 1 1 1.00 17 0.85 17.85 18 SSR 18-18,3.29
of 0.60 kg/sqm using mechanical means.

Providing and applying tack coat on the


prepared surface heating by fames in Boiler
and spraying bitumen with sprayer on Dry /
Sqm 1 1 1.00 9 0.45 9.45 10 SSR 19-18,3.31
Hungry B.T. surface 3 kg/10 sqm. VG-30 bulk
bitumen

BITUMINOUS CONCRETE:- Providing and


laying bituminous concrete using crushed
aggregates of grading 1, premixed with
bituminous binder @ 5.20 per cent by weight
of total mix and filler, transported to site with
VTS , laid over a previously prepared surface,
finished to the required grade, level,
alignment, and rolling to achieve the desired
compaction for 50 mm compacted thickness
with VG-30 Bitumen,Excluding prime / tack Cum 1 1 0.04 0.04 4814 240.7 5054.7 203 SSR 17-18,3.48
coat. For Bitumen VG-30 bulk -- USING 80
TPH Batch mix type hot mix plant with
SCADA, Sensor Paver, Intelligent Compactor
with compaction analyzer and V-Sat
attachment with Stone Dust filler

Sub Total 1187


Contingency @10% 119
Add GST @ 12% on
142.44
SSR Base Item
Cost per Sqm= 1448
E Bitumen Road Reinstatment
BITUMINOUS CONCRETE:--Providing and laying
bituminous concrete using crushed aggregate of
grading 2, premixed with bituminous binder
@5.4% by weight of total mix and filler, transported
at site with VTS, laid over a previously prepared
surface, finished to the required grade ,level,
alignment, and
1 rolling to achieve the desired density for 30/40 mm
compacted thickness with
drum mix plant with SCADA, Sensor paver and
Vibratory roller excluding
prime/Tack coat etc. complete -- Bitumen VG-30
grade with stone dust filler

DI Pipes-Distribution
Dia 100 Cum 4000 0.7 0.025 70.00
Dia.150 Cum 25,011 0.9 0.025 562.75
Dia.200 Cum 3,051 0.95 0.025 72.47
Dia.250 Cum 1,588 1 0.025 39.70
Dia.300 Cum 3,706 1.05 0.025 97.27
Dia.350 Cum 3,386 1.1 0.025 93.10
Dia.400 Cum 537 1.55 0.025 20.80
Dia.500 Cum 1,172 1.25 0.025 36.63

House hold connection


Dia.25 Cum 45000 0.3 0.025 337.50

DI Pipes-House hold connection


Dia 100mm Cum 20000 0.3 0.025 150.00
Dia 150mm Cum 2000 0.3 0.025 15.00
1495.22
DENSE BITUMINOUS MACADAM:--Providing and
laying dense bituminous macadam using crushed
aggregate of grading 2, premixed with bituminous
binder,@ 4.50 % by weight of total mix and filler,
transported at site with VTS, laid over a previously
prepared surface , finished to the required
grade ,level, alignment,and rolling to achieve the
desired density for 50/75 mm compacted thickness
with drum mix type hot mix plant with SCADA
2
having complying essential features of Hot mix
plant as per IRC-27-2009 specified conditions and
attachments such as electronic load sensor based
belt conveyers,
automatic synchronization of bitumen and
aggregate fedder,built in dust controller system
and PLC for Drum Mix plant ,Sensor paver, and
Vibratory roller excluding prime/Tack coat etc.
complete -- Bitumen VG-30 grade with stone dust

DI Pipes-Distribution
Dia 100 Cum 4000 0.7 0.05 140.00
Dia.150 Cum 25,011 0.9 0.05 1125.50
Dia.200 Cum 3,051 0.95 0.05 144.93
Dia.250 Cum 1,588 1 0.05 79.40
Dia.300 Cum 3,706 1.05 0.05 194.54
Dia.350 Cum 3,386 1.1 0.05 186.21
Dia.400 Cum 537 1.55 0.05 41.60
Dia.500 Cum 1,172 1.25 0.05 73.25

House hold connection


Dia.25 Cum 45,000 0.3 0.05 675.00
DI Pipes-House hold connection
Dia 100mm Cum 20,000 0.3 0.05 300.00
Dia 150mm Cum 2,000 0.3 0.05 30.00
Cum 2990.44

Wet Mix Macadam -- Providing, laying, spreading


and
compacting graded stone aggregate to wet mix
macadam specification including premixing the
3 Material with water at OMC in mechanical mix
plant carriage of mixed Material by tipper to site,
laying in uniform layers with paver in sub- base /
base course on well prepared surface and
compacting with vibratory roller to achieve the
desired density. Laying By Grader/Paver.
DI Pipes-Distribution
Dia 100 Cum 4000 0.7 0.2 560.00
Dia.150 Cum 25,011 0.9 0.2 4502.02
Dia.200 Cum 3,051 1.0 0.2 579.73
Dia.250 Cum 1,588 1.0 0.2 317.60
Dia.300 Cum 3,706 1.1 0.2 778.18
Dia.350 Cum 3,386 1.1 0.2 744.83
Dia.400 Cum 537 1.6 0.2 166.41
Dia.500 Cum 1,172 1.3 0.2 293.00

House hold connection


Dia.25 Cum 45,000 0.3 0.2 2700.00

DI Pipes-House hold connection


Dia 100mm Cum 20,000 0.3 0.2 1200.00
Dia 150mm Cum 2,000 0.3 0.2 120.00
Cum 11961.76
Construction of granular sub-base by providing
close graded Material, mixing in a mechanical mix
plant at OMC, carriage of mixed Material to work
4
site, spreading in uniform layers with motor
grader / Paver on prepared surface and
compacting with vibratory power roller to achieve
the desired density, complete as per clause 401 --
Plant Mix Method and Grading - II Material
DI Pipes-Distribution
Dia 100 Cum 4000 0.7 0.15 420.00
Dia.150 Cum 25,011 0.9 0.15 3376.51
Dia.200 Cum 3,051 1.0 0.15 434.80
Dia.250 Cum 1,588 1.0 0.15 238.20
Dia.300 Cum 3,706 1.1 0.15 583.63
Dia.350 Cum 3,386 1.1 0.15 558.62
Dia.400 Cum 537 1.6 0.15 124.81
Dia.500 Cum 1,172 1.3 0.15 219.75

House hold connection


Dia.25 Cum 45,000 0.3 0.15 2025.00

DI Pipes-House hold connection


Dia 100mm Cum 20,000 0.3 0.15 900.00
Dia 150mm Cum 2,000 0.3 0.15 90.00
Cum 8971.32
Providing and laying in-situ M40 Grade
unreinforced plain cement concrete pavement over
a prepared sub base with 43 grade cement ,coarse
and fine aggregate conforming to IS
383, using fine and coarse aggregates combined
gradation as per Table 600-3 of MORTH
Specification 2013, mixed in a batching and mixing
plant/ non tilting mixer and Weigh batcher as per
approved mix design, admixtures, transporting to
site, spreading, laying compacting and finished in
a continuous operation,
5 finishing to lines and grades as directed by
Engineer in-charge and curing by curing
compound /by providing cement vata in cement
Mortar 1:8 @0.6m X0.6m centre to centre,
admeasuring 80 mm at bottom and 40 mm at top
with depth of 75mm and maintaining the same
throughout curing period by any other method
approved by Engineer-in-charge.

DI Pipes-Distribution
Dia 100 Cum 1000 0.7 0.28 196.00
Dia.150 Cum 6252.8 0.95 0.28 1663.24
Dia.200 Cum 762.8 1 0.28 213.58
Dia.250 Cum 397 1.05 0.28 116.72
Dia.300 Cum 926.4 1.1 0.28 285.33
Dia.350 Cum 846.4 1.15 0.28 272.54
Dia.400 Cum 134.2 1.6 0.28 60.12
Dia.500 Cum 293 1.3 0.28 106.65

House hold connection


Dia.25 Cum 10000 0.3 0.28 840.00
DI Pipes-House hold connection
Dia 100mm Cum 2000 0.3 0.28 168.00
Dia 150mm Cum 400 0.3 0.28 33.60
Cum 3955.79

Construction of dry lean cement concrete Sub-


base over aprepared sub-grade with coarse and
fine aggregate conforming to IS: 383, the size of
coarse aggregate not exceeding 25 mm, , cement
content not to be less than 150 kg/ cum, optimum
moisture content to be determined during trial
length construction, concrete strength not to be
6 less than 10 Mpa at 7 days, mixed in a batching
plant/ Weigh batch mixer, transported to site with
all leads and lifts, laid with a paver with electronic
sensor /by suitable means as approved by
Engineer in-charge , compacting with vibratory
roller, finishing,
curing and including preparation of sub-grade
surface if required etc. complete.

DI Pipes-Distribution
Dia.100 Cum 1000 0.7 0.1 70.00
Dia.150 Cum 6252.8 0.95 0.1 594.02
Dia.200 Cum 762.8 1 0.1 76.28
Dia.250 Cum 397 1.05 0.1 41.69
Dia.300 Cum 926.4 1.1 0.1 101.90
Dia.350 Cum 846.4 1.15 0.1 97.34
Dia.400 Cum 134.2 1.6 0.1 21.47
Dia.500 Cum 293 1.3 0.1 38.09
House hold connection
Dia.25 Cum 10000 0.3 0.1 300.00

DI Pipes-House hold connection


Dia 100mm Cum 2000 0.3 0.1 60.00
Dia 150mm Cum 400 0.3 0.1 12.00
Cum 1412.78

Construction of granular sub-base by providing


close graded Material, mixing in a mechanical mix
plant at OMC, carriage of mixed Material to work
site, spreading in uniform layers with motor
7
grader / Paver on prepared surface and
compacting with vibratory power roller to achieve
the desired density, complete as per clause 401 --
Plant Mix Method and Grading - II Material

DI Pipes-Distribution
Dia.100 Cum 1000 0.70 0.15 105.00
Dia.150 Cum 6252.8 0.95 0.15 891.02
Dia.200 Cum 762.8 1.00 0.15 114.42
Dia.250 Cum 397 1.05 0.15 62.53
Dia.300 Cum 926.4 1.10 0.15 152.86
Dia.350 Cum 846.4 1.15 0.15 146.00
Dia.400 Cum 134.2 1.60 0.15 32.21
Dia.500 Cum 293 1.30 0.15 57.14

House hold connection


Dia.25 Cum 10000 0.30 0.15 450.00

DI Pipes-House hold connection


Dia 100mm Cum 2000 0.30 0.15 90.00
Dia 150mm Cum 400 0.30 0.15 18.00
Cum 2119.17
Royalty Statement
Constant for Total
Sr.No Description Unit Quantity
Material Quantity
Providing, laying and spreading soil on a prepared sub
grade, pulverizing, adding the designed quantity of
cement to the spread soil, mixing in place with
15 rotavator, grading with the motor grader and Cum 7820 1.3 10166
compacting with the road roller at OMC to achieve the
desired unconfined compressive strength and to form a
layer of sub-base/base.

Providing selected hard murum filling including


16 laying in layers of 15 to 20cm with watering and Cum 95670 1.3 124371
compacting etc. complete.
Construction of dry lean cement concrete Sub- base
over a prepared sub-grade with coarse and fine
aggregate conforming to IS: 383, the size of coarse
aggregate not exceeding 25 mm, , cement content not
to be less than 150 kg/cum, optimum moisture content
to be determined during trial length construction,
concrete strength not to be less than 10 Mpa at 7 days,
23 mixed in a batching plant/ Weigh batch mixer, Cum 19188 0.45 8635
transported to site with all leads and lifts, laid with a
paver with electronic sensor /by suitable means as
approved by Engineerin-charge , compacting with
vibratory roller, finishing, curing and including
preparation of sub-grade surface if required
etc.complete.

