MAIN STAIRCASE-01

REF.DET. DWG. NO

STORE UP

P.F.LIFT-03 STAIRCASE-02
P.LIFT-02 6'-0"x6'-6" REF.DET.
7'-0"x6'-0" ULTRASOUND/C.T.SCAN C-LAB STORE REF.DET. DWG. NO
TOILET 18'-0"x19'-9" 5'-7"x11'-0" 8'-0"x11'-0" DWG. NO
REF.DET.
11'-0"x10'-5" DWG. NO UP
REFER DETAIL NURSING WAITING
DWG. NO. 8'-2"x14'-0" 13'-1"x14'-6"

UP

OPD-1 U.G.W.TANK

SERVICE
DUCT
10'-0"x8'-0" 18'-0"x12'-6"x8'
11250 GALLON

OPD HALL
SUMPIT 25'-7"x25'-0" F.H.C.
3'-3"X6'-0"
6'-0" RECEPTION RECORD
OPD-2
ROOM

OPEN TO SKY
10'-0"x8'-0"
6'-0"x8'-0"

OPEN TO SKY

RECEPTION
14'-6"x7'-0"
LIFT-01
9'-0"x7'-0" TOILET
REF.DET. 8'-4"x9'-8"
OPD-3 DWG. NO WAITING
10'-0"x8'-0"
OPEN TO SKY

LABORATORY
23'-0"x15'-6"

F.H.C.
OPD-4
10'-0"x8'-0"

WAITING STORE ADMIN OFFICE ACC. OFFICE ADMIN STAFF UP

STAIRCASE-03
14'-0"x21'-0" 9'x15'-3" 9'x15'-3" 9'x15'-3" 8'-5"x15'-3"

REF.DET.
DWG. NO
OPD-5 OPD-6 X-RAY
13'-7"x10'-0" 7'-7"x10'-0" 23'-0"x11'-6"

STORE
7'-2"X3'-9"
OPEN TO SKY

Dwg Status
Project Title Owner Name Mechanical Plumbing Architects Title

-- BASEMENT-01
MANZOOR AHMED ib.arkitekts Drawn
S.F.J.
Date
FEB.2022
Structural Electrical Checked Scale
ARCHITECTURE INTERIOR DESIGN
CHAHCHAL HOSPITAL CELL . 0 3 2 1 2 4 3 5 5 6 6 Proj. Arch.
S.F.J.

Job. No.
1'-0"=3/16 " Revision No. Drawing No.

IMRAN BARI -- A-01


A-04
BOUNDARY 03
WALL

ELEC/MEC. AND GENT SET


MAIN STAIRCASE-01 DN
REF.DET. DWG. NO

DN LOOKING
BELOW
M.TOILET W.C. 10'-0"x13'-0"
8'-3"x9'-6" P.F.LIFT-03
DOCTOR F.TOILET TOILET
8'-2"x9'-6" P.LIFT-02 6'-0"x6'-6" DUTY
8'x10' REF.DET. 10'-10"x8'-4"
7'-0"x6'-0" DOCTORS
TOILET REF.DET.
DWG. NO
W.C.

OPEN TO SKY
9'-9"x10'
DWG. NO

4'-0"x19'-9"
LOBBY EMERGENCY
8'-2"x7'-6"
46'-3"x19'-9" STORE
UP
STORE
8'-3"x4'-6"

U.G.W.TANK

SERVICE
CABINET

DUCT
18'-0"x12'-6"x8'
11250 GALLON

ENT. LOBBY F.H.C.


10'-3"x12'-0"
STAIRCASE-02
REF.DET.
MALE WARD VOID DWG. NO

OPEN TO SKY
23'-3"x22'-9" DRESSING
21'-0"x6'-8" RECORD DN
ROOM ROOM
OPEN TO SKY

6'-8"x10'-0" 13'-6"x10'-0"

LIFT-01
9'-0"x7'-0" COURTYARD
REF.DET. 14'-0"x19'-3"
DWG. NO OPEN TO SKY ABOVE

MAIN RECEPTION
21'-0"x8'-0"
5'-4"WIDE
STAFF MOTOR CYCLE

TOILET PASSAGE

AND WHEEL CHAIR SPACE


5'X5'
F.H.C

EMPTY STRETCHERS
PARKING

DN
A-04

03

A-04
UP DN 02
H.D.U. WARD INTERNAL
21'-3"x15'-3" PHARMACY WAITING
14'-0"x19'-3" 17'-0"x15'-3"

BOUNDARY
WALL
RAMP

STAIRCASE-03
ENTRANCE VERANDAH
REF.DET.
OPEN DUCT FOR BASEMEN 35'-0"x14'-8"
DWG. NO
VENTILATION
UP
HANDICAP RAMP RAMP SPACE FOR
UP AMBULANCE

UP
CANTEEN

GUARD TIME
TOILET
PLANTER RM. OFFICE
6'-6"x85'-6"

GATE OUT GATE IN

Dwg Status
Project Title Owner Name Mechanical Plumbing Architects Title

--
MANZOOR AHMED ib.arkitekts Drawn
S.F.J.
Date
FEB.2022
Structural Electrical Checked Scale
ARCHITECTURE INTERIOR DESIGN
CHAHCHAL HOSPITAL CELL . 0 3 2 1 2 4 3 5 5 6 6 Proj. Arch.
S.F.J.

