Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 8

TRAINING ACTIVITY MATRIX

Training Trainee Facilities/ Venue Date & Remarks


Activity Tools and (Workstat Time
Equipment ion/Area)
● Prayer
● Recap  Projector
Activities  Computer LEARNIN
● Unfreezing All Trainee  Internet G
 Motherboar
Activities d
RESOURC
● Rejoinder/  CPU E AREA July 25,
Motivation  Power 2022
● Orientation Supply Unit
 RAM 8:00-8:30
 I/O devices
am
 Screwdriver
 Pliers
 Antistatic
wrist strap
 Antistatic mat

1. Perform Angela Lonzaga  Projector WORK July 25,


 Computer STATION 2022
Computer Melani Quirol
Hardware
Hardware Ricky Africano 1 Install
components
and 8:30-9:00
Assembly Ariel  Internet
 Motherboar Configure am
Subingsubing Computer
d
Sheryl Emutan  CPU Systems
 Power
Supply Unit
 RAM
 I/O devices
 Screwdriver
 Pliers
 Antistatic
wrist strap
 Antistatic mat
 Protective
Gear

2. Preparing Justin Medina  Projector WORK July 25,


 Computer STATION 2022
Bootable Christian
 Internet 1 Install
Installer for Santos  Bootable and
computer John Rhell dives Configure 9:00-9:30
Systems Aspacio  Printer Computer am
Joana Campos  Interface Systems
Judy Sabijon Cards

3. Perform Francisco  Projector WORK July 25,


 Desktop STATION 2022
installation Sabijon
Computer
of OS and Jomar Sabijon 1 Install
(meant for
installation and
Driver Lester Rosario
training Configure 9:30
updates/pa Renan Salva
tches in Genisis Trinidad purposes) Computer
 Operating Systems
accordance
System (any
with preferably 10:00am
manufactur windows)
 Internet
er’s
recommend
ations and
requiremen
ts

4. Perform Charloto Flores  Projector WORK


installation Sahara  Desktop STATION
of Bagundang Computer 1 Install July 25,
 Software and 2022
Application Roselyn Paraiso
Applicatio Configure
Software Christopher Computer
n 10:00-11:00
based on Lavina Installers Systems am
user, Arnold Gacang  Productivi
customer, ty Tools
and/or  Utility
manufactur software
ers
specificatio
ns

5. Conducting Angela Lonzaga  Projector WORK


Testing and Melani Quirol  Desktop STATION
Computer 1 Install July 25,
Documenta Ricky Africano 2022
 Stress and
tion Ariel
test Configure
Procedures Subingsubing Computer
following
Sheryl Emutan Systems 11:00-12:00
devices
am
 Processor
 Video
card
 Memory
 Hard
Disk

6. Perform Justin Medina  Network WORK July 25,


Installation Christian Topology STATION 2022
of network Santos  Distributi 2 SET-UP
ons COMPUTE 1:00-1:30
cables John Rhell
terminals R pm
Aspacio NETWOR
 Cables
Joana Campos KS
 Terminals
Judy Sabijon  Cable
raceway/
duct
 Clamps
 Fasteners
 Insulators
 Terminal
box
 Digital
Multi-
MeterWir
e Stripper
with bolt
cutter
 Pliers(ass
orted)
LAN
tester
 Crimping
Tools

7. Perform Charloto Flores  Laptop WORK July 25,


network Sahara  Desktop STATION 2022
configurati Bagundang  Network 2 SET-UP
storage COMPUTE
on based Roselyn Paraiso
 Network R
on Christopher NETWOR 1:30-2:30
Printer
Manufactur Lavina KS pm
 Other
er based Arnold Gacang tools
settings found
with above
addition of this list
network
system test
based on
standard
operating
procedures

8. Perform Charlito Flores  Laptop WORK July 25,


proper Set- Sahara  Desktop STATION 2022
up of Bagundang  Network 2 SET-UP
storage COMPUTE
router/Wi- Roselyn Paraiso
 Network R
Fi/wireless Christopher NETWOR 2:30-3:00
Printer
access Lavina KS pm
 Other
point/repea Arnold Gacang tools
ter found
configurati above
on based this list
Manufactur  Fiber
er and Optic
cable
Customer/
Client
Specificatio
ns

9. Inspect and Angela Lonzaga  Laptop WORK July 25,


test the Melani Quirol  Desktop STATION 2022
configured Ricky Africano  Network 2 SET-UP
storage COMPUTE
computer Ariel
 Network R 3:00-4:00
networks Subingsubing NETWOR pm
Printer
Sheryl Emutan KS

10. Perform Justin Medina  Laptop WORK


properly Christian  Desktop STATION
installation Santos  Network 3 SET-UP
storage COMPUTE
/set-up of John Rhell
 Network R
user access Aspacio SERVERS
Printer
were user Joana Campos
 Remote
access level Judy Sabijon access
is  Domain
configured controlle
based on r
NOS  Web July 25,
feature and services 2022
 Database 4:00-5:00
established
services pm
network
 Proxy
access server
policies  File,
printer
and
other
resource
sharing