Providing and laying in-situ M40 Grade unreinforced


plain cement concrete pavement over a prepared
sub base with 43 grade cement , coarse and fine
aggregate conforming to IS 383, using fine and coarse
aggregates combined gradation as per Table 600-3 of
MORTH Specification 2013, mixed in a batching and
mixing plant/ non tilting mixer and Weigh batcher as
per approved mix design, admixtures, transporting to
site, spreading, laying with approved make
paver,compacted and finished in a continuous
25 operation, finishing to lines and grades as directed by Cum 32181 0.45 14481
Engineer-in-charge and curing by curing compound /by
providing cement vata in cement Mortar 1:8 @0.6m X
0.6m centre to centre, admeasuring 80 mm at bottom
and 40 mm at top with depth of 75mm and maintaining
the same throughout curing period by any other
method approved by Engineer-in-charge.

Providing rubble filling of trap/ granite/ quartzite


gneiss stonesfor foundations including hand packing
30 filling gravel / sand in the voids etc. complete. Cum 8998 1.25 11248
Constant for Total
Sr.No Description Unit Quantity
Material Quantity
Providing and laying Cast in situ/Ready Mix cement
concrete in M15 of trap/ granite/quartzite/gneiss metal
for steps including steel centering, plywood/steel
formwork, laying/pumping, compacting, roughening
them if special finish is to be provided, finishing uneven
and honeycombed surface and curing etc. complete.
The Cement Mortar 1:3 plaster is considered for
rendering uneven and honeycombed surface, only.
Newly laid concrete shall be covered by gunny bag,
31 Cum 16922 0.45 7615
plastic, tarpaulin etc. (Wooden centering will not be
allowed.),with fully automatic micro processor based
PLC with SCADA enabled reversible Drum Type
mixer/concrete Batch mix plant (Pan mixer) etc.
complete. With natural sand/V.S.I. quality Artificial
Sand

Providing and laying in situ / ready mix / ready mix


M25 RCC work with trap/ granite/ quartzite/ gneiss
metal in well steining including shuttering, compacting
by vibrating, finishing and curing etc. complete. (fully
32 automatic micro processor based Cum 20983 0.45 9442
PLC with SCADA enabled concrete batch mix plant /
pan mixer with natural /artifical sand, excluding
reinforcement)

185958
Royalty Amount Statement
Total Quntity 185958
Rate per cum 141.34
Total Amount 26,283,275.00
Test And Frequency statement

No of Test
Sr.No Item BOQ Quantity Frequency Rate Amount Reference
Testing Required
A Cement
1 Standard Consistancy 1297.71 25 3300 82,500 PWD SSR 2018-2019,
2 Fineness 25 3300 82,500 Testing Charges,
Pg.No.540
3 Specific Gravity 25 3300 82,500
4 Setting Time ( Initial & Final ), 1 Test 3300.00 25 3300 82,500
5 Soundness 25 3300 82,500
Frequency Limit,
6 50 MT
Compressive Strength 26 3300 85,800 Pg.No.540

B GSB 6271.36
Water Absorption, Specific Gravity, lmpact PWD SSR 2018-
1 63 2300 144,900 2019,Frequency Limit,
Value/Crushing Value.
2 Sieve Analysis 63 600 37,800 Pg.No.394
100 Cum Testing Charges,
3 Abrasion Value 63 1050 66,150 Pg.No.540
4 Flakiness Index & Elongation Index. 63 750 47,250
5 Soundness. 63 2200 138,600
6 Mix Design 1 14300 14,300

C WMM #NAME?
Water Absorption, Specific Gravity, lmpact PWD SSR 2018-
1 #NAME? 2300 #NAME? 2019,Frequency Limit,
Value/Crushing Value.
2 Sieve Analysis #NAME? 600 #NAME? Pg.No.394
100 Cum Testing Charges,
3 Abrasion Value #NAME? 1050 #NAME? Pg.No.540
4 Flakiness Index & Elongation Index. #NAME? 750 #NAME?
5 Soundness. #NAME? 2200 #NAME?
6 Mix Desing 1 14300 14,300

D Sand
Fineness Modulus ( Sieve Analysis ),Silt & Clay PWD SSR 2018-2019,
1 25 1200 30,000 Testing Charges, Pg.No
Content 2177.00
2 Chloride & Sulphate Content 25 700 17,500 540
3 Silt Factor 25 750 18,750

E Brick
Water Absorption (Set of 5 Bricks),Compressive PWD SSR 2018-
1 Strength( Set of 5 Bricks),Efflorescence (Set of 5 #NAME? 50000 2 1900 3,800 2019,Frequency Limit,
Bricks) Pg.No.540

F Concrete
MoRT&H- Section 900
1 Compressive Strength OF C.C. Cube (Set of 3 4862.90 50 cum Quality control for
cubes) 64.83868666667 600 38,903 Roads , Pg.No.541
2 Concrete Mix Design (With all Tests on basic
materials) 10 12100 121,000
No of Test
Sr.No Item BOQ Quantity Frequency Rate Amount Reference
Testing Required
3 permeability Test. 1350 -
4 Concrete mix design by Accelerated curing
method. (By Accelerated curing method) 10 14300 143,000
5 Taking of core samples in concrete pavement.
(Excluding Dead Journey Charges) 2967.90 100 2500 250,000

G Paving Block
PWD SSR 2018-
1 Compressive Strength, Water Absorption,(Set of 8 2019,Testing Charges,
Blocks) #NAME? 50 2200 110,000 Pg.No.540

J Soil / Murum 4092.00 1000


1 Sieve Analysis. 4 600 2,400 PWD SSR 2018-
2 Liquid limit & plastic Limit. 25 1000 25,000 2019,Testing Charges,
Pg.No.540
3 Compaction Test ( Proctor Density ). 25 1650 41,250
Frequency Limit,
4 C.B.R. Test ( Lab) With compaction test. 4 6050 24,200

5 C.B.R. Test ( Field Determination Test)Excluding


Transportation.As per IS 2720 Part XXXI 4 2300 9,200
8 Field Density by Sand replacement method 4 1000 4,000
9 Sulphate & Chloride Contents. 25 700 17,500
10 Mechanical Analysis. 20 1950 39,000
11 Plate Load Bearing Test. (Excluding
Transportation) 20 27500 550,000
12 Free Swell Test for Soil. 20 800 16,000

K Bitumen
Penetration, Softening Point, Flash & Fire Point, PWD SSR 2018-2019,
1
Specific Gravity 25 2750 68,750 Testing Charges,
2 Viscosity 25 1700 42,500 Pg.No.542
Frequency Limit,
3 Ducility I Elastic Recovery 25 800 20,000
4 Extraction Test,(For OGC) 50 1400 70,000

5 Extraction and Sieve Analysis of Bituminous mix


(For BM/OBM/AC) (2 samples of extraction for one
sieve analvsis lncludlna extraction) 50 3450 172,500
6 Marshall Stability & Flow measurement.(Set of 3
moulds) 25 1000 25,000
7 Job Mix Design with all Tests on aggregate
(Excluding bitumen) for DBM/SDBC/AC. 1 14300 14,300
8 B. M. Job Mix Design with all Tests on aggregate
(Excluding bitumen) 1 6600 6,600
12 Density of Bituminous Core. #NAME? 700 sqm #NAME? 550 #NAME?
No of Test
Sr.No Item BOQ Quantity Frequency Rate Amount Reference
Testing Required

13 Taking of core samples in bituminous flexible


pavement. (Excluding Dead Journey Charges) 50 2500 125,000

BITUMINOUS
L
EMULSION

% Residue Test By Evaporation I Sieve Test 5 550 2,750 PWD SSR 2018-2019,
Testing Charges,
Pg.No.543
Partical Charge Test 5 350 1,750 Frequency Limit,

M Water
PWD SSR 2018-2019,
PHValue, Sulphate & Chloride Content. Testing Charges,
5 1000 5,000 Pg.No.543

PWD SSR 2018-2019,


N P.V.C. PIPES Weight per running meter, Diameter of pipe & wall Testing Charges,
thickness of pipe #NAME? Rmt 5 200 1,000 Pg.No.544

STEEL BAR
O
TESTING 34.26 MT
Upto 16 mm (Set of 3 Bars) Per lot 25 1100 27,500 PWD SSR 2018-2019,
Above 16 mm (Set of 3 Bars), (Tensile strength, 1400 Testing Charges,
%, Elongation, Yield Proof Stress.) Pg.No.544
Stress,Weight-Per Meter, Bend I Rebend Test,
Per lot 25 35,000
Nitrol Solution Test. (Set of 3 Bars) Per lot 25 3400 85,000

PAINT / THERMO-
P PLASTIC PAINT
1209.30 Sqm
Glass bead contents & grading analysis. 5 3400 17,000 PWD SSR 2018-2019,
Reflectance & yellowness index. 5 1000 5,000 Testing Charges,
Flowability.(Percentage residue). 5 1000 5,000 Pg.No544
Softening Point. (Ring & ball method). 5 900 4,500
Drying Time. 5 700 3,500

ROAD SIGN
Q BOARD
PWD SSR 2018-2019,
Testing Charges,
Retro Reflective Test. 176.40 5% 9 3500 31,500 Pg.No545

OVERLA Y
R DESIGN
PWD SSR 2018-2019,
Benkelman Beam Test Testing Charges,
(Excluding Dead Journey Charges) 4.30 per KM 4.30 12450 53,535 Pg.No545
No of Test
Sr.No Item BOQ Quantity Frequency Rate Amount Reference
Testing Required
Total #NAME?
Rate Analysis Per RMT
Sr. No. Description Quantity Rate Unit Amount
1 Contract Market Rate Material Component
Bus Lane Divider Bus Lane Divider 1 2330.00 Nos 2330.0
Achor Bolts With Nut along 3
Contract Market Rate With Drilling 38.00 Nos 114

Material Cost 2444.00

2 LabourComponent
Loading / Unloading /
Frieght/ Handling 20% 2444.00 Rs 488.80

Material Cost
3 Total Cost (1+2) 2932.80
Miscallaneous Charges 2% 58.66
4
Add 10 % Contractor's profit 10.00% 293.28
and overheads

5 Completed Rate (3+4) 3284.74


Completed cost per RMt 3285.00
Cost per Rmt 3285.00
Minor Roads Flexible to Rigid Pavements-MR1
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 97.00 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 97.00 1 0.1

3 Dismantling brick masonry Cum 1 97.00 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 3

6 Dismantling of flexible pavements


Bituminous courses cum 1 97.000 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 97.00 1.600 1.500
Light Pole cum 3 0.90 0.900 1.600
Utility Crossing cum 2 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 9.42

Compacting the existing Subgrade with


9 power roller Sqm 1 97.00 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 97.000 4.700 0.500


Utility Crossing cum 2 1.400 1.65 1.000

12 selected hard murum filling cum 1 97.000 1.600 1.000


deduction of pole cum -3 1.200 1.200 1.000
deduction of Manhole cum -3 1.500 1.500 1.100
Total

13 GSB cum 1 97.000 4.700 0.150


Utility Crossing cum 2 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 97.000 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 97.000 4.700

