PERMIT TO OPERATE
(PTO) APPLICATION
Requirements of RA 8749
(The Phil. Clean Air Act)
1. Introduction
2. Illustrative Demonstration of Online
PTO Application
3. Compliance to PTO Conditions
4. Reminders and Tips
2. National Ambient Air Quality Standards for Source Specific Air Pollutants
PROCESS FLOW
PERMIT TO OPERATE –AIR POLLUTION SOURCE AND CONTROL INSTALLATION
Air Quality Section
Applicant Evaluate submitted application and
Start Submit online application for requirements within 20 days
PTO with corresponding including inspection/sampling and
requirements endorses to Pollution Control
Division (PCD)
PCD
Conduct final evaluation and
recommends approval to the EMB
Regional Director
Go to the emb.gov.ph
Scroll the page down TLC: The Learning Curve Series
ON-LINE PERMITTING
PTO ONLINE APPLICATION
account
RENEWAL OF PTO
PTO-R4A-21-01363
3
5
TLC: The Learning Curve Series
ON-LINE PERMITTING
PTO ONLINE APPLICATION
Method 6
Maximum filesize is 20 MB
xxxxx
xxxxxxxx
xxxxxxxx xxxxxxxx
xxxxx xxxxxxxx
xxxxxxxx
xxxxxxxx
xxxxxxxx
xxxxxxxx
xxxxxxxx
xxxxxxxx
xxxxxxxx
xxxxxxx
xxxxxxx
xxxxxxx
xxxxxxx
Hi Ronel Reyes.
You submitted an application for a Permit to Operate. A screening officer will not check your application. You can check the status of your
application by logging into the system.
May
Hi Ronel Reyes.
May
Hi Ronel Reyes.
An application has been returned to you by one of our staff. You may view and take action on this application at
the EMB OPMS website.
Permit to
Operate
PTO PTO
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
PTO
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
xxxxxx xxxxxx
600.00
9,500
Permit to Operate
10.100.00
PAYMENT OPTIONS
Permit to
Operate
May
Hi Ronel Reyes.
Your application for Permit to Operate with number 112345 was approved. Please visit the following link to view your certificate.
XXXXXXXXXXXXXXX xxxxxxxxxxxxx
Company Name and Address xxxxxxxxxxx
Installation
Signatures
COMPLIANCE TO THE
CONDITIONS OF THE PTO
Permit Condition No. 1:
That the permittee shall install a Continuous Emissions Monitoring System (CEMS)
in compliance with RA 98749;
Ways to Comply
• DAO 2007-22 provides the guidelines for the requirements of the CEMS
• Criteria/Specifications for the CEMS when required for each applicable pollutant emitted by a
given source:
Ways to Comply
DAO 2007-22 Section 6 item 6:
• RATA must be performed annually by industries in the presence of
EMB personnel.
• A thirty (30) day notice should be presented to EMB prior to the
conduct of RATA.
• RATA is conducted to determine CEMS compliance to the RA.
Ways to Comply
• Maintain condition of the Air Pollution Devices as when the testing of the
CEMS was conducted
• There should be no changes on the mode of operation of the fuel burning
equipment
Ways to Comply
• The plant provides a web-based CCTV camera that is accessible to
the DENR EMB IVA personnel via internet.
• DAO 2017-14 requires large industries with emission of greater
than 750Tonnes/yr to re-program the CCTV and CEMS data to the
EMB online information database.
How to comply
How to Comply
How to Comply
• Always review the conditions of the permit and ensure 100% compliance
• Post the PTO in conspicuous place and near the equipment