Job. No.
3/16 "=1'-0" Revision No. Drawing No.

IMRAN BARI -- A-02


MAIN STAIRCASE-01
REF.DET. DWG. NO

SPACE FOR AC OUTER SPACE FOR AC OUTER


19'-0"x2'-6" 19'-0"x2'-6"
DN

W.C.
TOILET P.F.LIFT-03 TOILET
P.LIFT-02 6'-0"x6'-6"
7'-0"X6'-6" 8'-2"x10'-9"
7'-0"x6'-0" REF.DET. PANTRY
DWG. NO 10'-9"x10'-9"
REF.DET. W.C.
TOILET/

OPEN TO SKY
DWG. NO
CHANGING

4'-0"x19'-9"
10'-0"x12'-6" PEAD WARD
O.T.
18'-0"x21'-9" 28'-0"X19'-9"

6'-0" WIDE CORRIDOR


RECOVERY UP
SHOW
ROOM RICK
10'-6"x22'-0"
TOILET
6'x6'

SERVICE
PRIVATE

DUCT
DOCTOR ROOM-4
ENT. 13'-0"x10'-5"
10'-0"x14'-0"
F.H.C.

BABY CON.
STAFF
VOID DOCTOR PRIVATE
21'-0"x18'-0" 20'-9"x10'-3" ROOM-3
LIFT-01 6'x6'
13'-0"x10'-5"
LABOR ROOM 9'-0"x7'-0" TOILET
18'-4"x17'-3" REF.DET.
DOCTOR DWG. NO
8'-6"x17'-3"
RECEPTION
15'-3"x8'-0"
STORE TOILET
6'x6' 6'x6' PRIVATE
F.H.C. ROOM-2
13'-0"x10'-6"

TOILET 6'-0" WIDE


5'-0"x6'-0" CORRIDOR
UP DN

PRIVATE
ROOM-1
STAFF TOILET 13'-0"x10'-5"
TOILET
8'-0"x12'-6"

OPEN TO SKY
6'x6'
WAITING

4'-0"18'-6"
NICU GAYNEE WARD
28'-8"x17'-0" 31'-9"x18'-3"
STAIRCASE-03
TOILET REF.DET.
11'-3"x10'-0" DWG. NO

Dwg Status
Project Title Owner Name Mechanical Plumbing Architects Title

--
MANZOOR AHMED ib.arkitekts Drawn
S.F.J.
Date
FEB.2022
Structural Electrical Checked Scale
ARCHITECTURE INTERIOR DESIGN
CHAHCHAL HOSPITAL CELL . 0 3 2 1 2 4 3 5 5 6 6 Proj. Arch.
S.F.J.

Job. No.
3/16 "=1'-0" Revision No. Drawing No.

IMRAN BARI -- A-03


MAIN STAIRCASE-01
REF.DET. DWG. NO

SPACE FOR AC OUTER SPACE FOR AC OUTER


19'-0"x2'-6" 19'-0"x2'-6"
DN

O.H.W. TANK
TOILET I.T. ROOM FIRE FIGHTING OPEN TO SKY P.F.LIFT-03
TOILET 8'-9"x8'-0" 10'-0"X6'-0" 6'-0"x6'-6" ABLUTION
PANTRY P.LIFT-02 14'-6"X6'-0"X6' 13'-2"x6'-6"
4'-6"X8'-0" 4'x8'-0" REF.DET. 10'-10"x10'-2"
7'-0"x6'-0" 3262 GAL TOILET
DWG. NO
STAFF ROOM REF.DET.

OPEN TO SKY
11'-3"x14'-0" DWG. NO
C.C.TV. ROOM

4'-0"x19'-9"
10'-0"X7'-7"

UP
KITCHEN AREA
SERVICE AREA 13'-2"x12'-10" TOILET
14'-6"x13'-3" 19'-5"x5'-4"
DIRECTOR

SERVICE
OPEN TO SKY

DUCT
13'-10"X14'-0"

ENT. FOYER F.H.C.


22'-10"x10'-7"

LAUNDRY AREA
20'-2"x16'-0"
VOID
MEETING ROOM 21'-0"x18'-0"
20'-0"X12'-0" LIFT-01
9'-0"x7'-0"
ATRIUM REF.DET.
6'-10"x6'-7" DWG. NO

F.H.C.
PRAYER AREA
26'-6"x21'-9"
UP DN
ABLUTION
7'-7"x19'-6"

OPEN TO SKY
4'-0"18'-6"
STAIRCASE-03
REF.DET.
DWG. NO

Dwg Status
Project Title Owner Name Mechanical Plumbing Architects Title

--
MANZOOR AHMED ib.arkitekts Drawn
S.F.J.
Date
FEB.2022
Structural Electrical Checked Scale
ARCHITECTURE INTERIOR DESIGN
CHAHCHAL HOSPITAL CELL . 0 3 2 1 2 4 3 5 5 6 6 Proj. Arch.
S.F.J.

