GENERAL NOTES

1. GENERAL 2. CABLE SUPPORT SYSTEM 5. POWER OUTLETS 10. EMERGENCY VOICE COMMUNICATION & PUBLIC ADDRESS (PA) SYSTEM
A. ALL ELECTRICAL SERVICES INSTALLATIONS SHALL COMPLY TO THE LATEST INDONESIAN A. ALL GALVANISED IRON CONDUITS SHALL BE MINIMUM OF 25mm DIAMETER PROVIDED WITH A. SWITCH SOCKET OUTLETS AND SWITCHES INSTALLED IN PLANTROOMS, STORES AND ABOVE A. CONTRACTOR TO PROVISION ANY ADDITIONAL AMPLIFIERS THAT REQUIRED FOR THE
STANDARD CODE OF PRACTICES, POWERGRID AND IDA(COPIF) REQUIREMENTS. THE M&E STANDARD INSPECTION ELBOWS AND INSPECTION TEES. FALSE CEILING SHALL BE OF METAL CLAD TYPE. MODIFICATION AND ADDITIONAL SPEAKERS REQUIRED FOR EACH ZONE AND SHALL BE DEEMED
DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE M&E SPECIFICATIONS AND RELATED INCLUDED IN TENDER PRICE.
DRAWINGS OF OTHER TRADES. TENDER SHALL CLARIFY DISCREPANCY, IF ANY, AT THE TIME OF B. CONDUITS SHALL BE PROVIDED WITH JUNCTION BOXES TO ENABLE DRAWING OF CABLES, THE B. ALL ELECTRICAL EQUIPMENT AND ACCESSORIES THAT ARE EXPOSED OR LESS THAN 1.2 METRE
TENDER. SHOULD AND DISCREPANCY BE DISCOVERED AFTER THE TENDER AWARD, THE DISTANCE BETWEEN TWO JUNCTION BOX IN A STRAIGHT RUN SHALL NOT EXCEED 6 METRE. AWAY FROM SINK SHALL BE OF WEATHERPROOF TYPE. B. CONTRACTOR TO PROVIDE NEW PA SPEAKERS' CABLE LINE SUPERVISORY MONITORING / EOL IN
CONTRACTOR SHALL REFER TO THE S.O. DECISION AND NO EXTRA COST SHALL BE CLAIMED. EACH ZONE.
C. ALL TRUNKING COVER SHALL BE QUICK-FIX SCREW TYPE. C. COLOUR FOR ALL SWITCHES, SWITCH SOCKET OUTLETS SHALL BE APPROVED BY ARCHITECT
B. THE CONTRACTOR IS REQUIRED TO CHECK AND HIGHLIGHT IF ANY OF THE SUB-STATION, AND CLIENT PRIOR TO PROCUREMENT AND INSTALLATION. C. CONTRACTOR TO PROVIDE BLUE COLOR LABELING ON THE PA CABLE CONTAINMENT, RELAY
SWITCHROOMS, ELECTRICAL RISERS / ROOMS, ETC. AS PROVIDED IN THE DRAWINGS ARE NOT D. ALL TRUNKINGS OR PIPES SHALL BE INDELIBLY MARKED AT INTERVALS OF NOT GREATER THAN BOX AND ETC.
ADEQUATE TO ACCOMODATE ALL THE EQUIPMENT TO BE SUPPLIED UNDER THIS CONTRACT. 3 METRE. D. THE MOUNTING HEIGHT OF ALL SWITCH SOCKET OUTLET SHALL BE AS FOLLOWS UNLESS
OTHERWISE STATED IN ASSESSABLITY CODE OR SPECIFICATIONS / DRAWINGS. D. CONTRACTOR TO UPDATE GRAPHIC AND REPROGRAM THE SPEAKERS' ZONING BASED ON THE
C. THE CONTRACTOR SHALL BE RESPONSIBLE TO LIASE WITH THE RELEVANT LOCAL AUTHORITIES E. THE TRUNKING SHALL BE FREE FROM INTERNAL ROUGHNESS, SHARP EDGES, MOISTURE AND LAYOUT ON SITE.
