OWNER PROCESS ENGINEER ENGINEER

BID EVALUTAION FOR


EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 1 of 19

ECC

EGYPTIAN CANADIAN COMPANY FOR CHEMICAL INDUSTRIES

BID EVALUATION FOR PIPING SPECIALITIES

OILFIELD CHEMICALS PROJECT

JOB NO. : ECC-1-013


DOC. NO. : ECC-BE-15

A Issued for Review 20/12/2013 W.Y I.E I.E

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 2 of 19

REV DESCRIPTION DATE BY CHECKED APPROVED CLIENT

CONTENTS

A- Bid Evaluation Criteria

B- Bid Evaluation for Line Strainers

C- Bid Evaluation for Snap-lock Adaptors / Couplers

D- Bid Evaluation for Flexible Connections

E- Bid Evaluation for Burst Discs

F- Cost Summary for MR-15

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 3 of 19

A- Bid Evaluation Criteria

- Technical envelopes shall be evaluated based on the following criteria:

# Criteria Percentage
1 Compliance with client requirements / technical data 60%
2 Completeness of scope of work 15%
3 Equipment country of origin 25%
Total 100%

The successful bidders shall acquire at least 75% of the total value to be commercially evaluated.

- Commercial envelopes shall be evaluated as per the following basis:

 The percentage of lowest bid price shall be 100%

 The percentage of the remaining bids shall be as per the following equation:

 Financial Percentage = The Lowest Bid Price * 100 / The Bid Price

- Overall Evaluation

For overall evaluation, the technical evaluation shall have a weight factor equals to 70% and the financial evaluation shall have a weight factor
equals to 30%. The overall evaluation percentage shall be based on the following equation:

Overall Percentage = (Technical Percentage) x 0.70 + (Financial Percentage) x 0.30

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 4 of 19

B- Bid Evaluation for Line Strainers

1. Background

1.1 Requisition No. ECC-MR-15


1.2 Equipment Description Y Line Strainers
1.4 Number of Suppliers Four
Responded
1.5 Governing Documents  Material Requisition Doc. No. ECC-MR-15

2. Responsive Suppliers

# Supplier Name Country of Origin Quotation No. Date


1 Hughes / AG UK HME-QT867240 29/6/2013
2 Haws / Dos USA ---- 12/8/2013
3
4

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 5 of 19

3. Technical Data

3.1 Line Strainers Y type, # 300 BW - Carbon Steel

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Origin
Specification
Percentage

3.2 Line Strainers Y type, # 150 Flanged - Carbon Steel

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Origin
Specification
Percentage

3.3 Line Strainers Y type, # 150 Flanged - S.S

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Origin
Specification
Percentage

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 6 of 19

4. Technical Evaluation

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Technical Data
Completeness of scope of work
Country of Origin
Total Percentage

5. Prices & Payment Conditions

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Price
Freight (CIF)
Total Value
Total L.E
Delivery Period (weeks)
Payment

6. Commercial Evaluation

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Min. Bid Price
Bid Price
Total Percentage

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 7 of 19

7. Overall Evaluation

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Technical Percentage x 0.7
Commercial Percentage x 0.3
Total Percentage

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 8 of 19

C- Bid Evaluation for Snap-lock Adaptors / Couplers

1. Background

1.1 Requisition No. ECC-MR-15


1.2 Equipment Description Snap-lock Adaptors / Couplers
1.4 Number of Suppliers Four
Responded
1.5 Governing Documents Material Requisition Doc. No. ECC-MR-15

2. Responsive Suppliers

# Supplier Name Country of Origin Quotation No. Date


1 Hughes / AG UK HME-QT867240 29/6/2013
2 Haws / Dos USA ---- 12/8/2013
3
4

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 9 of 19

3. Technical Data

3.1 Male Snap-lock Adaptor -S.S

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Origin
Specification
Percentage

3.2 Female Snap Coupler W / Hose Tail -S.S

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Origin
Specification
Percentage

4. Technical Evaluation

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Technical Data
Completeness of scope of work
Country of Origin
Total Percentage

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 10 of 19

5. Prices & Payment Conditions

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Price
Freight (CIF)
Total Value
Total L.E
Delivery Period (weeks)
Payment

6. Commercial Evaluation

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Min. Bid Price
Bid Price
Total Percentage

7. Overall Evaluation

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Technical Percentage x 0.7
Commercial Percentage x 0.3
Total Percentage