Job. No.
3/16 "=1'-0" Revision No. Drawing No.

IMRAN BARI -- A-04


MAIN STAIRCASE-01
REF.DET. DWG. NO

LOW ROOF LOW ROOF


DN

O.H.W. TANK OPEN TO SKY


LIFT O.H.
P.LIFT-02 13'-2"x6'-6"
7'-0"x6'-0"
REF.DET.

OPEN TO SKY
DWG. NO

4'-0"x19'-9"
UP
LIFT MACHINE
SERVICE AREA ROOM
14'-6"x13'-3"

SERVICE
OPEN TO SKY

DUCT
F.H.C.
OPEN ROOF

OPEN TO SKY

LIFT O.H. LIFT MACHINE


ROOM
ATRIUM
6'-10"x6'-7"
OPEN ROOF

OPEN ROOF

VOID ROOF

Dwg Status
Project Title Owner Name Mechanical Plumbing Architects Title

--
MANZOOR AHMED ib.arkitekts Drawn
S.F.J.
Date
FEB.2022
Structural Electrical Checked Scale
ARCHITECTURE INTERIOR DESIGN
CHAHCHAL HOSPITAL CELL . 0 3 2 1 2 4 3 5 5 6 6 Proj. Arch.
S.F.J.

Job. No.
3/16 "=1'-0" Revision No. Drawing No.

IMRAN BARI -- A-05


ELEVATION-01

ELEVATION-03
Dwg Status
Project Title Owner Name Mechanical Plumbing Architects Title

--
MANZOOR AHMED ib.arkitekts Drawn
S.F.J.
Date
FEB.2022
Structural Electrical Checked Scale
ARCHITECTURE INTERIOR DESIGN
CHAHCHAL HOSPITAL CELL . 0 3 2 1 2 4 3 5 5 6 6 Proj. Arch.
S.F.J.

Job. No.
3/16 "=1'-0" Revision No. Drawing No.

IMRAN BARI -- A-06


ELEVATION-02 ELEVATION-04

Dwg Status
Project Title Owner Name Mechanical Plumbing Architects Title

--
MANZOOR AHMED ib.arkitekts Drawn
S.F.J.
Date
FEB.2022
Structural Electrical Checked Scale
ARCHITECTURE INTERIOR DESIGN
CHAHCHAL HOSPITAL CELL . 0 3 2 1 2 4 3 5 5 6 6 Proj. Arch.
S.F.J.

Job. No.
3/16 "=1'-0" Revision No. Drawing No.

IMRAN BARI -- A-07


LIFT O.H.
MACHINE
ROOF ROOM ROOF

L I F T
MEETING ROOM LAUNDRY AREA
ATRIUM ROOF

LABOR ROOM STAFF PRIVATE ROOM


DOCTOR DOCTOR

OPEN TO SKY ABOVE


L I F T

MALE WARD RECORD DRESSING


ROOM ROOM EMERGENCY
L I F T
RECEPTION

OPD-3

LIFT PIT

SECTION A-A

Dwg Status
Project Title Owner Name Mechanical Plumbing Architects Title

--
MANZOOR AHMED ib.arkitekts Drawn
S.F.J.
Date
FEB.2022
Structural Electrical Checked Scale
ARCHITECTURE INTERIOR DESIGN
CHAHCHAL HOSPITAL CELL . 0 3 2 1 2 4 3 5 5 6 6 Proj. Arch.
S.F.J.

Job. No.
3/16 "=1'-0" Revision No. Drawing No.

IMRAN BARI -- A-08


ROOF

MACHINE
ROOM ROOF

OPEN AREA KITCHEN AREA

STAFF
PEAD WARD DOCTOR RECEPTION

DRESSING MAIN
EMERGENCY ROOM RECEPTION

ULTRASOUND/
C-LAB C.T.SCAN WAITING STORE

SECTION B-B

Dwg Status
Project Title Owner Name Mechanical Plumbing Architects Title

--
MANZOOR AHMED ib.arkitekts Drawn
S.F.J.
Date
FEB.2022
Structural Electrical Checked Scale
ARCHITECTURE INTERIOR DESIGN
CHAHCHAL HOSPITAL CELL . 0 3 2 1 2 4 3 5 5 6 6 Proj. Arch.
S.F.J.

Job. No.
3/16 "=1'-0" Revision No. Drawing No.

