ii 110 KV Take off/Strung Bus Structure using single Pole RSJ 250X125
Main pole 250X125RSJ 10 37.3 2 1 746.00
Polebottom cleats 65x65x6MSA 0.45 5.8 4 1 10.44
Boom 125x 65MSC 6.4 12.7 2 1 162.56
Boom belts 50x50x6MSA 0.38 4.5 6 1 10.26
UnderhangBoom belts 65x10 MSF 0.38 5.1 6 1 11.63
Boom bracings 50x50x6MSA 0.71 4.5 16 1 51.12
Eye Bolt Fastener 65x10 MSF 0.12 5.1 6 1 3.67
Total 746.00 249.68
Page 1 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
Boom 125x 65MSC 6.4 12.7 2 1 162.56
ABS oprtg guide 100x50MSC 1.155 9.2 1 1 10.63
Boom belts 50x50x6MSA 1.285 4.5 4 1 23.13
Support Stool 125x 65MSC 1.285 12.7 6 1 97.92
Support Stool 125X65MSC 0.285 12.7 6 1 21.72
Total 609.84 332.15
Page 2 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
Top tie2nd row(bay8) 100x50MSC 4.765 9.2 1 1 43.84
Top tie3rd row(bay 100X50MSC 9 9.2 2 3 496.80
2,3,4,5,6,7)
Top tie3rd row(bay1,8) 100X50MSC 4.625 9.2 2 2 170.20
Middle row &outer row tie 75x75x6MSA 4.8 6.8 1 3 97.92
Page 3 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
Top tie3rd row(bay1,6) 100X50MSC 4.625 9.2 2 2 170.20
Middle row &outer row tie 75x75x6MSA 4.8 6.8 1 3 97.92
Page 4 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
Feeder bus boom xarm 100X50MSC 0.53 9.2 2 2 19.50
ABS Booms Bay 2,3 100x50MSC 4.5 9.2 2 5 414.00
ABS booms Bay 1,4 100x50MSC 4.6 9.2 2 4 338.56
Support Booms Bay1,4 100x50MSC 4.6 9.2 2 2 169.28
Page 5 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
LV strungbus boom belts 50x50x6MSA 0.33 4.5 3 1 4.46
Page 6 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
Support Boom X-Arms 100x50MSC 0.3 9.2 2 1 5.52
Page 7 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
Total 1234.20 1445.80
1st row Top tie(Extn bay 3) 100x50 MSC 4.665 9.2 1 1 42.92
Page 8 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
Top tie1st row(bay3,4,5,6) 75x75x6MSA 8 6.8 1 2 108.80
Page 9 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
Top tie2nd row(bay6) 75x75x6MSA 4.265 6.8 1 1 29.00
Top tie3rd row(bay 2,3,4,5) 100X50MSC 8 9.2 2 2 294.40
Page 10 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
Feeder bus boom xarm 75x75x6MSA 0.53 6.8 2 1 7.21
Feeder bus boom xarm 75x75x6MSA 0.23 6.8 2 1 3.13
ABS Booms Bay 2,3 100x50MSC 4 9.2 2 5 368.00
ABS Booms Bay 1,4 100x50MSC 4.1 9.2 2 4 301.76
Support Booms Bay1,4 100x50MSC 4.1 9.2 2 2 150.88
Page 11 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
18 Support Booms Bay1,3 100x50MSC 4.1 9.2 2 2 150.88
Page 12 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
LV strungbus boom belts 50x50x6MSA 0.33 4.5 3 1 4.46
Page 13 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
Feederbus boom 50x50x6MSA 0.23 4.5 3 1 3.11
belts(bay2)
Top tie belts3rd row 50x50x6MSA 0.3 4.5 6 1 8.10
ABS Boom Belts 50x50x6MSA 0.51 4.5 3 2 13.77
Support booms belts 50x50x6MSA 0.3 4.5 3 1 4.05
Eye Bolts Fastener 65x10 MSF 0.12 5.1 6 1 3.67
Eye Bolts Fastener 65x10 MSF 0.1 5.1 6 1 3.06
Total 617.10 611.29
Page 14 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
Top tie2nd row(extn bay3) 75x75x6MSA 4.115 6.8 1 1 27.98
Page 15 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
Middle row &outer row tie 75x75x6MSA 4.825 9.2 1 2 88.78
Page 16 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
Feeder bus boom xarm 75x75x6MSA 0.53 6.8 2 2 14.42
ABS Booms 100x50MSC 4 9.2 2 9 662.40
ABS Booms 100x50MSC 4.1 9.2 2 2 150.88
Support Booms 100x50MSC 4 9.2 2 3 220.80
Support Booms 100x50MSC 4.1 9.2 2 1 75.44
ABS Boom X-Arms 100x50MSC 0.51 9.2 2 11 103.22
Support Boom X-Arms 100x50MSC 0.3 9.2 2 4 22.08
Page 17 of 22
STEEL DATA FOR SUBSTATION ERECTION STRUCTURES IN GCC/TRICHY
Sl. Description Steel Length Wt/m Nos Set Total wt/set in kg
in m in kg Heavy Light
Support Boom X-Arms 100x50MSC 0.3 9.2 2 5 27.60
Page 18 of 22
Total
Heavy in Light in
Weight in
KG KG
KG
1A. 110 KV Structures (3M centre to centre
i 110 KV Take off/Strung Bus Structure using 968.00 293.42 1261.42
Double Butt Pole RSJ 200X100
ii 110 KV Take off/Strung Bus Structure using 746.00 249.68 995.68
single Pole RSJ 250X125
iii 110 KV Power Transformer Gantry Structure 746.00 390.91 1136.91
iv 110 KV AB Switch Structure 609.84 212.52 822.36
v 110 KV AB Switch Structure used as Support 609.84 332.15 941.99
1.26
1.00
1.14
0.82
0.94
0.40
0.47
0.60
0.45
10.52
8.23
5.83
4.60
0.90
1.31
2.68
3.63
9.91
7.80
5.43
4.38
3.33
0.86
1.23
2.28
3.46
4.67
5.65
6.75