FOR ALL NECESSARY SUBMISSION & APPROVAL FOR POWER SUPPLY TURN-ON. DIRT. I. 400mm AFFL IN GENERAL
II. 1500mm AFFL IN STORE AND WET AREAS
D. THE CONTRACTOR SHALL CO-ORDINATE WITH ARCHITECTURAL, STRUCTURAL AND INTERIOR F. ALL CABLES SHALL BE IN METALLIC CABLE TRUNKING, ON CABLE LADDER / TRAY, IN III. FALSE CEILING LEVEL FOR AUTO SENSOR FLUSH VALVE, EXHAUST FAN, HAND DRYER 11. FOR SINGLE LINE DIAGRAM
DESIGNER LAYOUT PLANS & OTHER TRADES FOR THE SERVICES INSTALLATION CO- GALVANISED STEEL CONDUIT. CABLES ON CABLE LADDER / TRAYS SHALL BE SECURITY FIXED IV. 300mm ABOVE TABLE TOP WHERE APPLICABLE
ORDINATION. THE CONTRACTOR SHALL SUBMIT CO-ORDINATED CEILING AND REFLECTED WITH CABLE CLEATS. 1. CONTRACTOR TO PROVIDE ADDITIONAL SPARE BREAKER CAPACITY FOR LV DBs, SB, MCC
CEILING SERVICES INSTALLATION SHOP DRAWINGS FOR S.O. APPROVAL. THE CONTRACTOR PANELS AND MSB. PROVISION A MINIMUM 20% SPARES BREAKER CAPACITY.
SHALL DEEM TO INCLUDE IN THE CONTRACT FOR ANY FINAL ADJUSTMENT TO THE APPROVED G. THE SIZES OF CABLE LADDER / TRAY / TRUNKING / CONDUIT AS SHOWN IN DRAWINGS ARE 6. SWITCHES
SHOP DRAWINGS. APPROXIMATE ONLY. ELECTRICAL CONTRACTOR IS DEEMED TO HAVE ALLOWED IN HIS TENDER 2. ALSO NEED 30% SPARE SPACE FOR DB FUTURE EXTENSION. CONTRACTOR MUST RESERVE
PRICE FOR ALL NECESSARY ADJUSTMENT TO ACCOMMODATE THE CABLES WITH SPACE A. LIGHTING SWITCHES THESE SPARES AND SPACE DURING CONSTRUCTION AND SHOP DRAWING.
E. THE CONTRACTOR SHALL NOTE THAT THE POSITIONS OF ELECTRICAL POINTS, LUMINAIRES, FACTOR 40% FREE SPACE AND COMPLYING WITH CODE OF PRACTICE NO.5 AND SHALL SUBMIT
LIGHTING SWITCHES, SWITCH SOCKET OUTLETS, TELEPHONE, DATA OUTLETS, ETC. SHOWN ON ALL DETAILED CO-ORDINATED CABLE SUPPORT SYSTEM ROUTE PLANS AND SECTIONS i. LIGHTING SWITCHES SHALL BE SINGLE-POLE 2-WAY AS REQUIRED, RATED FOR 10 AMPS, 3. CONTRACTOR TO PROVIDE EARTHING SYSTEM TO ALL METAL ENCLOSURE EQUIPMENT ITEM
THE DRAWINGS, ARE INDICATIVE ONLY. THE CONTRACTOR IS DEEMED TO HAVE ALLOWED IN HIS DRAWINGS TO CONSULTING ENGINEER FOR CLEARANCE PRIOR TO COMMENCEMENT OF THE 240V AC AND OF THE QUICK MAKE, QUICK BREAK TYPE. ETC. CONTRACTOR SHALL CARRY OUT HIS OWN FAULT LEVEL CALCULATIONS AND PROTECTION CLIENT
TENDER PRICE FOR ALL NECESSARY SITE ADJUSTMENT WITH IN 10M RADIUS OF THE LOCATION WORKS. RELAY SETTINGS BASED ON ACTUAL EQUIPMENT LAYOUT AND SUBMIT TO CONSULTANT FOR
SHOWN IN THE DRAWING TO SUIT THE FINAL POSITIONS. ii. MULTI-GANG SWITCHES SHALL BE USED AT LOCATIONS WHERE THE NUMBER OF SWITCHES APPROVAL.
