Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 11

Created on

https://www.dvdvideosoft.com/free- as the philippines in metro manila philippines the 36


youtube-subtitles-download
currently experienced its golden age of kilometer line
[Music]
philippines infrastructures which will run north to south between
tagged as the pearl of the orient in
western pacific region as the strong foundation in boosting its cities of quesad

a country with a variety of natural economic activities passage makoti taghi and pasik
resources
and a globally significant level of towards a prosperous country today the first alignment consists of 15

biodiversity we will feature the top project in the stations from the quirino highway to fti

[Music] sectors of aviation integrated terminal

but due to unstable political system railroads bridges and urban development it will become the country's second

widespread corruption on national level including the reclamation projects direct airport rail link

and lack of public infrastructure the the biggest rail projects in the after the north-south commuter railway

prosperous country philippines are the metro manila subway with a branch line to nanoy aquino

faded its fame in the last decades and the north south commuter rail international airport

however as the country undergo dub as the project of the century the as philippines is inching closer towards

internal reforms that aims to regain its metro manila subway having its first subway system

former glory is an under construction underground the department of transportation dotr

the government build numerous projects rapid transit line unveiled on february 2021 a part of a
tunnel boring machine subway line station lines

the head cutter that is crucial to the that's for 240 train cars or for the 38 run from new clark city in kappa's

construction of the metro manila subway car train sets tarlet via clark international airport

on december 22nd the transport agency the first phase of the project which is passing through metro manila to calamba

announced that it had ordered a total of four stations from east valenzuela to laguna

240 north avenue the railway system is expected to cost

train cars for the upcoming metro manila is already under construction and 14.9 billion dollars

subway expected to be up and running by the end making it one of the most expensive

following a contract package signing of projects of the philippines

between the philippine government and 2021 or early 2022 with the rest of the infrastructure program partial

the sumitomo corporation and the japan subway scheduled to become operational operations will begin by

transport engineering company joint by 2021 and full operations is expected to

venture 2026. the north-south commuter railway begin by

the deal has a total approved cost of also known as the clark calamba railway 2025. the project is co-financed by the

367 billion pesos for the design is a 148 kilometers urban rail transit asian development bank adv

supply installation construction testing line and the japanese international

and commissioning of train sets for the being constructed in luzon the 36 cooperation agency
going to the aviation industry the development authority
the project's construction is divided
biggest airport projects are the new dcda by megawide gmr construction joint
into three phases
manila international airport venture
phase one the 38 kilometers nscr
and clark international airport on january 22 2021
north commuter line between toad open
in expansion project the new passenger terminal building now

metro manila and malala's in the [Music] can accommodate 8 million passengers on

province of bulacan clark international airport development its opening year

the construction of the line reached a project almost tripling the airport's current

43 percent completion rate as of january the phase one of the four phases for the capacity of 4.2 million to 12.2 million

2021 development of clark annually

phase 2 the 53 kilometers nscr international airport expansion project clark international airport occupies

north regional line from malala's via is now completed 367 hectares of land inside the clark

clark international the 110 000 square meter terminal freeport zone civil aviation complex

airport to new clark city phase 3 building the phase 2 of the project consists of

pnr calamba the improvement of the was officially turned over to the the second terminal building which can

existing operation of totovan station to department of transportation accommodate up to 22 million passengers

calamba in the province of laguna dotr and the base's conversion and with an additional runway phase 3
project completions proposed development project to the new manila international airport is

can accommodate up to 80 million annual construct an airport city in bulacan part of the envision

passengers with completion of the third north of manila the 2500 hectares 12 000 hectares of aerotropolis that

runway airport features

four new terminals are expected to be will complement the air traffic residential zones commercial districts

completed and all will be fully operations at the existing government centers

operational by 2025. and overly congested nanoy aquino seaport and an industrial zone the

upon completion these four terminals international airport proposed airport will feature at least

will boost the philippine government awarded the 15 four runways

clark's passenger capacity to more than years of franchise to san miguel expandable to six eight taxiways

