Equipment Mobilization Approval/Persetujuan Mobilisasi Peralatan

(To be completed and approved prior to dispatch to site/ Untuk dilengkapi sebelum pengiriman ke kawasan)
A Contractor's Equipment Data / Data Peralatan Kontraktor
Type of Equipment:
1 SPECIFIC PURPOSE EQUIPMENT
Jenis Peralatan
9 UNIT of 20FT ISO DRY CONTAINER
Number of Equipment: SERIAL NUMBER:CRUU 313300 0, CRUU 355320 9, CRUU 138640 0,
2
Jumlah Peralatan CRUU 306171 8, CRUU CRUU 133387 0, CRUU 382967 9,
CRUU 054464 6, CRUU CRUU 226087 0, CRUU 260195 6

Usage: Explain in detail exact use and


location of use
3 To Move Chemical at Tangguh Site
Penggunaan: Jelaskan secara terperinci
penggunaan dan lokasinya
Contractor Name:
4 PT. LV LOGISTICS INDONESIA
Nama Kontraktor
Contract Name: PROVISION OF
5
Nama Kontrak INTEGRATED FREIGHT FORWARDING SERVICES
Contract Period:
6 3 Years
Periode Kontrak
Sub-Contractor:
7
Sub Kontraktor
Physically Checked and Verified by:
B Summary Inspection
Diperiksa secara fisik dan diverifikasi oleh
Name Position Sign
Nama Jabatan Tanda Tangan
Certification Check: See attached
1 Yes/No Jonly Roger Konhudt Inspector
Pemeriksaan Sertifikasi Inspection Report
Physically Checked See attached
2 Yes/No Jonly Roger Konhudt Inspector
Pemeriksaan Fisik Inspection Report
Load Tested: See attached
3 Yes/No Jonly Roger Konhudt Inspector
Uji Beban Inspection Report
I declare I have performed all tests and
inspection have performed is in safe condi-
tion to be used.
Maintenance record have been verified and no
defect exist to prevent it from safe operation
See attached
4 Saya mendeklarasikan bahwa Saya telah me- Jonly Roger Konhudt Inspector
Inspection Report
lakukan inspeksi dalam keadaan aman untuk
dioperasikan. Catatan perawatan telah dive-
rifikasi dan tidak ada kerusakan yang menga-
kibatkan tidak aman untuk dioperasikan

C Oroginator/ Dibuat oleh (Sub-contractor):


Name/ Nama Name/ Nama Function/ Dept Date/ Tanggal Signature/ Ttd
Single Point
Accountability

D Approval/ Persetujuan
EMA
1
COORDINATOR
BP CONSTRUCTION
2
MANAGER
Visual, NDT Report & R.O.T.E
Certificate of Inspection, Report of Thorough Examination, Visual, NDT Report and
And View Of Thorough Examination

20FT DRY CONTAINER


CRUU 313300 0

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE OF INSPECTION
Sertifikat Hasil Inspeksi
No. MIR.02/3889/VII/22
This is to certify that the equipment described herein has been inspected, examined & tested:
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Equipment Description : 20FT DRY CONTAINER
Unit Serial No : CRUU 313300 0
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,220 Kg
Payload : 28,260 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38.100 Kg
Manufactured by : QINGDAO PACIFIC CONTAINER CO, LTD.
Year Built/Year Used : 12/2004
Standard Reference : ISO 1496-1 & 2, ISO 668, ISO 1161 EN ISO 17638
& EN ISO 23278
Place of Inspection : Lamongan Shorebase, Indonesia
Date of Inspection : July 27th ,2022
Valid Until : July 27th ,2023

The Inspection consisted of:


1. Review Document ( C.S.C )
2. Visual Inspection and Observation
3. Dimensional Measurement and Thorough Examination
4. NDT Implementation (NDT Before & After Load Test)
5. Load Test Implementation
6. Tagging Name Plate
7. Color Code

We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended

Lamongan, July 27th , 2022


PT. MIR ENGINEERING

I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
REPORT OF THOROUGH EXAMINATION LIFTING EQUIPMENT
This report complies with the Lifting Equipment Engineers Association Technical requirements
Date of Examination: July 27th , 2022 Date of Report: July 27th , 2022 Report number: LSB/001/27/VII/22

Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:

PT. LV LOGISTICS INDONESIA Lamongan, Indonesia


Nifarro Park, Jl. Raya Pasar Minggu No. 1 –Kec. Pasar Minggu- Jakarta Selatan
Identification Number: CRUU 313300 0 Max.Gross Date of Date of last thorough
Mass: manufacture examination:
Description and identification of the equipment:

20FT DRY CONTAINER 30,480 Kg 12/ 2004 Not Applicable


Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,220 Kg
Payload : 28,260 Kg
Proof Load Test : 38,100 Kg

Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278

Was the examination carried out:


Is this the first examination after installation
YES NO √ Within an interval of 6 months? YES NO √
or assembly at a new site or location?
Within an interval of 12
YES √ NO
months?
If the answer to the above question is YES In accordance with an
YES NO YES √ NO
has the equipment been installed examination scheme?
correctly? After the occurrence of
YES NO √
exceptional circumstances?
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
YES by:
None
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
Particulars of any tests carried out as part of the examination:
Visual Inspection, Dimensional Measurement, NDT Before & After Load test, Load Test,Thorough Examination, Plate Name & Color Code
IS THIS EQUIPMENT FIT FOR PURPOSE? YES √ NO
Name & Qualifications of person making Name of person authenticating this report: Latest date by which next thorough
this report: examination must be carried out:

July 27th ,2023

Jonly Roger konhudt I Kade Suartana


LEEA INSPECTOR Reg#18901 TECHNICAL MANAGER
Name and address of employer of persons making and authenticating this report:

PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 23rd,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/001/23/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan Indonesia
Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-4
ID No : CRUU 313300 0 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,220 Kg ☒EN ISO 23278
Payload : 28,260 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

☒Magnetic ☐Dye Penetrant


Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2023
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- mm Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 23rd,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/001/23/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-4
ID No : CRUU 313300 0 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,220 Kg ☒EN ISO 23278
Payload : 28,260 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 313300 0

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 27th,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/001/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia
Customer : PT. LV LOGISTICS INDONESIA
Acceptance Criteria:
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER ☒ISO 1496-1
ID No : CRUU 313300 0
☒ISO 1496-4
Dimensional : 6060 X 2438 X 2591 (mm)
☒BS ISO 668
Tare Mass : 2,220 Kg
☒EN ISO 17638
Payload : 28,260 Kg
☒EN ISO 23278
Max. Gross Mass : 30.480 Kg
☒ISO 1161
Proof Load Test : 38.100 Kg
☒Magnetic ☐Dye Penetrant
Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2023
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- mm Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


Expired Date: July 27th ,2023
SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 27th,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/001/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER
☒ISO 1496-4
ID No : CRUU 313300 0
☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm)
☒EN ISO 17638
Tare Mass : 2,220 Kg
☒EN ISO 23278
Payload : 28,260 Kg
☒ISO 1161
Max. Gross Mass : 30.480 Kg
Proof Load Test : 38.100 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 313300 0

NAME PLATE & COLOR CODE

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


Expired Date: July 27th ,2023
SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Report No.
LSB/001/27/VII/22
VIEW OF PHOTOGRAPH VERIFICATION & THOROUGH
EXAMINATION 20FT DRY CONTAINER
SN. CRUU 313300 0

VIEW OF GENERAL STRUCTURAL CONTAINER


VIEW OF DATA PLATE MANUFACTURE
INSPECTION

EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
VISUAL INSPECTION BEFORE MPI ON THE TOP
VISUAL VIEW ON THE UNDER/BOTTOM FRAME
CORNER FITTING- ACC
CONTAINER INSPECTION - ACC

VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC

Lifting Inspector; Reviewed/Approved;

Jonly Roger Konhudt


LEEA INSPECTOR Reg#18901 I Kade Suartana
` Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : CRUU 313300 0
Location : Lamongan, Indonesia
Date : July 27th,2022
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Tidak Remarks
Ya Tidak Memenuhi
Memenuhi
Yes No Comply Not Comply
1. Document Review
Penelaahan Dokumen

Kesimpulan pemeriksaan
sebelumnya - - N/A
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar - - N/A

Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

2.2 Sambungan Diagonal Rangka


Utama
Bracing
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC

Sambungan bracing dengan


rangka utama
√ √ ACC
Joint between bracing with
main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.3 Sambungan Pojok


Corner Fitting

Rangka
Frame √ √ ACC

Dudukan pada rangka utama


Support at main frame √ √ ACC

Sambungan-sambungan
Joint √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

Dudukan Lifting Lug/ Corner


Fitting
√ √ ACC
Base Support of Lifting Lug/
Corner Fitting
2.4 Pemeriksaan Dalam & Lantai
Container
Internal & Floor Container
Kondisi Lantai
Floor Condition √ √ ACC

Kondisi dinding bagian dalam


Internal side wall condition √ √ ACC

2.5 Pintu
Door √ √ ACC

Rangka
Frame - - N/A

Sambungan antar rangka


Joint between frame √ √ ACC

Dudukan
Support √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List

Customer : PT. LV LOGISTICS INDONESIA


User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : CRUU 313300 0
Location : Lamongan, Indonesia
Date : July 27th,2022

Verifikasi Hasil Verifikasi


Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.6 Dinding Pelindung


Protective Wall

Dudukan
Support √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

2.7 Area Pembebanan


Loading Area

Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC

Sambungan pada rangka utama


√ √ ACC
Joint at main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

3 Pengukuran Dimensi
Dimension Measurement

3.1 Pengukuran Dimensi Utama


Dimension Measurement √ √ ACC

Panjang: 6,060 mm
Length √ √ ACC

Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

3.2 Pengukuran ketebalan plat


Plate thickness measurement

Ketebalan plate dasar


Floor thickness plate √ ACC

Ketebalan plat dinding
Shell thickness plate √ √ ACC

3.3 Pengukuran dimensi Lifting Lug


Dimension of Lifting Lug Measurement √ √ ACC

Tebal plate: - mm
- - -
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.3 mm √ √ ACC
B (Side Hole) :75.3 mm
C (Side Hole): 75.1 mm
4 Pengujian
Testing

Uji tak merusak (Visual & MPI)


Non destructive testing (MPI/PENETRANT) √ √ ACC

Uji Beban
Load Test √ √ ACC

5 Struktur secara khusus


Specific Structure

Apakah posisi Corner Fitting sesuai dengan standard


ISO 1161, ISO 1496-1 & 4? √ √ ACC

How about the position of Corner Fitting, is it


comply with standard ISO 1161, ISO 1496-1 & 4? √ √ ACC

Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use

Inspected By:

Jonly Roger Konhudt


LEEA Inspector Reg# 18901

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Load Test and
Examination, Picture of Load test

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE NO: MIR.02/3889/01/VII/22
CUSTOMER NAME PT. LV LOGISTICS INDONESIA
CERTIFICATE OF USER PT. BP TANGGUH
ADDRESS Lamongan, Indonesia
LOAD TEST DATE OF TEST July 27th,2022
PLACE OF TEST Lamongan Shorebase, Indonesia
AND MANUFACTURED BY QINGDAO PACIFIC CONTAINER CO,
LTD
EXAMINATION CUSTOMER ORDER NO: 001/PO/MIR/BP/VII/22
MIR JOB ORDER NO: -

TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 313300 0 38,100 Kg 2,220 Kg 28,260 Kg 30,480 Kg
Dimension: 6,060 X 2,438 X 2,591
(mm)

INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and ISO 1496-1 & 4 , ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02

The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.

REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use

The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.

Valid Until: July 27th ,2023


I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PICTURE OF LOAD TEST
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No : CRUU 313300 0
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mass : 2,220 Kg
Payload : 28,260 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38,100 Kg
Manufactured by : QINGDAO PACIFIC CONTAINER CO, LTD
Location of Load Test : Lamongan, Indonesia
Date of Load Test : July 27th ,2023
Standard Reference : ISO 1161, ISO 1496-1 & 4, BS ISO 668, EN ISO 17638

Figure 2. Reading actual Load test at


19,467 Kg & 19,440 Kg on digital load
monitor.
Holding Time 5 Minutes “Passed”

Figure1. Load test Performance Tandem for 20FT DRY


CONTAINER
SN: CRUU 313300 0 as per ISO 1161 & ISO 1496-1 & 4

Load Cell Operated By: Suryadi Reviewed By: I Kade Suartana

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Conformity
Drawing from CSC Scheme

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PT. MIR Engineering
The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Visual, NDT Report & R.O.T.E
Certificate of Inspection, Report of Thorough Examination, Visual, NDT Report and
And View Of Thorough Examination

20FT DRY CONTAINER


CRUU 355320 9

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE OF INSPECTION
Sertifikat Hasil Inspeksi
No. MIR.02/3889/VII/22
This is to certify that the equipment described herein has been inspected, examined & tested:
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Equipment Description : 20FT DRY CONTAINER
Unit Serial No : CRUU 355320 9
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,185 Kg
Payload : 28,295 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38.100 Kg
Manufactured by : QINGDAO PACIFIC CONTAINER CO, LTD.
Year Built/Year Used : 01/2005
Standard Reference : ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638
& EN ISO 23278
Place of Inspection : Lamongan Shorebase, Indonesia
Date of Inspection : July 27th ,2022
Valid Until : July 27th ,2023

The Inspection consisted of:


1. Review Document ( C.S.C )
2. Visual Inspection and Observation
3. Dimensional Measurement and Thorough Examination
4. NDT Implementation (NDT Before & After Load Test)
5. Load Test Implementation
6. Tagging Name Plate
7. Color Code

We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended

Lamongan, July 27th , 2022


PT. MIR ENGINEERING

I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
REPORT OF THOROUGH EXAMINATION LIFTING EQUIPMENT
This report complies with the Lifting Equipment Engineers Association Technical requirements
Date of Examination: July 27th , 2022 Date of Report: July 27hd , 2022 Report number: LSB/002/27/VII/22

Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:

PT. LV LOGISTICS INDONESIA Lamongan, Indonesia


Nifarro Park, Jl. Raya Pasar Minggu No. 1 –Kec. Pasar Minggu- Jakarta Selatan
Identification Number: CRUU 355320 9 Max.Gross Date of Date of last thorough
Mass: manufacture examination:
Description and identification of the equipment:

20FT DRY CONTAINER 30,480 Kg 01/ 2005 Not Applicable


Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,185 Kg
Payload : 28,260 Kg
Proof Load Test : 38,100 Kg

Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278

Was the examination carried out:


Is this the first examination after installation
YES NO √ Within an interval of 6 months? YES NO √
or assembly at a new site or location?
Within an interval of 12
YES √ NO
months?
If the answer to the above question is YES In accordance with an
YES NO YES √ NO
has the equipment been installed examination scheme?
correctly? After the occurrence of
YES NO √
exceptional circumstances?
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
YES by:
None
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
Particulars of any tests carried out as part of the examination:
Visual Inspection, Dimensional Measurement, NDT Before & After Load test, Load Test,Thorough Examination, Plate Name & Color Code
IS THIS EQUIPMENT FIT FOR PURPOSE? YES √ NO
Name & Qualifications of person making Name of person authenticating this report: Latest date by which next thorough
this report: examination must be carried out:

July 27th ,2023

Jonly Roger konhudt I Kade Suartana


LEEA INSPECTOR Reg#18901 TECHNICAL MANAGER
Name and address of employer of persons making and authenticating this report:

PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 23rd,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/002/23/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan Indonesia
Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-4
ID No : CRUU 355320 9 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,185 Kg ☒EN ISO 23278
Payload : 28,260 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

☒Magnetic ☐Dye Penetrant


Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2023
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- mm Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 23rd,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/002/23/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-4
ID No : CRUU 355320 9 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,185 Kg ☒EN ISO 23278
Payload : 28,295 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 355320 9