16 Cement Concrete Pavement cum 1 97.000 4.700 0.200

17 Cutting Joints Rmt 1 25.000 4.568

18 polysuphide sealent Rmt 1 25.000 4.568

19 Rubble Soling
Utility Crossing Cum 2 1.400 1.650 0.230
OFC Chamber Cum 2 1.400 1.400 0.230
Electrical Chamber Cum 3 1.700 1.700 0.230
Water Chamber Cum 3 1.500 1.500 0.230
Light pole Cum 3 0.800 0.800 0.230
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 2 1.40 1.650 0.100
OFC Chamber Cum 2 1.40 1.40 0.100
Electrical Chamber Cum 3 1.70 1.70 0.100
Water Chamber Cum 3 1.50 1.50 0.100
Light pole Cum 3 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000
Electrical Chamber Cum 3 6.000 0.150 1.500
Water Chamber Cum 3 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Cover Deduction Cum -6 0.900 0.600 0.150
Cover Deduction Cum -2 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 3 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 4 1.40

24 Painting Work
Edge Marking Line Sqm 2 97.000 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 3
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 2
26 Octagone size
27 Informatory sign board Sqm 1 1.170

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 3
600mm
a
Watersupply Manhole - Size-900mm x Nos 3
600mm
b OFC Manhole - Size-400mm x 600mm Nos 2
Length of Road 97.00 M
Quantity ROW 4.70 M
14.55
Existing Carriageway 4.70 M
OFC Manhole Nos 2 No
9.7
LT and HT Manhole 3 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
17.848 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.72 No. of water chamber 3 nos
Total PaverBlock Crust 0.41 1
3
Condition-1, Flexible to Rigid

91.18
0 10043.00
91.18

232.8
3.89
6.93
-91.18
152.44

9.42

300.70

10

0
4.62
4.62

155.2
-4.32
-7.43
143.45

68.39
0.69
0
69.08

68.39
68.39

455.90

91.18

114.2

114.2

1.06
0.90
1.99
1.55
0.44
5.94

0
0
0.46
0.39
0.87
0.68
0.19
2.59

0.43
1.01
0.76
2.21

1.44
4.05
2.34
7.83

0.43
1.01
0.76
-0.486
-0.096
1.62
1.62
13.28

255.26
822.15
161.60
1.24

5.6

29.1
14.55

2
1.17

2
Minor Roads Flexible to Rigid Pavements-MR3
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 305.00 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 305.00 1 0.1

3 Dismantling brick masonry Cum 1 305.00 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 10

6 Dismantling of flexible pavements


Bituminous courses cum 1 305.000 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 305.00 1.600 1.500
Light Pole cum 10 0.90 0.900 1.600
Utility Crossing cum 6 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 29.62

Compacting the existing Subgrade with


9 power roller Sqm 1 305.00 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 305.000 4.700 0.500


Utility Crossing cum 6 1.400 1.65 1.000

12 selected hard murum filling cum 1 305.000 1.600 1.000


deduction of pole cum -10 1.200 1.200 1.000
deduction of Manhole cum -10 1.500 1.500 1.000
Total

13 GSB cum 1 305.000 4.700 0.150


Utility Crossing cum 6 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 305.000 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 305.000 4.700

16 Cement Concrete Pavement cum 1 305.000 4.700 0.200

17 Cutting Joints Rmt 1 77.000 4.660

18 polysuphide sealent Rmt 1 77.000 4.660

19 Rubble Soling
Utility Crossing Cum 6 1.400 1.650 0.230
OFC Chamber Cum 6 1.400 1.400 0.230
Electrical Chamber Cum 10 1.700 1.700 0.230
Water Chamber Cum 9 1.500 1.500 0.230
Light pole Cum 10 0.800 0.800 0.230
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 6 1.40 1.650 0.100
OFC Chamber Cum 6 1.40 1.40 0.100
Electrical Chamber Cum 10 1.70 1.70 0.100
Water Chamber Cum 9 1.50 1.50 0.100
Light pole Cum 10 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 6 1.200 1.200 0.150
Electrical Chamber Cum 10 1.500 1.500 0.150
Water Chamber Cum 9 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 6 4.800 0.150 1.000
Electrical Chamber Cum 10 6.000 0.150 1.500
Water Chamber Cum 9 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 6 1.200 1.200 0.150
Electrical Chamber Cum 10 1.500 1.500 0.150
Water Chamber Cum 9 1.300 1.300 0.150
Cover Deduction Cum -19 0.900 0.600 0.150
Cover Deduction Cum -6 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 10 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 12 1.40

24 Painting Work
Edge Marking Line Sqm 2 305.000 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 10
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 6
26 Octagone size
27 Informatory sign board Sqm 4 0.900

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 9
600mm
a
Watersupply Manhole - Size-900mm x Nos 9
600mm
b OFC Manhole - Size-400mm x 600mm Nos 6
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 6 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 305.000 2.100


19 Paver Block-80mm Thk Sqm 1 305.000 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 305.00
b 160 mm outer dia for HT & LT Cable Rmt 10 305.00

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

12.2
29 Barrigates Rmt 1 61
30 FRP Perforated Cover
SWD Nos 61
Length of Road 305.00 M
Quantity ROW 4.70 M
45.75
Existing Carriageway 4.70 M
OFC Manhole Nos 6 No
30.5
LT and HT Manhole 10 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
56.12 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
2.27 No. of water chamber 9 nos
Total PaverBlock Crust 0.41 1
10
Condition-1, Flexible to Rigid

286.7
0 10251.00
286.7

732
12.96
20.79
-286.7
479.05

29.62

945.5

31

0
14
14

488
-14
-23
451

215.03
2.08
0
217.11

215.03
215.03

1433.5

286.7

359

359

3.19
2.70
6.65
4.66
1.47
18.67

0
0
1.39
1.18
2.89
2.03
0.64
8.13

1.30
3.38
2.28
6.95

4.32
13.5
7.02
25.00

1.30
3.38
2.28
-1.539
-0.288
5.00
5.40
42.35

803.01
2625.00
498.75
3.93

17.22

91.5
45.75

10

6
3.6

6
383

96

28.2

0
0
0

0
0
0.00

2440.00
3050.00

61

61
Minor Roads Flexible to Rigid Pavements-MR71
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 180.05 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 180.05 1 0.1

3 Dismantling brick masonry Cum 1 180.05 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 6

6 Dismantling of flexible pavements


Bituminous courses cum 1 180.050 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 180.05 1.600 1.500
Light Pole cum 6 0.90 0.900 1.450
Utility Crossing cum 4 1.400 1.650 1.450
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 17.49

Compacting the existing Subgrade with


9 power roller Sqm 1 180.05 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 180.050 4.700 0.500


Utility Crossing cum 4 1.400 1.65 0.950

12 selected hard murum filling cum 1 180.050 1.600 1.000


deduction of pole cum -6 1.200 1.200 1.000
deduction of Manhole cum -6 1.500 1.500 1.000
Total

13 GSB cum 1 180.050 4.700 0.150


Utility Crossing cum 4 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 180.050 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 180.050 4.700

16 Cement Concrete Pavement cum 1 180.050 4.700 0.200

17 Cutting Joints Rmt 1 46.000 4.605

18 polysuphide sealent Rmt 1 46.000 4.605

19 Rubble Soling
Utility Crossing Cum 4 1.400 1.650 0.230
OFC Chamber Cum 4 1.400 1.400 0.230
Electrical Chamber Cum 6 1.700 1.700 0.230
Water Chamber Cum 4 1.500 1.500 0.230
Light pole Cum 6 0.800 0.800 0.230
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 4 1.40 1.650 0.075
OFC Chamber Cum 4 1.40 1.40 0.100
Electrical Chamber Cum 6 1.70 1.70 0.100
Water Chamber Cum 5 1.50 1.50 0.100
Light pole Cum 6 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 4 4.800 0.120 1.000
Electrical Chamber Cum 6 6.000 0.150 1.500
Water Chamber Cum 5 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Cover Deduction Cum -11 0.900 0.600 0.150
Cover Deduction Cum -4 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 6 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 8 1.40

24 Painting Work
Edge Marking Line Sqm 2 180.050 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 6
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 4
26 Octagone size
27 Informatory sign board Sqm 2 1.084

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 6
600mm
a
Watersupply Manhole - Size-900mm x Nos 5
600mm
b OFC Manhole - Size-400mm x 600mm Nos 4
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 4 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 180.050 2.100


19 Paver Block-80mm Thk Sqm 1 180.050 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 180.05
b 160 mm outer dia for HT & LT Cable Rmt 10 180.05

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

7.202
29 Barrigates Rmt 1 36.01
30 FRP Perforated Cover
SWD Nos 36
Length of Road 180.05 M
Quantity ROW 4.70 M
27.0075
Existing Carriageway 4.70 M
OFC Manhole Nos 4 No
18.005
LT and HT Manhole 6 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
33.1292 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
1.34 No. of water chamber 5 nos
Total PaverBlock Crust 0.41 1
6
Condition-1, Flexible to Rigid

169.25
0 10126.05
169.25

432.12
7.05
13.4
-169.25
283.32

17.49

558.16

18

0
8.78
8.78

288.08
-8.64
-13.5
265.94

127
1.39
0
128.39

126.94
126.94

846.24

169.25

211.83 #NAME?

211.83

2.13
1.80
3.99
2.07
0.88
10.87

0
0
0.69
0.78
1.73
1.13
0.38
4.71

0.86
2.03
1.27
4.16

2.304
8.1
3.9
14.30

0.86
2.03
1.27
-0.891
-0.192
3.07
3.24
24.77

480.48
1501.50
306.23
2.29

11.2

54.015
27.0075

4
2.168 1.0845

4
227

57

18.8

0
0
0

0
0
0.00

1440.40
1800.50

36

36
Minor Roads Flexible to Rigid Pavements-MR72
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 100.09 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 100.09 1 0.1

3 Dismantling brick masonry Cum 1 100.09 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 3

6 Dismantling of flexible pavements


Bituminous courses cum 1 100.090 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 100.09 1.600 1.500
Light Pole cum 3 0.90 1.050 1.500
Utility Crossing cum 2 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 9.72

Compacting the existing Subgrade with


9 power roller Sqm 1 100.09 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 100.090 4.700 0.500


Utility Crossing cum 2 1.400 1.65 1.000

12 selected hard murum filling cum 1 100.090 1.600 1.000


deduction of pole cum -3 1.200 1.200 1.100
deduction of Manhole cum -3 1.500 1.500 1.100
Total

13 GSB cum 1 100.090 4.700 0.150


Utility Crossing cum 2 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 100.090 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 100.090 4.700

16 Cement Concrete Pavement cum 1 100.090 4.700 0.200

17 Cutting Joints Rmt 1 26.000 4.530

18 polysuphide sealent Rmt 1 26.000 4.530

19 Rubble Soling
Utility Crossing Cum 2 1.500 1.650 0.230
OFC Chamber Cum 2 1.400 1.400 0.230
Electrical Chamber Cum 3 1.700 1.700 0.230
Water Chamber Cum 3 1.500 1.500 0.230
Light pole Cum 3 0.800 0.800 0.230
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 2 1.40 1.650 0.100
OFC Chamber Cum 2 1.40 1.40 0.100
Electrical Chamber Cum 3 1.70 1.70 0.100
Water Chamber Cum 3 1.50 1.50 0.100
Light pole Cum 3 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000
Electrical Chamber Cum 3 6.000 0.150 1.500
Water Chamber Cum 3 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Cover Deduction Cum -6 0.900 0.600 0.150
Cover Deduction Cum -2 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 3 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 4 1.40

