Download as pdf or txt
Download as pdf or txt
You are on page 1of 13

PT.

SINOTRANS CSC INDONESIA


Kawasan CBD Pluit Blok S No. 10, Jl. Pluit Selatan Raya – Jakarta 14440, Indonesia

Telp: (62) 21 66675444 (Hunting), Fax : (62) 21 66675442/3

Contract Approval Form


Contract No.:

Name of the Contract Able Vendor Agreement


First
Party/Charterer
PT. SINOTRANS CSC INDONESIA
Second
PT. Able Metro Global Selaras
Party/Owners
Summary of the Contract: Able handling Sinotrans’s Godrej, Fiberhome, ZTE projects.

Agreed by: Prepared by:

Date:
Main Content:
1. Able Handling Sinotrans’s Project
Godrej: Manado, Pontianak, Banjarmasin, Balikpapan and Lampung
Fiberhome: Makassar, Banjarmasin, and Balikpapan.
ZTE: Sorong, Balikpapan, Denpasar, Semarang.
2. ABLE shall be responsible for any physical loss, shortfall or damage to any material/productl
in the warehouse which is obliged as part of the Service, It is agreed that the ABLE shall be
responsible for anything and in any case arising from or in connection with this Agreement,
whether for intentional and/or unintentional, direct and/or indirect error, or lack of caution on
implementation from this agreement, or service failure by the ABLE and/or breach of contract,
during the Term of this Agreement.
3. In the event the loss of the Material/Product is a result of intentional or accidental actions
done by ABLE including employees of ABLE, then SINO has the right to hold compensation in
the form of compensation caused by crimes committed by the ABLE employee such as theft,
robbery which results in lost or damaged of the materials/products. Compensation which must
be paid by ABLE to SINO in the form of a replacement of the selling price of the
Materials/Products or claim value from the owner of the goods.
4. Following the written approval from ABLE, SINO will off-set the payment from invoice to
ABLE in the amount of compensation that ABLE has to pay to SINO. In the event the value of
compensation must be paid by ABLE as agreed in the paragraph above is greater than the
invoice, ABLE shall pay for the shortfall in compensation within 30 (thirty) days.
5. Payment: Payment of warehouse storage rates and warehouse operations as referred
(appendix) of the agreement will be made one month after the invoice is received with the
complete supporting documents from ABLE
6. Able will be handling Storage, Handling In, and Handling Out.
7. For Godrej, the services provided by Able include Trucking.
8. All prices include VAT

Inspected by Legal Department

Checked by F&A Dept

Endorsed by : Approved by:


Attachment 1 (Godrej)
Referring to article3, stipulated the Warehouse Operation Agreement between PT. Abadi Metro
Global selaras and PT. Sinotrans CSC Indonesia, covering space and operation services with
detail as follows:
1. Location : Manado, Sulawesi Utara

2. Address : Jl. Husni Thamrin, Kampung Islam Lingkungan 2,


Depan Kantor Lurah Kampung Islam Tuminting,
Manado

3. Space : 400 M2

4. Period : 01 Sep 2020 – 31 Aug 2021 (2nd year)

5. Storage Rate : IDR 30,000/M2

6. Handling in : IDR 25,000/CBM

7. Handling out : IDR 25,000/CBM

8. Trucking Whs – DC : IDR 120,000/CBM

9. Trucking DC – Whs : IDR 90,000/CBM

10. Overnight/Staple : IDR 50,000/CBM

11. Overtime : IDR 15,000/manhour (weekday)


IDR 20,000/manhour (weekend)

The above-mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu


Attachment 2 (Godrej)
Referring to article 3, stipulated the Warehouse Operation Agreement between PT. Abadi Metro
Global selaras and PT. Sinotrans CSC Indonesia, covering space and operation services with
detail as follows:
1. Location : Pontianak, Kalimantan Barat

2. Address : Pergudangan Mandau Timbler No. 68,


Jl. Adi Sucipto KM6, Kuburaya, Pontianak

3. Space : 300 M2

4. Period : 01 Oct 2020 – 30 Sep 2021 (2nd year)

5. Storage Rate : IDR 30,000/M2

6. Handling in : IDR 25,000/CBM

7. Handling out : IDR 25,000/CBM

8. Trucking Whs – DC : IDR 130,000/CBM

9. Trucking DC – Whs : IDR 90,000/CBM

10. Overnight/Staple : IDR 50,000/CBM

11. Overtime : IDR 15,000/manhour (weekday)


IDR 20,000/manhour (weekend)

12. SPSI SAT : IDR 100,000/truck

The above mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu


Attachment 3 (Godrej)
Referring to article 3, stipulated the Warehouse Operation Agreement between PT. Abadi Metro
Global selaras and PT. Sinotrans CSC Indonesia, covering space and operation services with
detail as follows:
1. Location : Banjarmasin, Kalimantan Selatan