110 million annually corporation and at least three terminal buildings

meanwhile the biggest infrastructure for construction operation and they will have a design capacity of 200

project in the philippines is the new maintenance of the airport million passengers per year

manila international airport including the development of an adjacent when fully built which is about much

as part of san miguel aero city airport city larger than the current capacity of nya

incorporated called the san miguel arrow aerocity upon completion the new manila

new manila international airport is a incorporated international airport will become


the world's second biggest airport next [Music] then two cable-stayed bridges called the

only to china's daxing international the biggest bridge project in the north channel bridge

airport in beijing philippines are the bottom main span of 400 meters and south

the first phase of the project will cavity interlink bridge and the cebu channel bridge main span of 900 meters

include a terminal building with airside cordova link express will be constructed

and landside facilities the bada and kavidi interlink bridge before ending in kobiti

taxiways airport toll road and two of also known as the manila bay bridge [Music]

the four runways is a bridge for construction by the with the marine bridges standing in

in five years adding plans to expand to philippine government water as deep as 50 meters

four runways one year later it will be 32.15 kilometers long and the detailed design engineering phase of

preparatory works is scheduled to will cross over the manila bay the project

commence in first quarter of 2021 the four-lane bridge will connect the is expected to be completed in 15 months

with the land development project provinces of bada and then cavity the bridge will need to be high enough

expected to be completed by the end of it will consist of two main navigation to allow large ships to pass through

2024 bridges since manila bay is a major shipping

and the partial operability is set in the starting point will be located near route accommodated by the port of
manila
the end of 2025. the maravele's freeport area
the national economic and development
authority neta approved the bridge and the kandaba viaduct in north luzon will also form part of the cc lex

project in early 2020 with a budget of expressway as well as toll road facilities on an

175.7 billion pesos the 27 meter wide bridge is meant to artificial island

the implementation of the bridge project serve an alternate route serving the the toll facility's design is inspired

is projected to last for six mokton cebu international airport from the eight raid sun of the

years meanwhile cebu cordova serving at least 40 000 vehicles daily philippine flag

link expressway cc lex also known as the the 390 meter long main span of the cc the 30 billion pesos cebu cordova link

cebu cordova bridge lex will be cable stayed and will be expressway

is a toll bridge expressway under supported by cc lex hit a 59.68

construction in metro cebu 145 meter high twin tower pylon completion rate as of january according

philippines which will link cebu city the design of the pylons was inspired to metro pacific tollways corporation

mainland to cordova in mokton island from the historic magellan's cross smart city development the two most

the bridge will span eight kilometers the main span will have a 51 meters awaited and the biggest urban

and will be the longest and tallest navigation clearance development in the country is the new

bridge in the visayas which allows ships to traverse the clark city and clark freeport zone

surpassing the san wanako bridge bridge aeropolis

connecting leyte and sama viaduct approach bridges and a causeway the proposed metropolis located 100
socialization or solitude also in the vicinity or hospitals
kilometers north of manila
the city also designed to have wide government offices
is called new clark city with plans to
walkways and bike lanes through churches theaters museums libraries and
cover 9450 hectares it will be bigger
contiguous neighborhoods in this open community centers
than manhattan and could accommodate
as space networks the city will also feature the

many as 1.2 million people the city features residential blocked innovation district

as part of the clark special economic caters to people from all walks of life where diverse institution will devise

zone it will be administered by angela the rich variety of housing options industrial solutions as well as

city concretizing the city's vision of a responses to major concerns like climate

out of 9450 hectares of the city mixed community change and natural disasters

only 3 500 hectares will be developed living in harmony the central park meanwhile the industrial hub will cater

leaving the rest for green and open city's main commercial center innovative agricultural and

spaces making it as a green city houses the new clark city's iconic manufacturing enterprises

new clark city districts the city layout commercial buildings nearby agricultural production centers

features lots of open spaces where small where banks malls and a rich variety of ensure not just abundant food supply but

parks offer businesses were located which offer a rich resources for modern agribusiness

opportunities for recreation complete range of goods and services as well


as a smart metropolis new clark city in the country as a potential vrt services

features alternative to metro manila looping around in the seven districts

wide and diverse applications of the proposed clark freeport zone will the northern gateway district