H. CABLE TRAYS SHALL BE STRAIGHT RUN AND FOR ANY CHANGE IN DIRECTION THE BEND SHALL EXCEEDS ONE. WHERE MORE THAN ONE PHASE OF SUPPLY IS BROUGHT INTO A MULTI-
F. THE CONTRACTOR SHALL HAVE SOLE DUTY AND RESPONSIBILITY TO CHECK, VERIFY, HAVE A MINIMUM RADIUS OF 600mm. GANG SWITCH BOX, THE SWITCHES AND ACCESSORIES AND WIRING CONNECTED TO ONE
INVESTIGATE AND ACQUAINT HIMSELF AT HIS OWN EXPENSE WITH THE FULL EXTENT, PHASE SHALL BE ADEQUATELY SEPARATED FROM THOSE CONNECTED TO OTHER PHASES
POSITIONS, DEPTH, CONDITIONS AND DETAILS OF ALL EXISTING SERVICES, DUCTWORKS, I. ALL CONTAINMENT / SPORTS / ROAS / UNISTRUT MUST BE OF HOT DIPPED GALVANISED. 12. FUEL DISTRIBUTION
BY MEANS OF SEPERATE KNOCK OUT BOXES. A SUITABLE WARNING NOTICE SHALL BE
CABLES, PIPELINES, DRAINAGE AND ETC. IN THE VICINITY OF, IN AND AROUND THE SITE. NO DISPLAYED CLOSE AT HAND TO WARN OF THE PRESENCE OF PHASE TO PHASE VOLTAGE.
CLAIM WILL BE ENTERTAINED FOR ADDITIONAL COST DUE TO ABORTIVE WORKS AS A RESULT J. ALL CONDUITS SHALL BE CONCEALED IN PARTITIONS, COLUMN, WALL AND FLOOR SLAB UNLESS 1. FUEL SYSTEM VENDOR TO PROVIDE MODBUS TCP/IP INTERFACING, MODBUS MONITORING
OF NOT CHECKING THE SITE. OTHERWISE STATED. POINTS AND NETWORK LOOP FREE CONNECTION FOR EPMS MONITORING.
iii. SWITCHES INSTALLED ON THE MULLION OF GLASS WALLED OFFICE SHALL BE OF THE
NARROW ARCHITRAVE TYPE. 2. BUND WALL TO BE PROVIDED SURROUNDING THE FUEL REFILLING POINT PLINTH AND TO CATER
G. LOCATIONS FOR ELECTRICAL DISTRIBUTION BOARDS AND BUSBAR RISERS SHOWN ON THE K. SEPARATE CONDUIT SHALL BE PROVIDED FOR FINAL CIRCUIT OF DIFFERENT PHASES. ALSO A
DRAWINGS ARE INDICATIVE ONLY. CONTRACTOR SHALL VERIFY ON SITE AND PROPOSE THEIR SIGN SHALL BE PROVIDED TO INDICATE THE VOLTAGE BETWEEN THEM IN ACCORDANCE WITH FOR 50 LITERS OF FUEL SPILLAGE. NO GREENERY SHOULD BE EXPOSED BETWEEN THE
B. ALL SWITCHES SHALL BE FIXED 50mm AWAY FROM DOOR EDGE AND PLACED SUCH THAT IT IS REFILLING STATION AND THE REFILLING INLET POINT.
ACTUAL LOCATIONS ON THE SHOP DRAWING FOR CLEARANCE. THE CONTRACTOR IS DEEMED INDONESIAN STANDARD PERSYARATAN UMUM INSTALASI LISTRIK (PUIL). IMMEDIATELY ACCESSIBLE TO A PERSON ENTERING THE ROOM.
TO HAVE ALLOWED IN HIS TENDER PRICES FOR ALL NECESSARY SITE ADJUSTMENT, WITH 10M
RADIUS OF THE LOCATION SHOWN IN THE DRAWING TO SUIT THE FINAL LOCATION. L. ALL ELECTRICAL CONDUITS AND CONDUIT BOXES CONCEALED IN R.C SLAB AT WET AREAS (EG. 3. BUND WALL TO BE PROVIDED FOR FUEL PUMP PLINTH TO CATER FOR SPILL/LEAKS FROM THE
