Sl.no Name of the Employee QID Site Designation GP Apply date to GP Exp Date Status
PETROCON
1 Shinga bahadur 28252430879 Dukhan Carpenter 10/18/2021 Received (10-11-21) Seagull
2 Tek bahadur 28552450046 Dukhan Carpenter 10/18/2021 Received (10-11-21) Seagull
3 shyam Kishore 29552423817 Dukhan Carpenter 10/18/2021 Received (10-11-21) Seagull
4 Santose rajaram 29635619297 Dukhan Carpenter 10/18/2021 Received (10-11-21) Seagull
5 Yagya bahadur 29852413119 Dukhan Carpenter 10/18/2021 Received (10-11-21) Seagull
6 Kamal shahi 30052401860 Dukhan Carpenter 10/18/2021 Received (10-11-21) Seagull
7 Santa Bahadur 28052414706 Dukhan Carpenter 10/19/2021 Received (17-11-21) Seagull
8 Bhagawant chamar 28652445529 Dukhan Carpenter 10/19/2021 Received (17-11-21) Seagull
9 Penne lal 28952451335 Dukhan Carpenter 10/19/2021 Received (17-11-21) Seagull
10 Meikandan dhas reddy 29335625957 Dukhan Admin 10/19/2021 Received (17-11-21) Techno
11 Md anwar husaen riuj 28005022816 Dukhan Carpenter 10/24/2021 Received (17-11-21) Seagull
12 Md tarajul 28305025562 Dukhan Carpenter 10/24/2021 Received (17-11-21) Seagull
13 Nirmal barua 28405019567 Dukhan Carpenter 10/24/2021 Received (17-11-21) Seagull
14 Jitendra 28652428874 Dukhan Carpenter 10/24/2021 Received (17-11-21) Seagull
15 Anowar hossain 28905006764 Dukhan Carpenter 10/24/2021 Received (17-11-21) Seagull
16 Vikram bahadur 29335634248 Dukhan Carpenter 10/24/2021 Received (17-11-21) Seagull
17 Fasil 29435626811 Dukhan Carpenter 10/24/2021 Received (17-11-21) Seagull
18 Imam hussain 29605008360 Dukhan Carpenter 10/24/2021 Received (17-11-21) Seagull
19 Ejaj ahamad musalman 29352420290 Dukhan Excavator Operator 10/25/2021 Received (17-11-21) Patan- Rahman
20 Pramjit singh 29335608924 Dukhan Wheel Excav 11/22/2021 Received Allied
21 Ravi kumar sardari lal 28435634946 Dukhan Wheel Excav 11/22/2021 Received Allied
1 Saifu rehman aziz haman 28358603958 Dukhan Excavator Operator 1/10/2022 Ready for collection Patan
2 Lawung khan H.khan 26058600623 Dukhan Excavator Operator 1/10/2022 Ready for collection Patan
3 Gurnam singh 28935615504 Dukhan Excavator Operator 1/13/2022 3/20/2022 Ready for collection Al-Jaber
4 Hardeep singh 28835636942 Dukhan Showel Operator 1/13/2022 10/15/2022 Ready for collection Al-Jaber
5 Jogendra sah 27552424650 Dukhan Truck operator 1/13/2022 6/30/2022 Ready for collection Al-Jaber
6 Shaha alam mohammed bachu 26205003807 Dukhan Bobcut operator 1/13/2022 6/2/2022 Ready for collection Al-Jaber
7 Srinivas indur 27435627637 Dukhan Truck operator 1/13/2022 10/15/2022 Ready for collection Al-Jaber
