BOQ item

no.

1
,shuttering

2
specifications.

6 yard,

7 including

cutting
8

cutting
8

cutting
8

payble.
10 shuttering

1 concreting,

2
fixing

Recommended By
Mr. Rakesh Jangid
P.M. (Structures) Page 1 of 2

BOQitem

no.

7
2504

NOTE:- Term and conditions of contract.

for Labour contractor.


RMC at site and TMT and shuttering material at base camp shall be provided by GRIL.
For transportation of TMT and shuttering material ,vehicle shall be provided by GRIL on
2
availablity basis , loading & unloading is in scope of contractor.

Water for curing and drinking shall be provided by GRIL, in case of less curing 5% of bill
3
amount shall be deduct from RA Bill.

CGI sheet/tent and balli for labour hutment shall be provided by GRIL, making of shed is in
4
contractor scope.

For requirement of material and machine ,contractor have to inform min. 02 days before to
5
site incharge.

Boom placer/Pump for concreting shall be provided by GRIL with pipe line fitting labour as
6
when required.

safety and security of material,tool & tackles, DG, other machines at site is in contractor
scope.

8 All consumable shall be provided by GRIL on Reconsilation basis.


9 GST Extra shall be Charged as per govt. rules.

Reco mended By
Mr. Ra esh Jangid
P.M. ( tructures) Page 2 of 2
shuttering,concreting

For All Grades


Labour charges for substructure

curing as per drawing and specifications.


For All Grades

wall)) with PVC panels, including shuttering,concreting


curing as per drawing and specifications.
For All Grades

unloading

,shuttering ,concreting
drawing and specifications.

,bending

,bending

,bending
,concreting
specifications.
For Misc. Items

instructed by Engineer.

Approved By
Mr. Manish Gupta
Director (Ope rations)

GR INFRAPROJECTS LIMITED
CONSTRUCTIONOF EIGHT LANE ACCESS-CONTROLLED EXPRESSWAY DELH
ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF MADHY
Labour Rates for Structure Work

Item Description

Labour charges for laying of PCC for Rigid Appron including laying of stones as per

drawing and specifications.


Labour charges for laying of Flexible Appron including laying of stones as per drawing

and specifications.
Labour charges of laying Filter Media Below Quadrant Pitching complete as per

drawing and Technical specification clause2504.(For Bridges).


Labour charges for laying (M-10115 Grade) Quadrant Pitching on slopes laid over
prepared filter media complete as per drawing and Technical specification clause
(For Bridges)
ovided by GRIL on Reconsilation basis.
d as per govt. rules.

Approved By
Mr. Manish Gupta
Director (Operations)
GR INFRAPROJECTS LIMITED
CONSTRUCTION OF EIGHT LANE ACCESS-CONTROLLED EXPRESSW
ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE O
Labour Rates for Structure Work

Rem uescription

Box Cell Type (MNB I PUP/ LVUP / VUP)


For Foundation /Substructure /Superstructure work
Labour charges for laying of PCC for levelling course including dressing

, concreting and curing as per drawing and specifications.


Labour charges for Foundation(Box Raft/retaining wall raft/wing wall raft) including
,deshuttering ,finishing and curing as per drawing and

(Box Wall/ stem of retaining wall/ wall of wing


wall) with MS shuttering , including shuttering,concre,deshuttering

Labour charges for substructure (Box Wall/ stem of retaining wall/ wall of wing
g shuttering,concreting ,deshuttering

Labour charges for Casting of Precast RCC Beam including shuttering ,concreting

,deshuttering ,finishing and curing as per drawing and specifications.


Labour charges for Erection of Precast RCC Beam including loading from casting
at site and erection at location as per drawing & technical
specifications. Hydra & Trailer shall be provide by GRIL for lifting & shifting.
Labour charges for CAST IN SITU Deck Slab with over Beam/precast girders
,deshuttering

Labour charges for HYSDITMT steel work for foundation including straighting,
,loading from camp & unloading at site, placing and binding excluding
binding wire as per drawing and technical specifications. trailer for transportation for
TMT steel will be in scope of GRIL. Weight of lap and chair shall be payble.
Labour charges for HYSDITMT steel work for Sub Structure including straighting,
,loading from camp & unloading at site, placing and binding excluding
binding wire as per drawing and technical specifications. trailer for transportation for
TMT steel will be in scope of GRIL. Weight of lap and chair shall be payble.
Labour charges for HYSDITMT steel work for Super Structure including straighting,
,loading from camp & unloading at site, placing and binding excluding
binding wire as per drawing and technical specifications. trailer for transportation for
TMT steel will be in scope of GRIL. Weight of lap and chair shall be payble.
Labour charges for only placing and binding of TMT steel for precast PSC
pretension girders excluding binding wire and shifting from camp to site , trailer for
transportation for TMT steel will be in scope of GRIL. Weight of lap and chair shall be
Labour charges for Casting of Approach slab excluding reinforcement but including
,deshuttering ,finishing and curing as per drawing and

Labour charges for Cast in Situ Crash Barrier(RCC M40)


deshuttering, finishing & Curing as per technical specifications & as

Labour charges for fixing of Drainage spout including shifting from camp to site,

,concreting complete as per drawing and specifications.


Labour charges for Casting of Curtain wall/Toe wall/Wing wall including shuttering

,concreting,finishing and curing as per drawing and specifications.

VN, v p7- m
T LANE ACCESS-CONTROLLED EXPRESSWAY DELHI VADODARA GREEENFIELD ALIGNMENT (NH148N)
HARATMALA PARIYOJNA IN THE STATE OF MADHYA PRADESH

unit

CUM.

s per drawing
CUM.

CUM.

hing on slopes laid over


CUM.
/1/1 P Prow
T LANE ACCESS-CONTROLLED EXPRESSWAY DELHI VADODARA GREEENFIELD ALIGNMENT (NH148N)
HARATMALA PARIYOJNA IN THE STATE OF MADHYA PRADESH

Proposed
unit Remarks
Rates

,ramming
CUM. 300

drawing and

CUM. 450
l/ wall of wing
,finishing and

CUM. 900

,finishing and

CUM. 500

CUM. 700

as per drawing & technical EA. 400

,finishing and curing complete as per CUM. 600

at site, placing and binding excluding


MT. 3700

at site, placing and binding excluding


MT. 3900

at site, placing and binding excluding


MT. 4200

MT. 2200
CUM. 450

- including shuttering,
CUM. 1800

NOS. 500

CUM. 900

ci
LD ALIGNMENT (NH148N)

Proposed
Remarks
Rates

400

300

200

300
GR INFRAPROJECTS LIMITED

CONSTRUCTION OF EIGHT LANE ACCESS-CONTROLLED EXPRESSWAY DELHI VADOD

S.No. Item Description Unit Approved Rates(60%Rates(40%


For
BoxFoundation
Cell Type /Substructure
(MNB I PUP/ /Superstructure
LVUP / VUP)
work Labour charges for laying of PCC for
levelling course including dressing ,ramming ,
concreting and curing as per drawing and
1 specifications. CUM 300 180 120
Labour charges for Foundation(Box Raft/retaining wall
raft/wing wall raft) including ,deshuttering ,finishing
and curing as per drawing and curing as per
2 drawing and specifications. CUM 450 270 180
3
LIMITED

EXPRESSWAY DELHI VADODARA GREEENFIELD ALIGNMENT (NH148N)

Labour rates