IMRAN BARI -- A-09


GENERAL NOTES
1. DESIGN IS IN ACCORDANCE WITH ACI-318-08 CODE. 28. EXISTING UNDERGROUND SERVICES IF ANY, REQUIRED TO BE LEFT IN POSITION, SHALL
2. ALL WORK SHALL BE CARRIED OUT IN ACCORDANCE WITH THE JOB SPECIFICATIONS. BE CAREFULLY PROTECTED DURING EXCAVATION.
3. BEAM AND SLAB REINFORCED CONCRETE WILL BE OF 3500 PSI CYLINDER STRENGTH 29. EXCAVATION ADJACENT TO EXISTING STRUCTURES AND/OR UNDER-GROUND SERVICES
AND COLUMN, FOUNDATION REINFORCED CONCRETE WILL BE OF 4000 PSI CYLINDER STRENGTH SHALL BE MADE BY HAND AND PROPERLY PROTECTED.
WITH MINIMUM CEMENT CONTENT 380 KG/M 30. ADEQUATE SHORING AND SUPPORT TO THE SIDES OF ALL EXCAVATION SHALL BE b #3@4" OR AS PER BEAM OR AS PER BEAM
4. DESIGN OF SPECIFIED CONCRETE MIX SHALL BE SUBMITTED BY THE CONCTRACTOR AND ELEVATION WHICHEVER ELEVATION WHICHEVER
SUPPLIED AND ERECTED WHERE REQUIRED TO SAFE GUARD WORKMEN AND PROTECT
LESS SHOULD BE ADOPTED LESS SHOULD BE ADOPTED
SHALL BE GOT APPROVED FORM THE ENGINEER WELL BEFORE CONCRETING OF RELEVENT
ANY ADJACENT STRUCTURES.
STURCTURES ALONGWITH RESULT OF TEST CYLINDERS TESTED AS PER ASTM C 39.
31. FOUNDATIONS HAVE BEEN DESIGNED FOR BEARING CAPACITY OF 1.95 TSF FOR RAFT FOUNDATION AT
TEST SPECIMENS SHALL BE MADE AND CURED IN ACCORDANCE WITH ASTM C 31.
LEVEL 13'-0" FROM ROAD LEVEL. IN CASE OF ANY ADVERSE VARIETY OF SOIL OR BEARING
5. ALL REINFORCING STEEL IS DEFORMED 60,GRADE 60000 PSI MIN. YIELD STRENGTH AND MIN.
CAPACITY FOUND DURING CONSTRUCTION, IT SHALL BE IMMEDIATELY BROUGHT TO THE BEAM BAR BENDING DETAIL AT BEAM END
ULTIMATE STRENGTH OF 90000 PSI AS PER ASTM A-615 SPECIFICATIONS.
NOTICE OF ENGINEER IN CHARGE FOR FURTHER INSTRUCTIONS.
6. ORDINARY PORTLAND CEMENT, CONFORMING TO BS-12 / PS-232 SHALL BE USED IN ALL
LOSE POCKET WHEREVER ENCOUNTERED SHALL BE REMOVE AND REPLACED WITH
R.C.C. WORK EXCEPT WHERE IT IS SPECIFICALLY MENTIONED IN THE GEOTECHNICAL REPORT.
GOOD SOIL AND COMPACTED TO ARCHIVE DESIRE BEARING CAPACITY.
7. CEMENT FROM DIFFERENT SOURCES SHALL NOT BE MIXED FOR THE STRUCTURE.
32. WHILE BACK FILLING OF EXCAVATION FOR FOOTINGS COMPACTION SHALL BE DONE
8. COARSE SAND FROM APPROVED QUARRIES / SOURCES SHALL BE USED.
IN LAYERS.
9. WELL GRADED CRUSHED STONE FROM APPROVED QUARRIES / SOURCES SHALL BE USED
33. ALL CONDUITS AND PIPES TO BE LAID IN CONCRETE SHALL BE LOCATED ABOVE MAIN
AS COARSE AGGREGATE. MAXIMUM NOMINAL SIZE OF THE COARSE AGGREGATE SHALL BE
REINFORCEMENT OF SLABS AND BEAMS AND WITH THE APPROVAL OF THE ENGINEER.
20 MM FOR ALL R.C.C. WORK. AGGREGATE
3 SHALL COMPLY ASTM C33
34. PREFORMED EXPANSION JOINT FILLER (NON EXTRUDING AND RESILIENT TYPE) WHERE
10. POTABLE WATER SHALL BE USED FOR CONCRETE AND SHALL BE FREE OF ORGANIC AND FOOTING
USED SHALL CONFORM TO ASTM 1751 (AASHTO M 213) SPECIFICATION.
OTHER IMPURITIES. FLOOR LEVEL
35. EXCAVATION INCLUDING DEWATERING, BRACING OF EXCAVATION TO SAFEGUARD THE 3/8"Ø ANCHOR BAR
11. 60 X 60 MM PRECAST CONCRETE BLOCKS HAVING COMPRESSIVE STRENGTH OF 6000 PSI. EVERY 3RD COURSE
OR 3/8"Ø HILTI BAR BOLT.
ADJOINING PROPERTY AND LIFE AND DEWATERING PITS IN CASE OF RAIN IS CONTRACTOR'S
AND SPACED NOT MORE THAN 1 M C/C SHALL BE USED FOR PROVISION OF REQUIRED
RESPONSIBILITY. FOR THAT MATTER, A QUALIFIED GEO-TECHNICAL ENGINEER CAN BE
COVER TO MAIN REINFORCEMENT. THICKNESS OF THESE BLOCKS SHALL BE EQUAL TO
APPOINTED ON HIS ROLE.
THE REQUIRED COVER.
36. MAXIMUM WATER CEMENT RATIO =0.5 FOR UNDERGROUND CONCRETE P.C.C.
12. ALL DIMENSIONS ARE GIVEN IN FEET-INCHES . WRITTEN DIMENSIONS ARE TO (1:4:8)