8 Abdur Rahman 29358604710 Dukhan Engineer 12/29/2021 Ready for collection TTC
S.NO NAME INCHARGE POSITION GATE NO DK- VALID DATE cutoff date-08-05-22
1 BHUPENDRA BUDHATHOKI MERVIN CARPENTER 14,24,333,555 7/Jul/22
2 KULBIR SINGH MERVIN STEEL FIXER 0,555 7/Oct/22
3 DHARMESH KUMAR MERVIN STEEL FIXER 0,555 15/Oct/22
4 RAM BISWAS RAM MERVIN CARPENTER 0,555 15/Oct/22
5 RAM BACHAN CHAI MERVIN CARPENTER 0,555 15/Oct/22
6 RAJ KISHORE HAJARI MERVIN CARPENTER 0,555 15/Oct/22
7 RAHIM DAD MERVIN CARPENTER 0,555 22/Sep/22
8 AURANGEB KHAN MERVIN CARPENTER 0,555 27/Sep/22
9 RAM ASREYA RAY MERVIN CARPENTER 0,555 15/Oct/22
10 CHANDESHWAR KUMAR MERVIN CARPENTER 0,555 26/Sep/22
11 Ajit Kumar Gupta MERVIN CARPENTER 0,555 15/Oct/22
12 Nasim akhtan Momin MERVIN CARPENTER 0,555 31-08-22
13 MANI KAPAD MERVIN CARPENTER 0,555 15/Oct/22
14 NIRMAL BARUA MERVIN MASON 0,555 15/Oct/22
15 Manoj raut MERVIN CARPENTER 0,555
16 Udu rana MERVIN CARPENTER 0,555 15/Oct/22
17 GAGANDEV RAUT MERVIN CARPENTER 0,555 26-09-22
18 Ghanshyam chamer MERVIN CARPENTER 0,555
19 SANEHI CHAMER MERVIN CARPENTER 0,333,555 18/Jun/22
20 HARADHAN DEY MERVIN CARPENTER 0,333,555 18/Jul/22
21 MANOJ KUMAR PASWAN MERVIN CARPENTER 0,555 15/Oct/22
22 SANTOSE RAJARAM MERVIN CARPENTER 0,12,14,18,19,28,29,30,31,32,555 8/Sep/22
23 WAJID ALI MERVIN CARPENTER 0,555 7/Oct/22
24 GANESH GODIYA MERVIN MASON 555 13/Jul/22
25 SHINGA BAHADUR MERVIN CARPENTER 0,555 15/Oct/22
26 MOHAMMAD FARIDUL ISLAM MERVIN CARPENTER 0,555 15/Oct/22
27 DEVI KUMAR KAMAIT MERVIN CARPENTER 14,24,333,555 29/May/22
28 RAJENDRA PRASAD MERVIN CARPENTER 0,555 28-08-22
29 MUHAMMAD HAMZA MERVIN STEEL FIXER 0,555 27/Sep/22
30 BIJOY BISWAS ABSENT CARPENTER 0,555 27-07-22
31 ARUN KUMAR MUKHIYA CASE STEEL FIXER 0,555 26/Sep/22
32 IMAM HUSSAIN STEEL FIXER 0,12,14,18,19,28,29,30,31,32,555 16/Jun/22
33 Shatrughan Mahato CARPENTER 0,555 15/Oct/22
34 Pram tamang CARPENTER 0,555 15/Oct/22
35 TAJ MUHAMMAD STEEL FIXER 0,555 7/Oct/22
36 SUK BAHADUR TAMANG CARPENTER 0,555 15/Oct/22
37 Kaml uddin CARPENTER 0,555 15/Oct/22 FLAG MAN
38 RAJAN KUMAR RAY CARPENTER 0,555 15/Oct/22 ROTARY SCAFFOLDER
39 Billal miah CARPENTER 0,555 15/Oct/22 MIC SITE
40 MANOJ YADAV VINOTH STEEL FIXER 0,555 29/May/22
41 SHYAM KISHORE VINOTH CARPENTER 0,555 15/Oct/22
42 SANTO MUKHIYA VINOTH CARPENTER 0,555 26/Sep/22
43 Abdur sabur VINOTH CARPENTER 0,555 14/Oct/22
44 TEK BAHADUR VINOTH STEEL FIXER 0,12,14,18,19,28,29,30,31,32,555 31/May/22
45 MD ANWAR HUSAEN RIUJ VINOTH STEEL FIXER 0,12,14,18,19,28,29,30,31,32,555 2/May/22 MIC APPLIED
46 MOHAMMAD AMIR HOSSEN VINOTH CARPENTER 0,555 8/Mar/22 DK GP applied