24 Painting Work
Edge Marking Line Sqm 2 100.090 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 3
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 2
26 Octagone size
27 Informatory sign board Sqm 1 1.210

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 3
600mm
a
Watersupply Manhole - Size-900mm x Nos 3
600mm
b OFC Manhole - Size-400mm x 600mm Nos 2
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 2 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 100.090 2.100


19 Paver Block-80mm Thk Sqm 1 100.090 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 100.09
b 160 mm outer dia for HT & LT Cable Rmt 10 100.09

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

4.0036
29 Barrigates Rmt 1 20.018
30 FRP Perforated Cover
SWD Nos 20
Length of Road 100.09 M
Quantity ROW 4.70 M
15.0135
Existing Carriageway 4.70 M
OFC Manhole Nos 2 No
10.009
LT and HT Manhole 3 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
18.41656 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.74 No. of water chamber 3 nos
Total PaverBlock Crust 0.41 1
3
Condition-1, Flexible to Rigid

94
0 10046.09
94

240.22
4.25
6.93
-94
157.4

9.72

310.28

10

0
4.62
4.62

160.14
-4.75
-7.43
147.96

70.56
0.69
0
71.25

70.56
70.56

470.42

94.08

117.78

117.78

1.14
0.90
1.99
1.55
0.44
6.02

0
0
0.46
0.39
0.87
0.68
0.19
2.59

0.43
1.01
0.76
2.21

1.44
4.05
2.34
8.00

0.43
1.01
0.76
-0.486
-0.096
2.00
1.62
13.83

254.68
840.00
199.50
1.29

5.6

30.027
15.0135

2
1.21

2
126

31

9.4

0
0
0

0
0
0.00

800.72
1000.90

20

20
Minor Roads Flexible to Rigid Pavements-MR78
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 351.00 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 351.00 1 0.1

3 Dismantling brick masonry Cum 1 351.00 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 12

6 Dismantling of flexible pavements


Bituminous courses cum 1 351.000 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 351.00 1.600 1.500
Light Pole cum 12 0.90 0.900 1.600
Utility Crossing cum 7 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 34.09

Compacting the existing Subgrade with


9 power roller Sqm 1 351.00 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 351.000 4.700 0.500


Utility Crossing cum 7 1.400 1.65 1.000

12 selected hard murum filling cum 1 351.000 1.600 1.000


deduction of pole cum -12 1.200 1.200 1.100
deduction of Manhole cum -11 1.500 1.500 1.000
Total

13 GSB cum 1 351.000 4.700 0.150


Utility Crossing cum 7 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 351.000 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 351.000 4.700

16 Cement Concrete Pavement cum 1 351.000 4.700 0.200

17 Cutting Joints Rmt 1 89.000 4.640

18 polysuphide sealent Rmt 1 89.000 4.640

19 Rubble Soling
Utility Crossing Cum 7 1.400 1.650 0.230
OFC Chamber Cum 7 1.400 1.400 0.230
Electrical Chamber Cum 12 1.700 1.700 0.230
Water Chamber Cum 10 1.500 1.500 0.220
Light pole Cum 12 0.800 0.800 0.220
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 7 1.40 1.650 0.090
OFC Chamber Cum 7 1.40 1.40 0.100
Electrical Chamber Cum 12 1.70 1.70 0.100
Water Chamber Cum 10 1.50 1.50 0.100
Light pole Cum 12 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 7 1.200 1.200 0.150
Electrical Chamber Cum 12 1.500 1.500 0.150
Water Chamber Cum 10 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 7 4.800 0.150 0.900
Electrical Chamber Cum 12 6.000 0.150 1.500
Water Chamber Cum 10 5.200 0.150 0.900
Total
c Slab
OFC Chamber Cum 7 1.200 1.200 0.150
Electrical Chamber Cum 12 1.500 1.500 0.150
Water Chamber Cum 10 1.300 1.300 0.150
Cover Deduction Cum -22 0.900 0.600 0.150
Cover Deduction Cum -7 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 12 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 14 1.40

24 Painting Work
Edge Marking Line Sqm 2 351.000 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 12
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 5
26 Octagone size
27 Informatory sign board Sqm 5 0.900

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 11
600mm
a
Watersupply Manhole - Size-900mm x Nos 10
600mm
b OFC Manhole - Size-400mm x 600mm Nos 5
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 7 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 351.000 2.100


19 Paver Block-80mm Thk Sqm 1 351.000 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 351.00
b 160 mm outer dia for HT & LT Cable Rmt 10 351.00

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

14.04
29 Barrigates Rmt 1 70.2
30 FRP Perforated Cover
SWD Nos 70
Length of Road 351.00 M
Quantity ROW 4.70 M
52.65
Existing Carriageway 4.70 M
OFC Manhole Nos 7 No
35.1
LT and HT Manhole 12 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
64.584 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
2.61 No. of water chamber 10 nos
Total PaverBlock Crust 0.41 1
12
Condition-1, Flexible to Rigid

329.94
0 10297.00
329.94

842.4
15.55
24.26
-329.94
552.27

34.09

1088

35

0
16.17
16.17

562
-19
-25
518

247.46
2.43
0
250

247.46
247.46

1649.7

329.94

413

413

3.72
3.16
7.98
4.95
1.69
21.5

0
0
1.46
1.37
3.47
2.25
0.77
9.32

1.51
4.05
2.54
8.10

4.536
16.2
7.02
27.76

1.51
4.05
2.54
-1.782
-0.336
5.98
6.48
48.32

935.55
2914.80
596.51
4.45

19.6

105.3
52.65

12

5
4.5 1.0575

11

10

5
442

110

32.9

0
0
0

0
0
0.00

2808.00
3510.00

70

70
Minor Roads Flexible to Rigid Pavements-MR79
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 224.00 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 224.00 1 0.1

3 Dismantling brick masonry Cum 1 224.00 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 8

6 Dismantling of flexible pavements


Bituminous courses cum 1 224.000 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 224.00 1.600 1.500
Light Pole cum 7 0.90 0.900 1.600
Utility Crossing cum 4 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 21.76

Compacting the existing Subgrade with


9 power roller Sqm 1 224.00 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 224.000 4.700 0.500


Utility Crossing cum 4 1.400 1.65 1.105

12 selected hard murum filling cum 1 224.000 1.600 1.000


deduction of pole cum -7 1.200 1.200 1.000
deduction of Manhole cum -8 1.500 1.500 1.000
Total

13 GSB cum 1 224.000 4.700 0.150


Utility Crossing cum 4 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 224.000 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 224.000 4.700

16 Cement Concrete Pavement cum 1 224.000 4.700 0.200

17 Cutting Joints Rmt 1 57.000 4.626

18 polysuphide sealent Rmt 1 57.000 4.626

19 Rubble Soling
Utility Crossing Cum 4 1.400 1.650 0.230
OFC Chamber Cum 4 1.400 1.400 0.230
Electrical Chamber Cum 7 1.700 1.700 0.230
Water Chamber Cum 6 1.500 1.500 0.230
Light pole Cum 7 0.800 0.800 0.220
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.150
Utility Crossing Cum 4 1.40 1.650 0.150
OFC Chamber Cum 4 1.40 1.40 0.100
Electrical Chamber Cum 7 1.70 1.70 0.100
Water Chamber Cum 6 1.50 1.50 0.100
Light pole Cum 7 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 7 1.500 1.500 0.150
Water Chamber Cum 6 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 4 4.800 0.150 1.200
Electrical Chamber Cum 7 6.000 0.150 1.500
Water Chamber Cum 6 5.200 0.150 1.200
Total
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 7 1.500 1.500 0.150
Water Chamber Cum 6 1.300 1.300 0.150
Cover Deduction Cum -13 0.900 0.600 0.150
Cover Deduction Cum -4 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 7 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 8 1.58

24 Painting Work
Edge Marking Line Sqm 2 224.000 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 8
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 5
26 Octagone size
27 Informatory sign board Sqm 3 0.900

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 8
600mm
a
Watersupply Manhole - Size-900mm x Nos 6
600mm
b OFC Manhole - Size-400mm x 600mm Nos 5
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 4 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 224.000 2.100


19 Paver Block-80mm Thk Sqm 1 224.000 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 224.00
b 160 mm outer dia for HT & LT Cable Rmt 10 224.00

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

8.96
29 Barrigates Rmt 1 44.8
30 FRP Perforated Cover
SWD Nos 45
Length of Road 224.00 M
Quantity ROW 4.70 M
33.6
Existing Carriageway 4.70 M
OFC Manhole Nos 4 No
22.4
LT and HT Manhole 7 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
41.216 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
1.67 No. of water chamber 6 nos
Total PaverBlock Crust 0.41 1
8
Condition-1, Flexible to Rigid

210.56
0 10170.00
210.56

537.6
9.07
13.86
-207.56
352.97

21.76

694.4

22

0
10.21
10.21

356.6
-10
-18
328.6

157.92
1.39
0
159.31

157.92
157.92

1052.8

210.56

263.682

263.682

2.13
1.80
4.65
3.11
0.99
12.68

0
0
1.39
0.78
2.02
1.35
0.45
5.99

0.86
2.36
1.52
4.75

3.456
9.45
5.616
19.00

0.86
2.36
1.52
-1.053
-0.192
3.50
3.78
31.03

548.63
1995.00
349.13
2.89

12.64

67.2
33.6

5
2.7

5
282

71

18.8

0
0
0

0
0
0.00

1792.00
2240.00

45

45
Minor Roads Flexible to Rigid Pavements-MR80
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 104.99 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 104.99 1 0.1

3 Dismantling brick masonry Cum 1 104.99 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 4

6 Dismantling of flexible pavements


Bituminous courses cum 1 104.990 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 104.99 1.600 1.500
Light Pole cum 3 1.00 1.000 1.600
Utility Crossing cum 2 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 10.2

Compacting the existing Subgrade with


9 power roller Sqm 1 104.99 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 104.990 4.700 0.500


Utility Crossing cum 2 1.400 1.7 1.000

12 selected hard murum filling cum 1 104.990 1.600 1.000


deduction of pole cum -4 1.200 1.200 1.000
deduction of Manhole cum -3 1.500 1.500 1.000
Total

13 GSB cum 1 104.990 4.700 0.150


Utility Crossing cum 2 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 104.990 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 104.990 4.700

16 Cement Concrete Pavement cum 1 104.990 4.700 0.200

17 Cutting Joints Rmt 1 27.000 4.580

18 polysuphide sealent Rmt 1 27.000 4.570

19 Rubble Soling
Utility Crossing Cum 3 1.400 1.650 0.230
OFC Chamber Cum 2 1.400 1.400 0.230
Electrical Chamber Cum 3 1.700 1.700 0.230
Water Chamber Cum 3 1.500 1.500 0.230
Light pole Cum 3 0.800 0.800 0.230
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.150
Utility Crossing Cum 2 1.40 1.650 0.110
OFC Chamber Cum 2 1.40 1.40 0.110
Electrical Chamber Cum 3 1.70 1.70 0.110
Water Chamber Cum 3 1.50 1.50 0.100
Light pole Cum 3 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000
Electrical Chamber Cum 3 6.000 0.150 1.500
Water Chamber Cum 3 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Cover Deduction Cum -6 0.900 0.600 0.150
Cover Deduction Cum -2 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 5 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 110 kg/cum
c Slab MT 100 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 4 1.50