MAXIMUM WATER CEMENT RATIO =0.45 FOR ABOVE GROUND CONCRETE
BE FOLLOWED.
37. HEAVY DUTY POLYTHENE SHEET, 0.20MM THK SHALL BE PLACED BELOW THE LEAN SEISMIC BEAM/COLUMN JOINT DETAIL COLUMN/WALL ANCHOR DETAIL
13. UNLESS OTHERWISE SHOWN ON THE PLANS, CONCRETE COVER PROVIDED FOR
CONCRETE FOR ALL GROUND SLABS. FOR EXTERNAL BLOCK WALL ONLY
REINFORCEMENT SHALL BE AS FOLLOWS;
38. WATER PROOFING SHALL BE BITUTHENE 3000 OR PROOFEX 12X OR EQUIVALENT.
FOOTINGS ON 1:4:8
39. CRYSTALLINE WATER PROOFING WHERE SPECIFIED SHALL BE PENETRON OR XYPEX OR ACQUAFIN-IC
BOTTOM 1.5"
OF SCHAUMBURG OR EQUIVALENT.
SIDES 1.5" Stirrups and tie 135 deg Stirrup-tie
40. BLOCKWORK MUST NOT BE BUILT ON CONCRETE SLABS OR BEAMS UNTIL FORMWORK
SLABS 0.75" hook dimensions, in. hook dimensions, in.
SUPPORTING SAME HAS BEEN REMOVED.
BEAMS & COLUMNS 1.5"
41. MINIMUM CAMBER IN ALL BEAMS AND SLABS SHALL BE ATLEAST SPAN/240 AND Bar D 90-deg hooks 135-deg hooks 135-deg hooks
14. CONSTRUCTION DRAWINGS ALONG WITH BAR BENDING SCHEDULE SHALL BE SUBMITTED (in.)
SPAN/180 FOR CANTILEVER BEAMS AND SLABS. UNLESS SHOWN OTHERWISE. Size H H
BY THE CONTRACTOR FOR ENGINEER'S APPROVAL WELL BEFORE PROCEEDING ANY WORK. A or G, A or G, approx A or G, in. approx
42. TOP OF BLINDING SHALL BE 1.4 mm MULTI-LAYER COMPOSITE HIGH DENSITY
15. ALL LAYOUT, CONFIGURATION, DIMENSIONS AND LEVELS SHALL BE VERIFIED BEFORE #3 1½ 4 4 2½ 5 3½
POLYETHYLENE MEMBRANE WITH PRESSURE SENSITIVE ADHESIVE COATING.
PROCEEDING WITH THE WORK. #4 2 4½ 4½ 3 6½ 4½
43. ALL FACES OF CONCRETE SHALL BE PROTECTED WITH 1.5 mm THICK SELF ADHESIVE 3
16. ALL REINFORCING BARS SHALL BE HELD FIRMLY IN PLACE BEFORE AND DURING THE #6 4½ 12 7 4 4½ 10 34 6½
RUBBER/BITUMEN POLYETHYLENE LAMINATED WATER PROOFING MEMBERANE FOR MAIN STRUCTURES.
POURING OF CONCRETE BY MEANS OF ADEQUATE NUMBER OF WIRES AND SUPPORTS
44. CONTRACTOR SHALL PREPARE AT LEAST 6 CUBES/CYLINDRICAL FOR EACH POUR AND SHALL SUBMIT THE TEST
TO PREVENT DISLOCATION DURING THE COURSE OF CONSTRUCTION.
REPORTS TO ARCHITECT/ STRUCTURE ENGINEER, 2 EACH FOR 7 & 28 DAYS CRUSHING STRENGTH.
17. CONSTRUCTION JOINT NOT SHOWN ON THE DRAWING SHALL BE PROPERLY PLANED AND
45. THE TERMITE CONTROL TREATMENT SHALL BE APPLIED AFTER EXCAVATION OF
SO MADE AND LOCATED AS TO LEAST IMPAIR THE STRENGTH OF STRUCTURE AND
FOUNDATIONS ON BEDS AND SIDE SLOPES BEFORE CONCRETING OPERATION.
SHALL NEED PRIOR APPROVAL OF THE ENGINEER. IN GENERAL THEY SHALL BE LOCATED
46. THE BACK FILLING / EARTH FILLING WILL BE DONE IN LAYERS (6" TO 8" THICK) COMPACTED UPTO 95% AASHTO STANDARDS
NEAR THE MIDDLE OF THE SPAN OF SLAB AND BEAMS.
47. CONTRACTOR / SITE ENGINEER SHOULD PREPARE BAR BENDING SCHEDULE AND GET APPROVAL FROM THE DESIGNER
JOINTS SHALL BE PERPENDICULAR TO MAIN REINFORCEMENT. ALL REINFORCING
48. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE DESIGN, CONSTRUCTION AND SAFETY OF
STEEL SHALL BE CONTINUED PROPERLY ACROSS THE JOINTS.
THE FORM WORK.
18. DURING CONSTRUCTION, SAFETY AND STABILITY OF THE STRUCTURE AND ALL TEMPORARY
WORKS SHALL BE GIVEN PRIME IMPORTANCE. UTMOST CARE AND PRECAUTION SHALL BE
EXERCISED BY THE CONTRACTOR DURING THE WORK AGAINST ANY MISHAP OR ACCIDENT.
19. BARS IN BEAMS SHALL BE JOGGLED IN VERTICAL PLANE FOR LAPS AND SHALL RECOMENDED END HOOKS, ALL GRADES Detailing Detailing
BE STAGGERED. Finished Dimension Dimension
20. ALL LAPS ARE 54 TIMES BAR DIAMETER. bend
180-deg hooks 90-deg hooks
21. BARS IN COLUMN SHALL BE JOGGLED FOR LAPS WITH STARTER BARS. Bar diameter D db
db