2. Address : Kompleks Pergudangan Benteng Perkasa,


Jl. Gubernur Soebarjo KM.18, No. 8,
Banjarmasin 70241

3. Space : 350 M2

4. Period : 16 Sep 2020 – 15 Sep 2021 (2nd year)

5. Storage Rate : IDR 30,000/M2

6. Handling in : IDR 25,000/CBM

7. Handling out : IDR 25,000/CBM

8. Trucking Whs – DC : IDR 130,000/CBM

9. Trucking DC – Whs : IDR 90,000/CBM

10. Overnight/Staple : IDR 50,000/CBM

11. Overtime : IDR 15,000/manhour (weekday)


IDR 20,000/manhour (weekend)

12. SPSI SAT : IDR 100,000/truck

The above-mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu


Attachment 4 (Godrej)
Referring to article 3, stipulated the Warehouse Operation Agreement between PT. Abadi Metro
Global selaras and PT. Sinotrans CSC Indonesia, covering space and operation services with
detail as follows:
1. Location : Balikpapan, Kalimantan Timur

2. Address : Jl. Pattimura RT. 48, No. 150, Kel. Batu Ampar,
Kec. Balikpapan Utara, Kota balikpapan

3. Space : 420 M2

4. Period : 03 Oct 2020 – 02 Oct 2021 (2nd year)

5. Storage Rate : IDR 30,000/M2

6. Handling in : IDR 25,000/CBM

7. Handling out : IDR 25,000/CBM

8. Trucking Whs – DC : IDR 170,000/CBM (Min. Charge 3 CBM)

9. Trucking DC – Whs : IDR 145,000/CBM (Min. Charge 3 CBM)

10. Overtime : IDR 15,000/manhour (weekday)


IDR 20,000/manhour (weekend)

11. Overnight/Staple : IDR 60,000/CBM

The above mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu


Attachment 5 (Godrej)
Referring to article 3, stipulated the Warehouse Operation Agreement between PT. Abadi Metro
Global selaras and PT. Sinotrans CSC Indonesia, covering space and operation services with
detail as follows:
1. Location : Lampung

2. Address : Pergudangan Vastland, Jl. Tembesu 8A/29,


Kel. Campang Raya, Kec. Sukabumi,
Bandar Lampung 35122

3. Minimum Quantity : 163 Pallet

4. Period : 05 Nov 2020 – 04 Nov 2021 (1st year)

5. Storage Rate : IDR 65,000/Pallet

6. Handling in : IDR 32,000/CBM

7. Handling out : IDR 32,000/CBM

8. Trucking Whs – DC : IDR 145,000/CBM (Min. Charge 2.5 CBM)

9. Trucking DC – Whs : IDR 130,000/CBM (Min. Charge 2.5 CBM)

10. Overtime : IDR 15,000/manhour (weekday)

IDR 20,000/manhour (weekend)

11. Unloading charge : IDR 450/carton

12. SPSI/AMPERA : IDR 50,000/truck


The above-mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu


Attachment 1 (Fiberhome)
Referring to Article 3, stipulated the Warehouse Operation Agreement between PT.
Abadi Metro Global Selaras and PT. Sinotrans CSC Indonesia, covering warehouse
space and warehouse operation services with detail as follows:

1. Location : Makassar, Sulawesi Selatan

2. Address : Jl. Kima 4, No. 3A, Kel. Daya,


Kec. Biring Kanaya, Makassar

3. Space : 300 M2

4. Period : 01 March 2020 – 28 February 2021 (1st year)

5. Storage Rate : IDR 40,000/M2

6. Handling in : IDR 30,000/M3

7. Handling out : IDR 30,000/M3

8. Overtime : IDR 70,000/hour (weekday)


IDR 90,000/hour (weekend)

The above-mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu


Attachment 2 (Fiberhome)
Referring to Article 3, stipulated the Warehouse Operation Agreement between PT. Abadi
Metro Global Selaras and PT. Sinotrans CSC Indonesia, covering warehouse space and
warehouse operation services with detail as follows:

1. Location : Banjarmasin, Kalimantan Selatan

2. Address : Jl. Padang Golf Rt. 21 / VI


Landasan ulin utara.
Kecamatan Liang Anggang kota Banjarbaru

3. Space : 300 M2

4. Period : 01 July 2020 – 30 June 2021 (2nd year)

5. Storage Rate : IDR 25,000/M2

6. Handling in : IDR 30,000/M3

7. Handling out : IDR 30,000/M3

8. Overtime : IDR 70,000/hour (weekday)


IDR 90,000/hour (weekend)

