SAFETY OBSERVATION & NON-COMPLIANCES REPORT

PROJECT-THE CENTRAL, R-8A – Sub-structure works

Date: 07/09/2021 Doc No. MLDCL/SNCR/TC/R-8A/05

Observation/ Request/ Action


Taken By &
No Location Non- Attachment Photo Corrective Action Closure Photo
Target Date
Compliances
1 R-8A Fire hazards as To install flash back
Construction no flash back arrestor for all
, hot work arrestor of compressed gas
operation compressed cylinder to avoid fire
gas cylinders. spark going to inside
of cylinders.
River King
Ayeyar
(09/09/202
1)

2 R-8A Improper To do stair


Construction access ladder. handrail.
, excavation
area

River King
Ayeyar
(08/09/2
021)

PAGE (1)
SAFETY OBSERVATION & NON-COMPLIANCES REPORT
PROJECT-THE CENTRAL, R-8A – Sub-structure works

Date: 07/09/2021 Doc No. MLDCL/SNCR/TC/R-8A/05

Observation/ Request/ Action


Taken By &
No Location Non- Attachment Photo Corrective Action Closure Photo
Target Date
Compliances

3 R-8A Lack of To close back the


Construction manhole manhole covers
, EVA drain covers of after finish work.
drain.
River King
Ayeyar

PAGE (2)
SAFETY OBSERVATION & NON-COMPLIANCES REPORT
PROJECT-THE CENTRAL, R-8A – Sub-structure works

Date: 07/09/2021 Doc No. MLDCL/SNCR/TC/R-8A/05

Observation/ Request/ Action


Taken By &
No Location Non- Attachment Photo Corrective Action Closure Photo
Target Date
Compliances
4 R-8A Lifting and To check and
Construction crane safety. make sure wire
, mobile ropes slings and
crane’s shackles are safe
lifting to use, and
operation surface ground River King
soil condition of Ayeyar
outriggers To
standing area is implemen
safe before prior t any
start of mobile lifting
and lifting operation
operations. .
And to get crane
certificate and
operator/signaler
certificates.

PAGE (3)
SAFETY OBSERVATION & NON-COMPLIANCES REPORT
PROJECT-THE CENTRAL, R-8A – Sub-structure works

Date: 07/09/2021 Doc No. MLDCL/SNCR/TC/R-8A/05

Observation/ Request/ Action


Taken By &
No Location Non- Attachment Photo Corrective Action Closure Photo
Target Date
Compliances
5 R-8A The working Closely coordinate
Construction area is narrow each other
, Heavy and congested between the
machinery with heavy movements of
safety moments of heavy machinery
machinery. as mobile crane, River N/A
excavators and King Note
other vehicles. Ayeyar &
And assign traffic PP
controllers.

6 R-8A Parking on the Kabar Aye Pagoda


Construction Kabar Aye road is
, Traffic Pagoda road non-stop/park of
safety should be vehicles area and to River
problem with park at Kanbe road King N/A
traffic police. and one by one Ayeyar & Note
alternatively to PP
come site to avoid
parking at the Kabar
Aye pagoda road.

PAGE (4)
SAFETY OBSERVATION & NON-COMPLIANCES REPORT
PROJECT-THE CENTRAL, R-8A – Sub-structure works

Date: 07/09/2021 Doc No. MLDCL/SNCR/TC/R-8A/05

Observation/ Request/ Action


Taken By &
No Location Non- Attachment Photo Corrective Action Closure Photo
Target Date
Compliances
7 R-8A Existing 66 kv There have 66 kv
Construction power line, power lines and we
, Behind of and electrical fenced off this area.
RKA office hazards. To instruct anyone
not to go there, and
don’t damage it.
River N/A
King Note
Ayeyar &
PP

8 R-8A Dust pollution To make sure


Construction from hacking reduction of dust
, pile work. from the
hacking construction as
works. much as possible, as
watering,
covering, .,etc to River N/A
avoid complaint King Note
from MOHS and Ayeyar &
Show Gallery. PP

PAGE (5)
SAFETY OBSERVATION & NON-COMPLIANCES REPORT
PROJECT-THE CENTRAL, R-8A – Sub-structure works

Date: 07/09/2021 Doc No. MLDCL/SNCR/TC/R-8A/05

Observation/ Request/ Action


Taken By &
No Location Non- Attachment Photo Corrective Action Closure Photo
Target Date
Compliances
9 R-8A Without To provide warning
Construction warning and tape, signs around
, excavation proper barrier excavation area and
works at the don’t allow any one
excavation near the excavation River King
edge should be edge. Ayeyar
fall down the (08/09/202
workers. 1)

10 R-8A Unsafe act of Don’t allow to sit on


Construction excavator’s the excavator of
, excavation helper. helper during
works operation. Let’s
helper to signal from River King N/A
the outside area. Ayeyar Note

PAGE (6)
SAFETY OBSERVATION & NON-COMPLIANCES REPORT
PROJECT-THE CENTRAL, R-8A – Sub-structure works

Date: 07/09/2021 Doc No. MLDCL/SNCR/TC/R-8A/05

Observation/ Request/ Action


Taken By &
No Location Non- Attachment Photo Corrective Action Closure Photo
Target Date
Compliances
11 R-8A No proper Instruct the workers
Construction wearing of to wear face mask
, Pile face masks. any working time.
hacking
works

Positive N/A
Pioneer Note

PAGE (7)
SAFETY OBSERVATION & NON-COMPLIANCES REPORT
PROJECT-THE CENTRAL, R-8A – Sub-structure works

Date: 07/09/2021 Doc No. MLDCL/SNCR/TC/R-8A/05

Observation/ Request/ Action


Taken By &
No Location Non- Attachment Photo Corrective Action Closure Photo
Target Date
Compliances

Note: To submit Weekly Checklists of power tools as welding machine, grinder, vibrators and others, and all electrical wires, sockets, plugs and DB panel ASAP.

Inspected by: Action Taken by: Action Taken by:

Signature : Signature : Signature :

Name : Thein Zaw Lwin Name : Tin Htun Naing Name : Maw Lwin Oo

Designation : Safety Manager Designation : Safety Coordinator Designation : Safety Officer

Issued Date : 07/09/2021 Date : 07/09/2021 Date : 07/09/2021

Company Name: Marga Landmark Company Name: River King Ayeyar Co.,Ltd Company Name: Positive Pioneer Co.,Ltd

PAGE (8)