47 SANTA BAHADUR VINOTH STEEL FIXER 0,12,14,18,19,28,29,30,31,32
48 VIKRAM BAHADUR CARPENTER 0,12,14,18,19,28,29,30,31,32 28/Sep/22
49 JITENDRA KALWAR STEEL FIXER 0,12,14,18,19,28,29,30,31,32 20/Aug/22
50 MD TARAJUL ISLAM STEEL FIXER 0,12,14,18,19,28,29,30,31,32,555 21/Apr/22 MIC APPLIED
51 Anwar hossain CARPENTER 0,555 DRIVER
PRINTER
1 HP PRINTER - SMALL 1 MIC SITE
3 SMALL PRINTER (SCAN WRKNG) 1 MIC SITE
2 HP-BIG PRINTER 1 HEAD OFFICE
4 SMALL PRINTER - no ink 1 HEAD OFFICE
SITE MATERIALS
1 PLATE COMPACTOR 1 ROTARY
2 DIESEL GENERATOR 1 ROTARY
3 GRINDING MACHINE 1 MIC
4 GRINDING MACHINE 1 ROTARY
5 WOOD CUTTER 1 BIRTH-6
6 WOOD CUTTER 1 DUKHAN-VINO
7 DRILLING MACHINE - WIRELESS 1 RAJIV
8 DRILLING MACHINE 1 DUKHAN
9 DIESEL VIBRATOR 2 DUKHAN-MERVIN
10 MOBILE SCAFFOLD 2 ROTARY
11 HDPE WELDING MACHINE 1 MIC
12 NORMAL WELDING MACHINE
List of TECHNOLAX QPR details.
Sl.no Name of the Employee Designation
1 GURNAM SHOVEL OPERATOR
2 SRINIVAS SHOVEL OPERATOR
3 RIPU AMAN DUMPTRUCK
4 KULDEEP DUMPTRUCK
5 RAMISHWAR DUMPTRUCK
6 MIZAN DUMPTRUCK
7 SAMEER ENGINEER
8 ABDUR RAHMAN ENGINEER
1 MD Sabir Maqsood Alam CARPENTER
2 Mohammad Istkhar CARPENTER
3 Faiyaz Alam CARPENTER
IST
9/28/2021 FINISHED (04-10-21) SEAGULL
9/28/2021 FINISHED (04-10-21) SEAGULL
9/28/2021 FINISHED (04-10-21) SEAGULL
9/28/2021 FINISHED (04-10-21)
9/28/2021 FINISHED (04-10-21)
9/28/2021 FINISHED (04-10-21)
9/28/2021 FINISHED (04-10-21)
9/28/2021 FINISHED (04-10-21)
9/28/2021 FINISHED (04-10-21) SEAGULL
9/28/2021 FINISHED (04-10-21) MJK
9/28/2021 FINISHED (04-10-21) MJK
FINISHED (04-10-21) ALLIED
(vocation) PENDING SEAGULL
PENDING SEAGULL
PENDING PAK
PENDING
STAFF PENDING ALLIED
STAFF PENDING ALLIED
PENDING GRTC
PENDING AL-JABER
11/2/2021 FINISHED (08-11-21)
11/2/2021 FINISHED (08-11-21)
11/2/2021 FINISHED (08-11-21)
11/2/2021 FINISHED (08-11-21)
11/2/2021 FINISHED (08-11-21)
11/2/2021 FINISHED (08-11-21)
11/2/2021 FINISHED (08-11-21)
11/2/2021 FINISHED (08-11-21)
11/2/2021 FINISHED (08-11-21)
11/2/2021 FINISHED (08-11-21)
11/2/2021 FINISHED (08-11-21)
11/13/2021 FINISHED (15-11-21)
11/17/2021 FINISHED (23-11-21)
11/17/2021 FINISHED (23-11-21)
11/17/2021 FINISHED (23-11-21)
11/17/2021 FINISHED (23-11-21)
1/4/2022 FINISHED (05-01-22) ALLIED
1/4/2022 FINISHED (05-01-22)
1/4/2022 FINISHED (05-01-22)
1/4/2022 FINISHED (05-01-22)
1/4/2022 FINISHED (05-01-22)
1/4/2022 FINISHED (05-01-22)
1/4/2022 FINISHED (05-01-22)
1/4/2022 FINISHED (05-01-22)
1/4/2022 FINISHED (05-01-22)
1/5/2022 PENDING
1/5/2022 PENDING
1/5/2022 PENDING
1/5/2022 PENDING
1/15/2022 FINISHED (18-01-22) 27835651038