The above-mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu


Attachment 3 (Fiberhome)
Referring to Article 3, stipulated the Warehouse Operation Agreement between PT. Abadi
Metro Global Selaras and PT. Sinotrans CSC Indonesia, covering warehouse space and
warehouse operation services with detail as follows:

1. Location : Balikpapan, Kalimantan Timur

2. Address : Projakal Komplek Pergudangan Bizhub 52,


blok A21, Jl. AMD Projakal No. 59
karang joang, Balikpapan Utara,
Kalimantan Timur 76127

3. Space : 330 M2

4. Period : 18 April 2020 – 17 April 2021 (1st year)

5. Storage Rate : IDR 50,000/M2

6. Handling in : IDR 25,000/M3

7. Handling out : IDR 25,000/M3

8. Overtime : IDR 70,000/hour (weekday)


IDR 90,000/hour (weekend)

The above-mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu


Attachment 1 (ZTE)
Referring to Article 3 stipulated in the Warehouse Operation Agreement between PT. Abadi
Metro Global Selaras and PT. Sinotrans CSC Indonesia, covering warehouse space and
warehouse operation services with detail as follows:

1. Location : Sorong, Papua

2. Address : Jalan Sungai Remu KM 8, Kel. Malaingkedi,


Kec. Sorong Utara, Sorong, Papua Barat

3. Space : 720 M2

4. Period : 01 August 2020 – 31 July 2021 (2nd year)

5. Rate : IDR 75,000/M2


(include storage and handling in/out)

6. Overtime : IDR 30,000/manhour (weekday)


IDR 50,000/manhour (weekend)

7. Repacking >7CBM : IDR 500,000 (Wooden Packing)


IDR 250,000 (Carton Packing)
IDR 100,000 (Sack Packing)

The above-mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu


Attachment 2 (ZTE)
Referring to Article 3 stipulated in the Warehouse Operation Agreement between PT. Abadi
Metro Global Selaras and PT. Sinotrans CSC Indonesia, covering warehouse space and
warehouse operation services with detail as follows:

1. Location : Balikpapan, Kalimantan Timur

2. Address : Jl. AMD Projakal No.27, Batu Ampar, Kec. Balikpapan


Utara, Kota Balikpapan, Kalimantan Timur 76127
(gudang grace no.5)

3. Space : 500 M2

4. Period : 01 March 2020 – 28 February 2021 (1st year)

5. Rate : IDR 85,000/M2


(include storage and handling in/out)

6. Overtime : IDR 40,000/manhour (weekday)


IDR 50,000/manhour (weekend)

7. Repacking >7CBM : IDR 500,000 (Wooden Packing)


IDR 250,000 (Carton Packing)
IDR 100,000 (Sack Packing)

8. Battery Recharging : IDR 17,500 per group of 4 batteries

The above mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu


Attachment 3 (ZTE)
Referring to Article 3, stipulated in the Warehouse Operation Agreement between PT.
Abadi Metro Global selaras and PT. Sinotrans CSC Indonesia, covering warehouse
operation services only with detail as follows:

1. Location : Denpasar, Bali

2. Address : Jl. Gatot Subroto Barat No. 903,


Kecamatan Padangsambian Kaja,
Denpasar, Bali

3. Space : 720 M2

4. Period : 01 August 2020 – 31 Jul 2021 (1st year)

5. Rate : IDR 38,500/M2


(Operation only exclude storage)

6. Overtime : IDR 30,000/manhour (weekday)


IDR 40,000/manhour (weekend)

7. Repacking >7CBM : IDR 500,000 (Wooden Packing)


IDR 250,000 (Carton Packing)
IDR 100,000 (Sack Packing)

The above mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu


Attachment 4 (ZTE)
Referring to Article 3 stipulated in the Warehouse Operation Agreement between PT.
Abadi Metro Global selaras and PT. Sinotrans CSC Indonesia, covering warehouse
operation service only with detail as follows:
1. Location : Semarang, Jawa Tengah
2. Address : a) Kawasan Industri Candi Blok 5/28,
Kec. Ngaliyan, Semarang
b) Kawasan Industri Candi Blok 5/18,
Kec. Ngaliyan, Semarang

3. Space : a) 1700 M2
b) 1120 M2

4. Period : 01 Dec 2020 – 30 Nov 2021 (1st year)

5. Rate : IDR 42,000/M2


(Operation only exclude storage)

6. Overtime : IDR 30,000/manhour (weekday)


IDR 40,000/manhour (weekend)

7. Repacking >7CBM : IDR 500,000 (Wooden Packing)


IDR 250,000 (Carton Packing)
IDR 100,000 (Sack Packing)
The above mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu

You might also like