24 Painting Work
Edge Marking Line Sqm 2 104.990 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 4
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 2
26 Octagone size
27 Informatory sign board Sqm 2 0.650

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 3
600mm
a
Watersupply Manhole - Size-900mm x Nos 3
600mm
b OFC Manhole - Size-400mm x 600mm Nos 2
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 2 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 104.990 2.100


19 Paver Block-80mm Thk Sqm 1 104.990 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 104.99
b 160 mm outer dia for HT & LT Cable Rmt 10 104.99

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

4.1996
29 Barrigates Rmt 1 20.998
30 FRP Perforated Cover
SWD Nos 21
Length of Road 104.99 M
Quantity ROW 4.70 M
15.7485
Existing Carriageway 4.70 M
OFC Manhole Nos 2 No
10.499
LT and HT Manhole 3 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
19.31816 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.78 No. of water chamber 3 nos
Total PaverBlock Crust 0.41 1
4
Condition-1, Flexible to Rigid

98.69
0 10050.99
98.69

251.98
4.8
6.93
-98.69
165.02

10.2

325.47

11

0
4.76
4.76

168
-6
-7
155

74.02
0.69
0
74.71

74
74

493.45

98.69

123.39

123.39

1.59
0.90
1.99
1.55
0.44
6.47

0
0
0.51
0.43
0.95
0.68
0.19
2.76

0.43
1.01
0.76
2.21

1.44
4.05
2.34
7.83

0.43
1.01
0.76
-0.486
-0.096
1.62
2.70
14.36

255.26
904.37
170.10
1.33

31.497
15.7485

2
1.3

2
132

33

9.4

0
0
0

0
0
0.00

839.92
1049.90

21

21
Minor Roads Flexible to Rigid Pavements-MR81
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 176.78 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 176.78 1 0.1

3 Dismantling brick masonry Cum 1 176.78 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 6

6 Dismantling of flexible pavements


Bituminous courses cum 1 176.780 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 176.78 1.600 1.500
Light Pole cum 6 0.90 0.800 1.500
Utility Crossing cum 4 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 17.17

Compacting the existing Subgrade with


9 power roller Sqm 1 176.78 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 176.780 4.700 0.500


Utility Crossing cum 4 1.400 1.55 0.950

12 selected hard murum filling cum 1 176.780 1.600 1.000


deduction of pole cum -6 1.200 1.200 1.000
deduction of Manhole cum -6 1.500 1.500 1.000
Total

13 GSB cum 1 176.780 4.700 0.150


Utility Crossing cum 4 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 176.780 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 176.780 4.700

16 Cement Concrete Pavement cum 1 176.780 4.700 0.200

17 Cutting Joints Rmt 1 45.000 4.624

18 polysuphide sealent Rmt 1 45.000 4.624

19 Rubble Soling
Utility Crossing Cum 3 1.400 1.650 0.230
OFC Chamber Cum 4 1.400 1.400 0.230
Electrical Chamber Cum 6 1.700 1.700 0.230
Water Chamber Cum 5 1.500 1.500 0.230
Light pole Cum 6 0.800 0.800 0.230
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 4 1.40 1.650 0.100
OFC Chamber Cum 4 1.40 1.40 0.100
Electrical Chamber Cum 6 1.70 1.70 0.100
Water Chamber Cum 5 1.50 1.50 0.100
Light pole Cum 6 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000
Electrical Chamber Cum 6 6.000 0.150 1.500
Water Chamber Cum 5 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Cover Deduction Cum -11 0.900 0.600 0.150
Cover Deduction Cum -3 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 6 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 8 1.20

24 Painting Work
Edge Marking Line Sqm 2 176.780 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 6
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 4
26 Octagone size
27 Informatory sign board Sqm 3 0.700

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 6
600mm
a
Watersupply Manhole - Size-900mm x Nos 5
600mm
b OFC Manhole - Size-400mm x 600mm Nos 4
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 4 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 176.780 2.100


19 Paver Block-80mm Thk Sqm 1 176.780 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 176.78
b 160 mm outer dia for HT & LT Cable Rmt 10 176.78

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

7.0712
29 Barrigates Rmt 1 35.356
30 FRP Perforated Cover
SWD Nos 35
Length of Road 176.78 M
Quantity ROW 4.70 M
26.517
Existing Carriageway 4.70 M
OFC Manhole Nos 4 No
17.678
LT and HT Manhole 6 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
32.52752 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
1.32 No. of water chamber 5 nos
Total PaverBlock Crust 0.41 1
6
Condition-1, Flexible to Rigid

166.17
0 10122.78
166.17

424.27
6.48
13.86
-166.17
278.44

17.17

548

18

0
8.25
8.25

282.85
-8.64
-13.5
260.71

124.63
1.39
0
126.02

124.63
124.63

830.87

166.17

208.08 #NAME?

208.08

1.59
1.80
3.99
2.59
0.88
10.85

0
0
0.92
0.78
1.73
1.13
0.38
4.94

0.65
2.03
1.27
3.94

2.16
8.1
3.9
14.00

0.65
2.03
1.27
-0.891
-0.144
3.00
3.24
24.18

455.07
1470.00
299.25
2.22

9.6

53.034
26.517

4
2.1

4
223

56

18.8

0
0
0

0
0
0.00

1414.24
1767.80

35

35
Minor Roads Flexible to Rigid Pavements-MR82
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 66.69 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 66.69 1 0.1

3 Dismantling brick masonry Cum 1 66.69 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 2

6 Dismantling of flexible pavements


Bituminous courses cum 1 66.690 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 66.69 1.600 1.500
Light Pole cum 2 0.90 0.900 1.900
Utility Crossing cum 1 1.400 1.650 1.800
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 6.48

Compacting the existing Subgrade with


9 power roller Sqm 1 66.69 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 66.690 4.700 0.500


Utility Crossing cum 1 1.400 1.65 1.300

12 selected hard murum filling cum 1 66.690 1.600 1.000


deduction of pole cum -2 1.200 1.200 1.000
deduction of Manhole cum -2 1.500 1.500 1.000
Total

13 GSB cum 1 66.690 4.700 0.155


Utility Crossing cum 1 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 66.690 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 66.690 4.700

16 Cement Concrete Pavement cum 1 66.690 4.700 0.200

17 Cutting Joints Rmt 1 18.000 4.361

18 polysuphide sealent Rmt 1 18.000 4.361

19 Rubble Soling
Utility Crossing Cum 1 1.400 1.650 0.230
OFC Chamber Cum 1 1.400 1.400 0.230
Electrical Chamber Cum 2 1.700 1.700 0.230
Water Chamber Cum 3 1.500 1.500 0.230
Light pole Cum 3 0.800 0.800 0.230
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 1 1.40 1.650 0.100
OFC Chamber Cum 1 1.40 1.40 0.100
Electrical Chamber Cum 2 1.70 1.70 0.100
Water Chamber Cum 2 1.50 1.50 0.100
Light pole Cum 3 0.80 0.80 0.150
Total

21 RCC M25
a Raft
OFC Chamber Cum 1 1.200 1.200 0.150
Electrical Chamber Cum 2 1.500 1.500 0.150
Water Chamber Cum 2 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 1 4.800 0.150 1.000
Electrical Chamber Cum 2 6.000 0.150 1.500
Water Chamber Cum 2 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 1 1.200 1.200 0.150
Electrical Chamber Cum 2 1.500 1.500 0.150
Water Chamber Cum 2 1.300 1.300 0.150
Cover Deduction Cum -4 0.900 0.600 0.150
Cover Deduction Cum -1 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 3 0.600 0.600 1.650
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 110 kg/cum
c Slab MT 110 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 2 1.90

24 Painting Work
Edge Marking Line Sqm 2 66.690 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 2
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 1
26 Octagone size
27 Informatory sign board Sqm 2 0.900

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 2
600mm
a
Watersupply Manhole - Size-900mm x Nos 2
600mm
b OFC Manhole - Size-400mm x 600mm Nos 1
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 1 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 66.690 2.100


19 Paver Block-80mm Thk Sqm 1 66.690 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 66.69
b 160 mm outer dia for HT & LT Cable Rmt 10 66.69

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

2.6676
29 Barrigates Rmt 1 13.338
30 FRP Perforated Cover
SWD Nos 13
Length of Road 66.69 M
Quantity ROW 4.70 M
10.0035
Existing Carriageway 4.70 M
OFC Manhole Nos 1 No
6.669
LT and HT Manhole 2 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
12.27096 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.5 No. of water chamber 2 nos
Total PaverBlock Crust 0.41 1
2
Condition-1, Flexible to Rigid

62.69
0 10012.69
62.69

160.06
3.08
4.16
-62.69
104.61

6.48

206.74

0
3
3

106.7
-3
-5
98.7

48.58
0
0
48.58

47
47

313.44

62.69

78.498

78.498

0.53
0.45
1.33
1.55
0.44
4.3

0
0
0.23
0.2
0.58
0.45
0.29
1.75

0.22
0.68
0.51
1.40

0.72
2.7
1.56
4.98

0.22
0.68
0.51
-0.324
-0.048
1.03
1.78
9.19

161.70
575.19
118.97
0.86

3.8

20.007
10.0035

1
1.8

1
84

21

4.7

0
0
0

0
0
0.00

533.52
666.90

13

13
Minor Roads Flexible to Rigid Pavements-MR83
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 93.43 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 93.43 1 0.1

3 Dismantling brick masonry Cum 1 93.43 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 3

6 Dismantling of flexible pavements


Bituminous courses cum 1 93.430 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 93.43 1.600 1.500
Light Pole cum 3 0.90 0.900 1.600
Utility Crossing cum 2 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 9.07

Compacting the existing Subgrade with


9 power roller Sqm 1 93.43 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 93.430 4.700 0.500


Utility Crossing cum 2 1.400 1.55 1.000

12 selected hard murum filling cum 1 93.430 1.600 1.000


deduction of pole cum -3 1.200 1.200 1.000
deduction of Manhole cum -3 1.500 1.500 1.000
Total

13 GSB cum 1 93.430 4.700 0.150


Utility Crossing cum 2 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 93.430 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 93.430 4.700

16 Cement Concrete Pavement cum 1 93.430 4.700 0.200

17 Cutting Joints Rmt 1 24.000 4.583

18 polysuphide sealent Rmt 1 24.000 4.583

19 Rubble Soling
Utility Crossing Cum 2 1.400 1.550 0.230
OFC Chamber Cum 2 1.400 1.300 0.230
Electrical Chamber Cum 3 1.700 1.600 0.230
Water Chamber Cum 3 1.500 1.450 0.230
Light pole Cum 3 0.800 0.750 0.230
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 2 1.40 1.650 0.100
OFC Chamber Cum 2 1.40 1.40 0.100
Electrical Chamber Cum 3 1.70 1.70 0.100
Water Chamber Cum 3 1.50 1.50 0.100
Light pole Cum 3 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000
Electrical Chamber Cum 3 6.000 0.150 1.500
Water Chamber Cum 3 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 2 1.200 1.200 0.100
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Cover Deduction Cum -6 0.900 0.600 0.150
Cover Deduction Cum -2 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 3 0.600 0.600 1.400
Total
22 Reinforcement
a Raft MT 100 kg/cum
b Wall MT 100 kg/cum
c Slab MT 90 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 4 1.35

24 Painting Work
Edge Marking Line Sqm 2 93.430 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 3
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 2
26 Octagone size
27 Informatory sign board Sqm 2 0.560

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 3
600mm
a
Watersupply Manhole - Size-900mm x Nos 3
600mm
b OFC Manhole - Size-400mm x 600mm Nos 2
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 2 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 93.430 2.100


19 Paver Block-80mm Thk Sqm 1 93.430 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 93.43
b 160 mm outer dia for HT & LT Cable Rmt 10 93.43

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

3.7372
29 Barrigates Rmt 1 18.686
30 FRP Perforated Cover
SWD Nos 19
Length of Road 93.43 M
Quantity ROW 4.70 M
14.0145
Existing Carriageway 4.70 M
OFC Manhole Nos 2 No
9.343
LT and HT Manhole 3 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
17.19112 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.7 No. of water chamber 3 nos
Total PaverBlock Crust 0.41 1
3
Condition-1, Flexible to Rigid

87.82
0 10039.43
87.82

224
4
7
-87.82
147

9.07

289.63

0
4.34
4.34

149
-4.32
-6.75
137.93

65.87
0.69
0
66.56

65.87
65.87

439.12

87.82

109.992

109.992

1
0.84
1.88
1.5
0.41
5.63

0
0
0.46
0.39
0.87
0.68
0.19
2.59

0.43
1.01
0.76
2.21

1.44
4.05
2.34
7.83

0.29
1.01
0.76
-0.486
-0.096
1.48
1.51
13.03

232.05
822.15
139.86
1.19

5.4

28.029
14.0145

2
1.12

2
118

29

9.4

0
0
0

0
0
0.00

747.44
934.30

19

19
Minor Roads Flexible to Rigid Pavements-MR84
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 76.86 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 76.86 1 0.1

3 Dismantling brick masonry Cum 1 76.86 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 3

6 Dismantling of flexible pavements


Bituminous courses cum 1 76.860 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 76.86 1.600 1.500
Light Pole cum 3 0.90 0.900 1.600
Utility Crossing cum 2 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 7.46

Compacting the existing Subgrade with


9 power roller Sqm 1 76.86 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 76.860 4.700 0.500


Utility Crossing cum 2 1.400 1.45 0.900

12 selected hard murum filling cum 1 76.860 1.610 1.000


deduction of pole cum -3 1.200 1.150 1.000
deduction of Manhole cum -3 1.500 1.400 1.000
Total

13 GSB cum 1 76.860 4.700 0.150


Utility Crossing cum 2 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 76.860 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 76.860 4.700

16 Cement Concrete Pavement cum 1 76.860 4.700 0.200

17 Cutting Joints Rmt 1 20.000 4.525

18 polysuphide sealent Rmt 1 20.000 4.525

19 Rubble Soling
Utility Crossing Cum 2 1.400 1.450 0.230
OFC Chamber Cum 2 1.400 1.200 0.230
Electrical Chamber Cum 3 1.700 1.500 0.230
Water Chamber Cum 2 1.500 1.300 0.230
Light pole Cum 3 0.700 0.600 0.230
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 2 1.40 1.650 0.075
OFC Chamber Cum 2 1.40 1.40 0.075
Electrical Chamber Cum 3 1.70 1.70 0.100
Water Chamber Cum 2 1.50 1.50 0.100
Light pole Cum 3 0.70 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 2 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000
Electrical Chamber Cum 3 6.000 0.150 1.500
Water Chamber Cum 2 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 2 1.200 1.100 0.150
Electrical Chamber Cum 3 1.500 1.400 0.150
Water Chamber Cum 2 1.300 1.200 0.150
Cover Deduction Cum -5 0.900 0.500 0.150
Cover Deduction Cum -2 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 2 0.500 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 3 1.40

24 Painting Work
Edge Marking Line Sqm 2 76.860 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 3
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 2
26 Octagone size
27 Informatory sign board Sqm 1 0.900

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 3
600mm
a
Watersupply Manhole - Size-900mm x Nos 2
600mm
b OFC Manhole - Size-400mm x 600mm Nos 2
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 2 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 76.860 2.100


19 Paver Block-80mm Thk Sqm 1 76.860 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 76.86
b 160 mm outer dia for HT & LT Cable Rmt 10 76.86

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

3.0744
29 Barrigates Rmt 1 15.372
30 FRP Perforated Cover
SWD Nos 15
Length of Road 76.86 M
Quantity ROW 4.70 M
11.529
Existing Carriageway 4.70 M
OFC Manhole Nos 2 No
7.686
LT and HT Manhole 3 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
14.14224 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.57 No. of water chamber 2 nos
Total PaverBlock Crust 0.41 1
3
Condition-1, Flexible to Rigid

72.25
0 10022.86
72.25

184.46
3.89
6.93
-74.25
121.03

7.46

238.27

0
3.65
3.65

123.74
-4.14
-6.3
113.3

54.19
0.69
0
54.88

54.19
54.19

361.24

72.25

90.5

90.5

0.93
0.77
1.76
0.9
0.29
4.65

0
0
0.35
0.29
0.87
0.45
0.17
2.13

0.43
1.01
0.51
1.95

1.44
4.05
1.56
7.00

0.40
0.95
0.47
-0.3375
-0.096
1.00
0.90
10.85

225.23
735.00
99.75
1.06

4.2

23.058
11.529

2
0.9

2
97

24

9.4

0
0
0

0
0
0.00

614.88
768.60

15

15
Minor Roads Flexible to Rigid Pavements-MR85
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 146.10 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 146.10 1 0.1

3 Dismantling brick masonry Cum 1 146.10 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 5

6 Dismantling of flexible pavements


Bituminous courses cum 1 146.100 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 146.10 1.600 1.500
Light Pole cum 5 0.90 0.900 1.600
Utility Crossing cum 3 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 14.19

Compacting the existing Subgrade with


9 power roller Sqm 1 146.10 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 146.100 4.700 0.500


Utility Crossing cum 3 1.400 1.65 1.000

12 selected hard murum filling cum 1 146.100 1.600 1.000


deduction of pole cum -5 1.200 1.200 1.000
deduction of Manhole cum -5 1.500 1.500 1.000
Total

13 GSB cum 1 146.100 4.700 0.150


Utility Crossing cum 3 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 146.100 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 146.100 4.700

16 Cement Concrete Pavement cum 1 146.100 4.700 0.200

17 Cutting Joints Rmt 1 38.000 4.520

18 polysuphide sealent Rmt 1 38.000 4.520

19 Rubble Soling
Utility Crossing Cum 3 1.400 1.650 0.230
OFC Chamber Cum 3 1.400 1.400 0.230
Electrical Chamber Cum 5 1.700 1.700 0.230
Water Chamber Cum 4 1.500 1.500 0.220
Light pole Cum 5 0.800 0.800 0.200
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 3 1.40 1.650 0.090
OFC Chamber Cum 3 1.40 1.40 0.100
Electrical Chamber Cum 5 1.70 1.70 0.100
Water Chamber Cum 4 1.50 1.50 0.100
Light pole Cum 5 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.150
Electrical Chamber Cum 5 1.500 1.500 0.150
Water Chamber Cum 4 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000
Electrical Chamber Cum 5 6.000 0.150 1.400
Water Chamber Cum 4 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150
Electrical Chamber Cum 5 1.500 1.500 0.150
Water Chamber Cum 4 1.300 1.300 0.150
Cover Deduction Cum -9 0.900 0.600 0.150
Cover Deduction Cum -3 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 5 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 6 1.40

24 Painting Work
Edge Marking Line Sqm 2 146.100 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 5
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 3
26 Octagone size
27 Informatory sign board Sqm 2 0.900

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 5
600mm
a
Watersupply Manhole - Size-900mm x Nos 4
600mm
b OFC Manhole - Size-400mm x 600mm Nos 3
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 3 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 146.100 2.100


19 Paver Block-80mm Thk Sqm 1 146.100 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 146.10
b 160 mm outer dia for HT & LT Cable Rmt 10 146.10

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

5.844
29 Barrigates Rmt 1 29.22
30 FRP Perforated Cover
SWD Nos 29
Length of Road 146.10 M
Quantity ROW 4.70 M
21.915
Existing Carriageway 4.70 M
OFC Manhole Nos 3 No
14.61
LT and HT Manhole 5 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
26.8824 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
1.09 No. of water chamber 4 nos
Total PaverBlock Crust 0.41 1
5
Condition-1, Flexible to Rigid

137.33
0 10092.10
137.33

350.64
6.48
10.4
-137.73
229.79

14.19

453

15

0
6.93
6.93

233.76
-7
-11
215.76

103
1
0
104

103
103

686.67

137.33

171.76

171.76

1.59
1.35
3.32
1.98
0.64
8.88

0
0
0.62
0.59
1.45
0.9
0.32
3.1

0.65
1.69
1.01
3.35

2.16
6.3
3.12
11.58

0.65
1.69
1.01
-0.729
-0.144
2.48
2.70
20.11

386.93
1215.90
247.38
1.85

8.4

43.83
21.915

3
1.8

3
184

46

14.1

0
0
0

0
0
0.00

1168.80
1461.00

29

29
Minor Roads Flexible to Rigid Pavements-MR88
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 185.32 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 185.32 1 0.1

3 Dismantling brick masonry Cum 1 185.32 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 6

6 Dismantling of flexible pavements


Bituminous courses cum 1 185.320 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 185.32 1.600 1.500
Light Pole cum 6 0.90 0.900 1.600
Utility Crossing cum 4 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 18

Compacting the existing Subgrade with


9 power roller Sqm 1 185.32 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 185.320 4.700 0.500


Utility Crossing cum 4 1.400 1.55 1.000

12 selected hard murum filling cum 1 185.320 1.600 1.000


deduction of pole cum -6 1.200 1.200 1.000
deduction of Manhole cum -6 1.500 1.500 1.000
Total

13 GSB cum 1 185.320 4.700 0.150


Utility Crossing cum 4 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 185.320 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 185.320 4.700

16 Cement Concrete Pavement cum 1 185.320 4.700 0.200

17 Cutting Joints Rmt 1 47.000 4.640

18 polysuphide sealent Rmt 1 47.000 4.640

19 Rubble Soling
Utility Crossing Cum 4 1.400 1.650 0.230
OFC Chamber Cum 4 1.400 1.400 0.230
Electrical Chamber Cum 6 1.700 1.700 0.230
Water Chamber Cum 5 1.500 1.500 0.220
Light pole Cum 6 0.800 0.800 0.220
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 4 1.40 1.650 0.100
OFC Chamber Cum 4 1.40 1.40 0.100
Electrical Chamber Cum 6 1.70 1.70 0.100
Water Chamber Cum 5 1.50 1.50 0.100
Light pole Cum 6 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000
Electrical Chamber Cum 6 6.000 0.150 1.500
Water Chamber Cum 5 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Cover Deduction Cum -11 0.900 0.600 0.150
Cover Deduction Cum -4 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 6 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 8 1.40

24 Painting Work
Edge Marking Line Sqm 2 185.320 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 6
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 4
26 Octagone size
27 Informatory sign board Sqm 3 0.750

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 6
600mm
a
Watersupply Manhole - Size-900mm x Nos 5
600mm
b OFC Manhole - Size-400mm x 600mm Nos 4
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 4 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 185.320 2.100


19 Paver Block-80mm Thk Sqm 1 185.320 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 185.32
b 160 mm outer dia for HT & LT Cable Rmt 10 185.32

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

7.4128
29 Barrigates Rmt 1 37.064
30 FRP Perforated Cover
SWD Nos 37
Length of Road 185.32 M
Quantity ROW 4.70 M
27.798
Existing Carriageway 4.70 M
OFC Manhole Nos 4 No
18.532
LT and HT Manhole 6 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
34.09888 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
1.38 No. of water chamber 5 nos
Total PaverBlock Crust 0.41 1
6
Condition-1, Flexible to Rigid