technology for the benefit of the become a city that is a combination of a is a transit-driven development and a

community business center strategic location for the grand central

next is the clark of freeboard zone industrial estate residential community station

aerotropolis and leisure destination an intermodal transport terminal for

clark freeport zone is envisioned to be it will be divided into seven districts train and bus routes

a modern sustainable aerotrophical which includes the planned clark global this is the proposed main interchange

this modern city will encourage positive city as designated district 2 linking the clark

attitudes the southern gateway district with its freeport zone to the international

toward work and leisure and will provide strategic location which is adjacent to airport pampanga megalopolis and metro

a conducive environment for businesses the newly constructed new clark city manila

and investments to flourish the development will also be connected more than 1.5 million square meters of

it is planned to become the highly to the upcoming metro manila clark parks and open spaces

awaited aeropolis or airport driven city railway the lungs of the city are allotted for

and smart city nscr and the well-connected and frequent the seven districts
promoting a good balance between nature hectare reclaimed land in manila bay features that will define the lives of

and the built environment it has been described as the biggest all its residents

furthermore the plan provides pedestrian reclamation project in manila the canal park not only connects the

friendly philippines three islands but also provides horizon

bikeable and well-landscaped streets and the city built on scratch is mapped into with a public park at its core that

elevated pedestrian walkways three islands stretches all the way to the water's

shifting the design away from arranged east to west with long faces edge

car-centric developments to promote along the north-south axis ensuring that manila bay sunset will be

active and public transport modes with a four kilometer long canal park as always belong to the public

[Music] the main connecting feature in between a viaduct with a monorail system allows

reclaimed urban development in the the isles direct access from manila to the islands

philippines the biggest reclaimed urban this urban valley recalls the settlement from the central station the trackless

development is located within manila bay of manila along the pasig river and electric tram system loop around the

the horizon manila and the sm new bay bolsters the idea of manila as a city by development and no place in the island

city the river will be more than a five minutes walk

horizon manila is an upcoming mixed-use the main highlight of the city is the away from a tram station

plan community to be built on a 419 canal park a unique end enriching all the roads will be tree-lined and
will features eight meter wide sidewalks state-of-the-art basketball arena a vision of 726 hectare of reclaimed

with three meter arcades [Music] land to raise along 9.2 kilometer of

that ensure shades in any form of and most importantly the sunset view of manila bay shoreline

weather the development emphasizes the manila bay is put into consideration as a modern master plan development

personal mobility with pedestrian and as well creating a premier asian destination in

bike lanes ensuring that this city wonder will be the philippines

and aims to encourage a car-free enjoyed by people in the vicinity a collaboration of the people government

lifestyle for more of its residents with little to no impact to viewers from and enterprise

meanwhile buildings are designed to rojas boulevard in response to fast-growing cities and

minimize heat while the vertical massing the next reclaimed urban development is rapidly modernizing economy

creates clustered towers that keep the sm new bay city designed by local and international

certain areas the philippines pearl of the orient and planners and engineers

shaded all day there will be a wide asia's rising tiger it will provide a new home for 576 000

array of facilities and amenities to poised for a new beginning a unique resident

allow a diverse mix of entertainment for partnership of city governments 924 960 jobs and 851

its residents national authorities and a private 666 tours per year

such as pop-up galleries and a sector [Music]


the reclamation will play an important airport into the metro and providing greater opportunities for

role in the growth of the region the project will be developed with the people

and in philippine cities it's a new dawn careful consideration of the surrounding

for the philippines natural habitats

a truly global city the reclamation is designed to

the city of the future international standards to withstand the

[Music] strongest typhoon waves and surges with

a sustainable city to live work learn an occurrence of once on a thousand

and play years

promoting community living for realizing proving soil treatment deployed

your dreams considering extreme seismic conditions

a green inclusive city with open spaces wide's canals to accommodate drainage

putting philippines at par with hong water from the mainland

kong singapore the project is truly a milestone a

and sydney with world-class unique model of collaborative

transportation network development

and a cbd with fast connectivity to the aiming towards greater competitiveness

You might also like