C. SEQUENCE OF OPERATION FUEL PUMPS.
BATHROOM, WC, KITCHEN, BALCONY & ETC) MUST HAVE WATERPROOF SEALED JOINTS TO BE NO MULTI-POLE SWITCH OR CIRCUIT BREAKER WHICH ALSO INCORPORATES A SWITCH IN A
H. THE CONTRACTOR SHALL SUBMIT DETAILED SHOP DRAWINGS AND CO-ORDINATION SHOP SPECIFIC ACCESSORY. NEUTRAL CONDUCTOR SHALL CONNECT ANY LIVE CONDUCTOR BEFORE THE NEUTRAL
DRAWINGS (INCLUSIVE OF SECTIONS, MOUNTING DETAILS, SETTING-OUT, ETC) FOR ARCHITECT 4. FUEL STOP-GATE AT ALL FINAL STORMWATER OUTFALLS TO BE PROVIDED FOR ALL FUEL
CONDUCTOR IS MADE OR BREAKS THE NEUTRAL CONDUCTOR BEFORE ALL LIVE CONDUCTORS BUNDS TO PREVENT FUEL SPILLAGE INTO LOCAL STORMWATER DRAIN.
REVIEW PRIOR TO COMMENCEMENT OF INSTALLATION. HAVE BEEN OPENED.
3. ELECTRICAL BOARDS AND COMPONENTS 5. FUEL STOP-GATE VALVE FOR THE GENERATOR TRENCHES TO BE PROVIDED AND LINKED TO
I. ALL ELECTRICAL APPARATUS AND EQUIPMENT MOUNTED OUTSIDE BUILDING OR SUBJECT TO
WEATHER / WATER IMPACT SHALL BE OF WEATHERPROOF TYPE (IP 65). BELLY TANK LEAKAGE SENSORS FOR AUTOMATIC CLOSING.
A. ALL MCCB IN THE MAIN SWITCHBOARDS ARE TO BE PROVIDED WITH ROTARY EXTERNAL 7. LUMINAIRES ARCHITECT
THE CONTRACTOR SHALL ENSURE THAT CABLE INSTALLATION INTO PACKAGE CONTAINER WILL HANDLES WITH FACILITIES FOR PADLOCKING IN THE "OFF" POSITION. THE EXTERNAL HANDLE
NOT CAUSE WATER INGRESS OR WATER LEAKAGE INSIDE. 6. LEAK TEST FOR THE UNDERGROUND STORAGE TANK AND BELLY TANKS' LEAKAGE SENSORS
SHALL BE INSTALLED SUCH THE DOOR PANEL CAN ONLY BE OPENED WHEN THE MCCB IS AT A. THE METAL WORK, SUPPORT, GLASSWARE, DIFFUSERS, LAMP HOLDERS, LAMPS, BALLASTS AND SHALL BE TESTED BEFORE THE TANK IS COMMISSIONED. AWP PTE LTD
"OFF" POSITION. MCCB SHALL BE MOUNTED IN THE SWITCHBOARDS FIXED MOUNTING FRAME CAPACITORS WHICH FORM PART OF THE FITTING, AND CONTROL EQUIPMENT ELSEWHERE
J. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM STRUCTURAL ENGINEERS FOR AND THE EXTERNAL HANDLE SHALL BE MOUNTED ON THE DOOR PANEL.
PENETRATION THROUGH RC BEAMS AND FLOOR SLABS PRIOR TO CONSTRUCTION. SPECIFIED, OR FIXING AND CONNECTION OF THE LIGHT FITTINGS SHALL BE INCLUDED. 7. ALL LEAKAGE SENSORS TO BE LINKED TO BMS SYSTEM WITH FUNCTIONALITY FOR TESTING THE 143 CECIL STREET
LEAKAGE SENSOR ALARMS. #12-00 GB BUILDING
B. ALL MCCBs/MCBs USED FOR PROTECTION OF INDUCTION LOADS SHALL BE OF TYPE C
K. THE CONTRACTOR SHALL INCLUDE ALL NECESSARY COSTS IN HACKING, CORING, CUTTING B. ALL LIGHTING FIXTURES SHALL BE SECURELY HUNG OR MOUNTED AS FOLLOWS: SINGAPORE 069542
CHARACTERISTICS AND MOTOR LOAD SHALL BE OF TYPE D CHARACTERISTIC . 8. ALL UNDERGROUND FUEL PIPES TO BE DOUBLE WALLED AND EACH STRETCH OF PIPE TO HAVE
RAISED FLOOR OPENING, PENETRATION WORKS OR ALL OPENINGS FOR CABLES, BUSDUCT AND T:+ 65 63376777
CABLE SUPPORT SYSTEM WITH APPROVED FIRE STOPPED MATERIAL AND WATER SEAL AFTER i. SURFACE AND WALL MOUNTED FITTINGS SHALL BE SECURED WITH METAL THREADED LEAKAGE SENSOR DEVICES LINKED TO BMS. E.G. REFLLING POINT TO BREAK TANK, BREAK TANK F:+ 65 63396956
C. ALL ELECTRICAL EQUIPMENT AND ACCESSORIES THAT ARE EXPOSED TO WEATHER SHALL BE STUDS COMPLETE WITH TWO LOCK NUTS AND WASHERS USING APPROVED METAL STUDS TO PUMPSET, PUMPSET TO BELLY TANK, BELLY TANK TO FUTURE STORAGE TANKS.
