Occupational Code: EIS HNS 4

Project Information
Given the necessary tools, equipment and information, you are expected to
perform the following Three practical projects.
The assessor should ask oral questions on which s/he is not satisfied by
yours performance
Assessment Venue: Well Equipped Assessment Centre or real work place
Total Time Allotted for all Projects: 6:00hrs

Project I: Build Internet Infrastructure and Migrate to new Technology.


Total time for the project: 3:40hrs

Competences Covered:-
1. EIS HNS4 03 0811 Build Internet Infrastructure
2. EIS HNS4 04 0811 Migrate to New Technology

Instruction: - Under this project you are expected to perform the following
three tasks based on the information provided:-

Task 1: Set up Client-Server network and configure internet


Time Allotted: - 1:30hrs

Instruction: - Under this task you are to have three computers and the
necessary software so expected perform the following
activities based on the information provided:-

 Set up Client-Server network (Hint: Start from clear installation of


each PC, Use domain name ict.gov and configure internet
connection to all Pcs).

Task 2: Manage Users and Group


Time Allotted: - 0:50 hrs

Candidate’s Package for Hardware and Network Servicing Level IV


(Qualification Based)
Occupational Code: EIS HNS 4

Instruction: - Under this task you are expected to perform the following
activities tasks based on the information provided:-
 Create three organizational units(OU) named by Developer ,
Support and Analyst
 Create three groups named by Principal, Senior and Junior.
 Create four users named Seifu, Tina, Ahmed and Feven.
 Add Seifu and Tina to the group Principal.
 Add Ahmed and Seifu to the group Senior.
 Add Feven to the group Junior.
 Add the group Principal to Developer OU.
 Add the group Junior to Support OU.
 Add the group Senior to Analyst OU.

Task 3: Install and Upgrade Software

Time Allotted: - 1:20 hrs

Instruction: - Under this task you are expected to perform the following
activities tasks based on the information provided:-

 Install Microsoft office word 2007 and Microsoft office Visio 2007 on
client 1 pc
 Upgrade Client 2 to windows 8.1.
 Write the new features you analyse in windows 8.1 comparing with
windows 7 and save using notepad on Client 2.

Project II: Design company network and Internet Infrastructure


Total time for this project: 1:20hrs

Competences Covered:-
1. EIS HNS4 01 0811 Plan and Organize Work
2. EIS HNS4 02 0811 Assist with Policy Development for Client Support
3. EIS HNS4 03 0811 Build Internet Infrastructure

Candidate’s Package for Hardware and Network Servicing Level IV


(Qualification Based)
Occupational Code: EIS HNS 4

In this project you are required to design Company Network and Internet
Infrastructure for PARROT Plc.
The company is expandable and dedicated for Importing and Distribution of
drugs and medical equipments for resellers using Company’s Application
Software, it has 5 departments: Sales, Maintenance, HRM, Public Relation
and Marketing.
The Company has two buildings, G+2 and G+3 in a compound with a distance
of 30m between them. Each building has 25 users in each floor including the
ground.

The Company wants to implement centralized network infrastructure that


include:
1. Resource Sharing between different departments
2. 10 MB internet connection for the whole employees
3. Company Mailing System
4. System Security

Instruction: - Under this project you are expected to perform the following
two tasks based on the information provided:-

Task1. Identify the basic resources required to implement this project

Time Allotted: - 0:25 hrs

Instruction: - Under this task you are expected to perform the following
activities tasks based on the information provided:-

 Identify Hardware needed to built the infrastructure


 Identify Software needed to built the infrastructure
 Identify Type of internet connectivity needed to built the
infrastructure

Candidate’s Package for Hardware and Network Servicing Level IV


(Qualification Based)
Occupational Code: EIS HNS 4

Task2. Design the infrastructure of network using Microsoft office Visio


2007
Time allotted: 0:55 min

Instruction: -Under this task, you should prepare logical design for the
infrastructure using Microsoft Visio 2007 that considers:
 Appropriate network devices
 Suitable type of cable to be used.
 Internet connectivity

Project III. Prepare Service Level Agreement

Total time for this project: 1:00hrs

Competences Covered:-
1. EIS HNS4 05 0811 Determine Maintenance Strategy
2. EIS HNS4 06 0811 Establish Quality Standards

XY Company needs annual maintenance service for all PCs. The company
posts the announcement for interested bidders.

Instruction: - Under this project you are expected to perform the following
two tasks based on the information provided:-

Task1. Prepare SLA of XY Company using Microsoft Word.


Time Allotted: - 0:35 hrs

Instruction: - Under this task you assume as an ICT Solution provider PLC
who wins the bid and expected to prepare SLA of XY Company using
Microsoft Word. (Hint: - Use the following points to prepare the SLA)

Candidate’s Package for Hardware and Network Servicing Level IV


(Qualification Based)
Occupational Code: EIS HNS 4

 Objective of the Service


 Service provider’s responsibilities:
 Customer responsibilities:
 Service Measurement
 Modification and review of the agreement:

Task2. Prepare a format that monitors the quality of maintained


computer and network.

Time Allotted: - 0:25 hrs

Instruction: - Under this task you assume as a technician of XY Company


and invited to monitor the quality of maintained computer and
network so you are expected to prepare a format that helps to
monitor using Microsoft Word

Candidate’s Package for Hardware and Network Servicing Level IV


(Qualification Based)
Occupational Code: EIS HNS 4

Materials and supplies per candidate

No Item description Quantity unit Specification

1 Windows Server 2008 R2 1 DVD 32/64 bit


2 Windows 8.1 1 DVD
3 Windows 7 1 DVD 32/64 bit
4 MS Office 2007 1 CD
5 MS Visio 2007 1 CD
6 Driver Software 1 DVD
7 Broadband Internet connection Good performance

Tools, Instruments & Equipment

No Item description Quantity unit Specification

1 Client Computer 2 Pcs 1GHz Processor


1GBB RAM
80 GB HDD

2 Server Computer 1 Pcs 2GHz Processor


2GB RAM
80 GB HDD

Note: Materials and tools may be modified by the Assessor, depending on the
actual job performed, and location & the standard installation practices of the
country.

Candidate’s Package for Hardware and Network Servicing Level IV