b
Size D,in.
22. POSITION OF BARS IN BEAMS SHALL BE ADJUSTED KEEPING IN VIEW THE POSITION OF A or G, in. J, in. A or G, in.
VERTICAL BARS OF THE COLUMNS. #3 2¼ 5 3 6 4db
2½" Min.
23. STIRRUPS SHALL BE PLACED IN SUCH A WAY THAT THEIR HOOKS SHALL BE STAGGERED #4 3 6 4 8 180° 90°
AND LOCATED IN COMPRESSION FACE. #5 33 4 7 5 10
24. CONCRETE TEST CYLINDER SHALL BE CURED WITH THE SAME METHOD AND UNDER SAME #6 4½ 8 6 12 12db for #6, #7, #8
CONDITIONS AS THOSE FOR THE CONCRETE WORK THEY REPRESENT. #7 5¼ 10 7 14 6db for #3, #4, #5 25-02-2022 ISSUED FOR CONSTRUCTION MOHSIN 0
23. STIRRUPS SHALL BE PLACED IN SUCH A WAY THAT THEIR HOOKS SHALL BE STAGGERED #8 6 11 8 16 or 2½ in. minimum
DATE DESCRIPTION BY REV
AND LOCATED IN COMPRESSION FACE. #9 9½ 15 11 3 4 19
CLIENT
24. CONCRETE TEST CYLINDER SHALL BE CURED WITH THE SAME METHOD AND UNDER SAME #10 10 3 4 17 13¼ 20
--
CONDITIONS AS THOSE FOR THE CONCRETE WORK THEY REPRESENT. #11 12 19 14 3 4 24
D D
25. NO CONCRETE SHALL BE POURED UNTIL ITS FORM WORK AND REINFORCEMENT HAS #14 18¼ 27 21 3 4 31
CONSULTANT
#18 24 36 28½ 41
BEEN INSPECTED AND APPROVED BY THE ENGINEER.
CE
26. SEQUENCE OF REMOVAL OF FORM WORK SHALL BE AS APPROVED BY THE ENGINEER. b b b

D D
27. ALL STRUCTURAL DRAWINGS SHALL BE READ & CHECKED IN CONJUNCTION WITH THE
PROJECT
ARCHITECTURAL DRAWINGS & ELO FOR LAYOUT AND LEVELS OF DIFFERENT MEMBERS.
135-DEG SEISMIC HOSPITAL,
90° 135°
SHAIKHUPURA.
STIRRUP AND TIE HOOKS STIRRUP/TIE HOOKS

TITLE
GENERAL NOTES & GENERAL DETAILS

SCALE DRAWN DESIGNED CHECKED DATE

AS SHOWN MOHSIN YAHYA TANVEER FEB, 2022


DRG. NO.
GN-00
KEY PLAN

A B C E F G I J K L M N O P Q BASEMENT
1"
11'-12 1"
18'-82 1"
9'-32 1"
4'-72 1"
7'-02 1"
7'-112 1"
20'-12
9'-9" 3'-0" 7'-9" 7'-9" 5'-3" 4'-6" 9'-3" 6'-9"

3'-9" 3'-7" 4'-10"

PLOT LINE PLOT LINE

3'-3"
5'-11"

3'-0"

3'-0"
1"
4'-72

PLOT LINE

PLOT LINE
1"
1'-42

1
4'-0"

UP
2
1'-9"

T G
E
R IN
ED DR IS
PA W
U E EV
A
6'-9"

R
C T D
R EC IRE
UP

R
4

LO U
D
FO HIT U
1"

