Summary TER of 13 Unit 20FT ISO Dry Container
Summary TER of 13 Unit 20FT ISO Dry Container
(To be completed and approved prior to dispatch to site/ Untuk dilengkapi sebelum pengiriman ke kawasan)
A Contractor's Equipment Data / Data Peralatan Kontraktor
Type of Equipment:
1 SPECIFIC PURPOSE EQUIPMENT
Jenis Peralatan
9 UNIT of 20FT ISO DRY CONTAINER
Number of Equipment: SERIAL NUMBER:CRUU 313300 0, CRUU 355320 9, CRUU 138640 0,
2
Jumlah Peralatan CRUU 306171 8, CRUU CRUU 133387 0, CRUU 382967 9,
CRUU 054464 6, CRUU CRUU 226087 0, CRUU 260195 6
D Approval/ Persetujuan
EMA
1
COORDINATOR
BP CONSTRUCTION
2
MANAGER
Visual, NDT Report & R.O.T.E
Certificate of Inspection, Report of Thorough Examination, Visual, NDT Report and
And View Of Thorough Examination
We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended
I Kade Suartana
Technical Manager
Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:
Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278
PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC
VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC
Kesimpulan pemeriksaan
sebelumnya - - N/A
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar - - N/A
Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC
Rangka
Frame √ √ ACC
Sambungan-sambungan
Joint √ √ ACC
2.5 Pintu
Door √ √ ACC
Rangka
Frame - - N/A
Dudukan
Support √ √ ACC
Dudukan
Support √ √ ACC
Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC
3 Pengukuran Dimensi
Dimension Measurement
Panjang: 6,060 mm
Length √ √ ACC
Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC
Tebal plate: - mm
- - -
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.3 mm √ √ ACC
B (Side Hole) :75.3 mm
C (Side Hole): 75.1 mm
4 Pengujian
Testing
Uji Beban
Load Test √ √ ACC
Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use
Inspected By:
TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 313300 0 38,100 Kg 2,220 Kg 28,260 Kg 30,480 Kg
Dimension: 6,060 X 2,438 X 2,591
(mm)
INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and ISO 1496-1 & 4 , ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02
The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.
REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use
The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.
We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended
I Kade Suartana
Technical Manager
Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:
Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278
PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC
VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC
Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar - - -
Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC
Rangka
Frame √ √ ACC
Sambungan-sambungan
Joint √ √ ACC
2.5 Pintu
Door √ √ ACC
Rangka
Frame √ √ ACC
Dudukan
Support √ √ ACC
Dudukan
Support √ √ ACC
Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC
3 Pengukuran Dimensi
Dimension Measurement
Panjang: 6,060 mm
Length √ √ ACC
Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC
Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.2 mm √ √ ACC
B (Side Hole) :75.1 mm
C (Side Hole): 75.2 mm
4 Pengujian
Testing
Uji Beban
Load Test √ √ ACC
Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use
Inspected By:
TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 355320 9 38,100 Kg 2,185 Kg 28,295 Kg 30,480 Kg
Dimension: 6,060 X 2,438 X 2,591
(mm)
INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02
The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.
REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use
The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.
20FT CONTAINER
CRUU 138640 0
We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended
I Kade Suartana
Technical Manager
Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:
Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278
PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC
VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC
Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar - - -
Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC
Rangka
Frame √ √ ACC
Sambungan-sambungan
Joint √ √ ACC
2.5 Pintu
Door √ √ ACC
Rangka
Frame √ √ ACC
Dudukan
Support √ √ ACC
Dudukan
Support √ √ ACC
Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC
3 Pengukuran Dimensi
Dimension Measurement
Panjang: 6,060 mm
Length √ √ ACC
Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC
Uji Beban
Load Test √ √ ACC
Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use
Inspected By:
TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 138640 0 38.100 Kg 2,260 Kg 28,220 Kg 30.480 Kg
Dimension: 6,060 X 2,438 X 2,591 (mm)
INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and, ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02
The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.
REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use
The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.