174.2
0 10131.32
174.2

444.77
8
14
-174.2
292.57

18

574.49

19

0
8.68
8.68

296.51
-9
-14
273.51

131
1
0
132

130.65
130.65

871

174.2

219.29

219.29

2.13
1.80
3.99
2.48
0.84
11.77

0
0
0.92
0.78
1.73
1.13
0.38
4.94

0.86
2.03
1.27
4.16

2.88
8.1
3.9
15.00

0.86
2.03
1.27
-0.891
-0.192
3.00
3.24
25.40

480.48
1575.00
299.25
2.36

11.2

55.596
27.798

4
2.25

4
234

59

18.8

0
0
0

0
0
0.00

1482.56
1853.20

37

37
Minor Roads Flexible to Rigid Pavements-MR89
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 185.72 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 185.72 1 0.1

3 Dismantling brick masonry Cum 1 185.72 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 6

6 Dismantling of flexible pavements


Bituminous courses cum 1 185.720 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 185.72 1.600 1.500
Light Pole cum 6 0.90 0.900 1.600
Utility Crossing cum 4 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 18.04

Compacting the existing Subgrade with


9 power roller Sqm 1 185.72 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 185.720 4.700 0.500


Utility Crossing cum 4 1.400 1.55 1.000

12 selected hard murum filling cum 1 185.720 1.600 1.000


deduction of pole cum -6 1.200 1.200 1.000
deduction of Manhole cum -6 1.500 1.500 1.000
Total

13 GSB cum 1 185.720 4.700 0.150


Utility Crossing cum 4 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 185.720 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 185.720 4.700

16 Cement Concrete Pavement cum 1 185.720 4.700 0.200

17 Cutting Joints Rmt 1 47.000 4.650

18 polysuphide sealent Rmt 1 47.000 4.650

19 Rubble Soling
Utility Crossing Cum 4 1.400 1.650 0.230
OFC Chamber Cum 4 1.400 1.400 0.230
Electrical Chamber Cum 6 1.700 1.700 0.230
Water Chamber Cum 5 1.500 1.500 0.220
Light pole Cum 6 0.800 0.800 0.220
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 4 1.40 1.650 0.100
OFC Chamber Cum 4 1.40 1.40 0.100
Electrical Chamber Cum 6 1.70 1.70 0.100
Water Chamber Cum 5 1.50 1.50 0.100
Light pole Cum 6 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 4 4.800 0.150 1.000
Electrical Chamber Cum 6 6.000 0.150 1.500
Water Chamber Cum 5 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 4 1.200 1.200 0.150
Electrical Chamber Cum 6 1.500 1.500 0.150
Water Chamber Cum 5 1.300 1.300 0.150
Cover Deduction Cum -11 0.900 0.600 0.150
Cover Deduction Cum -4 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 6 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 8 1.45

24 Painting Work
Edge Marking Line Sqm 2 185.720 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 6
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 4
26 Octagone size
27 Informatory sign board Sqm 3 0.750

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 6
600mm
a
Watersupply Manhole - Size-900mm x Nos 5
600mm
b OFC Manhole - Size-400mm x 600mm Nos 4
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 4 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 185.720 2.100


19 Paver Block-80mm Thk Sqm 1 185.720 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 185.72
b 160 mm outer dia for HT & LT Cable Rmt 10 185.72

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

7.4288
29 Barrigates Rmt 1 37.144
30 FRP Perforated Cover
SWD Nos 37
Length of Road 185.72 M
Quantity ROW 4.70 M
27.858
Existing Carriageway 4.70 M
OFC Manhole Nos 4 No
18.572
LT and HT Manhole 6 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
34.17248 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
1.38 No. of water chamber 5 nos
Total PaverBlock Crust 0.41 1
6
Condition-1, Flexible to Rigid

174.58
0 10131.72
174.58

445.73
8
14
-174.58
293.15

18.04

575.73

19

0
8.68
8.68

297.15
-9
-14
274.15

130.93
1.39
0
130.32

130.93
131.4

872.58

174.6

218.55

218.55

2.13
1.80
3.99
2.48
0.84
11.24

0
0
0.92
0.78
1.73
1.13
0.38
4.94

0.86
2.03
1.27
4.16

2.88
8.1
3.9
15.00

0.86
2.03
1.27
-0.891
-0.192
3.00
3.24
25.70

480.48
1575.00
299.25
2.36

11.6

55.716
27.858

4
1.17

4
235

59

18.8

0
0
0

0
0
0.00

1485.76
1857.20

37

37
Minor Roads Flexible to Rigid Pavements-MR90
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 84.43 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 84.43 1 0.1

3 Dismantling brick masonry Cum 1 84.43 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 3

6 Dismantling of flexible pavements


Bituminous courses cum 1 84.430 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 84.43 1.600 1.500
Light Pole cum 3 0.90 0.900 1.600
Utility Crossing cum 2 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 8.2

Compacting the existing Subgrade with


9 power roller Sqm 1 84.43 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 84.430 4.700 0.500


Utility Crossing cum 2 1.400 1.55 1.000

12 selected hard murum filling cum 1 84.430 1.600 1.000


deduction of pole cum -3 1.200 1.200 1.000
deduction of Manhole cum -3 1.500 1.500 1.000
Total

13 GSB cum 1 84.430 4.700 0.150


Utility Crossing cum 2 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 84.430 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 84.430 4.700

16 Cement Concrete Pavement cum 1 84.430 4.700 0.200

17 Cutting Joints Rmt 1 22.000 4.518

18 polysuphide sealent Rmt 1 22.000 4.518

19 Rubble Soling
Utility Crossing Cum 2 1.400 1.650 0.220
OFC Chamber Cum 2 1.400 1.400 0.220
Electrical Chamber Cum 3 1.700 1.700 0.220
Water Chamber Cum 2 1.500 1.500 0.220
Light pole Cum 3 0.800 0.800 0.220
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 2 1.40 1.650 0.075
OFC Chamber Cum 2 1.40 1.40 0.100
Electrical Chamber Cum 3 1.70 1.70 0.100
Water Chamber Cum 2 1.50 1.50 0.100
Light pole Cum 3 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 2 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 2 4.800 0.150 1.000
Electrical Chamber Cum 3 6.000 0.150 1.500
Water Chamber Cum 2 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 3 1.500 1.500 0.150
Water Chamber Cum 2 1.300 1.300 0.150
Cover Deduction Cum -5 0.900 0.600 0.150
Cover Deduction Cum -2 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 3 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 4 1.20

24 Painting Work
Edge Marking Line Sqm 2 84.430 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 3
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 2
26 Octagone size
27 Informatory sign board Sqm 1 0.900

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 3
600mm
a
Watersupply Manhole - Size-900mm x Nos 2
600mm
b OFC Manhole - Size-400mm x 600mm Nos 2
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 2 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 84.430 2.100


19 Paver Block-80mm Thk Sqm 1 84.430 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 84.43
b 160 mm outer dia for HT & LT Cable Rmt 10 84.43

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

3.3772
29 Barrigates Rmt 1 16.886
30 FRP Perforated Cover
SWD Nos 17
Length of Road 84.43 M
Quantity ROW 4.70 M
12.6645
Existing Carriageway 4.70 M
OFC Manhole Nos 2 No
8.443
LT and HT Manhole 3 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
15.53512 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.63 No. of water chamber 2 nos
Total PaverBlock Crust 0.41 1
3
Condition-1, Flexible to Rigid

79.36
0 10030.43
79.36

202.63
4
7
-80.86
132.77

8.2

261.73

0
4
4

135.09
-4.32
-6.75
124.02

60
1
0
61

59.52
59.52

396.82

79.36

99.396

99.396

1.02
0.86
1.91
0.99
0.42
5.2

0
0
0.35
0.39
0.87
0.45
0.19
2.25

0.43
1.01
0.51
1.95

1.44
4.05
1.56
7.00

0.43
1.01
0.51
-0.405
-0.096
1.00
1.62
11.57

225.23
735.00
99.75
1.06

4.8

25.329
12.6645

2
0.9

2
106

27

9.4

0
0
0

0
0
0.00

675.44
844.30

17

17
Minor Roads Flexible to Rigid Pavements-MR91
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 130.13 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 130.13 1 0.1

3 Dismantling brick masonry Cum 1 130.13 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 4

6 Dismantling of flexible pavements


Bituminous courses cum 1 130.130 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 130.13 1.600 1.500
Light Pole cum 4 0.90 0.900 1.600
Utility Crossing cum 3 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 12.64

Compacting the existing Subgrade with


9 power roller Sqm 1 130.13 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 130.130 4.700 0.500


Utility Crossing cum 3 1.300 1.55 1.000

12 selected hard murum filling cum 1 130.130 1.600 1.000


deduction of pole cum -4 1.200 1.200 1.000
deduction of Manhole cum -4 1.500 1.500 1.000
Total

13 GSB cum 1 130.130 4.700 0.150


Utility Crossing cum 3 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 130.130 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 130.130 4.700

16 Cement Concrete Pavement cum 1 130.130 4.700 0.200

17 Cutting Joints Rmt 1 34.000 4.501

18 polysuphide sealent Rmt 1 34.000 4.501

19 Rubble Soling
Utility Crossing Cum 3 1.400 1.650 0.220
OFC Chamber Cum 3 1.400 1.400 0.220
Electrical Chamber Cum 4 1.700 1.700 0.220
Water Chamber Cum 4 1.500 1.500 0.220
Light pole Cum 4 0.800 0.800 0.230
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 3 1.40 1.650 0.075
OFC Chamber Cum 3 1.40 1.40 0.100
Electrical Chamber Cum 4 1.70 1.70 0.100
Water Chamber Cum 4 1.50 1.50 0.100
Light pole Cum 4 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 3 1.200 1.200 0.120
Electrical Chamber Cum 4 1.500 1.500 0.150
Water Chamber Cum 4 1.300 1.300 0.150
Total
b Wall
OFC Chamber Cum 3 4.800 0.150 1.000
Electrical Chamber Cum 4 6.000 0.150 1.500
Water Chamber Cum 4 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 3 1.200 1.200 0.150
Electrical Chamber Cum 4 1.500 1.500 0.150
Water Chamber Cum 4 1.300 1.300 0.150
Cover Deduction Cum -8 0.900 0.600 0.150
Cover Deduction Cum -3 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 4 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 6 1.20

24 Painting Work
Edge Marking Line Sqm 2 130.130 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 4
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 3
26 Octagone size
27 Informatory sign board Sqm 2 0.755

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 4
600mm
a
Watersupply Manhole - Size-900mm x Nos 4
600mm
b OFC Manhole - Size-400mm x 600mm Nos 3
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 3 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 130.130 2.100


19 Paver Block-80mm Thk Sqm 1 130.130 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 130.13
b 160 mm outer dia for HT & LT Cable Rmt 10 130.13

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

5.2052
29 Barrigates Rmt 1 26.026
30 FRP Perforated Cover
SWD Nos 26
Length of Road 130.13 M
Quantity ROW 4.70 M
19.5195
Existing Carriageway 4.70 M
OFC Manhole Nos 3 No
13.013
LT and HT Manhole 4 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
23.94392 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.97 No. of water chamber 4 nos
Total PaverBlock Crust 0.41 1
4
Condition-1, Flexible to Rigid