1/15/2022 FINISHED (18-01-22) 29235619606
1/15/2022 FINISHED (18-01-22) 382021360419
1/15/2022 FINISHED (18-01-22) 382021386280
1/15/2022 FINISHED (18-01-22) 382021352018
1/15/2022 FINISHED (18-01-22) 382021386370
1/15/2022 FINISHED (18-01-22) 382021386385
1/15/2022 FINISHED (18-01-22) 382021387306
1/15/2022 FINISHED (18-01-22) 29852413119
1/15/2022 FINISHED (18-01-22) 28052421911
1/15/2022 ABSENT 28158602538
1/15/2022 FINISHED (18-01-22) 29535626512
1/15/2022 FINISHED (18-01-22) 28835680569
1/15/2022 FINISHED (18-01-22) 27752414174
1/15/2022 FINISHED (18-01-22) 29035639295
1/15/2022 FINISHED (18-01-22) 28905006764
2/6/2022
2/6/2022
4/4/2022 applied
List of TECHNOLAX- NGL HSE INDUCTION Details.
Sl.no Name of the Employee Designation
1 SHYAM KISHORE YADAV CARPENTER
2 MOHAMMAD FARIDUL ISALAM CARPENTER
3 KAMAL UDDIN GOLAM SHARIF CARPENTER
4 MD ANWAR HUSAEN RIUJ CARPENTER
5 NURUL AMIN CARPENTER
6 YAGYA BAHADUR MASON
7 GURBAK SINGH JAWALA SINGH MT OPERATOR
8 PRAMJIT SINGH WHEEL EXC OPERATOR
9 EJAJ AHAMMAD MUSALMAN MINI EXC OPERATOR
10 ANAS ALI ABDUL ALI MASON
11 IMAM HOSSAIN HAMIDUL HOQUE CARPENTER
12 MOHAMMAD AMIR HOSSEN CARPENTER
13 MD TARAJUL ISLAM MONDOL CARPENTER
14 PANNE LAL KHATIK MASON
15 SHINGA BAHADUR HELPER
16 SHEIKH ISTEKHAR HELPER
17 JAGVEER SINGH KAIRA HARDEEP DRIVER
18 JAGDEEP SINGH AVTAR DRIVER
19 SANTOSE RAJARAM CARPENTER
20 VIKRAM BAHADUR CARPENTER
21 BHAGAWANT CHAMAR CARPENTER
22 BHUPENDRA BHDHATHOKI CARPENTER
23 JITEDRA KALWAR CARPENTER
24 NABARAJ BHUJEL CARPENTER
25 TEK BAHADUR CARPENTER
26 SANTA BAHADUR CARPENTER
27 GURWINDER SINGH CARPENTER
28 GURINDER SINGH JARNAIL SINGH DUMP TRUCK
29 JAGJEET SINGH SUKHDEV SINGH DUMP TRUCK
30 Rahim Dad CARPENTER
31 Mohammad Hamza CARPENTER
32 Aurangzeb Khan CARPENTER
33 Rajesh Kumar CARPENTER
34 Arun Kumar Mukhiya CARPENTER
35 Santo Mukhiya CARPENTER
36 Gagandev Raut CARPENTER
37 Dinesh Kumar Yadav CARPENTER
38 Chandeshwar Kumar Yadav CARPENTER
39 Meikandan CARPENTER
40 Ram Bachan Chai CARPENTER
41 Faiyaz Alam CARPENTER
42 MD Sabir Maqsood Alam CARPENTER
43 Mohammad Istkhar CARPENTER
44 Amrik chand EXCAVATOR OPE
45 Fahad shah DRIVER
46 Kulbir Singh Malkit Singh CARPENTER
47 Ravi Kumar lal EXCAVATOR OPE
48 Taj Muhammad Taza Khan CARPENTER
49 Wajid Ali CARPENTER
50 Rafeek Puthiyamaliyekkal Driver
51 Mani Kapad Carpentor
52 Raj Kishor Hajari Carpentor
53 Yogya bahadur Carpentor
54 Nasim khan Carpentor
55 Tej prasad chamlagain Carpentor
56 Taj Muhammad Taza Khan CARPENTER
57 Wajid Ali CARPENTER
58 Rajesh Kumar CARPENTER
ON SCHEDULE
Applied date
2/22/2022 wating for schedule