INSTALLATION, MAKE GOOD AND ASSOCIATED WORKS INCLUSIVE OF PROFESSIONAL OF WEATHER PROOF TYPE TO IP65 , UNLESS OTHERWISE STATED. W: www.awparchitects.com
ENGINEER'S (STRUCTURE) ENDORSEMENT AND SUBMISSION. CARTRIDGE HAMMER. THE THREADED METAL STUDS SHALL PENETRATE INTO THE HARD
E: awp200609@awparchitects.com
CONCRETE TO A DEPTH OF NOT LESS THAN 32mm. 9. UNDERGROUND PIPEWORK FOR FUEL TO COME WITH CORROSION RESISTANCE AND CATHODIC
D. ALL OVERCURRENT, EARTH FAULT RELAYS AND EARTH LEAKAGE RELAYS SHALL BE TESTED PROTECTION.
L. THE CONTRACTOR SHALL LIAISE WITH OTHER TRADES FOR THE POWER REQUIREMENTS OF AND CALIBRATED BY LICENSED HT TESTING ENGINEER AND ALL COSTS CONNECTED C & S CONSULTANT
THEIR ELECTRICAL EQUIPMENT AND APPARATUS. ii. FOR PENDANT FITTINGS, THE DOWNRODS SHALL BE SECURELY FIXED TO THE CEILING WITH
THEREWITH SHALL BE DEEMED TO HAVE BEEN INCLUDED IN THE CONTRACT. CONDUIT TERMINATING BOXES.
M. ONE TYPICAL SAMPLE OF EACH AND EVERY TYPE OF LIGHT FITTINGS AND ELECTRICAL E. LABEL MARKINGS , ARRANGEMENTS, CONNECTIONS AND GRADE OF COPPER SHALL COMPLY AS iii. ALL RECESSED LIGHT FITTINGS SHALL BE SUPPORTED INDEPENDENTLY BY ADJUSTABLE G.I.
13. SEISMIC PARAMATER
ACCESSORIES AND EQUIPMENT SHALL BE PROVIDED WITHOUT ADDITIONAL COST FOR APPROPRIATE WITH BS.158, 159, 1433, 1977. OR EQUIVALENT.
ARCHITECT REVIEW. HANGER ROD SECURITY FIXED INTO THE CEILING SLAB. FALSE CEILING GRID SYSTEM SHALL EQUIPMENT, PIPING, ETC., MUST BE SUFFICIENTLY STRONG TO WITHSTAND SUCH EXTERNAL
NOT BE USED TO SUPPORT LIGHT FITTINGS. ALL THE LIGHT FITTINGS SHALL BE ADJUSTED FORCES SUCH AS EARTHQUAKES. THE STRENGTH OF INSTALLATIONS, PARTS AND MATERIAL MUST
F. ALL ELECTRICAL BOARDS BUSBARS SHALL BE OF HARD DRAWN TINNED COPPER AND SHALL SO THAT THERE SHALL BE NO NOTICEABLE CEILING DEFLECTION WHEN THE LIGHT FITTINGS
N. WHEN THE SAMPLES HAVE BEEN APPROVED, THEY SHALL BE SO TAGGED AND LEFT ON SITE HAVE A CURRENT DENSITY OF NOT LESS THAN 1.55A/sq.mm. WHEN MORE THAN ONE SET OF BE MEASURED AND CALCULATED NECESSARY.
FOR REFERENCE. ARE INSTALLED.
BUSBARS ARE USED PER PHASE, APPROPRIATE DERATING FACTOR SHALL APPLY.