122.32
0 10076.13
122.32

312.31
5
10
-122.32
204.99

12.64

403.4

13

0
6.05
6.05

208.21
-6
-9
193.21

91.74
1
0
92.74

91.74
91.74

611.61

122.32

153.034

153.034

1.52
1.29
2.54
1.98
0.59
7.92

0
0
0.52
0.59
1.16
0.9
0.26
3.43

0.52
1.35
1.01
2.88

2.16
5.4
3.12
11.00

0.65
1.35
1.01
-0.648
-0.144
2.00
2.16
18.04

332.64
1155.00
199.50
1.69

7.2

39.039
19.5195

3
1.51

3
164

41

14.1

0
0
0

0
0
0.00

1041.04
1301.30

26

26
Minor Roads Flexible to Rigid Pavements-MR95
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 72.41 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 72.41 1 0.1

3 Dismantling brick masonry Cum 1 72.41 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 2

6 Dismantling of flexible pavements


Bituminous courses cum 1 72.410 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 72.41 1.600 1.500
Light Pole cum 2 0.90 0.900 1.600
Utility Crossing cum 1 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 7.03

Compacting the existing Subgrade with


9 power roller Sqm 1 72.41 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 72.410 4.700 0.500


Utility Crossing cum 1 1.700 1.75 1.100

12 selected hard murum filling cum 1 72.410 1.600 1.000


deduction of pole cum -2 1.200 1.200 1.000
deduction of Manhole cum -2 1.500 1.500 1.200
Total

13 GSB cum 1 72.410 4.700 0.150


Utility Crossing cum 1 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 72.410 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 72.410 4.700

16 Cement Concrete Pavement cum 1 72.410 4.700 0.200

17 Cutting Joints Rmt 1 19.000 4.480

18 polysuphide sealent Rmt 1 19.000 4.480

19 Rubble Soling
Utility Crossing Cum 1 1.400 1.650 0.230
OFC Chamber Cum 1 1.400 1.400 0.230
Electrical Chamber Cum 2 1.700 1.700 0.230
Water Chamber Cum 3 1.500 1.500 0.230
Light pole Cum 3 0.800 0.800 0.230
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 1 1.40 1.650 0.150
OFC Chamber Cum 1 1.40 1.40 0.150
Electrical Chamber Cum 2 1.70 1.70 0.120
Water Chamber Cum 2 1.50 1.50 0.100
Light pole Cum 2 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 1 1.200 1.200 0.200
Electrical Chamber Cum 2 1.500 1.500 0.200
Water Chamber Cum 2 1.300 1.300 0.200
Total
b Wall
OFC Chamber Cum 1 4.800 0.150 1.500
Electrical Chamber Cum 2 6.000 0.150 1.500
Water Chamber Cum 2 5.200 0.150 1.500
Total
c Slab
OFC Chamber Cum 1 1.200 1.200 0.150
Electrical Chamber Cum 2 1.500 1.500 0.150
Water Chamber Cum 2 1.300 1.300 0.150
Cover Deduction Cum -4 0.900 0.600 0.150
Cover Deduction Cum -1 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 2 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 100 kg/cum
c Slab MT 95 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 2 2.10

24 Painting Work
Edge Marking Line Sqm 2 72.410 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 2
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 1
26 Octagone size
27 Informatory sign board Sqm 1 0.900

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 2
600mm
a
Watersupply Manhole - Size-900mm x Nos 2
600mm
b OFC Manhole - Size-400mm x 600mm Nos 1
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 1 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 72.410 2.100


19 Paver Block-80mm Thk Sqm 1 72.410 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 72.41
b 160 mm outer dia for HT & LT Cable Rmt 10 72.41

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

2.8964
29 Barrigates Rmt 1 14.482
30 FRP Perforated Cover
SWD Nos 14
Length of Road 72.41 M
Quantity ROW 4.70 M
10.8615
Existing Carriageway 4.70 M
OFC Manhole Nos 1 No
7.241
LT and HT Manhole 2 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
13.32344 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.54 No. of water chamber 2 nos
Total PaverBlock Crust 0.41 1
2
Condition-1, Flexible to Rigid

68.07
0 10018.41
68.07

173.78
2.59
3
-65.47
113.9

7.03

224.47

0
3.27
3.27

115.86
-3
-5
107.86

51.05
0.35
0
51.4

51.05
51.05

340.33

68

85.12

85.12

0.53
0.45
1.33
1.55
0.44
4.3

0
0
0.35
0.29
0.69
0.45
0.13
1.91

0.29
0.90
0.68
1.86

1.08
2.7
2.34
6.12

0.22
0.68
0.51
-0.324
-0.048
1.03
1.08
10.09

214.83
642.60
102.74
0.96

4.2

21.723
10.8615

1
0.9

1
91

23

4.7

0
0
0

0
0
0.00

579.28
724.10

14

14
Minor Roads Flexible to Rigid Pavements-MR96
Sr. No. Description Unit No. Length Breadth Depth
Removing lime or lean cement
1 Cum 1 107.30 1 0.15
concrete

Removing rich mix cement concrete


2 Cum 1 107.30 1 0.1

3 Dismantling brick masonry Cum 1 107.30 0.8 0.23

4 Dismantling stone masonry Cum 1

Removal of telephone / Electric poles


5 Nos 1 4

6 Dismantling of flexible pavements


Bituminous courses cum 1 107.300 4.700 0.200
PaverBlock Area Deduction cum -1 0.000 0.200
Total

7 Excavation
Water Line & Utility Trench cum 1 107.30 1.600 1.500
Light Pole cum 4 0.90 0.900 1.600
Utility Crossing cum 2 1.400 1.650 1.500
Flexible Pavement deduction cum
Total

8 Carting Away Surplus earth cum 1 10.42

Compacting the existing Subgrade with


9 power roller Sqm 1 107.30 3.1

10 Dewatering Hour 1

11 Subgrade cum 0 107.300 4.700 0.500


Utility Crossing cum 2 1.500 1.65 1.000

12 selected hard murum filling cum 1 107.300 1.600 1.000


deduction of pole cum -4 1.200 1.200 1.000
deduction of Manhole cum -3 1.500 1.500 1.000
Total

13 GSB cum 1 107.300 4.700 0.150


Utility Crossing cum 2 1.400 1.65 0.150
Below Foothpath cum 1 0.000 0.150
14 DLC cum 1 107.300 4.700 0.150

15 Polyethylene (LDPE) sheet sqm 1 107.300 4.700

16 Cement Concrete Pavement cum 1 107.300 4.700 0.200

17 Cutting Joints Rmt 1 28.000 4.500

18 polysuphide sealent Rmt 1 28.000 4.500

19 Rubble Soling
Utility Crossing Cum 2 1.400 1.650 0.220
OFC Chamber Cum 2 1.400 1.400 0.220
Electrical Chamber Cum 4 1.700 1.700 0.220
Water Chamber Cum 3 1.500 1.500 0.220
Light pole Cum 4 0.800 0.800 0.220
Total

20 PCC M15
Foothpath Cum 1 0.000 0.150
Kerb Stone Cum 0 0.000 0.265 0.075
Utility Crossing Cum 2 1.40 1.650 0.100
OFC Chamber Cum 2 1.40 1.40 0.100
Electrical Chamber Cum 4 1.70 1.70 0.100
Water Chamber Cum 3 1.50 1.50 0.100
Light pole Cum 4 0.80 0.80 0.100
Total

21 RCC M25
a Raft
OFC Chamber Cum 2 1.200 1.200 0.100
Electrical Chamber Cum 4 1.500 1.500 0.100
Water Chamber Cum 3 1.300 1.300 0.100
Total
b Wall
OFC Chamber Cum 2 4.800 0.150 0.900
Electrical Chamber Cum 4 6.000 0.150 1.500
Water Chamber Cum 3 5.200 0.150 1.000
Total
c Slab
OFC Chamber Cum 2 1.200 1.200 0.150
Electrical Chamber Cum 4 1.500 1.500 0.150
Water Chamber Cum 3 1.300 1.300 0.150
Cover Deduction Cum -7 0.900 0.600 0.150
Cover Deduction Cum -2 -0.400 -0.600 0.200
Total
d Pole Foundation Cum 4 0.600 0.600 1.500
Total
22 Reinforcement
a Raft MT 110 kg/cum
b Wall MT 95 kg/cum
c Slab MT 95 kg/cum
Total

23 RCC Np3 Class Pipe


600 mm dia Rmt 4 1.50

24 Painting Work
Edge Marking Line Sqm 2 107.300 0.15
Lane Marking / Other Markings Sqm

Signages
Cautionary/Warning sign boards in
25 Nos. 4
Equilateral Triangle
Cautionary/Warning sign boards in
Nos. 2
26 Octagone size
27 Informatory sign board Sqm 2 0.650

28 FRP Cover C\C


Electrical Manhole - Size-900mm x Nos 3
600mm
a
Watersupply Manhole - Size-900mm x Nos 3
600mm
b OFC Manhole - Size-400mm x 600mm Nos 2
Excavation in earth, soil of all types, sand, Cum
A gravel and soft murum(Lift upto 1.5m) 80% of Tatal Excavation

Excavation in earth, soil of all types, sand, Cum


B gravel and soft murum(Lift from 1.5m to 20% of Tatal Excavation
3.0m)

8 Dismantling of flexible pavements


Scarifying the existing bituminous road
9 Sqm 1
surface

Removing all type of hume pipes and


5 stacking within a lead up to 1000 meters Rmt 2 4.70

6 Removal of Paver Block sqm

7 Dismantling of cement concrete pavement Cum

Scarifying the existing granular road


8 Sqm 1
surface

Sqm 2 107.300 2.100


19 Paver Block-80mm Thk Sqm 1 107.300 0.000

20 Kerb Stone Rm 0

1 Stud with Lense Reflector Nos


Zebra crossing Nos
Total
2 HDPE pipe on the both Surface
a 63 mm outer dia for Control Rmt 8 107.30
b 160 mm outer dia for HT & LT Cable Rmt 10 107.30

27 Brick manhole inspection chamber


a Nos. 4
Size 0.6 x 0.6 m, depth 1.2 M with cover
b Nos. 4
Size 0.6 x 0.9 m, depth 1.2 M with cover

4.292
29 Barrigates Rmt 1 21.46
30 FRP Perforated Cover
SWD Nos 21
Length of Road 107.30 M
Quantity ROW 4.70 M
16.095
Existing Carriageway 4.70 M
OFC Manhole Nos 2 No
10.73
LT and HT Manhole 4 No 1.2 Width 1.5 Depth
Existing Paver Block Area 0 sqm
19.7432 Proposed Paver Block area 0 Width
Water Line 0.15 Dia.
0.79 No. of water chamber 3 nos
Total PaverBlock Crust 0.41 1
4
Condition-1, Flexible to Rigid

100.86
0 10053.30
100.89

257.52
5
7
-100.89
167.29

10.42

333.03

0
4.95
4.99

171.68
-6
-7
157.9

75.65
1
0
76.65

75.65
75.65

504.31

100.86

126

126

1.02
0.86
2.54
1.49
0.56
6.47

0
0
0.46
0.39
1.16
0.68
0.26
2.95

0.29
0.90
0.51
1.70

1.296
5.4
2.34
9.04

0.43
1.35
0.76
-0.567
-0.096
1.88
2.16
14.78

196.35
901.74
187.53
1.24

32.2
16.1

2
1.3

2
134

33

9.4

0
0
0

0
0
0.00

858.40
1073.00

21

21

You might also like