Performing Material Requirements Planning at Plant Level

Performing Material Requirements Planning at Plant Level

Explanation Screenshot

Would you like to know more


about how a production
planner schedules an MRP
run for a material?

If so, follow this interactive


tutorial.

1. To open the app,


select the Schedule MRP
Runs tile.

2. Choose Create.

1
Performing Material Requirements Planning at Plant Level

Explanation Screenshot

3. To search for the job


template, open the input
help.

4. Select Material
Requirements Planning
(MRP).

5. In the Job Name field,


,enter MRP for FG216 and
press Enter.

6. Choose Step 2.

2
Performing Material Requirements Planning at Plant Level

Explanation Screenshot

7. Ensure Start Immediately


is selected. For this tutorial
this has been done for you.

Choose Define Recurrence


Pattern.

8. To select a recurrence
pattern, open the list.

9. Select Single Run.

10. Choose OK.

3
Performing Material Requirements Planning at Plant Level

Explanation Screenshot

11. Choose Step 3.

12. In the Plant field, enter


1710 and press Enter.

13. In the Material field,


enter MRP for FG126 and
press Enter.

14. Select Changed BOM


Compents.

4
Performing Material Requirements Planning at Plant Level

Explanation Screenshot

15. For this tutorial, the


Planning Mode value has
been entered for you.

Choose Check.

16. Choose Schedule.

17. To check the job's


status, in the Search field,
enter MRP for FG126 and
choose Go.

18. The new job is


displayed.

To return to the launchpad,


choose SAP.

5
Performing Material Requirements Planning at Plant Level

Explanation Screenshot

The new MRP run has now


been scheduled.

This concludes the


interactive tutorial.

You might also like