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 11 of 19

D- Bid Evaluation for Flexible Connections

1. Background

1.1 Requisition No. ECC-MR-15


1.2 Equipment Description Flexible Connection
1.4 Number of Suppliers Four
Responded
1.5 Governing Documents  Material Requisition Doc. No. ECC-MR-15

2. Responsive Suppliers

# Supplier Name Country of Origin Quotation No. Date


1 Hughes / AG UK HME-QT867240 29/6/2013
2 Haws / Dos USA ---- 12/8/2013
3
4

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 12 of 19

3. Technical Data

3.1 Flanged End Flexible Connection According to ASME B 16.5 #300 - S.S 316 / SS 316 Convoluted Hose

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Origin
Specification
Percentage

3.2 Female Snap - Lock Flexible Connection S.S 316 / Rubber Hose

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Origin
Specification
Percentage

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 13 of 19

4. Technical Evaluation

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Technical Data
Completeness of scope of work
Country of Origin
Total Percentage

5. Prices & Payment Conditions

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Price
Freight (CIF)
Total Value
Total L.E
Delivery Period (weeks)
Payment

6. Commercial Evaluation

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Min. Bid Price
Bid Price
Total Percentage

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 14 of 19

7. Overall Evaluation

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Technical Percentage x 0.7
Commercial Percentage x 0.3
Total Percentage

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 15 of 19

E- Bid Evaluation for Burst Discs

1. Background

1.1 Requisition No. ECC-MR-15


1.2 Equipment Description Burst Discs
1.4 Number of Suppliers Four
Responded
1.5 Governing Documents  Material Requisition Doc. No. ECC-MR-15

2. Responsive Suppliers

# Supplier Name Country of Origin Quotation No. Date


1 Hughes / AG UK HME-QT867240 29/6/2013
2 Haws / Dos USA ---- 12/8/2013
3
4

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 16 of 19

3. Technical Data

3.1 DOME SLOT COMP Type Burst Disc, Burst Pressure 50 PSI G, Holder Material 316 SS, # 150, Disc Material INCON/ FLURO/ SS @ 240 C

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Origin
Specification
Percentage

3.2 DOME SLOT COMP Type Burst Disc, Burst Pressure 35 PSI G, Holder Material 316 SS, # 150, Disc Material INCON/ FLURO/ SS @ 240 C

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Origin
Specification
Percentage

3.3 EHG2 GRAPHITE Type Burst Disc, Burst Pressure 5 PSI G, Holder Material 316 SS, # 150, Disc Material RESIN GRAPHITE @ 100 C

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Origin
Specification
Percentage

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 17 of 19

4. Technical Evaluation

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Technical Data
Completeness of scope of work
Country of Origin
Total Percentage

5. Prices & Payment Conditions

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Price
Freight (CIF)
Total Value
Total L.E
Delivery Period (weeks)
Payment

6. Commercial Evaluation

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Min. Bid Price
Bid Price
Total Percentage

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 18 of 19

7. Overall Evaluation

Supplier 1 Supplier 2 Supplier 3 Supplier 4


Technical Percentage x 0.7
Commercial Percentage x 0.3
Total Percentage

DOC. NO.: ECC-BE-15


OWNER PROCESS ENGINEER ENGINEER
BID EVALUTAION FOR
EGYPTIAN CANADIAN COMPANY MELBRAY INTERDESIGN GROUP
FOR CHEMICAL INDUSTRIES SAFETY SHOWERSPIPING SPECIALITIES CHEMICALS LTD.
Project
OILFIELD CHEMICALS PROJECT REV A DATE 20-12-2013 PAGE 19 of 19

F- Costs Summary for MR-15

The following cost summary is based on the technical evaluation implemented above:

Item Description Total Price (L.E) Recommended Supplier


1 Line Strainers 26687.5 Hughes
2 Flexible Connections
3 Snap-lock Adaptors / Couplers
4 Burst Discs
Total Cost (MR-15) L.E 53375

The upper cost summary is based on the following:

1- The total cost of each MR is based on our evaluation & offer received from Suppliers.

2- Some items which are not complete or sub-items, with no quotations their prices were estimated based on our experience.

3- Some figures / expenses like freight charges…etc., are estimated

4- Currency change rate are as follows;


1 $ = 7 L.E
1 Euro = 9.5 L.E
1 GBP = 11.32 L.E
5- Some expenses like site supervisions & 2 years recommended spare parts are not considered & can be accounted as percentage of total cost.

DOC. NO.: ECC-BE-15