We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended
I Kade Suartana
Technical Manager
Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:
Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278
July 27th,2023
PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC
VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC
Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar - - -
Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC
Rangka
Frame √ √ ACC
Sambungan-sambungan
Joint √ √ ACC
2.5 Pintu
Door √ √ ACC
Rangka
Frame √ √ ACC
Dudukan
Support √ √ ACC
Dudukan
Support √ √ ACC
Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC
3 Pengukuran Dimensi
Dimension Measurement
Panjang: 6,060 mm
Length √ √ ACC
Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC
Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.8 mm √ √ ACC
B (Side Hole) :75.3 mm
C (Side Hole): 75.5 mm
4 Pengujian
Testing
Uji Beban
Load Test √ √ ACC
Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use
Inspected By:
TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 306171 8 38,100 Kg 2,220 Kg 28,260 Kg 30,480 Kg
Dimension: 6,060 X 2,438 X 2,591
(mm)
INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02
The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.
REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use
The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.
We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended
I Kade Suartana
Technical Manager
Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:
Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278
PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC
VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC
Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar - - -
Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC
Rangka
Frame √ √ ACC
Sambungan-sambungan
Joint √ √ ACC
2.5 Pintu
Door √ √ ACC
Rangka
Frame √ √ ACC
Dudukan
Support √ √ ACC
Dudukan
Support √ √ ACC
Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC
3 Pengukuran Dimensi
Dimension Measurement
Panjang: 6,060 mm
Length √ √ ACC
Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC
Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.3 mm √ √ ACC
5B (Side Hole) :75.3 mm
C (Side Hole): 75.5 mm
4 Pengujian
Testing
Uji Beban
Load Test √ √ ACC
Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use
Inspected By:
TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 133387 0 38.100 Kg 2,250 Kg 28,230 Kg 30.480 Kg
Dimension: 6,060 X 2,438 X 2,591 (mm)
INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference a s BP Spec and ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02
The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.
REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use
The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.
We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended
I Kade Suartana
Technical Manager
Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:
Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278
PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC
VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC
Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar - - -
Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC
Rangka
Frame √ √ ACC
Sambungan-sambungan
Joint √ √ ACC
2.5 Pintu
Door √ √ ACC
Rangka
Frame - - N/A
Dudukan
Support √ √ ACC
Dudukan
Support √ √ ACC
Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC
3 Pengukuran Dimensi
Dimension Measurement
Panjang: 6,060 mm
Length √ √ ACC
Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC
Uji Beban
Load Test √ √ ACC
Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use
Inspected By:
TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 382967 9 38.100 Kg 2,220 Kg 28,260 Kg 30.480 Kg
Dimension: 6,060 X 2,438 X 2,591 (mm)
INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02
The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.
REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use
The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.
We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended
I Kade Suartana
Technical Manager
Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:
Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278
PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC
VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC
Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ C.O.C
Technic data
Drawing Design
Desain Gambar √ √ Acc
Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC
Rangka
Frame √ √ ACC
Sambungan-sambungan
Joint √ √ ACC
2.5 Pintu
Door √ √ ACC
Rangka
Frame √ √ ACC
Dudukan
Support √ √ ACC
Dudukan
Support √ √ ACC
Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC
3 Pengukuran Dimensi
Dimension Measurement
Panjang: 6,060 mm
Length √ √ ACC
Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC
Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.3 mm √ √ ACC
B (Side Hole) :75.3 mm
C (Side Hole): 75.6 mm
4 Pengujian
Testing
Uji Beban
Load Test √ √ ACC
Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use
Inspected By:
TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 054464 6 38.100 Kg 2,200 Kg 28,280 Kg 30.480 Kg
Dimension: 6,060 X 2,438 X 2,591 (mm)
INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02
The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.
REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use
The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.
We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended
I Kade Suartana
Technical Manager
Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:
Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278
PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC
VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC
Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar - - -
Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC
Rangka
Frame √ √ ACC
Sambungan-sambungan
Joint √ √ ACC
2.5 Pintu
Door √ √ ACC
Rangka
Frame √ √ ACC
Dudukan
Support √ √ ACC
Dudukan
Support √ √ ACC
Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC
3 Pengukuran Dimensi
Dimension Measurement
Panjang: 6,060 mm
Length √ √ ACC
Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC
Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.7 mm √ √ ACC
B (Side Hole) :75.1 mm
C (Side Hole): 75.5 mm
4 Pengujian
Testing
Uji Beban
Load Test √ √ ACC
Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use
Inspected By:
TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 226087 0 38.100 Kg 2,220 Kg 28,260 Kg 30.480 Kg
Dimension: 6,060 X 2,438 X 2,591 (mm)
INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02
The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.
REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use
The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.
We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended
I Kade Suartana
Technical Manager
Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:
Standard Reference: ISO 1496-1 & 4, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278
PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC
VISUAL INSPECTION BEFORE MPI ON THE BOTTOM APPLICATED TAGGING NAME PLATE
CORNER FITTING-ACC
Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ CSC
Technic data
Drawing Design
Desain Gambar -
Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC
Rangka
Frame √ √ ACC
Sambungan-sambungan
Joint √ √ ACC
2.5 Pintu
Door √ √ ACC
Rangka
Frame √ √ ACC
Dudukan
Support √ √ ACC
Dudukan
Support √ √ ACC
Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC
3 Pengukuran Dimensi
Dimension Measurement
Panjang: 6,060 mm
Length √ √ ACC
Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC
Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.4 mm √ √ ACC
B (Side Hole) :75.5 mm
C (Side Hole): 75.4 mm
4 Pengujian
Testing
Uji Beban
Load Test √ √ ACC
Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use
Inspected By:
TEST DETAIL
QTY DESCRIPTIONS ID No. PROOF LOAD TARE MAS PAYLOAD MAX.GROSS
APPLIED MASS:
1 20FT DRY CONTAINER CRUU 260195 6 38.100 Kg 2,180 Kg 28,300 Kg 30.480 Kg
Dimension: 6,060 X 2,438 X 2,591 (mm)
INSPECTION/ TESTS
The unit was Load tested using calibrate weight blocks. The load test was recorded from reference as BP Spec and ISO 1496-1& 4, ISO 1161 standard
stensile of Link hand-held display 55 Ton rated SWL. Dynamic Load Cell Monitoring and indicator . SN: 10020419 calibrated on September 21st 2021
complete with certificate No. MSE 100.02
The unit observed to be intact during pull tested loading without any abnormal sound, crack, distortion, bent and no significant defect during and after load
test. Holding time 5 minutes is complied.
REMARKS
All lifting corner post area are visual inspection and Magnetic Particle Inspection result passed ( Before and After Test)
All lifting Set, CLB connection and accessories are visual inspected and results passed
This equipment is fit for its intended use
The above items have been subjected to test and visual examination I hereby certify on behalf of Inspection that the particulars recorded in this document
and at the time of examination were found to be free of visual defect, are correct by PT.MIR ENGINEERING
flaws or other defects likely to affect the safe use of the
equipment(s) mentioned above.
D Approval/ Persetujuan
EMA
1
COORDINATOR
BP CONSTRUCTION
2
MANAGER
Visual, NDT Report & R.O.T.E
Certificate of Inspection, Report of Thorough Examination, Visual, NDT Report and
And View Of Thorough Examination
We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended
I Kade Suartana
Technical Manager
Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:
Standard Reference: ISO 1496-1 & 2, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278
July 29th,2023
PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
20FT CONTAINER
SN. RFCU 203353 9
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC
Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ C.O.C
Technic data
Drawing Design
Desain Gambar √ √ ACC
Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC
Rangka
Frame √ √ ACC
Sambungan-sambungan
Joint √ √ ACC
2.5 Pintu
Door √ √ ACC
Rangka
Frame √ √ ACC
Dudukan
Support √ √ ACC
Dudukan
Support √ √ ACC
Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC
3 Pengukuran Dimensi
Dimension Measurement
Panjang: 6,058 mm
Length √ √ ACC
Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC
Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.4 mm √ √ ACC
B (Side Hole) :75.5 mm
C (Side Hole): 75.4 mm
4 Pengujian
Testing
Uji Beban
Load Test √ √ ACC
Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use
Inspected By:
We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended
I Kade Suartana
Technical Manager
Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:
Standard Reference: ISO 1496-1 & 2, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278
July 29th,2023
PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
20FT CONTAINER
SN. TDTU 404671 3
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC
Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ C.O.C
Technic data
Drawing Design
Desain Gambar √ √ ACC
Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC
Rangka
Frame √ √ ACC
Sambungan-sambungan
Joint √ √ ACC
2.5 Pintu
Door √ √ ACC
Rangka
Frame √ √ ACC
Dudukan
Support √ √ ACC
Dudukan
Support √ √ ACC
Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC
3 Pengukuran Dimensi
Dimension Measurement
Panjang: 6,058 mm
Length √ √ ACC
Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC
Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.7 mm √ √ ACC
B (Side Hole) :75.8 mm
C (Side Hole): 75.2 mm
4 Pengujian
Testing
Uji Beban
Load Test √ √ ACC
Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use
Inspected By:
We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended
I Kade Suartana
Technical Manager
Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:
Standard Reference: ISO 1496-1 & 2, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278
July 29th,2023
PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
20FT CONTAINER
SN. TDRU 399110 0
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC
Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ C.O.C
Technic data
Drawing Design
Desain Gambar √ √ ACC
Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC
Rangka
Frame √ √ ACC
Sambungan-sambungan
Joint √ √ ACC
2.5 Pintu
Door √ √ ACC
Rangka
Frame √ √ ACC
Dudukan
Support √ √ ACC
Dudukan
Support √ √ ACC
Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC
3 Pengukuran Dimensi
Dimension Measurement
Panjang: 6,058 mm
Length √ √ ACC
Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC
Tebal plate: - mm
Plate Thickness
Uji Beban
Load Test √ √ ACC
Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use
Inspected By:
We hereby certify that the Products and or service detailed herein have been tested in accordance
with the conditions and test requirements of the purchase order and unless otherwise noted confirm in
all respect that the procedures followed are in accordance with industry recognized standards for this
type of equipments and will perform as intended
I Kade Suartana
Technical Manager
Name and Address of employer for whom the thorough examination was made: Address of premises at which the examination was made:
Standard Reference: ISO 1496-1 & 2, ISO 668, ISO 1161 EN ISO 17638 & EN ISO 23278
July 30th,2023
PT.MIR Engineering The Icon Business Park Block S No.7, BSD City, Tangerang, Indonesia 15310
Telephone +62 21 40000270 Fax +62 21 40000276
Top Corner Fitting #3 Top Corner Fitting #2 Top Corner Fitting #1 Top Corner Fitting #4
20FT CONTAINER
SN. HDMU 259937 4
Bottom Corner Fitting #4 Bottom Corner Fitting #3 Bottom Corner Fitting #2 Bottom Corner Fitting #1
EXAMINATION - LIFTING POINT ( MPI BOTTOM EXAMINATION - LIFTING POINT ( MPI TOP CORNER
CORNER FITTING) - ACC FITTING)- ACC
Kesimpulan pemeriksaan
sebelumnya √ √ ACC
Previous result of inspection
Data Teknis
√ √ C.O.C
Technic data
Drawing Design
Desain Gambar √ √ Acc
Pelat Nama
√ √ ACC
Name plate
2. Visual Inspection
Pemeriksaan Visual √ √ ACC
2.1 Main Frame
Rangka Utama
Pelat/Pipa
Plate/Pipe √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar rangka √
√ ACC
Joint between frame
Lapisan pelindung/ cat
Coating/ Painting √ √ ACC
Dudukan
√ √ ACC
Support
Sambungan antar bracing
Joint between bracing √ √ ACC
Rangka
Frame √ √ ACC
Sambungan-sambungan
Joint √ √ ACC
2.5 Pintu
Door √ √ ACC
Rangka
Frame √ √ ACC
Dudukan
Support √ √ ACC
Dudukan
Support √ √ ACC
Rangka
√ √ ACC
Frame
Dudukan
Support √ √ ACC
Sambungan antar rangka
Joint between frame √ √ ACC
3 Pengukuran Dimensi
Dimension Measurement
Panjang: 6,058 mm
Length √ √ ACC
Lebar: 2,438 mm
Width √ √ ACC
Tinggi: 2,591 mm
Height √ √ ACC
Tebal plate: - mm
Plate Thickness
Diameter Lubang (Oval)
Hole Diameter (Oval)
A (Top Hole ) :125.4 mm √ √ ACC
B (Side Hole) :75.5 mm
C (Side Hole): 75.4 mm
4 Pengujian
Testing
Uji Beban
Load Test √ √ ACC
Remaks: Identification of any complied to ISO 1496-1 & 4 and This equipment is fit and safe to use
Inspected By: