Professional Documents
Culture Documents
216-05 - Control of Quality Records
216-05 - Control of Quality Records
216-05 - Control of Quality Records
CONTENTS
1. PURPOSE....................................................................................................................
2. SCOPE.........................................................................................................................
3. REFERENCES............................................................................................................
4. DEFINITIONS............................................................................................................
5. RESPONSIBILITIES..................................................................................................
6. INSTRUCTIONS........................................................................................................
1 PURPOSE
The purpose of this procedure is to establish and maintain a system for the provision of
quality records to demonstrate that contract requirements have been met and that
the Company Quality System has been properly applied.
2 SCOPE
This procedure relates to quality records originated by departments and projects and those
obtained from Client, approving authorities, suppliers and subcontractors.
Such quality records include those retained by the Company and those submitted to the
Client and third parties as required by a contract.
This procedure shall apply in addition to any specific Client requirements regarding
quality records.
3 REFERENCES
Management Documents
4 DEFINITIONS
Quality Records - records demonstrating that contract requirements have been met and
that the Company Quality System has been applied.
5 RESPONSIBILITIES
6 INSTRUCTIONS
General
Records of this type generated by the New Delhi Execution Unit shall be
sent to the Project QA Manager for review and retention.
Records of this type generated by the New Delhi Execution Unit shall be
sent to the Project Engineering Manager for review and retention.
The Project Manager shall identify, by a project procedure, the quality records
that shall be maintained by each project using as guidance the Procedures
listed in Section 3.0 above, including the provisions of QAP-204 and
QAP-205.
The project procedure shall state the archiving, retention and security
requirements for quality records including those stored on computer
magnetic media (e.g.: tapes and diskettes) and shall prescribe adequate
back-up and integrity of the storage facilities. Such quality records
include those relating to CAD, micro, mini, mainframe and word
processing systems.
The project quality records shall include those pertaining to suppliers and
subcontractors and shall meet the applicable requirements in section 6.1
above.
The Project Functional Managers shall compile and maintain the quality records
as called for in project procedures and shall ensure that they meet the
requirements listed in Section 6.1 above.
If detailed design for the project is being performed in the New Delhi
Execution Unit, then the responsible engineers in that office shall compile
and maintain the quality records. Where required by the project
procedures such records shall be sent to the project management office for
review and comment/approval.
During the contract period and on completion, project quality records shall be
provided to the Client and/or third parties in accordance with the contract
requirements.
The Project Engineering Manager shall ensure quality records, including any
originating in New Delhi Execution Unit, are collected, sorted and sent for
retention in accordance with GOP 7EG 011.
The Manager of the Quality Assurance shall compile the records of quality audits
of the Company quality system.
The Quality Assurance Manager for the New Delhi Execution Unit shall
perform a similar analysis and copy the results to the Manager of Quality
Assurance.
The Manager of Quality Assurance shall coordinate the analysis of project and
departmental quality records for input to the review of the Company Quality
System.
Quality records shall be stored in accordance with GPP 7EG 109, and the project
specific requirements defined in Section 6.2 above. Engineering quality
records shall be stored in accordance with GPP 7EG 011 and Construction
records in accordance with GPP 7EG 601.
The quality records shall be stored and indexed in a manner that prevents
deterioration and enables ready retrieval. Archiving of Project quality
records shall be in accordance with GPP 7EG 117.