● Prayer July 26,


● Recap of 2022
activities
● Orientation All Trainee 8:00-8:30
am
11. Perform Francisco 2.1Network WORK July 26, Perform
operating
Configurati Sabijon system (NOS) STATION 2022 installatio
on network Jomar Sabijon
features 3 SET-UP n of OS
2.2. Computer
servers and COMPUTE and
services Lester Rosario functions R 8:30-9:30 Driver
with Renan Salva 2.3. Types of
SERVERS am updates/
Network
required Genisis Trinidad services patches
2.4. User access
modules/a level in
dd-ons configuration accordanc
2.5. Network
installed/u services e with
pdated
configuration manufact
based on 2.5.1. configuring urer’s
web services
NOS 2.5.2. configuring recomme
installation
file sharing ndations
services
and
procedures 2.5.3. configuring
print sharing requireme
services
2.6. Web nts
applications/te
chnologies
2.7. Setting-up
client/user
access and
security
2.8. Setting-up
and
configuring
servers
2.9. Installing and
configuring
modules/add-
ons
2.10.
Configuration
of network
services
2.11. Testing
procedures
2.12. Pre-
deployment
procedures
and practices
2.13. Enterprise
policies and
procedures
2.14. End user
requirements
2.15. Enterprise
policies and
procedures
2.16.
Documentatio
n and making
reports

12. Perform Charloto Flores  PC or WORK July 26, Perform


testing, Sahara workstati STATION 2022 installatio
documenta Bagundang on 3 SET-UP n of
network COMPUTE 9:30-10:30 software
tion and Roselyn Paraiso
and R Am updates
Pre- Christopher SERVERS in
server
deployment Lavina  Network accordanc
procedures Arnold Gacang Operatin e with
doing g System manufact
Operation (NOS) urer’s
and  Network recomme
Printer ndations
security
 Tools and
checks requireme
and Test
based on nts
instrume
end-user nts
requiremen  Appropri
ts ate
software
applicati
on/progr
ams
13. Plan and Angela Lonzaga  OH&S WORK July 26, 14. Perf
prepare for Melani Quirol GUIDELIN STATION 2022 orm
ES 4
maintenanc Ricky Africano  PHILLIPPIN networ
MAINTAI 10:30-11:30
e for repair Ariel E k
ENVIRONM
N AND am
tools, Subingsubing REPAIR config
ENTAL
equipment Sheryl Emutan STANDARD COMPUTE uratio
and testing S R n and
devices for Tools for: SYSTEMS networ
cutting, AND
performing k
shaping, NETWOR
diagnosis of drilling, syste
threading,
KS
faults m
tapping,
needed to diagno
finishing,
use based dismantling, stic
on OHS and based
policies assembling. on
Tool set
and includes but standa
procedures not limited to: rd
 Pliers(ass operat
orted) ing
 Screw proced
Drivers
ures
(assorted)
 Special
tools
 Soldering
iron/gun
 Wrenches
 Utility
knife/stri
pper
 Hot air
soldering
station
 LAN
tester
 Crimping
Tools
15. Perform Justin Medina Equipment WORK July 26, 16. Perf
maintenanc Christian includes but STATION 2022 orm
e on Santos not limited 4 Set-up
to: MAINTAI 11:30-12:00
computer John Rhell User
 Maintena N AND pm
system and Aspacio REPAIR Access
nce
network Joana Campos bench COMPUTE were
checking Judy Sabijon  Power R user
problems Supply SYSTEMS access
and equipmen AND level is
perform t NETWOR config
Testing KS
repairs ured
devices
need for based
periodic include but on
maintenanc not limited NOS
e to: featur
 Multi- e and
meter
establi
 Calibrator
s shed
 Signal networ
generator k
 Oscillosco access
pe policie
 Appropria s
te
Software
17. Perform Francisco Includes but WORK Perform
Diagnostic Sabijon not limited STATION Configura
to: 4 July 26, tion on
on Jomar Sabijon 2022
 Servers MAINTAI network
computer Lester Rosario
 Peripher N AND services
systems Renan Salva REPAIR
als
and Genisis Trinidad  Desktop COMPUTE 1:00-2:00
networks R pm
Compute
for faults or r SYSTEMS
problems  Network AND
based on Devices NETWOR
 Cables KS
standard
procedures and
Connecti
on
18. Rectify/ Charloto Flores Includes but WORK July 26, Perform
correct Sahara not limited STATION 2022 testing
defects in Bagundang to: 4 document
MAINTAI ation and
computer Roselyn Paraiso  Servers
 Peripher N AND 2:00-2:30 pre-
systems Christopher REPAIR pm deployme
als
and Lavina  Desktop COMPUTE nt
networks Arnold Gacang Compute R procedure
were r SYSTEMS s
defective  Network AND undertake
component Devices NETWOR n based
 Cables KS on
are to
and enterprise
replaced policies
Connecti
and and
on
corrected in  Disks procedure
accordance  Connecto s
to rs
established  Adaptors
procedures  Wire and
cables
 Appropri
ate
software
 Compute
r storage
media
 Personal
Protectiv
e
equipme
nt

19. Inspect Angela Lonzaga Equipment WORK Set


and Melani Quirol includes but STATION router/Wi
perform Ricky Africano not limited 4 -Fi
to: MAINTAI wireless
test on Ariel
 Maintena N AND access
computer Subingsubing REPAIR point/rep
nce
systems Sheryl Emutan bench COMPUTE eater
and  Power R configurat
networks Supply SYSTEMS ion
AND July 26,
based OHS equipmen
NETWOR 2022
standard t
Testing KS
and 5S
devices
principles 2:30-3:00
include but
to ensure pm
not limited
safe to:
operation  Multi-
meter
 Calibrator
s
 Signal
generator
 Oscillosco
pe
Appropriate
Software

Prepared by: Date:

EDESON JOHN M. CABANES July 25, 2022

You might also like