C EQ
3'-72

UP UP TO

R
M.H
5 UP TO BASEMENT
1"
2'-12

BASEMENT UP TO ROOF

AR
ROOF BASEMENT
6 UP TO
1'-6"

ROOF
B BASEMENT U.G.W.TANK
ST-02 ROOF 18'-0"x12'-6"x8'
3'-0" 8900 GALLON
1"
7'-12

A A UP TO
ST-02 ST-02 BASEMENT
ROOF
6'-0"

SUM M.H
7 PIT UP TO
BASEMENT
1"
4'-42

ROOF
C UP TO
B ST-02
BASEMENT
8 ST-02 ROOF
UP TO 9'-0"
BASEMENT 24" THICK
ROOF
LIFT SSL
7'-9"

7'-0"

10'-5"
PIT -8'-6"

7'-4"
9
C
UP TO
ST-02
5'-9"

BASEMENT
ROOF
3'-4"

10
1"
7'-12

UP TO
BASEMENT
#5@6"C/C
X ROOF
TOP AND BOTTOM BOTH WAYS X
ST-02 UP ST-02

1"
22'-22
11
#5@6"C/C
TOP AND BOTTOM BOTH WAYS
1"
8'-102

12

PLOT LINE
1"
3'-72

2'-10"
13 ~
1"
6'-12

7'-0"

7'-0"

7'-0"

7'-0"

7'-0"
14
1"

3'-0"

3'-0"
2'-72

25-02-2022 ISSUED FOR CONSTRUCTION MOHSIN 0


5'-11"
1"
52'-02 1"
9'-02 1"
14'-102 DATE DESCRIPTION BY REV
6'-0" 9'-10" 6'-0" 6'-0" 18'-2" 11'-1"
CLIENT
--
1"
21'-42

CONSULTANT
CE
PROJECT
PLOT LINE

HOSPITAL,
SHAIKHUPURA.

~
PLOT LINE PLOT LINE TITLE
FOUNDATION LAY OUT PLAN
FOUNDATION LAY OUT PLAN
SCALE 3/16"
SCALE DRAWN DESIGNED CHECKED DATE

AS SHOWN MOHSIN YAHYA TANVEER FEB, 2022


DRG. NO.
ST-01
A B C E F G I J K L M N O P Q
1"
18'-82 1"
9'-32 1"
4'-72 1"
7'-112 1"
20'-12
5'-11" 9'-9" 3'-0" 7'-9" 7'-9" 5'-3" 7'-01"
2
4'-6" 9'-3" 6'-9"

#5@6"C/C
COLUMN COLUMN COLUMN COLUMN RETAINING WALL
#5@6"C/C

2'-0" 2'-0"
4#8 4#8
24"

24"
(TYP.) (TYP.)
6"6"

1:4:8
6" STONE SOLING

#5@6"C/C
#5@6"C/C
SECTION (X-X)
SCALE: 1/4"=1-0"

9" 9""
SSL SSL
4-5/8"Ø 4-5/8"Ø
+3'-6" +3'-6"
2" D.P.C W GRID GRID GRID
Clear Span (L1) CLEAR SPAN (L2)
PLINTH LEVEL VENTILATOR SIZE
SLAB REINFORCEMENT SLAB REINFORCEMENT
L2 / 4 L2 / 4 L2 / 4 L2 / 4 AS PER ARCH.

3'-6"

3'-6"
TOP STEEL

AS PER ARCH.
EXTRA TOP WHICH EVER WHICH EVER WHICH EVER 4-5/8"Ø
TOP EXTRA CONTINUOUS IS GREATER IS GREATER IS GREATER
BARS BARS 3/8"Ø@6"c/c
SSL (BOTH FACE) SSL 3/8"Ø@6"c/c

(TYP.)
EQ.
W ±0'-0" ±0'-0" (BOTH FACE)
D

2" D.P.C STIRRUPS L2/4 STIRRUPS REST L2/4 L2/4 STIRRUPS REST L2/4

(TYP.)
AS PER ARCH.

EQ.
TOP STEEL
BOTT EXTRA

AS PER ARCH.

AS PER ARCH.
(BOTH FACE)
PLINTH LEVEL 1:4:8 1:4:8 1:4:8

3/8"Ø@8"c/c
3'-0

54 Ø LAP
6" STONE SOLING 6" STONE SOLING 3/8 "

(TYP.)
BOTT.STEEL "Ø
@8 SEE REINFORCEMENT
5/

(BOTH FACE)
BOTTOM EXTRA BARS BOTTOM EXTRA BARS 2'-0" "c/

7"
2'-0" 2'-0" 2'-0" 8"

3/8"Ø@8"c/c
Ø@ c OF RAFT PLAN
AS PER

54 Ø LAP
TOP EXTRA AT MID SPAN AT MID SPAN

(TYP.)
6"
SITE

BOTTOM CONTINUOUS BARS 3/8 c/c



N.G.L SITU (1:3:6) 5/8 @8 SSL
STIRRUPS 1/2"Ø@6"c/c "Ø
@
"c/
c
D

(BOTH FACE)
6"c
/c
-8'-6"
BOTTOM EXTRA TYPICAL ELEVATION 1/2"Ø@6"c/c

(TYP.)
3'-0"

EQ.
(BOTH FACE)

(TYP.)
6" 6" 6" W 6"

EQ.
OF PLINTH BEAM CONSTRUCTION CONSTRUCTION

24"
2'-0" 2'-0"
BOTT.STEEL SCALE: 1/2"=1'-0" JOINT JOINT (TYP.) (TYP.)