2/22/2022 wating for schedule
2/22/2022 wating for schedule
2/22/2022 wating for schedule
2/22/2022 wating for schedule
2/22/2022 wating for schedule
Have
CTION LIST
3/6/2022 already finished
3/6/2022 already finished
3/6/2022 waiting for schedule
3/6/2022 waiting for schedule
docs need h2s,pspt,qid,photo
4/4/2022 18-04-22
CONFINED SPACE
1 MURSHID ALAM 27105004279 carpenter
IMAM HOSSAIN HAMIDUL
2 29605008360 steelfixer
HOQUE
3 NABARAJ BHUJEL 29152429961 mason
4 VIKRAM BAHADUR 29335634248 steelfixer
5 RAHIM DAD 27358604026 carpenter
6 MOHAMMAD HAMZA 30258602124 carpenter
7 RAJESH KUMAR 29552424000 carpenter
8 ARUN KUMAR MUKHIYA 30152402262 mason
9 SANTO MUKHIYA 29952411377 mason
10 WAJID ALI 28758608536 mason
11 AURANGZED KHAN 28958607922 mason
12 DEVI KUMAR KAMAIT 28652452156 steelfixer
13 SANEHI CHAMER 28752456543 steelfixer
14 YOG BAHADUR DARLAMI 28452446274 steelfixer
15 MITHLESH KUMAR 30052407619 carpenter
16 BIJOY BISWAS 294050148789 steelfixer
17 RAJAN KUMAR RAY 28452449997 mason
18 RAJENDRA PRASAD 27752426751 mason
19 Billal mia 28905020252 carpenter
20 Shatrughan Mahato 27735648569 steelfixer
21 Anjit Kumar Gupta 29535626512 carpenter
22 Rajan kumar Bitthal 29635616845 steelfixer
23 Dharmesh Kumar Das 29852407463 carpenter
24 Thaman singh Thapa 26952405790 steelfixer
25 Manoj Yadav 28252446680 mason
26 Nasim Khan 27952434902 mason
27 Ghanshyam chamar 30052402843 carpenter
28 Lean Mia 28805014699 carpenter
29 Nasim akhtan Momin 27952434902 steelfixer
30 Prem Tamang 29752424103 mason
31 Taj mohammad 28658608219 mason
32 Arokia sibin derans 29735621017 supervisor
33 Lajbar khan muhammad akbar 29458607315 supervisor
34 Sahaya jekin christin Visa (382021478447) supervisor
REQUIRED DOCUMENTS FOR LABORS/STAFFS
Contach Num
44600350
66023718
55919827
66714209
50867725
55492322
55826583
33402818
50163359
30152485
74011847/33054432
55869819
2/4/2022
TECHNOLAX TRADIND & CONTRACTING
PENDING WORKS:
1 VINOTH - NOC
2 TTC - DRIVER 2NOS & SUPERVISOR 2NOS (HIRE)
3 HEAD OFZ & STORE MATERIALS - TRACKING & MONITERING
4 HSE OFFICER -ROTARY SITE (HIRE)
5 SALES EXECUTIVE - OFFICE (HIRE)
6 FOLLOW SHAFEEK FOR NEW VISA (100 visa)
7 HEAD OFFICE - KARAMA BILL
8 BALADYA- PICKUP CANCEL - thru prasad
9 PRESENTATION- TTC PROFILE (new workers)
TECHNOLAX TRADIND & CONTRACTING
1 No of Projects 26
2 Total Man hours 1,652,400
3 Lost Time Incident (LTI) 0
4 Fatalities 0
5 Safe Man- Hours since Last LTI 1,652,400
6 Highest Manhour Achieved without LTI 1,652,400
7 Peak Manpower ( Day basics ) 260
8 Near Misses 4
9 Incidents 2
10 HSE Inductions 610
11 Safety Trainings 64