Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Areas Possible Risk Preventive Measures

For a production environment with a low


connection rate that is configured to use priority
groups, disabling the Slow Ramp Time setting
1. Employee's Training Slowed ramp time
may improve how quickly active priority groups
are adjusted when a pool member's availability
changes.

To avoid malware, you must keep your computer


and software updated, Use a non-administrator
account whenever possible, Be careful and think
2. Technology Malware
twice before clicking links or downloading
anything, Limit your file-sharing and lastly use
antivirus software.

By the use of GPS-based tools that track


contractors’ presence. Such mobile apps can
provide contractors who are unfamiliar with a
Lack of emergency Preparedness facility with emergency procedures and location
3. Facilities maps with exit locations and evacuation routes. By
understanding potential threats and implementing
the strategies and actions discussed, facility
professionals can reduce, minimize or eliminate
risk.
To eliminate this kind of scenarios you must do a
Productivity losses and operational delays
regular inspections, reactive maintenance,
4. Equipment due to equipment failures and potentially
preventative maintenance and predictive
enormous costs.
maintenance.

Always consider steps to make cleaning easier and


Taking shortcuts & not following correct Construction materials should always be
5. Health and Safety Codes/Protocols
procedures. considered for potential contamination risks such
as glass, brittle plastics, and ceramics.

Use Original Content, Do not copy, share or alter


6. Licensing Loss of control of their intellectual property without seeking permission and review and retain
licensing agreements.

You might also like