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 27th,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/002/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia
Customer : PT. LV LOGISTICS INDONESIA
Acceptance Criteria:
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER ☒ISO 1496-1
ID No : CRUU 355320 9
☒ISO 1496-4
Dimensional : 6060 X 2438 X 2591 (mm)
☒BS ISO 668
Tare Mass : 2,185 Kg
☒EN ISO 17638
Payload : 28,295 Kg
☒EN ISO 23278
Max. Gross Mass : 30.480 Kg
☒ISO 1161
Proof Load Test : 38.100 Kg
☒Magnetic ☐Dye Penetrant
Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2023
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- mm Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


Expired Date: July 27th ,2023
SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 27th,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/002/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER
☒ISO 1496-4
ID No : CRUU 355320 9
☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm)
☒EN ISO 17638
Tare Mass : 2,185 Kg
☒EN ISO 23278
Payload : 28,295 Kg
☒ISO 1161
Max. Gross Mass : 30.480 Kg
Proof Load Test : 38.100 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 355320 9

NAME PLATE & COLOR CODE

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 27th, 2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Report No.
LSB/002/27/VII/22
VIEW OF PHOTOGRAPH VERIFICATION & THOROUGH
EXAMINATION 20FT DRY CONTAINER
SN. CRUU 355320 9

VIEW OF GENERAL STRUCTURAL CONTAINER


VIEW OF DATA PLATE MANUFACTURE
INSPECTION

EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
VISUAL INSPECTION BEFORE MPI ON THE TOP
VISUAL VIEW ON THE UNDER/BOTTOM FRAME
CORNER FITTING- ACC
CONTAINER INSPECTION - ACC

VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC

Lifting Inspector; Reviewed/Approved;

Jonly Roger Konhudt


LEEA INSPECTOR Reg#18901 I Kade Suartana
` Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : CRUU 355320 9
Location : Lamongan, Indonesia
Date : July 27th,2022
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Tidak Remarks
Ya Tidak Memenuhi
Memenuhi
Yes No Comply Not Comply
1. Document Review
Penelaahan Dokumen

Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar - - -

Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

2.2 Sambungan Diagonal Rangka


Utama
Bracing
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC

Sambungan bracing dengan


rangka utama
√ √ ACC
Joint between bracing with
main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.3 Sambungan Pojok


Corner Fitting

Rangka
Frame √ √ ACC

Dudukan pada rangka utama


Support at main frame √ √ ACC

Sambungan-sambungan
Joint √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

Dudukan Lifting Lug/ Corner


Fitting
√ √ ACC
Base Support of Lifting Lug/
Corner Fitting
2.4 Pemeriksaan Dalam & Lantai
Container
Internal & Floor Container
Kondisi Lantai
Floor Condition √ √ ACC

Kondisi dinding bagian dalam


Internal side wall condition √ √ ACC

2.5 Pintu
Door √ √ ACC

Rangka
Frame √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Dudukan
Support √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List

Customer : PT. LV LOGISTICS INDONESIA


User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : CRUU 355320 9
Location : Lamongan, Indonesia
Date : July 27th,2022

Verifikasi Hasil Verifikasi


Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.6 Dinding Pelindung


Protective Wall

Dudukan
Support √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

2.7 Area Pembebanan


Loading Area

Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC

Sambungan pada rangka utama


√ √ ACC
Joint at main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

3 Pengukuran Dimensi
Dimension Measurement

3.1 Pengukuran Dimensi Utama


Dimension Measurement √ √ ACC

Panjang: 6,060 mm
Length √ √ ACC

Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

3.2 Pengukuran ketebalan plat


Plate thickness measurement

Ketebalan plate dasar


Floor thickness plate √ ACC

Ketebalan plat dinding
Shell thickness plate √ √ ACC

3.3 Pengukuran dimensi Lifting Lug


Dimension of Lifting Lug Measurement √ √ ACC

Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.2 mm √ √ ACC
B (Side Hole) :75.1 mm
C (Side Hole): 75.2 mm
4 Pengujian
Testing

Uji tak merusak (Visual & MPI)


Non destructive testing (MPI/PENETRANT) √ √ ACC

Uji Beban
Load Test √ √ ACC

5 Struktur secara khusus


Specific Structure

Apakah posisi Corner Fitting sesuai dengan standard


ISO 1161, ISO 1496-1 & 4? √ √ ACC

How about the position of Corner Fitting, is it


comply with standard ISO 1161, ISO 1496-1 & 4? √ √ ACC

Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use

Inspected By:

Jonly Roger Konhudt


LEEA Inspector Reg# 18901

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Load Test and
Examination, Picture of Load test

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE NO: MIR.02/3889/002/VII/22
CUSTOMER NAME PT. LV LOGISTICS INDONESIA
CERTIFICATE OF USER PT. BP TANGGUH
ADDRESS Lamongan, Indonesia
LOAD TEST DATE OF TEST July 27th,2022
PLACE OF TEST Lamongan Shorebase, Indonesia
AND MANUFACTURED BY QINGDAO PACIFIC CONTAINER CO,
LTD.
EXAMINATION CUSTOMER ORDER NO: 001/PO/MIR/BP/VII/22
MIR JOB ORDER NO: -

TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 355320 9 38,100 Kg 2,185 Kg 28,295 Kg 30,480 Kg
Dimension: 6,060 X 2,438 X 2,591
(mm)

INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02

The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.

REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use

The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.

Valid Until: July 27th ,2023


I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PICTURE OF LOAD TEST
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No : CRUU 355320 9
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mass : 2,185 Kg
Payload : 28,295 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38,100 Kg
Manufactured by : QINGDAO PACIFIC CONTAINER CO, LTD
Location of Load Test : Lamongan, Indonesia
Date of Load Test : July 27th ,2023
Standard Reference : ISO 1161, ISO 1496-1 & 2, BS ISO 668, EN ISO 17638

Figure 2. Reading actual Load test at


19,280 Kg & 19,293 Kg on digital load
monitor.
Holding Time 5 Minutes “Passed”

Figure1. Load test Performance of 20FT DRY CONTAINER


SN: CRUU 313300 0 as per ISO 1161 & ISO 1496-1 & 2

Load Cell Operated By: Suryadi Reviewed By: I Kade Suartana

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Conformity
Drawing from CSC Scheme

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PT. MIR Engineering
The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Visual, NDT Report & R.O.T.E
Certificate of Inspection, Report of Thorough Examination, Visual, NDT Report and
And View Of Thorough Examination

20FT CONTAINER
CRUU 138640 0

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE OF INSPECTION
Sertifikat Hasil Inspeksi
No. MIR.02/3899/VII/22
This is to certify that the equipment described herein has been inspected, examined & tested:
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Equipment Description : 20FT CONTAINER
Unit Serial No : CRUU 138640 0
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,260 Kg
Payload : 28,220 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38.100 Kg
Manufactured by : CHANG ZHOU XINHUACHANG INTERNATION
CONTAINER CO. LTD.
Year Built/Year Used : 07/2007
Standard Reference : ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638
& EN ISO 23278
Place of Inspection : Lamongan Shorebase, Indonesia
Date of Inspection : July 27th ,2022
Valid Until : July 27th ,2023

The Inspection consisted of:


1. Review Document ( C.S.C )
2. Visual Inspection and Observation
3. Dimensional Measurement and Thorough Examination
4. NDT Implementation (NDT Before & After Load Test)
5. Load Test Implementation
6. Tagging Name Plate
7. Color Code

We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended

Lamongan, July 27th , 2022


PT. MIR ENGINEERING

I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
REPORT OF THOROUGH EXAMINATION LIFTING EQUIPMENT
This report complies with the Lifting Equipment Engineers Association Technical requirements
Date of Examination: July 27th , 2022 Date of Report: July 27th , 2022 Report number: LSB/003/27/VII/22

Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:

PT. LV LOGISTICS INDONESIA Lamongan, Indonesia


Nifarro Park, Jl. Raya Pasar Minggu No. 1 – Kec. Pasar Minggu- Jakarta Selatan
Identification Number: CRUU 138640 0 Max.Gross Date of Date of last thorough
Mass: manufacture examination:
Description and identification of the equipment:

20FT CONTAINER 30,480 Kg 07/2007 Not Applicable


Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,260 Kg
Payload : 28,220 Kg
Proof Load Test : 38,100 Kg

Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278

Was the examination carried out:


Is this the first examination after installation
YES NO √ Within an interval of 6 months? YES NO √
or assembly at a new site or location?
Within an interval of 12
YES √ NO
months?
If the answer to the above question is YES In accordance with an
YES NO YES √ NO
has the equipment been installed examination scheme?
correctly? After the occurrence of
YES NO √
exceptional circumstances?
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
YES by:
None
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
Particulars of any tests carried out as part of the examination:
Visual Inspection, Dimensional Measurement, NDT Before & After Load test, Load Test,Thorough Examination, Plate Name & Color Code
IS THIS EQUIPMENT FIT FOR PURPOSE? YES √ NO
Name & Qualifications of person making Name of person authenticating this report: Latest date by which next thorough
this report: examination must be carried out:

July 27th ,2023

Jonly Roger konhudt I Kade Suartana


LEEA INSPECTOR Reg#18901 TECHNICAL MANAGER
Name and address of employer of persons making and authenticating this report:

PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 26th ,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/003/26/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan Indonesia
Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT CONTAINER ☒ISO 1496-4
ID No : CRUU 138640 0 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,260 Kg ☒EN ISO 23278
Payload : 28,220 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

☒Magnetic ☐Dye Penetrant


Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2025
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- mm Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 26th ,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/003/26/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT CONTAINER ☒ISO 1496-4
ID No : CRUU 138640 0 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,260 Kg ☒EN ISO 23278
Payload : 28,220 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 138640 0

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 27th ,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/003/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia
Customer : PT. LV LOGISTICS INDONESIA
Acceptance Criteria:
User : PT. BP TANGGUH
Description : 20FT CONTAINER ☒ISO 1496-1
ID No : CRUU 138640 0
☒ISO 1496-4
Dimensional : 6060 X 2438 X 2591 (mm)
☒BS ISO 668
Tare Mass : 2,260 Kg
☒EN ISO 17638
Payload : 28,220 Kg
☒EN ISO 23278
Max. Gross Mass : 30.480 Kg
☒ISO 1161
Proof Load Test : 38.100 Kg
☒Magnetic ☐Dye Penetrant
Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2025
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- mm Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 27th, 2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 26d,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/001/26/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT CONTAINER
☒ISO 1496-4
ID No : CRUU 138640 0
☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm)
☒EN ISO 17638
Tare Mass : 2,260 Kg
☒EN ISO 23278
Payload : 28,220 Kg
☒ISO 1161
Max. Gross Mass : 30.480 Kg
Proof Load Test : 38.100 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 138640 0

NAME PLATE & COLOR CODE

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 27th, 2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Report No.
LSB/003/27/VII/22
VIEW OF PHOTOGRAPH VERIFICATION & THOROUGH
EXAMINATION 20FT CONTAINER
SN. CRUU 138640 0

VIEW OF GENERAL STRUCTURAL CONTAINER


VIEW OF DATA PLATE MANUFACTURE
INSPECTION

EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
VISUAL INSPECTION BEFORE MPI ON THE TOP
VISUAL VIEW ON THE UNDER/BOTTOM FRAME
CORNER FITTING- ACC
CONTAINER INSPECTION - ACC

VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC

Lifting Inspector; Reviewed/Approved;

Jonly Roger Konhudt


LEEA INSPECTOR Reg#18901 I Kade Suartana
` Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT CONTAINER
ID No./Tag No. : CRUU 138640 0
Location : Lamongan, Indonesia
Date : July 27th,2022
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Tidak Remarks
Ya Tidak Memenuhi
Memenuhi
Yes No Comply Not Comply
1. Document Review
Penelaahan Dokumen

Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar - - -

Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

2.2 Sambungan Diagonal Rangka


Utama
Bracing
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC

Sambungan bracing dengan


rangka utama
√ √ ACC
Joint between bracing with
main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.3 Sambungan Pojok


Corner Fitting

Rangka
Frame √ √ ACC

Dudukan pada rangka utama


Support at main frame √ √ ACC

Sambungan-sambungan
Joint √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

Dudukan Lifting Lug/ Corner


Fitting
√ √ ACC
Base Support of Lifting Lug/
Corner Fitting
2.4 Pemeriksaan Dalam & Lantai
Container
Internal & Floor Container
Kondisi Lantai
Floor Condition √ √ ACC

Kondisi dinding bagian dalam


Internal side wall condition √ √ ACC

2.5 Pintu
Door √ √ ACC

Rangka
Frame √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Dudukan
Support √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List

Customer : PT. LV LOGISTICS INDONESIA


User : PT. BP TANGGUH
Description : 20FT CONTAINER
ID No./Tag No. : CRUU 138640 0
Location : Lamongan, Indonesia
Date : July 27th,2022

Verifikasi Hasil Verifikasi


Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.6 Dinding Pelindung


Protective Wall

Dudukan
Support √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

2.7 Area Pembebanan


Loading Area

Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC

Sambungan pada rangka utama


√ √ ACC
Joint at main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

3 Pengukuran Dimensi
Dimension Measurement

3.1 Pengukuran Dimensi Utama


Dimension Measurement √ √ ACC

Panjang: 6,060 mm
Length √ √ ACC

Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

3.2 Pengukuran ketebalan plat


Plate thickness measurement

Ketebalan plate dasar


Floor thickness plate √ ACC

Ketebalan plat dinding
Shell thickness plate √ √ ACC

3.3 Pengukuran dimensi Lifting Lug


Dimension of Lifting Lug Measurement √ √ ACC

Tebal plate: -mm


Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.1 mm √ √ ACC
B (Side Hole) :75.1 mm
C (Side Hole): 75.2 mm
4 Pengujian
Testing

Uji tak merusak (Visual & MPI)


Non destructive testing (MPI/PENETRANT) √ √ ACC

Uji Beban
Load Test √ √ ACC

5 Struktur secara khusus


Specific Structure

Apakah posisi Corner Fitting sesuai dengan standard


ISO 1161, ISO 1496-1 & 4? √ √ ACC

How about the position of Corner Fitting, is it


comply with standard ISO 1161, ISO 1496-1 & 4? √ √ ACC

Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use

Inspected By:

Jonly Roger Konhudt


LEEA Inspector Reg# 18901

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Load Test and
Examination, Picture of Load test

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE NO: MIR.02/3899/03/VII/22
CUSTOMER NAME PT. LV LOGISTICS INDONESIA
CERTIFICATE OF USER PT. BP TANGGUH
ADDRESS Lamongan, Indonesia
LOAD TEST DATE OF TEST July 27th,2022
PLACE OF TEST Lamongan Shorebase, Indonesia
AND MANUFACTURED BY CHANG ZHOU XINHUACHANG
INTERNATION CONTAINER CO. LTD
EXAMINATION CUSTOMER ORDER NO: 001/PO/MIR/BP/VII/22
MIR JOB ORDER NO: -

TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 138640 0 38.100 Kg 2,260 Kg 28,220 Kg 30.480 Kg
Dimension: 6,060 X 2,438 X 2,591 (mm)

INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and, ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02

The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.

REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use

The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.

Valid Until: July 27th ,2023


I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PICTURE OF LOAD TEST
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No : CRUU 138640 0
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mass : 2,260 Kg
Payload : 28,220 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38,100 Kg
Manufactured by : CHANG ZHOU XINHUACHANG INTERNATION
CONTAINER CO. LTD.
Location of Load Test : Lamongan Shorebase, Indonesia
Date of Load Test : July 27th ,2023
Standard Reference : ISO 1161, ISO 1496-1 & 4, BS ISO 668, EN ISO 17638

Figure 2. Reading actual Load test at


19,140 Kg & 19,109 Kg on digital load
monitor.
Holding Time 5 Minutes “Passed”

Figure1. Load test Performance of 20FT CONTAINER


SN: CRUU 138640 0 as per ISO 1161 & ISO 1496-1 & 4

Load Cell Operated By: Suryadi Reviewed By: I Kade Suartana

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Conformity
Drawing from CSC Scheme

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PT. MIR Engineering
The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Visual, NDT Report & R.O.T.E
Certificate of Inspection, Report of Thorough Examination, Visual, NDT Report and
And View Of Thorough Examination

20FT DRY CONTAINER


CRUU 306171 8

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE OF INSPECTION
Sertifikat Hasil Inspeksi
No. MIR.02/3890/VII/22
This is to certify that the equipment described herein has been inspected, examined & tested:
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Equipment Description : 20FT DRY CONTAINER
Unit Serial No : CRUU 306171 8
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,220 Kg
Payload : 28,260 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38.100 Kg
Manufactured by : CHINA NATIONAL MARINE CONTAINER.
Year Built/Year Used : 06/2001
Standard Reference : ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638
& EN ISO 23278
Place of Inspection : Lamongan Shorebase, Indonesia
Date of Inspection : July 27th ,2022
Valid Until : July 27th ,2023

The Inspection consisted of:


1. Review Document ( C.S.C )
2. Visual Inspection and Observation
3. Dimensional Measurement and Thorough Examination
4. NDT Implementation (NDT Before & After Load Test)
5. Load Test Implementation
6. Tagging Name Plate
7. Color Code

We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended

Lamongan, July 27th , 2022


PT. MIR ENGINEERING

I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
REPORT OF THOROUGH EXAMINATION LIFTING EQUIPMENT
This report complies with the Lifting Equipment Engineers Association Technical requirements
Date of Examination: July 27th , 2022 Date of Report: July 27th , 2022 Report number: LSB/004/27/VII/22

Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:

PT. LV LOGISTICS INDONESIA Lamongan, Indonesia


Nifarro Park, Jl. Raya Pasar Minggu No. 1 –Kec. Pasar Minggu- Jakarta Selatan
Identification Number: CRUU 306171 8 Max.Gross Date of Date of last thorough
Mass: manufacture examination:
Description and identification of the equipment:

20FT DRY CONTAINER 30,480 Kg 06/ 2001 Not Applicable


Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,220 Kg
Payload : 28,260 Kg
Proof Load Test : 38,100 Kg

Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278

Was the examination carried out:


Is this the first examination after installation
YES NO √ Within an interval of 6 months? YES NO √
or assembly at a new site or location?
Within an interval of 12
YES √ NO
months?
If the answer to the above question is YES In accordance with an
YES NO YES √ NO
has the equipment been installed examination scheme?
correctly? After the occurrence of
YES NO √
exceptional circumstances?
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
YES by:
None
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
Particulars of any tests carried out as part of the examination:
Visual Inspection, Dimensional Measurement, NDT Before & After Load test, Load Test,Thorough Examination, Plate Name & Color Code
IS THIS EQUIPMENT FIT FOR PURPOSE? YES √ NO
Name & Qualifications of person making Name of person authenticating this report: Latest date by which next thorough
this report: examination must be carried out:

July 27th,2023

Jonly Roger konhudt I Kade Suartana


LEEA INSPECTOR Reg#18901 TECHNICAL MANAGER
Name and address of employer of persons making and authenticating this report:

PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 23rd,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/004/23/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan Indonesia
Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-4
ID No : CRUU 306171 8 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,220 Kg ☒EN ISO 23278
Payload : 28,260 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

☒Magnetic ☐Dye Penetrant


Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2024
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- mm Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 23rd,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/004/23/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-4
ID No : CRUU 306171 8 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,220 Kg ☒EN ISO 23278
Payload : 28,260 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 306171 8

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 27th,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/004/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia
Customer : PT. LV LOGISTICS INDONESIA
Acceptance Criteria:
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER ☒ISO 1496-1
ID No : CRUU 306171 8
☒ISO 1496-4
Dimensional : 6060 X 2438 X 2591 (mm)
☒BS ISO 668
Tare Mass : 2,220 Kg
☒EN ISO 17638
Payload : 28,260 Kg
☒EN ISO 23278
Max. Gross Mass : 30.480 Kg
☒ISO 1161
Proof Load Test : 38.100 Kg
☒Magnetic ☐Dye Penetrant
Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2024
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- mm Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


Expired Date: July 27th , 2023
SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 27th,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/002/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER
☒ISO 1496-4
ID No : CRUU 306171 8
☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm)
☒EN ISO 17638
Tare Mass : 2,220 Kg
☒EN ISO 23278
Payload : 28,260 Kg
☒ISO 1161
Max. Gross Mass : 30.480 Kg
Proof Load Test : 38.100 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 306171 8

NAME PLATE & COLOR CODE

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


Expired Date: July 27th , 2023
SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Report No.
LSB/004/27/VII/22
VIEW OF PHOTOGRAPH VERIFICATION & THOROUGH
EXAMINATION 20FT DRY CONTAINER
SN. CRUU 306171 8

VIEW OF GENERAL STRUCTURAL CONTAINER


VIEW OF DATA PLATE MANUFACTURE
INSPECTION

EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
VISUAL INSPECTION BEFORE MPI ON THE TOP
VISUAL VIEW ON THE UNDER/BOTTOM FRAME
CORNER FITTING- ACC
CONTAINER INSPECTION - ACC

VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC

Lifting Inspector; Reviewed/Approved;

Jonly Roger Konhudt


LEEA INSPECTOR Reg#18901 I Kade Suartana
` Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : CRUU 306171 8
Location : Lamongan, Indonesia
Date : July 27th,2022
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Tidak Remarks
Ya Tidak Memenuhi
Memenuhi
Yes No Comply Not Comply
1. Document Review
Penelaahan Dokumen

Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar - - -

Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

2.2 Sambungan Diagonal Rangka


Utama
Bracing
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC

Sambungan bracing dengan


rangka utama
√ √ ACC
Joint between bracing with
main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.3 Sambungan Pojok


Corner Fitting

Rangka
Frame √ √ ACC

Dudukan pada rangka utama


Support at main frame √ √ ACC

Sambungan-sambungan
Joint √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

Dudukan Lifting Lug/ Corner


Fitting
√ √ ACC
Base Support of Lifting Lug/
Corner Fitting
2.4 Pemeriksaan Dalam & Lantai
Container
Internal & Floor Container
Kondisi Lantai
Floor Condition √ √ ACC

Kondisi dinding bagian dalam


Internal side wall condition √ √ ACC

2.5 Pintu
Door √ √ ACC

Rangka
Frame √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Dudukan
Support √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List

Customer : PT. LV LOGISTICS INDONESIA


User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : CRUU 306171 8
Location : Lamongan, Indonesia
Date : July 27th,2022

Verifikasi Hasil Verifikasi


Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.6 Dinding Pelindung


Protective Wall

Dudukan
Support √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

2.7 Area Pembebanan


Loading Area

Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC

Sambungan pada rangka utama


√ √ ACC
Joint at main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

3 Pengukuran Dimensi
Dimension Measurement

3.1 Pengukuran Dimensi Utama


Dimension Measurement √ √ ACC

Panjang: 6,060 mm
Length √ √ ACC

Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

3.2 Pengukuran ketebalan plat


Plate thickness measurement

Ketebalan plate dasar


Floor thickness plate √ ACC

Ketebalan plat dinding
Shell thickness plate √ √ ACC

3.3 Pengukuran dimensi Lifting Lug


Dimension of Lifting Lug Measurement √ √ ACC

Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.8 mm √ √ ACC
B (Side Hole) :75.3 mm
C (Side Hole): 75.5 mm
4 Pengujian
Testing

Uji tak merusak (Visual & MPI)


Non destructive testing (MPI/PENETRANT) √ √ ACC

Uji Beban
Load Test √ √ ACC

5 Struktur secara khusus


Specific Structure

Apakah posisi Corner Fitting sesuai dengan standard


ISO 1161, ISO 1496-1 & 4? √ √ ACC

How about the position of Corner Fitting, is it


comply with standard ISO 1161, ISO 1496-1 & 4? √ √ ACC

Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use

Inspected By:

Jonly Roger Konhudt


LEEA Inspector Reg# 18901

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Load Test and
Examination, Picture of Load test

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE NO: MIR.02/3890/04/VII/22
CUSTOMER NAME PT. LV LOGISTICS INDONESIA
CERTIFICATE OF USER PT. BP TANGGUH
ADDRESS Lamongan, Indonesia
LOAD TEST DATE OF TEST July 27th,2022
PLACE OF TEST Lamongan Shorebase, Indonesia
AND MANUFACTURED BY CHINA NATIONAL MARINE CONTAINER
CUSTOMER ORDER NO: 001/PO/MIR/BP/VII/22
EXAMINATION MIR JOB ORDER NO: -

TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 306171 8 38,100 Kg 2,220 Kg 28,260 Kg 30,480 Kg
Dimension: 6,060 X 2,438 X 2,591
(mm)

INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02

The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.

REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use

The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.

Valid Until: July 27th ,2023


I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PICTURE OF LOAD TEST
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No : CRUU 306171 8
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mass : 2,220 Kg
Payload : 28,260 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38,100 Kg
Manufactured by : CHINA NATIONAL MARINE CONTAINER
Location of Load Test : Lamongan, Indonesia
Date of Load Test : July 27th ,2023
Standard Reference : ISO 1161, ISO 1496-1 & 4, BS ISO 668, EN ISO 17638

Figure 2. Reading actual Load test at


19,190 Kg & 19,195 Kg on digital load
monitor.
Holding Time 5 Minutes “Passed”

Figure1. Load test Performance of 20FT DRY CONTAINER


SN: CRUU 306171 8 as per ISO 1161 & ISO 1496-1 & 4

Load Cell Operated By: Suryadi Reviewed By: I Kade Suartana

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Conformity
Drawing from CSC Scheme

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PT. MIR Engineering
The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Visual, NDT Report & R.O.T.E
Certificate of Inspection, Report of Thorough Examination, Visual, NDT Report and
And View Of Thorough Examination

20FT DRY CONTAINER


CRUU 133387 0

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE OF INSPECTION
Sertifikat Hasil Inspeksi
No. MIR.02/3894/VII/22
This is to certify that the equipment described herein has been inspected, examined & tested:
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Equipment Description : 20FT DRY CONTAINER
Unit Serial No : CRUU 133387 0
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,250 Kg
Payload : 28,230 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38.100 Kg
Manufactured by : TAICANG CIMC CONTAINER CO. LTD.
Year Built/Year Used : 10/2007
Standard Reference : ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638
& EN ISO 23278
Place of Inspection : Lamongan Shorebase, Indonesia
Date of Inspection : July 27th ,2022
Valid Until : July 27th ,2023

The Inspection consisted of:


1. Review Document ( C.S.C )
2. Visual Inspection and Observation
3. Dimensional Measurement and Thorough Examination
4. NDT Implementation (NDT Before & After Load Test)
5. Load Test Implementation
6. Tagging Name Plate
7. Color Code

We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended

Lamongan, July 27th , 2022


PT. MIR ENGINEERING

I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
REPORT OF THOROUGH EXAMINATION LIFTING EQUIPMENT
This report complies with the Lifting Equipment Engineers Association Technical requirements
Date of Examination: July 27th , 2022 Date of Report: July 27th , 2022 Report number: LSB/005/27/VII/22

Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:

PT. LV LOGISTICS INDONESIA Lamongan, Indonesia


Nifarro Park, Jl. Raya Pasar Minggu No. 1 – Kec. Pasar Minggu- Jakarta Selatan
Identification Number: CRUU 133387 0 Max.Gross Date of Date of last thorough
Mass: manufacture examination:
Description and identification of the equipment:

20FT DRY CONTAINER 30,480 Kg 10/2007 Not Applicable


Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,250 Kg
Payload : 28,230 Kg
Proof Load Test : 38,100 Kg

Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278

Was the examination carried out:


Is this the first examination after installation
YES NO √ Within an interval of 6 months? YES NO √
or assembly at a new site or location?
Within an interval of 12
YES √ NO
months?
If the answer to the above question is YES In accordance with an
YES NO YES √ NO
has the equipment been installed examination scheme?
correctly? After the occurrence of
YES NO √
exceptional circumstances?
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
YES by:
None
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
Particulars of any tests carried out as part of the examination:
Visual Inspection, Dimensional Measurement, NDT Before & After Load test, Load Test,Thorough Examination, Plate Name & Color Code
IS THIS EQUIPMENT FIT FOR PURPOSE? YES √ NO
Name & Qualifications of person making Name of person authenticating this report: Latest date by which next thorough
this report: examination must be carried out:

July 27th ,2023

Jonly Roger konhudt I Kade Suartana


LEEA INSPECTOR Reg#18901 TECHNICAL MANAGER
Name and address of employer of persons making and authenticating this report:

PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 24th ,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/005/24/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan Indonesia
Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-4
ID No : CRUU 133387 0 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,250 Kg ☒EN ISO 23278
Payload : 28,230 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

☒Magnetic ☐Dye Penetrant


Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2025
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- mm Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 24th ,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/005/24/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-4
ID No : CRUU 133387 0 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,250 Kg ☒EN ISO 23278
Payload : 28,230 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 133387 0

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 27th ,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/005/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia
Customer : PT. LV LOGISTICS INDONESIA
Acceptance Criteria:
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER ☒ISO 1496-1
ID No : CRUU 133387 0
☒ISO 1496-4
Dimensional : 6060 X 2438 X 2591 (mm)
☒BS ISO 668
Tare Mass : 2,250 Kg
☒EN ISO 17638
Payload : 28,230 Kg
☒EN ISO 23278
Max. Gross Mass : 30.480 Kg
☒ISO 1161
Proof Load Test : 38.100 Kg
☒Magnetic ☐Dye Penetrant
Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2025
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- mm Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


Expired Date: July 27th ,2023
SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 27th ,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/005/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER
☒ISO 1496-4
ID No : CRUU 133387 0
☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm)
☒EN ISO 17638
Tare Mass : 2,250 Kg
☒EN ISO 23278
Payload : 28,230 Kg
☒ISO 1161
Max. Gross Mass : 30.480 Kg
Proof Load Test : 38.100 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 133387 0

NAME PLATE & COLOR CODE

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


Expired Date: July 27th ,2023
SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Report No.
LSB/005/27/VII/22
VIEW OF PHOTOGRAPH VERIFICATION & THOROUGH
EXAMINATION 20FT DRY CONTAINER
SN. CRUU 133387 0

VIEW OF GENERAL STRUCTURAL CONTAINER


VIEW OF DATA PLATE MANUFACTURE
INSPECTION

EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
VISUAL INSPECTION BEFORE MPI ON THE TOP
VISUAL VIEW ON THE UNDER/BOTTOM FRAME
CORNER FITTING- ACC
CONTAINER INSPECTION - ACC

VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC

Lifting Inspector; Reviewed/Approved;

Jonly Roger Konhudt


LEEA INSPECTOR Reg#18901 I Kade Suartana
` Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : CRUU 133387 0
Location : Lamongan, Indonesia
Date : July 27th,2022
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Tidak Remarks
Ya Tidak Memenuhi
Memenuhi
Yes No Comply Not Comply
1. Document Review
Penelaahan Dokumen

Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar - - -

Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

2.2 Sambungan Diagonal Rangka


Utama
Bracing
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC

Sambungan bracing dengan


rangka utama
√ √ ACC
Joint between bracing with
main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.3 Sambungan Pojok


Corner Fitting

Rangka
Frame √ √ ACC

Dudukan pada rangka utama


Support at main frame √ √ ACC

Sambungan-sambungan
Joint √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

Dudukan Lifting Lug/ Corner


Fitting
√ √ ACC
Base Support of Lifting Lug/
Corner Fitting
2.4 Pemeriksaan Dalam & Lantai
Container
Internal & Floor Container
Kondisi Lantai
Floor Condition √ √ ACC

Kondisi dinding bagian dalam


Internal side wall condition √ √ ACC

2.5 Pintu
Door √ √ ACC

Rangka
Frame √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Dudukan
Support √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List

Customer : PT. LV LOGISTICS INDONESIA


User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : CRUU 133387 0
Location : Lamongan, Indonesia
Date : July 27th,2022

Verifikasi Hasil Verifikasi


Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.6 Dinding Pelindung


Protective Wall

Dudukan
Support √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

2.7 Area Pembebanan


Loading Area

Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC

Sambungan pada rangka utama


√ √ ACC
Joint at main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

3 Pengukuran Dimensi
Dimension Measurement

3.1 Pengukuran Dimensi Utama


Dimension Measurement √ √ ACC

Panjang: 6,060 mm
Length √ √ ACC

Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

3.2 Pengukuran ketebalan plat


Plate thickness measurement

Ketebalan plate dasar


Floor thickness plate √ ACC

Ketebalan plat dinding
Shell thickness plate √ √ ACC

3.3 Pengukuran dimensi Lifting Lug


Dimension of Lifting Lug Measurement

Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.3 mm √ √ ACC
5B (Side Hole) :75.3 mm
C (Side Hole): 75.5 mm
4 Pengujian
Testing

Uji tak merusak (Visual & MPI)


Non destructive testing (MPI/PENETRANT) √ √ ACC

Uji Beban
Load Test √ √ ACC

5 Struktur secara khusus


Specific Structure

Apakah posisi Corner Fitting sesuai dengan standard


ISO 1161, ISO 1496-1 & 4? √ √ ACC

How about the position of Corner Fitting, is it


comply with standard ISO 1161, ISO 1496-1 & 4? √ √ ACC

Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use

Inspected By:

Jonly Roger Konhudt


LEEA Inspector Reg# 18901

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Load Test and
Examination, Picture of Load test

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE NO: MIR.02/3893/05/VII/22
CUSTOMER NAME PT. LV LOGISTICS INDONESIA
CERTIFICATE OF USER PT. BP TANGGUH
ADDRESS Lamongan, Indonesia
LOAD TEST DATE OF TEST July 27th,2022
PLACE OF TEST Lamongan Shorebase, Indonesia
AND MANUFACTURED BY GUANDONG HYUNDAI MOBIS CO,LTD
CUSTOMER ORDER NO: 001/PO/MIR/BP/VII/22
EXAMINATION MIR JOB ORDER NO: -

TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 133387 0 38.100 Kg 2,250 Kg 28,230 Kg 30.480 Kg
Dimension: 6,060 X 2,438 X 2,591 (mm)

INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference a s BP Spec and ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02

The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.

REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use

The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.

Valid Until: July 27th ,2023


I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PICTURE OF LOAD TEST
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No : CRUU 133387 0
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mass : 2,250 Kg
Payload : 28,230 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38,100 Kg
Manufactured by : TAICANG CIMC CONTAINER CO. LTD.
Location of Load Test : Lamongan Shorebase, Indonesia
Date of Load Test : July 24th ,2022
Standard Reference : ISO 1161, ISO 1496-1 & 4, BS ISO 668, EN ISO 17638

Figure 2. Reading actual Load test at


19,330 Kg & 19,376 Kg on digital load
monitor.
Holding Time 5 Minutes “Passed”

Figure1. Load test Performance of 20FT DRY CONTAINER


SN: CRUU 133387 0 as per ISO 1161 & ISO 1496-1 & 4

Load Cell Operated By: Suryadi Reviewed By: I Kade Suartana

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Conformity
Drawing from CSC Scheme

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PT. MIR Engineering
The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Visual, NDT Report & R.O.T.E
Certificate of Inspection, Report of Thorough Examination, Visual, NDT Report and
And View Of Thorough Examination

20FT DRY CONTAINER


CRUU 382967 9

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE OF INSPECTION
Sertifikat Hasil Inspeksi
No. MIR.02/3895/VII/22
This is to certify that the equipment described herein has been inspected, examined & tested:
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Equipment Description : 20FT DRY CONTAINER
Unit Serial No : CRUU 382967 9
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,220 Kg
Payload : 28,260 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38.100 Kg
Manufactured by : DALIAN CIMC CONTAINERS CO. LTD.
Year Built/Year Used : 01/2007
Standard Reference : ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638
& EN ISO 23278
Place of Inspection : Lamongan Shorebase, Indonesia
Date of Inspection : July 27th ,2022
Valid Until : July 27th ,2023

The Inspection consisted of:


1. Review Document ( C.S.C )
2. Visual Inspection and Observation
3. Dimensional Measurement and Thorough Examination
4. NDT Implementation (NDT Before & After Load Test)
5. Load Test Implementation
6. Tagging Name Plate
7. Color Code

We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended

Lamongan, July 27th , 2022


PT. MIR ENGINEERING

I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
REPORT OF THOROUGH EXAMINATION LIFTING EQUIPMENT
This report complies with the Lifting Equipment Engineers Association Technical requirements
Date of Examination: July 27th , 2022 Date of Report: July 27th , 2022 Report number: LSB/006/27/VII/22

Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:

PT. LV LOGISTICS INDONESIA Lamongan, Indonesia


Nifarro Park, Jl. Raya Pasar Minggu No. 1 – Kec. Pasar Minggu- Jakarta Selatan
Identification Number: CRUU 382967 9 Max.Gross Date of Date of last thorough
Mass: manufacture examination:
Description and identification of the equipment:

20FT DRY CONTAINER 30,480 Kg 01/2007 Not Applicable


Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,220 Kg
Payload : 28,260 Kg
Proof Load Test : 38,100 Kg

Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278

Was the examination carried out:


Is this the first examination after installation
YES NO √ Within an interval of 6 months? YES NO √
or assembly at a new site or location?
Within an interval of 12
YES √ NO
months?
If the answer to the above question is YES In accordance with an
YES NO YES √ NO
has the equipment been installed examination scheme?
correctly? After the occurrence of
YES NO √
exceptional circumstances?
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
YES by:
None
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
Particulars of any tests carried out as part of the examination:
Visual Inspection, Dimensional Measurement, NDT Before & After Load test, Load Test,Thorough Examination, Plate Name & Color Code
IS THIS EQUIPMENT FIT FOR PURPOSE? YES √ NO
Name & Qualifications of person making Name of person authenticating this report: Latest date by which next thorough
this report: examination must be carried out:

July 27th ,2023

Jonly Roger konhudt I Kade Suartana


LEEA INSPECTOR Reg#18901 TECHNICAL MANAGER
Name and address of employer of persons making and authenticating this report:

PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 24th ,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/006/24/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan Indonesia
Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-4
ID No : CRUU 382967 9 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,220 Kg ☒EN ISO 23278
Payload : 28,260 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

☒Magnetic ☐Dye Penetrant


Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2025
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 24th ,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/006/24/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-4
ID No : CRUU 382967 9 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,220 Kg ☒EN ISO 23278
Payload : 28,260 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 382967 9

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 27th ,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/006/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia
Customer : PT. LV LOGISTICS INDONESIA
Acceptance Criteria:
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER ☒ISO 1496-1
ID No : CRUU 382967 9
☒ISO 1496-4
Dimensional : 6060 X 2438 X 2591 (mm)
☒BS ISO 668
Tare Mass : 2,220 Kg
☒EN ISO 17638
Payload : 28,260 Kg
☒EN ISO 23278
Max. Gross Mass : 30.480 Kg
☒ISO 1161
Proof Load Test : 38.100 Kg
☒Magnetic ☐Dye Penetrant
Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2025
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 27th ,2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 27th ,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/006/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT CONTAINER
☒ISO 1496-4
ID No : CRUU 382967 9
☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm)
☒EN ISO 17638
Tare Mass : 2,220 Kg
☒EN ISO 23278
Payload : 28,260 Kg
☒ISO 1161
Max. Gross Mass : 30.480 Kg
Proof Load Test : 38.100 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 382967 9

NAME PLATE & COLOR CODE

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 27th ,2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Report No.
LSB/006/27/VII/22
VIEW OF PHOTOGRAPH VERIFICATION & THOROUGH
EXAMINATION 20FT CONTAINER
SN. CRUU 382967 9

VIEW OF GENERAL STRUCTURAL CONTAINER


VIEW OF DATA PLATE MANUFACTURE
INSPECTION

EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
VISUAL INSPECTION BEFORE MPI ON THE TOP
VISUAL VIEW ON THE UNDER/BOTTOM FRAME
CORNER FITTING- ACC
CONTAINER INSPECTION - ACC

VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC

Lifting Inspector; Reviewed/Approved;

Jonly Roger Konhudt


LEEA INSPECTOR Reg#18901 I Kade Suartana
` Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP T ANGGUH
Description : 20FT DRYCONTAINER
ID No./Tag No. : CRUU 382967 9
Location : Lamongan, Indonesia
Date : July 27th,2022
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Tidak Remarks
Ya Tidak Memenuhi
Memenuhi
Yes No Comply Not Comply
1. Document Review
Penelaahan Dokumen

Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar - - -

Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

2.2 Sambungan Diagonal Rangka


Utama
Bracing
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC

Sambungan bracing dengan


rangka utama
√ √ ACC
Joint between bracing with
main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.3 Sambungan Pojok


Corner Fitting

Rangka
Frame √ √ ACC

Dudukan pada rangka utama


Support at main frame √ √ ACC

Sambungan-sambungan
Joint √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

Dudukan Lifting Lug/ Corner


Fitting
√ √ ACC
Base Support of Lifting Lug/
Corner Fitting
2.4 Pemeriksaan Dalam & Lantai
Container
Internal & Floor Container
Kondisi Lantai
Floor Condition √ √ ACC

Kondisi dinding bagian dalam


Internal side wall condition √ √ ACC

2.5 Pintu
Door √ √ ACC

Rangka
Frame - - N/A

Sambungan antar rangka


Joint between frame √ √ ACC

Dudukan
Support √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List

Customer : PT. LV LOGISTICS INDONESIA


User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : CRUU 382967 9
Location : Lamongan, Indonesia
Date : July 27th,2022

Verifikasi Hasil Verifikasi


Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.6 Dinding Pelindung


Protective Wall

Dudukan
Support √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

2.7 Area Pembebanan


Loading Area

Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC

Sambungan pada rangka utama


√ √ ACC
Joint at main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

3 Pengukuran Dimensi
Dimension Measurement

3.1 Pengukuran Dimensi Utama


Dimension Measurement √ √ ACC

Panjang: 6,060 mm
Length √ √ ACC

Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

3.2 Pengukuran ketebalan plat


Plate thickness measurement

Ketebalan plate dasar


Floor thickness plate √ ACC

Ketebalan plat dinding
Shell thickness plate √ √ ACC

3.3 Pengukuran dimensi Lifting Lug


Dimension of Lifting Lug Measurement

Tebal plate: -mm


Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.3 mm √ √ ACC
B (Side Hole) :75.3 mm
C (Side Hole): 75.1 mm
4 Pengujian
Testing

Uji tak merusak (Visual & MPI)


Non destructive testing (MPI/PENETRANT) √ √ ACC

Uji Beban
Load Test √ √ ACC

5 Struktur secara khusus


Specific Structure

Apakah posisi Corner Fitting sesuai dengan standard


ISO 1161, ISO 1496-1 & 4? √ √ ACC

How about the position of Corner Fitting, is it


comply with standard ISO 1161, ISO 1496-1 & 4? √ √ ACC

Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use

Inspected By:

Jonly Roger Konhudt


LEEA Inspector Reg# 18901

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Load Test and
Examination, Picture of Load test

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE NO: MIR.02/3895/06/VII/22
CUSTOMER NAME PT. LV LOGISTICS INDONESIA
CERTIFICATE OF USER PT. BP TANGGUH
ADDRESS Lamongan, Indonesia
LOAD TEST DATE OF TEST July 27th,2022
PLACE OF TEST Lamongan Shorebase, Indonesia
AND MANUFACTURED BY DALIAN CIMC CONTAINERS CO. LTD
CUSTOMER ORDER NO: 001/PO/MIR/BP/VII/22
EXAMINATION MIR JOB ORDER NO: -

TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 382967 9 38.100 Kg 2,220 Kg 28,260 Kg 30.480 Kg
Dimension: 6,060 X 2,438 X 2,591 (mm)

INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02

The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.

REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use

The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.

Valid Until: July 27th ,2023


I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PICTURE OF LOAD TEST
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No : CRUU 382967 9
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mass : 2,220 Kg
Payload : 28,260 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38,100 Kg
Manufactured by : DALIAN CIMC CONTAINERS CO. LTD.
Location of Load Test : Lamongan Shorebase, Indonesia
Date of Load Test : July 27th ,2022
Standard Reference : ISO 1161, ISO 1496-1 & 4, BS ISO 668, EN ISO 17638

Figure 2. Reading actual Load test at


19,195 Kg & 19,190 Kg on digital load
monitor.
Holding Time 5 Minutes “Passed”

Figure1. Load test Performance of 20FT DRY CONTAINER


SN: CRUU 382967 9 as per ISO 1161 & ISO 1496-1 & 4

Load Cell Operated By: Suryadi Reviewed By: I Kade Suartana

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Conformity
Drawing from CSC Scheme

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PT. MIR Engineering
The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Visual, NDT Report & R.O.T.E
Certificate of Inspection, Report of Thorough Examination, Visual, NDT Report and
And View Of Thorough Examination

20FT DRY CONTAINER


CRUU 054464 6

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE OF INSPECTION
Sertifikat Hasil Inspeksi
No. MIR.02/3896/VII/22
This is to certify that the equipment described herein has been inspected, examined & tested:
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Equipment Description : 20FT DRY CONTAINER
Unit Serial No : CRUU 054464 6
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,200 Kg
Payload : 28,280 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38.100 Kg
Manufactured by : SHANGHAI BOASAN PASIFIC CONTAINER CO. LTD.
Year Built/Year Used : 01/2007
Standard Reference : ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638
& EN ISO 23278
Place of Inspection : Lamongan Shorebase, Indonesia
Date of Inspection : July 27th ,2022
Valid Until : July 27th ,2023

The Inspection consisted of:


1. Review Document ( C.S.C )
2. Visual Inspection and Observation
3. Dimensional Measurement and Thorough Examination
4. NDT Implementation (NDT Before & After Load Test)
5. Load Test Implementation
6. Tagging Name Plate
7. Color Code

We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended

Lamongan, July 27th , 2022


PT. MIR ENGINEERING

I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
REPORT OF THOROUGH EXAMINATION LIFTING EQUIPMENT
This report complies with the Lifting Equipment Engineers Association Technical requirements
Date of Examination: July 27th , 2022 Date of Report: July 27th , 2022 Report number: LSB/007/27/VII/22

Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:

PT. LV LOGISTICS INDONESIA Lamongan, Indonesia


Nifarro Park, Jl. Raya Pasar Minggu No. 1 – Kec. Pasar Minggu- Jakarta Selatan
Identification Number: CRUU 054464 6 Max.Gross Date of Date of last thorough
Mass: manufacture examination:
Description and identification of the equipment:

20FT CONTAINER 30,480 Kg 01/2007 Not Applicable


Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,200 Kg
Payload : 28,280 Kg
Proof Load Test : 38,100 Kg

Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278

Was the examination carried out:


Is this the first examination after installation
YES NO √ Within an interval of 6 months? YES NO √
or assembly at a new site or location?
Within an interval of 12
YES √ NO
months?
If the answer to the above question is YES In accordance with an
YES NO YES √ NO
has the equipment been installed examination scheme?
correctly? After the occurrence of
YES NO √
exceptional circumstances?
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
YES by:
None
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
Particulars of any tests carried out as part of the examination:
Visual Inspection, Dimensional Measurement, NDT Before & After Load test, Load Test,Thorough Examination, Plate Name & Color Code
IS THIS EQUIPMENT FIT FOR PURPOSE? YES √ NO
Name & Qualifications of person making Name of person authenticating this report: Latest date by which next thorough
this report: examination must be carried out:

July 27th ,2023

Jonly Roger konhudt I Kade Suartana


LEEA INSPECTOR Reg#18901 TECHNICAL MANAGER
Name and address of employer of persons making and authenticating this report:

PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 24th ,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/007/24/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan Indonesia
Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-4
ID No : CRUU 054464 6 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,200 Kg ☒EN ISO 23278
Payload : 28,280 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

☒Magnetic ☐Dye Penetrant


Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2025
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- mm Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 24th ,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/007/24/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT CONTAINER ☒ISO 1496-4
ID No : CRUU 054464 6 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,200 Kg ☒EN ISO 23278
Payload : 28,280 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 054464 6

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 27th ,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/007/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia
Customer : PT. LV LOGISTICS INDONESIA
Acceptance Criteria:
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER ☒ISO 1496-1
ID No : CRUU 054464 6
☒ISO 1496-4
Dimensional : 6060 X 2438 X 2591 (mm)
☒BS ISO 668
Tare Mass : 2,200 Kg
☒EN ISO 17638
Payload : 28,280 Kg
☒EN ISO 23278
Max. Gross Mass : 30.480 Kg
☒ISO 1161
Proof Load Test : 38.100 Kg
☒Magnetic ☐Dye Penetrant
Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2025
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- mm Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 27th ,2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 27th ,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/007/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT CONTAINER
☒ISO 1496-4
ID No : CRUU 054464 6
☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm)
☒EN ISO 17638
Tare Mass : 2,200 Kg
☒EN ISO 23278
Payload : 28,280 Kg
☒ISO 1161
Max. Gross Mass : 30.480 Kg
Proof Load Test : 38.100 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 054464 6

NAME PLATE & COLOR CODE

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 27th ,2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Report No.
LSB/007/27/VII/22
VIEW OF PHOTOGRAPH VERIFICATION & THOROUGH
EXAMINATION 20FT DRY CONTAINER
SN. CRUU 054464 6

VIEW OF GENERAL STRUCTURAL CONTAINER


VIEW OF DATA PLATE MANUFACTURE
INSPECTION

EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
VISUAL INSPECTION BEFORE MPI ON THE TOP
VISUAL VIEW ON THE UNDER/BOTTOM FRAME
CORNER FITTING- ACC
CONTAINER INSPECTION - ACC

VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC

Lifting Inspector; Reviewed/Approved;

Jonly Roger Konhudt


LEEA INSPECTOR Reg#18901 I Kade Suartana
` Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : CRUU 054464 6
Location : Lamongan, Indonesia
Date : July 27th,2022
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Tidak Remarks
Ya Tidak Memenuhi
Memenuhi
Yes No Comply Not Comply
1. Document Review
Penelaahan Dokumen

Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ C.O.C
Technic data
Drawing Design
Desain Gambar √ √ Acc

Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

2.2 Sambungan Diagonal Rangka


Utama
Bracing
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC

Sambungan bracing dengan


rangka utama
√ √ ACC
Joint between bracing with
main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.3 Sambungan Pojok


Corner Fitting

Rangka
Frame √ √ ACC

Dudukan pada rangka utama


Support at main frame √ √ ACC

Sambungan-sambungan
Joint √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

Dudukan Lifting Lug/ Corner


Fitting
√ √ ACC
Base Support of Lifting Lug/
Corner Fitting
2.4 Pemeriksaan Dalam & Lantai
Container
Internal & Floor Container
Kondisi Lantai
Floor Condition √ √ ACC

Kondisi dinding bagian dalam


Internal side wall condition √ √ ACC

2.5 Pintu
Door √ √ ACC

Rangka
Frame √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Dudukan
Support √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List

Customer : PT. LV LOGISTICS INDONESIA


User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : CRUU 054464 6
Location : Lamongan, Indonesia
Date : July 27th,2022

Verifikasi Hasil Verifikasi


Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.6 Dinding Pelindung


Protective Wall

Dudukan
Support √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

2.7 Area Pembebanan


Loading Area

Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC

Sambungan pada rangka utama


√ √ ACC
Joint at main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

3 Pengukuran Dimensi
Dimension Measurement

3.1 Pengukuran Dimensi Utama


Dimension Measurement √ √ ACC

Panjang: 6,060 mm
Length √ √ ACC

Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

3.2 Pengukuran ketebalan plat


Plate thickness measurement

Ketebalan plate dasar


Floor thickness plate √ ACC

Ketebalan plat dinding
Shell thickness plate √ √ ACC

3.3 Pengukuran dimensi Lifting Lug


Dimension of Lifting Lug Measurement √ √ ACC

Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.3 mm √ √ ACC
B (Side Hole) :75.3 mm
C (Side Hole): 75.6 mm
4 Pengujian
Testing

Uji tak merusak (Visual & MPI)


Non destructive testing (MPI/PENETRANT) √ √ ACC

Uji Beban
Load Test √ √ ACC

5 Struktur secara khusus


Specific Structure

Apakah posisi Corner Fitting sesuai dengan standard


ISO 1161, ISO 1496-1 & 4? √ √ ACC

How about the position of Corner Fitting, is it


comply with standard ISO 1161, ISO 1496-1 & 4? √ √ ACC

Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use

Inspected By:

Jonly Roger Konhudt


LEEA Inspector Reg# 18901

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Load Test and
Examination, Picture of Load test

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE NO: MIR.02/3896/07/VII/22
CUSTOMER NAME PT. LV LOGISTICS INDONESIA
CERTIFICATE OF USER PT. BP TANGGUH
ADDRESS Lamongan, Indonesia
LOAD TEST DATE OF TEST July 27th,2022
PLACE OF TEST Lamongan Shorebase, Indonesia
AND MANUFACTURED BY SHANGHAI BOASAN PASIFIC
CONTAINER CO. LTD
EXAMINATION CUSTOMER ORDER NO: 001/PO/MIR/BP/VII/22
MIR JOB ORDER NO: -

TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 054464 6 38.100 Kg 2,200 Kg 28,280 Kg 30.480 Kg
Dimension: 6,060 X 2,438 X 2,591 (mm)

INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02

The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.

REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use

The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.

Valid Until: July 27th ,2023


I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PICTURE OF LOAD TEST
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No : CRUU 054464 6
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mass : 2,200 Kg
Payload : 28,280 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38,100 Kg
Manufactured by : SHANGHAI BOASAN PASIFIC CONTAINER CO. LTD.
Location of Load Test : Lamongan Shorebase, Indonesia
Date of Load Test : July 27th ,2022
Standard Reference : ISO 1161, ISO 1496-1 & 4, BS ISO 668, EN ISO 17638

Figure 2. Reading actual Load test at


19,050 Kg & 19,050 Kg on digital load
monitor.
Holding Time 5 Minutes “Passed”

Figure1. Load test Performance of 20FT DRY CONTAINER


SN: CRUU 054464 6 as per ISO 1161 & ISO 1496-1 & 4

Load Cell Operated By: Suryadi Reviewed By: I Kade Suartana

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Conformity
Drawing from CSC Scheme

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PT. MIR Engineering
The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Visual, NDT Report & R.O.T.E
Certificate of Inspection, Report of Thorough Examination, Visual, NDT Report and
And View Of Thorough Examination

20FT DRY CONTAINER


CRUU 226087 0

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE OF INSPECTION
Sertifikat Hasil Inspeksi
No. MIR.02/3897/VII/22
This is to certify that the equipment described herein has been inspected, examined & tested:
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Equipment Description : 20FT DRY CONTAINER
Unit Serial No : CRUU 226087 0
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,220 Kg
Payload : 28,260 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38.100 Kg
Manufactured by : SHANGHAI PASIFIC CONTAINER CO. LTD.
Year Built/Year Used : 06/2007
Standard Reference : ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638
& EN ISO 23278
Place of Inspection : Lamongan Shorebase, Indonesia
Date of Inspection : July 27th ,2022
Valid Until : July 27th ,2023

The Inspection consisted of:


1. Review Document ( C.S.C )
2. Visual Inspection and Observation
3. Dimensional Measurement and Thorough Examination
4. NDT Implementation (NDT Before & After Load Test)
5. Load Test Implementation
6. Tagging Name Plate
7. Color Code

We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended

Lamongan, July 27th , 2022


PT. MIR ENGINEERING

I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
REPORT OF THOROUGH EXAMINATION LIFTING EQUIPMENT
This report complies with the Lifting Equipment Engineers Association Technical requirements
Date of Examination: July 27th , 2022 Date of Report: July 27th , 2022 Report number: LSB/008/27/VII/22

Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:

PT. LV LOGISTICS INDONESIA Lamongan, Indonesia


Nifarro Park, Jl. Raya Pasar Minggu No. 1 – Kec. Pasar Minggu- Jakarta Selatan
Identification Number: CRUU 226087 0 Max.Gross Date of Date of last thorough
Mass: manufacture examination:
Description and identification of the equipment:

20FT DRY CONTAINER 30,480 Kg 06/2007 Not Applicable


Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,220 Kg
Payload : 28,260 Kg
Proof Load Test : 38,100 Kg

Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278

Was the examination carried out:


Is this the first examination after installation
YES NO √ Within an interval of 6 months? YES NO √
or assembly at a new site or location?
Within an interval of 12
YES √ NO
months?
If the answer to the above question is YES In accordance with an
YES NO YES √ NO
has the equipment been installed examination scheme?
correctly? After the occurrence of
YES NO √
exceptional circumstances?
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
YES by:
None
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
Particulars of any tests carried out as part of the examination:
Visual Inspection, Dimensional Measurement, NDT Before & After Load test, Load Test,Thorough Examination, Plate Name & Color Code
IS THIS EQUIPMENT FIT FOR PURPOSE? YES √ NO
Name & Qualifications of person making Name of person authenticating this report: Latest date by which next thorough
this report: examination must be carried out:

July 27th ,2023

Jonly Roger konhudt I Kade Suartana


LEEA INSPECTOR Reg#18901 TECHNICAL MANAGER
Name and address of employer of persons making and authenticating this report:

PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 24th ,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/008/24/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan Indonesia
Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-4
ID No : CRUU 226087 0 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,220 Kg ☒EN ISO 23278
Payload : 28,260 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

☒Magnetic ☐Dye Penetrant


Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2025
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 24th ,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/008/24/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-4
ID No : CRUU 226087 0 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,220 Kg ☒EN ISO 23278
Payload : 28,260 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 226087 0

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 27th ,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/008/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia
Customer : PT. LV LOGISTICS INDONESIA
Acceptance Criteria:
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER ☒ISO 1496-1
ID No : CRUU 226087 0
☒ISO 1496-4
Dimensional : 6060 X 2438 X 2591 (mm)
☒BS ISO 668
Tare Mass : 2,220 Kg
☒EN ISO 17638
Payload : 28,260 Kg
☒EN ISO 23278
Max. Gross Mass : 30.480 Kg
☒ISO 1161
Proof Load Test : 38.100 Kg
☒Magnetic ☐Dye Penetrant
Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2025
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 27th, 2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 27th ,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/008/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER
☒ISO 1496-4
ID No : CRUU 226087 0
☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm)
☒EN ISO 17638
Tare Mass : 2,220 Kg
☒EN ISO 23278
Payload : 28,260 Kg
☒ISO 1161
Max. Gross Mass : 30.480 Kg
Proof Load Test : 38.100 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 226087 0

NAME PLATE & COLOR CODE

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 27th, 2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Report No.
LSB/008/27/VII/22
VIEW OF PHOTOGRAPH VERIFICATION & THOROUGH
EXAMINATION 20FT DRY CONTAINER
SN. CRUU 226087 0

VIEW OF GENERAL STRUCTURAL CONTAINER


VIEW OF DATA PLATE MANUFACTURE
INSPECTION

EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
VISUAL INSPECTION BEFORE MPI ON THE TOP
VISUAL VIEW ON THE UNDER/BOTTOM FRAME
CORNER FITTING- ACC
CONTAINER INSPECTION - ACC

VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC

Lifting Inspector; Reviewed/Approved;

Jonly Roger Konhudt


LEEA INSPECTOR Reg#18901 I Kade Suartana
` Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : CRUU 226087 0
Location : Lamongan, Indonesia
Date : July 27th,2022
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Tidak Remarks
Ya Tidak Memenuhi
Memenuhi
Yes No Comply Not Comply
1. Document Review
Penelaahan Dokumen

Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar - - -

Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

2.2 Sambungan Diagonal Rangka


Utama
Bracing
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC

Sambungan bracing dengan


rangka utama
√ √ ACC
Joint between bracing with
main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.3 Sambungan Pojok


Corner Fitting

Rangka
Frame √ √ ACC

Dudukan pada rangka utama


Support at main frame √ √ ACC

Sambungan-sambungan
Joint √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

Dudukan Lifting Lug/ Corner


Fitting
√ √ ACC
Base Support of Lifting Lug/
Corner Fitting
2.4 Pemeriksaan Dalam & Lantai
Container
Internal & Floor Container
Kondisi Lantai
Floor Condition √ √ ACC

Kondisi dinding bagian dalam


Internal side wall condition √ √ ACC

2.5 Pintu
Door √ √ ACC

Rangka
Frame √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Dudukan
Support √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List

Customer : PT. LV LOGISTICS INDONESIA


User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : CRUU 226087 0
Location : Lamongan, Indonesia
Date : July 27th,2022

Verifikasi Hasil Verifikasi


Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.6 Dinding Pelindung


Protective Wall

Dudukan
Support √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

2.7 Area Pembebanan


Loading Area

Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC

Sambungan pada rangka utama


√ √ ACC
Joint at main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

3 Pengukuran Dimensi
Dimension Measurement

3.1 Pengukuran Dimensi Utama


Dimension Measurement √ √ ACC

Panjang: 6,060 mm
Length √ √ ACC

Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

3.2 Pengukuran ketebalan plat


Plate thickness measurement

Ketebalan plate dasar


Floor thickness plate √ ACC

Ketebalan plat dinding
Shell thickness plate √ √ ACC

3.3 Pengukuran dimensi Lifting Lug


Dimension of Lifting Lug Measurement

Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.7 mm √ √ ACC
B (Side Hole) :75.1 mm
C (Side Hole): 75.5 mm
4 Pengujian
Testing

Uji tak merusak (Visual & MPI)


Non destructive testing (MPI/PENETRANT) √ √ ACC

Uji Beban
Load Test √ √ ACC

5 Struktur secara khusus


Specific Structure

Apakah posisi Corner Fitting sesuai dengan standard


ISO 1161, ISO 1496-1 & 4? √ √ ACC

How about the position of Corner Fitting, is it


comply with standard ISO 1161, ISO 1496-1 & 4? √ √ ACC

Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use

Inspected By:

Jonly Roger Konhudt


LEEA Inspector Reg# 18901

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Load Test and
Examination, Picture of Load test

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE NO: MIR.02/3896/08/VII/22
CUSTOMER NAME PT. LV LOGISTICS INDONESIA
CERTIFICATE OF USER PT. BP TANGGUH
ADDRESS Lamongan, Indonesia
LOAD TEST DATE OF TEST July 27th,2022
PLACE OF TEST Lamongan Shorebase, Indonesia
AND MANUFACTURED BY SHANGHAI PASIFIC CONTAINER CO.
LTD
EXAMINATION CUSTOMER ORDER NO: 001/PO/MIR/BP/VII/22
MIR JOB ORDER NO: -

TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 226087 0 38.100 Kg 2,220 Kg 28,260 Kg 30.480 Kg
Dimension: 6,060 X 2,438 X 2,591 (mm)

INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02

The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.

REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use

The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.

Valid Until: July 27th ,2023


I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PICTURE OF LOAD TEST
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No : CRUU 226087 0
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mass : 2,220 Kg
Payload : 28,260 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38,100 Kg
Manufactured by : SHANGHAI PASIFIC CONTAINER CO. LTD.
Location of Load Test : Lamongan Shorebase, Indonesia
Date of Load Test : July 27th, 2022
Standard Reference : ISO 1161, ISO 1496-1 & 4, BS ISO 668, EN ISO 17638

Figure 2. Reading actual Load test at


19.150 & 19.266 Kg on digital load
monitor.
Holding Time 5 Minutes “Passed”

Figure1. Load test Performance of 20FT CONTAINER


SN: CRUU 226087 0 as per ISO 1161 & ISO 1496-1 & 4

Load Cell Operated By: Suryadi Reviewed By: I Kade Suartana

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Conformity
Drawing from CSC Scheme

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PT. MIR Engineering
The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Visual, NDT Report & R.O.T.E
Certificate of Inspection, Report of Thorough Examination, Visual, NDT Report and
And View Of Thorough Examination

20FT DRY CONTAINER


CRUU 260195 6

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE OF INSPECTION
Sertifikat Hasil Inspeksi
No. MIR.02/3898/VII/22
This is to certify that the equipment described herein has been inspected, examined & tested:
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Equipment Description : 20FT DRY CONTAINER
Unit Serial No : CRUU 260195 6
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,180 Kg
Payload : 28,300 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38.100 Kg
Manufactured by : SHANGHAI BOASAN PASIFIC CONTAINER CO. LTD.
Year Built/Year Used : 07/2007
Standard Reference : ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638
& EN ISO 23278
Place of Inspection : Lamongan Shorebase, Indonesia
Date of Inspection : July 27th ,2022
Valid Until : July 27th ,2023

The Inspection consisted of:


1. Review Document ( C.S.C )
2. Visual Inspection and Observation
3. Dimensional Measurement and Thorough Examination
4. NDT Implementation (NDT Before & After Load Test)
5. Load Test Implementation
6. Tagging Name Plate
7. Color Code

We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended

Lamongan, July 27th , 2022


PT. MIR ENGINEERING

I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
REPORT OF THOROUGH EXAMINATION LIFTING EQUIPMENT
This report complies with the Lifting Equipment Engineers Association Technical requirements
Date of Examination: July 27th , 2022 Date of Report: July 27th , 2022 Report number: LSB/009/27/VII/22

Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:

PT. LV LOGISTICS INDONESIA Lamongan, Indonesia


Nifarro Park, Jl. Raya Pasar Minggu No. 1 – Kec. Pasar Minggu- Jakarta Selatan
Identification Number: CRUU 260195 6 Max.Gross Date of Date of last thorough
Mass: manufacture examination:
Description and identification of the equipment:

20FT DRY CONTAINER 30,480 Kg 07/2007 Not Applicable


Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,180 Kg
Payload : 28,300 Kg
Proof Load Test : 38,100 Kg

Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278

Was the examination carried out:


Is this the first examination after installation
YES NO √ Within an interval of 6 months? YES NO √
or assembly at a new site or location?
Within an interval of 12
YES √ NO
months?
If the answer to the above question is YES In accordance with an
YES NO YES √ NO
has the equipment been installed examination scheme?
correctly? After the occurrence of
YES NO √
exceptional circumstances?
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
YES by:
None
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
Particulars of any tests carried out as part of the examination:
Visual Inspection, Dimensional Measurement, NDT Before & After Load test, Load Test,Thorough Examination, Plate Name & Color Code
IS THIS EQUIPMENT FIT FOR PURPOSE? YES √ NO
Name & Qualifications of person making Name of person authenticating this report: Latest date by which next thorough
this report: examination must be carried out:

July 27th ,2023

Jonly Roger konhudt I Kade Suartana


LEEA INSPECTOR Reg#18901 TECHNICAL MANAGER
Name and address of employer of persons making and authenticating this report:

PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 24th ,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/009/24/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan Indonesia
Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-4
ID No : CRUU 260195 6 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,180 Kg ☒EN ISO 23278
Payload : 28,300 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

☒Magnetic ☐Dye Penetrant


Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2025
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 24th ,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/009/24/VII/22
(BEFORE LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-4
ID No : CRUU 260195 6 ☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,180 Kg ☒EN ISO 23278
Payload : 28,300 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 260195 6

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
Before Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 27th ,2022
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/009/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia
Customer : PT. LV LOGISTICS INDONESIA
Acceptance Criteria:
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER ☒ISO 1496-1
ID No : CRUU 260195 6
☒ISO 1496-4
Dimensional : 6060 X 2438 X 2591 (mm)
☒BS ISO 668
Tare Mass : 2,180 Kg
☒EN ISO 17638
Payload : 28,300 Kg
☒EN ISO 23278
Max. Gross Mass : 30.480 Kg
☒ISO 1161
Proof Load Test : 38.100 Kg
☒Magnetic ☐Dye Penetrant
Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☐ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2025
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 27th ,2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 27rd,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/009/27/VII/22
(AFTER LOAD TEST)
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER
☒ISO 1496-4
ID No : CRUU 260195 6
☒BS ISO 668
Dimensional : 6060 X 2438 X 2591 (mm)
☒EN ISO 17638
Tare Mass : 2,180 Kg
☒EN ISO 23278
Payload : 28,300 Kg
☒ISO 1161
Max. Gross Mass : 30.480 Kg
Proof Load Test : 38.100 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT DRY CONTAINER


SN. CRUU 260195 6

NAME PLATE & COLOR CODE

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT
After Load Test.
Visually The Structure Are In Good Condition.
During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 27th ,2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Report No.
LSB/009/27/VII/22
VIEW OF PHOTOGRAPH VERIFICATION & THOROUGH
EXAMINATION 20FT CONTAINER
SN. CRUU 260195 6

VIEW OF GENERAL STRUCTURAL CONTAINER


VIEW OF DATA PLATE MANUFACTURE
INSPECTION

EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
VISUAL INSPECTION BEFORE MPI ON THE TOP
VISUAL VIEW ON THE UNDER/BOTTOM FRAME
CORNER FITTING- ACC
CONTAINER INSPECTION - ACC

VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC

Lifting Inspector; Reviewed/Approved;

Jonly Roger Konhudt


LEEA INSPECTOR Reg#18901 I Kade Suartana
` Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : CRUU 260195 6
Location : Lamongan, Indonesia
Date : July 27th,2022
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Tidak Remarks
Ya Tidak Memenuhi
Memenuhi
Yes No Comply Not Comply
1. Document Review
Penelaahan Dokumen

Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar -

Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

2.2 Sambungan Diagonal Rangka


Utama
Bracing
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC

Sambungan bracing dengan


rangka utama
√ √ ACC
Joint between bracing with
main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.3 Sambungan Pojok


Corner Fitting

Rangka
Frame √ √ ACC

Dudukan pada rangka utama


Support at main frame √ √ ACC

Sambungan-sambungan
Joint √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

Dudukan Lifting Lug/ Corner


Fitting
√ √ ACC
Base Support of Lifting Lug/
Corner Fitting
2.4 Pemeriksaan Dalam & Lantai
Container
Internal & Floor Container
Kondisi Lantai
Floor Condition √ √ ACC

Kondisi dinding bagian dalam


Internal side wall condition √ √ ACC

2.5 Pintu
Door √ √ ACC

Rangka
Frame √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Dudukan
Support √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI CONTAINER
Container Inspection Check List

Customer : PT. LV LOGISTICS INDONESIA


User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : CRUU 260195 6
Location : Lamongan, Indonesia
Date : July 27th,2022

Verifikasi Hasil Verifikasi


Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.6 Dinding Pelindung


Protective Wall

Dudukan
Support √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

2.7 Area Pembebanan


Loading Area

Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC

Sambungan pada rangka utama


√ √ ACC
Joint at main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

3 Pengukuran Dimensi
Dimension Measurement

3.1 Pengukuran Dimensi Utama


Dimension Measurement √ √ ACC

Panjang: 6,060 mm
Length √ √ ACC

Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

3.2 Pengukuran ketebalan plat


Plate thickness measurement

Ketebalan plate dasar


Floor thickness plate √ ACC

Ketebalan plat dinding
Shell thickness plate √ √ ACC

3.3 Pengukuran dimensi Lifting Lug


Dimension of Lifting Lug Measurement √ √ ACC

Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.4 mm √ √ ACC
B (Side Hole) :75.5 mm
C (Side Hole): 75.4 mm
4 Pengujian
Testing

Uji tak merusak (Visual & MPI)


Non destructive testing (MPI/PENETRANT) √ √ ACC

Uji Beban
Load Test √ √ ACC

5 Struktur secara khusus


Specific Structure

Apakah posisi Corner Fitting sesuai dengan standard


ISO 1161, ISO 1496-1 & 4? √ √ ACC

How about the position of Corner Fitting, is it


comply with standard ISO 1161, ISO 1496-1 & 4? √ √ ACC

Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use

Inspected By:

Jonly Roger Konhudt


LEEA Inspector Reg# 18901

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Load Test and
Examination, Picture of Load test

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE NO: MIR.02/3898/09/VII/22
CUSTOMER NAME PT. LV LOGISTICS INDONESIA
CERTIFICATE OF USER PT. BP TANGGUH
ADDRESS Lamongan, Indonesia
LOAD TEST DATE OF TEST July 27th,2022
PLACE OF TEST Lamongan Shorebase, Indonesia
AND MANUFACTURED BY SHANGHAI PASIFIC CONTAINER CO.
LTD
EXAMINATION CUSTOMER ORDER NO: 001/PO/MIR/BP/VII/22
MIR JOB ORDER NO: -

TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 260195 6 38.100 Kg 2,180 Kg 28,300 Kg 30.480 Kg
Dimension: 6,060 X 2,438 X 2,591 (mm)

INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02

The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.

REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use

The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.

Valid Until: July 27th ,2023


I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PICTURE OF LOAD TEST
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No : CRUU 260195 6
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mass : 2,180 Kg
Payload : 28,300 Kg
Max. Gross Mass : 30,480 Kg
Proof Load Test : 38,100 Kg
Manufactured by : SHANGHAI BOASAN PASIFIC CONTAINER CO. LTD.
Location of Load Test : Lamongan Shorebase, Indonesia
Date of Load Test : July 27th, 2022
Standard Reference : ISO 1161, ISO 1496-1 & 4, BS ISO 668, EN ISO 17638

Figure 2. Reading actual Load test at


19,104 Kg & 19,100 on digital load
monitor.
Holding Time 5 Minutes “Passed”

Figure1. Load test Performance of 20FT DRY CONTAINER


SN: CRUU 260195 6 as per ISO 1161 & ISO 1496-1 & 4

Load Cell Operated By: Suryadi Reviewed By: I Kade Suartana

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Conformity
Drawing from CSC Scheme

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PT. MIR Engineering
The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Equipment Mobilization Approval/Persetujuan Mobilisasi Peralatan
(To be completed and approved prior to dispatch to site/ Untuk dilengkapi sebelum pengiriman ke kawasan)
A Contractor's Equipment Data / Data Peralatan Kontraktor
Type of Equipment:
1 SPECIFIC PURPOSE EQUIPMENT
Jenis Peralatan

4 UNIT of 20FT ISO DRY CONTAINER


Number of Equipment:
2 SERIAL NUMBER: RFCU 203353 9, TDTU 404671 3, TDRU 399110 0,
Jumlah Peralatan HDMU 259937 4

Usage: Explain in detail exact use and


location of use
3 To Move Chemical at Tangguh Site
Penggunaan: Jelaskan secara terperinci
penggunaan dan lokasinya
Contractor Name:
4 PT. LV LOGISTICS INDONESIA
Nama Kontraktor
Contract Name: PROVISION OF
5
Nama Kontrak INTEGRATED FREIGHT FORWARDING SERVICES
Contract Period:
6 3 Years
Periode Kontrak
Sub-Contractor:
7
Sub Kontraktor
Physically Checked and Verified by:
B Summary Inspection
Diperiksa secara fisik dan diverifikasi oleh
Name Position Sign
Nama Jabatan Tanda Tangan
Certification Check: See attached
1 Yes/No Jonly Roger Konhudt Inspector
Pemeriksaan Sertifikasi Inspection Report
Physically Checked See attached
2 Yes/No Jonly Roger Konhudt Inspector
Pemeriksaan Fisik Inspection Report
Load Tested: See attached
3 Yes/No Jonly Roger Konhudt Inspector
Uji Beban Inspection Report
I declare I have performed all tests and
inspection have performed is in safe condi-
tion to be used.
Maintenance record have been verified and no
defect exist to prevent it from safe operation
See attached
4 Saya mendeklarasikan bahwa Saya telah me- Jonly Roger Konhudt Inspector
Inspection Report
lakukan inspeksi dalam keadaan aman untuk
dioperasikan. Catatan perawatan telah dive-
rifikasi dan tidak ada kerusakan yang menga-
kibatkan tidak aman untuk dioperasikan

C Oroginator/ Dibuat oleh (Sub-contractor):


Name/ Nama Name/ Nama Function/ Dept Date/ Tanggal Signature/ Ttd
Single Point
Accountability

D Approval/ Persetujuan
EMA
1
COORDINATOR
BP CONSTRUCTION
2
MANAGER
Visual, NDT Report & R.O.T.E
Certificate of Inspection, Report of Thorough Examination, Visual, NDT Report and
And View Of Thorough Examination

20FT DRY CONTAINER


RFCU 203353 9

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE OF INSPECTION
Sertifikat Hasil Inspeksi
No. MIR.02//VII/22
This is to certify that the equipment described herein has been inspected, examined & tested:
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Equipment Description : 20FT DRY CONTAINER
Unit Serial No : RFCU 203353 9
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,200 Kg
Payload : 28,280 Kg
Max. Gross Mass : 30,480 Kg
Manufactured by : HUIZHOU PACIFIC CONTAINERCO.,LTD
Year Built/Year Used : 06/2008
Standard Reference : ISO 1496-1 & 2, ISO 668, ISO 1161 EN ISO 17638
& EN ISO 23278
Place of Inspection : Lamongan Shorebase, Indonesia
Date of Inspection : July 28th ,2022
Valid Until : July 28th ,2023

The Inspection consisted of:


1. Review Document ( C.O.C )
2. Visual Inspection and Observation
3. Dimensional Measurement and Thorough Examination
4. NDT Implementation
5. Tagging Name Plate
6. Color Code

We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended

Lamongan, July 28th , 2022


PT. MIR ENGINEERING

I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
REPORT OF THOROUGH EXAMINATION LIFTING EQUIPMENT
This report complies with the Lifting Equipment Engineers Association Technical requirements
Date of Examination: July 28th , 2022 Date of Report: July 28th , 2022 Report number: LSB/001/28/VII/22

Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:

PT. LV LOGISTICS INDONESIA Lamongan, Indonesia


Nifarro Park, Jl. Raya Pasar Minggu No. 1 –Kec. Pasar Minggu- Jakarta Selatan
Identification Number: RFCU 203353 9 Max.Gross Date of Date of last thorough
Mass: manufacture examination:
Description and identification of the equipment:

20FT DRY CONTAINER 30,480 Kg 06/ 2008 Not Applicable


Dimensional : 6058 X 2438 X 2591 (mm)
Tare Mas : 2,200 Kg
Payload : 28,280 Kg

Standard Reference: ISO 1496-1 & 2, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278

Was the examination carried out:


Is this the first examination after installation
YES NO √ Within an interval of 6 months? YES NO √
or assembly at a new site or location?
Within an interval of 12
YES √ NO
months?
If the answer to the above question is YES In accordance with an
YES NO YES √ NO
has the equipment been installed examination scheme?
correctly? After the occurrence of
YES NO √
exceptional circumstances?
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
YES by:
None
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
Particulars of any tests carried out as part of the examination:
Visual Inspection, Dimensional Measurement, NDT Test,Thorough Examination, Plate Name & Color Code
IS THIS EQUIPMENT FIT FOR PURPOSE? YES √ NO
Name & Qualifications of person making Name of person authenticating this report: Latest date by which next thorough
this report: examination must be carried out:

July 29th,2023

Jonly Roger konhudt I Kade Suartana


LEEA INSPECTOR Reg#18901 TECHNICAL MANAGER
Name and address of employer of persons making and authenticating this report:

PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 28th,2022

MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/001/28/VII/22


Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan Indonesia
Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-2
ID No : RFCU 203353 9 ☒BS ISO 668
Dimensional : 6058 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,200 Kg ☒EN ISO 23278
Payload : 28,280 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

☒Magnetic ☐Dye Penetrant


Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☒ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2024
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT

Visually The Structure Are In Good Condition.


During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 28th ,2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 28th,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/001/28/VII/22
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-2
ID No : RFCU 203353 9 ☒BS ISO 668
Dimensional : 6058 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,200 Kg ☒EN ISO 23278
Payload : 28,280 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT CONTAINER
SN. RFCU 203353 9

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT

Visually The Structure Are In Good Condition.


During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 29th ,2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Report No.
LSB/001/28/VII/22
VIEW OF PHOTOGRAPH VERIFICATION & THOROUGH
EXAMINATION 20FT CONTAINER
SN. RFCU 203353 9

VIEW OF GENERAL STRUCTURAL CONTAINER


VIEW OF DATA PLATE MANUFACTURE
INSPECTION

EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
VISUAL INSPECTION MPI ON THE TOP CORNER
VISUAL VIEW ON THE UNDER/BOTTOM TANK
FITTING- ACC
FRAME CONTAINER INSPECTION - ACC

MPI ON THE BOTTOM CORNER FITTING-ACC APPLICATED TAGGING NAME PLATE

Lifting Inspector; Reviewed/Approved;

Jonly Roger Konhudt


LEEA INSPECTOR Reg#18901 I Kade Suartana
` Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI ISO TANK
Container Inspection Check List
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : RFCU 203353 9
Location : Lamongan, Indonesia
Date : July 28th,2022
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Tidak Remarks
Ya Tidak Memenuhi
Memenuhi
Yes No Comply Not Comply
1. Document Review
Penelaahan Dokumen

Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ C.O.C
Technic data
Drawing Design
Desain Gambar √ √ ACC

Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

2.2 Sambungan Diagonal Rangka


Utama
Bracing
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC

Sambungan bracing dengan


rangka utama
√ √ ACC
Joint between bracing with
main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.3 Sambungan Pojok


Corner Fitting

Rangka
Frame √ √ ACC

Dudukan pada rangka utama


Support at main frame √ √ ACC

Sambungan-sambungan
Joint √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

Dudukan Lifting Lug/ Corner


Fitting
√ √ ACC
Base Support of Lifting Lug/
Corner Fitting
2.4 Pemeriksaan Dalam & Lantai
Container
Internal & Floor Container
Kondisi Lantai
Floor Condition √ √ ACC

Kondisi dinding bagian dalam


Internal side wall condition √ √ ACC

2.5 Pintu
Door √ √ ACC

Rangka
Frame √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Dudukan
Support √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI ISO TANK
Container Inspection Check List

Customer : PT. LV LOGISTICS INDONESIA


User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : RFCU 203353 9
Location : Lamongan, Indonesia
Date : July 28th,2022

Verifikasi Hasil Verifikasi


Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.6 Dinding Pelindung


Protective Wall

Dudukan
Support √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

2.7 Area Pembebanan


Loading Area

Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC

Sambungan pada rangka utama


√ √ ACC
Joint at main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

3 Pengukuran Dimensi
Dimension Measurement

3.1 Pengukuran Dimensi Utama


Dimension Measurement √ √ ACC

Panjang: 6,058 mm
Length √ √ ACC

Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

3.2 Pengukuran ketebalan plat


Plate thickness measurement

Ketebalan plate dasar


Floor thickness plate √ ACC

Ketebalan plat dinding
Shell thickness plate √ √ ACC

3.3 Pengukuran dimensi Lifting Lug


Dimension of Lifting Lug Measurement √ √ ACC

Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.4 mm √ √ ACC
B (Side Hole) :75.5 mm
C (Side Hole): 75.4 mm
4 Pengujian
Testing

Uji tak merusak (Visual & MPI)


Non destructive testing (MPI/PENETRANT) √ √ ACC

Uji Beban
Load Test √ √ ACC

5 Struktur secara khusus


Specific Structure

Apakah posisi Corner Fitting sesuai dengan standard


ISO 1161, ISO 1496-1 & 4? √ √ ACC

How about the position of Corner Fitting, is it


comply with standard ISO 1161, ISO 1496-1 & 4? √ √ ACC

Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use

Inspected By:

Jonly Roger Konhudt


LEEA Inspector Reg# 18901

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Conformity
Drawing from C.O.C Scheme

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PT. MIR Engineering
The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Visual, NDT Report & R.O.T.E
Certificate of Inspection, Report of Thorough Examination, Visual, NDT Report and
And View Of Thorough Examination

20FT DRY CONTAINER


TDTU 404671 3

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE OF INSPECTION
Sertifikat Hasil Inspeksi
No. MIR.02//VII/22
This is to certify that the equipment described herein has been inspected, examined & tested:
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Equipment Description : 20FT DRY CONTAINER
Unit Serial No : TDTU 404671 3
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,220 Kg
Payload : 28,260 Kg
Max. Gross Mass : 30,480 Kg
Manufactured by : TINAJING TIMC NORT OCEAN CONTAINER CO, LTD.
Year Built/Year Used : 02/2007
Standard Reference : ISO 1496-1 & 2, ISO 668, ISO 1161 EN ISO 17638
& EN ISO 23278
Place of Inspection : Lamongan Shorebase, Indonesia
Date of Inspection : July 29th ,2022
Valid Until : July 29th ,2023

The Inspection consisted of:


1. Review Document ( C.O.C )
2. Visual Inspection and Observation
3. Dimensional Measurement and Thorough Examination
4. NDT Implementation
5. Tagging Name Plate
6. Color Code

We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended

Lamongan, July 29th , 2022


PT. MIR ENGINEERING

I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
REPORT OF THOROUGH EXAMINATION LIFTING EQUIPMENT
This report complies with the Lifting Equipment Engineers Association Technical requirements
Date of Examination: July 29th , 2022 Date of Report: July 29th , 2022 Report number: LSB/001/29/VII/22

Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:

PT. LV LOGISTICS INDONESIA Lamongan, Indonesia


Nifarro Park, Jl. Raya Pasar Minggu No. 1 –Kec. Pasar Minggu- Jakarta Selatan
Identification Number: TDTU 404671 3 Max.Gross Date of Date of last thorough
Mass: manufacture examination:
Description and identification of the equipment:

20FT DRY CONTAINER 30,480 Kg 02/ 2007 Not Applicable


Dimensional : 6058 X 2438 X 2591 (mm)
Tare Mas : 2,220 Kg
Payload : 28,260 Kg

Standard Reference: ISO 1496-1 & 2, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278

Was the examination carried out:


Is this the first examination after installation
YES NO √ Within an interval of 6 months? YES NO √
or assembly at a new site or location?
Within an interval of 12
YES √ NO
months?
If the answer to the above question is YES In accordance with an
YES NO YES √ NO
has the equipment been installed examination scheme?
correctly? After the occurrence of
YES NO √
exceptional circumstances?
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
YES by:
None
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
Particulars of any tests carried out as part of the examination:
Visual Inspection, Dimensional Measurement, NDT Test,Thorough Examination, Plate Name & Color Code
IS THIS EQUIPMENT FIT FOR PURPOSE? YES √ NO
Name & Qualifications of person making Name of person authenticating this report: Latest date by which next thorough
this report: examination must be carried out:

July 29th,2023

Jonly Roger konhudt I Kade Suartana


LEEA INSPECTOR Reg#18901 TECHNICAL MANAGER
Name and address of employer of persons making and authenticating this report:

PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 29th,2022

MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/001/29/VII/22


Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan Indonesia
Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-2
ID No : TDTU 404671 3 ☒BS ISO 668
Dimensional : 6058 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,220 Kg ☒EN ISO 23278
Payload : 28,260 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

☒Magnetic ☐Dye Penetrant


Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☒ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2024
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT

Visually The Structure Are In Good Condition.


During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 29th ,2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 29th,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/001/29/VII/22
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-2
ID No : HDMU 404671 3 ☒BS ISO 668
Dimensional : 6058 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,220 Kg ☒EN ISO 23278
Payload : 28,260 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT CONTAINER
SN. TDTU 404671 3

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT

Visually The Structure Are In Good Condition.


During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 29th ,2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Report No.
LSB/001/30/VII/22
VIEW OF PHOTOGRAPH VERIFICATION & THOROUGH
EXAMINATION 20FT CONTAINER
SN. TDTU 404671 3

VIEW OF GENERAL STRUCTURAL CONTAINER


VIEW OF DATA PLATE MANUFACTURE
INSPECTION

EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
VISUAL INSPECTION MPI ON THE TOP CORNER
VISUAL VIEW ON THE UNDER/BOTTOM TANK
FITTING- ACC
FRAME CONTAINER INSPECTION - ACC

MPI ON THE BOTTOM CORNER FITTING-ACC APPLICATED TAGGING NAME PLATE

Lifting Inspector; Reviewed/Approved;

Jonly Roger Konhudt


LEEA INSPECTOR Reg#18901 I Kade Suartana
` Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI ISO TANK
Container Inspection Check List
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : TDTU 404671 3
Location : Lamongan, Indonesia
Date : July 29th,2022
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Tidak Remarks
Ya Tidak Memenuhi
Memenuhi
Yes No Comply Not Comply
1. Document Review
Penelaahan Dokumen

Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ C.O.C
Technic data
Drawing Design
Desain Gambar √ √ ACC

Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

2.2 Sambungan Diagonal Rangka


Utama
Bracing
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC

Sambungan bracing dengan


rangka utama
√ √ ACC
Joint between bracing with
main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.3 Sambungan Pojok


Corner Fitting

Rangka
Frame √ √ ACC

Dudukan pada rangka utama


Support at main frame √ √ ACC

Sambungan-sambungan
Joint √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

Dudukan Lifting Lug/ Corner


Fitting
√ √ ACC
Base Support of Lifting Lug/
Corner Fitting
2.4 Pemeriksaan Dalam & Lantai
Container
Internal & Floor Container
Kondisi Lantai
Floor Condition √ √ ACC

Kondisi dinding bagian dalam


Internal side wall condition √ √ ACC

2.5 Pintu
Door √ √ ACC

Rangka
Frame √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Dudukan
Support √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI ISO TANK
Container Inspection Check List

Customer : PT. LV LOGISTICS INDONESIA


User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : TDTU 404671 3
Location : Lamongan, Indonesia
Date : July 29th,2022

Verifikasi Hasil Verifikasi


Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.6 Dinding Pelindung


Protective Wall

Dudukan
Support √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

2.7 Area Pembebanan


Loading Area

Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC

Sambungan pada rangka utama


√ √ ACC
Joint at main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

3 Pengukuran Dimensi
Dimension Measurement

3.1 Pengukuran Dimensi Utama


Dimension Measurement √ √ ACC

Panjang: 6,058 mm
Length √ √ ACC

Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

3.2 Pengukuran ketebalan plat


Plate thickness measurement

Ketebalan plate dasar


Floor thickness plate √ ACC

Ketebalan plat dinding
Shell thickness plate √ √ ACC

3.3 Pengukuran dimensi Lifting Lug


Dimension of Lifting Lug Measurement √ √ ACC

Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.7 mm √ √ ACC
B (Side Hole) :75.8 mm
C (Side Hole): 75.2 mm
4 Pengujian
Testing

Uji tak merusak (Visual & MPI)


Non destructive testing (MPI/PENETRANT) √ √ ACC

Uji Beban
Load Test √ √ ACC

5 Struktur secara khusus


Specific Structure

Apakah posisi Corner Fitting sesuai dengan standard


ISO 1161, ISO 1496-1 & 4? √ √ ACC

How about the position of Corner Fitting, is it


comply with standard ISO 1161, ISO 1496-1 & 4? √ √ ACC

Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use

Inspected By:

Jonly Roger Konhudt


LEEA Inspector Reg# 18901

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Conformity
Drawing from C.O.C Scheme

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PT. MIR Engineering
The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Visual, NDT Report & R.O.T.E
Certificate of Inspection, Report of Thorough Examination, Visual, NDT Report and
And View Of Thorough Examination

20FT DRY CONTAINER


TDRU 399110 0

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE OF INSPECTION
Sertifikat Hasil Inspeksi
No. MIR.02//VII/22
This is to certify that the equipment described herein has been inspected, examined & tested:
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Equipment Description : 20FT DRY CONTAINER
Unit Serial No : TDRU 399110 0
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,220 Kg
Payload : 28,260 Kg
Max. Gross Mass : 30,480 Kg
Manufactured by : QINGDAO CIMC CONTAINER MANUFACTURE CO, LTD.
Year Built/Year Used : 03/2007
Standard Reference : ISO 1496-1 & 2, ISO 668, ISO 1161 EN ISO 17638
& EN ISO 23278
Place of Inspection : Lamongan Shorebase, Indonesia
Date of Inspection : July 29th ,2022
Valid Until : July 29th ,2023

The Inspection consisted of:


1. Review Document ( C.O.C )
2. Visual Inspection and Observation
3. Dimensional Measurement and Thorough Examination
4. NDT Implementation
5. Tagging Name Plate
6. Color Code

We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended

Lamongan, July 29th , 2022


PT. MIR ENGINEERING

I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
REPORT OF THOROUGH EXAMINATION LIFTING EQUIPMENT
This report complies with the Lifting Equipment Engineers Association Technical requirements
Date of Examination: July 29th , 2022 Date of Report: July 29th , 2022 Report number: LSB/002/29/VII/22

Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:

PT. LV LOGISTICS INDONESIA Lamongan, Indonesia


Nifarro Park, Jl. Raya Pasar Minggu No. 1 –Kec. Pasar Minggu- Jakarta Selatan
Identification Number: TDRU 399110 0 Max.Gross Date of Date of last thorough
Mass: manufacture examination:
Description and identification of the equipment:

20FT DRY CONTAINER 30,480 Kg 03/ 2007 Not Applicable


Dimensional : 6058 X 2438 X 2591 (mm)
Tare Mas : 2,220 Kg
Payload : 28,260 Kg

Standard Reference: ISO 1496-1 & 2, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278

Was the examination carried out:


Is this the first examination after installation
YES NO √ Within an interval of 6 months? YES NO √
or assembly at a new site or location?
Within an interval of 12
YES √ NO
months?
If the answer to the above question is YES In accordance with an
YES NO YES √ NO
has the equipment been installed examination scheme?
correctly? After the occurrence of
YES NO √
exceptional circumstances?
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
YES by:
None
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
Particulars of any tests carried out as part of the examination:
Visual Inspection, Dimensional Measurement, NDT Test,Thorough Examination, Plate Name & Color Code
IS THIS EQUIPMENT FIT FOR PURPOSE? YES √ NO
Name & Qualifications of person making Name of person authenticating this report: Latest date by which next thorough
this report: examination must be carried out:

July 29th,2023

Jonly Roger konhudt I Kade Suartana


LEEA INSPECTOR Reg#18901 TECHNICAL MANAGER
Name and address of employer of persons making and authenticating this report:

PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 29th,2022

MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/002/29/VII/22


Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan Indonesia
Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-2
ID No : TDRU 39910 0 ☒BS ISO 668
Dimensional : 6058 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,220 Kg ☒EN ISO 23278
Payload : 28,260 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

☒Magnetic ☐Dye Penetrant


Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☒ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2023
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT

Visually The Structure Are In Good Condition.