ALL EQUIPMENT LISTED IN BELOW TABLE, INCLUDE ALL NON-STRUCTURAL ELEMENTS AND +6221 719 0011 ttw@ttwindonesia.com ttw.com.au
O. CONTRACTOR SHALL ALSO ENSURE THAT ALL SERVICES INSTALLED ARE EASILY ACCESSIBLE C. CONDUIT STEMS, RODS AND BACK SUPPORTS FOR LIGHTING FIXTURES SHALL BE PAINTED WITH ACCESSORIES THAT ATTACHED TO STRUCTURAL MEMBER MUST BE DESIGNED IN ACCORDANCE TO
G. ALL NON-CURRENT CARRYING METALLIC PARTS OF THE DISTRIBUTION BOARD SHALL BE ONE COAT OF PRIMER AND TWO COATS OF SEMI-GLOSSY FINISH, COLOUR TO BE CONFIRMED Graha Chantia L3 .Jl Bangka Raya No. 6 Jakarta Selatan 12720
FOR MAINTENANCE AND REPAIR. BONDED TO ELECTRICAL EARTH. INDONESIAN SEISMIC CODE OF SNI 1726-2019 OR ASCE 7-16 WITH THE FOLLOWING PARAMETERS:
BY ARCHITECT.
P. DO NOT SCALE OF ANY DRAWING IN THIS PACKAGE.
M&E CONSULTANT
H. ALL PROTECTION CTs SHALL BE OF CLASS 5P10, 20VA OR EQUIVALENT RISK CATEGORY III (CENTRAL COMMUNICATION)
D. THE CONTRACTOR SHALL ENSURE THAT THE METAL PARTS OF ALL COMPONENTS OF THE
Q. REFER TO ARCHITECTURAL DRAWINGS WHEN CO-ORDINATING FINAL LOCATIONS OF LIGHTING FIXTURES SHALL BE IN EFFECTIVE ELECTRICAL CONTACT WITH THE EARTH LOCATION: JL. DANN MOGOT IN WEST JAKARTA. LONGITUDE: -6.158809; LATITUDE: 106.690534
I. ALL METERING CTs SHALL BE OF CLASS 0.5 10VA OR BETTER. TERMINALS.
ELECTRICAL EQUIPMENT SUCH AS SOCKET OUTLETS, FLOOR BOXES, LUMINAIRES, SWITCHES,
SECURITY AND COMMS EQUIPMENT, ETC. J. ALL MCCBs BELOW 250A SHOULD COME WITH TM PROTECTION TRIP, MCCBs ABOVE 250A SHALL SPECTRAL RESPONSE ACCELERATION PARAMETER AT SHORT PERIOD (SS) : 0.791 g
E. ALL EXIT AND EMERGENCY LIGHTS SHALL COMPLY WITH LATEST SS 563. THE POWER PACK SPECTRAL RESPONSE ACCELERATION PARAMETER AT PERIOD 1S (S1) : 0.392 g
BE ELECTRIONIC TRIP. MCCBs SERVING FIRE EQUIPMENT SHALL ONLY HAVE MAGENTIC TRIP OF COMPLETE WITH RECTIFIER, CHARGER, BATTERY AND INVERTOR SHALL BE RATED MINIMUM OF
R. DRAWINGS SHALL BE READ IN CONJUNCTION WITH ARCHITECTURAL DRAWINGS. ALL ROOMS, APPROPRIATE RANGE. SITE CLASSIFICATION: SITE CLASS SE (TBC BY GEOTECH ENGINEER)
DIMENSIONS AND SPACE PLANNING ARE SUBJECT TO COORDINATION WITH THE ARCHITECT. 2-HOURS OPERATION AND SHALL FORM AN INTEGRAL UNIT WITH THE LED LIGHT SOURCE. ALL DESIGN SPECTRAL RESPONSE ACCELERATION PARAMETER AT SHORT PERIOD (SDS) : 0.68 g
EXIT LIGHTS SHALL BE INSTALLED NOT MORE THAN 2.5M FROM FINISHED FLOOR LEVEL.
