Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTE:

SEE NOTE 3
1. HV INCOMING SUPPLY RETICULATION SUBJECTED TO
NEW PLN INCOMER
SEE NOTE 2
EXISTING PLN INCOMER FUTURE PLN INCOMER CHANGES PENDING DISCUSSIONS AND AGREEMENT WITH PLN.

2262KW GAS
G G
2262KW GAS 2. CABLES TO BE SUPPLIED AND TERMINATED AT
1250A 630A 1250A GENERATOR GENERATOR
N.C N.C N.C SWITCHGEAR BY MEP CONTRACTOR.
3. SHADED AREA INDICATES FUTURE DEVELOPMENTS WHICH
4000A 4000A
MV.A.B.1.01
630A
N.C
630A
N.C
630A
N.C
630A
N.C
630A
N.C EXISTING
630A
N.C
630A
N.C
630A
N.C
630A
N.C MV.A.D.1.01
630A
N.C
630A
N.C
630A
N.C
630A
N.C N.C N.C ARE NOT IN THE CONTRACTOR'S SCOPE FOR THIS PHASE.
(CSR1) JAK2 MV (CSR2)

SPARE FEEDER SPARE SEE NOTE 2


SPARE FEEDER
FOR JAK2
FOR JAK2
CONNECTION
CONNECTION
IN DAY 2 2.5MVA 2.5MVA
IN DAY 2
630A 630A 630A 630A 0.4/20KV 0.4/20KV
N.C N.O N.C N.C OIL TX OIL TX
200A 200A
N.C N.C

EXISTING EXISTING
2.5MVA 2.5MVA
630A 630A
N.C N.C

630A 630A
N.C N.C
3200A 3200A JAK-1.2-GSB

CLIENT
EXISTING JAK2 MSB EXISTING JAK2 MSB

SEE NOTE 2

630A 630A 630A 630A


N.C N.O N.O N.C
630A 630A
N.C N.C
JAK-1.2-MVB JAK-1.2-MVB

SEE NOTE 3

630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A
N.C N.C N.C N.C N.C N.O N.C N.C N.C N.C N.C N.C N.C N.C N.C N.C N.C N.C N.C N.O N.C N.C N.C N.C
200A 200A
200A 200A 200A 200A 200A N.C N.C 200A 200A 200A 200A 200A ARCHITECT
N.C N.C N.C N.C N.C N.C N.C N.C N.C N.C

AWP PTE LTD

143 CECIL STREET


#12-00 GB BUILDING
SINGAPORE 069542
T:+ 65 63376777
JAK 1.1 LOAD SEE NOTE 2 SEE NOTE 2 JAK 1.2 LOAD F:+ 65 63396956
9MW 2500A 2500A 9MW W: www.awparchitects.com
E: awp200609@awparchitects.com
800A 1600A 800A 1600A
C & S CONSULTANT

ADMIN LOAD ADMIN LOAD

2100KW GAS 2100KW GAS


GENERATOR G G GENERATOR

+6221 719 0011 ttw@ttwindonesia.com ttw.com.au


4000A 4000A Graha Chantia L3 .Jl Bangka Raya No. 6 Jakarta Selatan 12720
N.C N.C
M&E CONSULTANT

2.5MVA 2.5MVA
0.4/20KV 0.4/20KV
OIL TX OIL TX

AURECON SINGAPORE (PTE) LTD


152 BEACH ROAD #22-02, GATEWAY EAST SINGAPORE 189721
630A 630A
N.C N.C REV DATE REVISION DETAILS APPROVED
630A 630A
P1 23/09/20 LLE TENDER ISSUANCE
JAK-1.4-GSB N.C N.C A 30/10/20 ISSUED FOR TENDER
B 11/12/20 TENDER ISSUANCE
C 13/01/21 TENDER ADDENDUM 3
D 22/01/21 TENDER ADDENDUM 4
E 26/03/21 POST TENDER ADDENDUM 2

630A 630A 630A 630A


N.C N.O N.C N.O
SCALE SIZE FOR TENDER
630A 630A
JAK-1.4-MVB
N.C
JAK-1.4-MVB
N.C N.T.S A1 NOT FOR CONSTRUCTION
DRAWN APPROVED
Tho Tran DATE
DESIGNED
Filename: BIM 360://509548 - JAK1/JAK1-AUR-JJ-IFC.rvt

Aaron Chay
CHECKED
Harry Zhang Colin Eddison
630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A 630A
N.C N.C N.C N.C N.C N.O N.C N.C N.C N.C N.C N.C N.C N.C N.C N.O N.C N.C N.C N.C PROJECT
200A
N.C
200A
N.C
200A
N.C
200A
N.C
200A
N.C
200A
N.C
200A
N.C
200A
N.C
200A
N.C
200A
N.C
JAK1
JALAN DAAN MOGOT KM.18 JAKARTA BARAT

TITLE
ELECTRICAL SERVICES
JAK 1.3 LOAD JAK 1.4 LOAD
Office:

OVERALL SITE HV DISTRIBUTION SCHEMATICS


9MW 9MW
Plot Date: 1/14/2021 10:06:04 AM

PRINT IN COLOUR DRAWING NUMBER


PROJECT No. ORIGINATOR DISCIPLINE - DOC - ZONE - LEVEL - NUMBER REV

JAK1 AUR EL-DWG-A-0-9000 E