(TYP.)

(TYP.)
6" 6"

6"6"

1:4:8 1:4:8

24"

24"
STONE SOLING STONE SOLING GRID SSL SSL

6" 6"
L -8'-6" -8'-6" 1:4:8
STONE SOLING
WHICHEVER IS GREATER OF
DETAIL OF DETAIL OF L4, LBR & 54Ø OF BARS LBR STEEL REFER 24" STEEL REFER 24"
RAFT PLAN RAFT PLAN TYPICAL SECTION

24"

24"
TOP CONTINUOUS BARS EXTRA TOP BARS (TYP.) (TYP.)
INTERNAL PLINTH BEAM EXTERNAL PLINTH BEAM
SCALE: 1/2"=1'-0" SCALE: 1/2"=1'-0" STAIR STARTER
4-3/4"Ø 4-3/4"Ø SCALE: 3/8"=1-0"

6" 6"

6" 6"
STIRRUPS REST 1:4:8 1:4:8
STONE SOLING STONE SOLING
1:4:8 1:4:8
6" STONE SOLING 6" STONE SOLING TYPICAL SECTION TYPICAL SECTION
BOTTOM CONTINUOUS BARS
OF RETAINING WALL OF RETAINING WALL
TYPICAL ELEVATION WITHOUT VENTILATOR
SCALE: 3/8"=1-0"
WITH VENTILATOR
SCALE: 3/8"=1-0"

OF CANTILEVER BEAM
SCALE: 1/2"=1'-0"
1'-0" 6'-0" 1'-0" 9" 6'-0" 1'-0"

SSL SSL SSL


-8'-6" 6#8 6#8 -8'-6" 6#8 -8'-6"

SEE REINFORCEMENT SEE REINFORCEMENT SEE REINFORCEMENT

2'-0"

2'-0"

2'-0"
2'-0" OF RAFT PLAN OF RAFT PLAN 2'-0" OF RAFT PLAN 2'-0"
(TYP.) (TYP.) (TYP.)

(BOTH FACE)

(BOTH FACE)
(BOTH FACE)

(BOTH FACE)
#4@7"c/c

#4@7"c/c
#4@7"c/c

#4@7"c/c
6" 6"

6" 6"

6" 6"
1:4:8 1:4:8 1:4:8

6'-0"

6'-0"
#8@7"c/c #8@7"c/c
(BOTH FACE) (BOTH FACE)
#5@7"c/c #5@7"c/c
(BOTH FACE) (BOTH FACE)
SSL SSL
-14'-6" -14'-6"

SEE REINFORCEMENT SEE REINFORCEMENT


2'-0" OF RAFT PLAN 2'-0" 2'-0" OF RAFT PLAN 2'-0"

2'-0"

24"
(TYP.) (TYP.) (TYP.) (TYP.)

6" 6"
1:4:8 1:4:8

6" 6"
6" STONE SOLING 6" STONE SOLING
6#8 6#8 4#8 6#8

SECTION OF ( B - B ) SUMP PIT SECTION OF ( A - A ) SUMP PIT


SCALE: 3/8"=1-0" SCALE: 3/8"=1-0"

1'-0" 9'-0" 1'-0"

SSL SSL
-8'-6" 6#8 6#8 -8'-6"

SEE REINFORCEMENT SEE REINFORCEMENT


2'-0"

2'-0"
2'-0" OF RAFT PLAN OF RAFT PLAN 2'-0" 25-02-2022 ISSUED FOR CONSTRUCTION MOHSIN 0
(TYP.) (TYP.)

(BOTH FACE)
(BOTH FACE)
DATE DESCRIPTION BY REV

#4@7"c/c
#4@7"c/c
6" 6"

6" 6"
1:4:8 1:4:8

5'-0"
CLIENT
#5@7"c/c #8@7"c/c --
(BOTH FACE) (BOTH FACE)
SSL
-13'-6"
CONSULTANT
2'-0"
SEE REINFORCEMENT
2'-0" CE
2'-0"

(TYP.) OF RAFT PLAN (TYP.)

PROJECT
6" 6"

1:4:8
6" STONE SOLING

6#8 6#8
HOSPITAL,
SECTION OF ( C - C ) LIFT PIT SHAIKHUPURA.
SCALE: 3/8"=1-0"

TITLE
FOUNDATION REINFORCEMENT DETAILS

SCALE DRAWN DESIGNED CHECKED DATE

AS SHOWN MOHSIN YAHYA TANVEER FEB, 2022


DRG. NO.
ST-02