S. CONTRACTOR TO TAKE PHYSICAL AS-BUILT DIMENSIONS ON SITE BEFORE MANUFACTURING OF
K. ALL MCCBs/MCBs IN DISTRIBUTION BOARD SHALL BE RATED AT NOT LESS THAN 10kA. DESIGN SPECTRAL RESPONSE ACCELERATION PARAMETER AT 1S (SD1)
SEISMIC DESIGN CATEGORY D
: 0.63 g AURECON SINGAPORE (PTE) LTD
PRE-FABRICATED COMPONENTS COMMENCES L. ALL INDICATING LIGHTS SHALL BE LED LAMP CAN BE REMOVED SEPARATELY TRANSFORMER 152 BEACH ROAD #22-02, GATEWAY EAST SINGAPORE 189721
TYPE. 8. EXTRA LOW VOLTAGE EQUIPMENT REV DATE REVISION DETAILS APPROVED
T. ELECTRICAL SYSTEM TO COMPLY WITH TOTAL HARMONIC DISTORTION (THD) LIMITS AS
REQUIRED BY PLN TO BE WITHIN 5%. ANY ADDITIONAL EQUIPMENT REQUIRED TO COMPLY TO M. IDENTIFICATION FOR DISTRIBUTION BOARD SHALL BE ENGRAVED LAMACOLD NAMEPLATES ON A. ALL ELV INSTALLATION WORKS MUST BE CARRIED OUT BY LICENSED CONTRACTOR APPROVED P1 30/07/20 LLE TENDER ISSUANCE
THD LIMITS TO BE INCLUDED. BY THE RELEVANT LOCAL AUTHORITIES.
THE OUTSIDE FRONT FACE OF THE ENCLOSURE. 2.0 P2 19/08/20 DESIGN DEVELOPMENT ISSUANCE
U. ALL ELECTRICAL WORK DOWNSTREAM OF THE PLN SWITCHGEAR (I.E. ELECTRICAL CABLING, B. INSTALLATION OF AV/SCV SYSTEM MUST BE CARRIED OUT BY LICENSED CONTRACTOR 2.0 P3 14/09/20 LLE TENDER ISSUANCE
N. ALL CIRCUIT BREAKERS AT ELECTRICAL BOARDS SHALL BE LABELLED IN ACCORDANCE WITH
CABLE CONTAINMENT, UNDERGROUND DUCTS, TRENCHES, CABLE TERMINATION TO PLN THE SINGLE LINE DIAGRAM WITH APPROPRIATE CIRCUIT IDENTIFICATION. SINGLE LINE DIAGRAM APPROVED BY THE RELEVANT LOCAL AUTHORITIES. 2.0 P4 23/09/20 LLE TENDER ISSUANCE
SWITCHGEAR, ETC) TO BE CONSIDERED INCLUDED WITHIN THIS CONTRACT SCOPE FOR RESPECTIVE SUB-BOARDS / DISTRIBUTION BOARDS ARE TO BE FRAMED BEHIND THE 2.0 A 30/10/20 ISSUED FOR TENDER
COVER OF THE SUB-BOARDS / DISTRIBUTION BOARDS. C. COPPER CABLE LENGTH SHALL NOT EXCEED 90m, CONTRACTOR SHALL ALLOW FOR FIBRE
V. ALL METAL STRUCTURES EXPOSED TO EXTERNAL (LIGHTING POLES, MECHANICAL EQUIPMENT, REPLACEMENT OF ALL CABLES INCLUDING ALL EQUIPMENTS WHERE 90m LENGTH IS EXCEEDED. B 11/12/20 TENDER ISSUANCE
METAL ROOFING, ETC) ARE TO BE BONDED TO A LIGHTNING PROTECTION SYSTEM. IF NO O. ALL DISTRIBUTION BOARDS SHALL BE FIXED AT 1800mm MEASURED FROM FLOOR FINISH LEVEL
2.0
C 26/03/21 POST TENDER ADDENDUM 2
LIGHTNING PROTECTION SYSTEM EXISTS IN THE VINCINITY, EARTH PITS C/W LIGHTNING TAPE TO TOP OF THE BOARD, UNLESS OTHERWISE STATED. THE CONTRACTOR IS REQUIRED TO D. ALL EPMS AND BMS TRAY TO BE KEPT SEPARATE.