During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 29th ,2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 29th,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/002/29/VII/22
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-2
ID No : TDRU 39910 0 ☒BS ISO 668
Dimensional : 6058 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,220 Kg ☒EN ISO 23278
Payload : 28,260 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT CONTAINER
SN. TDRU 399110 0

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT

Visually The Structure Are In Good Condition.


During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 29th ,2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Report No.
LSB/002/30/VII/22
VIEW OF PHOTOGRAPH VERIFICATION & THOROUGH
EXAMINATION 20FT CONTAINER
SN. TDRU 399110 0

VIEW OF GENERAL STRUCTURAL CONTAINER


VIEW OF DATA PLATE MANUFACTURE
INSPECTION

EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
VISUAL INSPECTION MPI ON THE TOP CORNER
VISUAL VIEW ON THE UNDER/BOTTOM TANK
FITTING- ACC
FRAME CONTAINER INSPECTION - ACC

MPI ON THE BOTTOM CORNER FITTING-ACC APPLICATED TAGGING NAME PLATE

Lifting Inspector; Reviewed/Approved;

Jonly Roger Konhudt


LEEA INSPECTOR Reg#18901 I Kade Suartana
` Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI ISO TANK
Container Inspection Check List
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : TDRU 399110 0
Location : Lamongan, Indonesia
Date : July 29th,2022
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Tidak Remarks
Ya Tidak Memenuhi
Memenuhi
Yes No Comply Not Comply
1. Document Review
Penelaahan Dokumen

Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ C.O.C
Technic data
Drawing Design
Desain Gambar √ √ ACC

Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

2.2 Sambungan Diagonal Rangka


Utama
Bracing
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC

Sambungan bracing dengan


rangka utama
√ √ ACC
Joint between bracing with
main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.3 Sambungan Pojok


Corner Fitting

Rangka
Frame √ √ ACC

Dudukan pada rangka utama


Support at main frame √ √ ACC

Sambungan-sambungan
Joint √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

Dudukan Lifting Lug/ Corner


Fitting
√ √ ACC
Base Support of Lifting Lug/
Corner Fitting
2.4 Pemeriksaan Dalam & Lantai
Container
Internal & Floor Container
Kondisi Lantai
Floor Condition √ √ ACC

Kondisi dinding bagian dalam


Internal side wall condition √ √ ACC

2.5 Pintu
Door √ √ ACC

Rangka
Frame √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Dudukan
Support √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI ISO TANK
Container Inspection Check List

Customer : PT. LV LOGISTICS INDONESIA


User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : TDRU 399110 0
Location : Lamongan, Indonesia
Date : July 29th,2022

Verifikasi Hasil Verifikasi


Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.6 Dinding Pelindung


Protective Wall

Dudukan
Support √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

2.7 Area Pembebanan


Loading Area

Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC

Sambungan pada rangka utama


√ √ ACC
Joint at main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

3 Pengukuran Dimensi
Dimension Measurement

3.1 Pengukuran Dimensi Utama


Dimension Measurement √ √ ACC

Panjang: 6,058 mm
Length √ √ ACC

Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

3.2 Pengukuran ketebalan plat


Plate thickness measurement

Ketebalan plate dasar


Floor thickness plate √ ACC

Ketebalan plat dinding
Shell thickness plate √ √ ACC

3.3 Pengukuran dimensi Lifting Lug


Dimension of Lifting Lug Measurement √ √ ACC

Tebal plate: - mm
Plate Thickness

Diameter Lubang (Oval)


Hole Diameter (Oval)
A (Top Hole ) :125.5 mm √ √ ACC
B (Side Hole) :75.6 mm
C (Side Hole): 75.7 mm
4 Pengujian
Testing

Uji tak merusak (Visual & MPI)


Non destructive testing (MPI/PENETRANT) √ √ ACC

Uji Beban
Load Test √ √ ACC

5 Struktur secara khusus


Specific Structure

Apakah posisi Corner Fitting sesuai dengan standard


ISO 1161, ISO 1496-1 & 4? √ √ ACC

How about the position of Corner Fitting, is it


comply with standard ISO 1161, ISO 1496-1 & 4? √ √ ACC

Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use

Inspected By:

Jonly Roger Konhudt


LEEA Inspector Reg# 18901

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Conformity
Drawing from C.O.C Scheme

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PT. MIR Engineering
The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Visual, NDT Report & R.O.T.E
Certificate of Inspection, Report of Thorough Examination, Visual, NDT Report and
And View Of Thorough Examination

20FT DRY CONTAINER


HDMU 259937 4

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
CERTIFICATE OF INSPECTION
Sertifikat Hasil Inspeksi
No. MIR.02/3889/VII/22
This is to certify that the equipment described herein has been inspected, examined & tested:
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Equipment Description : 20FT DRY CONTAINER
Unit Serial No : HDMU 259937 4
Dimensional : 6060 X 2438 X 2591 (mm)
Tare Mas : 2,180 Kg
Payload : 28,300 Kg
Max. Gross Mass : 30,480 Kg
Manufactured by : SHANGHAI BAOSHAN PACIFIC CONTAINER CO, LTD.
Year Built/Year Used : 12/2007
Standard Reference : ISO 1496-1 & 2, ISO 668, ISO 1161 EN ISO 17638
& EN ISO 23278
Place of Inspection : Lamongan Shorebase, Indonesia
Date of Inspection : July 30th ,2022
Valid Until : July 30th ,2023

The Inspection consisted of:


1. Review Document ( C.O.C )
2. Visual Inspection and Observation
3. Dimensional Measurement and Thorough Examination
4. NDT Implementation
5. Load Test Implementation
6. Tagging Name Plate
7. Color Code

We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended

Lamongan, July 30th , 2022


PT. MIR ENGINEERING

I Kade Suartana
Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
REPORT OF THOROUGH EXAMINATION LIFTING EQUIPMENT
This report complies with the Lifting Equipment Engineers Association Technical requirements
Date of Examination: July 23rd , 2022 Date of Report: July 23rd , 2022 Report number: LSB/001/23/VII/22

Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:

PT. LV LOGISTICS INDONESIA Lamongan, Indonesia


Nifarro Park, Jl. Raya Pasar Minggu No. 1 –Kec. Pasar Minggu- Jakarta Selatan
Identification Number: HDMU 259937 4 Max.Gross Date of Date of last thorough
Mass: manufacture examination:
Description and identification of the equipment:

20FT DRY CONTAINER 30,480 Kg 12/ 2007 Not Applicable


Dimensional : 6058 X 2438 X 2591 (mm)
Tare Mas : 2,180 Kg
Payload : 28,300 Kg

Standard Reference: ISO 1496-1 & 2, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278

Was the examination carried out:


Is this the first examination after installation
YES NO √ Within an interval of 6 months? YES NO √
or assembly at a new site or location?
Within an interval of 12
YES √ NO
months?
If the answer to the above question is YES In accordance with an
YES NO YES √ NO
has the equipment been installed examination scheme?
correctly? After the occurrence of
YES NO √
exceptional circumstances?
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
None
Is the above a defect which is of immediate danger to persons YES NO √
Is the above a defect which is not yet but could become a danger to persons:
YES by:
None
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
None
Particulars of any tests carried out as part of the examination:
Visual Inspection, Dimensional Measurement, NDT Test,Thorough Examination, Plate Name & Color Code
IS THIS EQUIPMENT FIT FOR PURPOSE? YES √ NO
Name & Qualifications of person making Name of person authenticating this report: Latest date by which next thorough
this report: examination must be carried out:

July 30th,2023

Jonly Roger konhudt I Kade Suartana


LEEA INSPECTOR Reg#18901 TECHNICAL MANAGER
Name and address of employer of persons making and authenticating this report:

PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of Inspection : July 30th,2022

MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/008/30/VII/22


Procedure No. : MIR.3.SOP
Project Name : CCU/Container Inspection Place/Location : Lamongan Indonesia
Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-2
ID No : HDMU 259937 4 ☒BS ISO 668
Dimensional : 6058 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,180 Kg ☒EN ISO 23278
Payload : 28,300 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

☒Magnetic ☐Dye Penetrant


Inspection Method ☒Visual Inspection
Inspection Inspection
Welding Process (es) ☐GTAW ☒SMAW ☒Other
Stage Of Examination ☐ After Welding ☐ After Hydrostatic ☒After Brushing
Surface Condition ☒ As-Weld ☐As-Ground ☐Smooth
☒ Base Metal ☐Weld Part ☐ Back Gouging
Scope of Examination ☐Edge
☐ Repair Welding ☒ Along Lifting Point ( Corner Fitting)
Preparation
☒ Wet ☐ Dry Brand & Type: Magnaflux ( WCP-2 and
SKC)
Type of Particles Exp: 2023
☒ Visible ☐ Fluorescent
Magnetization Current ☒DC Continuous ☐ Residual ☐Other
Type of Material : Carbon Steel Thickness :- Surface Temperature : Ambient 0-30⁰ C
Interpretation
Area of Interest
Discont. Remarks
Type
Size (mm) Accepted Rejected Evaluation
Indication
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Top Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK
Bottom Corner Fitting #1 None None - Yes None Good Condition OK

SEE THE DETAIL PICTURE ATTACHED BELOW

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT

Visually The Structure Are In Good Condition.


During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 30th ,2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Date of
: July 30th,2022
Inspection
MAGNETIC PARTICLE INSPECTION REPORT Report No. : LSB/008/30/VII/22
Procedure No. : MIR.3.SOP

Project Name : CCU/Container Inspection Place/Location : Lamongan, Indonesia


Customer : PT. LV LOGISTICS INDONESIA Acceptance Criteria:
User : PT. BP TANGGUH
☒ISO 1496-1
Description : 20FT DRY CONTAINER ☒ISO 1496-2
ID No : HDMU 259937 4 ☒BS ISO 668
Dimensional : 6058 X 2438 X 2591 (mm) ☒EN ISO 17638
Tare Mass : 2,180 Kg ☒EN ISO 23278
Payload : 28,300 Kg ☒ISO 1161
Max. Gross Mass : 30.480 Kg

MPI AREA ON THE CORNER FITTING TOP SIDE

Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4

20FT CONTAINER
SN. HDMU 259937 4

MPI AREA ON THE CORNER FITTING BOTTOM SIDE

Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1

Type of Indication : LI = Linear Indication RI = Rounded Indication


Inspected by Reviewed/Approved by TEST RESULT

Visually The Structure Are In Good Condition.


During The Magnetic Particle No Indication
Found On Inspected Area/ Acceptable

SURYADI I KADE SUARTANA Expired Date: July 30th ,2023


SNT NDT LEVEL II TECHNICAL MANAGER

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Report No.
LSB/008/30/VII/22
VIEW OF PHOTOGRAPH VERIFICATION & THOROUGH
EXAMINATION 20FT CONTAINER
SN. HDMU 259937 4

VIEW OF GENERAL STRUCTURAL CONTAINER


VIEW OF DATA PLATE MANUFACTURE
INSPECTION

EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
VISUAL INSPECTION ON THE TOP CORNER FITTING-
VISUAL VIEW ON THE UNDER/BOTTOM TANK
ACC
FRAME CONTAINER INSPECTION - ACC

VISUAL ON THE BOTTOM CORNER FITTING-ACC APPLICATED TAGGING NAME PLATE

Lifting Inspector; Reviewed/Approved;

Jonly Roger Konhudt


LEEA INSPECTOR Reg#18901 I Kade Suartana
` Technical Manager

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI ISO TANK
Container Inspection Check List
Customer : PT. LV LOGISTICS INDONESIA
User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : HDMU 259937 4
Location : Lamongan, Indonesia
Date : July 30th,2022
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Tidak Remarks
Ya Tidak Memenuhi
Memenuhi
Yes No Comply Not Comply
1. Document Review
Penelaahan Dokumen

Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ C.O.C
Technic data
Drawing Design
Desain Gambar √ √ Acc

Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

2.2 Sambungan Diagonal Rangka


Utama
Bracing
Pelat/Pipa
Plate/Pipe √ √ ACC

Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC

Sambungan bracing dengan


rangka utama
√ √ ACC
Joint between bracing with
main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.3 Sambungan Pojok


Corner Fitting

Rangka
Frame √ √ ACC

Dudukan pada rangka utama


Support at main frame √ √ ACC

Sambungan-sambungan
Joint √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

Dudukan Lifting Lug/ Corner


Fitting
√ √ ACC
Base Support of Lifting Lug/
Corner Fitting
2.4 Pemeriksaan Dalam & Lantai
Container
Internal & Floor Container
Kondisi Lantai
Floor Condition √ √ ACC

Kondisi dinding bagian dalam


Internal side wall condition √ √ ACC

2.5 Pintu
Door √ √ ACC

Rangka
Frame √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Dudukan
Support √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
DAFTAR PERIKSA INSPEKSI ISO TANK
Container Inspection Check List

Customer : PT. LV LOGISTICS INDONESIA


User : PT. BP TANGGUH
Description : 20FT DRY CONTAINER
ID No./Tag No. : HDMU 259937 4
Location : Lamongan, Indonesia
Date : July 30th,2022

Verifikasi Hasil Verifikasi


Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

2.6 Dinding Pelindung


Protective Wall

Dudukan
Support √ √ ACC

Sambungan antar rangka


Joint between frame √ √ ACC

Lapisan pelindung/ cat


Coating/ Painting √ √ ACC

2.7 Area Pembebanan


Loading Area

Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC

Sambungan pada rangka utama


√ √ ACC
Joint at main frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC

3 Pengukuran Dimensi
Dimension Measurement

3.1 Pengukuran Dimensi Utama


Dimension Measurement √ √ ACC

Panjang: 6,058 mm
Length √ √ ACC

Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Verifikasi Hasil Verifikasi
Verification Verification Result
Deskripsi Keterangan
No.
Description Remarks
Ya Tidak Memenuhi Tidak Memenuhi
Yes No Comply Not Comply

3.2 Pengukuran ketebalan plat


Plate thickness measurement

Ketebalan plate dasar


Floor thickness plate √ ACC

Ketebalan plat dinding
Shell thickness plate √ √ ACC

3.3 Pengukuran dimensi Lifting Lug


Dimension of Lifting Lug Measurement √ √ ACC

Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.4 mm √ √ ACC
B (Side Hole) :75.5 mm
C (Side Hole): 75.4 mm
4 Pengujian
Testing

Uji tak merusak (Visual & MPI)


Non destructive testing (MPI/PENETRANT) √ √ ACC

Uji Beban
Load Test √ √ ACC

5 Struktur secara khusus


Specific Structure

Apakah posisi Corner Fitting sesuai dengan standard


ISO 1161, ISO 1496-1 & 4? √ √ ACC

How about the position of Corner Fitting, is it


comply with standard ISO 1161, ISO 1496-1 & 4? √ √ ACC

Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use

Inspected By:

Jonly Roger Konhudt


LEEA Inspector Reg# 18901

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
Certificate of Conformity
Drawing from C.O.C Scheme

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PT. MIR Engineering
The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
LEEA Certificate Personnel

PT. MIR Engineering


The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PT. MIR Engineering
The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com
PT. MIR Engineering
The Icon Business Park Block S No.7, BSD City, Tangerang Indonesia 15310
Telephone: +62 21 40000270 Fax: +62 21 40000276
Email: info@mir-engineering.com Website: www.mir-engineering.com