ARE TO BE PROVIDED. ADJACENT EARTH PITS ARE NOT TO BE SEPARATED MORE THAN 20M SUBMIT DETAILS OF FINAL ARRANGEMENT AND DIMENSIONAL LAYOUT OF ALL THE ITEMS OF
APART. E. ALL MV LEVEL BREAKERS ARE TO BE PROVIDED WITH RELAY MONITORING THROUGH DATA
EQUIPMENT IN RESPECTIVE ROOMS TO SUIT SITE CONDITIONS ETC FOR S.O. REVIEW BEFORE
2.0
SCALE SIZE FOR TENDER
COMMENCEMENT OF FABRICATION AND INSTALLATION. CONCENTRATOR TO THE EPMS
W. ALL LOW VOLTAGE ELECTRICAL AND MECHANICAL SYSTEMS ARE TO BE SPECIFIED TO BE N.T.S A1 NOT FOR CONSTRUCTION
WITHIN 5% TOTAL HARMONIC DISTORTION. SHOULD THE LIMIT BE EXCEEDED, ACTIVE HARMONIC P. THE RATING OF SURGE ARRESTOR AT MAIN DISTRIBUTION BOARD AND EXTERNAL 2.0
FILTERS TO BE INSTALLED AT THE MEDS TO REDUCE THD TO ACCEPTABLE LIMITS BY THE DRAWN APPROVED
UTILITY SUPPLIER.
DISTRIBUTION BOARD SHALL BE TYPE 1 COMMON/ DIFFERENTIAL MODE 50/12.5KA MIN. 9. EARTHING & LIGHTNING PROTECTION SYSTEMS T. TRAN
2.0 DATE
A. THE EARTHING SYSTEM SHALL COMPLY WITH CODE OF INDONESIAN STANDARD.
Filename: BIM 360://509548 - JAK1/JAK1-AUR-JJ-IFC.rvt

DESIGNED
4. CABLES 2.0
B. ALL EARTHING TERMINATION FOR ELECTRICAL, ELV, AND LIGHTNING PROTECTION SYSTEM
A. DIENTE
2.0
A. ALL SUB-MAIN AND FINAL CIRCUIT TO BE C/W EARTH CONTINUITY CONDUCTORS OF SIZES SHALL BE INTERLINKED ELECTRICALLY. CHECKED
COMPLYING TO LATEST PUIL. 2.0 H. ZHANG C. EDDISON
C. THE RESISTANCE VALUE SHALL BE LESS THAN 1 Ohm FOR LIGHTING PROTECTION SYSTEM AND
B. NEUTRAL CABLES FOR DIFFERENT CIRCUIT NUMBERS SHALL NOT BE LOOPED TOGETHER. 1 Ohm FOR EARTHING SYSTEMS. PROJECT
C. BOTH ENDS OF CABLES INCLUDING FINAL CIRCUIT CABLES AND NEUTRAL CABLES SHALL HAVE D. ALL WATER / GAS PIPES TO BE BONDED TO THE ELECTRICAL EARTHING SYSTEM. 2.0 JAK1
CABLE LUGS INDICATING ITS CIRCUIT NUMBER.
E. EARTH SWITCH INTERLOCKING TO BE PROVIDED TO ENSURE THAT NO ACCIDENTAL TURN-ON OF JALAN DAAN MOGOT KM.18 JAKARTA BARAT
D. IDENTIFICATION OF NON FLEXIBLE CABLES AND CONDUCTORS WITH CORE MARKER / CABLES UPSTREAM BREAKERS SHOULD OCCUR WHILE THE DOWNSTREAM BOARDS ARE UNDERGOING
MARKER. MAINTENANCE.
2.0 TITLE
E. CABLES SHALL BE INSTALLED OF THE CORRECT COLOUR CODE ACCORDING TO THE LATEST F. ALL DIFFERENTIAL PROTECTION, ZONE PROTECTION AND MAINS PROTECTION TO BE CLASS X
CP5 AND AMENDMENTS CT. KNEE POINT AND MAGNETIZING VOLTAGES SELECTION TO BE PROVIDED. 2.0 ELECTRICAL SERVICES
Office:

BROWN - LINE 1 ELECTRICAL GENERAL NOTES


BLACK - LINE 2
GREY - LINE 3
Plot Date: 3/26/2021 10:24:57 AM

BLUE - NEUTRAL
YELLOW/GREEN - CPC/EARTH

F. THE CONTRACTOR SHALL PROVIDE CPC/EARTH CABLES FOR ARMOUR CABLES & FR CABLES PRINT IN COLOUR DRAWING NUMBER
WITH YELLOW/GREEN COLOUR END CAP. PROJECT No. ORIGINATOR DISCIPLINE - DOC - ZONE - LEVEL - NUMBER REV

JAK1 AUR EL-DWG-A-0-0002 C